<iati-activities version="2.03" generated-datetime="2026-10-25T20:58:51"><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T00:13:13" hierarchy="1"><iati-identifier>44000-P089297</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Rural Development Program</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To increase access of rural households to high priority, small-scale economic and social infrastructure, agriculture and financial services.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The Objective of the Solomon Islands Rural Development Program (RDP) would be to raise the living standards of rural households by establishing improved mechanisms for the delivery of priority economic and social infrastructure and services by the public and the private sector. The project consists of three components with the first being the delivery of local infrastructure and services. The specific objective of this component is to increase access to and use o f infrastructure and services in rural areas through participatory planning, budgeting and execution mechanisms at community and provincial level. The second component involves improving the agricultural services. The specific objective of this component is to improve access of smallholder households to quality agricultural services to support rural income growth. The final component consists of rural business development. This would facilitate rural enterprise development through provision of an equity financing facility and associated training and technical assistance.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SB–P0000696"><narrative>Ministry of Finance &amp; Treasury</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SB–P0000696"><narrative>Ministry of Finance &amp; Treasury</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SB-COA-0000694"><narrative>Ministry Development Planning and Aid Coordination</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2006-12-15"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2007-09-11"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2015-02-28"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2015-02-28"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Erik Caldwell Johnson</narrative></person-name><telephone>+1-202-473-1000</telephone><email>ejohnson1@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>







<recipient-country code="SB" percentage="100"><narrative xml:lang="en">SOLOMON ISLANDS</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002101556" />
            <name><narrative> Western Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8 157</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002106552" />
            <name><narrative> Malaita Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9 161</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002108831" />
            <name><narrative>Guadalcanal Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.6333303 160.2</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002109308" />
            <name><narrative>Dadale</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.1166697 159.11667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002178472" />
            <name><narrative> Temotu Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.72754 165.93884</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002178730" />
            <name><narrative>Makira-Ulawa Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.55751 161.78517</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007280292" />
            <name><narrative> Choiseul</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-6.9918599 156.86279</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002105020" />
            <name><narrative>Nggumu</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.0571604 160.20888</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="31120" percentage="36" xml:lang="en"/><sector vocabulary="1" code="31130" percentage="13" xml:lang="en"/><sector vocabulary="1" code="43040" percentage="51" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TZ" percentage="9.00000000" xml:lang="en"><narrative>FY17 - Other Transportation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="34.0000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="16.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AB" percentage="19.0000000" xml:lang="en"><narrative>FY17 - Agricultural Extension, Research, and Other Support Activities</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YA" percentage="22.0000000" xml:lang="en"><narrative>FY17 - Agricultural markets, commercialization and agri-business</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000243" percentage="10" xml:lang="en"><narrative>MSME Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="100" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000721" percentage="10" xml:lang="en"><narrative>Rural Markets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000722" percentage="20" xml:lang="en"><narrative>Rural Non-farm Income Generation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="70" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000323" percentage="10" xml:lang="en"><narrative>MSME Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000032" percentage="10" xml:lang="en"><narrative>Financial Infrastructure and Access</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="10" xml:lang="en"><narrative>Finance for Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="70" xml:lang="en"><narrative>Rural Development</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">77777.78</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">77777.78</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">77777.77</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">77777.78</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">77777.78</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">77777.78</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">77777.78</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">77777.78</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">77777.77</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">40000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">40000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">40000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">40000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">40000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">40000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">40000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">40000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">40000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">40000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">40000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">40000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">57500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">57500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">57500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">57500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">57500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">57500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">57500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">57500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">57500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">57500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">57500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">57500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">56666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">56666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">56666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">56666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">56666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">56666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">56666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">56666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">56666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">56666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">56666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">56666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">41666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">41666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">41666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">41666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">41666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">41666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">41666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">41666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">41666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">41666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">41666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">41666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">16666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">16666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">16666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">16666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">16666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">16666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">16666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">16666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">16666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2007-09-30"/><value value-date="2007-09-30">3200000</value><description xml:lang="en"><narrative>Total Commitment in September Month of 2007</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2010-10-31"/><value value-date="2010-10-31">3000000</value><description xml:lang="en"><narrative>Total Commitment in October Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">-1792</value><description xml:lang="en"><narrative>Total Commitment Cancellations in December Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">3000000</value><description xml:lang="en"><narrative>Total Commitment in September Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">-1162</value><description xml:lang="en"><narrative>Total Commitment Cancellations in July Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">-1366</value><description xml:lang="en"><narrative>Total Commitment Cancellations in July Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-02-29"/><value value-date="2008-02-29">291000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2008</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-03-31"/><value value-date="2008-03-31">200000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-08-31"/><value value-date="2008-08-31">38126</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-09-30"/><value value-date="2008-09-30">30867</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-10-31"/><value value-date="2008-10-31">31572</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-12-31"/><value value-date="2008-12-31">73739</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-01-31"/><value value-date="2009-01-31">13531</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-02-28"/><value value-date="2009-02-28">19174</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-03-31"/><value value-date="2009-03-31">30026</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-04-30"/><value value-date="2009-04-30">25495</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-05-31"/><value value-date="2009-05-31">80846</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-06-30"/><value value-date="2009-06-30">44897</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-07-31"/><value value-date="2009-07-31">148117</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-08-31"/><value value-date="2009-08-31">46204</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-09-30"/><value value-date="2009-09-30">54967</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-10-31"/><value value-date="2009-10-31">31967</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-11-30"/><value value-date="2009-11-30">73050</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-12-31"/><value value-date="2009-12-31">117029</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-01-31"/><value value-date="2010-01-31">-159442</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-10-31"/><value value-date="2010-10-31">-200000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-11-30"/><value value-date="2010-11-30">-400112</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-12-31"/><value value-date="2010-12-31">272321</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-01-31"/><value value-date="2011-01-31">309752</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-02-28"/><value value-date="2011-02-28">120556</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-03-31"/><value value-date="2011-03-31">145823</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-04-30"/><value value-date="2011-04-30">157234</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-05-31"/><value value-date="2011-05-31">183704</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-06-30"/><value value-date="2011-06-30">104743</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-07-31"/><value value-date="2011-07-31">114360</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-08-31"/><value value-date="2011-08-31">194795</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-09-30"/><value value-date="2011-09-30">245921</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-10-31"/><value value-date="2011-10-31">12525</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-11-30"/><value value-date="2011-11-30">188053</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-12-31"/><value value-date="2011-12-31">346474</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-01-31"/><value value-date="2012-01-31">335921</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-02-29"/><value value-date="2012-02-29">65839</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">29678</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-04-30"/><value value-date="2012-04-30">230106</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-04-30"/><value value-date="2012-04-30">1696320</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">157548</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-06-30"/><value value-date="2012-06-30">502569</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-07-31"/><value value-date="2012-07-31">215677</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-08-31"/><value value-date="2012-08-31">55887</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">55902</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">7524</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">81345</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">48300</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-07-31"/><value value-date="2013-07-31">291785</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">8799</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">547200</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">724775</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">348293</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">202895</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">244133</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-07-31"/><value value-date="2014-07-31">440376</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">278196</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">277066</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">7084</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-694"><narrative>Ministry Development Planning and Aid Coordination; Ministry of Agriculture and Livestock Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P089297"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P089297?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P089297"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries that feel project investments reflected their needs (percentage)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2015-02-28" />
<target value="80.00">

</target>
<actual value="93.90">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average number of jobs created per SEF-supported business
</narrative></title>
<baseline year="2007" iso-date="2007-12-21" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-21" />
<period-end iso-date="2015-02-28" />
<target value="5.00">

</target>
<actual value="6.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of wards in participating provinces to whom agricultural services have been provided
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2015-02-28" />
<target value="90.00">

</target>
<actual value="79.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Component 4: Audits completed and submitted on time.
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2015-02-28" />
<target value="6">

</target>
<actual value="1">
<comment><narrative>
This number is revised to reflect the fact that while previous audits were completed, they were not on time. Only the 2013 auditwas submitted before the due date.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries who feel that the project investments reflected their needs
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2015-02-28" />
<target value="80.00">

</target>
<actual value="93.90">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries that feel project investments reflected their needs (percentage)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2015-02-28" />
<target value="80.00">

</target>
<actual value="93.90">
<comment><narrative>
This is based on a household survey conducted in the four provinces included in the baseline survey. Supplemental data is notavailable as the data is only a sample of households.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Component 3: Number of SEF-supported businesses established or expanding in rural areas.
</narrative></title>
<baseline year="2007" iso-date="2007-12-21" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-21" />
<period-end iso-date="2015-02-28" />
<target value="50">

</target>
<actual value="58">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Component 3: Number of SEF-supported businesses established or expanding in rural areas.
</narrative></title>
<baseline year="2007" iso-date="2007-12-21" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-21" />
<period-end iso-date="2015-02-28" />
<target value="50">

</target>
<actual value="">
<comment><narrative>
Exceeds target. Includes 65 grants (some businesses received more than one grant). Private sector financing leveraged as a resultof the grants was about six times the value of the grants themselves.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage increase in villages with satisfactory access to infrastructure and/or services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2015-02-28" />
<target value="10%">

</target>
<actual value="">
<comment><narrative>
The increase in levels of satisfaction  was far higher than expected. Village satisfaction went from a baseline of 34.2% to 65.8%for a basket of services that are most commonly funded by RDP including  water, health, education and electricity. It is likelythat support from sources other than RDP contributed to this outcome.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Component 4: Audits completed and submitted on time.
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2015-02-28" />
<target value="6">

</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Component 1: Number of infrastructure sub projects completed
</narrative></title>
<baseline year="2007" iso-date="2007-12-21" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-21" />
<period-end iso-date="2015-02-28" />
<target value="370">

</target>
<actual value="303">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Component 4: Annual work plan and budget approved and delivered on time
</narrative></title>
<baseline year="2009" iso-date="2009-08-31" value="1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-08-31" />
<period-end iso-date="2015-02-28" />
<target value="7">

</target>
<actual value="7">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries who feel that the project investments reflected their needs
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2015-02-28" />
<target value="80.00">

</target>
<actual value="93.90">
<comment><narrative>
Household survey of four provinces included in the baseline survey. This was a new question in the follow-up survey, asking surveyrespondents to reflect on the investments which RDP made in their communities.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Technologies demonstrated in the project areas (number)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2015-02-28" />
<target value="50.00">
<comment><narrative>
Unique technologies or packages of interdependent technologies.
</narrative></comment>
</target>
<actual value="0.00">
<comment><narrative>
This indicator was added at the time of restructuring in September 2013. Data is still being collected and will be reported in thenext ISR.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Component 4: Annual work plan and budget approved and delivered on time
</narrative></title>
<baseline year="2009" iso-date="2009-08-31" value="1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-08-31" />
<period-end iso-date="2015-02-28" />
<target value="7">

</target>
<actual value="">
<comment><narrative>
2014 Budget also includes 2015 activities as the project will only operate for two months in 2015.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Component 1: Number of infrastructure sub projects completed
</narrative></title>
<baseline year="2007" iso-date="2007-12-21" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-21" />
<period-end iso-date="2015-02-28" />
<target value="370">
<comment><narrative>
Recent project restructuring reduced this amount from 496 to 370.
</narrative></comment>
</target>
<actual value="157">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Component 1: Percentage of housholds in target planning units participating in infrastructure projects decision making
</narrative></title>
<baseline year="2009" iso-date="2009-08-31" value="11.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-08-31" />
<period-end iso-date="2015-02-28" />
<target value="80.00">

</target>
<actual value="47.90">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of completed community infrastructure subprojects
</narrative></title>
<baseline year="2007" iso-date="2007-12-21" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-21" />
<period-end iso-date="2015-02-28" />
<target value="300000.00">

</target>
<actual value="207579.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of households who have changed agricultural practices, including varieties, as a result of agricultural advice
</narrative></title>
<baseline year="2009" iso-date="2009-08-31" value="2.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-08-31" />
<period-end iso-date="2015-02-28" />
<target value="35.00">

</target>
<actual value="11.20">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of wards in participating provinces to whom agricultural services have been provided
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2015-02-28" />
<target value="90.00">

</target>
<actual value="79.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average number of jobs created per SEF-supported business
</narrative></title>
<baseline year="2007" iso-date="2007-12-21" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-21" />
<period-end iso-date="2015-02-28" />
<target value="5.00">

</target>
<actual value="6.00">
<comment><narrative>
About 350 new jobs created in 58 SEF-supported businesses.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of households who have changed agricultural practices, including varieties, as a result of agricultural advice
</narrative></title>
<baseline year="2009" iso-date="2009-08-31" value="2.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-08-31" />
<period-end iso-date="2015-02-28" />
<target value="35.00">

</target>
<actual value="11.20">
<comment><narrative>
Since there will be no further surveys to assess progress against the baseline, this is the final result. While the  percentage ofhouseholds surveyed that both received agricultural advice and changed farming practices did not reach the target of 35%, it didincrease five-fold from 2% to 11%. However, more impressively, the proportion of households that changed practices as a result ofreceiving advice is nearly 50%. More than 60% of households that received advice were satisfied with the advice.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage decrease in travel time to access improved water supply sources.
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2015-02-28" />
<target value="10.00">
<comment><narrative>
This target has been met.
</narrative></comment>
</target>
<actual value="13.50">
<comment><narrative>
Results are based on a household survey of completed projects in villages in the four provinces covered in the baseline survey.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Component 4: Procurement plan implementation on target
</narrative></title>
<baseline year="2009" iso-date="2009-08-31" value="20.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-08-31" />
<period-end iso-date="2015-02-28" />
<target value="90.00">

</target>
<actual value="90.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of completed community infrastructure subprojects
</narrative></title>
<baseline year="2007" iso-date="2007-12-21" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-21" />
<period-end iso-date="2015-02-28" />
<target value="300000.00">

</target>
<actual value="112673.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Component 2: Percentage of villages in the participating provinces to whom agricultural services have been provided
</narrative></title>
<baseline year="2009" iso-date="2009-08-31" value="1.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-08-31" />
<period-end iso-date="2015-02-28" />
<target value="50.00">

</target>
<actual value="49.00">
<comment><narrative>
Since this is the last time this data will be collected by survey, increases that may happen as a result of activity over the lastyear of the project will not be captured. Nonetheless, the result is already only one percentage point short of the target.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Component 1: Percentage of housholds in target planning units participating in infrastructure projects decision making
</narrative></title>
<baseline year="2009" iso-date="2009-08-31" value="11.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-08-31" />
<period-end iso-date="2015-02-28" />
<target value="80.00">

</target>
<actual value="47.90">
<comment><narrative>
Since there will be no further surveys, this is the final value for this measure. The target of 80% appears to have been overlyambitious as nearly 50% of household participation is still a strong indication of community engagement.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Component 2: Percentage of villages in the participating provinces to whom agricultural services have been provided
</narrative></title>
<baseline year="2009" iso-date="2009-08-31" value="1.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-08-31" />
<period-end iso-date="2015-02-28" />
<target value="50.00">

</target>
<actual value="49.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage increase in villages with satisfactory access to infrastructure and/or services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2015-02-28" />
<target value="10%">

</target>
<actual value="92">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage decrease in travel time to access improved water supply sources.
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2015-02-28" />
<target value="10.00">

</target>
<actual value="13.50">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Component 4: Procurement plan implementation on target
</narrative></title>
<baseline year="2009" iso-date="2009-08-31" value="20.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-08-31" />
<period-end iso-date="2015-02-28" />
<target value="90.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Technologies demonstrated in the project areas (number)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2015-02-28" />
<target value="50.00">

</target>
<actual value="60.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T00:13:13" hierarchy="1"><iati-identifier>44000-P100311</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Solomon Islands Sustainable Energy</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The objective of the project is to improve operational efficiency, system reliability and financial sustainability of SIEA.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Sustainable Energy Project for Solomon Islands is to improve operational efficiency, system reliability and financial sustainability of Solomon Islands Electricity Authority (SIEA) through: improved financial and operational management, reduction of losses, and increased revenue collection. The project consist of the following three components: (i) strengthen management, which consist of engagement of two professional utility line managers (a general manager with a technical background and a commercialization manager) and an overseas director to the Board, training of key management staff; (ii) financial operations, which consist of implementation of a commercialization program for the finance department, including new financial management and billing systems and preparation and implementation of a new finance accounting manual with a staff training program; and (iii) technical operations, implementation of a loss reduction program, a planned maintenance program for generation facilities in Honiara, and a distribution reinforcement program to increase the availability of existing generation and improve system reliability. Technical project implementation support to SIEA will also be provided, with consultancy services, a technical training program for engineering staff, and establishment of a partnership with the Fiji Electricity Authority.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SB–P0001328"><narrative>Ministry of Finance and Treasury</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SB–P0001328"><narrative>Ministry of Finance and Treasury</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SB-COA-0001329"><narrative>Solomon Islands Electricity Authority</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2007-07-12"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2008-07-08"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2019-03-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2019-03-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Mits Motohashi</narrative></person-name><telephone>+1-202-473-1000</telephone><email>mmotohashi@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="SB" percentage="100"><narrative xml:lang="en">SOLOMON ISLANDS</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002108831" />
            <name><narrative>Guadalcanal Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.6333303 160.2</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002103350" />
            <name><narrative>Solomon Islands</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8 159</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002104533" />
            <name><narrative>Panatina</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.4321499 160.00607</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002108502" />
            <name><narrative>Honiara</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.4333296 159.95</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="23111" percentage="100" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LZ" percentage="100.000000" xml:lang="en"><narrative>FY17 - Other Energy and Extractives</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000712" percentage="67" xml:lang="en"><narrative>Services and Housing for the Poor</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="67" xml:lang="en"><narrative>Urban Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="33" xml:lang="en"><narrative>Public Administration</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">61164.32</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">61164.32</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">61164.32</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">50000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">50000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">50000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">50000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">50000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">50000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">61164.32</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">61164.32</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">61164.32</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">71358.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">71358.38</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">71358.38</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">71358.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">71358.38</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">71358.38</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">91746.49</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">91746.49</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">91746.49</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">81552.43</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">81552.43</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">81552.44</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">91746.49</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">91746.49</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">91746.49</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">81552.43</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">81552.43</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">81552.44</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">66666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">66666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">66666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2008-07-31"/><value value-date="2008-07-31">4000000</value><description xml:lang="en"><narrative>Total Commitment in July Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">2000000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">11000000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-106</value><description xml:lang="en"><narrative>Total Commitment Cancellations in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">-3302322</value><description xml:lang="en"><narrative>Total Commitment Cancellations in April Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-5478</value><description xml:lang="en"><narrative>Total Commitment Cancellations in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-955980</value><description xml:lang="en"><narrative>Total Commitment Cancellations in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-08-31"/><value value-date="2009-08-31">50000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-10-31"/><value value-date="2009-10-31">48463</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-11-30"/><value value-date="2009-11-30">16000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-12-31"/><value value-date="2009-12-31">50966</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-01-31"/><value value-date="2010-01-31">76690</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-02-28"/><value value-date="2010-02-28">86133</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-04-30"/><value value-date="2010-04-30">255640</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-05-31"/><value value-date="2010-05-31">146239</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-06-30"/><value value-date="2010-06-30">102854</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-08-31"/><value value-date="2010-08-31">73242</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-10-31"/><value value-date="2010-10-31">88715</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-11-30"/><value value-date="2010-11-30">97415</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-12-31"/><value value-date="2010-12-31">65165</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-03-31"/><value value-date="2011-03-31">157693</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-04-30"/><value value-date="2011-04-30">18500</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-05-31"/><value value-date="2011-05-31">99275</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-06-30"/><value value-date="2011-06-30">152795</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-08-31"/><value value-date="2011-08-31">73357</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-09-30"/><value value-date="2011-09-30">-73308</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-10-31"/><value value-date="2011-10-31">148405</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-11-30"/><value value-date="2011-11-30">90519</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-12-31"/><value value-date="2011-12-31">96766</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-02-29"/><value value-date="2012-02-29">51738</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">90316</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">70119</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-06-30"/><value value-date="2012-06-30">124775</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-08-31"/><value value-date="2012-08-31">61474</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-09-30"/><value value-date="2012-09-30">72626</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-10-31"/><value value-date="2012-10-31">18885</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">54000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-01-31"/><value value-date="2013-01-31">75297</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-02-28"/><value value-date="2013-02-28">41439</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">10547</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-04-30"/><value value-date="2013-04-30">53395</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">54000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">59165</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-07-31"/><value value-date="2013-07-31">151330</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">242700</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">81015</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">460179</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-02-28"/><value value-date="2014-02-28">86519</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">49900</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">-205984</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">12026</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-01-31"/><value value-date="2015-01-31">74516</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">100000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">20085</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">10017</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">15704</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">60186</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">38780</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-81</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">87936</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">551383</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">24631</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">108972</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">97356</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">46821</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">14222</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">267277</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">64755</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">97740</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">803505</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">420143</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">42399</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">102180</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">76706</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">536823</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">149406</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">488196</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">104935</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-07-31"/><value value-date="2018-07-31">248605</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-07-31"/><value value-date="2018-07-31">302957</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">158080</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">513138</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">78915</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">59236</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">224130</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">519600</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">21693</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">375326</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">448405</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">382178</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">268122</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">67580</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">14393</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-8915</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-5478</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-1493</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-3588</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-8239</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-12995</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-16037</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-21550</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-21835</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-22026</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-23049</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-22568</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-21873</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-20514</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-21089</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-20852</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-21095</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-20095</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-20116</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-23119</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-21171</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-57001</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-56291</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-58008</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-57366</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-1329"><narrative>Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P100311"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P100311?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P100311"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Feeder 12 load relocated from Lungga 11kV generation bus to East Honiara Substation
</narrative></title>
<baseline year="2014" iso-date="2014-02-13" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-02-13" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
System Average Interruption Duration Index (SAIDI)
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="51840.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2019-03-31" />
<target value="2000.00">
<comment><narrative>
&lt;p&amp;gt;Indicator was achieved with an achievement ratio of 112 percent.&amp;nbsp; SISEP&amp;#39;s financing of the system reliability component directly contributed towards achieving this indicator.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="1757.60">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Commissioning of 5MVA 33kV/11kV transformer and a second 33 kV switchboard at Ranadi
</narrative></title>
<baseline year="2014" iso-date="2014-02-13" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-02-13" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Works for commissioning of 5MVA 33kV/11kV transformer and a second 33 kV switchboard at Ranadi are complete.&amp;nbsp; SIEA is awaiting completion of works (not included in SISEP) for commissioning the plant&amp;nbsp; as it would be more cost-effective on a system-wide basis.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="N">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
System Average Interruption Frequency Index (SAIFI)
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="816.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2019-03-31" />
<target value="85.00">
<comment><narrative>
&lt;p&amp;gt;Indicator achieved with an achievement ratio of 179 percent.&amp;nbsp;&amp;nbsp;SISEP&amp;#39;s financing of the system reliability component directly contributed towards achieving this indicator.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="17.50">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
System losses
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="27.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2019-03-31" />
<target value="18.00">
<comment><narrative>
&lt;p&amp;gt;Indicator achieved at 104 percent.&amp;nbsp; System losses as measured by technical and non-technical losses demonstrated a steady decline through the project implementation period.&amp;nbsp; Losses had declined by 6 percentage points at the time Additional Finance was approved (from 27 percent at project start to 21 percent in 2014), and 17.3 percent at project close.&amp;nbsp; Project activities directly responded to the outcome of system loss reduction&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="17.30">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Commissioning of one 12MVA transformer at Lungga Power Station
</narrative></title>
<baseline year="2014" iso-date="2014-02-13" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-02-13" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Works for commissioning of the 12MVA transformer at Lungga Power Station are complete.&amp;nbsp; SIEA is awaiting completion of works (not included in SISEP) for commissioning the plant&amp;nbsp; as it would be more cost-effective on a system-wide basis.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="N">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Quarterly financial management reports, and rolling projections for SIEA performance within 14 days after end of each quarter
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Indicator was achieved at achievement ratio of 100 percent and can be directly attributed to project supported activities of strengthening management.&amp;nbsp; New management instituted new procedures and company rules which had a direct bearing on the production of quarterly financial management reports and projections within&amp;nbsp;14 days after the end of each quarter.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Kola'a Ridge 33/11kV substation commissioned with one 7.5MVA transformer
</narrative></title>
<baseline year="2014" iso-date="2014-02-13" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-02-13" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Works for commissioning of the 33/11kV substation at Kola&amp;#39;a Ridge&amp;nbsp;with one 7.5MVA&amp;nbsp;are complete.&amp;nbsp; SIEA is awaiting completion of works (not included in SISEP) for commissioning&amp;nbsp;as it would be more cost-effective on a system-wide basis.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="N">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average number of debtor days to collect billed revenue
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="360.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2019-03-31" />
<target value="35.00">
<comment><narrative>
&lt;p&amp;gt;Substantial improvement in average number of debtor days to collect billed revenue with an achievement ratio of 104 percent.&amp;nbsp; Project interventions, especially in areas of management strengthening,&amp;nbsp;are directly relevant in&amp;nbsp; achievement of this outcome.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="33.61">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Revenue per Kwh generated
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="SB$ 1.39/KWh"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2019-03-31" />
<target value="SB$ 4.5/KWH">
<comment><narrative>
&lt;p&amp;gt;Indicator achieved with an achievement ratio of 103 percent.&amp;nbsp; Achievement of this indicator can be directly attributed to SIEA&amp;#39;s commercialization program supported by SISEP.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="SB$ 4.64/KWh">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of days between due date of customer bill, and if not paid, notice of arrears
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="365.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Indicator achieved with an achievement ratio of 100 percent.&amp;nbsp; Customer is provided with a bill at the end of a billing period with a due date of 15 days after the billing period.&amp;nbsp; Included in the bill is a table indicating that the bill will be in arrears (called aged debts) 30 days after the billing period,&amp;nbsp;i.e., 15 days after the due date.&amp;nbsp; When the bill is in arrears (15 days after the due date), the customer is put on the disconnection list.&amp;nbsp; The bill indicates that no further notice is proided.&amp;nbsp; Therefore, notice that the bill would be in arrears is provided at the end of the billing cycle (0 days) and the customer has been given 15 days between the bill due date and being in arrears.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="15.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Net Profit before tax
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="Loss SB$ 44M"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2018-12-31" />
<target value="Profit SB$ 98M">

</target>
<actual value="SB$ 80.1M">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Collection ratio
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="72.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2019-03-31" />
<target value="70.00">
<comment><narrative>
&lt;p&amp;gt;The collection ratio indicator was deemed to contain significant methodological errors which precluded it from being a viable measure of improved collections and was therefore not included in the ICR&amp;#39;s analysis.&amp;nbsp; However, SIEA&amp;#39;s net profitability, an intermediate indicator in ISRs was deemed adequate to substantiate the PDO and was elevated to a PDO level indicator for purpose of this ICR&amp;#39;s assessment.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="60.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T00:13:13" hierarchy="1"><iati-identifier>44000-P113148</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>SB: Telecommunications and ICT Development Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Project aims to facilitate increased access to a wide variety of reliable and affordable telecommunications services for the majority of the Solomon Islands population through efficient and well-regulated competition.  The Project will support the development of a new regulatory institution#the Telecommunications Commission#designed to promote good governance in the sector. Further, through support for enabling infrastructure, the Project will pave the way for more widespread application of information communication technologies (ICT) supporting economic and social development, including greater opportunities for women.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The Telecommunications Technical Assistance Project aims to facilitate increased access to a wide variety of reliable and affordable telecommunications services for the majority of the Solomon Islands population through efficient and well-regulated competition. There are four components to the project, the first component being sector policy support. This component comprises technical assistance for the Ministry of Communications and Aviation (MCA), in consultation with other ministries and agencies as appropriate, to develop a policy capability for telecommunications, and Information and Communication Technologies (ICT) in a broader sense. The second component is the regulatory support. This component comprises operational support as well as advisory assistance and capacity-building for the telecommunications commission. The third component is the technical assistance for universal access. This component will likely commence after year three once the commercial rollout of telecommunications infrastructure and services is more clearly established. The program will be sustained through the use of the two percent universal access (UA) levy established under the act which will be activated after 2014. Finally, the fourth component is the project management.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SB–P0002578"><narrative>Ministry of Finance and Treasury</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SB-COA-0002577"><narrative>Telecommunications Commission</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2009-07-06"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2010-04-06"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2015-03-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2015-03-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Natasha Beschorner</narrative></person-name><telephone>+1-202-473-1000</telephone><email>nbeschorner@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="SB" percentage="100"><narrative xml:lang="en">SOLOMON ISLANDS</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002108502" />
            <name><narrative>Honiara</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.4333296 159.95</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="22010" percentage="17" xml:lang="en"/><sector vocabulary="1" code="22020" percentage="83" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="CF" percentage="100.000000" xml:lang="en"><narrative>FY17 - Public Administration - Information and Communications Technologies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000725" percentage="11" xml:lang="en"><narrative>Land Administration and Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000725" percentage="11" xml:lang="en"><narrative>Land Administration and Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="33" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000083" percentage="22" xml:lang="en"><narrative>Renewable Natural Resources Asset Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="22" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="22" xml:lang="en"><narrative>Jobs</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">106666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">106666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">106666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">50000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">50000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">50000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">33333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">33333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">33333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">66666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">66666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">66666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">66666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">66666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">66666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">100000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">100000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">100000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">50000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">50000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">50000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">33333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">33333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">33333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">33333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">33333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">33333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">66666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">66666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">66666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">50000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">50000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">50000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">50000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">50000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">50000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">50000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">50000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">50000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">33333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">33333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">33333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">33333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">33333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">33333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">43333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">43333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">43333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">106666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">106666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">106666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">36666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">36666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">36666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">36666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">36666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">36666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">36666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">36666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">36666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">106666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">106666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">106666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">50000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">50000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">50000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">33333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">33333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">33333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">66666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">66666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">66666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">66666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">66666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">66666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">100000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">100000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">100000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">50000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">50000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">50000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">33333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">33333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">33333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">33333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">33333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">33333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">66666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">66666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">66666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">50000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">50000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">50000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">50000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">50000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">50000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">50000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">50000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">50000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">33333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">33333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">33333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">33333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">33333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">33333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">43333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">43333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">43333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">46265.27</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">46265.27</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2010-04-30"/><value value-date="2010-04-30">3250000</value><description xml:lang="en"><narrative>Total Commitment in April Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2577"><narrative>Telecommunications Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">-46947</value><description xml:lang="en"><narrative>Total Commitment Cancellations in August Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2577"><narrative>Telecommunications Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-09-30"/><value value-date="2010-09-30">200000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2577"><narrative>Telecommunications Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-11-30"/><value value-date="2010-11-30">70099</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2577"><narrative>Telecommunications Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-02-28"/><value value-date="2011-02-28">57640</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2577"><narrative>Telecommunications Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-03-31"/><value value-date="2011-03-31">216000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2577"><narrative>Telecommunications Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-04-30"/><value value-date="2011-04-30">108478</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2577"><narrative>Telecommunications Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-06-30"/><value value-date="2011-06-30">248178</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2577"><narrative>Telecommunications Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-07-31"/><value value-date="2011-07-31">150698</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2577"><narrative>Telecommunications Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-08-31"/><value value-date="2011-08-31">132655</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2577"><narrative>Telecommunications Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-09-30"/><value value-date="2011-09-30">124875</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2577"><narrative>Telecommunications Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-10-31"/><value value-date="2011-10-31">63047</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2577"><narrative>Telecommunications Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-11-30"/><value value-date="2011-11-30">81373</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2577"><narrative>Telecommunications Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-12-31"/><value value-date="2011-12-31">46627</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2577"><narrative>Telecommunications Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-01-31"/><value value-date="2012-01-31">88672</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2577"><narrative>Telecommunications Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">74405</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2577"><narrative>Telecommunications Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">104904</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2577"><narrative>Telecommunications Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-07-31"/><value value-date="2012-07-31">113194</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2577"><narrative>Telecommunications Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-08-31"/><value value-date="2012-08-31">78025</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2577"><narrative>Telecommunications Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-10-31"/><value value-date="2012-10-31">53456</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2577"><narrative>Telecommunications Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">82221</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2577"><narrative>Telecommunications Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">104423</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2577"><narrative>Telecommunications Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">90756</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2577"><narrative>Telecommunications Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">62752</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2577"><narrative>Telecommunications Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-07-31"/><value value-date="2013-07-31">188378</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2577"><narrative>Telecommunications Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">79448</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2577"><narrative>Telecommunications Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">174334</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2577"><narrative>Telecommunications Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">112633</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2577"><narrative>Telecommunications Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">104631</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2577"><narrative>Telecommunications Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">165000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2577"><narrative>Telecommunications Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">-56358</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2577"><narrative>Telecommunications Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">120383</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2577"><narrative>Telecommunications Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">3265</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2577"><narrative>Telecommunications Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">-40458</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2577"><narrative>Telecommunications Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P113148"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P113148?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P113148"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Decrease in tariffs of key communications services
</narrative></title>
<baseline year="2010" iso-date="2010-03-04" value="February 2010 tariffs for local mobile calls; 
calls to Australia; &amp; 128kpbs Internet access"><comment><narrative>See sub indicators.</narrative></comment></baseline>
<period>
<period-start iso-date="2010-03-04" />
<period-end iso-date="2015-03-04" />
<target value="Reduced tariffs for stated
services">

</target>
<actual value="Reduced tariffs">
<comment><narrative>
Further reduction in tariffs for mobile and mobile Internet. Some increase in fixed Internet packages but for increased value ofservice (bandwidth, cap) so overall unit costs lower. Increased price complexity.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in teledensity
</narrative></title>
<baseline year="2010" iso-date="2010-03-04" value="8.00"><comment><narrative>Limited access to telephony.</narrative></comment></baseline>
<period>
<period-start iso-date="2010-03-04" />
<period-end iso-date="2015-03-04" />
<target value="40.00">

</target>
<actual value="60.00">
<comment><narrative>
Increasing network rollout to remoter islands.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Mobile 3 minute local call
</narrative></title>
<baseline year="2010" iso-date="2010-03-04" value="1.20"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-03-04" />
<period-end iso-date="1900-01-01"/>
<target value="1.08">
<comment><narrative>
Expected by YR3
</narrative></comment>
</target>
<actual value="0.13">
<comment><narrative>
The cost of a one minute local mobile call is US$0.13-US$0.27 per minute (STL-Bemobile=US$0.20, Bemobile-STL=US$0.22,STL-fixed=US$0.20, Bemobile-fixed=US$0.27, STL-STL=US$0.13 and Bemobile-Bemobile=US$0.18).
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Mobile 3 minute local call
</narrative></title>
<baseline year="2010" iso-date="2010-03-04" value="1.20"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-03-04" />
<period-end iso-date="1900-01-01"/>
<target value="1.08">
<comment><narrative>
Expected by YR3
</narrative></comment>
</target>
<actual value="0.13">
<comment><narrative>
The cost of a one minute local mobile call is US$0.13-US$0.27 per minute (STL-Bemobile=US$0.20, Bemobile-STL=US$0.22,STL-fixed=US$0.27, Bemobile-fixed=US$0.24, STL-STL=US$0.13 and Bemobile-Bemobile=US$0.18).
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
New ICT policy framework formulated and adopted
</narrative></title>
<baseline year="2010" iso-date="2010-03-04" value="Basic ICT policy"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-03-04" />
<period-end iso-date="2015-03-04" />
<target value="ICT policy framework and capacity in place">

</target>
<actual value="">
<comment><narrative>
ICT policy framework development in progress.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
New ICT policy framework formulated and adopted
</narrative></title>
<baseline year="2010" iso-date="2010-03-04" value="Basic ICT policy"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-03-04" />
<period-end iso-date="2015-03-04" />
<target value="ICT policy framework and capacity in place">

</target>
<actual value="Updated ICT policy pending. Capacity still limited.">
<comment><narrative>
ICT policy framework development in place.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Price of 3 minute international call (Australia)
</narrative></title>
<baseline year="2010" iso-date="2010-03-04" value="3.60"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-03-04" />
<period-end iso-date="1900-01-01"/>
<target value="3.06">
<comment><narrative>
Expected by YR3
</narrative></comment>
</target>
<actual value="2.61">
<comment><narrative>
Ranges from $2.61 to $2.64.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Decrease in tariffs of key communications services
</narrative></title>
<baseline year="2010" iso-date="2010-03-04" value="February 2010 tariffs for local mobile calls; 
calls to Australia; &amp; 128kpbs Internet access"><comment><narrative>See sub indicators.</narrative></comment></baseline>
<period>
<period-start iso-date="2010-03-04" />
<period-end iso-date="2015-03-04" />
<target value="Reduced tariffs for stated
services">

</target>
<actual value="">
<comment><narrative>
Tariffs for several services have been reduced, notably for mobile broadband.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Develop strategy for universal access
</narrative></title>
<baseline year="2010" iso-date="2010-03-04" value=""><comment><narrative>Expected by YR5</narrative></comment></baseline>
<period>
<period-start iso-date="2010-03-04" />
<period-end iso-date="2015-03-04" />
<target value="Universal Access Strategy prepared">

</target>
<actual value="">
<comment><narrative>
Commercial rollout still ongoing, so will be launched in late 2014.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase in the level of competition in the ICT sector
</narrative></title>
<baseline year="2010" iso-date="2010-03-04" value="Incumbent monopoly"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-03-04" />
<period-end iso-date="2015-03-04" />
<target value="At least two telecommunications operators">

</target>
<actual value="Market remains competitive and stable.">
<comment><narrative>
5 active market participants: STL, Bemobile, Satsol, Pointcruz and Smile. Six other class licenses awarded. Class licensing regime.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase in the level of competition in the ICT sector
</narrative></title>
<baseline year="2010" iso-date="2010-03-04" value="Incumbent monopoly"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-03-04" />
<period-end iso-date="2015-03-04" />
<target value="At least two telecommunications operators">

</target>
<actual value="Market remains competitive.">
<comment><narrative>
5 active market participants: STL, Bemobile, Satsol, Pointcruz and Smile. Six other class licenses awarded. Class licensing regime.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Price of 3 minute international call (Australia)
</narrative></title>
<baseline year="2010" iso-date="2010-03-04" value="3.60"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-03-04" />
<period-end iso-date="1900-01-01"/>
<target value="3.06">
<comment><narrative>
Expected by YR3
</narrative></comment>
</target>
<actual value="2.85">
<comment><narrative>
Ranges from $2.85 to $3.06.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Impact on Telecom sector of World Bank Technical Assistance (composite score: 1- low impact to 5-high impact)
</narrative></title>
<baseline year="2010" iso-date="2010-03-04" value="1.00"><comment><narrative>Baseline value in PAD.</narrative></comment></baseline>
<period>
<period-start iso-date="2010-03-04" />
<period-end iso-date="2015-03-04" />
<target value="5.00">

</target>
<actual value="3.00">
<comment><narrative>
ICT sector fully competitive; stable market environment; functioning independent regulator.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in teledensity
</narrative></title>
<baseline year="2010" iso-date="2010-03-04" value="8.00"><comment><narrative>Limited access to telephony.</narrative></comment></baseline>
<period>
<period-start iso-date="2010-03-04" />
<period-end iso-date="2015-03-04" />
<target value="40.00">

</target>
<actual value="57.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved ICT policy environment in the country.
</narrative></title>
<baseline year="2010" iso-date="2010-03-04" value="Basic Telecoms Policy in place, as adopted by Cabinet in 2008"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-03-04" />
<period-end iso-date="2015-03-04" />
<target value="ICT policy capacity in Government.">

</target>
<actual value="ICT policy inputs documents prepared for consultation.">
<comment><narrative>
Improved ICT policy environment defined in terms of available policy documentation, and capacity to update and implement. ICTPolicy specialist deliverables specified in TOR. Will work with MOCAIT, MOFT and Consultative Group.  
MOCAIT ICT Director andDeputy Director to be recruited.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Legal and regulatory framework more effective at delivering sector performance
</narrative></title>
<baseline year="2010" iso-date="2010-03-04" value="Law enacted; no regulations"><comment><narrative>Telecoms Law enacted August 2009. Regulatory framework to be developed.</narrative></comment></baseline>
<period>
<period-start iso-date="2010-03-04" />
<period-end iso-date="2015-03-04" />
<target value="Regs
enforced &amp; updated">

</target>
<actual value="Key sector regulations in place and enforced by TCSI.">
<comment><narrative>
End target defined in terms of regulations in line with international best practice in place and implemented as needed. Progressindevelopment of regulatory framework for new licensing, general authorizations, interconnection, spectrum, numbering.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Impact on Telecom sector of World Bank Technical Assistance (composite score: 1- low impact to 5-high impact)
</narrative></title>
<baseline year="2010" iso-date="2010-03-04" value="1.00"><comment><narrative>Baseline value in PAD.</narrative></comment></baseline>
<period>
<period-start iso-date="2010-03-04" />
<period-end iso-date="2015-03-04" />
<target value="5.00">

</target>
<actual value="3.00">
<comment><narrative>
Mobile competition introduced; additional Internet competition pending, and independent regulator staffed and operational.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Develop strategy for universal access
</narrative></title>
<baseline year="2010" iso-date="2010-03-04" value=""><comment><narrative>Expected by YR5</narrative></comment></baseline>
<period>
<period-start iso-date="2010-03-04" />
<period-end iso-date="2015-03-04" />
<target value="Universal Access Strategy prepared">

</target>
<actual value="">
<comment><narrative>
Commercial rollout still ongoing, so will be launched in late 2013.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved ICT policy environment in the country.
</narrative></title>
<baseline year="2010" iso-date="2010-03-04" value="Basic Telecoms Policy in place, as adopted by Cabinet in 2008"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-03-04" />
<period-end iso-date="2015-03-04" />
<target value="ICT policy capacity in Government.">

</target>
<actual value="ICT policy documents prepared.">
<comment><narrative>
Improved ICT policy environment defined in terms of available policy documentation, and capacity to update and implement. ICTPolicy specialist deliverables specified in TOR. Will work with MOCAIT, MOFT and Consultative Group.  
MOCAIT ICT Director to berecruited.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Legal and regulatory framework more effective at delivering sector performance
</narrative></title>
<baseline year="2010" iso-date="2010-03-04" value="Law enacted; no regulations"><comment><narrative>Telecoms Law enacted August 2009. Regulatory framework to be developed.</narrative></comment></baseline>
<period>
<period-start iso-date="2010-03-04" />
<period-end iso-date="2015-03-04" />
<target value="Regs
enforced &amp; updated">

</target>
<actual value="Key sector regulations in place and enforced by TCSI.">
<comment><narrative>
End target defined in terms of regulations in line with international best practice in place and implemented as needed. Progressindevelopment of regulatory framework for new licensing, general authorizations, interconnection, spectrum, numbering.
</narrative></comment>
</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T00:13:13" hierarchy="1"><iati-identifier>44000-P114987</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Rapid Employment Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The proposed new PDO is: to assist targeted vulnerable urban populations in the Recipient's territory to (i) increase their incomesthrough the provision of short term employment; (ii) improve their knowledge, experience and basic employment skills that are valued in the workplace and society; and (iii) improve their access to services and markets through repaired, more climate resilient roads and access infrastructure.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SB–P0002888"><narrative>Solomon Islands Ministry of Finance and Treasury</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SB-COA-0002887"><narrative>Honiara City Council</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2010-10-29"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2010-05-18"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2018-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2018-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Sonya Woo</narrative></person-name><telephone>+1-202-473-1000</telephone><email>swoo1@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>




<recipient-country code="SB" percentage="100"><narrative xml:lang="en">SOLOMON ISLANDS</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002108502" />
            <name><narrative>Honiara</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.4333296 159.95</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="11330" percentage="16" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="6" xml:lang="en"/><sector vocabulary="1" code="16020" percentage="39" xml:lang="en"/><sector vocabulary="1" code="21023" percentage="39" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="70.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TF" percentage="4.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Transportation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TI" percentage="11.0000000" xml:lang="en"><narrative>FY17 - Rural and Inter-Urban Roads</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="5.00000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TC" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Urban Transport</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="10" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="100" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000531" percentage="10" xml:lang="en"><narrative>Conflict Prevention</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000532" percentage="10" xml:lang="en"><narrative>Post-conflict reconstruction</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000521" percentage="70" xml:lang="en"><narrative>Social Safety Nets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="10" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">66666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">66666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">66666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">33333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">33333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">33333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">33333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">33333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">33333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">66666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">66666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">66666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">66666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">66666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">66666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">66666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">66666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">66666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">66666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">66666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">66666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">66666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">66666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">66666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">50000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">50000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">50000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">66666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">66666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">66666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">66666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">66666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">66666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">66666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">66666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">66666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">66666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">66666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">66666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">66666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">66666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">66666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">66666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">66666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">66666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">66666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">66666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">66666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">33333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">33333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">33333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">33333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">33333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">33333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">16666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">16666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">16666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2010-05-31"/><value value-date="2010-05-31">3200000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">1500000</value><description xml:lang="en"><narrative>Total Commitment in July Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">1900000</value><description xml:lang="en"><narrative>Total Commitment in November Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-3</value><description xml:lang="en"><narrative>Total Commitment Cancellations in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-5</value><description xml:lang="en"><narrative>Total Commitment Cancellations in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-380</value><description xml:lang="en"><narrative>Total Commitment Cancellations in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-11-30"/><value value-date="2010-11-30">68695</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-12-31"/><value value-date="2010-12-31">99920</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-01-31"/><value value-date="2011-01-31">88265</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-02-28"/><value value-date="2011-02-28">75557</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-04-30"/><value value-date="2011-04-30">89965</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-05-31"/><value value-date="2011-05-31">102400</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-07-31"/><value value-date="2011-07-31">46512</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-08-31"/><value value-date="2011-08-31">196810</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-11-30"/><value value-date="2011-11-30">33474</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-12-31"/><value value-date="2011-12-31">71602</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-02-29"/><value value-date="2012-02-29">96360</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-04-30"/><value value-date="2012-04-30">153578</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">129129</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-06-30"/><value value-date="2012-06-30">90743</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-08-31"/><value value-date="2012-08-31">38455</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-09-30"/><value value-date="2012-09-30">159250</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">170344</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">71170</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-02-28"/><value value-date="2013-02-28">99128</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">89566</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-04-30"/><value value-date="2013-04-30">89174</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">28578</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">152541</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-07-31"/><value value-date="2013-07-31">102526</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">184549</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">164897</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">166572</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">70225</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">82638</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-02-28"/><value value-date="2014-02-28">37358</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">21748</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">98226</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">37386</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">110832</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">35471</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">261450</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">20027</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">191784</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">193950</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">105083</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">127909</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">136224</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">121111</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">59730</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">209993</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">48524</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">268450</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">46342</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">63345</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">82863</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">161037</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">9074</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-07-31"/><value value-date="2017-07-31">142896</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">72165</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">293904</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">51454</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">64271</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">34809</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-01-31"/><value value-date="2018-01-31">45922</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">58447</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">177447</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">6019</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">48374</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">164946</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">44062</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">570</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-07-31"/><value value-date="2018-07-31">35024</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">143883</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">11848</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">29</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-2887"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P114987"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P114987?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P114987"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of participants who produced CVs
</narrative></title>
<baseline year="2014" iso-date="2014-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-30" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="1137.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of women participating in the project
</narrative></title>
<baseline year="2010" iso-date="2010-09-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-09-28" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="53.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Kilometers of roads improved to all-weather, climate resilient standard
</narrative></title>
<baseline year="2015" iso-date="2015-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-30" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="2.20">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of one-on-one coaching sessions conducted
</narrative></title>
<baseline year="2014" iso-date="2014-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-30" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="1879.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of youth participating in the project
</narrative></title>
<baseline year="2010" iso-date="2010-09-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-09-28" />
<period-end iso-date="2018-12-31" />
<target value="50.00">

</target>
<actual value="58.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of PET Trainees who are certified
</narrative></title>
<baseline year="2011" iso-date="2011-09-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-09-01" />
<period-end iso-date="2015-12-31" />
<target value="11000.00">

</target>
<actual value="11629.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of women participating in the project
</narrative></title>
<baseline year="2010" iso-date="2010-09-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-09-28" />
<period-end iso-date="2018-12-31" />
<target value="50.00">

</target>
<actual value="53.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of one-on-one coaching sessions conducted
</narrative></title>
<baseline year="2014" iso-date="2014-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-30" />
<period-end iso-date="2018-12-31" />
<target value="1800.00">

</target>
<actual value="1879.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of PET Trainees who are certified
</narrative></title>
<baseline year="2011" iso-date="2011-09-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-09-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="11629.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average number of labor-days worked per person
</narrative></title>
<baseline year="2010" iso-date="2010-09-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-09-28" />
<period-end iso-date="2018-12-31" />
<target value="50.00">

</target>
<actual value="60.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average wage transfer per person per year
</narrative></title>
<baseline year="2010" iso-date="2010-09-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-09-28" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The target was exceeded by 31.3% with an additional SBD 502 wage transfers per-person per-year being achieved above the target of SBD 1,600.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="2102.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of community leaders in project areas reporting they have better access to services and markets because of REP infrastructure
</narrative></title>
<baseline year="2015" iso-date="2015-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-30" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="92.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of Safety Nets programs (number)
</narrative></title>
<baseline year="2010" iso-date="2010-09-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-09-28" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;This is the number of participants who actually worked under the Rapid Employment Scheme.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="13180.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total labor days generated through RES
</narrative></title>
<baseline year="2010" iso-date="2010-09-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-09-28" />
<period-end iso-date="2015-06-30" />
<target value="810000.00">
<comment><narrative>
&lt;p&amp;gt;Target within range but not achieved as the implementing agencies decided to adopt a more cost efficient approach to the task work towards the end of the project. This resulted in small groups of workers carrying out the work.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="801931.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of participants who produced CVs
</narrative></title>
<baseline year="2014" iso-date="2014-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-30" />
<period-end iso-date="2018-12-31" />
<target value="1140.00">

</target>
<actual value="1137.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Community Access Infrastructure sub-projects completed
</narrative></title>
<baseline year="2011" iso-date="2011-09-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-09-28" />
<period-end iso-date="2018-12-31" />
<target value="46.00">

</target>
<actual value="49.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average wage transfer per person per year
</narrative></title>
<baseline year="2010" iso-date="2010-09-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-09-28" />
<period-end iso-date="2018-12-31" />
<target value="1600.00">

</target>
<actual value="2047.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of REP Graduates who obtained subsequent employment
</narrative></title>
<baseline year="2010" iso-date="2010-09-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-09-28" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;A total of 3372 REP Graduates obtained subsequent employment after participating in the program. This almost doubled the target. However these figures are not solely attributable to REP. During the last outcomes survey, 76.7% of participants stated that REP ha &amp;lsquo;some&amp;rsquo; degree of influence in obtaining their current employment.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="29.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Community Access Infrastructure sub-projects completed
</narrative></title>
<baseline year="2011" iso-date="2011-09-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-09-28" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="49.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Estimated number of beneficiaries of road works, and other community access infrastructure
</narrative></title>
<baseline year="2014" iso-date="2014-12-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-01" />
<period-end iso-date="2018-12-31" />
<target value="62000.00">

</target>
<actual value="61857.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Estimated number of beneficiaries of road works, and other community access infrastructure
</narrative></title>
<baseline year="2014" iso-date="2014-12-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="61857.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of community leaders in project areas reporting they have better access to services and markets because of REP infrastructure
</narrative></title>
<baseline year="2015" iso-date="2015-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-30" />
<period-end iso-date="2018-12-31" />
<target value="75.00">

</target>
<actual value="92.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads rehabilitated, Non-rural
</narrative></title>
<baseline year="2012" iso-date="2012-09-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-09-28" />
<period-end iso-date="2018-12-31" />
<target value="110.00">

</target>
<actual value="118.71">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percent of participants from communities ranked as the highest priority on the vulnerability index
</narrative></title>
<baseline year="2010" iso-date="2010-09-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-09-28" />
<period-end iso-date="2015-06-30" />
<target value="50.00">

</target>
<actual value="58.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of community access infrastructure units maintained or landscaped
</narrative></title>
<baseline year="2014" iso-date="2014-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-30" />
<period-end iso-date="2018-12-31" />
<target value="30.00">

</target>
<actual value="32.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of Participants reporting that REP was useful in finding subsequent employment
</narrative></title>
<baseline year="2010" iso-date="2010-09-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-09-28" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="76.70">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Value of community grants provided
</narrative></title>
<baseline year="2010" iso-date="2010-09-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-09-28" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="22510000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Value of community grants provided
</narrative></title>
<baseline year="2010" iso-date="2010-09-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-09-28" />
<period-end iso-date="2018-12-31" />
<target value="18900000.00">

</target>
<actual value="21650000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of community access infrastructure units maintained or landscaped
</narrative></title>
<baseline year="2014" iso-date="2014-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-30" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="32.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Kilometers of roads improved to all-weather, climate resilient standard
</narrative></title>
<baseline year="2015" iso-date="2015-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-30" />
<period-end iso-date="2018-12-31" />
<target value="3.20">

</target>
<actual value="2.20">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of contractor representatives trained on labor based works methods
</narrative></title>
<baseline year="2010" iso-date="2010-09-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-09-28" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="490.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of youth participating in the project
</narrative></title>
<baseline year="2010" iso-date="2010-09-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-09-28" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="58.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of REP Graduates reporting that they invested REP income in business activities
</narrative></title>
<baseline year="2010" iso-date="2010-09-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-09-28" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="16.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of contractor representatives trained on labor based works methods
</narrative></title>
<baseline year="2010" iso-date="2010-09-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-09-28" />
<period-end iso-date="2018-12-31" />
<target value="500.00">

</target>
<actual value="490.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads rehabilitated, Non-rural
</narrative></title>
<baseline year="2012" iso-date="2012-09-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-09-28" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="118.71">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percent of participants from communities ranked as the highest priority on the vulnerability index
</narrative></title>
<baseline year="2010" iso-date="2010-09-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-09-28" />
<period-end iso-date="2018-12-31" />
<target value="50.00">

</target>
<actual value="58.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average number of labor-days worked per person
</narrative></title>
<baseline year="2010" iso-date="2010-09-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-09-28" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="60.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T00:13:13" hierarchy="1"><iati-identifier>44000-P126740</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Solomon Islands Development Policy Operation 1</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The proposed grant is the first in a series of two development policy operations in support of Solomon Islands transition from post-conflict recovery to sustainable development in the context of its National Development Strategy (NDS).  The proposed operation would support the following three development objectives:i) improve the quality of public financial management; ii) improve the financial management of key State Owned Enterprises; and iii) improve extractive revenue transparency.  The proposed operation is fully aligned with the objectives set out in the most recent World Bank Interim Strategy Note (ISN) to:  (I.a.) address fiscal and balance of payments pressures through the provision of financing and through the attendant participation in the policy dialogue; (II.c.) update the mining sector regulatory and institutional framework and seek participation in the Extractive Industries Transparency Initiative (EITI); and (III.c.) improve the effectiveness, efficiency, and planning in public spending. The overarching themes throughout are public sector effectiveness and accountability.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[Solomon Islands are a fragile, post-conflict small island state and the poorest in the Pacific when measured in terms of Gross Domestic Product (GDP) per capita. Most of the population continues to be dispersed across rural areas of the archipelago, where they largely depend on subsistence agriculture. This caps food poverty rates, but exposes the population to environmental shocks. Poverty rates are higher in urban areas, where traditional safety nets are weaker and unemployment rates are high. A former British protectorate, the country became independent in 1978 and enjoyed twenty years of moderate but sustained economic growth and improvement in social indicators. The grant is the first in a series of two development policy operations in support of Solomon Islands transition from post-conflict recovery to sustainable development in the context of its National Development Strategy (NDS). The operation will support the following World Bank Interim Strategy Note (ISN) objectives: (a) address fiscal and balance of payments pressures through the provision of financing and through the attendant participation in the policy dialogue; (b) update the mining sector regulatory and institutional framework and seek participation in the Extractive Industries Transparency Initiative (EITI); and (c) improve the effectiveness, efficiency, and planning of public spending. The operation complements similar support, cited above, provided by the Asian Development Bank (ADB) and the European Commission (EC).]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SB-COA-273"><narrative>Ministry of Finance and Treasury</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2012-01-02"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2012-04-26"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2013-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2013-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Douglas M. Addison</narrative></person-name><telephone>+1-202-473-1000</telephone><email>daddison@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>


<recipient-country code="SB" percentage="100"><narrative xml:lang="en">SOLOMON ISLANDS</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="2108502" />
                <name><narrative>Honiara</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-9.43333 159.95</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="15111" percentage="100" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YZ" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Other Industry, Trade and Services</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="90.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="45" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="45" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000411" percentage="45" xml:lang="en"><narrative>Public Expenditure Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="45" xml:lang="en"><narrative>Public Administration</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">2000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">2000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">51898.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">51898.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2012-04-30"/><value value-date="2012-04-30">2000000</value><description xml:lang="en"><narrative>Total Commitment in April Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-6607"><narrative>Ministry of Finance and Treasury</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-07-31"/><value value-date="2012-07-31">1948102</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-6607"><narrative>Ministry of Finance and Treasury</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P126740"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P126740?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P126740"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T00:13:13" hierarchy="1"><iati-identifier>44000-P143242</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Solomon Islands Development Policy Operation-2</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Program Development Objectives are:  i) improve public financial management; ii) improve the financial position of key State Owned Enterprises; and iii) improve extractive revenue transparency.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[Solomon Islands are a fragile, post-conflict small island state and the poorest in the Pacific when measured in terms of Gross Domestic Product, or GDP per capita. Most of the population is dispersed across rural areas of the archipelago, where they largely depend on subsistence agriculture. This caps food poverty rates, but exposes the population to environmental shocks. Poverty rates are higher in urban areas, where traditional safety nets are weaker and unemployment rates are high. A former British protectorate, the country became independent in 1978 and enjoyed twenty years of moderate but sustained economic growth and improvement in social indicators. A low-level conflict between 1998 and 2003, known as 'the tension,' brought the formal economy and many state functions to a halt. Real GDP per capita, which had been slowly eroding between 1996 and 1999, fell sharply between 2000 and 2002. An Australian-led and financed regional peacekeeping mission, the Regional Assistance Mission to Solomon Islands (RAMSI), stopped the violence and rapidly restored order and basic state functions, particularly in finance. The country has subsequently enjoyed a fairly good security situation, interrupted only by short-lived but destructive riots in 2006, mainly in the capital Honiara. RAMSI presently retains a police and military presence, as well as a large corps of civilians in advisory or in line functions, notably in the Ministry of Finance and Treasury (MoFT). Given the overall stability in the country, RAMSI will undergo a significant transition in mid-2013. Although an extensive police presence will remain to build the capacity of the Royal Solomon Islands police force, the bulk of the military component is scheduled to depart, and the advisory support will transition to bilateral programs.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SB-COA-0012285"><narrative>Ministry of Finance &amp; Treasury</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2013-07-16"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2013-08-27"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2014-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2014-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Tobias Akhtar Haque</narrative></person-name><telephone>+1-202-473-1000</telephone><email>thaque2@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="SB" percentage="100"><narrative xml:lang="en">SOLOMON ISLANDS</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="2108502" />
                <name><narrative>Honiara</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-9.43333 159.95</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="15111" percentage="79" xml:lang="en"/><sector vocabulary="1" code="32210" percentage="14" xml:lang="en"/><sector vocabulary="1" code="16010" percentage="7" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WC" percentage="7.00000000" xml:lang="en"><narrative>FY17 - Water Supply</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LM" percentage="15.0000000" xml:lang="en"><narrative>FY17 - Mining</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LT" percentage="7.00000000" xml:lang="en"><narrative>FY17 - Energy Transmission and Distribution</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="71.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000111" percentage="5" xml:lang="en"><narrative>Fiscal sustainability</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000413" percentage="5" xml:lang="en"><narrative>Debt Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000114" percentage="8" xml:lang="en"><narrative>Tax policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000411" percentage="25" xml:lang="en"><narrative>Public Expenditure Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000011" percentage="13" xml:lang="en"><narrative>Fiscal Policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="35" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000111" percentage="5" xml:lang="en"><narrative>Fiscal sustainability</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="35" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="38" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="35" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000411" percentage="25" xml:lang="en"><narrative>Public Expenditure Management</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">2000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">2000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">2000000</value><description xml:lang="en"><narrative>Total Commitment in August Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-12285"><narrative>Ministry of Finance &amp; Treasury</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">2133278</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-12285"><narrative>Ministry of Finance &amp; Treasury</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P143242"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P143242?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P143242"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T00:13:13" humanitarian="1"  hierarchy="1"><iati-identifier>44000-P149282</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Solomon Islands Rural Development Program II</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The objective of the Project is to assist the Recipient to improve basic infrastructure and services in rural areas and to strengthen the linkages between smallholder farming households and markets.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The Solomon Island?s Second Rural Development Program has an objective to improve basic infrastructure and services in rural areas and to strengthen the linkages between smallholder farming households and markets. Component one aims to retain and refine the community-driven development mechanisms developed during the first phase of the RDP with a number of modifications based on implementation lessons and evaluation findings. Component two aims to: (i) assist farming households to engage in productive partnerships with commercial enterprises; (ii) build the capacity of MAL to deliver its core functions of regulation, research and sector coordination; and (iii) restore the productive assets of households critically affected by the April 2014 flash floods. Component three contains only core, cross-component management functions would remain under this overarching component including: overall program management, finance, procurement, overall M&amp;E/MIS (including contracting studies on topics such as land use and ownership, disaster preparedness, etc.), and environmental safeguards.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SB–P0018233"><narrative>Solomon Islands</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SB–P0018233"><narrative>Solomon Islands</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SB-COA-0018235"><narrative>Ministry of National Planning and Development Coordination</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2014-11-20"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2014-11-21"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2022-02-07"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2022-02-07"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Robert Anders Anderson</narrative></person-name><telephone>+1-202-473-1000</telephone><email>randerson1@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>







<recipient-country code="SB" percentage="100"><narrative xml:lang="en">SOLOMON ISLANDS</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002108262" />
            <name><narrative>Isabel Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.0537901 159.13696</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002108831" />
            <name><narrative>Guadalcanal Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.6333303 160.2</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007280293" />
            <name><narrative>Rennell and Bellona</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-11.60516 160.15457</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007280292" />
            <name><narrative>Choiseul</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-6.9918599 156.86279</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002106552" />
            <name><narrative>Malaita Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9 161</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002101556" />
            <name><narrative>Western Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8 157</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002178730" />
            <name><narrative>Makira-Ulawa Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.55751 161.78517</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002178472" />
            <name><narrative>Temotu Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.72754 165.93884</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002109495" />
            <name><narrative>Central Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.0966702 160.24109</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="43042" percentage="44" xml:lang="en"/><sector vocabulary="1" code="32161" percentage="27" xml:lang="en"/><sector vocabulary="1" code="73010" percentage="8" xml:lang="en"/><sector vocabulary="1" code="31193" percentage="8" xml:lang="en"/><sector vocabulary="1" code="31191" percentage="5" xml:lang="en"/><sector vocabulary="1" code="31110" percentage="4" xml:lang="en"/><sector vocabulary="1" code="31163" percentage="4" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="35.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="18.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YA" percentage="25.0000000" xml:lang="en"><narrative>FY17 - Agricultural markets, commercialization and agri-business</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AZ" percentage="13.0000000" xml:lang="en"><narrative>FY17 - Other Agriculture, Fishing and Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AK" percentage="9.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Agriculture, Fishing &amp; Forestry</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="65" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000512" percentage="3" xml:lang="en"><narrative>Other Excluded Groups</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000511" percentage="3" xml:lang="en"><narrative>Indigenous People and Ethnic Minorities</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000721" percentage="25" xml:lang="en"><narrative>Rural Markets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000513" percentage="23" xml:lang="en"><narrative>Participation and Civic Engagement</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="1" xml:lang="en"><narrative>Finance for Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="29" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="100" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000723" percentage="40" xml:lang="en"><narrative>Rural Infrastructure and service delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000513" percentage="23" xml:lang="en"><narrative>Participation and Civic Engagement</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="1" xml:lang="en"><narrative>Finance for Development</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">208333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">166666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">166666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">41666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">41666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">41666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">41666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">41666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">41666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">41666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">41666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">41666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">41666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">41666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">41666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">2076800.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">1020001.93</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">344929.96</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">1067126.41</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">545228.42</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">260699.93</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">345597.05</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">408299.65</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">2285953.94</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">534146.61</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">1558621.13</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">1953774.16</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">869967.41</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">639500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">425900.62</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">296376.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">647501.10</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">304356.98</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">194642.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">2169388.59</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">723685.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">80525.16</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">589262.32</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">628494.10</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">876052.59</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">194802.38</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">1089413.50</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">489933.25</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">256691.21</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">571628.77</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2022-02-07"/>
<value currency="USD" value-date="2022-02-07">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2022-02-07"/>
<value currency="USD" value-date="2022-02-07">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">5000000</value><description xml:lang="en"><narrative>Total Commitment in November Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18234"><narrative>Ministry of Agriculture and Livestock Development; Ministry of National Planning and Development Coordination</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">4000000</value><description xml:lang="en"><narrative>Total Commitment in November Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18234"><narrative>Ministry of Agriculture and Livestock Development; Ministry of National Planning and Development Coordination</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">2200000</value><description xml:lang="en"><narrative>Total Commitment in February Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18234"><narrative>Ministry of Agriculture and Livestock Development; Ministry of National Planning and Development Coordination</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">-10010</value><description xml:lang="en"><narrative>Total Commitment Cancellations in August Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18234"><narrative>Ministry of Agriculture and Livestock Development; Ministry of National Planning and Development Coordination</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">-86666</value><description xml:lang="en"><narrative>Total Commitment Cancellations in July Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18234"><narrative>Ministry of Agriculture and Livestock Development; Ministry of National Planning and Development Coordination</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">-109764</value><description xml:lang="en"><narrative>Total Commitment Cancellations in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18234"><narrative>Ministry of Agriculture and Livestock Development; Ministry of National Planning and Development Coordination</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">2076800</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18234"><narrative>Ministry of Agriculture and Livestock Development; Ministry of National Planning and Development Coordination</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">-2076800</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18234"><narrative>Ministry of Agriculture and Livestock Development; Ministry of National Planning and Development Coordination</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">2076800</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18234"><narrative>Ministry of Agriculture and Livestock Development; Ministry of National Planning and Development Coordination</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">271802</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18234"><narrative>Ministry of Agriculture and Livestock Development; Ministry of National Planning and Development Coordination</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">344930</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18234"><narrative>Ministry of Agriculture and Livestock Development; Ministry of National Planning and Development Coordination</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">271228</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18234"><narrative>Ministry of Agriculture and Livestock Development; Ministry of National Planning and Development Coordination</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">260700</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18234"><narrative>Ministry of Agriculture and Livestock Development; Ministry of National Planning and Development Coordination</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">172799</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18234"><narrative>Ministry of Agriculture and Livestock Development; Ministry of National Planning and Development Coordination</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">204150</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18234"><narrative>Ministry of Agriculture and Livestock Development; Ministry of National Planning and Development Coordination</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">128100</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18234"><narrative>Ministry of Agriculture and Livestock Development; Ministry of National Planning and Development Coordination</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">20988</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18234"><narrative>Ministry of Agriculture and Livestock Development; Ministry of National Planning and Development Coordination</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">1537480</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18234"><narrative>Ministry of Agriculture and Livestock Development; Ministry of National Planning and Development Coordination</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">1953774</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18234"><narrative>Ministry of Agriculture and Livestock Development; Ministry of National Planning and Development Coordination</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">869967</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18234"><narrative>Ministry of Agriculture and Livestock Development; Ministry of National Planning and Development Coordination</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">178080</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18234"><narrative>Ministry of Agriculture and Livestock Development; Ministry of National Planning and Development Coordination</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">25388</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18234"><narrative>Ministry of Agriculture and Livestock Development; Ministry of National Planning and Development Coordination</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">5848</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18234"><narrative>Ministry of Agriculture and Livestock Development; Ministry of National Planning and Development Coordination</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">4430</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18234"><narrative>Ministry of Agriculture and Livestock Development; Ministry of National Planning and Development Coordination</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-47905</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18234"><narrative>Ministry of Agriculture and Livestock Development; Ministry of National Planning and Development Coordination</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">38933</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18234"><narrative>Ministry of Agriculture and Livestock Development; Ministry of National Planning and Development Coordination</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">755400</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18234"><narrative>Ministry of Agriculture and Livestock Development; Ministry of National Planning and Development Coordination</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">386116</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18234"><narrative>Ministry of Agriculture and Livestock Development; Ministry of National Planning and Development Coordination</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">1154708</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18234"><narrative>Ministry of Agriculture and Livestock Development; Ministry of National Planning and Development Coordination</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">-1141994</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18234"><narrative>Ministry of Agriculture and Livestock Development; Ministry of National Planning and Development Coordination</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">741731</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18234"><narrative>Ministry of Agriculture and Livestock Development; Ministry of National Planning and Development Coordination</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">310509</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18234"><narrative>Ministry of Agriculture and Livestock Development; Ministry of National Planning and Development Coordination</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-01-31"/><value value-date="2022-01-31">187350</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18234"><narrative>Ministry of Agriculture and Livestock Development; Ministry of National Planning and Development Coordination</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">41396</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18234"><narrative>Ministry of Agriculture and Livestock Development; Ministry of National Planning and Development Coordination</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-86666</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18234"><narrative>Ministry of Agriculture and Livestock Development; Ministry of National Planning and Development Coordination</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-109764</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18234"><narrative>Ministry of Agriculture and Livestock Development; Ministry of National Planning and Development Coordination</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">-1084</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18234"><narrative>Ministry of Agriculture and Livestock Development; Ministry of National Planning and Development Coordination</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-1084</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18234"><narrative>Ministry of Agriculture and Livestock Development; Ministry of National Planning and Development Coordination</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-2018</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18234"><narrative>Ministry of Agriculture and Livestock Development; Ministry of National Planning and Development Coordination</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-17243</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18234"><narrative>Ministry of Agriculture and Livestock Development; Ministry of National Planning and Development Coordination</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-17519</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18234"><narrative>Ministry of Agriculture and Livestock Development; Ministry of National Planning and Development Coordination</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-17631</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18234"><narrative>Ministry of Agriculture and Livestock Development; Ministry of National Planning and Development Coordination</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-17082</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18234"><narrative>Ministry of Agriculture and Livestock Development; Ministry of National Planning and Development Coordination</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-17103</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18234"><narrative>Ministry of Agriculture and Livestock Development; Ministry of National Planning and Development Coordination</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-16990</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18234"><narrative>Ministry of Agriculture and Livestock Development; Ministry of National Planning and Development Coordination</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-16688</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18234"><narrative>Ministry of Agriculture and Livestock Development; Ministry of National Planning and Development Coordination</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-17492</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18234"><narrative>Ministry of Agriculture and Livestock Development; Ministry of National Planning and Development Coordination</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-17678</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18234"><narrative>Ministry of Agriculture and Livestock Development; Ministry of National Planning and Development Coordination</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-17471</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18234"><narrative>Ministry of Agriculture and Livestock Development; Ministry of National Planning and Development Coordination</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-16432</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18234"><narrative>Ministry of Agriculture and Livestock Development; Ministry of National Planning and Development Coordination</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-15989</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18234"><narrative>Ministry of Agriculture and Livestock Development; Ministry of National Planning and Development Coordination</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-16701</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18234"><narrative>Ministry of Agriculture and Livestock Development; Ministry of National Planning and Development Coordination</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-16424</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18234"><narrative>Ministry of Agriculture and Livestock Development; Ministry of National Planning and Development Coordination</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-16435</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18234"><narrative>Ministry of Agriculture and Livestock Development; Ministry of National Planning and Development Coordination</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-15950</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18234"><narrative>Ministry of Agriculture and Livestock Development; Ministry of National Planning and Development Coordination</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-15597</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18234"><narrative>Ministry of Agriculture and Livestock Development; Ministry of National Planning and Development Coordination</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-16482</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18234"><narrative>Ministry of Agriculture and Livestock Development; Ministry of National Planning and Development Coordination</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-15366</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18234"><narrative>Ministry of Agriculture and Livestock Development; Ministry of National Planning and Development Coordination</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-43535</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18234"><narrative>Ministry of Agriculture and Livestock Development; Ministry of National Planning and Development Coordination</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-42779</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18234"><narrative>Ministry of Agriculture and Livestock Development; Ministry of National Planning and Development Coordination</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-43023</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18234"><narrative>Ministry of Agriculture and Livestock Development; Ministry of National Planning and Development Coordination</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P149282"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P149282?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P149282"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Male and female members of farming households engaged in productive partnerships with commercial enterprises
</narrative></title>
<baseline year="2015" iso-date="2015-02-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-02-27" />
<period-end iso-date="2018-01-25" />
<target value="14000.00">
<comment><narrative>
&lt;p&amp;gt;Revised target substantially achieved. Data from endline surveys, MAL extension agent reports, field verification.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="18922.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Representatives in Ward Development Committees who are women
</narrative></title>
<baseline year="2015" iso-date="2015-02-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-02-27" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Target partly achieved. Data from survey of WDC membership per ward.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="37.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Participants in community prioritization/consultaton meetings
</narrative></title>
<baseline year="2015" iso-date="2015-02-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-02-27" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Target achieved. Data from project MIS, field verification.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="213088.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
The agreed amount of government counterpart contribution being disbursed
</narrative></title>
<baseline year="2015" iso-date="2015-02-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-02-27" />
<period-end iso-date="1900-01-01"/>
<target value="6092000.00">
<comment><narrative>
&lt;p&amp;gt;Target achieved. Data from bank records. The original target was &amp;quot;years with adequate government counterpart contributions.&amp;quot;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="6515895.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of community infrastructure sub-projects completed (including from disaster recovery)
</narrative></title>
<baseline year="2015" iso-date="2015-02-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-02-27" />
<period-end iso-date="2020-02-26" />
<target value="275.00">
<comment><narrative>
&lt;p&amp;gt;Revised target substantially achieved. Data from sub-project technical evaluations, field verification, project MIS. Note that the January 2018 Restructure revised the target to 260.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="317.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of completed sub-projects for which community engagement in post-project operations and maintenance are established
</narrative></title>
<baseline year="2015" iso-date="2015-02-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-02-27" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Target achieved. Data from project MIS, sub-project evaluations, field verification.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Audit reports submitted on time
</narrative></title>
<baseline year="2015" iso-date="2015-02-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-02-27" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="5.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
The economic rate of return of a sample of agribusiness partnerships
</narrative></title>
<baseline year="2017" iso-date="2017-09-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-09-08" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Target not achieved. The ERR was - 9 percent. Negative numbers cannot be entered into the field above.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the volume of produce sold by households engaging in agribusiness partnerships
</narrative></title>
<baseline year="2015" iso-date="2015-02-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-02-27" />
<period-end iso-date="2018-01-25" />
<target value="15.00">
<comment><narrative>
&lt;p&amp;gt;Revised target substantially achieved. Data from 2016 baseline, 2021 endlines for each agribusiness partner, and a meta-endline analysis.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="50.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of male and female beneficiaries receiving agriculture and livestock support to recover incomes lost from April 2014 flooding
</narrative></title>
<baseline year="2015" iso-date="2015-02-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-02-27" />
<period-end iso-date="2018-01-25" />
<target value="2500.00">
<comment><narrative>
&lt;p&amp;gt;Revised target achieved. Data from project MIS and field verification.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="2846.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of agribusiness partnerships established
</narrative></title>
<baseline year="2015" iso-date="2015-02-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-02-27" />
<period-end iso-date="2018-01-25" />
<target value="43.00">
<comment><narrative>
&lt;p&amp;gt;Revised target partly achieved. Data from agribusiness proposals, MAL extension agent reports, field verification, endlines.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="35.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of male and female partnership members who adopt improved farming practice due to engagement in agribusiness partnerships
</narrative></title>
<baseline year="2017" iso-date="2017-09-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-09-08" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Target achieved. Data from endline survey, field verification.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="7298.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Community and other non-project financed contributions as a percentage of total subproject costs (at the time of completion)
</narrative></title>
<baseline year="2015" iso-date="2015-02-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-02-27" />
<period-end iso-date="2020-02-26" />
<target value="30.00">
<comment><narrative>
&lt;p&amp;gt;Target partly achieved. Data from estimates in sub-project technical design forms measured against final sub-project technical evaluations, project MIS, field verification. Note that the 2018 restructure revised the target to 20 percent.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="25.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Client days of agriculture training provided (number)
</narrative></title>
<baseline year="2015" iso-date="2015-02-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-02-27" />
<period-end iso-date="2020-02-25" />
<target value="22000.00">
<comment><narrative>
&lt;p&amp;gt;Target substantially achieved. From MAL extension agent records, sign-in sheets, field verification, project MIS.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="38394.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total value of ASEF grants disbursed
</narrative></title>
<baseline year="2015" iso-date="2015-02-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-02-27" />
<period-end iso-date="2018-01-25" />
<target value="1000000.00">
<comment><narrative>
&lt;p&amp;gt;Target not achieved. Data from project MIS. There is reference in the 2020 AF to this indicator&amp;#39;s target reduction to US$120,000&amp;nbsp;after a March 2018 review, but this was not officially done.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="122986.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries with improved quality of, and/or, access to rural infrastructure or services (including from disaster recovery)
</narrative></title>
<baseline year="2015" iso-date="2015-02-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-02-27" />
<period-end iso-date="2020-02-26" />
<target value="155000.00">
<comment><narrative>
&lt;p&amp;gt;Revised target substantially achieved. Data from sub-project proposals,&amp;nbsp;project MIS, field verification. Note the 2018 restructure previously revised the target to 140,000.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="171320.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T00:13:13" hierarchy="1"><iati-identifier>44000-P149886</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Solomon Islands Recovery Financing Development Policy Operation</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[ The program development objectives of the operation are aligned with the Government&amp;rsquo;s Economic and Financial Reform Program and include: i) improved management of public expenditure and debt; ii) strengthened management of extractive industries; and iii)better conditions for private sector investment.&amp;nbsp; ]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The Economic Reform and Recovery Development Policy Operation of Solomon Islands has an objectives of the operation are aligned with the Government?s Economic and Financial Reform Program and include: i) improved management of public expenditure and debt; ii) strengthened management of extractive industries; and iii) better conditions for private sector investment. This stand-alone operation supports continued progress of the Solomon Islands Government?s economic reform agenda in the context of a recent major natural disaster. The operation follows a successful programmatic series of two development policy operations, and precedes a possible further programmatic series of operations planned for 2015, following elections in November 2014 and finalization of a new Economic and Financial Reform Plan.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SB–P0018875"><narrative>Ministry of Finance and Treasury</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SB–P0018875"><narrative>Ministry of Finance and Treasury</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SB-COA-0018876"><narrative>Ministry of Finance</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2014-11-20"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2014-11-21"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2015-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2015-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Tobias Akhtar Haque</narrative></person-name><telephone>+1-202-473-1000</telephone><email>thaque2@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="SB" percentage="100"><narrative xml:lang="en">SOLOMON ISLANDS</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002108502" />
            <name><narrative>Honiara</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.4333296 159.95</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="15111" percentage="20" xml:lang="en"/><sector vocabulary="1" code="11420" percentage="20" xml:lang="en"/><sector vocabulary="1" code="32210" percentage="20" xml:lang="en"/><sector vocabulary="1" code="15111" percentage="20" xml:lang="en"/><sector vocabulary="1" code="25010" percentage="20" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LZ" percentage="40.0000000" xml:lang="en"><narrative>FY17 - Other Energy and Extractives</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="ET" percentage="20.0000000" xml:lang="en"><narrative>FY17 - Tertiary Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YZ" percentage="20.0000000" xml:lang="en"><narrative>FY17 - Other Industry, Trade and Services</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="20.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000021" percentage="20" xml:lang="en"><narrative>Business Enabling Environment</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000653" percentage="5" xml:lang="en"><narrative>Science and Technology</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000111" percentage="10" xml:lang="en"><narrative>Fiscal sustainability</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000011" percentage="20" xml:lang="en"><narrative>Fiscal Policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="20" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000657" percentage="5" xml:lang="en"><narrative>Standards, Curriculum and Textbooks</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="20" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000212" percentage="20" xml:lang="en"><narrative>Regulation and Competition Policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="20" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="20" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000413" percentage="10" xml:lang="en"><narrative>Debt Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000111" percentage="10" xml:lang="en"><narrative>Fiscal sustainability</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="20" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000654" percentage="5" xml:lang="en"><narrative>Teachers</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="20" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000114" percentage="10" xml:lang="en"><narrative>Tax policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="20" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="20" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="100" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="20" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000653" percentage="5" xml:lang="en"><narrative>Science and Technology</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">5000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">5000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">419006.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">419006.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">5000000</value><description xml:lang="en"><narrative>Total Commitment in November Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18876"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">4580994</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-18876"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P149886"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P149886?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P149886"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of provincial consultations held using data from the EITI Report.
</narrative></title>
<baseline year="2014" iso-date="2014-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-06-30" />
<period-end iso-date="2015-06-30" />
<target value="2.00">

</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Availability of gender-disaggregated data on scholarship awards and student performance from the Scholarship Management InformationSystem
</narrative></title>
<baseline year="2014" iso-date="2014-12-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-01" />
<period-end iso-date="2015-12-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Balances and transfers into and from the Mining Royalty Special Fund reported in annual budget documentation.
</narrative></title>
<baseline year="2014" iso-date="2014-12-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-01" />
<period-end iso-date="2015-12-31" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of on-lending and guarantees to SOEs endorsed by the Debt Management Advisory Committee
</narrative></title>
<baseline year="2014" iso-date="2014-12-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-01" />
<period-end iso-date="2015-12-31" />
<target value="100.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Information on all land transactions approved by the Land Board publicly available in the Ministry of Lands Annual Report
</narrative></title>
<baseline year="2014" iso-date="2014-12-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-01" />
<period-end iso-date="2015-12-31" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Variance between budgeted and actual scholarship expenditure
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="101.80"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2015-12-31" />
<target value="10.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IMF/WB Debt Distress Rating
</narrative></title>
<baseline year="2014" iso-date="2014-12-01" value="Moderate"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-01" />
<period-end iso-date="2015-12-31" />
<target value="Moderate">

</target>
<actual value="Moderate">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T00:13:13" hierarchy="1"><iati-identifier>44000-P151777</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Pacific Islands Regional Oceanscape Program - Solomon Islands</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The objective of the Project is to strengthen the shared management of selected Pacific Island oceanic and coastal fisheries, and the critical habitats upon which they depend.  ]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Pacific Islands Regional Oceanscape Program Project for the Federated States of Micronesia is to strengthen the shared management of selected Pacific Island oceanic and coastal fisheries, and the critical habitats upon which they depend. The project has four components. (1) Sustainable management of oceanic fisheries component will help participating Pacific Island countries strengthen the management of the region's purse seine and long-line tuna fisheries. The component includes activities to: (i) strengthen the capacity of national and regional institutions to sustainably manage Pacific Island tuna fisheries; and (ii) ensure an equitable distribution within Pacific Island countries of the benefits of sustainably managed tuna fisheries. (2) Sustainable management of coastal fisheries component aims to support participating countries to sustainably manage defined coastal fisheries and the habitats that support them, focusing on those with the greatest potential for increased benefits, i.e. coastal fisheries such as beche-de-mer (BDM) that (i) can generate export earnings for the country, and/or (ii) support livelihoods, food security and dietary health. Towards this objective, this component includes activities to: (i) empower stakeholders to sustainably manage targeted coastal fisheries in participating countries; and (ii) link sustainable coastal fish products to regional markets. This component will provide climate change co-benefits by supporting adaptation in the form of better management of coastal fisheries and natural defenses. (3) Sustainable financing of the conservation of critical fishery habitats component will help identify revenue streams to sustainably finance the conservation of critical habitats that underpin oceanic and coastal fisheries in the region. This component also provides climate change co-benefits by supporting mitigation, in the form of conservation of vegetated coastal habitats that sequester significant amounts of carbon. (4) Regional coordination, implementation support, national program management and monitoring and evaluation component will provide regional coordination, implementation support and project management, to ensure a coherent approach to program implementation and wide dissemination of results and lessons learned; as well as implementation support and training as needed for the program to achieve its objectives.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SB–P0020960"><narrative>Ministry of Finance &amp; Treasury</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SB-COA-290"><narrative>Ministry of Fisheries and Marine Resources</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2014-12-22"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2014-12-22"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2021-09-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2021-09-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Nina Doetinchem</narrative></person-name><telephone>+1-202-473-1000</telephone><email>ndoetinchem@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="SB" percentage="100"><narrative xml:lang="en">SOLOMON ISLANDS</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002108502" />
            <name><narrative>Honiara</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.4333296 159.95</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="31320" percentage="100" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AL" percentage="49.0000000" xml:lang="en"><narrative>FY17 - Livestock</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AK" percentage="2.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Agriculture, Fishing &amp; Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AF" percentage="49.0000000" xml:lang="en"><narrative>FY17 - Fisheries</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="33" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="33" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000083" percentage="6" xml:lang="en"><narrative>Renewable Natural Resources Asset Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000821" percentage="11" xml:lang="en"><narrative>Air quality management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000084" percentage="27" xml:lang="en"><narrative>Environmental policies and institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000834" percentage="6" xml:lang="en"><narrative>Biodiversity</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000834" percentage="6" xml:lang="en"><narrative>Biodiversity</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000823" percentage="11" xml:lang="en"><narrative>Soil Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="100" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000025" percentage="27" xml:lang="en"><narrative>Regional Integration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="7" xml:lang="en"><narrative>Rural Development</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">42535.20</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">42535.20</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">42535.20</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">42535.20</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">42535.20</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">42535.20</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">42535.20</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">42535.20</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">42535.20</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">42535.20</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">42535.20</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">42535.27</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">81223.73</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">81223.73</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">81223.73</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">81223.73</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">81223.73</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">81223.73</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">81223.73</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">81223.73</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">81223.73</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">81223.73</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">81223.73</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">81223.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">81223.73</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">81223.73</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">81223.73</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">81223.73</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">81223.73</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">81223.73</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">81223.73</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">81223.73</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">81223.73</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">81223.73</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">81223.73</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">81223.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">81223.73</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">81223.73</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">81223.73</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">81223.73</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">81223.73</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">81223.73</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">81223.73</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">81223.73</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">81223.73</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">81223.73</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">81223.73</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">81223.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">87657.15</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">87657.15</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">87657.15</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">87657.15</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">87657.15</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">87657.15</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">87657.15</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">87657.15</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">87657.15</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">87657.15</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">87657.15</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">87657.19</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">176853.22</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">176853.22</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">176853.22</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">176853.22</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">176853.22</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">176853.22</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">176853.22</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">176853.22</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">176853.22</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">176853.22</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">176853.22</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">176853.28</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">206036.21</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">206036.21</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">206036.21</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">5392834.99</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">5392834.99</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">5950000</value><description xml:lang="en"><narrative>Total Commitment in December Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-20961"><narrative>Ministry of Fisheries and Marine Resources</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">3800000</value><description xml:lang="en"><narrative>Total Commitment in December Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-20961"><narrative>Ministry of Fisheries and Marine Resources</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-1786344</value><description xml:lang="en"><narrative>Total Commitment Cancellations in November Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-20961"><narrative>Ministry of Fisheries and Marine Resources</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-1786344</value><description xml:lang="en"><narrative>Total Commitment Cancellations in November Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-20961"><narrative>Ministry of Fisheries and Marine Resources</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-127634</value><description xml:lang="en"><narrative>Total Commitment Cancellations in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-20961"><narrative>Ministry of Fisheries and Marine Resources</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-1241250</value><description xml:lang="en"><narrative>Total Commitment Cancellations in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-20961"><narrative>Ministry of Fisheries and Marine Resources</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">777093</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-20961"><narrative>Ministry of Fisheries and Marine Resources</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">50993</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-20961"><narrative>Ministry of Fisheries and Marine Resources</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">54365</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-20961"><narrative>Ministry of Fisheries and Marine Resources</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-07-31"/><value value-date="2017-07-31">251822</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-20961"><narrative>Ministry of Fisheries and Marine Resources</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">164153</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-20961"><narrative>Ministry of Fisheries and Marine Resources</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">6882</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-20961"><narrative>Ministry of Fisheries and Marine Resources</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-07-31"/><value value-date="2018-07-31">15586</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-20961"><narrative>Ministry of Fisheries and Marine Resources</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">-740853</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-20961"><narrative>Ministry of Fisheries and Marine Resources</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">768295</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-20961"><narrative>Ministry of Fisheries and Marine Resources</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">390874</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-20961"><narrative>Ministry of Fisheries and Marine Resources</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">13681</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-20961"><narrative>Ministry of Fisheries and Marine Resources</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">21269</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-20961"><narrative>Ministry of Fisheries and Marine Resources</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">101162</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-20961"><narrative>Ministry of Fisheries and Marine Resources</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">504395</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-20961"><narrative>Ministry of Fisheries and Marine Resources</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">60944</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-20961"><narrative>Ministry of Fisheries and Marine Resources</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">116484</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-20961"><narrative>Ministry of Fisheries and Marine Resources</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">44585</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-20961"><narrative>Ministry of Fisheries and Marine Resources</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">207070</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-20961"><narrative>Ministry of Fisheries and Marine Resources</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">91925</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-20961"><narrative>Ministry of Fisheries and Marine Resources</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">69763</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-20961"><narrative>Ministry of Fisheries and Marine Resources</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">462678</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-20961"><narrative>Ministry of Fisheries and Marine Resources</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">46657</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-20961"><narrative>Ministry of Fisheries and Marine Resources</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">231854</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-20961"><narrative>Ministry of Fisheries and Marine Resources</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">105198</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-20961"><narrative>Ministry of Fisheries and Marine Resources</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">187729</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-20961"><narrative>Ministry of Fisheries and Marine Resources</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">311909</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-20961"><narrative>Ministry of Fisheries and Marine Resources</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">-3149</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-20961"><narrative>Ministry of Fisheries and Marine Resources</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">97896</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-20961"><narrative>Ministry of Fisheries and Marine Resources</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">-44248</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-20961"><narrative>Ministry of Fisheries and Marine Resources</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">-73</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-20961"><narrative>Ministry of Fisheries and Marine Resources</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-9771</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-20961"><narrative>Ministry of Fisheries and Marine Resources</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-997</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-20961"><narrative>Ministry of Fisheries and Marine Resources</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-3961</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-20961"><narrative>Ministry of Fisheries and Marine Resources</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-4663</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-20961"><narrative>Ministry of Fisheries and Marine Resources</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-4961</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-20961"><narrative>Ministry of Fisheries and Marine Resources</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-8025</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-20961"><narrative>Ministry of Fisheries and Marine Resources</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-8854</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-20961"><narrative>Ministry of Fisheries and Marine Resources</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-10100</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-20961"><narrative>Ministry of Fisheries and Marine Resources</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-9713</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-20961"><narrative>Ministry of Fisheries and Marine Resources</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-9136</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-20961"><narrative>Ministry of Fisheries and Marine Resources</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-9468</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-20961"><narrative>Ministry of Fisheries and Marine Resources</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-9363</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-20961"><narrative>Ministry of Fisheries and Marine Resources</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-9296</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-20961"><narrative>Ministry of Fisheries and Marine Resources</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-9413</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-20961"><narrative>Ministry of Fisheries and Marine Resources</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-8406</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-20961"><narrative>Ministry of Fisheries and Marine Resources</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-10680</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-20961"><narrative>Ministry of Fisheries and Marine Resources</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-9502</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-20961"><narrative>Ministry of Fisheries and Marine Resources</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-25530</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-20961"><narrative>Ministry of Fisheries and Marine Resources</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-25612</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-20961"><narrative>Ministry of Fisheries and Marine Resources</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-25856</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-20961"><narrative>Ministry of Fisheries and Marine Resources</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P151777"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P151777?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P151777"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Electronic Monitoring System for long-line vessels developed in the Solomon Islands
</narrative></title>
<baseline year="2015" iso-date="2015-04-29" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-04-29" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Electronic monitoring system for long-line vessels has been developed in the Solomon Islands as a part of the pilot program. It was rolled out to an additional 9 vessels during the remaining life of the project.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances registered related to delivery of project benefits that are addressed
</narrative></title>
<baseline year="2015" iso-date="2015-04-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-04-29" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;No grievances were registered.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Coastal fish resources assessed as the basis for improved management
</narrative></title>
<baseline year="2015" iso-date="2015-04-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-04-29" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Assessments for coral, clams and trochus were&amp;nbsp;completed.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
MFMRs monitoring, control and surveillance institutional capacity strengthened through expansion of the Compliance Officer Program
</narrative></title>
<baseline year="2015" iso-date="2015-04-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-04-29" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;10 of the 24 certified compliance officers are female (42%). Over time, these Compliance Officers have been absorbed in to the public service staff establishment&amp;nbsp;and at project closure only two were still funded by PROP&amp;nbsp;and were planned for absorption into MFMR after project closure. One officer left MFMR so the number reduced from 25 to 24 in the reporting period.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="24.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Coastal fisheries management plans designed for key species in the Solomon Islands
</narrative></title>
<baseline year="2015" iso-date="2015-04-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-04-29" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Three management plans were prepared and are under implementation: coral, trochus&amp;nbsp;and giant clam.&amp;nbsp; An existing beche-de-mer plan was also updated.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Management plans for key coastal fish species implemented in the Solomon Islands
</narrative></title>
<baseline year="2015" iso-date="2015-04-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-04-29" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Three management plans are under implementation: coral, trochus and giant clam (clam and corals are addressed in a single shared document).&amp;nbsp; The&amp;nbsp;beche-de-mer plan was also updated.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Electronic monitoring system for long-line vessels piloted in the Solomon Islands
</narrative></title>
<baseline year="2015" iso-date="2015-04-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-04-29" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;EMS has been successfully piloted in seven long-line vessels. The system was rolled out to an additional nine vessels prior to project closure.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="7.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T00:13:13" hierarchy="1"><iati-identifier>44000-P161319</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Tina River Hydropower Development Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The project development objective (PDO) is to increase the share of renewable energy through hydropower in Solomon Islands.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SB–P0030671"><narrative>Solomon Islands</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SB–P0030671"><narrative>Solomon Islands</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SB-COA-0030672"><narrative>Solomon Islands Ministry of Mines, Energy and Rural Electrification</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2017-04-28"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2017-06-20"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2029-02-15"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2029-02-15"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Nicolas Jean Marie Sans</narrative></person-name><telephone>+1-202-473-1000</telephone><email>nsans@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>









<recipient-country code="SB" percentage="100"><narrative xml:lang="en">SOLOMON ISLANDS</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002105135" />
            <name><narrative>Ngalimbiu</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.478 159.7572</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002106427" />
            <name><narrative>Mangakiki</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.3309 159.59732</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002108502" />
            <name><narrative>Honiara</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.43333 159.95</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002108832" />
            <name><narrative>Guadalcanal Island</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.57062 160.13947</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002102569" />
            <name><narrative>Tina River</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.5388 160.09335</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><sector vocabulary="1" code="23220" percentage="90" xml:lang="en"/><sector vocabulary="1" code="23630" percentage="10" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LH" percentage="85.0000000" xml:lang="en"><narrative>FY17 - Renewable Energy Hydro</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LP" percentage="9.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Energy and Extractives</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LT" percentage="6.00000000" xml:lang="en"><narrative>FY17 - Energy Transmission and Distribution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000023" percentage="94" xml:lang="en"><narrative>Public Private Partnerships</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="100" xml:lang="en"><narrative>Climate change</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">76941.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">44310.60</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">99807.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">114639.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">127956.90</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">68598.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">146929.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">166860.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">90042.60</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">188706.30</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">194948.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">180219.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">180219.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">180219.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">180219.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">180219.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">180219.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">180219.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">180219.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">180219.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">180219.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">180219.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">180219.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">366781.61</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">366781.61</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">366781.61</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">366781.61</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">366781.61</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">366781.61</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">366781.61</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">366781.61</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">366781.61</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">366781.61</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">366781.61</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">366781.59</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">602273.08</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">602273.08</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">602273.08</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">602273.08</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">602273.08</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">602273.08</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">602273.08</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">602273.08</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">602273.08</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">602273.08</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">602273.08</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">602273.12</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">376145.70</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">775868.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">802133.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">409888.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">837606.30</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">873357.60</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">447555.60</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">909634.20</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">923137.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">464797.80</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">938556.60</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">957529.20</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">977276.53</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">977276.53</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">977276.53</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">977276.53</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">977276.53</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">977276.53</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">977276.53</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">977276.53</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">977276.53</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">977276.53</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">5944.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">100000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">83034.03</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">72656.03</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">69556.94</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">200000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">150000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">75913.62</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">70775.81</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-15"/>
<value currency="USD" value-date="2029-02-15">8063563.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-15"/>
<value currency="USD" value-date="2029-02-15">8063563.50</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">10255000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30673"><narrative>Solomon Islands Electricity Authority; Solomon Islands Ministry of Mines, Energy and Rural Electrification; Tina Hydropower Limited</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">23375000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30673"><narrative>Solomon Islands Electricity Authority; Solomon Islands Ministry of Mines, Energy and Rural Electrification; Tina Hydropower Limited</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">12500000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30673"><narrative>Solomon Islands Electricity Authority; Solomon Islands Ministry of Mines, Energy and Rural Electrification; Tina Hydropower Limited</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">9500000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30673"><narrative>Solomon Islands Electricity Authority; Solomon Islands Ministry of Mines, Energy and Rural Electrification; Tina Hydropower Limited</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">3000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30673"><narrative>Solomon Islands Electricity Authority; Solomon Islands Ministry of Mines, Energy and Rural Electrification; Tina Hydropower Limited</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">200000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30673"><narrative>Solomon Islands Electricity Authority; Solomon Islands Ministry of Mines, Energy and Rural Electrification; Tina Hydropower Limited</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">75914</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30673"><narrative>Solomon Islands Electricity Authority; Solomon Islands Ministry of Mines, Energy and Rural Electrification; Tina Hydropower Limited</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">70776</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30673"><narrative>Solomon Islands Electricity Authority; Solomon Islands Ministry of Mines, Energy and Rural Electrification; Tina Hydropower Limited</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">2066578</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30673"><narrative>Solomon Islands Electricity Authority; Solomon Islands Ministry of Mines, Energy and Rural Electrification; Tina Hydropower Limited</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-01-31"/><value value-date="2020-01-31">52294</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30673"><narrative>Solomon Islands Electricity Authority; Solomon Islands Ministry of Mines, Energy and Rural Electrification; Tina Hydropower Limited</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">170556</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30673"><narrative>Solomon Islands Electricity Authority; Solomon Islands Ministry of Mines, Energy and Rural Electrification; Tina Hydropower Limited</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">91951</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30673"><narrative>Solomon Islands Electricity Authority; Solomon Islands Ministry of Mines, Energy and Rural Electrification; Tina Hydropower Limited</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">20380</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30673"><narrative>Solomon Islands Electricity Authority; Solomon Islands Ministry of Mines, Energy and Rural Electrification; Tina Hydropower Limited</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">1238322</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30673"><narrative>Solomon Islands Electricity Authority; Solomon Islands Ministry of Mines, Energy and Rural Electrification; Tina Hydropower Limited</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">2555132</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30673"><narrative>Solomon Islands Electricity Authority; Solomon Islands Ministry of Mines, Energy and Rural Electrification; Tina Hydropower Limited</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">189052</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30673"><narrative>Solomon Islands Electricity Authority; Solomon Islands Ministry of Mines, Energy and Rural Electrification; Tina Hydropower Limited</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">85948</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30673"><narrative>Solomon Islands Electricity Authority; Solomon Islands Ministry of Mines, Energy and Rural Electrification; Tina Hydropower Limited</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">1710353</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30673"><narrative>Solomon Islands Electricity Authority; Solomon Islands Ministry of Mines, Energy and Rural Electrification; Tina Hydropower Limited</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">86824</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30673"><narrative>Solomon Islands Electricity Authority; Solomon Islands Ministry of Mines, Energy and Rural Electrification; Tina Hydropower Limited</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">155216</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30673"><narrative>Solomon Islands Electricity Authority; Solomon Islands Ministry of Mines, Energy and Rural Electrification; Tina Hydropower Limited</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">144454</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30673"><narrative>Solomon Islands Electricity Authority; Solomon Islands Ministry of Mines, Energy and Rural Electrification; Tina Hydropower Limited</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">147569</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30673"><narrative>Solomon Islands Electricity Authority; Solomon Islands Ministry of Mines, Energy and Rural Electrification; Tina Hydropower Limited</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">84819</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30673"><narrative>Solomon Islands Electricity Authority; Solomon Islands Ministry of Mines, Energy and Rural Electrification; Tina Hydropower Limited</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">172260</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30673"><narrative>Solomon Islands Electricity Authority; Solomon Islands Ministry of Mines, Energy and Rural Electrification; Tina Hydropower Limited</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">76137</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30673"><narrative>Solomon Islands Electricity Authority; Solomon Islands Ministry of Mines, Energy and Rural Electrification; Tina Hydropower Limited</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">47838</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30673"><narrative>Solomon Islands Electricity Authority; Solomon Islands Ministry of Mines, Energy and Rural Electrification; Tina Hydropower Limited</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">137029</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30673"><narrative>Solomon Islands Electricity Authority; Solomon Islands Ministry of Mines, Energy and Rural Electrification; Tina Hydropower Limited</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">120306</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30673"><narrative>Solomon Islands Electricity Authority; Solomon Islands Ministry of Mines, Energy and Rural Electrification; Tina Hydropower Limited</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">73545</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30673"><narrative>Solomon Islands Electricity Authority; Solomon Islands Ministry of Mines, Energy and Rural Electrification; Tina Hydropower Limited</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">91871</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30673"><narrative>Solomon Islands Electricity Authority; Solomon Islands Ministry of Mines, Energy and Rural Electrification; Tina Hydropower Limited</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">166103</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30673"><narrative>Solomon Islands Electricity Authority; Solomon Islands Ministry of Mines, Energy and Rural Electrification; Tina Hydropower Limited</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">82088</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30673"><narrative>Solomon Islands Electricity Authority; Solomon Islands Ministry of Mines, Energy and Rural Electrification; Tina Hydropower Limited</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">668615</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30673"><narrative>Solomon Islands Electricity Authority; Solomon Islands Ministry of Mines, Energy and Rural Electrification; Tina Hydropower Limited</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">4997612</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30673"><narrative>Solomon Islands Electricity Authority; Solomon Islands Ministry of Mines, Energy and Rural Electrification; Tina Hydropower Limited</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">116343</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30673"><narrative>Solomon Islands Electricity Authority; Solomon Islands Ministry of Mines, Energy and Rural Electrification; Tina Hydropower Limited</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">158195</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30673"><narrative>Solomon Islands Electricity Authority; Solomon Islands Ministry of Mines, Energy and Rural Electrification; Tina Hydropower Limited</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">7800</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30673"><narrative>Solomon Islands Electricity Authority; Solomon Islands Ministry of Mines, Energy and Rural Electrification; Tina Hydropower Limited</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">48355</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30673"><narrative>Solomon Islands Electricity Authority; Solomon Islands Ministry of Mines, Energy and Rural Electrification; Tina Hydropower Limited</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">3800843</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30673"><narrative>Solomon Islands Electricity Authority; Solomon Islands Ministry of Mines, Energy and Rural Electrification; Tina Hydropower Limited</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">53670</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30673"><narrative>Solomon Islands Electricity Authority; Solomon Islands Ministry of Mines, Energy and Rural Electrification; Tina Hydropower Limited</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">34946</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30673"><narrative>Solomon Islands Electricity Authority; Solomon Islands Ministry of Mines, Energy and Rural Electrification; Tina Hydropower Limited</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">98577</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30673"><narrative>Solomon Islands Electricity Authority; Solomon Islands Ministry of Mines, Energy and Rural Electrification; Tina Hydropower Limited</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">1900000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30673"><narrative>Solomon Islands Electricity Authority; Solomon Islands Ministry of Mines, Energy and Rural Electrification; Tina Hydropower Limited</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-1938</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30673"><narrative>Solomon Islands Electricity Authority; Solomon Islands Ministry of Mines, Energy and Rural Electrification; Tina Hydropower Limited</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">1951000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30673"><narrative>Solomon Islands Electricity Authority; Solomon Islands Ministry of Mines, Energy and Rural Electrification; Tina Hydropower Limited</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">118550</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30673"><narrative>Solomon Islands Electricity Authority; Solomon Islands Ministry of Mines, Energy and Rural Electrification; Tina Hydropower Limited</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">412136</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30673"><narrative>Solomon Islands Electricity Authority; Solomon Islands Ministry of Mines, Energy and Rural Electrification; Tina Hydropower Limited</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">547717</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30673"><narrative>Solomon Islands Electricity Authority; Solomon Islands Ministry of Mines, Energy and Rural Electrification; Tina Hydropower Limited</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">267865</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30673"><narrative>Solomon Islands Electricity Authority; Solomon Islands Ministry of Mines, Energy and Rural Electrification; Tina Hydropower Limited</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">272835</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30673"><narrative>Solomon Islands Electricity Authority; Solomon Islands Ministry of Mines, Energy and Rural Electrification; Tina Hydropower Limited</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-7800</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30673"><narrative>Solomon Islands Electricity Authority; Solomon Islands Ministry of Mines, Energy and Rural Electrification; Tina Hydropower Limited</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-53670</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30673"><narrative>Solomon Islands Electricity Authority; Solomon Islands Ministry of Mines, Energy and Rural Electrification; Tina Hydropower Limited</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-66302</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30673"><narrative>Solomon Islands Electricity Authority; Solomon Islands Ministry of Mines, Energy and Rural Electrification; Tina Hydropower Limited</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-82517</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30673"><narrative>Solomon Islands Electricity Authority; Solomon Islands Ministry of Mines, Energy and Rural Electrification; Tina Hydropower Limited</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P161319"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P161319?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P161319"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Hydropower generation capacity constructed under the project (Megawatt, Corporate Breakdown)
</narrative></title>
<baseline year="2017" iso-date="2017-06-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-25" />
<period-end iso-date="2029-02-13" />
<target value="15.00">
<comment><narrative>
Construction ongoing; commissioning expected by 02/2028.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Completion of Dam Safety Advisory Panel annual reviews (Number, Custom)
</narrative></title>
<baseline year="2017" iso-date="2017-06-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-20" />
<period-end iso-date="2029-02-11" />
<target value="9.00">
<comment><narrative>
The Dam Safety Advisory Pannel (DSAP) has completed 5 annual reviews with the last review mission held in September/October 2025. The next DSAP review mission is tentatively planned for March 2026.
</narrative></comment>
</target>
<actual value="5">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Electricity generated by the Project (Gigawatt-hour (GWh), Custom)
</narrative></title>
<baseline year="2017" iso-date="2017-06-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-25" />
<period-end iso-date="2029-02-13" />
<target value="78.35">
<comment><narrative>
Construction ongoing; commissioning expected by 02/2028.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Electricity generated by the Project (Gigawatt-hour (GWh), Custom)
</narrative></title>
<baseline year="2017" iso-date="2017-06-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-25" />
<period-end iso-date="2029-02-13" />
<target value="78.35">
<comment><narrative>
Construction ongoing; commissioning expected by 02/2028.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Hydropower generation capacity constructed under the project (Megawatt, Corporate Breakdown)
</narrative></title>
<baseline year="2017" iso-date="2017-06-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-25" />
<period-end iso-date="2029-02-13" />
<target value="15.00">
<comment><narrative>
Construction ongoing; commissioning expected by 02/2028.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Hydropower generation capacity constructed under the project (Megawatt, Corporate Breakdown)
</narrative></title>
<baseline year="2017" iso-date="2017-06-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-25" />
<period-end iso-date="2029-02-13" />
<target value="15.00">
<comment><narrative>
Construction ongoing; commissioning expected by 02/2028.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of hydropower in the generation mix (Percentage, Custom)
</narrative></title>
<baseline year="2017" iso-date="2017-06-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-07" />
<period-end iso-date="2029-02-14" />
<target value="68.00">
<comment><narrative>
Construction ongoing; commissioning expected by 02/2028.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of hydropower in the generation mix (Percentage, Custom)
</narrative></title>
<baseline year="2017" iso-date="2017-06-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-07" />
<period-end iso-date="2029-02-14" />
<target value="68.00">
<comment><narrative>
Construction ongoing; commissioning expected by 02/2028.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy capacity enabled with direct support
</narrative></title>
<baseline year="2017" iso-date="2017-06-06" value="000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-06" />
<period-end iso-date="2029-02-12" />
<target value="15">
<comment><narrative>
Construction ongoing; commissioning expected by 02/2028.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Transmission lines constructed or rehabilitated under the project (Kilometers, Custom)
</narrative></title>
<baseline year="2017" iso-date="2017-06-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-20" />
<period-end iso-date="2029-02-12" />
<target value="23.00">
<comment><narrative>
Procurement for Infrastructure Works Contract is underway – tender has closed in November 2025, anticipating contractor mobilization to site in June 2026.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Preparation of Protected Area Management Plan and Budget by upper catchment communities (Yes/No, Custom)
</narrative></title>
<baseline year="2017" iso-date="2017-06-20" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-20" />
<period-end iso-date="2029-02-11" />
<target value="Yes">
<comment><narrative>
Work is ongoing to prepare terms of reference for the recruitment of a consulting firm to support the Project Office with establishment of a Protected Area in the Upper Tina Catchment area.
</narrative></comment>
</target>
<actual value="NO">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net greenhouse gas (GHG) reduction (tCO2-eq per year) (Tones/year, Custom)
</narrative></title>
<baseline year="2017" iso-date="2017-06-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-20" />
<period-end iso-date="2029-02-15" />
<target value="49,500.00">
<comment><narrative>
Construction ongoing; commissioning expected by 02/2028.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women who are satisfied with the way in which their individual Tribal Cooperative account funds, and those of their children, are spent (Percentage, Custom)
</narrative></title>
<baseline year="2017" iso-date="2017-06-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-20" />
<period-end iso-date="2029-02-11" />
<target value="75.00">
<comment><narrative>
The baseline socio-economic survey was completed in 2021. To date, no funds have been disbursed from the Tribal Cooperative Society accounts to individual members, as the (Tina Core Land Company) TCLC and the five (5) tribal co-operative societies have not yet reached the stage of full commercial operation under the Land Lease Agreement. Payments under the Land Lease (royalties, rental income) are an operational-phase entitlement, and accordingly, this indicator is not yet measurable.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Electricity generated by the Project (Gigawatt-hour (GWh), Custom)
</narrative></title>
<baseline year="2017" iso-date="2017-06-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-25" />
<period-end iso-date="2029-02-13" />
<target value="78.35">
<comment><narrative>
Construction ongoing; commissioning expected by 02/2028.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Hydropower generation capacity constructed under the project (Megawatt, Corporate Breakdown)
</narrative></title>
<baseline year="2017" iso-date="2017-06-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-25" />
<period-end iso-date="2029-02-13" />
<target value="15.00">
<comment><narrative>
Construction ongoing; commissioning expected by 02/2028.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Electricity generated by the Project (Gigawatt-hour (GWh), Custom)
</narrative></title>
<baseline year="2017" iso-date="2017-06-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-25" />
<period-end iso-date="2029-02-13" />
<target value="78.35">
<comment><narrative>
Construction ongoing; commissioning expected by 02/2028.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Electricity generated by the Project (Gigawatt-hour (GWh), Custom)
</narrative></title>
<baseline year="2017" iso-date="2017-06-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-25" />
<period-end iso-date="2029-02-13" />
<target value="78.35">
<comment><narrative>
Construction ongoing; commissioning expected by 02/2028.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Hydropower generation capacity constructed under the project (Megawatt, Corporate Breakdown)
</narrative></title>
<baseline year="2017" iso-date="2017-06-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-25" />
<period-end iso-date="2029-02-13" />
<target value="15.00">
<comment><narrative>
Construction ongoing; commissioning expected by 02/2028.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in project-affected community household consumption before and after hydropower facility commissioning (Percentage, Custom)
</narrative></title>
<baseline year="2017" iso-date="2017-06-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-20" />
<period-end iso-date="2029-02-11" />
<target value="20.00">
<comment><narrative>
The baseline socio-economic survey was completed in 2021. . Construction ongoing; commissioning expected by 02/2028.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of hydropower in the generation mix (Percentage, Custom)
</narrative></title>
<baseline year="2017" iso-date="2017-06-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-07" />
<period-end iso-date="2029-02-14" />
<target value="68.00">
<comment><narrative>
Construction ongoing; commissioning expected by 02/2028.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of hydropower in the generation mix (Percentage, Custom)
</narrative></title>
<baseline year="2017" iso-date="2017-06-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-07" />
<period-end iso-date="2029-02-14" />
<target value="68.00">
<comment><narrative>
Construction ongoing; commissioning expected by 02/2028.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy capacity enabled with direct support
</narrative></title>
<baseline year="2017" iso-date="2017-06-06" value="000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-06" />
<period-end iso-date="2029-02-12" />
<target value="15">
<comment><narrative>
Construction ongoing; commissioning expected by 02/2028.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Electricity generated by the Project (Gigawatt-hour (GWh), Custom)
</narrative></title>
<baseline year="2017" iso-date="2017-06-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-25" />
<period-end iso-date="2029-02-13" />
<target value="78.35">
<comment><narrative>
Construction ongoing; commissioning expected by 02/2028.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private Capital Mobilized (Amount(USD), Custom
</narrative></title>
<baseline year="2017" iso-date="2017-06-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-20" />
<period-end iso-date="2025-12-05" />
<target value="10,800,000.00">
<comment><narrative>
Private equity subscription was completed in August 2024.
</narrative></comment>
</target>
<actual value="10800000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Transmission lines constructed or rehabilitated under the project (Kilometers, Custom)
</narrative></title>
<baseline year="2017" iso-date="2017-06-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-20" />
<period-end iso-date="2029-02-12" />
<target value="23.00">
<comment><narrative>
Procurement for Infrastructure Works Contract is underway – tender has closed in November 2025, anticipating contractor mobilization to site in March 2026.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Completion of semi-annual, independent social and environmental monitoring reports (Number, Custom)
</narrative></title>
<baseline year="2017" iso-date="2017-06-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-20" />
<period-end iso-date="2029-02-11" />
<target value="18.00">
<comment><narrative>
The Lender's Technical Advisor (LTA), including the Independent social and environmental monitoring agent commenced in February 2020. The 10th semi-annual report was submitted on February 22nd, 2026. The 11th semi-annual report is anticipated for submission around August 15th, 2026.
</narrative></comment>
</target>
<actual value="10">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net greenhouse gas (GHG) reduction (tCO2-eq per year) (Tones/year, Custom)
</narrative></title>
<baseline year="2017" iso-date="2017-06-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-20" />
<period-end iso-date="2029-02-15" />
<target value="49,500.00">
<comment><narrative>
Construction ongoing; commissioning expected by 02/2028.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Preparation of Protected Area Management Plan and Budget by upper catchment communities (Yes/No, Custom)
</narrative></title>
<baseline year="2017" iso-date="2017-06-20" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-20" />
<period-end iso-date="2029-02-11" />
<target value="Yes">
<comment><narrative>
Procurement is ongoing for the recruitment of a consulting firm to support the Project Office with establishment of a Protected Area in the Upper Tina Catchment area.
</narrative></comment>
</target>
<actual value="NO">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Fuel savings (million liters per year) (Liters (Million), Custom)
</narrative></title>
<baseline year="2017" iso-date="2017-06-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-20" />
<period-end iso-date="2029-02-13" />
<target value="18.00">
<comment><narrative>
Construction ongoing; commissioning expected by 02/2028.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private Capital Mobilized (Amount(USD), Custom
</narrative></title>
<baseline year="2017" iso-date="2017-06-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-20" />
<period-end iso-date="2025-12-05" />
<target value="10,800,000.00">
<comment><narrative>
Private equity subscription was completed in August 2024.
</narrative></comment>
</target>
<actual value="10800000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in project-affected community household consumption before and after hydropower facility commissioning (Percentage, Custom)
</narrative></title>
<baseline year="2017" iso-date="2017-06-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-20" />
<period-end iso-date="2029-02-11" />
<target value="20.00">
<comment><narrative>
The baseline socio-economic survey was completed in 2021. Construction ongoing; commissioning expected by 02/2028.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Fuel savings (million liters per year) (Liters (Million), Custom)
</narrative></title>
<baseline year="2017" iso-date="2017-06-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-20" />
<period-end iso-date="2029-02-13" />
<target value="18.00">
<comment><narrative>
Construction ongoing; commissioning expected by 02/2028.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Quarterly meetings of the Gender Action Plan Steering Committee taking place in a year (Number, Custom)
</narrative></title>
<baseline year="2017" iso-date="2017-06-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-20" />
<period-end iso-date="2029-02-11" />
<target value="37.00">
<comment><narrative>
The Gender Steering Committee (GSC) was established on July 3, 2019 with 21 meetings held so far. A GSC meeting was held on July 4, 2025 for Q2. There was no GSC meeting held for Q3 due to funding constraints that affected the implementation of planned activities. To address this gap, two GSC meetings are scheduled for Q4 to ensure coverage of pending matters from Q3.
</narrative></comment>
</target>
<actual value="21">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Completion of Dam Safety Advisory Panel annual reviews (Number, Custom)
</narrative></title>
<baseline year="2017" iso-date="2017-06-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-20" />
<period-end iso-date="2029-02-11" />
<target value="9.00">
<comment><narrative>
The Dam Safety Advisory Pannel (DSAP) has completed six annual reviews with the last review mission held in March 2026. The next DSAP review mission is tentatively planned for October 2026.
</narrative></comment>
</target>
<actual value="6">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of hydropower in the generation mix (Percentage, Custom)
</narrative></title>
<baseline year="2017" iso-date="2017-06-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-07" />
<period-end iso-date="2029-02-14" />
<target value="68.00">
<comment><narrative>
Construction ongoing; commissioning expected by 02/2028.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Completion of semi-annual, independent social and environmental monitoring reports (Number, Custom)
</narrative></title>
<baseline year="2017" iso-date="2017-06-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-20" />
<period-end iso-date="2029-02-11" />
<target value="18.00">
<comment><narrative>
The 8th semi-annual report was submitted on February 15, 2025 and the 9th semi-annual report was submitted on October 7, 2025.
</narrative></comment>
</target>
<actual value="9">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Hydropower generation capacity constructed under the project (Megawatt, Corporate Breakdown)
</narrative></title>
<baseline year="2017" iso-date="2017-06-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-25" />
<period-end iso-date="2029-02-13" />
<target value="15.00">
<comment><narrative>
Construction ongoing; commissioning expected by 02/2028.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Quarterly meetings of the Gender Action Plan Steering Committee taking place in a year (Number, Custom)
</narrative></title>
<baseline year="2017" iso-date="2017-06-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-20" />
<period-end iso-date="2029-02-11" />
<target value="37.00">
<comment><narrative>
The Gender Steering Committee (GSC) was established on July 3rd, 2019. The 22nd GSC meeting was held on December 2, 2025. In 2026, two meetings are targeted in Q2 and one meeting per quarter thereafter.
</narrative></comment>
</target>
<actual value="22">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads constructed, Rural (Kilometers, Custom)
</narrative></title>
<baseline year="2017" iso-date="2017-06-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-20" />
<period-end iso-date="2029-02-12" />
<target value="18.70">
<comment><narrative>
Excavation for Lots 2 and 3 has been substantially completed.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of hydropower in the generation mix (Percentage, Custom)
</narrative></title>
<baseline year="2017" iso-date="2017-06-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-07" />
<period-end iso-date="2029-02-14" />
<target value="68.00">
<comment><narrative>
Construction ongoing; commissioning expected by 02/2028.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads constructed, Rural (Kilometers, Custom)
</narrative></title>
<baseline year="2017" iso-date="2017-06-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-20" />
<period-end iso-date="2029-02-12" />
<target value="18.70">
<comment><narrative>
Excavation for Lots 1, 2 and 3 has been substantially completed with RCC pavement of steep sections and ongoing maintenance.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women who are satisfied with the way in which their individual Tribal Cooperative account funds, and those of their children, are spent (Percentage, Custom)
</narrative></title>
<baseline year="2017" iso-date="2017-06-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-20" />
<period-end iso-date="2029-02-11" />
<target value="75.00">
<comment><narrative>
The baseline socio-economic survey was completed in 2021. The mid-term socio-economic survey is ongoing with survey work started on November 10, 2025.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T00:13:13" hierarchy="1"><iati-identifier>44000-P161320</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Community Access and Urban Services Enhancement Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To improve basic infrastructure and services for vulnerable urban populations in targeted urban centers of the Recipient.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Community Access and Urban Services Enhancement Project for Solomon Islands is to improve basic infrastructure and services for vulnerable urban populations in targeted urban centers of the recipient. The project comprises of four components. The first component, urban works and services, includes activities of engagement of community groups and contractors through community grants and contracts to build basic transport infrastructure and provide waste management and cleaning services. It consists of following sub-components: (i) community access infrastructure; and (ii) community-based waste management services. The second component, road maintenance and repair supports transport development priorities identified in the national transport plan (NTP) across the feeder and lower tier road network in Honiara and selected urban areas of Guadalcanal province. It consists of following sub-components: (i) community-based road maintenance; and (ii) community-based road improvement and rehabilitation. The third component, infrastructure and service delivery training (ISDT) will provide skills training for 5,300 individuals from targeted urban communities and contractors to strengthen their knowledge of basic life and job-readiness skills; and increase their capacity to access benefits linked to labor-based activities funded by the project. The fourth component, project management will finance project management support, including safeguards oversight, monitoring and evaluation (M and E), audits, communications, and media support (for the project overall, and specifically around the waste management services to increase awareness), short-term technical help, training, financial management, procurement, and provision of goods and operating costs.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SB–P0030675"><narrative>Solomon Islands Ministry of Finance and Treasury</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SB-COA-0030677"><narrative>Honiara City Council</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2018-03-19"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2018-04-02"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2024-10-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2024-10-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Ifeta Smajic</narrative></person-name><telephone>+1-202-473-1000</telephone><email>ismajic@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>




<recipient-country code="SB" percentage="100"><narrative xml:lang="en">SOLOMON ISLANDS</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002101556" />
            <name><narrative>Western Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8 157</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002106552" />
            <name><narrative>Malaita Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9 161</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002108831" />
            <name><narrative>Guadalcanal Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.63333 160.2</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002108857" />
            <name><narrative>Gizo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.10303 156.84186</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002109701" />
            <name><narrative>Auki</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.76778 160.69778</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002178723" />
            <name><narrative>Malo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.69859 165.79894</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0008987088" />
            <name><narrative>Munda</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.32806 157.27083</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0009035073" />
            <name><narrative>Noro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.22274 157.19978</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0009259067" />
            <name><narrative>Honiara</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.44167 159.96667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="43032" percentage="32" xml:lang="en"/><sector vocabulary="1" code="21023" percentage="24" xml:lang="en"/><sector vocabulary="1" code="14050" percentage="24" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="20" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WB" percentage="22.0000000" xml:lang="en"><narrative>FY17 - Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TC" percentage="58.0000000" xml:lang="en"><narrative>FY17 - Urban Transport</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="11.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="9.00000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000066" percentage="20" xml:lang="en"><narrative>Labor Market Policy and Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000223" percentage="20" xml:lang="en"><narrative>Youth Employment</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="20" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="100" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000066" percentage="20" xml:lang="en"><narrative>Labor Market Policy and Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="38" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="54" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="100" xml:lang="en"><narrative>Urban Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="100" xml:lang="en"><narrative>Urban Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000221" percentage="29" xml:lang="en"><narrative>Job Creation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="68" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000066" percentage="20" xml:lang="en"><narrative>Labor Market Policy and Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="38" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000661" percentage="20" xml:lang="en"><narrative>Skills Development</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="1900-01-01"/>
<period-end iso-date="1900-01-01"/>
<value currency="USD" value-date="1900-01-01">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">13275.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">42735.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">51585.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">29100.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">64440.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">72225.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">80280.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">91305.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">49410.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">104235.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">109065.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">112950.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">58410.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">120705.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">125310.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">127245.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">127620.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">65595.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">138180.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">151350.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">159180.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">166275.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">87510.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">186975.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">200640.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">212340.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">225195.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">117705.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">244875.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">257730.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">269190.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">278520.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">143640.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">296715.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">307545.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">316215.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">160965.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">331695.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">343770.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">350895.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">353790.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">180630.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">368880.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">372960.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">370200.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">371520.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">187905.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">376380.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">372630.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">370260.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">372390.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">186045.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">370125.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="1900-01-01"/>
<period-end iso-date="1900-01-01"/>
<value currency="USD" value-date="1900-01-01">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">264448.24</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">23361.88</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">165226.71</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">24440.44</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">282411.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">168244.78</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">333766.10</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">709947.28</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">21860.92</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">413504.32</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">647934.09</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">21435.04</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">582944.89</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">32904.82</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">492859.86</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">12857.90</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">205152.87</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">486175.12</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">419732.63</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">22326.06</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">421448.03</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">18891.48</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">877188.31</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">19313.88</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">492045.69</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">498731.45</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">21021.53</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">578981.29</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">390796.80</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">444714.23</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">1005103.19</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">26361.03</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">570126.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">261977.68</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">340173.82</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">455676.62</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">455676.62</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">15000000</value><description xml:lang="en"><narrative>Total Commitment in April Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30677"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-647</value><description xml:lang="en"><narrative>Total Commitment Cancellations in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30677"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">264448</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30677"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">23362</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30677"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">165227</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30677"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">24440</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30677"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">282412</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30677"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">168245</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30677"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">333766</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30677"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">709947</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30677"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">21861</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30677"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">413504</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30677"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">647934</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30677"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">21435</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30677"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">582945</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30677"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">32905</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30677"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">492860</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30677"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">12858</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30677"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">205153</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30677"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-01-31"/><value value-date="2020-01-31">486175</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30677"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">419733</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30677"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">22326</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30677"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">421448</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30677"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">18891</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30677"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">877188</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30677"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">19314</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30677"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">492046</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30677"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">498731</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30677"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">21022</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30677"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">578981</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30677"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">390797</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30677"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">444714</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30677"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">1005103</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30677"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">26361</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30677"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">570126</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30677"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">261978</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30677"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">888628</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30677"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">375978</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30677"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">308937</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30677"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">16096</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30677"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">566489</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30677"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">20506</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30677"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-01-31"/><value value-date="2022-01-31">505951</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30677"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">21054</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30677"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">487228</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30677"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">16967</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30677"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">17955</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30677"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">17265</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30677"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">147655</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30677"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">139681</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30677"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">50445</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30677"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">5253</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-30677"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P161320"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P161320?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P161320"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cumulative length of roads restored and maintained annually (km X years) (Kilometers)
</narrative></title>
<baseline year="2018" iso-date="2018-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-30" />
<period-end iso-date="2024-10-31" />
<target value="83.00">
<comment><narrative>
&amp;nbsp;

&amp;nbsp;
</narrative></comment>
</target>
<actual value="99.57">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Youth that are engaged in works or training activities
</narrative></title>
<baseline year="2018" iso-date="2018-03-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-03-28" />
<period-end iso-date="2024-09-30" />
<target value="4,200.00">
<comment><narrative>
Youth referred to participants ages 16-29.
</narrative></comment>
</target>
<actual value="4,303">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Community access infrastructure constructed
</narrative></title>
<baseline year="2018" iso-date="2018-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-30" />
<period-end iso-date="2024-10-31" />
<target value="212.00">
<comment><narrative>
&amp;nbsp;

Urban Works and Services are completed in most locations besides Honiara and GP.
</narrative></comment>
</target>
<actual value="213">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Trainees that expressed satisfaction with knowledge and skills received from ISDT
</narrative></title>
<baseline year="2018" iso-date="2018-04-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-22" />
<period-end iso-date="2024-10-23" />
<target value="80.00">
<comment><narrative>
Measured as the number of respondents that responded ‘very satisfied’ or ‘somewhat satisfied’ with the ISDT training/total survey respondents.  This indicator was captured through the second FUS (May 2023).
</narrative></comment>
</target>
<actual value="97">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of labor days generated (under Components 1 &amp; 2)
</narrative></title>
<baseline year="2018" iso-date="2018-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-30" />
<period-end iso-date="2024-10-31" />
<target value="370,000.00">
<comment><narrative>
As reported in the Quarterly Progress Report for end September 2024.
</narrative></comment>
</target>
<actual value="369,062">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances resolved within three months
</narrative></title>
<baseline year="2018" iso-date="2018-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-30" />
<period-end iso-date="2024-10-31" />
<target value="100.00">
<comment><narrative>
As reported in the Quarterly Progress Report for end September 2024 and verified by the GRM report.
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Trainees that expressed satisfaction with knowledge and skills received from ISDT
</narrative></title>
<baseline year="2018" iso-date="2018-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-30" />
<period-end iso-date="2024-10-31" />
<target value="80.00">
<comment><narrative>
infrastructure by community, and total Project direct beneficiaries
</narrative></comment>
</target>
<actual value="97">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances resolved within three months
</narrative></title>
<baseline year="2018" iso-date="2018-04-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-22" />
<period-end iso-date="2024-10-23" />
<target value="100.00">
<comment><narrative>
Data generated from CIMS.
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New bank accounts opened or reactivated as result of the project
</narrative></title>
<baseline year="2018" iso-date="2018-04-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-22" />
<period-end iso-date="2024-10-23" />
<target value="2,700.00">
<comment><narrative>
Community workers with new or reactivated bank accounts. Data generated from CIMS. The Project encountered problems with the banking service provider being unable to respond in a timely manner to the high demand. Despite steps taken to establish a uniform, predictable process for participants to register or reactive Bank account, the Project was unable to meet the indicator end target.
</narrative></comment>
</target>
<actual value="1,571.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Individuals trained under the ISDT
</narrative></title>
<baseline year="2018" iso-date="2018-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-30" />
<period-end iso-date="2024-10-31" />
<target value="8,400.00">

</target>
<actual value="8,857.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of roads improved to climate resilient standards (Kilometers)
</narrative></title>
<baseline year="2018" iso-date="2018-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-30" />
<period-end iso-date="2024-10-31" />
<target value="14.10">

</target>
<actual value="17.88">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Individuals trained under the ISDT
</narrative></title>
<baseline year="2018" iso-date="2018-04-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-22" />
<period-end iso-date="2024-10-23" />
<target value="8,400.00">

</target>
<actual value="8,857.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of waste collected
</narrative></title>
<baseline year="2018" iso-date="2018-04-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-22" />
<period-end iso-date="2024-10-23" />
<target value="78,000.00">

</target>
<actual value="66,522">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of job-focused interventions
</narrative></title>
<baseline year="2018" iso-date="2018-03-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-03-13" />
<period-end iso-date="2024-10-13" />
<target value="8,400.00">

</target>
<actual value="8,412">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Trainees that accessed post training support services (Number)
</narrative></title>
<baseline year="2018" iso-date="2018-04-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-22" />
<period-end iso-date="2024-10-23" />
<target value="2,500.00">
<comment><narrative>
Individual trained (recorded with unique ID number) who accessed one or several post training support services provided by the Project. Data generated from CIMS.
</narrative></comment>
</target>
<actual value="6,074.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of job-focused interventions
</narrative></title>
<baseline year="2018" iso-date="2018-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-30" />
<period-end iso-date="2024-10-31" />
<target value="8,400.00">
<comment><narrative>
As reported in the Quarterly Progress Report for ended September 2024. Includes 448 from the original (REP).
</narrative></comment>
</target>
<actual value="8,412">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of roads improved to climate resilient standards (Kilometers)
</narrative></title>
<baseline year="2018" iso-date="2018-04-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-22" />
<period-end iso-date="2024-10-23" />
<target value="14.10">

</target>
<actual value="17.88">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New bank accounts opened or reactivated as result of the project
</narrative></title>
<baseline year="2018" iso-date="2018-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-30" />
<period-end iso-date="2024-10-31" />
<target value="2,700.00">
<comment><narrative>
Although the number of accounts have increased, there are ongoing problems encountered by the project due to the inability of the banking service provider&amp;nbsp;to respond in a timely manner to the high demand. Despite steps taken to establish a uniform, predictable process for participants to register or reactive Bank account, the project is unlikely to meet the&amp;nbsp;indicator end target.
</narrative></comment>
</target>
<actual value="1,571.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Financial progress of road restoration and maintenance (USD) (Number)
</narrative></title>
<baseline year="2018" iso-date="2018-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-30" />
<period-end iso-date="2024-10-31" />
<target value="3,200,000.00">

</target>
<actual value="2,875,612">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries reporting that project investments reflected their needs
</narrative></title>
<baseline year="2018" iso-date="2018-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-30" />
<period-end iso-date="2024-10-31" />
<target value="70.00">
<comment><narrative>
&amp;nbsp;

Second Follow Up Survey (May, 2023).&amp;nbsp;The FUS asked about two main aspects of project investments reflecting beneficiary needs-infrastructure and ISDT training. The indicator is reported as the percentage of beneficiaries in the FUS2 responding positively to either infrastructure or ISDT reflecting their needs.&amp;nbsp;
</narrative></comment>
</target>
<actual value="96.70">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries from poor communities ranked as “highest priority” in the vulnerability index
</narrative></title>
<baseline year="2018" iso-date="2018-04-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-13" />
<period-end iso-date="2024-10-13" />
<target value="50.00">

</target>
<actual value="60">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Community members reporting that the infrastructure improved pedestrian safety
</narrative></title>
<baseline year="2018" iso-date="2018-04-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-14" />
<period-end iso-date="2024-10-14" />
<target value="80.00">

</target>
<actual value="95.40">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Community members reporting that the infrastructure improved pedestrian safety
</narrative></title>
<baseline year="2018" iso-date="2018-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-30" />
<period-end iso-date="2024-10-31" />
<target value="80.00">
<comment><narrative>
&amp;nbsp;

This indicator was captured through the Second Follow-Up Survey completed in 2023.
</narrative></comment>
</target>
<actual value="95.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cumulative length of roads restored and maintained annually (km X years) (Kilometers)
</narrative></title>
<baseline year="2018" iso-date="2018-04-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-22" />
<period-end iso-date="2024-10-23" />
<target value="83.00">

</target>
<actual value="99.57">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Trainees that are assessed as successfully completing the training
</narrative></title>
<baseline year="2018" iso-date="2018-04-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-22" />
<period-end iso-date="2024-10-23" />
<target value="80.00">
<comment><narrative>
Successfully completing means that the trainees have attended 80% or more of the 7-day ISDT, as reported in the ISDT Exit Survey.
</narrative></comment>
</target>
<actual value="93.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of labor days generated (under Components 1 &amp; 2)
</narrative></title>
<baseline year="2018" iso-date="2018-04-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-22" />
<period-end iso-date="2024-10-23" />
<target value="370,000.00">
<comment><narrative>
Data generated from CIMS (as labor days recorded per community worker engaged by the Project).
</narrative></comment>
</target>
<actual value="369,062">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Youth that are engaged in works or training activities
</narrative></title>
<baseline year="2018" iso-date="2018-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-30" />
<period-end iso-date="2024-10-31" />
<target value="4,200.00">
<comment><narrative>
&amp;nbsp;

As reported in the Quarterly Progress Report for end March 2024.
</narrative></comment>
</target>
<actual value="4,303">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Households in project areas benefiting from improved access to infrastructure, services or markets
</narrative></title>
<baseline year="2018" iso-date="2018-03-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-03-13" />
<period-end iso-date="2024-10-13" />
<target value="18,000.00">

</target>
<actual value="18,100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Trainees that accessed post training support services (Number)
</narrative></title>
<baseline year="2018" iso-date="2018-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-30" />
<period-end iso-date="2024-10-31" />
<target value="2,500.00">
<comment><narrative>
&amp;nbsp;

&amp;nbsp;
</narrative></comment>
</target>
<actual value="6,074.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries reporting that project investments reflected their needs
</narrative></title>
<baseline year="2018" iso-date="2018-04-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-13" />
<period-end iso-date="2024-10-13" />
<target value="70.00">

</target>
<actual value="96.60">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Financial progress of road restoration and maintenance (USD) (Number)
</narrative></title>
<baseline year="2018" iso-date="2018-04-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-22" />
<period-end iso-date="2024-10-23" />
<target value="3,200,000.00">

</target>
<actual value="2,875,612">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cumulative expenditure on spot improvement works (USD) (Number)
</narrative></title>
<baseline year="2018" iso-date="2018-04-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-22" />
<period-end iso-date="2024-10-23" />
<target value="2,200,000.00">

</target>
<actual value="2,111,590.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Individuals from project areas reporting improved access to infrastructure, services or markets
</narrative></title>
<baseline year="2018" iso-date="2018-04-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-13" />
<period-end iso-date="2024-10-13" />
<target value="75.00">

</target>
<actual value="93.40">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of waste collected
</narrative></title>
<baseline year="2018" iso-date="2018-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-30" />
<period-end iso-date="2024-10-31" />
<target value="78,000.00">

</target>
<actual value="66,522">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Households in project areas benefiting from improved access to infrastructure, services or markets
</narrative></title>
<baseline year="2018" iso-date="2018-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-30" />
<period-end iso-date="2024-10-31" />
<target value="18,000.00">
<comment><narrative>
&amp;nbsp;

Calculated based on: 2009 Census, population projection used based on 2.3% annual growth and estimated number of 5.5 people per household.&amp;nbsp;Google map aerial images dated 2019 for Honiara and 2016 for provinces.

&amp;nbsp;
</narrative></comment>
</target>
<actual value="18,100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cumulative expenditure on spot improvement works (USD) (Number)
</narrative></title>
<baseline year="2018" iso-date="2018-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-30" />
<period-end iso-date="2024-10-31" />
<target value="2,200,000.00">

</target>
<actual value="2,111,590.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries from poor communities ranked as “highest priority” in the vulnerability index
</narrative></title>
<baseline year="2018" iso-date="2018-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-30" />
<period-end iso-date="2024-10-31" />
<target value="50.00">
<comment><narrative>
Figure provided is cumulative over Project lifetime.
</narrative></comment>
</target>
<actual value="60">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Individuals from project areas reporting improved access to infrastructure, services or markets
</narrative></title>
<baseline year="2018" iso-date="2018-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-30" />
<period-end iso-date="2024-10-31" />
<target value="75.00">
<comment><narrative>
The Second Follow-up Survey (May 2023) was&amp;nbsp;used to estimate a percentage of individuals from project areas, who report improved access to infrastructure, services or markets.&amp;nbsp;

&amp;nbsp;
</narrative></comment>
</target>
<actual value="82.80">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Trainees that are assessed as successfully completing the training
</narrative></title>
<baseline year="2018" iso-date="2018-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-30" />
<period-end iso-date="2024-10-31" />
<target value="80.00">
<comment><narrative>
&amp;nbsp;

As reported in the ISDT Exit Survey.
</narrative></comment>
</target>
<actual value="93.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Community access infrastructure constructed
</narrative></title>
<baseline year="2018" iso-date="2018-04-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-22" />
<period-end iso-date="2024-10-23" />
<target value="212.00">

</target>
<actual value="213">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T00:13:13" hierarchy="1"><iati-identifier>44000-P162902</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>GEF Electricity Access and Renewable Energy Expansion Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The project development objective is to increase access to grid-supplied electricity and increase renewable energy generation in Solomon Islands.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of Electricity Access and Renewable Energy Expansion Project is to increase access to grid-supplied electricity and increase renewable energy generation in Solomon Islands. This project has four components. 1) The first component, Renewable Energy Hybrid Mini-grids, would finance supply, installation, and initial maintenance of new hybrid mini-grids throughout Solomon Islands. 2) The second component, Electricity Connections in Low-income Areas, would finance electricity connections to households, micro enterprises (such as small canteens), and community infrastructure (e.g., schools and hospitals) in low-income areas, through an output based aid (OBA) mechanism, building on the Electricity Access Expansion Project (EAEP). 3) The third component, Grid-connected Solar Power, would finance the supply, installation, and initial maintenance for one or more grid-connected solar facilities in Solomon Islands. 4) The fourth component, Enabling Environment and Project Management, consists of two subcomponents. Subcomponent 4.1 would finance specific areas of project management and implementation, including gender related activities, as well as technical assistance and training activities for SP. Subcomponent 4.2 would finance equipment, technical assistance and training activities to be carried out by SP for the benefit of Ministry of Mines, Energy and Rural Electrification (MMERE).]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SB–P0032299"><narrative>Solomon Islands</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SB–P0032299"><narrative>Solomon Islands</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SB-COA-0032298"><narrative>Solomon Islands Electricity Authority (Solomon Power)</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2018-01-09"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2018-07-05"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2025-11-28"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2025-11-28"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Slavena Georgieva</narrative></person-name><telephone>+1-202-473-1000</telephone><email>sgeorgieva1@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="SB" percentage="100"><narrative xml:lang="en">SOLOMON ISLANDS</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002101556" />
            <name><narrative>Western Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8 157</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002108262" />
            <name><narrative>Isabel Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.05379 159.13696</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002108831" />
            <name><narrative>Guadalcanal Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.63333 160.2</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002109495" />
            <name><narrative>Central Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.09667 160.24109</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002178472" />
            <name><narrative>Temotu Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.72754 165.93884</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002178512" />
            <name><narrative>Santa Ana Island</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.832 162.46686</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002178730" />
            <name><narrative>Makira-Ulawa Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.55751 161.78517</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007280292" />
            <name><narrative>Choiseul</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-6.99186 156.86279</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007280293" />
            <name><narrative>Rennell and Bellona</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-11.60516 160.15457</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002109701" />
            <name><narrative>Auki</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.76778 160.69778</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0009259067" />
            <name><narrative>Honiara</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.44167 159.96667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002106987" />
            <name><narrative>Lambi</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.40794 159.6086</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002102925" />
            <name><narrative>Tanahai</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.42721 159.91439</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002101875" />
            <name><narrative>Visale</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.6 157.33333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002103571" />
            <name><narrative>Seghe</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.58034 157.87688</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002102779" />
            <name><narrative>Taro'a</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.22389 161.2013</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002105329" />
            <name><narrative>Mount Nasuha</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.83442 160.61673</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><sector vocabulary="1" code="23230" percentage="95" xml:lang="en"/><sector vocabulary="1" code="23630" percentage="5" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LP" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Energy and Extractives</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LT" percentage="34.0000000" xml:lang="en"><narrative>FY17 - Energy Transmission and Distribution</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LU" percentage="56.0000000" xml:lang="en"><narrative>FY17 - Renewable Energy Solar</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000862" percentage="10" xml:lang="en"><narrative>Energy Policies &amp; Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000863" percentage="100" xml:lang="en"><narrative>Access to Energy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="5" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000086" percentage="100" xml:lang="en"><narrative>Energy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="82" xml:lang="en"><narrative>Climate change</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">8504.46</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">28314.70</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">33269.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">38213.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">42652.30</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">46679.60</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">52128.30</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">58668.80</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">62902.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">32300.80</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">65724.30</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">67938.80</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">69834.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">70410.80</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">68927.60</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">67815.20</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">69298.40</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">73408.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">78249.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">80412.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">41539.90</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">87714.80</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">93647.60</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">97613.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">72631.70</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">78233.79</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">82149.46</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">84081.96</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">88424.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">95105.19</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">142387.20</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">73078.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">152306.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">163038.70</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">174708.60</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">184596.60</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">194917.20</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">205217.20</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">216990.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">228484.90</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">237734.30</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">85457.15</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">248456.60</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">258622.70</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">267377.70</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">275133.60</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">284877.40</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">296125.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">303211.40</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">307712.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">310627.40</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">157157.40</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">319176.40</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">324017.40</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">328364.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">334605.80</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">340373.80</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">345595.90</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">350766.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">356040.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">361427.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">283064.60</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-11-28"/>
<value currency="USD" value-date="2025-11-28">5745758.27</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-11-28"/>
<value currency="USD" value-date="2025-11-28">5745758.27</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2018-07-31"/><value value-date="2018-07-31">4750000</value><description xml:lang="en"><narrative>Total Commitment in July Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-32298"><narrative>Solomon Islands Electricity Authority (Solomon Power)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2018-07-31"/><value value-date="2018-07-31">5550000</value><description xml:lang="en"><narrative>Total Commitment in July Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-32298"><narrative>Solomon Islands Electricity Authority (Solomon Power)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-5026452</value><description xml:lang="en"><narrative>Total Commitment Cancellations in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-32298"><narrative>Solomon Islands Electricity Authority (Solomon Power)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-14722</value><description xml:lang="en"><narrative>Total Commitment Cancellations in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-32298"><narrative>Solomon Islands Electricity Authority (Solomon Power)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-422160</value><description xml:lang="en"><narrative>Total Commitment Cancellations in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-32298"><narrative>Solomon Islands Electricity Authority (Solomon Power)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">800000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-32298"><narrative>Solomon Islands Electricity Authority (Solomon Power)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">113409</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-32298"><narrative>Solomon Islands Electricity Authority (Solomon Power)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">121482</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-32298"><narrative>Solomon Islands Electricity Authority (Solomon Power)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">58996</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-32298"><narrative>Solomon Islands Electricity Authority (Solomon Power)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">206638</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-32298"><narrative>Solomon Islands Electricity Authority (Solomon Power)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">223494</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-32298"><narrative>Solomon Islands Electricity Authority (Solomon Power)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">57750</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-32298"><narrative>Solomon Islands Electricity Authority (Solomon Power)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">229472</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-32298"><narrative>Solomon Islands Electricity Authority (Solomon Power)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">79400</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-32298"><narrative>Solomon Islands Electricity Authority (Solomon Power)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">192247</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-32298"><narrative>Solomon Islands Electricity Authority (Solomon Power)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">136568</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-32298"><narrative>Solomon Islands Electricity Authority (Solomon Power)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">392544</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-32298"><narrative>Solomon Islands Electricity Authority (Solomon Power)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">225496</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-32298"><narrative>Solomon Islands Electricity Authority (Solomon Power)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">163016</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-32298"><narrative>Solomon Islands Electricity Authority (Solomon Power)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">26365</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-32298"><narrative>Solomon Islands Electricity Authority (Solomon Power)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">155242</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-32298"><narrative>Solomon Islands Electricity Authority (Solomon Power)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">512142</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-32298"><narrative>Solomon Islands Electricity Authority (Solomon Power)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">93692</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-32298"><narrative>Solomon Islands Electricity Authority (Solomon Power)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">335976</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-32298"><narrative>Solomon Islands Electricity Authority (Solomon Power)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">312120</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-32298"><narrative>Solomon Islands Electricity Authority (Solomon Power)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">37</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-32298"><narrative>Solomon Islands Electricity Authority (Solomon Power)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">131893</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-32298"><narrative>Solomon Islands Electricity Authority (Solomon Power)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-13737</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-32298"><narrative>Solomon Islands Electricity Authority (Solomon Power)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-1604</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-32298"><narrative>Solomon Islands Electricity Authority (Solomon Power)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-1234</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-32298"><narrative>Solomon Islands Electricity Authority (Solomon Power)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P162902"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P162902?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P162902"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual electricity output from renewable energy capacity constructed under the project
</narrative></title>
<baseline year="2018" iso-date="2018-05-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-30" />
<period-end iso-date="2025-11-28" />
<target value="3.16">
<comment><narrative>
The grid connected solar (2MW and 220 kW) has been constructed. Solomon Power will measure  electricity output gathered after commissioning of these systems. The construction of the renewable energy hybrid minigrids is delayed.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of women employed in basic maintenance of solar facilities constructed through the project
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-11-28" />
<target value="80.00">
<comment><narrative>
An options paper for employing women in basic maintenance of solar facilities was presented and discussed with Solomon Power in June 2025.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Generation capacity of energy constructed or rehabilitated
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-11-28" />
<target value="3.40">
<comment><narrative>
Construction has not commenced due to&amp;nbsp;disruptions and challenges presented by the novel coronavirus (COVID-19) pandemic and some challenges encountered with major procurement activities.
</narrative></comment>
</target>
<actual value="2.22">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Generation capacity of energy constructed or rehabilitated
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-11-28" />
<target value="3.40">

</target>
<actual value="2.22">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of women employed in basic maintenance of solar facilities constructed through the project
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-11-28" />
<target value="80.00">
<comment><narrative>
An options paper for employing women in basic maintenance of solar facilities was presented and discussed with Solomon Power in June 2025.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual electricity output from renewable energy capacity constructed under the project
</narrative></title>
<baseline year="2018" iso-date="2018-05-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-30" />
<period-end iso-date="2025-11-28" />
<target value="5.66">
<comment><narrative>
The grid connected solar (2MW and 220 kW) has been constructed. Solomon Power will measure  electricity output gathered after commissioning of these systems. The construction of the renewable energy hybrid minigrids is delayed.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of micro-enterprises connected to electricity through the project
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-11-28" />
<target value="75.00">
<comment><narrative>
The end target has been exceed. The OBA program was closed by Solomon Power in December 2023.
</narrative></comment>
</target>
<actual value="95.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Access strategy study completed
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-11-28" />
<target value="Yes">
<comment><narrative>
Preparation of the access strategy study was completed by MMERE in 2022.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of staff that believe domestic violence is never acceptable
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="31.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-11-28" />
<target value="41.00">

</target>
<actual value="31.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy capacity enabled with direct support
</narrative></title>
<baseline year="2018" iso-date="2018-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-15" />
<period-end iso-date="2025-11-14" />
<target value="2.22">
<comment><narrative>
The grid connected solar (2MW and 220 kW) has been constructed. The construction of the renewable energy hybrid minigrids is delayed.
</narrative></comment>
</target>
<actual value="2.22">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with direct access to electricity through new connections
</narrative></title>
<baseline year="2018" iso-date="2018-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-15" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="2586">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with direct access to electricity through new connections
</narrative></title>
<baseline year="2018" iso-date="2018-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-15" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="2586">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Project-supported organization(s) publish reports on inputs and effect of consultation on project/policies
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-11-28" />
<target value="Yes">
<comment><narrative>
The overall aim of the awareness sessions is to reduce the waiting time for the customers to be energized online and hence increasing the effectiveness and the efficiency of the OBA program. The future reports would indicate the effect of consultation in reducing the waiting time as part of the satisfaction survey taken simultaneously during the consultation.

Solomon Power publishes reports on consultations with project-affected stakeholders.&amp;nbsp;


 Project safeguards reports: https://solomonpower.com.sb/projects/environmental-safeguard-esmp-arap-reports/
 Solomon Power corporate annual reports focus on customer services activities: https://solomonpower.com.sb/wp-content/uploads/2020/12/Final-REPORT-10.07.20b-Lr-1.pdf
 In addition, we have instances of customer concerns identified in Output Verification Reports (OVRs) addressed by the company.


Going forward, Solomon Power will enhance its semi-annual reporting of this aspect.&amp;nbsp;
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of households connected to electricity through the project
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-11-28" />
<target value="1,350.00">
<comment><narrative>
The end target has been exceed. The OBA program was closed by Solomon Power in December 2023.
</narrative></comment>
</target>
<actual value="2,586.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or improved electricity service
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-11-28" />
<target value="9,345.00">
<comment><narrative>
The end target has been exceed. The OBA program was closed by Solomon Power in December 2023.
</narrative></comment>
</target>
<actual value="18,042.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or improved electricity service
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-11-28" />
<target value="9,345.00">
<comment><narrative>
The end target has been exceed. The OBA program was closed by Solomon Power in December 2023.
</narrative></comment>
</target>
<actual value="18,042.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or improved electricity service
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-11-28" />
<target value="9,345.00">
<comment><narrative>
The end target has been exceed. The OBA program was closed by Solomon Power in December 2023.
</narrative></comment>
</target>
<actual value="18,042.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual electricity output from renewable energy capacity constructed under the project
</narrative></title>
<baseline year="2018" iso-date="2018-05-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-30" />
<period-end iso-date="2025-11-28" />
<target value="3.16">
<comment><narrative>
The grid connected solar (2MW and 220 kW) has been constructed. Solomon Power will measure  electricity output gathered after commissioning of these systems. The construction of the renewable energy hybrid minigrids is delayed.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual electricity output from renewable energy capacity constructed under the project
</narrative></title>
<baseline year="2018" iso-date="2018-05-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-30" />
<period-end iso-date="2025-11-28" />
<target value="3.16">
<comment><narrative>
The grid connected solar (2MW and 220 kW) has been constructed. Solomon Power will measure  electricity output gathered after commissioning of these systems. The construction of the renewable energy hybrid minigrids is delayed.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual electricity output from renewable energy capacity constructed under the project
</narrative></title>
<baseline year="2018" iso-date="2018-05-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-30" />
<period-end iso-date="2025-11-28" />
<target value="5.66">
<comment><narrative>
The grid connected solar (2MW and 220 kW) has been constructed. Solomon Power will measure  electricity output gathered after commissioning of these systems. The construction of the renewable energy hybrid minigrids is delayed.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net greenhouse gas emissions
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-11-28" />
<target value="7,7000">
<comment><narrative>
Results will be reported in the next ISR. The completion of new renewable energy generation capacity construction under component 1 is delayed and component 3 was recently completed.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net greenhouse gas emissions
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-11-28" />
<target value="7,7000">
<comment><narrative>
Results will be reported in the next ISR. The completion of new renewable energy generation capacity construction under component 1 is delayed and component 3 was recently completed.
</narrative></comment>
</target>
<actual value="7700">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of women in technical or managerial roles within SP
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="6.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-11-28" />
<target value="10.00">
<comment><narrative>
The baseline value was provided by Solomon Power. According to the benchmarking report from the Pacific Power Association (PPA) in 2017 (2015 data),  21.3 percent of the total workforce employed in Pacific power utilities are women, with four percent of female representation in technical levels.
</narrative></comment>
</target>
<actual value="10.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Project-supported organization(s) publish reports on inputs and effect of consultation on project/policies
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-11-28" />
<target value="Yes">
<comment><narrative>
The overall aim of the awareness sessions is to reduce the waiting time for the customers to be energized online and hence increasing the effectiveness and the efficiency of the OBA program. The future reports would indicate the effect of consultation in reducing the waiting time as part of the satisfaction survey taken simultaneously during the consultation.

Solomon Power publishes reports on consultations with project-affected stakeholders.&amp;nbsp;


 Project safeguards reports: https://solomonpower.com.sb/projects/environmental-safeguard-esmp-arap-reports/
 Solomon Power corporate annual reports focus on customer services activities: https://solomonpower.com.sb/wp-content/uploads/2020/12/Final-REPORT-10.07.20b-Lr-1.pdf
 In addition, we have instances of customer concerns identified in Output Verification Reports (OVRs) addressed by the company.


Going forward, Solomon Power will enhance its semi-annual reporting of this aspect.&amp;nbsp;
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or improved electricity service
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-11-28" />
<target value="9,345.00">
<comment><narrative>
The end target has been exceed. The OBA program was closed by Solomon Power in December 2023.
</narrative></comment>
</target>
<actual value="18,042.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy capacity enabled with direct support
</narrative></title>
<baseline year="2018" iso-date="2018-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-15" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
The grid connected solar (2MW and 220 kW) has been constructed. The construction of the renewable energy hybrid minigrids is delayed.
</narrative></comment>
</target>
<actual value="2.22">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of mini-grids with design completed under the project
</narrative></title>
<baseline year="2018" iso-date="2018-05-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-14" />
<period-end iso-date="2025-11-14" />
<target value="5.00">
<comment><narrative>
Preconstruction activities have been completed at all five minigrids sites.
</narrative></comment>
</target>
<actual value="5">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of women in technical or managerial roles within SP
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="6.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-11-28" />
<target value="10.00">
<comment><narrative>
The baseline value was provided by Solomon Power. According to the benchmarking report from the Pacific Power Association (PPA) in 2017 (2015 data),  21.3 percent of the total workforce employed in Pacific power utilities are women, with four percent of female representation in technical levels.
</narrative></comment>
</target>
<actual value="10.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of households connected to electricity through the project
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-11-28" />
<target value="1,350.00">
<comment><narrative>
The end target has been exceed. The OBA program was closed by Solomon Power in December 2023.
</narrative></comment>
</target>
<actual value="2,586.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Access strategy study completed
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-11-28" />
<target value="Yes">
<comment><narrative>
Preparation of the access strategy study was completed by MMERE in 2022.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Access strategy study completed
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-11-28" />
<target value="Yes">
<comment><narrative>
Preparation of the access strategy study was completed by MMERE in 2022.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of micro-enterprises connected to electricity through the project
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-11-28" />
<target value="75.00">
<comment><narrative>
The end target has been exceed. The OBA program was closed by Solomon Power in December 2023.
</narrative></comment>
</target>
<actual value="95.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of micro-enterprises connected to electricity through the project
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-11-28" />
<target value="75.00">
<comment><narrative>
The end target has been exceed. The OBA program was closed by Solomon Power in December 2023.
</narrative></comment>
</target>
<actual value="95.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of mini-grids constructed under the project
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-11-28" />
<target value="5.00">
<comment><narrative>
Preconstruction activities have been completed at all five minigrids sites.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of women in technical or managerial roles within SP
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="6.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-11-28" />
<target value="10.00">
<comment><narrative>
The baseline value was provided by Solomon Power. According to the benchmarking report from the Pacific Power Association (PPA) in 2017 (2015 data),  21.3 percent of the total workforce employed in Pacific power utilities are women, with four percent of female representation in technical levels.
</narrative></comment>
</target>
<actual value="10.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with direct access to electricity through new connections
</narrative></title>
<baseline year="2018" iso-date="2018-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-15" />
<period-end iso-date="2025-11-14" />
<target value="2,586">

</target>
<actual value="2,586">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of households connected to electricity through the project
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-11-28" />
<target value="1,350.00">
<comment><narrative>
The end target has been exceed. The OBA program was closed by Solomon Power in December 2023.
</narrative></comment>
</target>
<actual value="2,586.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or improved electricity service
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-11-28" />
<target value="9,345.00">
<comment><narrative>
The end target has been exceed. The OBA program was closed by Solomon Power in December 2023.
</narrative></comment>
</target>
<actual value="18,042.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Tariff review completed
</narrative></title>
<baseline year="2018" iso-date="2018-03-22" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-03-22" />
<period-end iso-date="2025-11-28" />
<target value="Yes">
<comment><narrative>
The cost of service and tariff review study was completed in March 2021. The new tariff regulations were gazette in May 2021. The new charges to electricity are reflected on Solomon Power's website and are updated monthly.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of mini-grids with design completed under the project
</narrative></title>
<baseline year="2018" iso-date="2018-05-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-14" />
<period-end iso-date="2025-11-14" />
<target value="5.00">
<comment><narrative>
Preconstruction activities have been completed at all five minigrids sites.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual electricity output from renewable energy capacity constructed under the project
</narrative></title>
<baseline year="2018" iso-date="2018-05-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-30" />
<period-end iso-date="2025-11-28" />
<target value="3.16">
<comment><narrative>
The grid connected solar (2MW and 220 kW) has been constructed. Solomon Power will measure  electricity output gathered after commissioning of these systems. The construction of the renewable energy hybrid minigrids is delayed.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of women employed in basic maintenance of solar facilities constructed through the project
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-11-28" />
<target value="80.00">
<comment><narrative>
An options paper for employing women in basic maintenance of solar facilities was presented and discussed with Solomon Power in June 2025.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net greenhouse gas emissions
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-11-28" />
<target value="13,800.00">
<comment><narrative>
Results will be reported in the next ISR. The completion of new renewable energy generation capacity construction under component 1 is delayed and component 3 was recently completed.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Generation capacity of energy constructed or rehabilitated
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-11-28" />
<target value="3.40">

</target>
<actual value="2.22">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or improved electricity service
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-11-28" />
<target value="9,345.00">
<comment><narrative>
The end target has been exceed. The OBA program was closed by Solomon Power in December 2023.
</narrative></comment>
</target>
<actual value="18,042.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy capacity enabled with direct support
</narrative></title>
<baseline year="2018" iso-date="2018-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-15" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
The grid connected solar (2MW and 220 kW) has been constructed. The construction of the renewable energy hybrid minigrids is delayed.
</narrative></comment>
</target>
<actual value="2.22">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Tariff review completed
</narrative></title>
<baseline year="2018" iso-date="2018-03-22" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-03-22" />
<period-end iso-date="2025-11-28" />
<target value="Yes">
<comment><narrative>
The cost of service and tariff review study was completed in March 2021. The new tariff regulations were gazette in May 2021. The new charges to electricity are reflected on Solomon Power's website and are updated monthly.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or improved electricity service
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-11-28" />
<target value="9,345.00">
<comment><narrative>
The end target has been exceed. The OBA program was closed by Solomon Power in December 2023.
</narrative></comment>
</target>
<actual value="18,042.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of staff that believe domestic violence is never acceptable
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="31.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-11-28" />
<target value="41.00">

</target>
<actual value="31.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Project-supported organization(s) publish reports on inputs and effect of consultation on project/policies
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-11-28" />
<target value="Yes">
<comment><narrative>
The overall aim of the awareness sessions is to reduce the waiting time for the customers to be energized online and hence increasing the effectiveness and the efficiency of the OBA program. The future reports would indicate the effect of consultation in reducing the waiting time as part of the satisfaction survey taken simultaneously during the consultation.

Solomon Power publishes reports on consultations with project-affected stakeholders.&amp;nbsp;


 Project safeguards reports: https://solomonpower.com.sb/projects/environmental-safeguard-esmp-arap-reports/
 Solomon Power corporate annual reports focus on customer services activities: https://solomonpower.com.sb/wp-content/uploads/2020/12/Final-REPORT-10.07.20b-Lr-1.pdf
 In addition, we have instances of customer concerns identified in Output Verification Reports (OVRs) addressed by the company.


Going forward, Solomon Power will enhance its semi-annual reporting of this aspect.&amp;nbsp;
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Tariff review completed
</narrative></title>
<baseline year="2018" iso-date="2018-03-22" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-03-22" />
<period-end iso-date="2025-11-28" />
<target value="Yes">
<comment><narrative>
The cost of service and tariff review study was completed in March 2021. The new tariff regulations were gazette in May 2021. The new charges to electricity are reflected on Solomon Power's website and are updated monthly.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of staff that believe domestic violence is never acceptable
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="31.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-11-28" />
<target value="41.00">
<comment><narrative>
The baseline of 31% is taken from the Solomon Islands Demographic and Social Statistics. The project will offer training to SP in cooperation with the IFC. After each training, a survey will be undertaken to measure, among others, the perception of staff on whether domestic violence is acceptable or not. Based on the survey, the percentage of staff that believes domestic violence is never acceptable will be recorded.
</narrative></comment>
</target>
<actual value="31.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual electricity output from renewable energy capacity constructed under the project
</narrative></title>
<baseline year="2018" iso-date="2018-05-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-30" />
<period-end iso-date="2025-11-28" />
<target value="5.66">
<comment><narrative>
The grid connected solar (2MW and 220 kW) has been constructed. Solomon Power will measure  electricity output gathered after commissioning of these systems. The construction of the renewable energy hybrid minigrids is delayed.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual electricity output from renewable energy capacity constructed under the project
</narrative></title>
<baseline year="2018" iso-date="2018-05-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-30" />
<period-end iso-date="2025-11-28" />
<target value="3.16">
<comment><narrative>
The grid connected solar (2MW and 220 kW) has been constructed. Solomon Power will measure  electricity output gathered after commissioning of these systems. The construction of the renewable energy hybrid minigrids is delayed.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual electricity output from renewable energy capacity constructed under the project
</narrative></title>
<baseline year="2018" iso-date="2018-05-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-30" />
<period-end iso-date="2025-11-28" />
<target value="3.16">
<comment><narrative>
The grid connected solar (2MW and 220 kW) has been constructed. Solomon Power will measure  electricity output gathered after commissioning of these systems. The construction of the renewable energy hybrid minigrids is delayed.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or improved electricity service
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-11-28" />
<target value="9,345.00">
<comment><narrative>
The end target has been exceed. The OBA program was closed by Solomon Power in December 2023.
</narrative></comment>
</target>
<actual value="18,042.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or improved electricity service
</narrative></title>
<baseline year="2018" iso-date="2018-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-31" />
<period-end iso-date="2025-11-28" />
<target value="9,345.00">
<comment><narrative>
The end target has been exceed. The OBA program was closed by Solomon Power in December 2023.
</narrative></comment>
</target>
<actual value="18,042.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T00:13:13" hierarchy="1"><iati-identifier>44000-P165872</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Urban Water Supply and Sanitation Sector Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To increase access and quality of water supply in selected service areas of Solomon Water, and to improve the operational performance of Solomon Water.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective for Urban Water Supply and Sanitation Sector Project for Solomon Islands is to increase access and quality of water supply and quality of sanitation services in selected service areas of Solomon Water, and to improve the operational performance of Solomon Water. The project has four components. (1) Urban water supply component will improve access and quality of safe water supply services in Honiara and selected provincial capitals. The activities financed under this component include: (i) the construction, rehabilitation, upgrade and expansion of water  production and treatment systems; (ii) the installation of additional water storage capacity within Solomon Water distribution network; (iii) the rehabilitation, upgrade and expansion of water supply transmission and distribution system; and (iv) carrying out non-revenue water reduction activities including leak detection and network repairs. (2) Urban sanitation component will improve quality and efficiency of sewerage and sanitation services in Honiara. The activities financed under this component include: (i) the design, construction, operation and maintenance ofa septage treatment facility; (ii) the improvement of the septage management institutional and regulatory framework; and (iii) the rehabilitation and upgrade of sewerage systems, including sewer mains, pumping stations and submarine outfalls. (3) Water conservation, sanitation, and hygiene awareness and education component will support significant transformations in the population's water use and behavior that are key to project success, with a particular focus on informal settlement areas. It will support the formulation and implementation of water conservation, sanitation and hygiene awareness and education activities. Activities will include the design and implementation of awareness and education programs aiming to change behaviors linked to sanitation, hygiene, menstrual hygiene management, and solid waste management in a nutrition sensitive manner. (4) Institutional strengthening and project management component will improve SW's financial, technical and operational sustainability so that by 2027 SW is expected to fully recover its annual operations and maintenance costs, asset depreciation costs, and debt servicing costs from user charges and SIG community service obligation payments. The activities financed under this component include: (a) the preparation and implementation of priority corporate and water sector policies; (b) strengthening of Solomon Water operational capacity; (c) the preparation of infrastructure designs and conduct of construction supervision; and (d) strengthening management capacity of the SW to administer, supervise and monitor Project implementation.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SB–00014086"><narrative>Solomon Islands</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SB–00014086"><narrative>Solomon Islands</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SB–P0035642"><narrative>Solomon Islands </narrative></participating-org><participating-org role="2" xml:lang="en" ref="SB–P0035642"><narrative>Solomon Islands </narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SB-COA-0035643"><narrative>Solomon Islands Water Authority</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2019-03-20"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2019-05-16"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2027-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2027-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Shona Fitzgerald</narrative></person-name><telephone>+1-202-473-1000</telephone><email>sfitzgerald1@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>







<recipient-country code="SB" percentage="100"><narrative xml:lang="en">SOLOMON ISLANDS</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002102384" />
            <name><narrative>Tulagi</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.10306 160.15056</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002103350" />
            <name><narrative>Solomon Islands</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8 159</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002108857" />
            <name><narrative>Gizo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.10303 156.84186</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002109701" />
            <name><narrative>Auki</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.76778 160.69778</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0008987088" />
            <name><narrative>Munda</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.32806 157.27083</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0009035073" />
            <name><narrative>Noro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.22274 157.19978</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0009259067" />
            <name><narrative>Honiara</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.44167 159.96667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="14020" percentage="100" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WC" percentage="83.0000000" xml:lang="en"><narrative>FY17 - Water Supply</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WA" percentage="17.0000000" xml:lang="en"><narrative>FY17 - Sanitation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="59" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000716" percentage="100" xml:lang="en"><narrative>Urban Water and Sanitation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="46" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="100" xml:lang="en"><narrative>Urban Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="100" xml:lang="en"><narrative>Urban Development</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">27405.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">17460.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">18960.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">20505.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">21990.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">48240.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">26115.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">27390.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">28605.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">30165.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">32295.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">70185.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">37260.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">38250.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">39000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">39540.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">39885.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">81000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">41385.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">42165.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">43110.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">44160.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">44460.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">86550.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">43005.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">44055.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">45975.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">48720.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">52440.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">112230.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">57390.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">58860.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">61305.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">64815.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">69435.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">151335.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">79590.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">82365.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">85770.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">89775.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">94395.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">202785.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">106485.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">109590.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">113310.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">117195.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">121155.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">254550.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">133785.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">137685.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">141510.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">145320.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">301875.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">156225.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">160200.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">165540.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">170880.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">175365.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">361635.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">184200.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">185430.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">187980.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">193410.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">198180.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">404835.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">203730.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">202605.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">200880.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">201330.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">204030.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">413910.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">207585.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">206760.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">204930.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">203910.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">205590.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">413745.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">206955.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">206400.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">205455.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">204435.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">202725.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">402450.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">200640.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">200340.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">199890.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">199200.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">198450.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">395820.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">197490.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">197085.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">196605.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">196110.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">195570.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">389640.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">194100.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">193635.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">193170.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">192705.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">545460.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">39113.58</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">962238.83</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">613000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">401320.99</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">-163220.70</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">286903.44</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">41465.84</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">606500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">4762321.91</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">4762321.91</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">15000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-35643"><narrative>Solomon Islands Water Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">2000000</value><description xml:lang="en"><narrative>Total Commitment in December Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-35643"><narrative>Solomon Islands Water Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">13000000</value><description xml:lang="en"><narrative>Total Commitment in December Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-35643"><narrative>Solomon Islands Water Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">39114</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-35643"><narrative>Solomon Islands Water Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">962239</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-35643"><narrative>Solomon Islands Water Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">613000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-35643"><narrative>Solomon Islands Water Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">401321</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-35643"><narrative>Solomon Islands Water Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-163221</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-35643"><narrative>Solomon Islands Water Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">286903</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-35643"><narrative>Solomon Islands Water Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">41466</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-35643"><narrative>Solomon Islands Water Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">606500</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-35643"><narrative>Solomon Islands Water Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">134672</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-35643"><narrative>Solomon Islands Water Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">152612</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-35643"><narrative>Solomon Islands Water Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">533414</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-35643"><narrative>Solomon Islands Water Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">98255</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-35643"><narrative>Solomon Islands Water Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">1759237</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-35643"><narrative>Solomon Islands Water Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">220643</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-35643"><narrative>Solomon Islands Water Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">28308</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-35643"><narrative>Solomon Islands Water Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">242267</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-35643"><narrative>Solomon Islands Water Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">1004886</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-35643"><narrative>Solomon Islands Water Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">385724</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-35643"><narrative>Solomon Islands Water Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">209677</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-35643"><narrative>Solomon Islands Water Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">527454</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-35643"><narrative>Solomon Islands Water Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">466977</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-35643"><narrative>Solomon Islands Water Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">140329</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-35643"><narrative>Solomon Islands Water Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">209011</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-35643"><narrative>Solomon Islands Water Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">446802</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-35643"><narrative>Solomon Islands Water Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">890089</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-35643"><narrative>Solomon Islands Water Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-8746</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-35643"><narrative>Solomon Islands Water Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-11704</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-35643"><narrative>Solomon Islands Water Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-11704</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-35643"><narrative>Solomon Islands Water Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-11704</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-35643"><narrative>Solomon Islands Water Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-11704</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-35643"><narrative>Solomon Islands Water Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-15804</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-35643"><narrative>Solomon Islands Water Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-21039</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-35643"><narrative>Solomon Islands Water Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-20208</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-35643"><narrative>Solomon Islands Water Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-22104</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-35643"><narrative>Solomon Islands Water Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-39679</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-35643"><narrative>Solomon Islands Water Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-53684</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-35643"><narrative>Solomon Islands Water Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-67748</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-35643"><narrative>Solomon Islands Water Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P165872"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P165872?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P165872"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
4.3 Grievances responded to and satisfactorily resolved in relation to SW water services according to standards
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="90.00">
<comment><narrative>
This indicators describes whether complaints are addressed in compliance with SW operating standards, which define timing of responsiveness, and the level of required responses.
</narrative></comment>
</target>
<actual value="81">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to improved water sources through piped house water connections
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="34,000.00">
<comment><narrative>
This indicator measures the cumulative number of people who benefited from improved water supply services through piped house water connections.
</narrative></comment>
</target>
<actual value="947.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
3.1 People trained to improved hygiene behaviour or sanitation practices under the project
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="1,000.00">
<comment><narrative>
The consultant has just been mobilized in August 2021 who is preparing the awareness-raising strategy and has started a baseline survey.

This indicator describes the number of people who have taken part in improved hygiene behavior or sanitation practies training under the project. This includes beneficiaries of face-to-face training, workshop, community consultations implemented as part of WASH awareness campaigns
</narrative></comment>
</target>
<actual value="835.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
4.7 Share of women in management position at SW
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="30.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="40.00">
<comment><narrative>
Share of women in employed Tier 1-4 positions at SW. This includes the following positions: Chief Executive Officer (Tier 1), Chief Financial Officer (Tier 2), Coordinators (Tier 3) and General Administrative and Management positions (Tier 4)
</narrative></comment>
</target>
<actual value="29">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.1 New septage treatment capacity at the centralized septage treatment plant (Population-Equivalent)
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="60,000.00">
<comment><narrative>
Treatment capacity of the septage treatment plant
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to improved water sources through piped house water connections
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="34,000.00">
<comment><narrative>
This indicator measures the cumulative number of people who benefited from improved water supply services through piped house water connections.
</narrative></comment>
</target>
<actual value="947.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to improved water sources through piped house water connections
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="34,000.00">
<comment><narrative>
This indicator measures the cumulative number of people who benefited from improved water supply services through piped house water connections.
</narrative></comment>
</target>
<actual value="947.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to improved water sources through piped house water connections
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="34,000.00">
<comment><narrative>
Current progress shows increased connections to Solomon Water services after rehabilitation works in Auki were completed as at Dec 2023. No further project-financed infrastructure has been commissioned to-date.
</narrative></comment>
</target>
<actual value="947.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of water unaccounted for
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="7,355,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="4,745,000.00">
<comment><narrative>
Difference between billed and produced water volumes for the supply of Honiara during one year.
</narrative></comment>
</target>
<actual value="7,133,216">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of water unaccounted for
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="7,355,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="4,745,000.00">
<comment><narrative>
Difference between billed and produced water volumes for the supply of Honiara during one year.
</narrative></comment>
</target>
<actual value="7255962">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of water unaccounted for
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="7,355,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="4,745,000.00">
<comment><narrative>
Difference between billed and produced water volumes for the supply of Honiara during one year.
</narrative></comment>
</target>
<actual value="7255962">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Operating cost coverage
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="1.11"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="1.25">
<comment><narrative>
Total annual operational revenues (generated by water sales) / total annual operating costs (including depreciation)
</narrative></comment>
</target>
<actual value="1.03">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Operating cost coverage
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="1.11"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="1.25">
<comment><narrative>
Total annual operational revenues (generated by water sales) / total annual operating costs (including depreciation)
</narrative></comment>
</target>
<actual value="0.79">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Operating cost coverage
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="1.11"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="1.25">
<comment><narrative>
Current value is calculated using draft audited financial statements for FY2024. Audited statements are not yet available for FY2025.
Total annual operational revenues (generated by water sales) / total annual operating costs (including depreciation).
</narrative></comment>
</target>
<actual value="1.06">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Samples tests meeting national water quality standards at distribution points (%)
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="70.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="95.00">
<comment><narrative>
Water samples from the regular SW monitoring system that comply with Solomon Islands potable water quality standards
</narrative></comment>
</target>
<actual value="85">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Samples tests meeting national water quality standards at distribution points (%)
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="70.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="95.00">
<comment><narrative>
Water samples from the regular SW monitoring system that comply with Solomon Islands potable water quality standards
</narrative></comment>
</target>
<actual value="88">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Samples tests meeting national water quality standards at distribution points (%)
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="70.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="95.00">
<comment><narrative>
Water samples from the regular SW monitoring system that comply with Solomon Islands potable water quality standards
</narrative></comment>
</target>
<actual value="88">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of collected wastewater disposed of in accordance with international environmental standards during dry weather (%)
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="65.00">
<comment><narrative>
Percentage of collected sewage in the sewerage network that receive screening and are disposed through rehabilitated outfalls.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of collected wastewater disposed of in accordance with international environmental standards during dry weather (%)
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="65.00">
<comment><narrative>
Percentage of collected sewage in the sewerage network that receive screening and are disposed through rehabilitated outfalls.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of collected wastewater disposed of in accordance with international environmental standards during dry weather (%)
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="65.00">
<comment><narrative>
Percentage of collected sewage in the sewerage network that receive screening and are disposed through rehabilitated outfalls.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
4.4 Operating cost efficiency of water supply services (US$/m3 sold)
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="2.20"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="2.00">
<comment><narrative>
Ratio between operational and maintenance costs (without depreciation) and volumes of water sold over one year.
</narrative></comment>
</target>
<actual value="3.16">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to improved water sources through piped house water connections
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="34,000.00">
<comment><narrative>
This indicator measures the cumulative number of people who benefited from improved water supply services through piped house water connections.
</narrative></comment>
</target>
<actual value="947.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to improved water sources through piped house water connections
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="34,000.00">
<comment><narrative>
This indicator measures the cumulative number of people who benefited from improved water supply services through piped house water connections.
</narrative></comment>
</target>
<actual value="947.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to improved water sources through piped house water connections
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="34,000.00">
<comment><narrative>
Current progress shows increased connections to Solomon Water services after rehabilitation works in Auki were completed as at Dec 2023. No further project-financed infrastructure has been commissioned to-date.
</narrative></comment>
</target>
<actual value="947.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of water unaccounted for
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="7,355,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="4,745,000.00">
<comment><narrative>
Difference between billed and produced water volumes for the supply of Honiara during one year.
</narrative></comment>
</target>
<actual value="7,133,216">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of water unaccounted for
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="7,355,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="4,745,000.00">
<comment><narrative>
Difference between billed and produced water volumes for the supply of Honiara during one year.
</narrative></comment>
</target>
<actual value="7255962">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of water unaccounted for
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="7,355,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="4,745,000.00">
<comment><narrative>
Difference between billed and produced water volumes for the supply of Honiara during one year.
</narrative></comment>
</target>
<actual value="7255962">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Operating cost coverage
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="1.11"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="1.25">
<comment><narrative>
Total annual operational revenues (generated by water sales) / total annual operating costs (including depreciation)
</narrative></comment>
</target>
<actual value="1.03">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Operating cost coverage
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="1.11"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="1.25">
<comment><narrative>
Total annual operational revenues (generated by water sales) / total annual operating costs (including depreciation)
</narrative></comment>
</target>
<actual value="0.79">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Operating cost coverage
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="1.11"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="1.25">
<comment><narrative>
Current value is calculated using draft audited financial statements for FY2024. Audited statements are not yet available for FY2025.
Total annual operational revenues (generated by water sales) / total annual operating costs (including depreciation).
</narrative></comment>
</target>
<actual value="1.06">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Samples tests meeting national water quality standards at distribution points (%)
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="70.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="95.00">
<comment><narrative>
Water samples from the regular SW monitoring system that comply with Solomon Islands potable water quality standards
</narrative></comment>
</target>
<actual value="85">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Samples tests meeting national water quality standards at distribution points (%)
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="70.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="95.00">
<comment><narrative>
Water samples from the regular SW monitoring system that comply with Solomon Islands potable water quality standards
</narrative></comment>
</target>
<actual value="88">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Samples tests meeting national water quality standards at distribution points (%)
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="70.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="95.00">
<comment><narrative>
Water samples from the regular SW monitoring system that comply with Solomon Islands potable water quality standards
</narrative></comment>
</target>
<actual value="88">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of collected wastewater disposed of in accordance with international environmental standards during dry weather (%)
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="65.00">
<comment><narrative>
Percentage of collected sewage in the sewerage network that receive screening and are disposed through rehabilitated outfalls.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of collected wastewater disposed of in accordance with international environmental standards during dry weather (%)
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="65.00">
<comment><narrative>
Percentage of collected sewage in the sewerage network that receive screening and are disposed through rehabilitated outfalls.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of collected wastewater disposed of in accordance with international environmental standards during dry weather (%)
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="65.00">
<comment><narrative>
Percentage of collected sewage in the sewerage network that receive screening and are disposed through rehabilitated outfalls.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Samples tests meeting national water quality standards at distribution points (%)
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="70.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="95.00">
<comment><narrative>
Water samples from the regular SW monitoring system that comply with Solomon Islands potable water quality standards
</narrative></comment>
</target>
<actual value="88">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.2 New storage capacity implemented
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="12,000.00">
<comment><narrative>
Volume of new reservoirs connected to the network.
</narrative></comment>
</target>
<actual value="820.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
4.6 Increase in the share of women and girls who feel safer from gender-based violence during water collection or using sanitation facility as a result of the project
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="25.00">
<comment><narrative>
This indicator measures the cumulative increase (in percentage point) in the share of surveyed women and girls who declare feeling safer from gender-based violence during water collection and using sanitation facility than before the improvement of water supply and/or sanitation services due to the project.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of water unaccounted for
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="7,355,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="4,745,000.00">
<comment><narrative>
Difference between billed and produced water volumes for the supply of Honiara during one year.
</narrative></comment>
</target>
<actual value="7255962">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to improved water sources through piped house water connections
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="34,000.00">
<comment><narrative>
This indicator measures the cumulative number of people who benefited from improved water supply services through piped house water connections.
</narrative></comment>
</target>
<actual value="947.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Samples tests meeting national water quality standards at distribution points (%)
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="70.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="95.00">
<comment><narrative>
Water samples from the regular SW monitoring system that comply with Solomon Islands potable water quality standards
</narrative></comment>
</target>
<actual value="88">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
4.1 SW staff training on improved operation and maintenance
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="2,000.00">
<comment><narrative>
This indicators captures the total amount of training (staff-hours) delivered to SW staff through activities supported by the project. This covers both theoretical and on-the-job training.
</narrative></comment>
</target>
<actual value="9789">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Operating cost coverage
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="1.11"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="1.25">
<comment><narrative>
Total annual operational revenues (generated by water sales) / total annual operating costs (including depreciation)
</narrative></comment>
</target>
<actual value="0.79">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
4.2 SCADA system installed and operational
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="Yes">
<comment><narrative>
SCADA system has been installed and is operational.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
4.6 Increase in the share of women and girls who feel safer from gender-based violence during water collection or using sanitation facility as a result of the project
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="25.00">
<comment><narrative>
This indicator measures the cumulative increase (in percentage point) in the share of surveyed women and girls who declare feeling safer from gender-based violence during water collection and using sanitation facility than before the improvement of water supply and/or sanitation services due to the project.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
4.4 Operating cost efficiency of water supply services (US$/m3 sold)
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="2.20"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="2.00">
<comment><narrative>
Current value is calculated using draft audited financial statements for FY2024. Audited statements are not yet available for FY2025.Ratio between operational and maintenance costs (without depreciation) and volumes of water sold over one year.
</narrative></comment>
</target>
<actual value="2.66">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Operating cost coverage
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="1.11"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="1.25">
<comment><narrative>
Total annual operational revenues (generated by water sales) / total annual operating costs (including depreciation)
</narrative></comment>
</target>
<actual value="1.03">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.1 New septage treatment capacity at the centralized septage treatment plant (Population-Equivalent)
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="60,000.00">
<comment><narrative>
Treatment capacity of the septage treatment plant
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.1 Water mains created and rehabilitated
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="45.00">
<comment><narrative>
Length of water mains installed or rehabilitated.
</narrative></comment>
</target>
<actual value="8">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.2 Trunk sewer mains rehabilitated
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="7.00">
<comment><narrative>
Km of new or rehabilitated sewer trunk mains
</narrative></comment>
</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="2019" iso-date="2019-05-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-14" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Measures enhanced resilience to climate change due to project investments resulting non-revenue water reduction, increase storage capacity or improved treatment.
</narrative></comment>
</target>
<actual value="947">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.1 Water mains created and rehabilitated
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="45.00">
<comment><narrative>
Length of water mains installed or rehabilitated.
</narrative></comment>
</target>
<actual value="11.3">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of water unaccounted for
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="7,355,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="4,745,000.00">
<comment><narrative>
Difference between billed and produced water volumes for the supply of Honiara during one year.
</narrative></comment>
</target>
<actual value="7,133,216">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of collected wastewater disposed of in accordance with international environmental standards during dry weather (%)
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="65.00">
<comment><narrative>
Percentage of collected sewage in the sewerage network that receive screening and are disposed through rehabilitated outfalls.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.2 Trunk sewer mains rehabilitated
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="7.00">
<comment><narrative>
Km of new or rehabilitated sewer trunk mains
</narrative></comment>
</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.2 Trunk sewer mains rehabilitated
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="7.00">
<comment><narrative>
Km of new or rehabilitated sewer trunk mains
</narrative></comment>
</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Samples tests meeting national water quality standards at distribution points (%)
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="70.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="95.00">
<comment><narrative>
Water samples from the regular SW monitoring system that comply with Solomon Islands potable water quality standards
</narrative></comment>
</target>
<actual value="85">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to improved water sources through piped house water connections
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="34,000.00">
<comment><narrative>
Current progress shows increased connections to Solomon Water services after rehabilitation works in Auki were completed as at Dec 2023. No further project-financed infrastructure has been commissioned to-date.
</narrative></comment>
</target>
<actual value="947.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of collected wastewater disposed of in accordance with international environmental standards during dry weather (%)
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="65.00">
<comment><narrative>
Percentage of collected sewage in the sewerage network that receive screening and are disposed through rehabilitated outfalls.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
4.3 Grievances responded to and satisfactorily resolved in relation to SW water services according to standards
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="90.00">
<comment><narrative>
This indicators describes whether complaints are addressed in compliance with SW operating standards, which define timing of responsiveness, and the level of required responses.
</narrative></comment>
</target>
<actual value="81">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
4.4 Operating cost efficiency of water supply services (US$/m3 sold)
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="2.20"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="2.00">
<comment><narrative>
Ratio between operational and maintenance costs (without depreciation) and volumes of water sold over one year.
</narrative></comment>
</target>
<actual value="3.16">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.1 New septage treatment capacity at the centralized septage treatment plant (Population-Equivalent)
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="60,000.00">
<comment><narrative>
Treatment capacity of the septage treatment plant
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of collected wastewater disposed of in accordance with international environmental standards during dry weather (%)
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="65.00">
<comment><narrative>
Percentage of collected sewage in the sewerage network that receive screening and are disposed through rehabilitated outfalls.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
3.1 People trained to improved hygiene behaviour or sanitation practices under the project
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="1,000.00">
<comment><narrative>
The consultant has just been mobilized in August 2021 who is preparing the awareness-raising strategy and has started a baseline survey.

This indicator describes the number of people who have taken part in improved hygiene behavior or sanitation practies training under the project. This includes beneficiaries of face-to-face training, workshop, community consultations implemented as part of WASH awareness campaigns
</narrative></comment>
</target>
<actual value="835.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
4.7 Share of women in management position at SW
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="30.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="40.00">
<comment><narrative>
Share of women in employed Tier 1-4 positions at SW. This includes the following positions: Chief Executive Officer (Tier 1), Chief Financial Officer (Tier 2), Coordinators (Tier 3) and General Administrative and Management positions (Tier 4)
</narrative></comment>
</target>
<actual value="29">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="2019" iso-date="2019-05-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-14" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Measures enhanced resilience to climate change due to project investments resulting non-revenue water reduction, increase storage capacity or improved treatment.
</narrative></comment>
</target>
<actual value="947">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.2 New storage capacity implemented
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="12,000.00">
<comment><narrative>
Volume of new reservoirs connected to the network.
</narrative></comment>
</target>
<actual value="820.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
4.7 Share of women in management position at SW
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="30.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="40.00">
<comment><narrative>
Share of women in employed Tier 1-4 positions at SW. This includes the following positions: Chief Executive Officer (Tier 1), Chief Financial Officer (Tier 2), Coordinators (Tier 3) and General Administrative and Management positions (Tier 4)
</narrative></comment>
</target>
<actual value="29">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.2 New storage capacity implemented
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="12,000.00">
<comment><narrative>
Volume of new reservoirs connected to the network.
</narrative></comment>
</target>
<actual value="820.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Operating cost coverage
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="1.11"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="1.25">
<comment><narrative>
Current value is calculated using draft audited financial statements for FY2024. Audited statements are not yet available for FY2025.
Total annual operational revenues (generated by water sales) / total annual operating costs (including depreciation).
</narrative></comment>
</target>
<actual value="1.06">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
4.1 SW staff training on improved operation and maintenance
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="2,000.00">
<comment><narrative>
This indicators captures the total amount of training (staff-hours) delivered to SW staff through activities supported by the project. This covers both theoretical and on-the-job training.
</narrative></comment>
</target>
<actual value="8075">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
3.1 People trained to improved hygiene behaviour or sanitation practices under the project
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="1,000.00">
<comment><narrative>
The consultant has just been mobilized in August 2021 who is preparing the awareness-raising strategy and has started a baseline survey.

This indicator describes the number of people who have taken part in improved hygiene behavior or sanitation practies training under the project. This includes beneficiaries of face-to-face training, workshop, community consultations implemented as part of WASH awareness campaigns
</narrative></comment>
</target>
<actual value="835.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
4.6 Increase in the share of women and girls who feel safer from gender-based violence during water collection or using sanitation facility as a result of the project
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="25.00">
<comment><narrative>
This indicator measures the cumulative increase (in percentage point) in the share of surveyed women and girls who declare feeling safer from gender-based violence during water collection and using sanitation facility than before the improvement of water supply and/or sanitation services due to the project.
Data has not yet been collected to report on this indicator.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
4.2 SCADA system installed and operational
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="Yes">
<comment><narrative>
SCADA system has been installed and is operational.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.1 Water mains created and rehabilitated
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="45.00">
<comment><narrative>
Length of water mains installed or rehabilitated.
</narrative></comment>
</target>
<actual value="9.6">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of water unaccounted for
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="7,355,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="4,745,000.00">
<comment><narrative>
Difference between billed and produced water volumes for the supply of Honiara during one year.
</narrative></comment>
</target>
<actual value="7255962">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
4.2 SCADA system installed and operational
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="Yes">
<comment><narrative>
SCADA system has been installed and is operational.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
4.3 Grievances responded to and satisfactorily resolved in relation to SW water services according to standards
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="90.00">
<comment><narrative>
This indicators describes whether complaints are addressed in compliance with SW operating standards, which define timing of responsiveness, and the level of required responses.
</narrative></comment>
</target>
<actual value="81">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
4.1 SW staff training on improved operation and maintenance
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2027-06-30" />
<target value="2,000.00">
<comment><narrative>
This indicators captures the total amount of training (staff-hours) delivered to SW staff through activities supported by the project. This covers both theoretical and on-the-job training.
</narrative></comment>
</target>
<actual value="9789">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="2019" iso-date="2019-05-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-14" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Measures enhanced resilience to climate change due to project investments resulting non-revenue water reduction, increase storage capacity or improved treatment.
</narrative></comment>
</target>
<actual value="947">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T00:13:13" hierarchy="1"><iati-identifier>44000-P166622</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Solomon Islands Roads and Aviation Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[Improve operational safety and oversight of air transport and associated infrastructure, strengthen the sustainability and climate resilience of the Project Roads, and in the event of an Eligible Crisis or Emergency, to provide an immediate response to the Eligible Crisis or Emergency.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Roads and Aviation Project for Solomon Islands is to improve operational safety and oversight of air transport and associated infrastructure, strengthen the sustainability and climate resilience of the project roads, and in the event of an eligible crisis or emergency, to provide an immediate response to the eligible crisis or emergency.it has four components.The first component, Honiara and munda airports infrastructure investments is to improve operational safety and overall infrastructure resilience to climate change at Honiara, this activity will include: (i) 5 cm overlay of existing runway (including pavement strength testing and drainage improvements); (ii) installation of airfield ground lighting for runway (AGL); (iii) construction of rescue fire service (RFS) vehicle station; (iv) installation of automatic weather observation system (AWOS); (v) installation of very small aperture terminal (VSAT) communications systems; (vi) installation of automatic dependent surveillance-broadcast (ADS-b) ground stations and aircraft equipage; and, (vii) provision of equipment for improved power supply; second component, Malaita road improvement and maintenance program aim to improve the climate resilience of the malaita road network through a combination of specific spot improvements and overall system condition strengthening via adaptive maintenance measures; third component, institutional strengthening includes: (i) training needs analysis; (ii) airport operational training; (iii) airport regulatory training; (iv) preparation of a strategic plan for the sustainability of solomon airlines (i.e., airline strategy review); (v) airport master planning studies for both honiara and munda airports; (vi) preparation of an aviation sector strategy; (vii) technical support to civil aviation authority of solomon islands (CAASI) to improve safety and security oversight; and, (viii) technical support so solomon islands airport corporation limited (SIACL) for strengthening capabilities for airport management and operation; and fourth component,  project implementation support will be located in ministry of communications and aviation (MCA), providing support to both mca and ministry of infrastructure development (MID) for project preparation and implementation. in addition, the existing PAIP technical and fiduciary services unit (TFSU) will provide support to the pst for procurement, financial management, safeguards, contract management, monitoring and evaluation, audit, communications subscription for vsat, and technical guidance, particularly for aviation matters.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SB–P0036394"><narrative>Solomon Islands</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SB-COA-0036391"><narrative>Ministry of Communication and Aviation</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2018-09-28"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2019-03-28"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2024-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2024-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Naoki Kakuta</narrative></person-name><telephone>+1-202-473-1000</telephone><email>nkakuta@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="SB" percentage="100"><narrative xml:lang="en">SOLOMON ISLANDS</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002106552" />
            <name><narrative>Malaita Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9 161</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002109701" />
            <name><narrative>Auki</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.76778 160.69778</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006295679" />
            <name><narrative>Honiara-Henderson International Airport</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.428 160.05479</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006295681" />
            <name><narrative>Munda</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.32797 157.26309</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007668064" />
            <name><narrative>Gwaunaru'u Airport</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.70257 160.68201</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002109304" />
            <name><narrative>Dala</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.59866 160.68479</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="21050" percentage="74" xml:lang="en"/><sector vocabulary="1" code="21023" percentage="26" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TF" percentage="5.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Transportation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TI" percentage="25.0000000" xml:lang="en"><narrative>FY17 - Rural and Inter-Urban Roads</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TV" percentage="70.0000000" xml:lang="en"><narrative>FY17 - Aviation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000074" percentage="31" xml:lang="en"><narrative>Road Safety</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000713" percentage="100" xml:lang="en"><narrative>Public Transport</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000713" percentage="100" xml:lang="en"><narrative>Public Transport</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="52" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="41" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="100" xml:lang="en"><narrative>Urban Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="40" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="100" xml:lang="en"><narrative>Urban Development</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">59925.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">140199.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">164730.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">189210.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">73633.97</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">221391.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">242505.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">275400.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">148614.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">311457.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">321759.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">330225.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">341955.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">173604.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">348636.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">341292.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">335784.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">343128.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">178092.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">377604.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">392700.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">406368.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">434316.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">229398.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">473127.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">496077.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">530604.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">568854.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">290853.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">592467.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">623067.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">670140.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">350064.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">716805.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">754137.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">807279.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">865062.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">450789.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">939369.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">990675.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">745707.95</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">789742.52</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">571965.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">841359.21</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">865964.62</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">897095.02</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">646272.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">946269.38</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">973718.08</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">1410558.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">1466250.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">747456.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">1512813.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">1531836.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">1549074.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">1580388.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">799884.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">1613793.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">1641027.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">1671678.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">1698453.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">858738.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">1736805.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">1762917.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">1789590.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">1401582.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">858738.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">1736805.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">1762917.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">1789590.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">1401582.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">2008836.58</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">2008836.58</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">30500000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">20500000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-2130</value><description xml:lang="en"><narrative>Total Commitment Cancellations in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-13005</value><description xml:lang="en"><narrative>Total Commitment Cancellations in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">456067</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">979200</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">127495</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">520507</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">264819</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">149091</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">606000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">510550</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">446534</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">198788</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">440941</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">201144</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">439283</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">269063</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">1169644</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">405603</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">632324</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">439371</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">896577</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">698986</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">58154</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">339558</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">3059620</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">477850</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">482497</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">368579</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">663739</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">4465682</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">2739877</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">865553</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">1160055</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">806272</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">543884</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">2431100</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">2652064</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">28319</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">351353</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">884524</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">2185669</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">229406</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">198625</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">329397</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">3064077</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">367188</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">549704</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">1614656</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">1265702</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">217131</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">1317746</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">608230</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">398824</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">786395</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">690023</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">82825</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">246324</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">239483</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">716373</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">736094</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">7613</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">659480</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">250000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-467</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-1097</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-6605</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-12484</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-18202</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-21371</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-21718</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-22839</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-49312</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-72721</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-81636</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-99038</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-105594</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-114937</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-112257</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-36391"><narrative>Ministry of Communication and Aviation; Ministry of Finance and Treasury; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P166622"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P166622?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P166622"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Unqualified audit with the time specified under the Legal Agreement
</narrative></title>
<baseline year="2018" iso-date="2018-11-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-15" />
<period-end iso-date="2025-06-15" />
<target value="Yes">
<comment><narrative>
Target fully achieved (100 percent). The unqualified Annual Project Financial Statement for 2023 was uploaded to Client Connection on June 30, 2024 and accepted.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Adoption of CERC Operations Manual
</narrative></title>
<baseline year="2018" iso-date="2018-11-10" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-10" />
<period-end iso-date="2024-11-10" />
<target value="This indicator was dropped.">
<comment><narrative>
Target fully achieved (100 percent). This indicator was dropped at the restructuring in August 2023 due to its similarity with the original eighth PDO indicator ‘CERC Manual adopted by SIG with appropriate training on activating and implementing (Yes/No).’
</narrative></comment>
</target>
<actual value="This indicator was been dropped">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances responded and/or resolved within the stipulated service standards
</narrative></title>
<baseline year="2019" iso-date="2019-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-01" />
<period-end iso-date="2025-08-01" />
<target value="75.00">
<comment><narrative>
The project's grievance redress mechanism (GRM) defines service standards for responding to and ideally resolving complaints (High/Med/Low priority 5/10/30 working days respectively. There was one (1) grievance received during this reporting period for Malaita. The issue was responded to within a day, and it was resolved within 3 months (March 2024). The previous one outstanding grievance for the drainage in Munda is still with MCA and Ministry of Lands, Housing and Survey (MLHS) to agree with the landowner. This one grievance was responded to within 30 working days. Therefore the % = 2/2 x 100 = 100%.
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of gravel roads on Malaita main roads in good or fair condition
</narrative></title>
<baseline year="2019" iso-date="2019-01-01" value="10.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-01" />
<period-end iso-date="2024-12-31" />
<target value="19.00">
<comment><narrative>
The actual value of 19.0=(17km+21km)/200kmx100% where 17km=the length of the North Road maintenance works which is ongoing, 21 km=the length of the East Road maintenance works which is ongoing, and 200km=length of gravel roads in Malaita.
</narrative></comment>
</target>
<actual value="19.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Completion of new terminal building at Munda Airport
</narrative></title>
<baseline year="2019" iso-date="2019-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-01" />
<period-end iso-date="2024-12-31" />
<target value="100.00">
<comment><narrative>
Completed on October 9, 2023.
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Project-supported organization(s) publishing periodic reports on GRM and how issues were resolved [including resolution rates]
</narrative></title>
<baseline year="2018" iso-date="2018-11-10" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-10" />
<period-end iso-date="2024-12-05" />
<target value="Yes">
<comment><narrative>
Target fully achieved (100 percent). The project website for publishing aggregate and disaggregate statistics on GRM resolution rates was implemented in April 2024. The website included the link to the most recent progressive statistics.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Open Contracting used to publicize procurement data and updated on a monthly basis
</narrative></title>
<baseline year="2019" iso-date="2019-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-01" />
<period-end iso-date="2025-08-01" />
<target value="Yes">
<comment><narrative>
All the procurement activities under SIRAP were completed, using open contracting.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
State requirements for safety and security noncompliance reach global ICAO average.
</narrative></title>
<baseline year="2018" iso-date="2018-11-28" value="66.48"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-28" />
<period-end iso-date="2024-11-28" />
<target value="This indicator was dropped.">
<comment><narrative>
Target could not be measured. At completion, the ICAO website showed that the last mission year to Solomon Islands was 2014. This indicator was dropped at the restructuring in August 2023 as its measurement relied on ICAO visit, which was outside the project's control; and this indicator did not distinguish outcomes attributable to SIRAP from outcomes attributable to other interventions.
</narrative></comment>
</target>
<actual value="This indicator was dropped.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of women in the community advisory committees established for routine maintenance and regravelling works in Malaita
</narrative></title>
<baseline year="2019" iso-date="2019-06-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-06-10" />
<period-end iso-date="2024-12-05" />
<target value="20.00">
<comment><narrative>
Target exceeded (106 percent). This measured the percentage of women in the community advisory committees (CAC) established for routine maintenance and regravelling works for 17 km of North and 21 km of East Roads in Malaita. The four CACs had a total of 47 members, of which 10 members were represented by women. 

This indicator was added to SIRAP at the restructuring in August 2023 to replace the original indicator 'Number of person days worked by women in routine maintenance activities'.
</narrative></comment>
</target>
<actual value="21.28">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced access to transportation services
</narrative></title>
<baseline year="2019" iso-date="2019-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-01" />
<period-end iso-date="2024-12-31" />
<target value="721000.00">
<comment><narrative>
The opening of the new terminal building and the upgraded runway, taxiway, and apron on October 10, 2023 led to the resumption of Solomon Islands direct flights from Brisbane to Munda on January 6, 2024. The actual value has been updated to the end target of 721,000, or the entire population of Solomon Islands as the upgraded infrastructure is now in use as an international airport and as an alternative airport to Honiara.
</narrative></comment>
</target>
<actual value="721000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of person days worked by women in routine maintenance activities (person-days)
</narrative></title>
<baseline year="2018" iso-date="2018-11-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-10" />
<period-end iso-date="2024-12-05" />
<target value="This indicator was dropped.">
<comment><narrative>
Target not achieved (14 percent). Out of 169 people employed in the two routine maintenance works, 12 people were female (=7.1 percent). This indicates 14 (=7.1/50x100) percent achievement of the end target of 50 percent. This indicator was dropped through the August 2023 restructuring. Instead, a new indicator 'Percentage of women in the community advisory committees established for routine maintenance and regravelling works in Malaita (%)' was added to reflect improved gender participation in the CACs.
</narrative></comment>
</target>
<actual value="This indicator was dropped.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Resurfacing of Munda Airport pavement in line with implementation schedule
</narrative></title>
<baseline year="2019" iso-date="2019-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-01" />
<period-end iso-date="2025-08-01" />
<target value="100.00">
<comment><narrative>
Completed on September 23, 2023.
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Successful implementation of agreed training plan.
</narrative></title>
<baseline year="2018" iso-date="2018-11-10" value="No training"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-10" />
<period-end iso-date="2024-12-05" />
<target value="This indicator was dropped.">
<comment><narrative>
Target not achieved (0 percent). The original indicator 'Successful implementation of agreed training plan' was dropped due to the overcommitted SIRAP budget and was replaced by a new indicator 'Training needs assessment completed for MCA, SIACL, CAASI, and Solomon Airlines'.
</narrative></comment>
</target>
<actual value="This indicator was dropped.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of contracts completed within their original forecast delivery date
</narrative></title>
<baseline year="2019" iso-date="2019-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-01" />
<period-end iso-date="2025-08-01" />
<target value="80.00">
<comment><narrative>
Seven of the 34 procurement activities (=21 percent) were completed within their original forecast delivery date.
</narrative></comment>
</target>
<actual value="21.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of women in the community advisory committees established for routine maintenance and regravelling works in Malaita
</narrative></title>
<baseline year="2019" iso-date="2019-08-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-08-01" />
<period-end iso-date="2024-12-31" />
<target value="20.00">
<comment><narrative>
This measures the percentage of women in the community advisory committees (CAC) established for routine maintenance and regravelling works for 17 km of North and 21 km of East Roads in Malaita. The current value of 21.28 percent (=10/47 x 100) is for both North and East Roads. Two CACs for East Road were established on March 4, 2024.
</narrative></comment>
</target>
<actual value="21.28">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Implementation of recommended PASO annual work plan
</narrative></title>
<baseline year="2018" iso-date="2018-12-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-03" />
<period-end iso-date="2024-12-02" />
<target value="80.00">
<comment><narrative>
Target exceeded (125 percent). There were a total of 17 audits/activities scheduled for 2024 in the PASO annual work plan. These consisted of 13 Certification Audits (including Parts 139 and 140 at both Munda and Honiara International Airports) and 4 Surveillance Activities. At completion, all the 17 audits/activities were completed. It should be noted that the actual value was 0 percent in 2019, 30 percent in 2020 and 2021, 59 percent in 2022 and 2023, and 100 percent in 2024.
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of procurement activities completed (i.e., contracts signed) by the planned dates set in the approved procurement plan in STEP
</narrative></title>
<baseline year="2019" iso-date="2019-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-01" />
<period-end iso-date="2025-08-01" />
<target value="80.00">
<comment><narrative>
There were no contracts signed during Q2 2024.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Satisfactory post-construction road safety audit
</narrative></title>
<baseline year="2019" iso-date="2019-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-01" />
<period-end iso-date="2025-08-01" />
<target value="Yes">
<comment><narrative>
The road safety audit will be undertaken post-construction to confirm road safety issues are properly addressed. Road Safety Adviser delivered two half day workshops on road safety in July 2020 and third workshop in July 2021. The post-construction survey timing is pending the progression of the Malaita road and bridge activities, but current expectations are Q3 2024.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Modernization of air traffic management achieved
</narrative></title>
<baseline year="2018" iso-date="2018-12-03" value="No VSAT or ADS-B Ground Stations"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-03" />
<period-end iso-date="2024-12-02" />
<target value="VSAT and ADS-B Ground Stations operational">
<comment><narrative>
Target fully achieved (100 percent) against the revised target or substantially achieved (80 percent) against the original target. Installation and commissioning of ADS-B ground stations and VSAT communications systems at Honiara and Munda Airports were completed under SIRAP and they are both operational.

The end target was revised &quot;VSAT and ADS-B fully operational&quot; to &quot;VSAT and ADS-B Ground Stations operational&quot; at the restructuring in August 2023  as ADS-B aircraft equipage could not be procured after four attempts due to the lack of market response.
</narrative></comment>
</target>
<actual value="VSAT and ADS-B ground stations operational.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Navigation and safety aids in line with implementation schedule
</narrative></title>
<baseline year="2019" iso-date="2019-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-01" />
<period-end iso-date="2025-08-01" />
<target value="100.00">
<comment><narrative>
Munda runway, taxiway, and apron resurfacing works were completed on September 23, 2023. The works included reinstatement, testing, and commissioning of airfield ground lighting and reinstatement of visual aids of centerline markings, edge markings, designation markings, threshold markings, fixed distance markings, taxi-holding position markings, and apron markings.
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads rehabilitated
</narrative></title>
<baseline year="2018" iso-date="2018-11-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-10" />
<period-end iso-date="2024-11-30" />
<target value="This indicator was dropped.">
<comment><narrative>
Target not achieved (0 percent). This indicator was dropped at the restructuring in August 2023 to reflect the removal of resealing the sealed roads in Malaita from SIRAP.
</narrative></comment>
</target>
<actual value="This indicator was dropped.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Open Contracting used to publicize procurement data and updated on a monthly basis
</narrative></title>
<baseline year="2018" iso-date="2018-11-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-15" />
<period-end iso-date="2025-06-15" />
<target value="Yes">
<comment><narrative>
Target fully achieved (100 percent). All the procurement activities under SIRAP were completed, using open contracting.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Availability of social services within an accessible distance
</narrative></title>
<baseline year="2019" iso-date="2019-01-01" value="2.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-01" />
<period-end iso-date="2025-04-01" />
<target value="6.00">
<comment><narrative>
The number and type of organizations in a community that provide social welfare-based services, including counselling, case management, and safe shelter. In Munda, there are two social service providers; however, both do not provide a safe shelter. In Malaita, there are five service providers and out of the five, one provides a safe shelter. All the services providers are not based in the communities. They are all based in the Provincial Headquarters, and they deploy to communities whenever there is a case. It should be noted that SIRAP has no direct or indirect influence on this indicator.
</narrative></comment>
</target>
<actual value="7.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of Malaita main roads maintained
</narrative></title>
<baseline year="2019" iso-date="2019-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-01" />
<period-end iso-date="2024-12-31" />
<target value="38.00">
<comment><narrative>
The 17km length of North Road and the 21 km of East Road are currently receiving maintenance.
</narrative></comment>
</target>
<actual value="38.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Local employment in routine road maintenance (person-days)
</narrative></title>
<baseline year="2018" iso-date="2018-11-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-15" />
<period-end iso-date="2024-11-14" />
<target value="950.00">
<comment><narrative>
Target fully achieved (100 percent) against the revised target or not achieved (2 percent) against the original target. The actual value of 950 = 50 person-days/km/year x (17 km + 21km) x 0.5 years.

The target was revised at the restructuring in August 2023 to reflect the reduction of gravel road length to be maintained from 210 km to 38 km, and the reduction in routine maintenance contract duration from four years to six months.
</narrative></comment>
</target>
<actual value="950.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Completion of new terminal building at Munda Airport
</narrative></title>
<baseline year="2018" iso-date="2018-11-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-15" />
<period-end iso-date="2024-11-14" />
<target value="100.00">
<comment><narrative>
Target fully achieved (100 percent). The Munda Airport terminal building works were completed on October 9, 2023.

This indicator was revised to remove the &quot;flight services center&quot; from the indicator description, as it was dropped from SIRAP at the restructuring in August 2023. Instead, an air traffic control tower will be constructed under SIRAP2.
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Successful implementation of the GBV, VAC and Trafficking Strategy and Action Plan
</narrative></title>
<baseline year="2018" iso-date="2018-11-10" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-10" />
<period-end iso-date="2024-12-05" />
<target value="Yes">
<comment><narrative>
Target fully achieved (100 percent). The GBV, VAC, and Trafficking Strategy and Action Plan successfully implemented, with the final deliverables by the GBV consultant accepted on July 25, 2023.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of contracts completed within their original forecast delivery date
</narrative></title>
<baseline year="2018" iso-date="2018-11-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-15" />
<period-end iso-date="2025-06-15" />
<target value="80.00">
<comment><narrative>
Target not achieved (26 percent). Seven of the 34 procurement activities (=21 percent) were completed within their original forecast delivery date. The end target of 80 percent was not achieved due to delays to tender according to their planned dates and extensions to the completion dates.
</narrative></comment>
</target>
<actual value="21.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Successful implementation of the GBV, VAC and Trafficking Strategy and Action Plan
</narrative></title>
<baseline year="2019" iso-date="2019-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-01" />
<period-end iso-date="2025-08-01" />
<target value="Yes">
<comment><narrative>
The GBV, VAC, and Trafficking Strategy and Action Plan successfully implemented, with the final deliverables by the consultant to address GBV accepted on July 25, 2023.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Resurfacing of Honiara Airport pavement in line with implementation schedule.
</narrative></title>
<baseline year="2018" iso-date="2018-11-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-10" />
<period-end iso-date="2024-12-03" />
<target value="This indicator was dropped.">
<comment><narrative>
Target not achieved (7 percent). SIRAP financed the runway emergency repair (450m-long and 15m-wide high traffic area), which accounted for 7 percent of the entire runway area (2,200m-long and 45m-wide). This indicator was dropped at the restructuring in August 2023 and the Honiara Airport runway resurfacing works were transferred to SIRAP2 and completed on March 31, 2025.
</narrative></comment>
</target>
<actual value="This indicator was dropped.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Successful implementation of the GBV, VAC and Trafficking Strategy and Action Plan
</narrative></title>
<baseline year="2019" iso-date="2019-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-01" />
<period-end iso-date="2025-08-01" />
<target value="Yes">
<comment><narrative>
The GBV, VAC, and Trafficking Strategy and Action Plan successfully implemented, with the final deliverables by the consultant to address GBV accepted on July 25, 2023.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Bridge upgraded
</narrative></title>
<baseline year="2019" iso-date="2019-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-01" />
<period-end iso-date="2024-12-31" />
<target value="3.00">
<comment><narrative>
The physical progress of Koa, Bio1, and Bio2 Bridges works is 85 percent, with a plan for completion by July 31, 2024.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Training needs assessment completed for MCA, SIACL, CAASI, and Solomon Airlines
</narrative></title>
<baseline year="2018" iso-date="2018-11-15" value="No training needs assessment"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-15" />
<period-end iso-date="2024-11-14" />
<target value="Training needs assessment completed">
<comment><narrative>
Target fully achieved (100 percent). The training needs assessment for MCA, CAASI, SIACL, and Solomon Airlines was completed in January 2024.

This indicator is new (was added in the second project restructuring) and comes to replace the above indicator &quot;successful implementation of agreed training plans&quot;.
</narrative></comment>
</target>
<actual value="Training needs assessment completed.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Equipment and systems standardized with regional standards
</narrative></title>
<baseline year="2019" iso-date="2019-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-01" />
<period-end iso-date="2025-08-01" />
<target value="4.00">
<comment><narrative>
ADS-B ground stations (HIR/MUA) and VSAT (HIR/MUA) systems are completed and commissioned. While ADS-B ground station at MUA became inoperable during Q3 2023, this was repaired on May 27, 2024. The VSAT system in Honiara and Munda was commissioned in September 2022 and had additional filters installed in March 2023.
</narrative></comment>
</target>
<actual value="4.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of women in the community advisory committees established for routine maintenance and regravelling works in Malaita
</narrative></title>
<baseline year="2019" iso-date="2019-08-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-08-01" />
<period-end iso-date="2024-12-31" />
<target value="20.00">
<comment><narrative>
This measures the percentage of women in the community advisory committees (CAC) established for routine maintenance and regravelling works for 17 km of North and 21 km of East Roads in Malaita. The current value of 21.28 percent (=10/47 x 100) is for both North and East Roads. Two CACs for East Road were established on March 4, 2024.
</narrative></comment>
</target>
<actual value="21.28">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Training needs assessment completed for MCA, SIACL, CAASI, and Solomon Airlines
</narrative></title>
<baseline year="2019" iso-date="2019-01-01" value="No training needs assessment"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-01" />
<period-end iso-date="2024-12-31" />
<target value="Training needs assessment completed">
<comment><narrative>
The training needs assessment for MCA, CAASI, SIACL, and Solomon Airlines is completed.
</narrative></comment>
</target>
<actual value="Training needs assessment completed">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Training needs assessment completed for MCA, SIACL, CAASI, and Solomon Airlines
</narrative></title>
<baseline year="2019" iso-date="2019-01-01" value="No training needs assessment"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-01" />
<period-end iso-date="2024-12-31" />
<target value="Training needs assessment completed">
<comment><narrative>
The training needs assessment for MCA, CAASI, SIACL, and Solomon Airlines is completed.
</narrative></comment>
</target>
<actual value="Training needs assessment completed">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Completion of new terminal building at Munda Airport
</narrative></title>
<baseline year="2019" iso-date="2019-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-01" />
<period-end iso-date="2024-12-31" />
<target value="100.00">
<comment><narrative>
Completed on October 9, 2023.
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of procurement activities completed (i.e., contracts signed) by the planned dates set in the approved procurement plan in STEP
</narrative></title>
<baseline year="2019" iso-date="2019-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-01" />
<period-end iso-date="2025-08-01" />
<target value="80.00">
<comment><narrative>
There were no contracts signed during Q1 2024.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Project-supported organization(s) publishing periodic reports on GRM and how issues were resolved [including resolution rates]
</narrative></title>
<baseline year="2019" iso-date="2019-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-01" />
<period-end iso-date="2025-08-01" />
<target value="Yes">
<comment><narrative>
The project website for publishing aggregate and disaggregate statistics on GRM resolution rates was implemented in April 2024. The website includes the link to the latest Q1 2024 statistics.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Asset Management System updated and used for preparing investment program
</narrative></title>
<baseline year="2019" iso-date="2019-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-01" />
<period-end iso-date="2025-08-01" />
<target value="Yes">
<comment><narrative>
The plan was to update the MID's asset management system along with its data collection processes. However, due to the overcommitted SIRAP budget, this activity was cancelled in the procurement plan approved on March 15, 2024.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Bridge upgraded
</narrative></title>
<baseline year="2018" iso-date="2018-11-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-15" />
<period-end iso-date="2024-11-14" />
<target value="3.00">
<comment><narrative>
Target fully achieved (100 percent) against the revised target or substantially achieved (75 percent) against the original target. The upgrading of all three bridges of Koa, Bio1, Bio2 was completed on September 24, 2024 under SIRAP.

The end target was revised from 4 to 3 to reflect the removal of Fiu River Bridge from SIRAP.
</narrative></comment>
</target>
<actual value="3">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of Malaita main roads maintained
</narrative></title>
<baseline year="2018" iso-date="2018-11-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-15" />
<period-end iso-date="2024-11-14" />
<target value="38.00">
<comment><narrative>
Target fully achieved (100 percent). The 17km length of North Road and the 21 km of East Road were maintained under SIRAP. 

This indicator was added to SIRAP at the restructuring in August 2023 and replaced the original indicator 'Number of multi-year maintenance contracts awarded for Malaita roads'.
</narrative></comment>
</target>
<actual value="38.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Local employment in routine road maintenance (person-days)
</narrative></title>
<baseline year="2019" iso-date="2019-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-01" />
<period-end iso-date="2024-12-31" />
<target value="950.00">
<comment><narrative>
The actual value of 950 = 50 person-days/km/year x (17 km + 21km) x 0.5 years.
</narrative></comment>
</target>
<actual value="950.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Local employment in routine road maintenance (person-days)
</narrative></title>
<baseline year="2019" iso-date="2019-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-01" />
<period-end iso-date="2024-12-31" />
<target value="950.00">
<comment><narrative>
The actual value of 950 = 50 person-days/km/year x (17 km + 21km) x 0.5 years.
</narrative></comment>
</target>
<actual value="950.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in number of survivors seeking help in Malaita Province (Percentage)
</narrative></title>
<baseline year="2018" iso-date="2018-11-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-10" />
<period-end iso-date="2024-12-05" />
<target value="This indicator was dropped">
<comment><narrative>
Target not achieved (0 percent). This indicator was dropped at the restructuring in August 2023 to avoid misperception that SIRAP led to an increase in GBV cases.
</narrative></comment>
</target>
<actual value="This indicator was dropped.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of gravel roads on Malaita main roads in good or fair condition
</narrative></title>
<baseline year="2018" iso-date="2018-12-03" value="10.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-03" />
<period-end iso-date="2024-12-02" />
<target value="19.00">
<comment><narrative>
Target fully achieved (100 percent) against the revised target or modestly achieved (38 percent) against the original target. The actual value at completion of 19.0=(17km+21km)/200km x 100% where 17km=the length of the North Road maintenance works, 21 km=the length of the East Road maintenance works, and 200km=length of gravel roads in Malaita.

The end target was revised from 50% to 19% to reflect the reduced scope of works from 210 km to 38 km at the restructuring in August 2023.
</narrative></comment>
</target>
<actual value="19.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Asset Management System updated and used for preparing investment program
</narrative></title>
<baseline year="2019" iso-date="2019-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-01" />
<period-end iso-date="2025-08-01" />
<target value="Yes">
<comment><narrative>
The plan was to update the MID's asset management system along with its data collection processes. However, due to the overcommitted SIRAP budget, this activity was cancelled in the procurement plan approved on March 15, 2024.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Identified climate resilient investments constructed and in use
</narrative></title>
<baseline year="2019" iso-date="2019-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-01" />
<period-end iso-date="2024-12-31" />
<target value="8.00">
<comment><narrative>
Climate Resilient investments will include concreting five steep grade sections of gravel roads (with a total length of 1,300 m, consisting of CH 8.170-CH8.370 on North Road, and CH4.000-CH4.300, CH12.750-CH12.950, CH13.050-CH13.350, and CH16.700-CH17.000 on East Road) and three bridges (Koa, Bio1, and Bio2 Bridges) replacements. These works are underway, with a plan for completion by the end of August 2024.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of training courses related to GBV delivered
</narrative></title>
<baseline year="2018" iso-date="2018-11-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-10" />
<period-end iso-date="2024-12-05" />
<target value="5.00">
<comment><narrative>
Target exceeded (260 percent). The GBV consultant successfully completed all deliverables under their contract. This included four trainings to the service providers in Honiara, Munda, and Malaita; four awareness sessions for the contractors engaged under SIRAP; and five community awareness sessions at Munda and Malaita project sites. A total of 13 training/awareness sessions was delivered by the GBV consultant from 2020 to 2023.
</narrative></comment>
</target>
<actual value="13.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Airport Master Plan, Sector Strategy and Airline Strategy in line with implementation schedule
</narrative></title>
<baseline year="2018" iso-date="2018-11-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-15" />
<period-end iso-date="2025-06-15" />
<target value="100.00">
<comment><narrative>
Target fully achieved (100 percent). The Airline Strategy Review was completed in October 2019. The Master Plan for the Honiara and Munda Airports was completed in March 2020. The Aviation Sector Strategy was completed in October 2020. The Solomon Airlines Strategic Options Analysis was completed in July 2021. All contracts were completed.
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Identified climate resilient investments constructed and in use
</narrative></title>
<baseline year="2018" iso-date="2018-12-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-03" />
<period-end iso-date="2024-12-02" />
<target value="8.00">
<comment><narrative>
Target exceeded both against the revised target (113 percent) and the original target (180 percent). Climate Resilient investments originally included concreting 5 steep grade sections of gravel roads, which subsequently increased to 6 sections (with a total length of 1,300 m, consisting of CH 8.170-CH8.370 on North Road, and CH4.000-CH4.160, CH7.180–CH7.320, CH12.750-CH12.950, CH13.050-CH13.350, and CH16.700-CH17.000 on East Road) and 3 bridges (Koa, Bio1, and Bio2 Bridges) replacements. The completion date for the three bridges was September 24, 2024, for Malaita North Road was August 9, 2024, and for East Road was November 8, 2024. 

The end target was from 5 to 8 at the restructuring in August 2023.
</narrative></comment>
</target>
<actual value="9">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
CERC Operations Manual adopted by SIG with appropriate training on activating and implementing
</narrative></title>
<baseline year="2018" iso-date="2018-12-03" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-03" />
<period-end iso-date="2024-12-02" />
<target value="Yes">
<comment><narrative>
Target fully achieved (100 percent). Final CERC Operating Manual and associated ESMF were submitted to the World Bank on August 17, 2020 and were approved on September 22, 2020.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of contracts completed within their original forecast delivery date
</narrative></title>
<baseline year="2019" iso-date="2019-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-01" />
<period-end iso-date="2025-08-01" />
<target value="80.00">
<comment><narrative>
Seven of the 34 procurement activities (=21 percent) were completed within their original forecast delivery date.
</narrative></comment>
</target>
<actual value="21.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced access to transportation services (CRI)
</narrative></title>
<baseline year="2018" iso-date="2018-11-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-10" />
<period-end iso-date="2024-12-03" />
<target value="721000.00">
<comment><narrative>
Target fully achieved (100 percent). For aviation, the opening of the new terminal building and the upgraded runway, taxiway, and apron at Munda Airport on October 10, 2023 led to the resumption of Solomon Islands direct flights from Brisbane to Munda on January 6, 2024. The actual value reached the end target of 721,000, or the entire population of Solomon Islands as the upgraded infrastructure became in use as an international airport. For roads, upgrading of Koa, Bio1, and Bio2 Bridges was completed on September 24, 2024. Routine maintenance and regravelling of 17 km of Malaita North Road was completed on August 9, 2024, and that of 21 km of Malaita East Road was completed on November 8, 2024. The actual value reached the end target of 82,000, or those living in the 12 wards connected by the Malaita North and East Roads. 

This corporate results indicator (CRI) was added to SIRAP at the restructuring in August 2023 to meet the CRI requirements.
</narrative></comment>
</target>
<actual value="721000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances responded and/or resolved within the stipulated service standards
</narrative></title>
<baseline year="2019" iso-date="2019-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-01" />
<period-end iso-date="2025-08-01" />
<target value="75.00">
<comment><narrative>
The project's grievance redress mechanism (GRM) defines service standards for responding to and ideally resolving complaints (High/Med/Low priority 5/10/30 working days respectively. The previous one outstanding grievance for the drainage in Munda is still with MCA and Ministry of Lands, Housing and Survey (MLHS) to agree with the landowner. Two grievances were received during Q2 2024 on the three bridges replacement works. Both grievances were responded to within the stipulated service standards, namely 10 working days for the April 2024 grievance, and five working days for the June 2024 grievance. Therefore, the % = 2/2 x 100 = 100%.
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Airport Master Plan, Sector Strategy and Airline Strategy in line with implementation schedule
</narrative></title>
<baseline year="2019" iso-date="2019-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-01" />
<period-end iso-date="2025-08-01" />
<target value="100.00">
<comment><narrative>
The Airline Strategy Review was completed in October 2019. The Master Plan for the Honiara and Munda airports was completed in March 2020. The Aviation Sector Strategy was completed in October 2020. The Solomon Airlines Strategic Options Analysis was completed in July 2021. All contracts are completed.
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Resurfacing of Munda Airport pavement in line with implementation schedule
</narrative></title>
<baseline year="2019" iso-date="2019-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-01" />
<period-end iso-date="2025-08-01" />
<target value="100.00">
<comment><narrative>
Completed on September 23, 2023.
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Unqualified audit with the time specified under the Legal Agreement
</narrative></title>
<baseline year="2019" iso-date="2019-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-01" />
<period-end iso-date="2025-08-01" />
<target value="Yes">
<comment><narrative>
The unqualified Annual Project Financial Statement for 2022 was uploaded to Client Connection on June 30, 2023 and accepted; and that for 2023 was uploaded to Client Connection on June 30, 2024.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Navigation and safety aids in line with implementation schedule
</narrative></title>
<baseline year="2018" iso-date="2018-11-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-15" />
<period-end iso-date="2025-06-15" />
<target value="100.00">
<comment><narrative>
Target fully achieved (100 percent). Reinstatement, testing, and commissioning of airfield ground lighting and reinstatement of visual aids of centerline markings, edge markings, designation markings, threshold markings, fixed distance markings, taxi-holding position markings, and apron markings were completed at Munda Airport. 

While the end target was not revised, the scope of work for this indicator was revised to focus on Munda Airport works only, as Honiara Airport works (including airfield ground lighting and line markings) were transferred to SIRAP2 and completed on March 31, 2025.
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Availability of social services within an accessible distance
</narrative></title>
<baseline year="2018" iso-date="2018-11-10" value="2.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-10" />
<period-end iso-date="2024-12-05" />
<target value="6.00">
<comment><narrative>
Target exceeded (113 percent). This measured the number and type of organizations in a community that provided social welfare-based services, including counselling, case management, and safe shelter. In Munda, there were two social service providers; however, both did not provide a safe shelter. In Malaita, there were five service providers and out of the five, one provided a safe shelter. All the services providers were not based in the communities. They were all based in the Provincial Headquarters, and they deployed to communities whenever there was a case. It should be noted that SIRAP had no direct or indirect influence on this indicator.
</narrative></comment>
</target>
<actual value="7.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of training courses related to GBV delivered
</narrative></title>
<baseline year="2019" iso-date="2019-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-01" />
<period-end iso-date="2025-08-01" />
<target value="5.00">
<comment><narrative>
The GBV consultant successfully completed all deliverables under their contract. This includes four trainings to the service providers in Honiara, Munda, and Malaita; four awareness sessions for the contractors engaged under SIRAP; and five community awareness sessions at Munda and Malaita project sites. A total of 13 training/awareness sessions was delivered by the GBV consultant from 2020 to 2023.
</narrative></comment>
</target>
<actual value="13.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of multi-year maintenance contracts awarded for Malaita roads.
</narrative></title>
<baseline year="2018" iso-date="2018-11-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-10" />
<period-end iso-date="2024-11-30" />
<target value="This indicator was dropped.">
<comment><narrative>
Target not achieved (0 percent). The original indicator ‘Number of multi-year maintenance contracts awarded for Malaita roads was dropped at the restructuring in August 2023 as multi-year maintenance contracts were downsized to single-year maintenance contracts due to budget constraints. It was replaced by an indicator 'Length of Malaita main roads maintained' that measures the progress of maintenance works.
</narrative></comment>
</target>
<actual value="This indicator was dropped.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of gravel roads on Malaita main roads in good or fair condition
</narrative></title>
<baseline year="2019" iso-date="2019-01-01" value="10.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-01" />
<period-end iso-date="2024-12-31" />
<target value="19.00">
<comment><narrative>
The actual value of 19.0=(17km+21km)/200kmx100% where 17km=the length of the North Road maintenance works which is ongoing, 21 km=the length of the East Road maintenance works which is ongoing, and 200km=length of gravel roads in Malaita.
</narrative></comment>
</target>
<actual value="19.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of Malaita main roads maintained
</narrative></title>
<baseline year="2019" iso-date="2019-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-01" />
<period-end iso-date="2024-12-31" />
<target value="38.00">
<comment><narrative>
The 17km length of North Road and the 21 km of East Road are currently receiving maintenance.
</narrative></comment>
</target>
<actual value="38.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Bridge upgraded
</narrative></title>
<baseline year="2019" iso-date="2019-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-01" />
<period-end iso-date="2024-12-31" />
<target value="3.00">
<comment><narrative>
All three bridges of Koa, Bio1, Bio2 are 100% completed which account for the “Actual (Current)” value of 3.
</narrative></comment>
</target>
<actual value="3">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Availability of social services within an accessible distance
</narrative></title>
<baseline year="2019" iso-date="2019-01-01" value="2.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-01" />
<period-end iso-date="2025-04-01" />
<target value="6.00">
<comment><narrative>
The number and type of organizations in a community that provide social welfare-based services, including counselling, case management, and safe shelter. In Munda, there are two social service providers; however, both do not provide a safe shelter. In Malaita, there are five service providers and out of the five, one provides a safe shelter. All the services providers are not based in the communities. They are all based in the Provincial Headquarters, and they deploy to communities whenever there is a case. It should be noted that SIRAP has no direct or indirect influence on this indicator.
</narrative></comment>
</target>
<actual value="7.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Asset Management System updated and used for preparing investment program
</narrative></title>
<baseline year="2018" iso-date="2018-11-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-15" />
<period-end iso-date="2025-06-15" />
<target value="Yes">
<comment><narrative>
Target not achieved (0 percent). The plan was to update the MID's asset management system along with its data collection processes. However, due to the overcommitted SIRAP budget, this activity was cancelled in the procurement plan approved on March 15, 2024. The activity is being conducted under SIRAP2.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Modernization of air traffic management achieved
</narrative></title>
<baseline year="2019" iso-date="2019-01-01" value="No VSAT or ADS-B Ground Stations"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-01" />
<period-end iso-date="2024-12-31" />
<target value="VSAT and ADS-B Ground Stations operational">
<comment><narrative>
Installation and commissioning of ADS-B ground stations and VSAT communications systems at Honiara and Munda Airports have been completed and they are both operational.
</narrative></comment>
</target>
<actual value="VSAT and ADS-B ground stations operational.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Airport Master Plan, Sector Strategy and Airline Strategy in line with implementation schedule
</narrative></title>
<baseline year="2019" iso-date="2019-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-01" />
<period-end iso-date="2025-08-01" />
<target value="100.00">
<comment><narrative>
The Airline Strategy Review was completed in October 2019. The Master Plan for the Honiara and Munda airports was completed in March 2020. The Aviation Sector Strategy was completed in October 2020. The Solomon Airlines Strategic Options Analysis was completed in July 2021. All contracts are completed.
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of training courses related to GBV delivered
</narrative></title>
<baseline year="2019" iso-date="2019-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-01" />
<period-end iso-date="2025-08-01" />
<target value="5.00">
<comment><narrative>
The GBV consultant successfully completed all deliverables under their contract. This includes four trainings to the service providers in Honiara, Munda, and Malaita; four awareness sessions for the contractors engaged under SIRAP; and five community awareness sessions at Munda and Malaita project sites. A total of 13 training/awareness sessions was delivered by the GBV consultant from 2020 to 2023.
</narrative></comment>
</target>
<actual value="13.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
CERC Operations Manual adopted by SIG with appropriate training on activating and implementing
</narrative></title>
<baseline year="2019" iso-date="2019-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-01" />
<period-end iso-date="2024-12-31" />
<target value="Yes">
<comment><narrative>
Final CERC Operating Manual and associated ESMF were submitted to the World Bank on August 17, 2020 and were approved on September 22, 2020.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Airport Certification according to ICAO safety and security standards at Munda Airport
</narrative></title>
<baseline year="2019" iso-date="2019-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-01" />
<period-end iso-date="2024-12-31" />
<target value="Yes">
<comment><narrative>
The interim Airport Operating Certificate (Part 139) issued by CAASI on February 28, 2024 was extended to November 30, 2024. Following SIACL's submission of the required operating manuals to CAASI, the Pacific Aviation Safety Office (PASO) undertook the certification audits in October 2024, and CAASI noted their plan of issuing the full certificate on December 1, 2024 for 24 months. The end target is achievable within Q4 2024.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances responded and/or resolved within the stipulated service standards
</narrative></title>
<baseline year="2018" iso-date="2018-11-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-10" />
<period-end iso-date="2024-12-05" />
<target value="75.00">
<comment><narrative>
Target exceeded (133 percent). The project's grievance redress mechanism (GRM) defined service standards for responding to and ideally resolving complaints (High/Med/Low priority 5/10/30 working days respectively). With the closure of two complaints received during the fourth quarter of 2024, all the 56 complaints received during project implementation were responded and/or resolved within the stipulated service standards by the project's closing date.
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of paved roads on Malaita main roads in very good or good condition
</narrative></title>
<baseline year="2018" iso-date="2018-11-28" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-28" />
<period-end iso-date="2024-11-28" />
<target value="This indicator was dropped.">
<comment><narrative>
Target not achieved (0 percent). This indicator was removed at the restructuring in August 2023 to reflect the removal of resealing the sealed roads in Malaita from SIRAP.
</narrative></comment>
</target>
<actual value="This indicator was dropped.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Open Contracting used to publicize procurement data and updated on a monthly basis
</narrative></title>
<baseline year="2019" iso-date="2019-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-01" />
<period-end iso-date="2025-08-01" />
<target value="Yes">
<comment><narrative>
There was one procurement published this quarter (ADS-B aircraft equipage).
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
CERC Operations Manual adopted by SIG with appropriate training on activating and implementing
</narrative></title>
<baseline year="2019" iso-date="2019-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-01" />
<period-end iso-date="2024-12-31" />
<target value="Yes">
<comment><narrative>
Final CERC Operating Manual and associated ESMF were submitted to the World Bank on August 17, 2020 and were approved on September 22, 2020.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Satisfactory post-construction road safety audit
</narrative></title>
<baseline year="2018" iso-date="2018-11-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-15" />
<period-end iso-date="2025-06-15" />
<target value="Yes">
<comment><narrative>
Target fully achieved (100 percent). The post-construction road safety audit was undertaken on November 18, 2024 and confirmed that road safety issues were satisfactorily addressed.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Implementation of recommended PASO annual work plan
</narrative></title>
<baseline year="2019" iso-date="2019-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-01" />
<period-end iso-date="2024-12-31" />
<target value="80.00">
<comment><narrative>
During the October 2024 mission, CAASI noted that five activities in the PASO annual work plan 2024 have been recently completed. The end target is achievable within Q4 2024.
</narrative></comment>
</target>
<actual value="65">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Modernization of air traffic management achieved
</narrative></title>
<baseline year="2019" iso-date="2019-01-01" value="No VSAT or ADS-B Ground Stations"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-01" />
<period-end iso-date="2024-12-31" />
<target value="VSAT and ADS-B Ground Stations operational">
<comment><narrative>
ADS-B ground station at Munda Airport was repaired on May 27, 2024.
</narrative></comment>
</target>
<actual value="VSAT and ADS-B ground stations operational.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Equipment and systems standardized with regional standards
</narrative></title>
<baseline year="2019" iso-date="2019-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-01" />
<period-end iso-date="2025-08-01" />
<target value="4.00">
<comment><narrative>
ADS-B ground stations (HIR/MUA) and VSAT (HIR/MUA) systems are completed and commissioned. While ADS-B ground station at MUA became inoperable during Q3 2023, this was repaired on May 27, 2024. The VSAT system in Honiara and Munda was commissioned in September 2022 and had additional filters installed in March 2023.
</narrative></comment>
</target>
<actual value="4.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of procurement activities completed (i.e., contracts signed) by the planned dates set in the approved procurement plan in STEP
</narrative></title>
<baseline year="2018" iso-date="2018-11-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-15" />
<period-end iso-date="2025-06-15" />
<target value="80.00">
<comment><narrative>
Target mostly achieved (78 percent). Based on the Procurement Plan, there were 45 contracts signed under SIRAP, of which 28 contracts were signed on or before the planned signing date, equating to 62 percent. The end target of 80 percent was not achieved due to amendments to bid/proposal closing dates.
</narrative></comment>
</target>
<actual value="62">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Project-supported organization(s) publishing periodic reports on GRM and how issues were resolved [including resolution rates]
</narrative></title>
<baseline year="2019" iso-date="2019-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-01" />
<period-end iso-date="2025-08-01" />
<target value="Yes">
<comment><narrative>
The project website for publishing aggregate and disaggregate statistics on GRM resolution rates was implemented in April 2024. The website includes the link to the latest Q1 2024 statistics.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Satisfactory post-construction road safety audit
</narrative></title>
<baseline year="2019" iso-date="2019-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-01" />
<period-end iso-date="2025-08-01" />
<target value="Yes">
<comment><narrative>
The road safety audit will be undertaken post-construction to confirm road safety issues are properly addressed. Road Safety Adviser delivered two half day workshops on road safety in July 2020 and third workshop in July 2021. The post-construction survey timing is pending the progression of the Malaita road and bridge activities, but current expectations are November/December 2024.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Unqualified audit with the time specified under the Legal Agreement
</narrative></title>
<baseline year="2019" iso-date="2019-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-01" />
<period-end iso-date="2025-08-01" />
<target value="Yes">
<comment><narrative>
The unqualified Annual Project Financial Statement for 2023 was uploaded to Client Connection on June 30, 2024 and accepted.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Equipment and systems standardized with regional standards
</narrative></title>
<baseline year="2018" iso-date="2018-11-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-15" />
<period-end iso-date="2025-06-15" />
<target value="4.00">
<comment><narrative>
Target fully achieved (100 percent) against the revised target or substantially achieved (80 percent) against the original target. ADS-B ground stations and VSAT communications systems at Honiara and Munda Airports were completed and commissioned under SIRAP. While ADS-B ground station at Munda Airport became inoperable during Q3 2023, this was repaired on May 27, 2024. The VSAT communications systems at Honiara and Munda Airports were commissioned in September 2022 and had additional filters installed in March 2023.

The end target was revised from 5 to 4 at the restructuring in August 2023 as ADS-B aircraft equipage could not be procured after four attempts and was not implemented under SIRAP.
</narrative></comment>
</target>
<actual value="4.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Navigation and safety aids in line with implementation schedule
</narrative></title>
<baseline year="2019" iso-date="2019-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-01" />
<period-end iso-date="2025-08-01" />
<target value="100.00">
<comment><narrative>
Munda runway, taxiway, and apron resurfacing works were completed on September 23, 2023. The works included reinstatement, testing, and commissioning of airfield ground lighting and reinstatement of visual aids of centerline markings, edge markings, designation markings, threshold markings, fixed distance markings, taxi-holding position markings, and apron markings.
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Airport Certification according to ICAO safety and security standards at Munda Airport
</narrative></title>
<baseline year="2018" iso-date="2018-12-03" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-03" />
<period-end iso-date="2024-12-02" />
<target value="Yes">
<comment><narrative>
Target fully achieved (100 percent). On November 30, 2024, CAASI issued to SIACL the full Airport Operating Certificate (Part 139) for Munda valid for 24 months from December 1, 2024. This indicator was revised from the original scope of &quot;Honiara and Munda Airports&quot;, to &quot;Munda Airport&quot; only, as improvement works at Honiara Airport were dropped from SIRAP at the restructuring in August 2023 and transferred to SIRAP2.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Resurfacing of Munda Airport pavement in line with implementation schedule
</narrative></title>
<baseline year="2018" iso-date="2018-11-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-15" />
<period-end iso-date="2025-06-15" />
<target value="100.00">
<comment><narrative>
Target fully achieved (100 percent). The Munda Airport runway, taxiway, and apron resurfacing works were completed on September 23, 2023.
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Implementation of recommended PASO annual work plan
</narrative></title>
<baseline year="2019" iso-date="2019-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-01" />
<period-end iso-date="2024-12-31" />
<target value="80.00">
<comment><narrative>
SIACL and PASO have met and established a workplan towards certifying the documents for Honiara and Munda International Airports. SIACL is waiting for confirmation from PASO regarding a co-share arrangement for a technical advisor to assist SIACL reviewing all the aeronautical documents.
</narrative></comment>
</target>
<actual value="59.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced access to transportation services
</narrative></title>
<baseline year="2019" iso-date="2019-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-01" />
<period-end iso-date="2024-12-31" />
<target value="721000.00">
<comment><narrative>
The opening of the new terminal building and the upgraded runway, taxiway, and apron on October 10, 2023 led to the resumption of Solomon Islands direct flights from Brisbane to Munda on January 6, 2024. The actual value has been updated to the end target of 721,000, or the entire population of Solomon Islands as the upgraded infrastructure is now in use as an international airport and as an alternative airport to Honiara.
</narrative></comment>
</target>
<actual value="721000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Identified climate resilient investments constructed and in use
</narrative></title>
<baseline year="2019" iso-date="2019-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-01" />
<period-end iso-date="2024-12-31" />
<target value="8.00">
<comment><narrative>
Climate Resilient investments originally included concreting five steep grade sections of gravel roads, which subsequently increased to six sections (with a total length of 1,300 m, consisting of CH 8.170-CH8.370 on North Road, and CH4.000-CH4.160, CH7.180–CH7.320, CH12.750-CH12.950, CH13.050-CH13.350, and CH16.700-CH17.000 on East Road) and three bridges (Koa, Bio1, and Bio2 Bridges) replacements. Five steep graded concrete sections (CH 8.170-CH8.370 on North Road, and CH4.000-CH4.160, CH7.180–CH7.320, CH12.750-CH12.950, and CH16.700-CH17.000 on East Road) and Koa, Bio1, and Bio2 Bridges are 100 percent completed, which account for the Actual (Current) value of 8. The end value is expected to reach 9 once the remaining graded section at CH13.050-CH13.350 is completed.
</narrative></comment>
</target>
<actual value="8">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads rehabilitated- non-rural
</narrative></title>
<baseline year="2018" iso-date="2018-11-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-10" />
<period-end iso-date="2024-11-30" />
<target value="This indicator was dropped.">
<comment><narrative>
Target not achieved (0 percent). This indicator was dropped at the restructuring in August 2023 to reflect the removal of resealing the sealed roads in Malaita from SIRAP.
</narrative></comment>
</target>
<actual value="This indicator was dropped.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads rehabilitated- rural
</narrative></title>
<baseline year="2018" iso-date="2018-11-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-10" />
<period-end iso-date="2024-11-30" />
<target value="This indicator was dropped.">
<comment><narrative>
Target not achieved (0 percent). This indicator was dropped at the restructuring in August 2023 to reflect the removal of resealing the sealed roads in Malaita from SIRAP.
</narrative></comment>
</target>
<actual value="This indicator was dropped.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Airport Certification according to ICAO safety and security standards at Munda Airport
</narrative></title>
<baseline year="2019" iso-date="2019-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-01" />
<period-end iso-date="2024-12-31" />
<target value="Yes">
<comment><narrative>
The interim Airport Operating Certificate (Part 139) issued by CAASI on February 28, 2024 was up to May 31, 2024. In mid-May 2024, SIACL submitted a letter to CAASI to extend the current interim arrangement by another six month. With technical assistance from PASO, SIACL continues to work through updating airport manuals, processes, and plans to comply with ICAO requirements and CAASI oversight.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T00:13:13" hierarchy="1"><iati-identifier>44000-P167465</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>The First Solomon Islands Transition to Sustainable Growth Development Policy Operation</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The proposed operation focuses on two Program Development Objectives, namely i) strengthening fiscal management in the areas of debt management, cash management and budget management; and ii) strengthening the business environment through simplifying tax processes, fighting corruption and supporting more efficient payments systems.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objectives of First Solomon Islands Transition to Sustainable Growth Development Policy Operation for Solomon Islands are: strengthening  fiscal  management in the areas of debt management, cash management and budget management; and ii) strengthening the business environment through simplifying tax processes, fighting corruption  and supporting more efficient payments systems. The first pillar of the operation to strengthen fiscal management is closely aligned to the inclusive economic growth and governance objectives of the National Development Strategy (NDS). Similarly, the second pillar of the operation to strengthen the business environment is also closely aligned with the inclusive economic growth objective of the NDS.  The reforms under the first pillar on fiscal management are focused  on strengthening debt management to promote debt sustainability, improving cash management to mitigate cashflow-related  risks, and strengthening budget management to improve fiscal discipline, budget credibility and allocative efficiency.  The reforms under the second pillar on strengthening the  business environment are focused on the introduction of a fairer and more efficient tax administration framework; promoting an even playing field for the private sector through the introduction of anti-corruption legislation; and improving the efficiency of the national payments system.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SB–P0037439"><narrative>Solomon Islands</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SB–P0037439"><narrative>Solomon Islands</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SB-COA-273"><narrative>Ministry of Finance and Treasury</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2019-11-26"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2020-05-06"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2021-11-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2021-11-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Anna Elizabeth Robinson</narrative></person-name><telephone>+1-202-473-1000</telephone><email>arobinson6@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="SB" percentage="100"><narrative xml:lang="en">SOLOMON ISLANDS</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="2108502" />
                <name><narrative>Honiara</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-9.43333 159.95</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="15142" percentage="70" xml:lang="en"/><sector vocabulary="1" code="15155" percentage="10" xml:lang="en"/><sector vocabulary="1" code="15117" percentage="10" xml:lang="en"/><sector vocabulary="1" code="15113" percentage="10" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="80.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="FA" percentage="20.0000000" xml:lang="en"><narrative>FY17 - Banking Institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="100" xml:lang="en"><narrative>Disease Control</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000114" percentage="20" xml:lang="en"><narrative>Tax policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000413" percentage="20" xml:lang="en"><narrative>Debt Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000011" percentage="20" xml:lang="en"><narrative>Fiscal Policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="40" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000411" percentage="20" xml:lang="en"><narrative>Public Expenditure Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="20" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="20" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000626" percentage="100" xml:lang="en"><narrative>Pandemic Response</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000411" percentage="20" xml:lang="en"><narrative>Public Expenditure Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000433" percentage="20" xml:lang="en"><narrative>E-Government, incl. e-services</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000032" percentage="20" xml:lang="en"><narrative>Financial Infrastructure and Access</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000433" percentage="20" xml:lang="en"><narrative>E-Government, incl. e-services</narrative></sector><humanitarian-scope type="1" vocabulary="1-2" code="EP-2020-000012-001"> </humanitarian-scope><humanitarian-scope type="2" vocabulary="2-1" code="HCOVD20"> </humanitarian-scope><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">15000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">15000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">11840000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-37438"><narrative>Ministry of Finance and Treasury</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">3160000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-37438"><narrative>Ministry of Finance and Treasury</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">3314712</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-37438"><narrative>Ministry of Finance and Treasury</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">12015831</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-37438"><narrative>Ministry of Finance and Treasury</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-8881</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-37438"><narrative>Ministry of Finance and Treasury</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-12869</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-37438"><narrative>Ministry of Finance and Treasury</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-12707</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-37438"><narrative>Ministry of Finance and Treasury</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-12271</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-37438"><narrative>Ministry of Finance and Treasury</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-11489</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-37438"><narrative>Ministry of Finance and Treasury</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-12036</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-37438"><narrative>Ministry of Finance and Treasury</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-11939</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-37438"><narrative>Ministry of Finance and Treasury</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-11847</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-37438"><narrative>Ministry of Finance and Treasury</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-12023</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-37438"><narrative>Ministry of Finance and Treasury</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-11794</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-37438"><narrative>Ministry of Finance and Treasury</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-12664</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-37438"><narrative>Ministry of Finance and Treasury</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-12364</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-37438"><narrative>Ministry of Finance and Treasury</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P167465"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P167465?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P167465"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T00:13:13" hierarchy="1"><iati-identifier>44000-P172454</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>The Second Solomon Islands Transition to Sustainable Growth Development Policy Operation</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objectives and pillars of the Second Transition to Sustainable Growth Development Policy Operation in Solomon Islands are: (1) to strengthen fiscal management in the areas of debt management, cash management and procurement; (2) to strengthen the business environment through simplifying tax processes, fighting corruption and supporting more efficient payments systems; and (3) to improve environmental sustainability by strengthening national planning for climate change and reducing plastic pollution. Pillar 1, on strengthening fiscal management, supports strengthened debt management to safeguard debt sustainability, and stronger public procurement to improve efficiency and reduce corruption. Pillar 2 supports improvements to the business environment, including: making tax compliance easier for the private sector and promoting e-tax; addressing corruption and promoting women's inclusion in decision-making; and the introduction of a national system for electronic payments, for faster and more secure financial transactions. Pillar 3, on environmental sustainability, is a new introduction to the program and signals the growing importance of climate change and green growth for both Solomon Islands Government and the Bank. This pillar supports Solomon Islands Updated Nationally Determined Contribution under the Paris Agreement and efforts to reduce plastic pollution through the introduction of a levy on single use and toxic plastics.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SB–P0043577"><narrative>Solomon Islands</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SB-COA-273"><narrative>Ministry of Finance and Treasury</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2021-07-06"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2021-11-30"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2023-03-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2023-03-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Csilla Lakatos</narrative></person-name><telephone>+1-202-473-1000</telephone><email>clakatos1@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="SB" percentage="100"><narrative xml:lang="en">SOLOMON ISLANDS</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="2108502" />
                <name><narrative>Honiara</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-9.43333 159.95</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="41010" percentage="29" xml:lang="en"/><sector vocabulary="1" code="15196" percentage="15" xml:lang="en"/><sector vocabulary="1" code="15117" percentage="14" xml:lang="en"/><sector vocabulary="1" code="15113" percentage="14" xml:lang="en"/><sector vocabulary="1" code="15119" percentage="14" xml:lang="en"/><sector vocabulary="1" code="15155" percentage="14" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="FA" percentage="14.0000000" xml:lang="en"><narrative>FY17 - Banking Institutions</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="29.0000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="57.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000433" percentage="14" xml:lang="en"><narrative>E-Government, incl. e-services</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000011" percentage="14" xml:lang="en"><narrative>Fiscal Policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="14" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000114" percentage="14" xml:lang="en"><narrative>Tax policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="14" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="29" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000433" percentage="14" xml:lang="en"><narrative>E-Government, incl. e-services</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="14" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000032" percentage="14" xml:lang="en"><narrative>Financial Infrastructure and Access</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="7" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000411" percentage="14" xml:lang="en"><narrative>Public Expenditure Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000413" percentage="14" xml:lang="en"><narrative>Debt Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="43" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="14" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000411" percentage="14" xml:lang="en"><narrative>Public Expenditure Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000084" percentage="29" xml:lang="en"><narrative>Environmental policies and institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000084" percentage="29" xml:lang="en"><narrative>Environmental policies and institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000024" percentage="14" xml:lang="en"><narrative>Enterprise Development</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">15000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">15000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">15000000</value><description xml:lang="en"><narrative>Total Commitment in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-43576"><narrative>Ministry of Finance and Treasury</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">11500000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-43576"><narrative>Ministry of Finance and Treasury</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">3500000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-43576"><narrative>Ministry of Finance and Treasury</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">14975613</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-43576"><narrative>Ministry of Finance and Treasury</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">3334441</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-43576"><narrative>Ministry of Finance and Treasury</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">10955457</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-43576"><narrative>Ministry of Finance and Treasury</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-8304</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-43576"><narrative>Ministry of Finance and Treasury</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-12958</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-43576"><narrative>Ministry of Finance and Treasury</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-12486</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-43576"><narrative>Ministry of Finance and Treasury</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-12731</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-43576"><narrative>Ministry of Finance and Treasury</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-12508</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-43576"><narrative>Ministry of Finance and Treasury</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">-12602</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-43576"><narrative>Ministry of Finance and Treasury</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-13214</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-43576"><narrative>Ministry of Finance and Treasury</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-12951</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-43576"><narrative>Ministry of Finance and Treasury</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P172454"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P172454?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P172454"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
9. The consumption of single use plastic products has decreased, as measured by a reduction in the volume of imported polyethylene plastic bags
</narrative></title>
<baseline year="2020" iso-date="2020-06-30" value="128,000 kilograms of polyethylene plastic bags imported (2020)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-30" />
<period-end iso-date="2022-06-30" />
<target value="No more than 115,000 kilograms of polyethylene plastic bags imported (a 10 percent reduction) (2022)">
<comment><narrative>
&lt;p&amp;gt;Achieved&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="95,589 kilograms of plastic bags imported">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
5. The SIICAC is reporting transparently on its activities, as measured by the tabling of its annual report in Parliament in accordance with the Anti- Corruption Act.
</narrative></title>
<baseline year="2018" iso-date="2018-06-30" value="No report (2018)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-30" />
<period-end iso-date="2023-06-30" />
<target value="2020 - 2022 annual reports have been presented to Parliament and published online (2023)">
<comment><narrative>
&lt;p&amp;gt;Not achieved&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="No annual reports submitted and published on-line since 2020">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
1b. The share of domestic debt in total central government debt has increased
</narrative></title>
<baseline year="2020" iso-date="2020-06-30" value="31.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-30" />
<period-end iso-date="2023-06-30" />
<target value="35.00">
<comment><narrative>
&lt;p&amp;gt;Achieved&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="42.20">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
3a. Transparency in public procurement is improved, as measured by an increased share of Central Tender Board (CTB) contract award notices being published online in accordance with the Regulations
</narrative></title>
<baseline year="2019" iso-date="2019-06-30" value="No CTB contract awards published online (2019)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-06-30" />
<period-end iso-date="2023-06-30" />
<target value="100 percent of CTB contract awards are published online">
<comment><narrative>
&lt;p&amp;gt;Achieved&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="All CTB contract awards were published online in 2023">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
4c. Tax administration is made more efficient, as measured by a reduction in tax debt for the large taxpayer segment
</narrative></title>
<baseline year="2021" iso-date="2021-06-30" value="SBD136m tax debt (June 2021)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-06-30" />
<period-end iso-date="2023-06-30" />
<target value="Less than SI$125m (at least a 25 percent reduction) (2023)">
<comment><narrative>
&lt;p&amp;gt;Achieved&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="SI$93m, representing a 31 percent reduction">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
8b. Planning for climate adaptation has improved, as measured by the incorporation of gender analysis in all new assessments
</narrative></title>
<baseline year="2021" iso-date="2021-06-30" value="Assessments do not include gender analysis. (June 2021)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-06-30" />
<period-end iso-date="2023-12-31" />
<target value="All new assessments include gender analysis (Jan 2022 – Dec 2023)">
<comment><narrative>
&lt;p&amp;gt;Achieved&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Gender considerations were included in all focus groups and discussions">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
1a. Government debt operations comply with the Annual Borrowing Limit (ABL)
</narrative></title>
<baseline year="2018" iso-date="2018-06-30" value="Annual contracted debt did not exceed the ABL (SI$74m contracted against ABL of SI$300m) (2018)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-30" />
<period-end iso-date="2022-06-30" />
<target value="Annual contracted debt does not exceed the ABL (2019 – 2022)">
<comment><narrative>
&lt;p&amp;gt;Achieved&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="SI$ 331 million contracted on average annually in 2019-22, against average ABL of SI$ 450 million">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
3b. Competition is improved, as measured by a reduced number of bid waivers (exemptions from competitive tendering) granted for procurements over SI$100,000
</narrative></title>
<baseline year="2019" iso-date="2019-06-30" value="77 bid waivers granted (2019)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-06-30" />
<period-end iso-date="2023-06-30" />
<target value="Bid waivers are reduced below pre-COVID-19 levels (i.e. less than 77) (2023)">
<comment><narrative>
&lt;p&amp;gt;Not achieved&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Bid waivers were reduced to 155 in 2022 and 135 in 2023">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
7b. The efficiency of payment systems is improved, as measured by a reduction in bank transaction fees for the Ministry of Finance and Treasury
</narrative></title>
<baseline year="2020" iso-date="2020-06-30" value="Bank fees of SI$1.36m (2020)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-30" />
<period-end iso-date="2023-06-30" />
<target value="Bank fees of less than SI$0.95m (at least a 30 percent reduction) (2023)">
<comment><narrative>
&lt;p&amp;gt;Not achieved&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="No reduction in amount of fees due to delays in ATS introduction">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
8a. Planning for climate adaptation has improved, as measured by an increase in the number of communities covered by Integrated Vulnerability and Adaptation Assessments
</narrative></title>
<baseline year="2021" iso-date="2021-06-30" value="Integrated Vulnerability and Adaptation Assessments have been completed for the Reef Islands in Temotu Province and all of Malaita province except for the Ontong Java atolls"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-06-30" />
<period-end iso-date="2023-06-30" />
<target value="Communities in at least three out of nine provinces are covered by an Integrated Vulnerability and Adaptation Assessment (2023)">
<comment><narrative>
&lt;p&amp;gt;Not achieved&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Assessments have been conducted in 2 provinces and about 100 communities in all other provinces">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
2. Reduced accumulation of expenditure arrears
</narrative></title>
<baseline year="2017" iso-date="2017-12-31" value="Estimated arrears stock of SI$138m (end-2017)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-31" />
<period-end iso-date="2023-06-30" />
<target value="Arrears stock is reduced below SI$100m (2023)">
<comment><narrative>
&lt;p&amp;gt;Achieved&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="SI$24m, according to IMF projections, confirmed by SIG to have been largely cleared (2023).">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
4b. Tax administration is made more efficient, as measured by an increase in the on-time filing rate for large taxpayers
</narrative></title>
<baseline year="2021" iso-date="2021-06-30" value="84 percent on-time filing (June 2021)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-06-30" />
<period-end iso-date="2023-06-30" />
<target value="At least 90 percent on-time filing">
<comment><narrative>
&lt;p&amp;gt;Not achieved&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="84 percent on-time filing">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
4a. Tax administration is made more efficient, as measured by a greater share of large taxpayers filing tax returns online via e-tax
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="88 percent registered for e-tax and 10 percent filing returns via e-tax (Dec 2020)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2023-12-31" />
<target value="At least 90 percent registered for e-tax and 25 percent filing returns via e-tax">
<comment><narrative>
&lt;p&amp;gt;Achieved&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="94 percent registered for e-tax
73 percent filing returns via e-tax">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
6. Female representation in anti- corruption efforts is increased, as measured by the share of female SIICAC Commissioners
</narrative></title>
<baseline year="2018" iso-date="2018-06-30" value="No Commissioners appointed (2018)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-06-30" />
<period-end iso-date="2023-06-30" />
<target value="At least two out of five Commissioners (40 percent) are female (2023)">
<comment><narrative>
&lt;p&amp;gt;Achieved&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Two women Commissioners have been appointed">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
7a. The efficiency of payment systems is improved, as measured by an increased share of electronic payments in total payments cleared and settled by commercial banks
</narrative></title>
<baseline year="2020" iso-date="2020-06-30" value="Electronic payments made up 0 percent of payments by volume (0 electronic payments and 183,000 cheques) (2020)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-30" />
<period-end iso-date="2023-06-30" />
<target value="Electronic payments make up at least 30 percent of payments by volume (2023)">
<comment><narrative>
&lt;p&amp;gt;Not achieved&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="No electronic payments due to delays in ATS introduction">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T00:13:13" hierarchy="1"><iati-identifier>44000-P173018</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Solomon Islands Sustainable Mining Development Technical Assistance Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To strengthen the capacity of regulatory institutions to implement revised mining and related laws consistently, transparently and effectively.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Sustainable Mining Development Technical Assistance Project for Solomon Islands is to strengthen the capacity of regulatory institutions to implement revised mining and related laws consistently, transparently and effectively. The project comprises of three components. The first component, completion of the regulatory framework will support Ministry of Mines, Energy and Rural Electrification (MMERE) to complete the design of the regulatory framework in line with the national minerals policy (NMP). It consists of following sub-components: (i) policy, plans, and legislation; and (ii) institutional structures and functions. The second component, strengthening the capacity of regulatory institutions will support building capacity of government regulatory institutions to fulfill their functions consistently, transparently, and effectively and support MMERE to overcome near term operational challenges. It consists of following sub-components: (i) mineral rights management; (ii) mineral revenue management; (iii) geo-data management; (iv) operational support; and (v) independent advisory institution. The third component, project management will fund: (a) the operational and technical assistance needed by MMERE as the implementing agency to manage the project during implementation for which a project management unit (PMU) will be established to exercise project management responsibilities on MMERE's behalf; and (b) selected equipment costs and office refurbishment at MMERE.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SB–P0044220"><narrative>Solomon Islands</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SB-COA-0044219"><narrative>Ministry of Mines, Energy and Rural Electrification</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2020-12-01"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2021-11-30"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2026-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2026-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Wilfred Lus</narrative></person-name><telephone>+1-202-473-1000</telephone><email>wlus@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="SB" percentage="100"><narrative xml:lang="en">SOLOMON ISLANDS</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002103350" />
            <name><narrative>Solomon Islands</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8 159</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="32210" percentage="98" xml:lang="en"/><sector vocabulary="1" code="32110" percentage="2" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LM" percentage="72.0000000" xml:lang="en"><narrative>FY17 - Mining</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LP" percentage="28.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Energy and Extractives</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="64" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000513" percentage="49" xml:lang="en"><narrative>Participation and Civic Engagement</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000862" percentage="100" xml:lang="en"><narrative>Energy Policies &amp; Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="49" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000261" percentage="64" xml:lang="en"><narrative>ICT Solutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="7" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="7" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000513" percentage="49" xml:lang="en"><narrative>Participation and Civic Engagement</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000726" percentage="64" xml:lang="en"><narrative>Geospatial Services</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">100000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">50000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">50000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">100000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">50000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">50000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">100000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">50000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">100000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">50000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">50000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">90000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">50000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">50000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">90000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">50000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">90000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">50000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">50000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">90000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">50000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">50000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">100000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">50000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">30000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">40000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">20000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">50000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">30000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">30000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">60000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">30000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">30000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">60000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">30000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">50000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">30000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">30000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">60000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">20000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">20000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">50000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">30000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">60000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">30000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">60000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">150000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">80000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">70000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">140000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">70000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">70000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">130000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">70000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">130000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">70000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">70000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">130000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">70000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">70000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">130000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">70000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">140000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">70000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">70000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">140000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">70000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">210000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">70000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">70000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">210000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">70000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">665273.77</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">665273.77</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">5000000</value><description xml:lang="en"><narrative>Total Commitment in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44219"><narrative>Ministry of Mines, Energy and Rural Electrification</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">495600</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44219"><narrative>Ministry of Mines, Energy and Rural Electrification</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">420787</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44219"><narrative>Ministry of Mines, Energy and Rural Electrification</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">385009</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44219"><narrative>Ministry of Mines, Energy and Rural Electrification</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">309219</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44219"><narrative>Ministry of Mines, Energy and Rural Electrification</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">108040</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44219"><narrative>Ministry of Mines, Energy and Rural Electrification</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">97620</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44219"><narrative>Ministry of Mines, Energy and Rural Electrification</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">97620</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44219"><narrative>Ministry of Mines, Energy and Rural Electrification</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">238076</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44219"><narrative>Ministry of Mines, Energy and Rural Electrification</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">146430</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44219"><narrative>Ministry of Mines, Energy and Rural Electrification</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">212852</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44219"><narrative>Ministry of Mines, Energy and Rural Electrification</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">211055</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44219"><narrative>Ministry of Mines, Energy and Rural Electrification</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">315583</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44219"><narrative>Ministry of Mines, Energy and Rural Electrification</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">209199</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44219"><narrative>Ministry of Mines, Energy and Rural Electrification</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">302767</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44219"><narrative>Ministry of Mines, Energy and Rural Electrification</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">256424</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44219"><narrative>Ministry of Mines, Energy and Rural Electrification</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">112828</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44219"><narrative>Ministry of Mines, Energy and Rural Electrification</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">242961</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44219"><narrative>Ministry of Mines, Energy and Rural Electrification</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">172657</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44219"><narrative>Ministry of Mines, Energy and Rural Electrification</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P173018"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P173018?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P173018"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Approval and publication of MMERE's Communications Strategy
</narrative></title>
<baseline year="2022" iso-date="2022-01-12" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-12" />
<period-end iso-date="2026-06-12" />
<target value="Yes">
<comment><narrative>
This target partially achieved. The Project has developed the communications Strategy, however, this document has not gone through the Ministry's formal approval, adoption, and publication process.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Time taken for grievances registered related to Project delivery to be addressed
</narrative></title>
<baseline year="2022" iso-date="2022-01-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-12" />
<period-end iso-date="2026-06-12" />
<target value="1.00">
<comment><narrative>
The Project has established a GM which is reflected in the Stakeholder Engagement Plan (SEP) and Labor Management Procedures (LMP). Since then, the project has reported no grievances due to activities related to the core shed being delayed and later dropped by the project. To date no grievances have been reported to the PMU.
</narrative></comment>
</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Use of a digital geo-referenced platform for managing cadastral records
</narrative></title>
<baseline year="2022" iso-date="2022-01-12" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-12" />
<period-end iso-date="2026-06-12" />
<target value="Yes">
<comment><narrative>
The project has achieved this key intermediate result of establishing Mining Cadaster Administration System in the MMERE. The implementation of MCAS a significant achievement for the MMERE and is now an integral part of Ministry's daily operations and has been recognized for its effectiveness and the transparency it brings to managing cadastral records.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women's employment in mining sector increased (Cumulative)
</narrative></title>
<baseline year="2022" iso-date="2022-01-11" value="14.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-11" />
<period-end iso-date="2026-06-11" />
<target value="30.00">
<comment><narrative>
While the year 4 target was 25%, the project achieved only 11%, up from the previous year's 9%. This data includes both public and private employment. Some mining operations, like Pacific Nickel Mining Kolosori, have had to scale down or stop operations, affecting employment.

To achieve this indicator, MMERE is committed to increasing women's employment in the mining sector through its GESI Strategy. This strategy aims to ensure inclusive, equitable, and beneficial mining sector development in the Solomon Islands. The Draft GESI Strategy, section 6, Strategy 3, outlines actions to expand employment and economic opportunities for women, including promoting recruitment, retention, and career advancement through targeted programs, training, and mentorship.
</narrative></comment>
</target>
<actual value="11.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
MMERE Annual  Report  published within  a year of the  Minerals  Resources Bill  coming into  effect to include  information on  actions taken by  the Mines  Division to  implement the  NMP and MRB
</narrative></title>
<baseline year="2022" iso-date="2022-01-12" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-12" />
<period-end iso-date="2026-06-12" />
<target value="Yes">
<comment><narrative>
Not achieved yet. An MMERE Annual Report is a recurrent activity compiled by the Deputy Secretary for the Permanent Secretary reporting on all the activities in that year for all Divisions.”
The MMERE made a recommendation to rename the indicator to “MMERE Annual Report published within a year of the Minerals Resources Bill coming into effect to include information on actions taken by the Mines Division to implement the NMP and the Minerals Resources Act 2025.”
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Adoption of the MMERE Gender and Social Inclusion Plan
</narrative></title>
<baseline year="2022" iso-date="2022-01-12" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-12" />
<period-end iso-date="2026-06-12" />
<target value="Yes">
<comment><narrative>
This target has achieved partially. The Project has developed a Gender and Social Inclusion Strategy which is a policy strategy. However, the document is still pending formal approval and adoption by MMERE.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of  Beneficiaries  Who report that  Project address  their needs   (disaggregated by gender)
</narrative></title>
<baseline year="2022" iso-date="2022-01-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-13" />
<period-end iso-date="2027-06-13" />
<target value="85.00">
<comment><narrative>
The project has surveyed to understand how beneficiaries perceive the project's impact on their needs, disaggregated by gender. Currently the project is analyzing the data .
</narrative></comment>
</target>
<actual value="25.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Gender related employment requirements incorporated in the obligations which license holders must comply with
</narrative></title>
<baseline year="2022" iso-date="2022-01-12" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-12" />
<period-end iso-date="2026-06-12" />
<target value="Yes">
<comment><narrative>
This indicator will be achieved when the Mineral Resources Bill is enacted in Parliament, Gazetted and published

As stated in Mineral Resources Bill 2024, Part 6, Division 4, subdivision 4, Clause 88 – provides for the Content of community development agreement inclusive of a program for local employment and training which ensures equal opportunity for employment, training, promotion, and pay for men and women.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women's employment in mining sector increased (Cumulative)
</narrative></title>
<baseline year="2022" iso-date="2022-01-11" value="14.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-11" />
<period-end iso-date="2026-06-11" />
<target value="30.00">
<comment><narrative>
While the year 4 target was 25%, the project achieved only 11%, up from the previous year's 9%. This data includes both public and private employment. Some mining operations, like Pacific Nickel Mining Kolosori, have had to scale down or stop operations, affecting employment.

To achieve this indicator, MMERE is committed to increasing women's employment in the mining sector through its GESI Strategy. This strategy aims to ensure inclusive, equitable, and beneficial mining sector development in the Solomon Islands. The Draft GESI Strategy, section 6, Strategy 3, outlines actions to expand employment and economic opportunities for women, including promoting recruitment, retention, and career advancement through targeted programs, training, and mentorship.
</narrative></comment>
</target>
<actual value="11.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increased monitoring of contractual and regulatory arrangements and their enforcement to ensure alignment with National Minerals Policy and applicable international standards
</narrative></title>
<baseline year="2022" iso-date="2022-01-11" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-11" />
<period-end iso-date="2026-06-11" />
<target value="Yes">
<comment><narrative>
The Mineral Resources Bill 2025 is currently with the Bills and Legislation Committee (BLC) deliberation phase, with enactment delayed by stakeholder concerns and pending provincial hearings. Regulations cannot proceed without the bill's passage, projected for Q4 2025. This PDO is at risk of meeting the target, as it hinges on the legislative timeline. The Project and MMERE are heavily reliant on external processes (Parliament), which poses risks to meeting the target; however, MMERE is still optimistic that the Mineral Resources Bill passage will be enacted in Q4 2025, as it is a government priority.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Adoption of the MMERE Gender and Social Inclusion Plan
</narrative></title>
<baseline year="2022" iso-date="2022-01-12" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-12" />
<period-end iso-date="2026-06-12" />
<target value="Yes">
<comment><narrative>
This target has achieved partially. The Project has developed a Gender and Social Inclusion Strategy which is a policy strategy. However, the document is still pending formal approval and adoption by MMERE.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Mining Bill based on the NMP enacted
</narrative></title>
<baseline year="2023" iso-date="2023-05-12" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-05-12" />
<period-end iso-date="2026-06-12" />
<target value="Yes">
<comment><narrative>
The enactment of the Mining Bill, a key project milestone, has not yet been achieved. MMERE has completed 70% of the  mineral Resources Bill (MRB), with the remaining 30% currently in the government's hands. The next steps include the MRB going before the Bills Legislation Committee, having its First, Second, and Third Readings in Parliament, receiving Royal Assent, and being gazetted to become effective, all tentatively scheduled for the last quarter of 2025.Government and MMERE to fast-track the process, as with the current trend, this could be enacted in early 2026.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of licensed mining operations for which a recent inspection report has been uploaded to a MMERE inspection database (Cumulative)
</narrative></title>
<baseline year="2022" iso-date="2022-01-11" value="10.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-11" />
<period-end iso-date="2026-06-11" />
<target value="90.00">
<comment><narrative>
The project exceeded its target of 75% in year 3, achieving a remarkable 88% compliance rate for mine inspections. This data was verified by viewing the inspection reports for each active ML stored in the inspectorate section.
currently, performance for this particular indicator has declined slightly, with only 35% achieved against an 80% target. The primary reason for this shortfall is budget constraints, which have limited the inspectorate team's ability to mobilize to mining sites.
</narrative></comment>
</target>
<actual value="35.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Comprehensive public disclosure of cadastral records of license applications and awards and subsequent license management
</narrative></title>
<baseline year="2022" iso-date="2022-01-11" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-11" />
<period-end iso-date="2026-06-11" />
<target value="Yes">
<comment><narrative>
The indicator has been successfully met.
The Mining Cadastre Administration System (MCAS) is the main system that was developed for government civil servants which is the MMERE, Mines Division. This system, MCAS comes with a portal, accessible to the public. The online portal is a completely separate application that connects to MCAS. This online portal is also linked with the MMERE website (www.mmere.gov.sb) . Currently, MCAS is used by Mines Division for their purpose and the public with the mining companies are using the online portal to make new applications, reporting obligations, and even due diligence checks on applications in preparation for Mines and Minerals Board meetings. This demonstrates improvement in transparency and efficiency in the processing of applications and permits within MMERE and public disclosure of cadastral records.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduced time between lodging applications and approval hearings
</narrative></title>
<baseline year="2022" iso-date="2022-01-11" value="3.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-11" />
<period-end iso-date="2026-06-11" />
<target value="1.00">
<comment><narrative>
The Ministry of Mines, Energy and Rural Electrification (MMERE) has significantly reduced the average processing time for new exploration license applications, achieving a one-month processing time, exceeding the target of two months set for Year 3. This accomplishment demonstrates MMERE's commitment to improving the efficiency and effectiveness of its services. The reduction in processing time reflects MMERE's dedication to providing a more efficient and responsive service to applicants and stakeholders. This achievement is attributed to the successful implementation of the Mining Cadaster Administration System (MCAS), a digital geo-referenced platform developed under the project.
</narrative></comment>
</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduced time between lodging applications and approval hearings
</narrative></title>
<baseline year="2022" iso-date="2022-01-11" value="3.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-11" />
<period-end iso-date="2026-06-11" />
<target value="1.00">
<comment><narrative>
The Ministry of Mines, Energy and Rural Electrification (MMERE) has significantly reduced the average processing time for new exploration license applications, achieving a one-month processing time, exceeding the target of two months set for Year 3. This accomplishment demonstrates MMERE's commitment to improving the efficiency and effectiveness of its services. The reduction in processing time reflects MMERE's dedication to providing a more efficient and responsive service to applicants and stakeholders. This achievement is attributed to the successful implementation of the Mining Cadaster Administration System (MCAS), a digital geo-referenced platform developed under the project.
</narrative></comment>
</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Comprehensive public disclosure of cadastral records of license applications and awards and subsequent license management
</narrative></title>
<baseline year="2022" iso-date="2022-01-11" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-11" />
<period-end iso-date="2026-06-11" />
<target value="Yes">
<comment><narrative>
The indicator has been successfully met.
The Mining Cadastre Administration System (MCAS) is the main system that was developed for government civil servants which is the MMERE, Mines Division. This system, MCAS comes with a portal, accessible to the public. The online portal is a completely separate application that connects to MCAS. This online portal is also linked with the MMERE website (www.mmere.gov.sb) . Currently, MCAS is used by Mines Division for their purpose and the public with the mining companies are using the online portal to make new applications, reporting obligations, and even due diligence checks on applications in preparation for Mines and Minerals Board meetings. This demonstrates improvement in transparency and efficiency in the processing of applications and permits within MMERE and public disclosure of cadastral records.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Comprehensive public disclosure of cadastral records of license applications and awards and subsequent license management
</narrative></title>
<baseline year="2022" iso-date="2022-01-11" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-11" />
<period-end iso-date="2026-06-11" />
<target value="Yes">
<comment><narrative>
The indicator has been successfully met.
The Mining Cadastre Administration System (MCAS) is the main system that was developed for government civil servants which is the MMERE, Mines Division. This system, MCAS comes with a portal, accessible to the public. The online portal is a completely separate application that connects to MCAS. This online portal is also linked with the MMERE website (www.mmere.gov.sb) . Currently, MCAS is used by Mines Division for their purpose and the public with the mining companies are using the online portal to make new applications, reporting obligations, and even due diligence checks on applications in preparation for Mines and Minerals Board meetings. This demonstrates improvement in transparency and efficiency in the processing of applications and permits within MMERE and public disclosure of cadastral records.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Participation rate of women in committees and boards established by communities to negotiate access, community development and other agreements provided for in the mining legislation (Cumulative)
</narrative></title>
<baseline year="2022" iso-date="2022-01-11" value="10.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-11" />
<period-end iso-date="2026-06-11" />
<target value="50.00">
<comment><narrative>
The current participation rate is at 19% which falls short of the 30% target for year 4 but improved from the 17% previously reached. This shows positive results from MMERE. This is making progress but yearly targets should be revised for practicality.
MMERE has recently created a Community Liaison Section within the Mines Division, a significant milestone achieved under SISMDTAP for community engagement. The Ministry of Public Service has approved four positions for this section, currently in the interviewing stage.
This new unit will serve as an intermediary to address issues and facilitate communication between MMERE, the community, mining companies, and other affected parties regarding socio-economic development in the mining sector. This unit will also be advocating for mining-affected communities to promote active stakeholder participation in mining governance by working to improve women's participation rate.
</narrative></comment>
</target>
<actual value="17.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Participation rate of women in committees and boards established by communities to negotiate access, community development and other agreements provided for in the mining legislation (Cumulative)
</narrative></title>
<baseline year="2022" iso-date="2022-01-11" value="10.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-11" />
<period-end iso-date="2026-06-11" />
<target value="50.00">
<comment><narrative>
At the beginning of year 4, project has achieved 19% of females participating in committees and boards established by the communities involved in SAA and SARA negotiations, and currently reached 26%. Over the years, data shows fluctuating trends in women's participation, with notable improvements in 2025. This demonstrates the effectiveness of interventions in improving stakeholder participation in the governance of the mining sector.
Moreover, MMERE has recently created a Community Liaison Section within the Mines Division, a significant milestone achieved under SISMDTAP for community engagement. The Ministry of Public Service has approved four positions for this section, in which three staff are on board.
This new unit will serve as an intermediary to address issues and facilitate communication between MMERE, the community, mining companies, and other affected parties regarding socio-economic development in the mining sector.
</narrative></comment>
</target>
<actual value="26.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
An increase in the average ratio of actual royalty collection to collections at the nominal royalty rate (reduced leakage)
</narrative></title>
<baseline year="2022" iso-date="2022-01-11" value="50.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-11" />
<period-end iso-date="2026-06-11" />
<target value="90.00">
<comment><narrative>
To date, 156 shipments have been exported since the operation of active Mining License ( ML) holders in the country of which 14 are Nickle shipments and 142 are Gold&amp; Silver shipments. The Royalty payment (3% of Gross product) has three different categories namely SIG (50% of Royalty), PG (10% of Royalty), and LO (40% of Royalty). The total Royalty collected on Average is 52.60.
</narrative></comment>
</target>
<actual value="52.60">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
An increase in the average ratio of actual royalty collection to collections at the nominal royalty rate (reduced leakage)
</narrative></title>
<baseline year="2022" iso-date="2022-01-11" value="50.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-11" />
<period-end iso-date="2026-06-11" />
<target value="90.00">
<comment><narrative>
Royalty collection has improved since MMERE has taken action for active mining companies in the Solomon Islands to comply and pay up their dues. GRML has so far paid SBD$14,892,226.38 of unpaid royalties (worth SBD$33M) to SIG. Through observation, it has been witnessed that the MMERE has stepped up and toughened up in ensuring all mining companies comply. To date, the actual royalty collection ratio stands at 91%: 9%, showing improvement from the baseline of 50%:50%, reflecting improvement done to reduce leakage and better collection performance. This also shows that year 4 target (80%) has been overachieved.
</narrative></comment>
</target>
<actual value="91">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Extent of forest loss in mining areas
</narrative></title>
<baseline year="2022" iso-date="2022-01-11" value="30.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-11" />
<period-end iso-date="2026-06-11" />
<target value="10.00">
<comment><narrative>
The Project is working to assess the extent of forest loss in mining areas. Drone surveys have been completed for five sites. Data analysis is ongoing, and results are expected to be available soon.
</narrative></comment>
</target>
<actual value="30.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Extent of forest loss in mining areas
</narrative></title>
<baseline year="2022" iso-date="2022-01-11" value="30.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-11" />
<period-end iso-date="2026-06-11" />
<target value="10.00">
<comment><narrative>
The dataset covers six sites across three provinces, namely Isabel, Choiseul and Guadalcanal. The overall average forest cover on the six sites is approximately 77.88%, with a total forest cover of 2,030 ha over 2,606 ha. This indicates that the extent which forest loss in mining areas is approximately 22.12% including water bodies.
</narrative></comment>
</target>
<actual value="22.12">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women's employment in mining sector increased (Cumulative)
</narrative></title>
<baseline year="2022" iso-date="2022-01-11" value="14.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-11" />
<period-end iso-date="2026-06-11" />
<target value="30.00">
<comment><narrative>
While the year 4 target was 25%, the project achieved only 11%, up from the previous year's 9%. This data includes both public and private employment. Some mining operations, like Pacific Nickel Mining Kolosori, have had to scale down or stop operations, affecting employment.

To achieve this indicator, MMERE is committed to increasing women's employment in the mining sector through its GESI Strategy. This strategy aims to ensure inclusive, equitable, and beneficial mining sector development in the Solomon Islands. The Draft GESI Strategy, section 6, Strategy 3, outlines actions to expand employment and economic opportunities for women, including promoting recruitment, retention, and career advancement through targeted programs, training, and mentorship.
</narrative></comment>
</target>
<actual value="11.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women's employment in mining sector increased (Cumulative)
</narrative></title>
<baseline year="2022" iso-date="2022-01-11" value="14.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-11" />
<period-end iso-date="2026-06-11" />
<target value="30.00">
<comment><narrative>
While the year 4 target was 25%, the project achieved only 11%, up from the previous year's 9%. This data includes both public and private employment. Some mining operations, like Pacific Nickel Mining Kolosori, have had to scale down or stop operations, affecting employment.

To achieve this indicator, MMERE is committed to increasing women's employment in the mining sector through its GESI Strategy. This strategy aims to ensure inclusive, equitable, and beneficial mining sector development in the Solomon Islands. The Draft GESI Strategy, section 6, Strategy 3, outlines actions to expand employment and economic opportunities for women, including promoting recruitment, retention, and career advancement through targeted programs, training, and mentorship.
</narrative></comment>
</target>
<actual value="11.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increased monitoring of contractual and regulatory arrangements and their enforcement to ensure alignment with National Minerals Policy and applicable international standards
</narrative></title>
<baseline year="2022" iso-date="2022-01-11" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-11" />
<period-end iso-date="2026-06-11" />
<target value="Yes">
<comment><narrative>
This indicator has not been achieved yet. It measures the implementation of all necessary regulations for the revised Mining Law and is expected to be achieved by the end of year 3. However, two key actions need to be completed: first, the MRB needs to be enacted, and second, the provision (regulation) to effectively implement the new mining act must be established.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increased monitoring of contractual and regulatory arrangements and their enforcement to ensure alignment with National Minerals Policy and applicable international standards
</narrative></title>
<baseline year="2022" iso-date="2022-01-11" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-11" />
<period-end iso-date="2026-06-11" />
<target value="Yes">
<comment><narrative>
The Mineral Resources Bill 2025 is currently with the Bills and Legislation Committee (BLC) deliberation phase, with enactment delayed by stakeholder concerns and pending provincial hearings. Regulations cannot proceed without the bill's passage, projected for Q4 2025. This PDO is at risk of meeting the target, as it hinges on the legislative timeline. The Project and MMERE are heavily reliant on external processes (Parliament), which poses risks to meeting the target; however, MMERE is still optimistic that the Mineral Resources Bill passage will be enacted in Q4 2025, as it is a government priority.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of licensed mining operations for which a recent inspection report has been uploaded to a MMERE inspection database (Cumulative)
</narrative></title>
<baseline year="2022" iso-date="2022-01-11" value="10.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-11" />
<period-end iso-date="2026-06-11" />
<target value="90.00">
<comment><narrative>
The project exceeded its target of 75% in year 3, achieving a remarkable 88% compliance rate for mine inspections. This data was verified by viewing the inspection reports for each active ML stored in the inspectorate section.
currently, performance for this particular indicator has declined slightly, with only 35% achieved against an 80% target. The primary reason for this shortfall is budget constraints, which have limited the inspectorate team's ability to mobilize to mining sites.
</narrative></comment>
</target>
<actual value="35.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of licensed mining operations for which a recent inspection report has been uploaded to a MMERE inspection database (Cumulative)
</narrative></title>
<baseline year="2022" iso-date="2022-01-11" value="10.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-11" />
<period-end iso-date="2026-06-11" />
<target value="90.00">
<comment><narrative>
The project exceeded its target of 75% in year 3, achieving a remarkable 88% compliance rate for mine inspections. This data was verified by viewing the inspection reports for each active ML stored in the inspectorate section.
currently, performance for this particular indicator has declined slightly, with only 35% achieved against  90% target. The primary reason for this shortfall is budget constraints, which have limited the inspectorate team's ability to mobilize to mining sites.
</narrative></comment>
</target>
<actual value="35.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of licensed mining operations for which a recent inspection report has been uploaded to a MMERE inspection database (Cumulative)
</narrative></title>
<baseline year="2022" iso-date="2022-01-11" value="10.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-11" />
<period-end iso-date="2026-06-11" />
<target value="90.00">
<comment><narrative>
The project exceeded its target of 75% in year 3, achieving a remarkable 88% compliance rate for mine inspections. This data was verified by viewing the inspection reports for each active ML stored in the inspectorate section.
currently, performance for this particular indicator has declined slightly, with only 35% achieved against  90% target. The primary reason for this shortfall is budget constraints, which have limited the inspectorate team's ability to mobilize to mining sites.
</narrative></comment>
</target>
<actual value="35.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
MMERE Annual  Report  published within  a year of the  Minerals  Resources Bill  coming into  effect to include  information on  actions taken by  the Mines  Division to  implement the  NMP and MRB
</narrative></title>
<baseline year="2022" iso-date="2022-01-12" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-12" />
<period-end iso-date="2026-06-12" />
<target value="Yes">
<comment><narrative>
Not achieved yet. MMERE has to secure the Bills and Legislation Committee's approval for advancing the Mineral Resources Bill 2025 to Parliament for debate this year.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Approval and publication of MMERE's Communications Strategy
</narrative></title>
<baseline year="2022" iso-date="2022-01-12" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-12" />
<period-end iso-date="2026-06-12" />
<target value="Yes">
<comment><narrative>
This target partially achieved. The Project has developed the communications Strategy, however, this document has not gone through the Ministry's formal approval, adoption, and publication process.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduced time between lodging applications and approval hearings
</narrative></title>
<baseline year="2022" iso-date="2022-01-11" value="3.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-11" />
<period-end iso-date="2026-06-11" />
<target value="1.00">
<comment><narrative>
The Ministry of Mines, Energy and Rural Electrification (MMERE) has significantly reduced the average processing time for new exploration license applications, achieving a one-month processing time, exceeding the target of two months set for Year 3. This accomplishment demonstrates MMERE's commitment to improving the efficiency and effectiveness of its services. The reduction in processing time reflects MMERE's dedication to providing a more efficient and responsive service to applicants and stakeholders. This achievement is attributed to the successful implementation of the Mining Cadaster Administration System (MCAS), a digital geo-referenced platform developed under the project.
</narrative></comment>
</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduced time between lodging applications and approval hearings
</narrative></title>
<baseline year="2022" iso-date="2022-01-11" value="3.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-11" />
<period-end iso-date="2026-06-11" />
<target value="1.00">
<comment><narrative>
The Ministry of Mines, Energy and Rural Electrification (MMERE) has significantly reduced the average processing time for new exploration license applications, achieving a one-month processing time, exceeding the target of two months set for Year 3. This accomplishment demonstrates MMERE's commitment to improving the efficiency and effectiveness of its services. The reduction in processing time reflects MMERE's dedication to providing a more efficient and responsive service to applicants and stakeholders. This achievement is attributed to the successful implementation of the Mining Cadaster Administration System (MCAS), a digital geo-referenced platform developed under the project.
</narrative></comment>
</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Comprehensive public disclosure of cadastral records of license applications and awards and subsequent license management
</narrative></title>
<baseline year="2022" iso-date="2022-01-11" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-11" />
<period-end iso-date="2026-06-11" />
<target value="Yes">
<comment><narrative>
The indicator has been successfully met.
The Mining Cadastre Administration System (MCAS) is the main system that was developed for government civil servants which is the MMERE, Mines Division. This system, MCAS comes with a portal, accessible to the public. The online portal is a completely separate application that connects to MCAS. This online portal is also linked with the MMERE website (www.mmere.gov.sb) . Currently, MCAS is used by Mines Division for their purpose and the public with the mining companies are using the online portal to make new applications, reporting obligations, and even due diligence checks on applications in preparation for Mines and Minerals Board meetings. This demonstrates improvement in transparency and efficiency in the processing of applications and permits within MMERE and public disclosure of cadastral records.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Comprehensive public disclosure of cadastral records of license applications and awards and subsequent license management
</narrative></title>
<baseline year="2022" iso-date="2022-01-11" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-11" />
<period-end iso-date="2026-06-11" />
<target value="Yes">
<comment><narrative>
The indicator has been successfully met.
The Mining Cadastre Administration System (MCAS) is the main system that was developed for government civil servants which is the MMERE, Mines Division. This system, MCAS comes with a portal, accessible to the public. The online portal is a completely separate application that connects to MCAS. This online portal is also linked with the MMERE website (www.mmere.gov.sb) . Currently, MCAS is used by Mines Division for their purpose and the public with the mining companies are using the online portal to make new applications, reporting obligations, and even due diligence checks on applications in preparation for Mines and Minerals Board meetings. This demonstrates improvement in transparency and efficiency in the processing of applications and permits within MMERE and public disclosure of cadastral records.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Participation rate of women in committees and boards established by communities to negotiate access, community development and other agreements provided for in the mining legislation (Cumulative)
</narrative></title>
<baseline year="2022" iso-date="2022-01-11" value="10.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-11" />
<period-end iso-date="2026-06-11" />
<target value="50.00">
<comment><narrative>
The current participation rate is at 19% which falls short of the 30% target for year 4 but improved from the 17% previously reached. This shows positive results from MMERE. This is making progress but yearly targets should be revised for practicality.
MMERE has recently created a Community Liaison Section within the Mines Division, a significant milestone achieved under SISMDTAP for community engagement. The Ministry of Public Service has approved four positions for this section, currently in the interviewing stage.
This new unit will serve as an intermediary to address issues and facilitate communication between MMERE, the community, mining companies, and other affected parties regarding socio-economic development in the mining sector. This unit will also be advocating for mining-affected communities to promote active stakeholder participation in mining governance by working to improve women's participation rate.
</narrative></comment>
</target>
<actual value="17.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Participation rate of women in committees and boards established by communities to negotiate access, community development and other agreements provided for in the mining legislation (Cumulative)
</narrative></title>
<baseline year="2022" iso-date="2022-01-11" value="10.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-11" />
<period-end iso-date="2026-06-11" />
<target value="50.00">
<comment><narrative>
At the beginning of year 4, project has achieved 19% of females participating in committees and boards established by the communities involved in SAA and SARA negotiations, and currently reached 26%. Over the years, data shows fluctuating trends in women's participation, with notable improvements in 2025. This demonstrates the effectiveness of interventions in improving stakeholder participation in the governance of the mining sector.
Moreover, MMERE has recently created a Community Liaison Section within the Mines Division, a significant milestone achieved under SISMDTAP for community engagement. The Ministry of Public Service has approved four positions for this section, in which three staff are on board.
This new unit will serve as an intermediary to address issues and facilitate communication between MMERE, the community, mining companies, and other affected parties regarding socio-economic development in the mining sector.
</narrative></comment>
</target>
<actual value="26.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Extent of forest loss in mining areas
</narrative></title>
<baseline year="2022" iso-date="2022-01-11" value="30.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-11" />
<period-end iso-date="2026-06-11" />
<target value="10.00">
<comment><narrative>
The Project is working to assess the extent of forest loss in mining areas. Drone surveys have been completed for five sites. Data analysis is ongoing, and results are expected to be available soon.
</narrative></comment>
</target>
<actual value="30.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
An increase in the average ratio of actual royalty collection to collections at the nominal royalty rate (reduced leakage)
</narrative></title>
<baseline year="2022" iso-date="2022-01-11" value="50.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-11" />
<period-end iso-date="2026-06-11" />
<target value="90.00">
<comment><narrative>
To date, 156 shipments have been exported since the operation of active Mining License ( ML) holders in the country of which 14 are Nickle shipments and 142 are Gold&amp; Silver shipments. The Royalty payment (3% of Gross product) has three different categories namely SIG (50% of Royalty), PG (10% of Royalty), and LO (40% of Royalty). The total Royalty collected on Average is 52.60.
</narrative></comment>
</target>
<actual value="52.60">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
An increase in the average ratio of actual royalty collection to collections at the nominal royalty rate (reduced leakage)
</narrative></title>
<baseline year="2022" iso-date="2022-01-11" value="50.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-11" />
<period-end iso-date="2026-06-11" />
<target value="90.00">
<comment><narrative>
Royalty collection has improved since MMERE has taken action for active mining companies in the Solomon Islands to comply and pay up their dues. GRML has so far paid SBD$14,892,226.38 of unpaid royalties (worth SBD$33M) to SIG. Through observation, it has been witnessed that the MMERE has stepped up and toughened up in ensuring all mining companies comply. To date, the actual royalty collection ratio stands at 91%: 9%, showing improvement from the baseline of 50%:50%, reflecting improvement done to reduce leakage and better collection performance. This also shows that year 4 target (80%) has been overachieved.
</narrative></comment>
</target>
<actual value="91">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Extent of forest loss in mining areas
</narrative></title>
<baseline year="2022" iso-date="2022-01-11" value="30.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-11" />
<period-end iso-date="2026-06-11" />
<target value="10.00">
<comment><narrative>
The Project is working to assess the extent of forest loss in mining areas. Drone surveys have been completed for five sites. Data analysis is ongoing, and results are expected to be available soon.
</narrative></comment>
</target>
<actual value="30.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Extent of forest loss in mining areas
</narrative></title>
<baseline year="2022" iso-date="2022-01-11" value="30.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-11" />
<period-end iso-date="2026-06-11" />
<target value="10.00">
<comment><narrative>
The dataset covers six sites across three provinces, namely Isabel, Choiseul and Guadalcanal. The overall average forest cover on the six sites is approximately 77.88%, with a total forest cover of 2,030 ha over 2,606 ha. This indicates that the extent which forest loss in mining areas is approximately 22.12% including water bodies.
</narrative></comment>
</target>
<actual value="22.12">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women's employment in mining sector increased (Cumulative)
</narrative></title>
<baseline year="2022" iso-date="2022-01-11" value="14.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-11" />
<period-end iso-date="2026-06-11" />
<target value="30.00">
<comment><narrative>
While the year 4 target was 25%, the project achieved only 11%, up from the previous year's 9%. This data includes both public and private employment. Some mining operations, like Pacific Nickel Mining Kolosori, have had to scale down or stop operations, affecting employment.

To achieve this indicator, MMERE is committed to increasing women's employment in the mining sector through its GESI Strategy. This strategy aims to ensure inclusive, equitable, and beneficial mining sector development in the Solomon Islands. The Draft GESI Strategy, section 6, Strategy 3, outlines actions to expand employment and economic opportunities for women, including promoting recruitment, retention, and career advancement through targeted programs, training, and mentorship.
</narrative></comment>
</target>
<actual value="11.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women's employment in mining sector increased (Cumulative)
</narrative></title>
<baseline year="2022" iso-date="2022-01-11" value="14.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-11" />
<period-end iso-date="2026-06-11" />
<target value="30.00">
<comment><narrative>
While the year 4 target was 25%, the project achieved only 11%, up from the previous year's 9%. This data includes both public and private employment. Some mining operations, like Pacific Nickel Mining Kolosori, have had to scale down or stop operations, affecting employment.

To achieve this indicator, MMERE is committed to increasing women's employment in the mining sector through its GESI Strategy. This strategy aims to ensure inclusive, equitable, and beneficial mining sector development in the Solomon Islands. The Draft GESI Strategy, section 6, Strategy 3, outlines actions to expand employment and economic opportunities for women, including promoting recruitment, retention, and career advancement through targeted programs, training, and mentorship.
</narrative></comment>
</target>
<actual value="11.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increased monitoring of contractual and regulatory arrangements and their enforcement to ensure alignment with National Minerals Policy and applicable international standards
</narrative></title>
<baseline year="2022" iso-date="2022-01-11" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-11" />
<period-end iso-date="2026-06-11" />
<target value="Yes">
<comment><narrative>
This indicator has not been achieved yet. It measures the implementation of all necessary regulations for the revised Mining Law and is expected to be achieved by the end of year 3. However, two key actions need to be completed: first, the MRB needs to be enacted, and second, the provision (regulation) to effectively implement the new mining act must be established.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increased monitoring of contractual and regulatory arrangements and their enforcement to ensure alignment with National Minerals Policy and applicable international standards
</narrative></title>
<baseline year="2022" iso-date="2022-01-11" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-11" />
<period-end iso-date="2026-06-11" />
<target value="Yes">
<comment><narrative>
The Mineral Resources Bill 2025 is currently with the Bills and Legislation Committee (BLC) deliberation phase, with enactment delayed by stakeholder concerns and pending provincial hearings. Regulations cannot proceed without the bill's passage, projected for Q4 2025. This PDO is at risk of meeting the target, as it hinges on the legislative timeline. The Project and MMERE are heavily reliant on external processes (Parliament), which poses risks to meeting the target; however, MMERE is still optimistic that the Mineral Resources Bill passage will be enacted in Q4 2025, as it is a government priority.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of licensed mining operations for which a recent inspection report has been uploaded to a MMERE inspection database (Cumulative)
</narrative></title>
<baseline year="2022" iso-date="2022-01-11" value="10.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-11" />
<period-end iso-date="2026-06-11" />
<target value="90.00">
<comment><narrative>
The project exceeded its target of 75% in year 3, achieving a remarkable 88% compliance rate for mine inspections. This data was verified by viewing the inspection reports for each active ML stored in the inspectorate section.
currently, performance for this particular indicator has declined slightly, with only 35% achieved against an 80% target. The primary reason for this shortfall is budget constraints, which have limited the inspectorate team's ability to mobilize to mining sites.
</narrative></comment>
</target>
<actual value="35.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of licensed mining operations for which a recent inspection report has been uploaded to a MMERE inspection database (Cumulative)
</narrative></title>
<baseline year="2022" iso-date="2022-01-11" value="10.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-11" />
<period-end iso-date="2026-06-11" />
<target value="90.00">
<comment><narrative>
The project exceeded its target of 75% in year 3, achieving a remarkable 88% compliance rate for mine inspections. This data was verified by viewing the inspection reports for each active ML stored in the inspectorate section.
currently, performance for this particular indicator has declined slightly, with only 35% achieved against  90% target. The primary reason for this shortfall is budget constraints, which have limited the inspectorate team's ability to mobilize to mining sites.
</narrative></comment>
</target>
<actual value="35.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increased monitoring of contractual and regulatory arrangements and their enforcement to ensure alignment with National Minerals Policy and applicable international standards
</narrative></title>
<baseline year="2022" iso-date="2022-01-11" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-11" />
<period-end iso-date="2026-06-11" />
<target value="Yes">
<comment><narrative>
This indicator has not been achieved yet. It measures the implementation of all necessary regulations for the revised Mining Law and is expected to be achieved by the end of year 3. However, two key actions need to be completed: first, the MRB needs to be enacted, and second, the provision (regulation) to effectively implement the new mining act must be established.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Participation rate of women in committees and boards established by communities to negotiate access, community development and other agreements provided for in the mining legislation (Cumulative)
</narrative></title>
<baseline year="2022" iso-date="2022-01-11" value="10.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-11" />
<period-end iso-date="2026-06-11" />
<target value="50.00">
<comment><narrative>
The current participation rate is at 19% which falls short of the 30% target for year 4 but improved from the 17% previously reached. This shows positive results from MMERE. This is making progress but yearly targets should be revised for practicality.
MMERE has recently created a Community Liaison Section within the Mines Division, a significant milestone achieved under SISMDTAP for community engagement. The Ministry of Public Service has approved four positions for this section, currently in the interviewing stage.
This new unit will serve as an intermediary to address issues and facilitate communication between MMERE, the community, mining companies, and other affected parties regarding socio-economic development in the mining sector. This unit will also be advocating for mining-affected communities to promote active stakeholder participation in mining governance by working to improve women's participation rate.
</narrative></comment>
</target>
<actual value="17.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduced time between lodging applications and approval hearings
</narrative></title>
<baseline year="2022" iso-date="2022-01-11" value="3.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-11" />
<period-end iso-date="2026-06-11" />
<target value="1.00">
<comment><narrative>
The Ministry of Mines, Energy and Rural Electrification (MMERE) has significantly reduced the average processing time for new exploration license applications, achieving a one-month processing time, exceeding the target of two months set for Year 3. This accomplishment demonstrates MMERE's commitment to improving the efficiency and effectiveness of its services. The reduction in processing time reflects MMERE's dedication to providing a more efficient and responsive service to applicants and stakeholders. This achievement is attributed to the successful implementation of the Mining Cadaster Administration System (MCAS), a digital geo-referenced platform developed under the project.
</narrative></comment>
</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Gender related employment requirements incorporated in the obligations which license holders must comply with
</narrative></title>
<baseline year="2022" iso-date="2022-01-12" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-12" />
<period-end iso-date="2026-06-12" />
<target value="Yes">
<comment><narrative>
This indicator will be achieved when the Mineral Resources Bill is enacted in Parliament, Gazetted and published.

As stated in Mineral Resources Bill 2024, Part 6, Division 4, subdivision 4, Clause 88 – provides for the Content of community development agreement inclusive of a program for local employment and training which ensures equal opportunity for employment, training, promotion, and pay for men and women.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Time taken for grievances registered related to Project delivery to be addressed
</narrative></title>
<baseline year="2022" iso-date="2022-01-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-12" />
<period-end iso-date="2026-06-12" />
<target value="1.00">
<comment><narrative>
The Project has established a GM which is reflected in the Stakeholder Engagement Plan (SEP) and Labor Management Procedures (LMP). The PMU safeguards officer reviewed the GRM procedure in February 2024 and provided training on the GRM. Since then, the project has reported no grievances due to activities related to the core shed being delayed and later dropped by the project. To date no grievances have been reported to the PMU.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
An increase in the average ratio of actual royalty collection to collections at the nominal royalty rate (reduced leakage)
</narrative></title>
<baseline year="2022" iso-date="2022-01-11" value="50.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-11" />
<period-end iso-date="2026-06-11" />
<target value="90.00">
<comment><narrative>
Royalty collection has improved since MMERE has taken action for active mining companies in the Solomon Islands to comply and pay up their dues. GRML has so far paid SBD$14,892,226.38 of unpaid royalties (worth SBD$33M) to SIG. Through observation, it has been witnessed that the MMERE has stepped up and toughened up in ensuring all mining companies comply. To date, the actual royalty collection ratio stands at 91%: 9%, showing improvement from the baseline of 50%:50%, reflecting improvement done to reduce leakage and better collection performance. This also shows that year 4 target (80%) has been overachieved.
</narrative></comment>
</target>
<actual value="91">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Mining Bill based on the NMP enacted
</narrative></title>
<baseline year="2023" iso-date="2023-05-12" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-05-12" />
<period-end iso-date="2026-06-12" />
<target value="Yes">
<comment><narrative>
The enactment of the Mining Bill, a key project milestone, has not yet been achieved. MMERE has completed 70% of the  mineral Resources Bill (MRB), with the remaining 30% currently in the government's hands. The next steps include the MRB going before the Bills Legislation Committee, having its First, Second, and Third Readings in Parliament, receiving Royal Assent, and being gazetted to become effective, all tentatively scheduled for the second quarter of 2025.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Participation rate of women in committees and boards established by communities to negotiate access, community development and other agreements provided for in the mining legislation (Cumulative)
</narrative></title>
<baseline year="2022" iso-date="2022-01-11" value="10.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-11" />
<period-end iso-date="2026-06-11" />
<target value="50.00">
<comment><narrative>
At the beginning of year 4, project has achieved 19% of females participating in committees and boards established by the communities involved in SAA and SARA negotiations, and currently reached 26%. Over the years, data shows fluctuating trends in women's participation, with notable improvements in 2025. This demonstrates the effectiveness of interventions in improving stakeholder participation in the governance of the mining sector.
Moreover, MMERE has recently created a Community Liaison Section within the Mines Division, a significant milestone achieved under SISMDTAP for community engagement. The Ministry of Public Service has approved four positions for this section, in which three staff are on board.
This new unit will serve as an intermediary to address issues and facilitate communication between MMERE, the community, mining companies, and other affected parties regarding socio-economic development in the mining sector.
</narrative></comment>
</target>
<actual value="26.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduced time between lodging applications and approval hearings
</narrative></title>
<baseline year="2022" iso-date="2022-01-11" value="3.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-11" />
<period-end iso-date="2026-06-11" />
<target value="1.00">
<comment><narrative>
The Ministry of Mines, Energy and Rural Electrification (MMERE) has significantly reduced the average processing time for new exploration license applications, achieving a one-month processing time, exceeding the target of two months set for Year 3. This accomplishment demonstrates MMERE's commitment to improving the efficiency and effectiveness of its services. The reduction in processing time reflects MMERE's dedication to providing a more efficient and responsive service to applicants and stakeholders. This achievement is attributed to the successful implementation of the Mining Cadaster Administration System (MCAS), a digital geo-referenced platform developed under the project.
</narrative></comment>
</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of  Beneficiaries  Who report that  Project address  their needs   (disaggregated by gender)
</narrative></title>
<baseline year="2022" iso-date="2022-01-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-13" />
<period-end iso-date="2027-06-13" />
<target value="85.00">

</target>
<actual value="25.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Use of a digital geo-referenced platform for managing cadastral records
</narrative></title>
<baseline year="2022" iso-date="2022-01-12" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-12" />
<period-end iso-date="2026-06-12" />
<target value="Yes">
<comment><narrative>
The project has achieved this key intermediate result of establishing Mining Cadaster Administration System in the MMERE. The implementation of MCAS a significant achievement for the MMERE and is now an integral part of Ministry's daily operations and has been recognized for its effectiveness and the transparency it brings to managing cadastral records.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Extent of forest loss in mining areas
</narrative></title>
<baseline year="2022" iso-date="2022-01-11" value="30.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-11" />
<period-end iso-date="2026-06-11" />
<target value="10.00">
<comment><narrative>
The dataset covers six sites across three provinces, namely Isabel, Choiseul and Guadalcanal. The overall average forest cover on the six sites is approximately 77.88%, with a total forest cover of 2,030 ha over 2,606 ha. This indicates that the extent which forest loss in mining areas is approximately 22.12% including water bodies.
</narrative></comment>
</target>
<actual value="22.12">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
An increase in the average ratio of actual royalty collection to collections at the nominal royalty rate (reduced leakage)
</narrative></title>
<baseline year="2022" iso-date="2022-01-11" value="50.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-11" />
<period-end iso-date="2026-06-11" />
<target value="90.00">
<comment><narrative>
To date, 156 shipments have been exported since the operation of active Mining License ( ML) holders in the country of which 14 are Nickle shipments and 142 are Gold&amp; Silver shipments. The Royalty payment (3% of Gross product) has three different categories namely SIG (50% of Royalty), PG (10% of Royalty), and LO (40% of Royalty). The total Royalty collected on Average is 52.60.
</narrative></comment>
</target>
<actual value="52.60">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Comprehensive public disclosure of cadastral records of license applications and awards and subsequent license management
</narrative></title>
<baseline year="2022" iso-date="2022-01-11" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-11" />
<period-end iso-date="2026-06-11" />
<target value="Yes">
<comment><narrative>
The indicator has been successfully met.
The Mining Cadastre Administration System (MCAS) is the main system that was developed for government civil servants which is the MMERE, Mines Division. This system, MCAS comes with a portal, accessible to the public. The online portal is a completely separate application that connects to MCAS. This online portal is also linked with the MMERE website (www.mmere.gov.sb) . Currently, MCAS is used by Mines Division for their purpose and the public with the mining companies are using the online portal to make new applications, reporting obligations, and even due diligence checks on applications in preparation for Mines and Minerals Board meetings. This demonstrates improvement in transparency and efficiency in the processing of applications and permits within MMERE and public disclosure of cadastral records.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T00:13:13" hierarchy="1"><iati-identifier>44000-P173043</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Solomon Islands Agriculture and Rural Transformation Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To increase agricultural production and improve market access in selected value chains in the Project Provinces, and in case of an Eligible Crisis or Emergency, respond promptly and effectively to it.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Agriculture and Rural Transformation Project for Solomon Islands (SI ART) is to increase agricultural production and improve market access in selected value chains in the project provinces, and in case of an eligible crisis or emergency, respond promptly and effectively to it. The project comprises of four components. The first component, agribusiness and infrastructure investments aims to: (a) increase agricultural production and promote agriculture commercialization in selected value chains, and (b) develop productive infrastructure to facilitate the economic activities under (a). It consists of following sub-components: (i) Agribusiness Producer Organizations (ABPOs); and (ii) infrastructure investments. The second component, institutional capacity development aims to improve the agriculture and small stock extension system of Ministry of Agriculture and Livestock (MAL) by improving the knowledge, skills, and capacity of current staff and to strengthen MAL's outreach capacity through the engagement of young professionals (YPs) and interns. It consists of following sub-components: (i) community managed extension system; (ii) small stock sector renewal; and (iii) innovations and development marketplace. The third component, project management will establish the Project Management Unit (PMU) within MAL which will be responsible for the overall implementation of the SI ART Project. The fourth component, contingent emergency response component (CERC) will draw upon the uncommitted credit and grant resources from other project components to cover the emergency response.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SB–P0044247"><narrative>Solomon Islands</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SB–P0044247"><narrative>Solomon Islands</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SB-COA-0044248"><narrative>Ministry of Agriculture and Livestock</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2021-03-31"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2022-03-17"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2026-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2026-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Allan Tobalbal Oliver</narrative></person-name><telephone>+1-202-473-1000</telephone><email>aoliver1@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="SB" percentage="100"><narrative xml:lang="en">SOLOMON ISLANDS</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002102627" />
            <name><narrative>Tenaru</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.44434 160.07329</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002102798" />
            <name><narrative>Tarapaina</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.42123 161.37815</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002103179" />
            <name><narrative>Su'u</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.85482 160.82946</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002106552" />
            <name><narrative>Malaita Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9 161</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002108502" />
            <name><narrative>Honiara</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.43333 159.95</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002108831" />
            <name><narrative>Guadalcanal Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.63333 160.2</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002109675" />
            <name><narrative>Avu Avu</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.84528 160.39042</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002109701" />
            <name><narrative>Auki</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.76778 160.69778</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002178656" />
            <name><narrative>Mwaniwowo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.82093 162.17594</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002178730" />
            <name><narrative>Makira-Ulawa Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.55751 161.78517</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002178753" />
            <name><narrative>Kirakira</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.45442 161.92045</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002178869" />
            <name><narrative>Apaora</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.53946 161.51917</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002106317" />
            <name><narrative>Maravovo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.28488 159.63586</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002104454" />
            <name><narrative>Paruru</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.85154 160.83389</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002102318" />
            <name><narrative>Tutumu</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.48333 160.28333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002178781" />
            <name><narrative>Heuru</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.21991 161.43349</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002109291" />
            <name><narrative>Daringali</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.53333 160.91667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="31166" percentage="38" xml:lang="en"/><sector vocabulary="1" code="31110" percentage="22" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="22" xml:lang="en"/><sector vocabulary="1" code="32161" percentage="18" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AB" percentage="35.0000000" xml:lang="en"><narrative>FY17 - Agricultural Extension, Research, and Other Support Activities</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AK" percentage="33.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Agriculture, Fishing &amp; Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YA" percentage="32.0000000" xml:lang="en"><narrative>FY17 - Agricultural markets, commercialization and agri-business</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="53" xml:lang="en"><narrative>Finance for Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000066" percentage="59" xml:lang="en"><narrative>Labor Market Policy and Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000213" percentage="15" xml:lang="en"><narrative>Innovation and Technology Policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000721" percentage="92" xml:lang="en"><narrative>Rural Markets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="30" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000066" percentage="59" xml:lang="en"><narrative>Labor Market Policy and Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000066" percentage="59" xml:lang="en"><narrative>Labor Market Policy and Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000261" percentage="59" xml:lang="en"><narrative>ICT Solutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="48" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="100" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="44" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">10000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">70000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">70000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">70000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">140000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">70000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">70000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">70000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">70000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">140000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">70000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">70000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">70000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">70000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">140000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">70000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">70000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">70000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">70000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">140000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">70000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">70000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">70000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">70000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">140000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">70000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">70000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">70000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">70000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">150000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">80000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">80000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">80000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">80000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">150000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">80000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">80000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">80000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">80000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">150000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">80000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">80000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">80000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">190000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">110000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">130000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">150000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">110000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">240000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">130000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">150000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">160000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">180000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">660000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">490000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">410000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">340000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">290000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">530000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">240000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">240000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">480000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">240000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">480000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">240000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">490000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">240000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">240000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">240000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">10000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">70000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">70000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">70000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">140000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">70000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">70000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">70000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">70000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">140000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">70000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">70000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">70000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">70000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">140000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">70000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">70000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">70000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">70000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">140000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">70000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">70000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">70000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">70000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">140000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">70000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">70000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">70000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">70000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">150000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">80000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">80000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">80000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">80000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">150000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">80000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">80000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">80000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">80000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">150000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">80000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">80000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">80000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">190000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">110000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">130000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">150000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">110000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">240000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">130000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">150000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">160000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">180000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">660000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">490000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">410000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">340000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">290000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">530000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">240000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">240000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">480000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">240000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">480000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">240000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">490000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">240000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">240000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">240000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">4578379.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">4578379.37</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">9000000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44248"><narrative>Ministry of Agriculture and Livestock</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">6000000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44248"><narrative>Ministry of Agriculture and Livestock</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">988800</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44248"><narrative>Ministry of Agriculture and Livestock</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">494400</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44248"><narrative>Ministry of Agriculture and Livestock</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">365681</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44248"><narrative>Ministry of Agriculture and Livestock</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">198443</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44248"><narrative>Ministry of Agriculture and Livestock</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">51005</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44248"><narrative>Ministry of Agriculture and Livestock</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">466796</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44248"><narrative>Ministry of Agriculture and Livestock</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">288401</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44248"><narrative>Ministry of Agriculture and Livestock</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">207196</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44248"><narrative>Ministry of Agriculture and Livestock</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">197661</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44248"><narrative>Ministry of Agriculture and Livestock</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">72759</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44248"><narrative>Ministry of Agriculture and Livestock</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">403026</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44248"><narrative>Ministry of Agriculture and Livestock</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">166603</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44248"><narrative>Ministry of Agriculture and Livestock</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">102488</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44248"><narrative>Ministry of Agriculture and Livestock</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">116161</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44248"><narrative>Ministry of Agriculture and Livestock</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">115565</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44248"><narrative>Ministry of Agriculture and Livestock</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">250890</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44248"><narrative>Ministry of Agriculture and Livestock</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">211647</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44248"><narrative>Ministry of Agriculture and Livestock</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">527872</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44248"><narrative>Ministry of Agriculture and Livestock</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">256766</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44248"><narrative>Ministry of Agriculture and Livestock</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">213179</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44248"><narrative>Ministry of Agriculture and Livestock</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">126166</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44248"><narrative>Ministry of Agriculture and Livestock</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">401356</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44248"><narrative>Ministry of Agriculture and Livestock</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">132242</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44248"><narrative>Ministry of Agriculture and Livestock</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">115885</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44248"><narrative>Ministry of Agriculture and Livestock</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">451544</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44248"><narrative>Ministry of Agriculture and Livestock</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">76201</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44248"><narrative>Ministry of Agriculture and Livestock</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">759709</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44248"><narrative>Ministry of Agriculture and Livestock</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">187947</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44248"><narrative>Ministry of Agriculture and Livestock</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">192165</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44248"><narrative>Ministry of Agriculture and Livestock</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">395755</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44248"><narrative>Ministry of Agriculture and Livestock</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">204152</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44248"><narrative>Ministry of Agriculture and Livestock</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">379428</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44248"><narrative>Ministry of Agriculture and Livestock</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">420128</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44248"><narrative>Ministry of Agriculture and Livestock</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">364624</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44248"><narrative>Ministry of Agriculture and Livestock</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">518983</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44248"><narrative>Ministry of Agriculture and Livestock</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-1298</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44248"><narrative>Ministry of Agriculture and Livestock</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-3934</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44248"><narrative>Ministry of Agriculture and Livestock</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-3807</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44248"><narrative>Ministry of Agriculture and Livestock</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-3902</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44248"><narrative>Ministry of Agriculture and Livestock</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-5137</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44248"><narrative>Ministry of Agriculture and Livestock</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">-7926</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44248"><narrative>Ministry of Agriculture and Livestock</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-9257</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44248"><narrative>Ministry of Agriculture and Livestock</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-15137</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-44248"><narrative>Ministry of Agriculture and Livestock</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P173043"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P173043?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P173043"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in sales of coconut, by quantity, reported by farmers participating in coconut Agribusiness producer organizations (ABPO's).
</narrative></title>
<baseline year="2022" iso-date="2022-06-23" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-23" />
<period-end iso-date="2026-12-24" />
<target value="15.00">
<comment><narrative>
This is to measure the increase in sales of coconut, by quantity, as a proxy for market access. A single value will be computed for coconut, for each ABPO, and averaged across ABPO's. The percentage increase over the baseline will be computed from this value. The baseline will be obtained from the initial data recorded when farmers become members of the ABPO.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="2024" iso-date="2024-05-06" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-06" />
<period-end iso-date="2026-12-06" />
<target value="7500">
<comment><narrative>
The number of people benefitting directly and indirectly from improved climate risk management and increased climate resilience due to investments and activities by the project during the intervention period, where data and methodologies exist. It will consider how the interventions enhance resilience of their beneficiaries by including structural investments, non-structural or capacity development elements, and improvements to the enabling environments and institutional frameworks for climate resilience. These interventions could include, for example: access to climate-resilient infrastructure, training on and practice of climate smart agriculture practices, enhanced climate disaster response, and support to livelihoods, improved access to financial mechanisms, and safety nets.
Data sources:
• ToT report (MAL Officers)
• Training for farmers in climate smart agriculture participants list and report.
• Mid Term Review report.
• Impact assessment report
• Endline assessment.

1. Data collected from farmers who have been trained in climate start agriculture.
2. Data collected from farmers/ HH members/ People with access to climate risks infrastructure.
3. MAL Officer who are participating in climate smart agriculture TOT.
4. Farmers practice/ implement activities that enhance climate disaster response
</narrative></comment>
</target>
<actual value="4510">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
1.5. Beneficiaries with access to project infrastructure investments that feel these reflected their needs
</narrative></title>
<baseline year="2022" iso-date="2022-06-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-13" />
<period-end iso-date="2026-12-14" />
<target value="75.00">
<comment><narrative>
Citizen engagement indicator – this indicator captures feedback from the project beneficiaries on what extent to which the implemented infrastructure subproject responds to their priorities/needs for production improvement.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in sales of poultry, by quantity, by the targeted farmers participating in poultry Agribusiness producer organizations (ABPOs)
</narrative></title>
<baseline year="2022" iso-date="2022-06-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-19" />
<period-end iso-date="2026-12-20" />
<target value="10">
<comment><narrative>
This is to measure the increase in sales of poultry, by value, as a proxy for market access. A single value will be computed for poultry, for each ABPO, and averaged across ABPO&amp;rsquo;s. The percentage increase over the baseline will be computed from this valu. The baseline will be obtained from the initial data recorded when farmers become members of the ABPO. The Baseline figure has been corrected to 0 as the original (10%) was&amp;nbsp;incorrectly entered.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
3.1: Grievances addressed within 3 months
</narrative></title>
<baseline year="2022" iso-date="2022-06-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-24" />
<period-end iso-date="2026-12-25" />
<target value="100.00">
<comment><narrative>
Defined as ways of handling/responding to any grievance according to a written procedure, as defined in the PIM. 8 grievances received and resolved so far.
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in sales of coconut, by quantity, reported by farmers participating in coconut Agribusiness producer organizations (ABPO's).
</narrative></title>
<baseline year="2022" iso-date="2022-06-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-19" />
<period-end iso-date="2026-12-20" />
<target value="10">
<comment><narrative>
This is to measure the increase in sales of coconut, by quantity, as a proxy for market access. A single value will be computed for coconut, for each ABPO, and averaged across ABPO's. The percentage increase over the baseline will be computed from this value. The baseline will be obtained from the initial data recorded when farmers become members of the ABPO.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.6. Number of innovations or best practices recognized/awarded during the project period.
</narrative></title>
<baseline year="2022" iso-date="2022-06-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-13" />
<period-end iso-date="2026-12-14" />
<target value="20.00">
<comment><narrative>
This indicator measures number of innovations or best practices, which are relevant to project interventions, that have been selected, recognized, and awarded from the Annual Innovations Competition and the Development Market Place supported and organized by the project.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.1. Poultry and pigs raised by ABPO members
</narrative></title>
<baseline year="2022" iso-date="2022-12-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-22" />
<period-end iso-date="2026-12-22" />
<target value="44,700.00">
<comment><narrative>
This indicator measures the cumulative quantity of poultry and pigs raised by ABPO member households.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
3.3. Audit report submitted on time
</narrative></title>
<baseline year="2022" iso-date="2022-06-24" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-24" />
<period-end iso-date="2027-06-24" />
<target value="Yes">
<comment><narrative>
This indicator measures whether audits submitted by the June 30 deadline each year. Currently no audits are due.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.4. Productive infrastructure facilities  under MAL management completed
</narrative></title>
<baseline year="2022" iso-date="2022-06-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-13" />
<period-end iso-date="2026-12-14" />
<target value="3">
<comment><narrative>
This indicator measures the number of the approved infrastructure facilities  under MAL management that physically completed in compliance with the current infrastructure development regulations , functioned, and handed over and being used by beneficiaries.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in sales of cocoa, by quantity, reported by farmers participating in cocoa Agribusiness producer organizations (ABPO's).
</narrative></title>
<baseline year="2022" iso-date="2022-06-23" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-23" />
<period-end iso-date="2026-12-24" />
<target value="15.00">
<comment><narrative>
This is to measure the increase in sales of cocoa, by quantity, as a proxy for market access. A single value will be computed for cocoa, for each ABPO, and averaged across ABPO's. The percentage increase over the baseline will be computed from this value. The baseline will be obtained from the initial data recorded when farmers become members of the ABPO.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="2022" iso-date="2022-06-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-25" />
<period-end iso-date="2026-12-26" />
<target value="56000">
<comment><narrative>
They are defined as (i) the whole families of ABPO members; ii) members of ABPOs who are benefiting from project interventions and/or TA; (iii) users of rehabilitated/newly constructed productive infrastructures, and (iv) recipients of capacity building and/or training including MAL and stakeholder staff, YPs, Interns and CRPs.
Households will be based on the average household size in Solomon Islands (5.5). The MIS will record and track the number of individual beneficiaries and beneficiary households.
</narrative></comment>
</target>
<actual value="7233">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.3. MAL staff and Young Professionals trained
</narrative></title>
<baseline year="2022" iso-date="2022-06-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-12" />
<period-end iso-date="2026-12-13" />
<target value="100.00">
<comment><narrative>
This indicator measures the number of agriculture extension, veterinary staff and young professionals who have been trained to provide extension services to farmers.
</narrative></comment>
</target>
<actual value="118">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers adopting improved agricultural technology
</narrative></title>
<baseline year="2022" iso-date="2022-06-23" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-23" />
<period-end iso-date="2026-12-24" />
<target value="4600">
<comment><narrative>
This indicator measures the number of farmers (of agricultural products) who have adopted an improved agricultural technology promoted by operations supported by the World Bank.
  
  NB: &quot;Agriculture&quot; or &quot;Agricultural&quot; includes: crops, livestock, capture fisheries, aquaculture, agroforestry, timber and non-timber forest products.
  Adoption refers to a change of practice or change in use of a technology that was introduced or promoted by the project.
  Technology includes a change in practices compared to currently used pactices or technologies (seed preparation, planting time, feeding schedule, feeding ingredients, postharvest storage/ processing, etc.). If the project introduces or promotes a technology package in which the benefit depends on the application of the entire package (e.g., a combination of inputs such as a new variety and advice on agronomic practices such as soil preparation, changes in seeding time, fertilizer schedule, plant protection, etc.), this counts as one technology.
  Farmers are people engaged in farming of agricultural products or members of an agriculture related business (disaggregated by men and women) targeted by the project.
</narrative></comment>
</target>
<actual value="1,435.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
3.2. Communication and public awareness strategy implemented
</narrative></title>
<baseline year="2022" iso-date="2022-06-24" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-24" />
<period-end iso-date="2026-12-25" />
<target value="Yes">
<comment><narrative>
This indicator reports whether the SI ART project develops and implements a specific communication strategy to disseminate the project's best practices, innovations, technologies, showcase for wider replication.  This includes the exchanged ideas and innovations among PO members, policymakers, entrepreneurs, buyers, and investors.
 'Implementation' is defined as at least 50% of the annual planned budget effectively spent.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiary agri-producers reporting increased agricultural production
</narrative></title>
<baseline year="2022" iso-date="2022-06-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-26" />
<period-end iso-date="2026-12-27" />
<target value="75.00">
<comment><narrative>
This indicator measures  increase in agricultural production through a set of proxy indicators. Beneficiary households are unlikely to maintain useful records of production and crops are likely to be harvested as needed. The proxy questions will ask ABPO membersbout changes in production, project benefits received, and changes to their production practices. “Increase production” is defined as household having achieved of, for example, an increase of crop plantation, intensive home garden plantation; increased revenue from market sales; better productivity; and/or reduction of losses and waste, etc. The reference period of 12 months before the survey.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiary agri-producers reporting increased agricultural production
</narrative></title>
<baseline year="2022" iso-date="2022-06-23" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-23" />
<period-end iso-date="2026-12-24" />
<target value="75.00">
<comment><narrative>
This indicator measures  increase in agricultural production through a set of proxy indicators. Beneficiary households are unlikely to maintain useful records of production and crops are likely to be harvested as needed. The proxy questions will ask ABPO membersbout changes in production, project benefits received, and changes to their production practices. “Increase production” is defined as household having achieved of, for example, an increase of crop plantation, intensive home garden plantation; increased revenue from market sales; better productivity; and/or reduction of losses and waste, etc. The reference period of 12 months before the survey.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.2. Number of Agribusiness Producer Organizations (ABPOs) established
</narrative></title>
<baseline year="2022" iso-date="2022-06-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-16" />
<period-end iso-date="2026-12-17" />
<target value="66">
<comment><narrative>
&quot;Established” defines as ABPO complies with the standard procedures on the formation and setup as outlined in the PIM.
</narrative></comment>
</target>
<actual value="62">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
3.1: Grievances addressed within 3 months
</narrative></title>
<baseline year="2022" iso-date="2022-06-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-16" />
<period-end iso-date="2026-12-17" />
<target value="100.00">
<comment><narrative>
Defined as ways of handling/responding to any grievance according to a written procedure, as defined in the PIM. 8 grievances received and resolved so far.
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.3. MAL staff and Young Professionals trained
</narrative></title>
<baseline year="2022" iso-date="2022-06-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-20" />
<period-end iso-date="2026-12-21" />
<target value="100.00">
<comment><narrative>
This indicator measures the number of agriculture extension, veterinary staff and young professionals who have been trained to provide extension services to farmers.
</narrative></comment>
</target>
<actual value="118">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.4. Productive infrastructure facilities  under MAL management completed
</narrative></title>
<baseline year="2022" iso-date="2022-06-21" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-21" />
<period-end iso-date="2026-12-22" />
<target value="6">
<comment><narrative>
This indicator measures the number of the approved infrastructure facilities  under MAL management that physically completed in compliance with the current infrastructure development regulations , functioned, and handed over and being used by beneficiaries.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.2. ABPO members trained in agriculture and small stock production in climate stressed areas (person days)
</narrative></title>
<baseline year="2022" iso-date="2022-06-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-20" />
<period-end iso-date="2026-12-21" />
<target value="6000">
<comment><narrative>
This indicator measures the number of ABPO members who completed training in agriculture and small stock production in climate stressed areas. The number will be measured on the number of days of training delivered, multiplied by how many ABPO members attended that day. ABPO members can be counted multiple times if they attended multiple days of training. Given the climate and disaster vulnerability of Solomon Islands, all provinces are considered as ‘climate stressed’.
</narrative></comment>
</target>
<actual value="240">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
2.7. MAL extension and technical staff which are women
</narrative></title>
<baseline year="2022" iso-date="2022-06-12" value="27.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-12" />
<period-end iso-date="2026-12-13" />
<target value="31.00">
<comment><narrative>
This indicator measures a reduction in the gap between female and male extension and technical staff under MAL. Over the life of the project, MAL will hire extension and technical staff through expansion or staff turnover
</narrative></comment>
</target>
<actual value="32">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
1.5. Beneficiaries with access to project infrastructure investments that feel these reflected their needs
</narrative></title>
<baseline year="2022" iso-date="2022-06-21" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-21" />
<period-end iso-date="2026-12-22" />
<target value="75.00">
<comment><narrative>
Citizen engagement indicator – this indicator captures feedback from the project beneficiaries on what extent to which the implemented infrastructure subproject responds to their priorities/needs for production improvement.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="2024" iso-date="2024-05-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-14" />
<period-end iso-date="2026-12-14" />
<target value="3000">
<comment><narrative>
The number of people benefitting directly and indirectly from improved climate risk management and increased climate resilience due to investments and activities by the project during the intervention period, where data and methodologies exist. It will consider how the interventions enhance resilience of their beneficiaries by including structural investments, non-structural or capacity development elements, and improvements to the enabling environments and institutional frameworks for climate resilience. These interventions could include, for example: access to climate-resilient infrastructure, training on and practice of climate smart agriculture practices, enhanced climate disaster response, and support to livelihoods, improved access to financial mechanisms, and safety nets.
Data sources:
• ToT report (MAL Officers)
• Training for farmers in climate smart agriculture participants list and report.
• Mid Term Review report.
• Impact assessment report
• Endline assessment.

1. Data collected from farmers who have been trained in climate start agriculture.
2. Data collected from farmers/ HH members/ People with access to climate risks infrastructure.
3. MAL Officer who are participating in climate smart agriculture TOT.
4. Farmers practice/ implement activities that enhance climate disaster response
</narrative></comment>
</target>
<actual value="4510">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.1. Poultry and pigs raised by ABPO members
</narrative></title>
<baseline year="2022" iso-date="2022-12-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-14" />
<period-end iso-date="2026-12-14" />
<target value="11500">
<comment><narrative>
This indicator measures the cumulative quantity of poultry and pigs raised by ABPO member households.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.6. Number of innovations or best practices recognized/awarded during the project period.
</narrative></title>
<baseline year="2022" iso-date="2022-06-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-20" />
<period-end iso-date="2026-12-21" />
<target value="20.00">
<comment><narrative>
This indicator measures number of innovations or best practices, which are relevant to project interventions, that have been selected, recognized, and awarded from the Annual Innovations Competition and the Development Market Place supported and organized by the project.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="2022" iso-date="2022-06-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-22" />
<period-end iso-date="2026-12-23" />
<target value="13500">
<comment><narrative>
They are defined as (i) the whole families of ABPO members; ii) members of ABPOs who are benefiting from project interventions and/or TA; (iii) users of rehabilitated/newly constructed productive infrastructures, and (iv) recipients of capacity building and/or training including MAL and stakeholder staff, YPs, Interns and CRPs.
Households will be based on the average household size in Solomon Islands (5.5). The MIS will record and track the number of individual beneficiaries and beneficiary households.
</narrative></comment>
</target>
<actual value="7233">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiary agri-producers reporting increased agricultural production
</narrative></title>
<baseline year="2022" iso-date="2022-06-23" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-23" />
<period-end iso-date="2026-12-24" />
<target value="75.00">
<comment><narrative>
This indicator measures  increase in agricultural production through a set of proxy indicators. Beneficiary households are unlikely to maintain useful records of production and crops are likely to be harvested as needed. The proxy questions will ask ABPO membersbout changes in production, project benefits received, and changes to their production practices. “Increase production” is defined as household having achieved of, for example, an increase of crop plantation, intensive home garden plantation; increased revenue from market sales; better productivity; and/or reduction of losses and waste, etc. The reference period of 12 months before the survey.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.2. ABPO members trained in agriculture and small stock production in climate stressed areas (person days)
</narrative></title>
<baseline year="2022" iso-date="2022-06-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-13" />
<period-end iso-date="2026-12-14" />
<target value="6000">
<comment><narrative>
This indicator measures the number of ABPO members who completed training in agriculture and small stock production in climate stressed areas. The number will be measured on the number of days of training delivered, multiplied by how many ABPO members attended that day. ABPO members can be counted multiple times if they attended multiple days of training. Given the climate and disaster vulnerability of Solomon Islands, all provinces are considered as ‘climate stressed’.
</narrative></comment>
</target>
<actual value="240">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiary agri-producers reporting increased agricultural production
</narrative></title>
<baseline year="2022" iso-date="2022-06-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-26" />
<period-end iso-date="2026-12-27" />
<target value="75.00">
<comment><narrative>
This indicator measures  increase in agricultural production through a set of proxy indicators. Beneficiary households are unlikely to maintain useful records of production and crops are likely to be harvested as needed. The proxy questions will ask ABPO membersbout changes in production, project benefits received, and changes to their production practices. “Increase production” is defined as household having achieved of, for example, an increase of crop plantation, intensive home garden plantation; increased revenue from market sales; better productivity; and/or reduction of losses and waste, etc. The reference period of 12 months before the survey.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in sales of cocoa, by quantity, reported by farmers participating in cocoa Agribusiness producer organizations (ABPO's).
</narrative></title>
<baseline year="2022" iso-date="2022-06-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-19" />
<period-end iso-date="2026-12-20" />
<target value="10">
<comment><narrative>
This is to measure the increase in sales of cocoa, by quantity, as a proxy for market access. A single value will be computed for cocoa, for each ABPO, and averaged across ABPO's. The percentage increase over the baseline will be computed from this value. The baseline will be obtained from the initial data recorded when farmers become members of the ABPO.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in sales of cocoa, by quantity, reported by farmers participating in cocoa Agribusiness producer organizations (ABPO's).
</narrative></title>
<baseline year="2022" iso-date="2022-06-23" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-23" />
<period-end iso-date="2026-12-24" />
<target value="15.00">
<comment><narrative>
This is to measure the increase in sales of cocoa, by quantity, as a proxy for market access. A single value will be computed for cocoa, for each ABPO, and averaged across ABPO's. The percentage increase over the baseline will be computed from this value. The baseline will be obtained from the initial data recorded when farmers become members of the ABPO.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="2022" iso-date="2022-06-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-22" />
<period-end iso-date="2026-12-23" />
<target value="13500">
<comment><narrative>
They are defined as (i) the whole families of ABPO members; ii) members of ABPOs who are benefiting from project interventions and/or TA; (iii) users of rehabilitated/newly constructed productive infrastructures, and (iv) recipients of capacity building and/or training including MAL and stakeholder staff, YPs, Interns and CRPs.
Households will be based on the average household size in Solomon Islands (5.5). The MIS will record and track the number of individual beneficiaries and beneficiary households.
</narrative></comment>
</target>
<actual value="7233">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="2022" iso-date="2022-06-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-25" />
<period-end iso-date="2026-12-26" />
<target value="56000">
<comment><narrative>
They are defined as (i) the whole families of ABPO members; ii) members of ABPOs who are benefiting from project interventions and/or TA; (iii) users of rehabilitated/newly constructed productive infrastructures, and (iv) recipients of capacity building and/or training including MAL and stakeholder staff, YPs, Interns and CRPs.
Households will be based on the average household size in Solomon Islands (5.5). The MIS will record and track the number of individual beneficiaries and beneficiary households.
</narrative></comment>
</target>
<actual value="7233">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in sales of coconut, by quantity, reported by farmers participating in coconut Agribusiness producer organizations (ABPO's).
</narrative></title>
<baseline year="2022" iso-date="2022-06-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-19" />
<period-end iso-date="2026-12-20" />
<target value="10">
<comment><narrative>
This is to measure the increase in sales of coconut, by quantity, as a proxy for market access. A single value will be computed for coconut, for each ABPO, and averaged across ABPO's. The percentage increase over the baseline will be computed from this value. The baseline will be obtained from the initial data recorded when farmers become members of the ABPO.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in sales of coconut, by quantity, reported by farmers participating in coconut Agribusiness producer organizations (ABPO's).
</narrative></title>
<baseline year="2022" iso-date="2022-06-23" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-23" />
<period-end iso-date="2026-12-24" />
<target value="15.00">
<comment><narrative>
This is to measure the increase in sales of coconut, by quantity, as a proxy for market access. A single value will be computed for coconut, for each ABPO, and averaged across ABPO's. The percentage increase over the baseline will be computed from this value. The baseline will be obtained from the initial data recorded when farmers become members of the ABPO.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in sales of poultry, by quantity, by the targeted farmers participating in poultry Agribusiness producer organizations (ABPOs)
</narrative></title>
<baseline year="2022" iso-date="2022-06-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-19" />
<period-end iso-date="2026-12-20" />
<target value="10">
<comment><narrative>
This is to measure the increase in sales of poultry, by value, as a proxy for market access. A single value will be computed for poultry, for each ABPO, and averaged across ABPO&amp;rsquo;s. The percentage increase over the baseline will be computed from this valu. The baseline will be obtained from the initial data recorded when farmers become members of the ABPO. The Baseline figure has been corrected to 0 as the original (10%) was&amp;nbsp;incorrectly entered.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in sales of poultry, by quantity, by the targeted farmers participating in poultry Agribusiness producer organizations (ABPOs)
</narrative></title>
<baseline year="2022" iso-date="2022-06-23" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-23" />
<period-end iso-date="2026-12-24" />
<target value="32.00">
<comment><narrative>
This is to measure the increase in sales of poultry, by value, as a proxy for market access. A single value will be computed for poultry, for each ABPO, and averaged across ABPO&amp;rsquo;s. The percentage increase over the baseline will be computed from this valu. The baseline will be obtained from the initial data recorded when farmers become members of the ABPO. The Baseline figure has been corrected to 0 as the original (10%) was&amp;nbsp;incorrectly entered.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers adopting improved agricultural technology
</narrative></title>
<baseline year="2022" iso-date="2022-06-18" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-18" />
<period-end iso-date="2026-12-19" />
<target value="3300">
<comment><narrative>
This indicator measures the number of farmers (of agricultural products) who have adopted an improved agricultural technology promoted by operations supported by the World Bank.
  
  NB: &quot;Agriculture&quot; or &quot;Agricultural&quot; includes: crops, livestock, capture fisheries, aquaculture, agroforestry, timber and non-timber forest products.
  Adoption refers to a change of practice or change in use of a technology that was introduced or promoted by the project.
  Technology includes a change in practices compared to currently used pactices or technologies (seed preparation, planting time, feeding schedule, feeding ingredients, postharvest storage/ processing, etc.). If the project introduces or promotes a technology package in which the benefit depends on the application of the entire package (e.g., a combination of inputs such as a new variety and advice on agronomic practices such as soil preparation, changes in seeding time, fertilizer schedule, plant protection, etc.), this counts as one technology.
  Farmers are people engaged in farming of agricultural products or members of an agriculture related business (disaggregated by men and women) targeted by the project.
</narrative></comment>
</target>
<actual value="1,435.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers adopting improved agricultural technology
</narrative></title>
<baseline year="2022" iso-date="2022-06-23" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-23" />
<period-end iso-date="2026-12-24" />
<target value="4600">
<comment><narrative>
This indicator measures the number of farmers (of agricultural products) who have adopted an improved agricultural technology promoted by operations supported by the World Bank.
  
  NB: &quot;Agriculture&quot; or &quot;Agricultural&quot; includes: crops, livestock, capture fisheries, aquaculture, agroforestry, timber and non-timber forest products.
  Adoption refers to a change of practice or change in use of a technology that was introduced or promoted by the project.
  Technology includes a change in practices compared to currently used pactices or technologies (seed preparation, planting time, feeding schedule, feeding ingredients, postharvest storage/ processing, etc.). If the project introduces or promotes a technology package in which the benefit depends on the application of the entire package (e.g., a combination of inputs such as a new variety and advice on agronomic practices such as soil preparation, changes in seeding time, fertilizer schedule, plant protection, etc.), this counts as one technology.
  Farmers are people engaged in farming of agricultural products or members of an agriculture related business (disaggregated by men and women) targeted by the project.
</narrative></comment>
</target>
<actual value="1,435.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.3. Number of ABPOs functioning one year after establishment
</narrative></title>
<baseline year="2022" iso-date="2022-06-21" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-21" />
<period-end iso-date="2026-12-22" />
<target value="53">
<comment><narrative>
&quot;Functioning” defined as: ABPO maintains regular meetings on a monthly or quarterly basis. The annual and target values are estimated at 80% of total established ABPOs.
</narrative></comment>
</target>
<actual value="15">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.4. Community Resource Persons (CRPs) trained and working
</narrative></title>
<baseline year="2022" iso-date="2022-06-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-20" />
<period-end iso-date="2026-12-21" />
<target value="66">
<comment><narrative>
This indicator measures the number of CRPs selected, trained and working on the project. CRPs are the best practicing farmers or lead farmers from the ABPOs who are nominated and developed as CRPs through training programs organized and led by MAL extension staff.
</narrative></comment>
</target>
<actual value="21">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiary agri-producers reporting increased agricultural production
</narrative></title>
<baseline year="2022" iso-date="2022-06-23" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-23" />
<period-end iso-date="2026-12-24" />
<target value="75.00">
<comment><narrative>
This indicator measures  increase in agricultural production through a set of proxy indicators. Beneficiary households are unlikely to maintain useful records of production and crops are likely to be harvested as needed. The proxy questions will ask ABPO membersbout changes in production, project benefits received, and changes to their production practices. “Increase production” is defined as household having achieved of, for example, an increase of crop plantation, intensive home garden plantation; increased revenue from market sales; better productivity; and/or reduction of losses and waste, etc. The reference period of 12 months before the survey.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiary agri-producers reporting increased agricultural production
</narrative></title>
<baseline year="2022" iso-date="2022-06-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-26" />
<period-end iso-date="2026-12-27" />
<target value="75.00">
<comment><narrative>
This indicator measures  increase in agricultural production through a set of proxy indicators. Beneficiary households are unlikely to maintain useful records of production and crops are likely to be harvested as needed. The proxy questions will ask ABPO membersbout changes in production, project benefits received, and changes to their production practices. “Increase production” is defined as household having achieved of, for example, an increase of crop plantation, intensive home garden plantation; increased revenue from market sales; better productivity; and/or reduction of losses and waste, etc. The reference period of 12 months before the survey.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in sales of cocoa, by quantity, reported by farmers participating in cocoa Agribusiness producer organizations (ABPO's).
</narrative></title>
<baseline year="2022" iso-date="2022-06-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-19" />
<period-end iso-date="2026-12-20" />
<target value="10">
<comment><narrative>
This is to measure the increase in sales of cocoa, by quantity, as a proxy for market access. A single value will be computed for cocoa, for each ABPO, and averaged across ABPO's. The percentage increase over the baseline will be computed from this value. The baseline will be obtained from the initial data recorded when farmers become members of the ABPO.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in sales of cocoa, by quantity, reported by farmers participating in cocoa Agribusiness producer organizations (ABPO's).
</narrative></title>
<baseline year="2022" iso-date="2022-06-23" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-23" />
<period-end iso-date="2026-12-24" />
<target value="15.00">
<comment><narrative>
This is to measure the increase in sales of cocoa, by quantity, as a proxy for market access. A single value will be computed for cocoa, for each ABPO, and averaged across ABPO's. The percentage increase over the baseline will be computed from this value. The baseline will be obtained from the initial data recorded when farmers become members of the ABPO.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="2022" iso-date="2022-06-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-22" />
<period-end iso-date="2026-12-23" />
<target value="13500">
<comment><narrative>
They are defined as (i) the whole families of ABPO members; ii) members of ABPOs who are benefiting from project interventions and/or TA; (iii) users of rehabilitated/newly constructed productive infrastructures, and (iv) recipients of capacity building and/or training including MAL and stakeholder staff, YPs, Interns and CRPs.
Households will be based on the average household size in Solomon Islands (5.5). The MIS will record and track the number of individual beneficiaries and beneficiary households.
</narrative></comment>
</target>
<actual value="7233">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="2022" iso-date="2022-06-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-25" />
<period-end iso-date="2026-12-26" />
<target value="56000">
<comment><narrative>
They are defined as (i) the whole families of ABPO members; ii) members of ABPOs who are benefiting from project interventions and/or TA; (iii) users of rehabilitated/newly constructed productive infrastructures, and (iv) recipients of capacity building and/or training including MAL and stakeholder staff, YPs, Interns and CRPs.
Households will be based on the average household size in Solomon Islands (5.5). The MIS will record and track the number of individual beneficiaries and beneficiary households.
</narrative></comment>
</target>
<actual value="7233">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in sales of coconut, by quantity, reported by farmers participating in coconut Agribusiness producer organizations (ABPO's).
</narrative></title>
<baseline year="2022" iso-date="2022-06-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-19" />
<period-end iso-date="2026-12-20" />
<target value="10">
<comment><narrative>
This is to measure the increase in sales of coconut, by quantity, as a proxy for market access. A single value will be computed for coconut, for each ABPO, and averaged across ABPO's. The percentage increase over the baseline will be computed from this value. The baseline will be obtained from the initial data recorded when farmers become members of the ABPO.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in sales of coconut, by quantity, reported by farmers participating in coconut Agribusiness producer organizations (ABPO's).
</narrative></title>
<baseline year="2022" iso-date="2022-06-23" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-23" />
<period-end iso-date="2026-12-24" />
<target value="15.00">
<comment><narrative>
This is to measure the increase in sales of coconut, by quantity, as a proxy for market access. A single value will be computed for coconut, for each ABPO, and averaged across ABPO's. The percentage increase over the baseline will be computed from this value. The baseline will be obtained from the initial data recorded when farmers become members of the ABPO.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in sales of poultry, by quantity, by the targeted farmers participating in poultry Agribusiness producer organizations (ABPOs)
</narrative></title>
<baseline year="2022" iso-date="2022-06-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-19" />
<period-end iso-date="2026-12-20" />
<target value="10">
<comment><narrative>
This is to measure the increase in sales of poultry, by value, as a proxy for market access. A single value will be computed for poultry, for each ABPO, and averaged across ABPO&amp;rsquo;s. The percentage increase over the baseline will be computed from this valu. The baseline will be obtained from the initial data recorded when farmers become members of the ABPO. The Baseline figure has been corrected to 0 as the original (10%) was&amp;nbsp;incorrectly entered.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in sales of poultry, by quantity, by the targeted farmers participating in poultry Agribusiness producer organizations (ABPOs)
</narrative></title>
<baseline year="2022" iso-date="2022-06-23" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-23" />
<period-end iso-date="2026-12-24" />
<target value="32.00">
<comment><narrative>
This is to measure the increase in sales of poultry, by value, as a proxy for market access. A single value will be computed for poultry, for each ABPO, and averaged across ABPO&amp;rsquo;s. The percentage increase over the baseline will be computed from this valu. The baseline will be obtained from the initial data recorded when farmers become members of the ABPO. The Baseline figure has been corrected to 0 as the original (10%) was&amp;nbsp;incorrectly entered.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers reached with agricultural assets or services
</narrative></title>
<baseline year="2022" iso-date="2022-06-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-12" />
<period-end iso-date="2026-12-13" />
<target value="6000">
<comment><narrative>
This indicator measures the number of farmers who were provided with agricultural assets or services as a result of World Bank project support. &quot;Agriculture&quot; or &quot;Agricultural&quot; includes: crops, livestock, capture fisheries, aquaculture, agroforestry, timber, and non-timber forest products. Assets include property, biological assets, and farm and processing equipment. Biological assets may include animal agriculture breeds (e.g., livestock, fisheries) and genetic material of livestock, crops, trees, and shrubs (including fiber and fuel crops). Services include research, extension, training, education, ICTs, inputs (e.g., fertilizers, pesticides, labor), production-related services (e.g., soil testing, animal health/veterinary services), phyto-sanitary and food safety services, agricltural marketing support services (e.g., price monitoring, export promotion), access to farm and post-harvest machinery and storage facilities, employment, irrigation and drainage, and finance. Farmers are people engaged in agricultural activities or members of a agriculture-related business (disaggregated by men and women) targeted by the project.
</narrative></comment>
</target>
<actual value="2087">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers reached with agricultural assets or services
</narrative></title>
<baseline year="2022" iso-date="2022-06-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-20" />
<period-end iso-date="2026-12-21" />
<target value="6000">
<comment><narrative>
This indicator measures the number of farmers who were provided with agricultural assets or services as a result of World Bank project support. &quot;Agriculture&quot; or &quot;Agricultural&quot; includes: crops, livestock, capture fisheries, aquaculture, agroforestry, timber, and non-timber forest products. Assets include property, biological assets, and farm and processing equipment. Biological assets may include animal agriculture breeds (e.g., livestock, fisheries) and genetic material of livestock, crops, trees, and shrubs (including fiber and fuel crops). Services include research, extension, training, education, ICTs, inputs (e.g., fertilizers, pesticides, labor), production-related services (e.g., soil testing, animal health/veterinary services), phyto-sanitary and food safety services, agricltural marketing support services (e.g., price monitoring, export promotion), access to farm and post-harvest machinery and storage facilities, employment, irrigation and drainage, and finance. Farmers are people engaged in agricultural activities or members of a agriculture-related business (disaggregated by men and women) targeted by the project.
</narrative></comment>
</target>
<actual value="2087">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Extent of land rehabilitated or newly planted with Cocoa, under the ABPOs
</narrative></title>
<baseline year="2022" iso-date="2022-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-04-15" />
<period-end iso-date="2026-12-13" />
<target value="270">
<comment><narrative>
New indicator intended to replace the poultry indicator, reflecting the emerging emphasis on Cocoa as a focus area by a majority of ABPOs
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.4. Community Resource Persons (CRPs) trained and working
</narrative></title>
<baseline year="2022" iso-date="2022-06-17" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-17" />
<period-end iso-date="2026-12-18" />
<target value="66">
<comment><narrative>
This indicator measures the number of CRPs selected, trained and working on the project. CRPs are the best practicing farmers or lead farmers from the ABPOs who are nominated and developed as CRPs through training programs organized and led by MAL extension staff.
</narrative></comment>
</target>
<actual value="21">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in sales of cocoa, by quantity, reported by farmers participating in cocoa Agribusiness producer organizations (ABPO's).
</narrative></title>
<baseline year="2022" iso-date="2022-06-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-19" />
<period-end iso-date="2026-12-20" />
<target value="10">
<comment><narrative>
This is to measure the increase in sales of cocoa, by quantity, as a proxy for market access. A single value will be computed for cocoa, for each ABPO, and averaged across ABPO's. The percentage increase over the baseline will be computed from this value. The baseline will be obtained from the initial data recorded when farmers become members of the ABPO.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.2. Number of Agribusiness Producer Organizations (ABPOs) established
</narrative></title>
<baseline year="2022" iso-date="2022-06-21" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-21" />
<period-end iso-date="2026-12-22" />
<target value="66">
<comment><narrative>
&quot;Established” defines as ABPO complies with the standard procedures on the formation and setup as outlined in the PIM.
</narrative></comment>
</target>
<actual value="62">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
2.7. MAL extension and technical staff which are women
</narrative></title>
<baseline year="2022" iso-date="2022-06-20" value="27.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-20" />
<period-end iso-date="2026-12-21" />
<target value="31.00">
<comment><narrative>
This indicator measures a reduction in the gap between female and male extension and technical staff under MAL. Over the life of the project, MAL will hire extension and technical staff through expansion or staff turnover
</narrative></comment>
</target>
<actual value="32">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
3.2. Communication and public awareness strategy implemented
</narrative></title>
<baseline year="2022" iso-date="2022-06-16" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-16" />
<period-end iso-date="2026-12-17" />
<target value="Yes">
<comment><narrative>
This indicator reports whether the SI ART project develops and implements a specific communication strategy to disseminate the project's best practices, innovations, technologies, showcase for wider replication.  This includes the exchanged ideas and innovations among PO members, policymakers, entrepreneurs, buyers, and investors.
 'Implementation' is defined as at least 50% of the annual planned budget effectively spent.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
2.5. ABPO members raising small stock using locally grown feed crops and following technical feed production advice
</narrative></title>
<baseline year="2022" iso-date="2022-06-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-12" />
<period-end iso-date="2026-12-13" />
<target value="45.00">
<comment><narrative>
This indicator measures the numbers of all smallstock agribusiness ABPO members who report their increased feed crops production, for example, growing more high-protein bean, cassava and cowpea crops, or having better feedstuff for small stock as result from following the feedstuff formulation advice, or any feeding practices that promoted by the project. Counting as % of ABPO member.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.3. Number of ABPOs functioning one year after establishment
</narrative></title>
<baseline year="2022" iso-date="2022-06-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-16" />
<period-end iso-date="2026-12-17" />
<target value="53">
<comment><narrative>
&quot;Functioning” defined as: ABPO maintains regular meetings on a monthly or quarterly basis. The annual and target values are estimated at 80% of total established ABPOs.
</narrative></comment>
</target>
<actual value="15">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers adopting improved agricultural technology
</narrative></title>
<baseline year="2022" iso-date="2022-06-18" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-18" />
<period-end iso-date="2026-12-19" />
<target value="3300">
<comment><narrative>
This indicator measures the number of farmers (of agricultural products) who have adopted an improved agricultural technology promoted by operations supported by the World Bank.
  
  NB: &quot;Agriculture&quot; or &quot;Agricultural&quot; includes: crops, livestock, capture fisheries, aquaculture, agroforestry, timber and non-timber forest products.
  Adoption refers to a change of practice or change in use of a technology that was introduced or promoted by the project.
  Technology includes a change in practices compared to currently used pactices or technologies (seed preparation, planting time, feeding schedule, feeding ingredients, postharvest storage/ processing, etc.). If the project introduces or promotes a technology package in which the benefit depends on the application of the entire package (e.g., a combination of inputs such as a new variety and advice on agronomic practices such as soil preparation, changes in seeding time, fertilizer schedule, plant protection, etc.), this counts as one technology.
  Farmers are people engaged in farming of agricultural products or members of an agriculture related business (disaggregated by men and women) targeted by the project.
</narrative></comment>
</target>
<actual value="1,435.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
3.3. Audit report submitted on time
</narrative></title>
<baseline year="2022" iso-date="2022-06-16" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-16" />
<period-end iso-date="2027-06-16" />
<target value="Yes">
<comment><narrative>
This indicator measures whether audits submitted by the June 30 deadline each year. Currently no audits are due.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
2.5. ABPO members raising small stock using locally grown feed crops and following technical feed production advice
</narrative></title>
<baseline year="2022" iso-date="2022-06-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-20" />
<period-end iso-date="2026-12-21" />
<target value="45.00">
<comment><narrative>
This indicator measures the numbers of all smallstock agribusiness ABPO members who report their increased feed crops production, for example, growing more high-protein bean, cassava and cowpea crops, or having better feedstuff for small stock as result from following the feedstuff formulation advice, or any feeding practices that promoted by the project. Counting as % of ABPO member.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in sales of poultry, by quantity, by the targeted farmers participating in poultry Agribusiness producer organizations (ABPOs)
</narrative></title>
<baseline year="2022" iso-date="2022-06-23" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-23" />
<period-end iso-date="2026-12-24" />
<target value="32.00">
<comment><narrative>
This is to measure the increase in sales of poultry, by value, as a proxy for market access. A single value will be computed for poultry, for each ABPO, and averaged across ABPO&amp;rsquo;s. The percentage increase over the baseline will be computed from this valu. The baseline will be obtained from the initial data recorded when farmers become members of the ABPO. The Baseline figure has been corrected to 0 as the original (10%) was&amp;nbsp;incorrectly entered.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers adopting improved agricultural technology
</narrative></title>
<baseline year="2022" iso-date="2022-06-23" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-23" />
<period-end iso-date="2026-12-24" />
<target value="4600">
<comment><narrative>
This indicator measures the number of farmers (of agricultural products) who have adopted an improved agricultural technology promoted by operations supported by the World Bank.
  
  NB: &quot;Agriculture&quot; or &quot;Agricultural&quot; includes: crops, livestock, capture fisheries, aquaculture, agroforestry, timber and non-timber forest products.
  Adoption refers to a change of practice or change in use of a technology that was introduced or promoted by the project.
  Technology includes a change in practices compared to currently used pactices or technologies (seed preparation, planting time, feeding schedule, feeding ingredients, postharvest storage/ processing, etc.). If the project introduces or promotes a technology package in which the benefit depends on the application of the entire package (e.g., a combination of inputs such as a new variety and advice on agronomic practices such as soil preparation, changes in seeding time, fertilizer schedule, plant protection, etc.), this counts as one technology.
  Farmers are people engaged in farming of agricultural products or members of an agriculture related business (disaggregated by men and women) targeted by the project.
</narrative></comment>
</target>
<actual value="1,435.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers adopting improved agricultural technology
</narrative></title>
<baseline year="2022" iso-date="2022-06-18" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-18" />
<period-end iso-date="2026-12-19" />
<target value="3300">
<comment><narrative>
This indicator measures the number of farmers (of agricultural products) who have adopted an improved agricultural technology promoted by operations supported by the World Bank.
  
  NB: &quot;Agriculture&quot; or &quot;Agricultural&quot; includes: crops, livestock, capture fisheries, aquaculture, agroforestry, timber and non-timber forest products.
  Adoption refers to a change of practice or change in use of a technology that was introduced or promoted by the project.
  Technology includes a change in practices compared to currently used pactices or technologies (seed preparation, planting time, feeding schedule, feeding ingredients, postharvest storage/ processing, etc.). If the project introduces or promotes a technology package in which the benefit depends on the application of the entire package (e.g., a combination of inputs such as a new variety and advice on agronomic practices such as soil preparation, changes in seeding time, fertilizer schedule, plant protection, etc.), this counts as one technology.
  Farmers are people engaged in farming of agricultural products or members of an agriculture related business (disaggregated by men and women) targeted by the project.
</narrative></comment>
</target>
<actual value="1,435.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T00:13:13" hierarchy="1"><iati-identifier>44000-P173688</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Integrated Economic Development and Community Resilience Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To increase access to economic and social infrastructure in rural wards, deliver climate and disaster resilience actions and enhance Provincial Governments accountability to citizens.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The World Bank Board of Executive Directors approved the Integrated Economic Development and Community Resilience (IEDCR) Project on June 9, 2022 with total financing of US$23.57 million comprising an IDA Grant (SDR 9.50 million equivalent to US$13.00 million), an IDA Credit (SDR 4.40 million equivalent to US$6.00 million), and a Global Environment Facility (GEF) Least Developed Countries Fund Grant (US$4.57 million). The PDO of the IEDCR is to increase access to economic and social infrastructure in rural wards, deliver climate and disaster resilience actions, and enhance Provincial Governments accountability to citizens. The IEDCR comprises three components. Component 1: Performance-Based Grants (US$10.36 million) finances four cycles of PBGs to participating provinces for infrastructure development using the institutional arrangements of the national PCDF (financed by the SIG since its establishment in 2008). Component 2: Support to Subnational Entities (US$8.74 million) improves provincial and ward-level capacity for economic development and climate change adaptation through investments in systems and capacity building in participatory planning, social accountability, infrastructure preparation and implementation, and climate and disaster resilience. Component 3: Project Management (US$4.47 million) supports the coordination, oversight, and operational support necessary for effective project delivery. The project is jointly implemented by Ministries of Provincial Government and Institutional Strengthening (MPGIS) and Environment, Climate Change, Disaster Management, and Meteorology (MECDM).The proposed AF and project extension is driven by three interrelated factors: (i) a financing gap that threatens achievement of the PDO and the sustainability of project outcomes: (ii) the opportunity to scale up provincial service delivery, particularly economic infrastructure, through additional PBG cycles; and (iii) ongoing and emerging national priorities, including finalizing the PCDF reform agenda through the updated PCDF modality, and piloting a community-level delivery mechanism for disaster and crisis finance.Furthermore, the AF, through the Japan Policy and Human Resources Development (PHRD) Grant financing, will scale up the IEDCR's contribution to community resilience by establishing and piloting an inclusive community-level preparedness and recovery financing mechanism that complements the Project's investments in provincial service delivery, infrastructure, and resilience. The grant will help close the gap between available disaster financing and the systems needed to deliver support quickly and fairly to vulnerable and remote communities.The proposed AF, with a total cost of US$17.73 million, will be financed through a combination of a US$15.00 million IDA Credit and a US$2.73 million PHRD Grant. The AF will finance the scale-up of investments under the PCDF, strengthen provincial and ward-level systems for infrastructure delivery and resilience, and support the pilot implementation of community preparedness and recovery mechanisms. The AF will also support a 30-month extension of the implementation period and revisions to the Results Framework to reflect the expanded scope of activities. No additional co-financing from other development partners is envisaged under the proposed AF, and the AF will not change the PDO or the existing implementation arrangements.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SB–P0045090"><narrative>Solomon Islands</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SB-COA-0045092"><narrative>Ministry of Environment, Climate Change, Disaster Management and Meteorology</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2021-10-29"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2022-06-09"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2027-07-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2027-07-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Ifeta Smajic</narrative></person-name><telephone>+1-202-473-1000</telephone><email>ismajic@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>




<recipient-country code="SB" percentage="100"><narrative xml:lang="en">SOLOMON ISLANDS</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002103350" />
            <name><narrative>Solomon Islands</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.64571 160.156194</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="74020" percentage="28" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="24" xml:lang="en"/><sector vocabulary="1" code="15185" percentage="18" xml:lang="en"/><sector vocabulary="1" code="21011" percentage="17" xml:lang="en"/><sector vocabulary="1" code="32161" percentage="13" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YA" percentage="9.00000000" xml:lang="en"><narrative>FY17 - Agricultural markets, commercialization and agri-business</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="40.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TI" percentage="17.0000000" xml:lang="en"><narrative>FY17 - Rural and Inter-Urban Roads</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="34.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000753" percentage="57" xml:lang="en"><narrative>Disaster Preparedness</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="67" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000513" percentage="57" xml:lang="en"><narrative>Participation and Civic Engagement</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000044" percentage="67" xml:lang="en"><narrative>Data Development and Capacity Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000437" percentage="57" xml:lang="en"><narrative>Municipal Institution Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="67" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000512" percentage="100" xml:lang="en"><narrative>Other Excluded Groups</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="100" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="22" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000441" percentage="67" xml:lang="en"><narrative>Data production, accessibility and use</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000721" percentage="67" xml:lang="en"><narrative>Rural Markets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000044" percentage="67" xml:lang="en"><narrative>Data Development and Capacity Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="100" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000441" percentage="67" xml:lang="en"><narrative>Data production, accessibility and use</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000044" percentage="67" xml:lang="en"><narrative>Data Development and Capacity Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="22" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000513" percentage="57" xml:lang="en"><narrative>Participation and Civic Engagement</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">30000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">190000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">190000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">210000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">210000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">210000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">220000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">220000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">230000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">240000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">270000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">310000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">290000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">280000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">280000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">280000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">280000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">440000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">300000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">310000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">310000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">300000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">320000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">330000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">360000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">390000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">390000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">390000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">390000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">390000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">390000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">390000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">390000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">390000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">680000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">291666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">291666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">291666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">291666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">291666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">291666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">291666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">291666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">291666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">291666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">291666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">291666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">30000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">4253502.24</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">4253502.24</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">6000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45092"><narrative>Ministry of Environment, Climate Change, Disaster Management and Meteorology; Ministry of Provincial Government and Institutional Strengthening</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">13000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45092"><narrative>Ministry of Environment, Climate Change, Disaster Management and Meteorology; Ministry of Provincial Government and Institutional Strengthening</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">201317</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45092"><narrative>Ministry of Environment, Climate Change, Disaster Management and Meteorology; Ministry of Provincial Government and Institutional Strengthening</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">3006946</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45092"><narrative>Ministry of Environment, Climate Change, Disaster Management and Meteorology; Ministry of Provincial Government and Institutional Strengthening</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">746709</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45092"><narrative>Ministry of Environment, Climate Change, Disaster Management and Meteorology; Ministry of Provincial Government and Institutional Strengthening</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">-746709</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45092"><narrative>Ministry of Environment, Climate Change, Disaster Management and Meteorology; Ministry of Provincial Government and Institutional Strengthening</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">518370</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45092"><narrative>Ministry of Environment, Climate Change, Disaster Management and Meteorology; Ministry of Provincial Government and Institutional Strengthening</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-826000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45092"><narrative>Ministry of Environment, Climate Change, Disaster Management and Meteorology; Ministry of Provincial Government and Institutional Strengthening</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">671289</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45092"><narrative>Ministry of Environment, Climate Change, Disaster Management and Meteorology; Ministry of Provincial Government and Institutional Strengthening</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">839496</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45092"><narrative>Ministry of Environment, Climate Change, Disaster Management and Meteorology; Ministry of Provincial Government and Institutional Strengthening</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">1023437</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45092"><narrative>Ministry of Environment, Climate Change, Disaster Management and Meteorology; Ministry of Provincial Government and Institutional Strengthening</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">299519</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45092"><narrative>Ministry of Environment, Climate Change, Disaster Management and Meteorology; Ministry of Provincial Government and Institutional Strengthening</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">326199</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45092"><narrative>Ministry of Environment, Climate Change, Disaster Management and Meteorology; Ministry of Provincial Government and Institutional Strengthening</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">507519</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45092"><narrative>Ministry of Environment, Climate Change, Disaster Management and Meteorology; Ministry of Provincial Government and Institutional Strengthening</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">222288</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45092"><narrative>Ministry of Environment, Climate Change, Disaster Management and Meteorology; Ministry of Provincial Government and Institutional Strengthening</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">184674</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45092"><narrative>Ministry of Environment, Climate Change, Disaster Management and Meteorology; Ministry of Provincial Government and Institutional Strengthening</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">163629</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45092"><narrative>Ministry of Environment, Climate Change, Disaster Management and Meteorology; Ministry of Provincial Government and Institutional Strengthening</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">169098</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45092"><narrative>Ministry of Environment, Climate Change, Disaster Management and Meteorology; Ministry of Provincial Government and Institutional Strengthening</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">118913</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45092"><narrative>Ministry of Environment, Climate Change, Disaster Management and Meteorology; Ministry of Provincial Government and Institutional Strengthening</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">213588</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45092"><narrative>Ministry of Environment, Climate Change, Disaster Management and Meteorology; Ministry of Provincial Government and Institutional Strengthening</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">457642</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45092"><narrative>Ministry of Environment, Climate Change, Disaster Management and Meteorology; Ministry of Provincial Government and Institutional Strengthening</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">126134</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45092"><narrative>Ministry of Environment, Climate Change, Disaster Management and Meteorology; Ministry of Provincial Government and Institutional Strengthening</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">365194</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45092"><narrative>Ministry of Environment, Climate Change, Disaster Management and Meteorology; Ministry of Provincial Government and Institutional Strengthening</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">34821</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45092"><narrative>Ministry of Environment, Climate Change, Disaster Management and Meteorology; Ministry of Provincial Government and Institutional Strengthening</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">330386</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45092"><narrative>Ministry of Environment, Climate Change, Disaster Management and Meteorology; Ministry of Provincial Government and Institutional Strengthening</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">397816</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45092"><narrative>Ministry of Environment, Climate Change, Disaster Management and Meteorology; Ministry of Provincial Government and Institutional Strengthening</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">456487</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45092"><narrative>Ministry of Environment, Climate Change, Disaster Management and Meteorology; Ministry of Provincial Government and Institutional Strengthening</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">572300</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45092"><narrative>Ministry of Environment, Climate Change, Disaster Management and Meteorology; Ministry of Provincial Government and Institutional Strengthening</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">452216</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45092"><narrative>Ministry of Environment, Climate Change, Disaster Management and Meteorology; Ministry of Provincial Government and Institutional Strengthening</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">1218691</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45092"><narrative>Ministry of Environment, Climate Change, Disaster Management and Meteorology; Ministry of Provincial Government and Institutional Strengthening</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">60601</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45092"><narrative>Ministry of Environment, Climate Change, Disaster Management and Meteorology; Ministry of Provincial Government and Institutional Strengthening</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">413772</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45092"><narrative>Ministry of Environment, Climate Change, Disaster Management and Meteorology; Ministry of Provincial Government and Institutional Strengthening</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">147084</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45092"><narrative>Ministry of Environment, Climate Change, Disaster Management and Meteorology; Ministry of Provincial Government and Institutional Strengthening</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">84695</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45092"><narrative>Ministry of Environment, Climate Change, Disaster Management and Meteorology; Ministry of Provincial Government and Institutional Strengthening</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">47079</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45092"><narrative>Ministry of Environment, Climate Change, Disaster Management and Meteorology; Ministry of Provincial Government and Institutional Strengthening</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">148540</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45092"><narrative>Ministry of Environment, Climate Change, Disaster Management and Meteorology; Ministry of Provincial Government and Institutional Strengthening</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">310716</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45092"><narrative>Ministry of Environment, Climate Change, Disaster Management and Meteorology; Ministry of Provincial Government and Institutional Strengthening</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">214862</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45092"><narrative>Ministry of Environment, Climate Change, Disaster Management and Meteorology; Ministry of Provincial Government and Institutional Strengthening</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">148838</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45092"><narrative>Ministry of Environment, Climate Change, Disaster Management and Meteorology; Ministry of Provincial Government and Institutional Strengthening</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">13303</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45092"><narrative>Ministry of Environment, Climate Change, Disaster Management and Meteorology; Ministry of Provincial Government and Institutional Strengthening</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">6404</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45092"><narrative>Ministry of Environment, Climate Change, Disaster Management and Meteorology; Ministry of Provincial Government and Institutional Strengthening</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">78013</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45092"><narrative>Ministry of Environment, Climate Change, Disaster Management and Meteorology; Ministry of Provincial Government and Institutional Strengthening</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">856295</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45092"><narrative>Ministry of Environment, Climate Change, Disaster Management and Meteorology; Ministry of Provincial Government and Institutional Strengthening</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">164330</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45092"><narrative>Ministry of Environment, Climate Change, Disaster Management and Meteorology; Ministry of Provincial Government and Institutional Strengthening</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-377</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45092"><narrative>Ministry of Environment, Climate Change, Disaster Management and Meteorology; Ministry of Provincial Government and Institutional Strengthening</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-787</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45092"><narrative>Ministry of Environment, Climate Change, Disaster Management and Meteorology; Ministry of Provincial Government and Institutional Strengthening</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-2880</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45092"><narrative>Ministry of Environment, Climate Change, Disaster Management and Meteorology; Ministry of Provincial Government and Institutional Strengthening</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-5255</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45092"><narrative>Ministry of Environment, Climate Change, Disaster Management and Meteorology; Ministry of Provincial Government and Institutional Strengthening</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-7742</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45092"><narrative>Ministry of Environment, Climate Change, Disaster Management and Meteorology; Ministry of Provincial Government and Institutional Strengthening</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">-8859</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45092"><narrative>Ministry of Environment, Climate Change, Disaster Management and Meteorology; Ministry of Provincial Government and Institutional Strengthening</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-13059</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45092"><narrative>Ministry of Environment, Climate Change, Disaster Management and Meteorology; Ministry of Provincial Government and Institutional Strengthening</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-16101</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45092"><narrative>Ministry of Environment, Climate Change, Disaster Management and Meteorology; Ministry of Provincial Government and Institutional Strengthening</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P173688"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P173688?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P173688"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of investments focused on climate change adaptation or disaster resilience
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="20.00">
<comment><narrative>
Percentage based on $ value of grants approved that are focused specifically on climate change adaptation or disaster resilience. Computed as a proportion of PCDF funds. (The number of sub-projects focused on climate change will also be tracked separately). 


As reported in the Quarterly Progress Report (QPR) for the period ended June 2025.
</narrative></comment>
</target>
<actual value="21">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of beneficiaries who report that communities are better able to resolve the main types of grievances and disputes at community level.
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="70.00">
<comment><narrative>
Measures the effectiveness of WDC Support Officers role in supporting local authorities to manage grievances and disputes.

‘Main types is a composite of five areas (drug and alcohol related disputes; domestic and family related disputes; serious crime; development related disputes; and land related disputes) as used in CGGM.

Indicator value will be sourced from follow up survey (expected June 2025).
</narrative></comment>
</target>
<actual value="75">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of beneficiaries reporting increased  access to economic or social infrastructure
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="70.00">
<comment><narrative>
This indicator measures the percentage of the target beneficiary population that reports having actually benefited as opposed to the number estimated at planning stage. Measures percentage as it will depend on a sample survey.

“Youth” - defined as those between 15-34 years in accordance with the National Youth Policy 2017-2030.

Indicator value was sourced from the first follow up survey (completed in July 2025).
</narrative></comment>
</target>
<actual value="75">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of beneficiaries reporting increased  access to economic or social infrastructure
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="70.00">
<comment><narrative>
This indicator measures the percentage of the target beneficiary population that reports having actually benefited as opposed to the number estimated at planning stage. Measures percentage as it will depend on a sample survey.

“Youth” - defined as those between 15-34 years in accordance with the National Youth Policy 2017-2030.

Indicator value was sourced from the first follow up survey (completed in July 2025).
</narrative></comment>
</target>
<actual value="75">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of investments focused on climate change adaptation or disaster resilience
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="20.00">
<comment><narrative>
Percentage based on $ value of grants approved that are focused specifically on climate change adaptation or disaster resilience. Computed as a proportion of PCDF funds. (The number of sub-projects focused on climate change will also be tracked separately). 


As reported in the Quarterly Progress Report (QPR) for the period ended June 2025.
</narrative></comment>
</target>
<actual value="21">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of investments focused on climate change adaptation or disaster resilience
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="20.00">
<comment><narrative>
Percentage based on $ value of grants approved that are focused specifically on climate change adaptation or disaster resilience. Computed as a proportion of PCDF funds. (The number of sub-projects focused on climate change will also be tracked separately). 


As reported in the Quarterly Progress Report (QPR) for the period ended December 2025.
</narrative></comment>
</target>
<actual value="16">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of beneficiaries that report Project investments reflected their priority needs
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="70.00">
<comment><narrative>
Project’ here effectively means PCDF (i.e. the whole of the program to which IEDCR is contributing).
‘Beneficiaries are the individuals potentially served by investments.

Indicator value was sourced from the first follow up survey (completed in July 2025).
</narrative></comment>
</target>
<actual value="82">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of beneficiaries that report Project investments reflected their priority needs
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="70.00">
<comment><narrative>
Project’ here effectively means PCDF (i.e. the whole of the program to which IEDCR is contributing).
‘Beneficiaries are the individuals potentially served by investments.

Indicator value was sourced from the first follow up survey (completed in July 2025).
</narrative></comment>
</target>
<actual value="82">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of beneficiaries who report improvements in engagement with government.
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="70.00">
<comment><narrative>
Attempts to measure “Engagement” defined as a composite score based on results of several identified activities which would increase information flows between PGs and communities, including the participatory planning process for PCDF and WDC grants.
Based on survey questions that mirror similar indicator in CGGM.

Indicator value was sourced from the first follow up survey (completed in July 2025).
</narrative></comment>
</target>
<actual value="23">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Ward Development Plans that will mainstream climate and disaster resilience
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="125.00">
<comment><narrative>
Responds to GEF RF Core Indicator #3 
Number.

Based on the number of Ward Development Plans that show evidence of being informed by climate and disaster risk considerations (reviewed and updated using the I-RIPLANT tool).
</narrative></comment>
</target>
<actual value="60">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of infrastructure sub-projects completed
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="130.00">
<comment><narrative>
Data will additionally be categorized by type, such as: economic, social (including schools and health facilities), climate adaptation and disaster resilience; and tracked according to status.

25 sub-projects out of 34 financed by the Project have been completed by September 2025. Another 9 are in progress.  A further 69 subprojects have been committed for Financial Year 2025/26.
</narrative></comment>
</target>
<actual value="24">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Ward Development Plans that will mainstream climate and disaster resilience
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="125.00">
<comment><narrative>
Responds to GEF RF Core Indicator #3 
Number.

Based on the number of Ward Development Plans that show evidence of being informed by climate and disaster risk considerations (reviewed and updated using the I-RIPLANT tool).
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of beneficiaries that report Project investments reflected their priority needs
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="70.00">
<comment><narrative>
Project’ here effectively means PCDF (i.e. the whole of the program to which IEDCR is contributing).
‘Beneficiaries are the individuals potentially served by investments.

Indicator value was sourced from the first follow up survey (completed in July 2025).
</narrative></comment>
</target>
<actual value="82">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of WDC Chairs present at Provincial Planning and Development Committee meetings
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="100.00">
<comment><narrative>
Tracks level of community representation in Provincial planning process. Baseline value to be determined with survey.

As reported in the Quarterly Progress Report for the period ended December 2025. All WDC Chairs were represented in the PPDC meetings for 2025/2026 budget.
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of assets funded by project assessed with a satisfactory Operations and Maintenance Plan
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="75.00">
<comment><narrative>
Based on evidence of O&amp;M plan being in place.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Value of investments focused on climate change adaptation or disaster resilience
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="2,200,000.00">
<comment><narrative>
Number - US$ Amount

Responds to GEF RF Output 2.2.4
Measures PCDF investments focused on climate change or disaster resilience, during IEDCR period.
(funds will not be distinguishable as currently planned)
</narrative></comment>
</target>
<actual value="3120000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of beneficiaries reporting awareness of climate change impacts, appropriate adaptation responses and disaster risk management.
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="50.00">
<comment><narrative>
Measures the effect of training and awareness activities. Measured as percentage improvement over baseline as it will be measured through a sample survey
Responds to GEF RF outcome 2.3.2/3.3.2. 

Indicator value was sourced from the first follow up survey (completed in July 2025).
</narrative></comment>
</target>
<actual value="54">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Wards achieving minimum levels of community participation, including women and youth, in Ward planning meetings
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="159.00">
<comment><narrative>
A composite indicator based on agreed targets for: - number of community participants - percentage of female participants - percentage of youth Baseline value to be determined with survey.

As reported in the Quarterly Progress Report for the period ended December 2025.
</narrative></comment>
</target>
<actual value="173.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of executive members / MPAs and provincial officers trained in public expenditure management systems and/or financial reporting.
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="620.00">
<comment><narrative>
Measures training outputs designed to address issues that typically lead to disclaimer audit reports.

As reported in the Quarterly Progress Report for the period ended December 2024.
</narrative></comment>
</target>
<actual value="848">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Provincial Governments achieving increased Accountability Score
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="9.00">
<comment><narrative>
Indicator tracks the number of PG's achieving an improved score compared with the last assessment.

A composite score comprising PG performance on: (a) the new minimum condition on audit [MC#6]; and (b) key minimum conditions and performance measures corresponding to the additional social accountability mechanisms being implemented with support from the Project, appropriately revised following technical assistance from IDA – provisionally consisting of a revised minimum condition on Public Accounts Committee follow-up actions [MC#7], a revised minimum condition on participatory planning [MC#9], a revised performance measure on gender inclusion in project work plans [PM#1.5] and a revised performance measure on community monitoring [PM#6.5]

Indicator value is sourced from the most recent PCDF Annual Performance Assessment (2023/24).
</narrative></comment>
</target>
<actual value="6">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of beneficiaries who report improvements in engagement with government.
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="70.00">
<comment><narrative>
Attempts to measure “Engagement” defined as a composite score based on results of several identified activities which would increase information flows between PGs and communities, including the participatory planning process for PCDF and WDC grants.
Based on survey questions that mirror similar indicator in CGGM.

Indicator value was sourced from the first follow up survey (completed in July 2025).
</narrative></comment>
</target>
<actual value="23">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of PGs that resolve at least 50 percent of findings reported in audit management letter within the fiscal year following its issuance.
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="2.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="8.00">
<comment><narrative>
Additional accountability measure that indicates the extent to which PG's have acted on auditors comments. 

Annually increasing targets from 3 in Year 2 to 8 in Year 5.

As reported in the Quarterly Progress Report for the period ended December 2025.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of beneficiaries that report Project investments reflected their priority needs
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="70.00">
<comment><narrative>
Project’ here effectively means PCDF (i.e. the whole of the program to which IEDCR is contributing).
‘Beneficiaries are the individuals potentially served by investments.

Indicator value was sourced from the first follow up survey (completed in July 2025).
</narrative></comment>
</target>
<actual value="82">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Provincial Governments receiving an unqualified audit.
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="2.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="6.00">
<comment><narrative>
Basic accountability measure. Targets an annually increasing number of PG's achieving
unqualified audits. Two provinces achieved unqualified audits in 2019. Targets will be 3 PG's in
Year 2 rising annually to 6 PG's in Year 5.

No Audit reports were received in the reporting period. As reported in the QPR for the period ended December 2025.
</narrative></comment>
</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Wards implementing training on climate change adaptation or disaster resilience
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="159.00">
<comment><narrative>
As reported in the Quarterly Progress Report for the period ended June 2025.
</narrative></comment>
</target>
<actual value="169">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of executive members / MPAs and provincial officers trained in public expenditure management systems and/or financial reporting.
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="620.00">
<comment><narrative>
Measures training outputs designed to address issues that typically lead to disclaimer audit reports.

As reported in the Quarterly Progress Report for the period ended December 2024.
</narrative></comment>
</target>
<actual value="761">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of COVID response and mitigation investments completed by the Project
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="18.00">
<comment><narrative>
The number of health clinics, quarantine facilities and other activities that support the government's COVID-19 Response and Mitigation Strategy.

No new Covid-19/emergency related projects were completed within the reporting period. As reported in the QPR for the period ended June 2025.

.
</narrative></comment>
</target>
<actual value="11">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of WDCs that meet the minimum representation requirements for women and youth
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="100.00">
<comment><narrative>
Tracks quality of participation at community level. The Policy Blueprint includes provisions for minimum representation in several committees, including two women's groups and one youth group representative as voting members in the WDCs.

As reported in the Quarterly Progress Report for the period ended June 2025.
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people trained on climate change adaptation or disaster resilience.
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="1,700.00">
<comment><narrative>
GEF Core indicator #4 Includes persons at various levels who receive training under the project, as per GEF RF outcome 2.3.1 / 3.3.1 - People at line ministries - Community members - extension service officers - DRM agency staff - small business owners - schoolchildren, university students or teachers - other categories.

As reported in the Quarterly Progress Report for the period ended  June 2025.
</narrative></comment>
</target>
<actual value="1953">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of grants focused on economic infrastructure
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="42.00">
<comment><narrative>
Percentage of overall PCDF budget allocated to performance based grants that focus on economic infrastructure. 

As reported in the QPR for the period ended June 2025.
</narrative></comment>
</target>
<actual value="33">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Value of investments focused on climate change adaptation or disaster resilience
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="2,200,000.00">
<comment><narrative>
Number - US$ Amount

Responds to GEF RF Output 2.2.4
Measures PCDF investments focused on climate change or disaster resilience, during IEDCR period.
(funds will not be distinguishable as currently planned)
</narrative></comment>
</target>
<actual value="3244475">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Provincial Governments achieving increased Accountability Score
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="9.00">
<comment><narrative>
Indicator tracks the number of PG's achieving an improved score compared with the last assessment.

A composite score comprising PG performance on: (a) the new minimum condition on audit [MC#6]; and (b) key minimum conditions and performance measures corresponding to the additional social accountability mechanisms being implemented with support from the Project, appropriately revised following technical assistance from IDA – provisionally consisting of a revised minimum condition on Public Accounts Committee follow-up actions [MC#7], a revised minimum condition on participatory planning [MC#9], a revised performance measure on gender inclusion in project work plans [PM#1.5] and a revised performance measure on community monitoring [PM#6.5]

Indicator value is sourced from the most recent PCDF Annual Performance Assessment (2022/23).
</narrative></comment>
</target>
<actual value="3">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of beneficiaries reporting increased  access to economic or social infrastructure
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="70.00">
<comment><narrative>
This indicator measures the percentage of the target beneficiary population that reports having actually benefited as opposed to the number estimated at planning stage. Measures percentage as it will depend on a sample survey.

“Youth” - defined as those between 15-34 years in accordance with the National Youth Policy 2017-2030.

Indicator value was sourced from the first follow up survey (completed in July 2025).
</narrative></comment>
</target>
<actual value="75">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of PGs that resolve at least 50 percent of findings reported in audit management letter within the fiscal year following its issuance.
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="2.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="8.00">
<comment><narrative>
Additional accountability measure that indicates the extent to which PG's have acted on auditors comments. 

Annually increasing targets from 3 in Year 2 to 8 in Year 5.

As reported in the Quarterly Progress Report for the period ended June 2025.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of grievances addressed within one month through the IEDCR Grievance Redress Mechanism
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="90.00">
<comment><narrative>
Measures grievances recorded in the GRM and formally addressed by the PMU, including responding to the complainant(s). Does not require that the grievances were resolved to the satisfaction of the complainant(s).

Data source: MIS
</narrative></comment>
</target>
<actual value="92">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total number of direct beneficiaries of climate resilient infrastructure
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="250,000.00">
<comment><narrative>
GEF Core Indicator No. 1 Estimated number of Individuals in project areas benefiting from improved climate resilient infrastructure. Estimated during preparation of infrastructure investments; reported based on completed sub projects. 

As reported in the QPR for the period ended June 2025.
</narrative></comment>
</target>
<actual value="107385">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of WDC Chairs present at Provincial Planning and Development Committee meetings
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="100.00">
<comment><narrative>
Tracks level of community representation in Provincial planning process. Baseline value to be determined with survey.

As reported in the Quarterly Progress Report for the period ended June 2025.
</narrative></comment>
</target>
<actual value="83.2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of beneficiaries reporting awareness of climate change impacts, appropriate adaptation responses and disaster risk management.
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="50.00">
<comment><narrative>
Measures the effect of training and awareness activities. Measured as percentage improvement over baseline as it will be measured through a sample survey
Responds to GEF RF outcome 2.3.2/3.3.2. 

Indicator value was sourced from the first follow up survey (completed in July 2025).
</narrative></comment>
</target>
<actual value="54">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of grants focused on economic infrastructure
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="42.00">
<comment><narrative>
Percentage of overall PCDF budget allocated to performance based grants that focus on economic infrastructure. 

As reported in the QPR for the period ended December 2025.
</narrative></comment>
</target>
<actual value="33">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Wards achieving minimum levels of community participation, including women and youth, in Ward planning meetings
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="159.00">
<comment><narrative>
A composite indicator based on agreed targets for: - number of community participants - percentage of female participants - percentage of youth Baseline value to be determined with survey.

As reported in the Quarterly Progress Report for the period ended June 2025.
</narrative></comment>
</target>
<actual value="173.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of WDCs that meet the minimum representation requirements for women and youth
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="100.00">
<comment><narrative>
Tracks quality of participation at community level. The Policy Blueprint includes provisions for minimum representation in several committees, including two women's groups and one youth group representative as voting members in the WDCs.

As reported in the Quarterly Progress Report for the period ended December 2025.
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Provincial Governments achieving increased Accountability Score
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="9.00">
<comment><narrative>
Indicator tracks the number of PG's achieving an improved score compared with the last assessment.

A composite score comprising PG performance on: (a) the new minimum condition on audit [MC#6]; and (b) key minimum conditions and performance measures corresponding to the additional social accountability mechanisms being implemented with support from the Project, appropriately revised following technical assistance from IDA – provisionally consisting of a revised minimum condition on Public Accounts Committee follow-up actions [MC#7], a revised minimum condition on participatory planning [MC#9], a revised performance measure on gender inclusion in project work plans [PM#1.5] and a revised performance measure on community monitoring [PM#6.5]

Indicator value is sourced from the most recent PCDF Annual Performance Assessment (2023/24).
</narrative></comment>
</target>
<actual value="6">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Provincial Governments achieving increased Accountability Score
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="9.00">
<comment><narrative>
Indicator tracks the number of PG's achieving an improved score compared with the last assessment.

A composite score comprising PG performance on: (a) the new minimum condition on audit [MC#6]; and (b) key minimum conditions and performance measures corresponding to the additional social accountability mechanisms being implemented with support from the Project, appropriately revised following technical assistance from IDA – provisionally consisting of a revised minimum condition on Public Accounts Committee follow-up actions [MC#7], a revised minimum condition on participatory planning [MC#9], a revised performance measure on gender inclusion in project work plans [PM#1.5] and a revised performance measure on community monitoring [PM#6.5]

Indicator value is sourced from the most recent PCDF Annual Performance Assessment (2022/23).
</narrative></comment>
</target>
<actual value="3">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of beneficiaries who report that communities are better able to resolve the main types of grievances and disputes at community level.
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="70.00">
<comment><narrative>
Measures the effectiveness of WDC Support Officers role in supporting local authorities to manage grievances and disputes.

‘Main types is a composite of five areas (drug and alcohol related disputes; domestic and family related disputes; serious crime; development related disputes; and land related disputes) as used in CGGM.

Indicator value is sourced from first follow up survey (July 2025).
</narrative></comment>
</target>
<actual value="75">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of beneficiaries reporting increased  access to economic or social infrastructure
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="70.00">
<comment><narrative>
This indicator measures the percentage of the target beneficiary population that reports having actually benefited as opposed to the number estimated at planning stage. Measures percentage as it will depend on a sample survey.

“Youth” - defined as those between 15-34 years in accordance with the National Youth Policy 2017-2030.

Indicator value was sourced from the first follow up survey (completed in July 2025).
</narrative></comment>
</target>
<actual value="75">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of PCDF funded projects that were identified by WDCs
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="60.00">
<comment><narrative>
Tracks outcomes of participatory planning at Ward level. 

As reported in the Quarterly Progress Report for the period ended December 2024.
</narrative></comment>
</target>
<actual value="60.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of investments focused on climate change adaptation or disaster resilience
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="20.00">
<comment><narrative>
Percentage based on $ value of grants approved that are focused specifically on climate change adaptation or disaster resilience. Computed as a proportion of PCDF funds. (The number of sub-projects focused on climate change will also be tracked separately). 


As reported in the Quarterly Progress Report (QPR) for the period ended December 2025.
</narrative></comment>
</target>
<actual value="16">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Wards implementing training on climate change adaptation or disaster resilience
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="159.00">
<comment><narrative>
As reported in the Quarterly Progress Report for the period ended June 2025.
</narrative></comment>
</target>
<actual value="173">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of infrastructure sub-projects completed
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="130.00">
<comment><narrative>
Data will additionally be categorized by type, such as: economic, social (including schools and health facilities), climate adaptation and disaster resilience; and tracked according to status.

25 sub-projects out of 34 financed by the Project have been completed by September 2025. Another 9 are in progress.  A further 69 subprojects have been committed for Financial Year 2025/26.
</narrative></comment>
</target>
<actual value="33">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people trained on climate change adaptation or disaster resilience.
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="1,700.00">
<comment><narrative>
GEF Core indicator #4 Includes persons at various levels who receive training under the project, as per GEF RF outcome 2.3.1 / 3.3.1 - People at line ministries - Community members - extension service officers - DRM agency staff - small business owners - schoolchildren, university students or teachers - other categories.

As reported in the Quarterly Progress Report for the period ended  December 2025.
</narrative></comment>
</target>
<actual value="1953">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total number of direct beneficiaries of climate resilient infrastructure
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="250,000.00">
<comment><narrative>
GEF Core Indicator No. 1 Estimated number of Individuals in project areas benefiting from improved climate resilient infrastructure. Estimated during preparation of infrastructure investments; reported based on completed sub projects. 

As reported in the QPR for the period ended December 2025.
</narrative></comment>
</target>
<actual value="125,461">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of assets funded by project assessed with a satisfactory Operations and Maintenance Plan
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="75.00">
<comment><narrative>
Based on evidence of O&amp;M plan being in place.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of PCDF funded projects that were identified by WDCs
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="60.00">
<comment><narrative>
Tracks outcomes of participatory planning at Ward level. 

As reported in the Quarterly Progress Report for the period ended December 2025.
</narrative></comment>
</target>
<actual value="60.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of beneficiaries reporting increased  access to economic or social infrastructure
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="70.00">
<comment><narrative>
This indicator measures the percentage of the target beneficiary population that reports having actually benefited as opposed to the number estimated at planning stage. Measures percentage as it will depend on a sample survey.

“Youth” - defined as those between 15-34 years in accordance with the National Youth Policy 2017-2030.

Indicator value was sourced from the first follow up survey (completed in July 2025).
</narrative></comment>
</target>
<actual value="75">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of beneficiaries reporting increased  access to economic or social infrastructure
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="70.00">
<comment><narrative>
This indicator measures the percentage of the target beneficiary population that reports having actually benefited as opposed to the number estimated at planning stage. Measures percentage as it will depend on a sample survey.

“Youth” - defined as those between 15-34 years in accordance with the National Youth Policy 2017-2030.

Indicator value was sourced from the first follow up survey (completed in July 2025).
</narrative></comment>
</target>
<actual value="75">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of investments focused on climate change adaptation or disaster resilience
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="20.00">
<comment><narrative>
Percentage based on $ value of grants approved that are focused specifically on climate change adaptation or disaster resilience. Computed as a proportion of PCDF funds. (The number of sub-projects focused on climate change will also be tracked separately). 


As reported in the Quarterly Progress Report (QPR) for the period ended June 2025.
</narrative></comment>
</target>
<actual value="21">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of investments focused on climate change adaptation or disaster resilience
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="20.00">
<comment><narrative>
Percentage based on $ value of grants approved that are focused specifically on climate change adaptation or disaster resilience. Computed as a proportion of PCDF funds. (The number of sub-projects focused on climate change will also be tracked separately). 


As reported in the Quarterly Progress Report (QPR) for the period ended December 2025.
</narrative></comment>
</target>
<actual value="16">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of beneficiaries that report Project investments reflected their priority needs
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="70.00">
<comment><narrative>
Project’ here effectively means PCDF (i.e. the whole of the program to which IEDCR is contributing).
‘Beneficiaries are the individuals potentially served by investments.

Indicator value was sourced from the first follow up survey (completed in July 2025).
</narrative></comment>
</target>
<actual value="82">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of beneficiaries that report Project investments reflected their priority needs
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="70.00">
<comment><narrative>
Project’ here effectively means PCDF (i.e. the whole of the program to which IEDCR is contributing).
‘Beneficiaries are the individuals potentially served by investments.

Indicator value was sourced from the first follow up survey (completed in July 2025).
</narrative></comment>
</target>
<actual value="82">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Provincial Governments achieving increased Accountability Score
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="9.00">
<comment><narrative>
Indicator tracks the number of PG's achieving an improved score compared with the last assessment.

A composite score comprising PG performance on: (a) the new minimum condition on audit [MC#6]; and (b) key minimum conditions and performance measures corresponding to the additional social accountability mechanisms being implemented with support from the Project, appropriately revised following technical assistance from IDA – provisionally consisting of a revised minimum condition on Public Accounts Committee follow-up actions [MC#7], a revised minimum condition on participatory planning [MC#9], a revised performance measure on gender inclusion in project work plans [PM#1.5] and a revised performance measure on community monitoring [PM#6.5]

Indicator value is sourced from the most recent PCDF Annual Performance Assessment (2022/23).
</narrative></comment>
</target>
<actual value="3">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Provincial Governments achieving increased Accountability Score
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="9.00">
<comment><narrative>
Indicator tracks the number of PG's achieving an improved score compared with the last assessment.

A composite score comprising PG performance on: (a) the new minimum condition on audit [MC#6]; and (b) key minimum conditions and performance measures corresponding to the additional social accountability mechanisms being implemented with support from the Project, appropriately revised following technical assistance from IDA – provisionally consisting of a revised minimum condition on Public Accounts Committee follow-up actions [MC#7], a revised minimum condition on participatory planning [MC#9], a revised performance measure on gender inclusion in project work plans [PM#1.5] and a revised performance measure on community monitoring [PM#6.5]

Indicator value is sourced from the most recent PCDF Annual Performance Assessment (2023/24).
</narrative></comment>
</target>
<actual value="6">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Provincial Governments receiving an unqualified audit.
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="2.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="6.00">
<comment><narrative>
Basic accountability measure. Targets an annually increasing number of PG's achieving
unqualified audits. Two provinces achieved unqualified audits in 2019. Targets will be 3 PG's in
Year 2 rising annually to 6 PG's in Year 5.

No Audit reports were received in the reporting period. As reported in the QPR for the period ended June 2025.
</narrative></comment>
</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of COVID response and mitigation investments completed by the Project
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="18.00">
<comment><narrative>
The number of health clinics, quarantine facilities and other activities that support the government's COVID-19 Response and Mitigation Strategy.

No new Covid-19/emergency related projects were completed within the reporting period. As reported in the QPR for the period ended December 2025.

.
</narrative></comment>
</target>
<actual value="12">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of grievances addressed within one month through the IEDCR Grievance Redress Mechanism
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="90.00">
<comment><narrative>
Measures grievances recorded in the GRM and formally addressed by the PMU, including responding to the complainant(s). Does not require that the grievances were resolved to the satisfaction of the complainant(s).

Data source: MIS. No grievances received in the reporting period.
</narrative></comment>
</target>
<actual value="92">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of beneficiaries that report awareness of PCDF supported investments
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="70.00">
<comment><narrative>
Definition of ‘beneficiaries and ‘project’ as for Indicator 4.

Helps track the gap between those aware of investments and those saying those investments reflect their needs.

Indicator value was sourced from the first follow up survey (completed in July 2025).
</narrative></comment>
</target>
<actual value="59">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of beneficiaries that report awareness of PCDF supported investments
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2027-06-30" />
<target value="70.00">
<comment><narrative>
Definition of ‘beneficiaries and ‘project’ as for Indicator 4.

Helps track the gap between those aware of investments and those saying those investments reflect their needs.

Indicator value was sourced from the first follow up survey (completed in July 2025).
</narrative></comment>
</target>
<actual value="59">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T00:13:13" hierarchy="1"><iati-identifier>44000-P173933</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Solomon Islands COVID-19 Emergency Response Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To prevent, detect and respond to the threat posed by COVID-19 and to strengthen national systems for public health preparedness in Solomon Islands.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The Project under the Global MPA will support the country's COVID-19 response and to strengthen the health system for public health emergencies. The project components and activities under each component are designed to support critical gaps identified through the Consolidated National Preparedness and Response Plan for COVID-19 (issued on 12 March 2020) and complement activities that have already been committed by other DPs, including DFAT, WHO, UNICEF and the Asian Development Bank among others. The project coverage will be national in scale, but also includes support to selected Provinces. The project will comprise the following three components:Component 1. Emergency COVID-19 Preparedness and Response: Carrying out activities to assist the SIG to prevent, prepare for and respond to COVID-19 including: (a) improving infection prevention and control measures by providing personal protective equipment and necessary supplies and consumables; (b) enhancing case detection, confirmation and contact tracing capabilities; (c) upgrading quarantine facilities and isolation units; and (d) mobilizing contractual health care workers as may be required to respond to a surge in demand for health care services and general operating capacity.  Component 2. Health System Strengthening: Carrying out activities to strengthen the Recipient's health care system by enhancing clinical care capacity to manage COVID-19 cases and sustain routine health service delivery, including: (a) renovations and upgrades to intensive care units in two provincial hospitals; (b) enhancing health care waste management by financing incinerators, waste disposal transportation, and training in health care waste management; (c) upgrading of the national medical storage facility by financing refurbishment of its warehouse and training of its staff; (d) supporting MHMS with establishing of a national health emergency coordination center through upgrading and repurposing of the existing building currently used as temporary accommodation for health care workers; and (e) training of health care workers in hospital infection prevention and control.Component 3. Implementation Management and Monitoring and Evaluation: Providing technical and operational assistance to the Recipient on Project management and implementation, including supporting monitoring and evaluation activities, capacity building of Ministry of Health and Medical Services (MHMS) staff and establishing and supporting the Project Management Unit. The MHMS of Solomon Islands will be the project's implementing agency and will have the overall implementation responsibility for the Project, including the responsibility for carrying out day-to-day management and implementation of the project and coordinating with other government ministries/agencies and stakeholders on all aspects of project implementation as required. The project is expected to benefit the general population, including at-risk populations, particularly the elderly and people with chronic conditions, medical and emergency personnel, medical and testing facilities, and public health agencies engaged in the response in participating countries.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SB–P0045460"><narrative>Solomon Islands</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SB–P0045460"><narrative>Solomon Islands</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SB-COA-276"><narrative>Ministry of Health and Medical Services</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2020-04-30"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2021-01-04"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2024-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2024-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Wayne Jeremy Irava</narrative></person-name><telephone>+1-202-473-1000</telephone><email>wirava@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="SB" percentage="100"><narrative xml:lang="en">SOLOMON ISLANDS</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002101556" />
            <name><narrative>Western Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8 157</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002102384" />
            <name><narrative>Tulagi</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.10306 160.15056</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002103350" />
            <name><narrative>Solomon Islands</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8 159</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002106552" />
            <name><narrative>Malaita Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9 161</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002108502" />
            <name><narrative>Honiara</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.43333 159.95</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002108857" />
            <name><narrative>Gizo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.10303 156.84186</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002178472" />
            <name><narrative>Temotu Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.72754 165.93884</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007280292" />
            <name><narrative>Choiseul</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-6.99186 156.86279</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0011423653" />
            <name><narrative>Taro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-6.71111 156.39722</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="12250" percentage="82" xml:lang="en"/><sector vocabulary="1" code="12191" percentage="12" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="6" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HQ" percentage="13.0000000" xml:lang="en"><narrative>FY17 - Health Facilities and Construction</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="80.0000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HF" percentage="7.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="56" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="100" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="100" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="100" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="56" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="33" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="100" xml:lang="en"><narrative>Disease Control</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000633" percentage="74" xml:lang="en"><narrative>Health Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="21" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="100" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="1900-01-01"/>
<period-end iso-date="1900-01-01"/>
<value currency="USD" value-date="1900-01-01">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">208333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">166666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">41666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">41666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">41666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">41666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">41666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">41666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">41666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">41666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">41666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">41666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">41666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">41666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="1900-01-01"/>
<period-end iso-date="1900-01-01"/>
<value currency="USD" value-date="1900-01-01">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">1034840.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">30647.61</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">2500000</value><description xml:lang="en"><narrative>Total Commitment in January Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">2500000</value><description xml:lang="en"><narrative>Total Commitment in January Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">5000000</value><description xml:lang="en"><narrative>Total Commitment in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">631000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">403840</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">30648</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">197712</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">275679</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">133079</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">44191</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">373</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">321217</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">106862</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">14335</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">212274</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">34669</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">725180</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">69191</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">3645</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">24775</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">179160</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">213897</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">713656</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">1633</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">63878</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">267788</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">76942</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">44228</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">42959</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">595</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">171020</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">134105</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">42984</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">125975</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">112514</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">181954</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">224691</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">180852</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">497590</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">91351</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">30</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">279734</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">675070</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">242959</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">3072</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">119415</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">754541</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">903</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">79488</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">213659</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">550</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">201884</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">484694</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">34</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">44565</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">14866</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">43690</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">14386</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-3636</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-10750</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-01-31"/><value value-date="2022-01-31">-1716</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">-1903</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">-3007</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">-3254</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">-3172</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">-3475</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">-8071</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">-9071</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">-9270</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-45461"><narrative>Ministry of Health and Medical Services</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P173933"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P173933?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P173933"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of frontline workers trained on public health emergency (SC2.2)
</narrative></title>
<baseline year="2021" iso-date="2021-12-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-07" />
<period-end iso-date="2024-12-31" />
<target value="1,000.00">
<comment><narrative>
Not achieved. The Public Health Emergency Bill was not enacted during the project lifespan, a prerequisite for training.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
First COVID-19 case reported to WHO within 24 hours of confirmation reported per IHR requirements (SC1.1)
</narrative></title>
<baseline year="2020" iso-date="2020-10-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-15" />
<period-end iso-date="2024-12-31" />
<target value="Yes">
<comment><narrative>
Achieved in January 2022. The first case was reported to WHO within 24 hours of confirmation, meeting international health regulations requirements and ensuring timely global notification.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of vaccination coverage of the total population (fully vaccinated), disaggregated by sex
</narrative></title>
<baseline year="2020" iso-date="2020-12-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-07" />
<period-end iso-date="2024-12-31" />
<target value="80.00">
<comment><narrative>
Partially achieved. Vaccination coverage stagnated due to significant hesitancy driven by safety concerns, cultural beliefs, and reduced demand after the repeal of the &quot;No-Jab, No-Job&quot; policy in December 2023, with coverage far below the target despite efforts to address data backlogs. Coverage for women mirrored the overall trend, reaching only 34.87 percent due to the same challenges of vaccine hesitancy and declining demand, falling short of the target.
</narrative></comment>
</target>
<actual value="35.75">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of suspected cases of COVID-19 reported and investigated per MHMS approved protocol
</narrative></title>
<baseline year="2020" iso-date="2020-09-30" value="3,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-09-30" />
<period-end iso-date="2024-12-31" />
<target value="40,000.00">
<comment><narrative>
Achieved. The MHMS Public Health Emergency and Surveillance Unit stopped providing reports on suspected cases since December 2022, as COVID-19 reporting priorities shifted, but the indicator had already exceeded its end target, reflecting robust surveillance during the pandemic peak.
</narrative></comment>
</target>
<actual value="197,733">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of health workers trained in infection prevention and control per MHMS-approved protocols, disaggregated by sex (SC2.1)
</narrative></title>
<baseline year="2020" iso-date="2020-09-30" value="50.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-09-30" />
<period-end iso-date="2024-12-31" />
<target value="1,500.00">
<comment><narrative>
Achieved. Training reached 1,522 health workers across multiple provinces, exceeding the target, with support from partners like UNICEF and WHO.
</narrative></comment>
</target>
<actual value="1522">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of beneficiaries who expressed satisfaction with the project interventions, disagregated by sex (SC1.1)
</narrative></title>
<baseline year="2020" iso-date="2020-10-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-30" />
<period-end iso-date="2024-12-31" />
<target value="70.00">
<comment><narrative>
Achieved. Beneficiaries expressed high satisfaction through various surveys fielded throughout implementation, covering interventions like waste management trucks, PPE, and training, exceeding the target.
</narrative></comment>
</target>
<actual value="82.40">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of healthcare workers fully vaccinated, disaggregated by sex (SC1.2)
</narrative></title>
<baseline year="2021" iso-date="2021-12-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-07" />
<period-end iso-date="2024-12-31" />
<target value="90.00">
<comment><narrative>
Not achieved. Using the WHO denominator (4,500 health workers), coverage reached 75.84 percent, limited by hesitancy and declining demand; however, using MHMS data (2,427 health workers), the target would be met at 98 percent, highlighting a definitional discrepancy.
</narrative></comment>
</target>
<actual value="75.84">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of designated laboratories with COVID-19 diagnostic equipment, test kits, and reagents (SC1.1)
</narrative></title>
<baseline year="2020" iso-date="2020-09-30" value="2.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-09-30" />
<period-end iso-date="2024-12-31" />
<target value="6.00">
<comment><narrative>
Achieved. Eight laboratories, including Molecular Lab NRH, Gizo Hospital, and others, were equipped, surpassing the target and enhancing diagnostic capacity.
</narrative></comment>
</target>
<actual value="8.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of frontline health care workers with the knowledge to recognize, medically manage, and refer GBV survivors to appropriate services, disaggregated by sex (SC2.1)
</narrative></title>
<baseline year="2020" iso-date="2020-09-30" value="20.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-09-30" />
<period-end iso-date="2024-12-31" />
<target value="60.00">
<comment><narrative>
Achieved. Training reached 59.18 percent of frontline workers, slightly below the target but considered met, with 12 GBV trainings conducted.
</narrative></comment>
</target>
<actual value="59.18">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
M&amp;E system established to monitor COVID-19 preparedness and response plan
</narrative></title>
<baseline year="2020" iso-date="2020-04-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-30" />
<period-end iso-date="2023-06-30" />
<target value="Yes">
<comment><narrative>
Achieved. The M&amp;E system was established, providing reliable data for decision-making, though inconsistent reporting and logistical challenges in remote areas limited its effectiveness.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of acute healthcare facilities with isolation capacity
</narrative></title>
<baseline year="2020" iso-date="2020-09-30" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-09-30" />
<period-end iso-date="2024-12-31" />
<target value="4.00">
<comment><narrative>
Achieved. The project constructed three new 4-bed isolation units at Helena Goldie Hospital (HGH), Good Samaritan Hospital (GSH), and Nila Area Health Centre, adding to the baseline of one at the National Referral Hospital (NRH), meeting the end target.
</narrative></comment>
</target>
<actual value="4">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of provincial hospitals renovated and refurbished with climate and disaster-resilient standards (SC2.1)
</narrative></title>
<baseline year="2020" iso-date="2020-10-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-30" />
<period-end iso-date="2024-12-31" />
<target value="6.00">
<comment><narrative>
Partially achieved. Hospital renovations, originally targeting six facilities, were reduced to three by the last year when the government confirmed the final scope of works and number of sites (Helena Goldie Hospital, Tulagi Hospital and at National Referral Hospital). This late clarification limited the team's ability to adjust targets earlier. While reducing the target during implementation was not formally pursued through restructuring—due to a focus on accelerating progress rather than revising the Results Framework—this adjustment enabled deeper, transformative investments in fewer facilities, significantly enhancing health infrastructure resilience.
</narrative></comment>
</target>
<actual value="3">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of acute healthcare facilities with triage capacity (SC2.1)
</narrative></title>
<baseline year="2020" iso-date="2020-09-30" value="10.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-09-30" />
<period-end iso-date="2024-12-31" />
<target value="80.00">
<comment><narrative>
Achieved. All five targeted facilities (NRH, GSH, Atoifi Hospital, HGH, Nila AHC) gained triage capacity, surpassing the target and improving emergency care access.
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T00:13:13" hierarchy="1"><iati-identifier>44000-P176548</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Second Solomon Islands Roads and Aviation Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To improve the climate resilience and safety of the Recipient's road and aviation sectors, and in case of an Eligible Crisis or Emergency, respond promptly and effectively to it.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The Second Solomon Islands Roads and Aviation Project (SIRAP2) was approved by the World Bank Board on June 1, 2022, with US$89.21 million equivalent IDA financing. A scale-up and cost overrun Additional Financing (AF1) for SIRAP2 was approved by the Management on February 21, 2025, with additional US$51.20 million IDA financing. The PDO of SIRAP2 is to “improve the climate resilience and safety of the Recipient's road and aviation sectors, and in case of an Eligible Crisis or Emergency, respond promptly and effectively to it”. The proposed second Additional Financing (AF2) for SIRAP2 is for scale-up investments for replacing the Fiu River Bridge and upgrading of section of the sealed road in Malaita Province as well as additional technical assistance to support the proposed AF2 activities. The proposed AF2 will also finance cost overruns from first Additional Financing activities.The PDO of SIRAP2 is expected to be achieved through the following four components:Component 1: Climate Resilience and Safety Investments in the Aviation Sector. This component finances the following activities: (a) improvements to Honiara International Airport in Guadalcanal Province, Munda International Airport in Western Province, Santa Cruz (Lata) Airfield in Temotu Province, and Suavanao Airfield in Isabel Province; (b) modernization of air navigation systems in Makira-Ulawa and Temotu Provinces; and (c) multiyear maintenance of critical mechanical and electrical assets at the two international airports.Component 2: Climate Resilience and Safety Investments in the Road Sector. This component finances climate resilience and safety improvements to 10 km of the road network in Noro in Western Province; the four bridges (Kolofe1, Kolofe2, Su’u Harbor, and Bira Brides) in Malaita Province, 12 km of North Road between Auki Gwaunaru’u Airfield and Kwaisulinin Road Junction, and 21 km of East Road between Baratoro and Atori in Malaita Province. The proposed AF2 will support to (i) replacing the Fiu River Bridge; and (ii) upgrading of 4.9 km of the sealed road between Auki Guwaunaru’u Airfield and Kilu’ufi Hospital Junction.Component 3: Institutional Strengthening and Project Management. This component finances technical assistance in the area of aviation planning, climate resilient transport, and road safety; and project implementation support in the form of a Project Support Team (PST). This component will also finance additional technical assistance activities (e.g., D&amp;S consultancy, project management) under the proposed AF2.Component 4: Contingent Emergency Response. This zero-dollar component is designed to provide swift response in the event of an Eligible Crisis or Emergency, by enabling SIG to request the World Bank to reallocate project funds to support emergency response and reconstruction.The proposed AF2, with an estimated total cost of US$38 million,  will be fully funded by IDA, and no other donor investments are envisaged.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SB–P0049041"><narrative>Solomon Islands</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SB-COA-0049042"><narrative>Ministry of Communication and Aviation</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2022-06-15"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2022-06-01"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2029-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2029-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Anita Shrestha</narrative></person-name><telephone>+1-202-473-1000</telephone><email>ashrestha@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>




<recipient-country code="SB" percentage="100"><narrative xml:lang="en">SOLOMON ISLANDS</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002106552" />
            <name><narrative>Malaita Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9 161</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002178750" />
            <name><narrative>Lata</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.725 165.79722</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006295679" />
            <name><narrative>Honiara-Henderson International Airport</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.428 160.05479</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006295681" />
            <name><narrative>Munda</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.32797 157.26309</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0009035073" />
            <name><narrative>Noro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.22274 157.19978</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="21050" percentage="41" xml:lang="en"/><sector vocabulary="1" code="21050" percentage="41" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="36" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="36" xml:lang="en"/><sector vocabulary="1" code="21021" percentage="9" xml:lang="en"/><sector vocabulary="1" code="21021" percentage="9" xml:lang="en"/><sector vocabulary="1" code="21022" percentage="6" xml:lang="en"/><sector vocabulary="1" code="21022" percentage="6" xml:lang="en"/><sector vocabulary="1" code="21023" percentage="4" xml:lang="en"/><sector vocabulary="1" code="21023" percentage="4" xml:lang="en"/><sector vocabulary="1" code="21024" percentage="4" xml:lang="en"/><sector vocabulary="1" code="21024" percentage="4" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TV" percentage="72.0000000" xml:lang="en"><narrative>FY17 - Aviation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TI" percentage="16.0000000" xml:lang="en"><narrative>FY17 - Rural and Inter-Urban Roads</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TF" percentage="12.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Transportation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="100" xml:lang="en"><narrative>Urban Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000074" percentage="28" xml:lang="en"><narrative>Road Safety</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="55" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000751" percentage="52" xml:lang="en"><narrative>Disaster Response and Recovery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000713" percentage="100" xml:lang="en"><narrative>Public Transport</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="40" xml:lang="en"><narrative>Finance for Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="100" xml:lang="en"><narrative>Urban Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="42" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="52" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000753" percentage="52" xml:lang="en"><narrative>Disaster Preparedness</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">172000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">172000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">172000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">172000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">172000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">293333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">293333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">293333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">293333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">293333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">293333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">293333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">293333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">293333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">293333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">293333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">293333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">743333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">743333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">743333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">743333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">743333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">743333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">743333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">743333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">743333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">743333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">743333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">743333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">1105000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">1105000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">1105000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">1105000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">1105000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">1105000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">1105000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">1105000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">1105000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">1105000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">1105000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">1105000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">1375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">1375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">1375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">1375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">1375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">1375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">1375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">1375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">1375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">1375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">1375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">1375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">1464166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">1464166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">1464166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">1464166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">1464166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">1464166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">1464166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">1464166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">1464166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">1464166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">1464166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">1464166.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">1512500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">1512500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">1512500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">1512500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">1512500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">1512500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">1512500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">1512500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">1512500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">1512500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">1512500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">1512500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">869166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">869166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">869166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">869166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">869166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">869166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">869166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">869166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">869166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">869166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">869166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">869166.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">172000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">172000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">172000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">172000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">67690000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">21520000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">19050000</value><description xml:lang="en"><narrative>Total Commitment in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">20920000</value><description xml:lang="en"><narrative>Total Commitment in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">11230000</value><description xml:lang="en"><narrative>Total Commitment in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">1471200</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">3666000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">3454273</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">68594</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">1555377</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">113564</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">285833</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">200262</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">333019</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">4475063</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">42588</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">409599</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">4504257</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">25384</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">223886</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">474099</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">5523476</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">398245</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">90183</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">223886</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">136979</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">116207</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">5163991</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">1140192</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">1527623</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">265201</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">75626</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">947692</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">7215789</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">3402166</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">447456</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">1941940</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">74348</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">223806</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">4986925</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">317600</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">3585965</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">2609470</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">1084680</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">347187</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">3739534</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">98438</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">341013</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">734400</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">370093</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">3200058</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">511373</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">5340716</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">350485</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">3672877</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">2358623</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">1196351</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">581944</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">739839</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">435738</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">1115100</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">641567</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">2588212</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">2432255</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-5048</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-26695</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-47855</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-83361</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-142066</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-198546</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-248789</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49042"><narrative>Ministry of Communication and Aviation; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P176548"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P176548?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P176548"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National Airports Development Plan prepared
</narrative></title>
<baseline year="2022" iso-date="2022-01-25" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-25" />
<period-end iso-date="2029-06-24" />
<target value="Yes">
<comment><narrative>
In the past, MCA noted the need to prepare a National Aviation Development Plan, and more recently, it advised at the NSC in February 2025, that a consultant was hired to draft a high-level report that will identify the mission gaps. This activity is pending and requires MCA's advice on the next steps.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads with climate resilience and safety measures constructed and in use
</narrative></title>
<baseline year="2022" iso-date="2022-01-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-09" />
<period-end iso-date="2029-06-08" />
<target value="43">
<comment><narrative>
The construction of the Noro Roads is expected to be completed by December 28, 2025. For the Malaita Roads Improvement investments under the AF, detailed design is underway, and works are expected to be completed by mid-2027.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-01-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-01-10" />
<period-end iso-date="2029-06-10" />
<target value="385,100">
<comment><narrative>
The end target of 385,150 is set by aggregating people using air and road infrastructure.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National Airports Development Plan prepared
</narrative></title>
<baseline year="2022" iso-date="2022-01-25" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-25" />
<period-end iso-date="2029-06-24" />
<target value="Yes">
<comment><narrative>
In the past, MCA noted the need to prepare a National Aviation Development Plan, and more recently, it advised at the NSC in February 2025, that a consultant was hired to draft a high-level report that will identify potential gaps.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Road network criticality and vulnerability assessments and sustainable road financing strategy completed and in use
</narrative></title>
<baseline year="2022" iso-date="2022-01-25" value="Road network criticality and vulnerability assessments done for Guadalcanal and Malaita under RTSIDS"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-25" />
<period-end iso-date="2029-06-24" />
<target value="Road network criticality and vulnerability assessments and sustainable transport financing strategy used to inform future investments">
<comment><narrative>
During discussions in February 2025 between WB/MID/PST, MID provided confirmation to move to other software that is easier to use and amend. Following the EOI evaluation, the RFP was issued on July 25, 2025 and closed on September 18, 2025. The technical evaluation was completed on November 20, 2025, followed by the opening of the financial proposals on December 5, 2025.
</narrative></comment>
</target>
<actual value="Road network criticality and vulnerability assessments done for Guadalcanal and Malaita under RTSIDS">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-01-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-01-10" />
<period-end iso-date="2029-06-10" />
<target value="385,100">
<comment><narrative>
The end target of 385,150 is set by aggregating people using air and road infrastructure. 216,800 = Actual (Current) value for 3.3 + Actual (Current) value for 3.4 = 205,800 + 11,000. The End Target is expected to be achieved.
</narrative></comment>
</target>
<actual value="21,6800">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Airport or airfield runways with climate resilience and safety measures constructed and in use
</narrative></title>
<baseline year="2021" iso-date="2021-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-30" />
<period-end iso-date="2029-05-30" />
<target value="3.00">
<comment><narrative>
The contract for Honiara Runway Resurfacing and Airfield Ground Lighting (AGL) was completed on March 31, 2025, and the upgraded runway and AGL are in use. The contract for Santa Cruz (Lata) Airfield Runway Pavement is expected to be completed by April 27, 2026. For the Suavanao Airfield infrastructure investment under the AF, the RFB was issued on December 5, 2025, and the works are expected to be completed by the end of Q1 2028.
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Roads rehabilitated, which are equipped with gender responsive road safety infrastructure
</narrative></title>
<baseline year="2022" iso-date="2022-01-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-25" />
<period-end iso-date="2029-06-24" />
<target value="100.00">
<comment><narrative>
The construction of the Noro Roads is expected to be completed by October 29, 2025. The Malaita North and East Roads investments were added through the AF, which declared effective on March 3, 2025.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Consultancy for detailed design and supervision of building and civil works provided
</narrative></title>
<baseline year="2022" iso-date="2022-01-25" value="No contract with the consulting firm in place"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-25" />
<period-end iso-date="2029-06-24" />
<target value="Supervision of building and civil works completed with Defect Liability Period completed">
<comment><narrative>
The contract with the SIRAP2 D&amp;S consultant was executed on March 21, 2023. The design reports for all the key infrastructure investments under the original scope of SIRAP2 have been accepted, with the construction supervision of the Honiara Airport runway resurfacing, perimeter fence, standby generators, Noro Roads improvement, Santa Cruz Airfield upgrading, Malaita Bridges improvement, Honiara Airport rescue fire services station, Honiara and Munda Airports ATC tower, and Honiara Airport aviation complex building underway. The AF D&amp;SS Phase I (Design) &amp; II (Procurement Support) Effective Date is May 16, 2025 and services will continue through to February 15, 2026. The final Inception Report was issued on July 22, 2025, and the final Suavanao Airfield Design Review Report was issued on September 10, 2025. The AF D&amp;SS Phase III (Construction Supervision) is expected to start in Q1 2026.
</narrative></comment>
</target>
<actual value="The Design Reports for all the key infrastructure investments accepted, with the construction supervision of the Honiara Airport, Munda Airport, Santa Cruz Airfield, Noro Roads, and Malaita Bridges works underway.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-01-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-01-10" />
<period-end iso-date="2029-06-10" />
<target value="385,100">
<comment><narrative>
The end target of 385,150 is set by aggregating people using air and road infrastructure.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-01-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-01-10" />
<period-end iso-date="2029-06-10" />
<target value="385,100">
<comment><narrative>
The end target of 385,150 is set by aggregating people using air and road infrastructure. 216,800 = Actual (Current) value for 3.3 + Actual (Current) value for 3.4 = 205,800 + 11,000. The End Target is expected to be achieved.
</narrative></comment>
</target>
<actual value="21,6800">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-01-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-01-10" />
<period-end iso-date="2029-06-10" />
<target value="385,100">
<comment><narrative>
The end target of 385,150 is set by aggregating people using air and road infrastructure. 301,000 = Actual (Current) value for 3.3 + Actual (Current) value for 3.4 = 214,900 + 86,100. 
The End Target is expected to be achieved.
</narrative></comment>
</target>
<actual value="30,1000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2025" iso-date="2025-01-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-01-14" />
<period-end iso-date="2029-06-14" />
<target value="385,100">
<comment><narrative>
The end target of 385,150 is set by aggregating people using climate resilient air and road infrastructure.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2025" iso-date="2025-01-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-01-14" />
<period-end iso-date="2029-06-14" />
<target value="385,100">
<comment><narrative>
The end target of 385,150 is set by aggregating people using climate resilient air and road infrastructure. 216,800 = Actual (Current) value for 3.3 + Actual (Current) value for 3.4 = 205,800 + 11,000. The End Target is expected to be achieved.
</narrative></comment>
</target>
<actual value="21,6800">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2025" iso-date="2025-01-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-01-14" />
<period-end iso-date="2029-06-14" />
<target value="385,100">
<comment><narrative>
The end target of 385,150 is set by aggregating people using climate resilient air and road infrastructure. 301,000 = Actual (Current) value for 3.3 + Actual (Current) value for 3.4 = 214,900 + 86,100. The End Target is expected to be achieved.
</narrative></comment>
</target>
<actual value="30,1000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Enhanced climate resilience and operational safety at regional airports under preventative and corrective airport maintenance program for airport equipment and facilities
</narrative></title>
<baseline year="2022" iso-date="2022-01-09" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-09" />
<period-end iso-date="2029-06-08" />
<target value="Yes">
<comment><narrative>
The Request for Proposals was issued on May 30, 2025, and closed on June 27, 2025.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Bridges with climate resilience and safety measures constructed and in use
</narrative></title>
<baseline year="2022" iso-date="2022-01-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-14" />
<period-end iso-date="2029-06-13" />
<target value="4.00">
<comment><narrative>
The construction of Kolofe1 and Kolofe2 Bridges on North Road and Su'u Harbor and Bira Bridges on South Road in Malaita Province is expected to be completed by March 8, 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Bridges with climate resilience and safety measures constructed and in use
</narrative></title>
<baseline year="2022" iso-date="2022-01-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-14" />
<period-end iso-date="2029-06-13" />
<target value="4.00">
<comment><narrative>
The construction of Kolofe1 and Kolofe2 Bridges on North Road and Su'u Harbor and Bira Bridges on South Road in Malaita Province is expected to be completed by March 8, 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Bridges with climate resilience and safety measures constructed and in use
</narrative></title>
<baseline year="2022" iso-date="2022-01-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-14" />
<period-end iso-date="2029-06-13" />
<target value="4.00">
<comment><narrative>
The construction of Kolofe1 and Kolofe2 Bridges on North Road and Su'u Harbor and Bira Bridges on South Road in Malaita Province completed and opening ceremonies were held on March 31 and April 1, 2026.
</narrative></comment>
</target>
<actual value="4">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads with climate resilience and safety measures constructed and in use
</narrative></title>
<baseline year="2022" iso-date="2022-01-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-09" />
<period-end iso-date="2029-06-08" />
<target value="43">
<comment><narrative>
The construction of the Noro Roads is expected to be completed by December 28, 2025. For the Malaita Roads Improvement investments under the AF, detailed design is underway, and works are expected to be completed by mid-2027.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads with climate resilience and safety measures constructed and in use
</narrative></title>
<baseline year="2022" iso-date="2022-01-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-09" />
<period-end iso-date="2029-06-08" />
<target value="43">
<comment><narrative>
The construction of the Noro Roads is expected to be completed by January 27, 2026. For the Malaita Roads Improvement investments under the AF, detailed design is underway, and works are expected to be completed by end-2027.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads with climate resilience and safety measures constructed and in use
</narrative></title>
<baseline year="2022" iso-date="2022-01-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-09" />
<period-end iso-date="2029-06-08" />
<target value="43">
<comment><narrative>
The construction of the Noro Roads is completed and opening ceremony held on February 13, 2026. For the Malaita Roads Improvement investments under the AF, the notifications for contract award sent on June 5, 2026, and the contracts are expected to be signed by end of June 2026. The works are expected to be completed by end-2027.
</narrative></comment>
</target>
<actual value="10">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Airport or airfield runways with climate resilience and safety measures constructed and in use
</narrative></title>
<baseline year="2021" iso-date="2021-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-30" />
<period-end iso-date="2029-05-30" />
<target value="3.00">
<comment><narrative>
The contract for Honiara Runway Resurfacing and Airfield Ground Lighting (AGL) was completed on March 31, 2025, and the upgraded runway and AGL are in use. The contract for Santa Cruz (Lata) Airfield Runway Pavement is expected to be completed by April 27, 2026. For the Suavanao Airfield infrastructure investment under the AF, detailed design is underway, and works are expected to be completed by Q4 2027.
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Airport or airfield runways with climate resilience and safety measures constructed and in use
</narrative></title>
<baseline year="2021" iso-date="2021-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-30" />
<period-end iso-date="2029-05-30" />
<target value="3.00">
<comment><narrative>
The contract for Honiara Runway Resurfacing and Airfield Ground Lighting (AGL) was completed on March 31, 2025, and the upgraded runway and AGL are in use. The contract for Santa Cruz (Lata) Airfield Runway Pavement is expected to be completed by April 27, 2026. For the Suavanao Airfield infrastructure investment under the AF, the RFB was issued on December 5, 2025, and the works are expected to be completed by the end of Q1 2028.
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Airport or airfield runways with climate resilience and safety measures constructed and in use
</narrative></title>
<baseline year="2021" iso-date="2021-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-30" />
<period-end iso-date="2029-05-30" />
<target value="3.00">
<comment><narrative>
The contract for Honiara Runway Resurfacing and Airfield Ground Lighting (AGL) was completed on March 31, 2025, and the upgraded runway and AGL are in use. 

The Taking Over Certificate for the Santa Cruz (Lata) Airfield runway pavement and airfield ground lighting was issued on May 28, 2026, with the completion date of February 20, 2026. For the Suavanao Airfield infrastructure investment under the AF, the contract is expected to be awarded by Q4 2026 and the works completed by the end of Q3 2028.
</narrative></comment>
</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Modernization of air traffic and aviation safety management
</narrative></title>
<baseline year="2022" iso-date="2022-01-09" value="No ADS-B"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-09" />
<period-end iso-date="2029-06-08" />
<target value="ADS-B Ground Stations in Temotu and Makira-Ulawa Provines and CRV at Honiara Airport operational">
<comment><narrative>
For ADS-B ground stations, the contract was signed on September 24, 2024. The goods arrived at Honiara International Port on April 23, 2025 and delivered to storage site in Honiara on May 2, 2025. Packages for Lata, Temotu Province was delivered on-site on June 30, 2025, while those for Kirakira, Makira Province was delivered on-site on August 3, 2025. The forecasted completion date is November 30, 2025. The procurement of Common Regional Virtual Private Network (CRV) for Honiara Airport is underway.
</narrative></comment>
</target>
<actual value="No ADS-B Ground Stations in Temotu and Makira-Ulawa Provinces or CRV at Honiara Airport">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Modernization of air traffic and aviation safety management
</narrative></title>
<baseline year="2022" iso-date="2022-01-09" value="No ADS-B"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-09" />
<period-end iso-date="2029-06-08" />
<target value="ADS-B Ground Stations in Temotu and Makira-Ulawa Provines and CRV at Honiara Airport operational">
<comment><narrative>
For ADS-B ground stations, the contract was signed on September 24, 2024. The goods arrived at Honiara International Port on April 23, 2025 and delivered to storage site in Honiara on May 2, 2025. Packages for Lata, Temotu Province were delivered on-site on June 30, 2025, while those for Kirakira, Makira Province were delivered on-site on August 3, 2025. The procurement of Common Regional Virtual Private Network (CRV) for Honiara Airport is underway.
</narrative></comment>
</target>
<actual value="No ADS-B Ground Stations in Temotu and Makira-Ulawa Provinces or CRV at Honiara Airport">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Modernization of air traffic and aviation safety management
</narrative></title>
<baseline year="2022" iso-date="2022-01-09" value="No ADS-B"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-09" />
<period-end iso-date="2029-06-08" />
<target value="ADS-B Ground Stations in Temotu and Makira-Ulawa Provines and CRV at Honiara Airport operational">
<comment><narrative>
For ADS-B ground stations, the contract was signed on September 24, 2024. The goods arrived at Honiara International Port on April 23, 2025 and delivered to storage site in Honiara on May 2, 2025. Packages for Lata, Temotu Province were delivered on-site on June 30, 2025, while those for Kirakira, Makira Province were delivered on-site on August 3, 2025. The contract for Common Regional Virtual Private Network (CRV) for Honiara Airport is signed on May 28, 2026 for 31 months.
</narrative></comment>
</target>
<actual value="No ADS-B Ground Stations in Temotu and Makira-Ulawa Provinces or CRV at Honiara Airport">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Enhanced climate resilience and operational safety at regional airports under preventative and corrective airport maintenance program for airport equipment and facilities
</narrative></title>
<baseline year="2022" iso-date="2022-01-09" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-09" />
<period-end iso-date="2029-06-08" />
<target value="Yes">
<comment><narrative>
The Request for Proposals was issued on May 30, 2025, and closed on June 27, 2025.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Enhanced climate resilience and operational safety at regional airports under preventative and corrective airport maintenance program for airport equipment and facilities
</narrative></title>
<baseline year="2022" iso-date="2022-01-09" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-09" />
<period-end iso-date="2029-06-08" />
<target value="Yes">
<comment><narrative>
The contract was signed on November 19, 2025, for 36 months.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Enhanced climate resilience and operational safety at regional airports under preventative and corrective airport maintenance program for airport equipment and facilities
</narrative></title>
<baseline year="2022" iso-date="2022-01-09" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-09" />
<period-end iso-date="2029-06-08" />
<target value="Yes">
<comment><narrative>
The contract was signed on November 19, 2025, for 36 months.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Honiara Airport rescue fire service vehicle station constructed and code of conduct established
</narrative></title>
<baseline year="2022" iso-date="2022-01-25" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-25" />
<period-end iso-date="2029-06-24" />
<target value="Yes">
<comment><narrative>
The construction of the Honiara Airport Rescue Fire Services Station was completed, and the opening ceremony was held on April 24, 2026. On May 29, 2026, the Rescue Fire Services crew relocated from their previous location to the new station and established the code of conduct.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Consultancy for detailed design and supervision of building and civil works provided
</narrative></title>
<baseline year="2022" iso-date="2022-01-25" value="No contract with the consulting firm in place"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-25" />
<period-end iso-date="2029-06-24" />
<target value="Supervision of building and civil works completed with Defect Liability Period completed">
<comment><narrative>
The contract with the SIRAP2 D&amp;S consultant was executed on March 21, 2023. The design reports for all the key infrastructure investments under the original scope of SIRAP2 have been accepted, with the construction supervision of the Honiara Airport runway resurfacing, perimeter fence, standby generators, Noro Roads improvement, Santa Cruz Airfield upgrading, Malaita Bridges improvement, Honiara Airport rescue fire services station, Honiara and Munda Airports ATC tower, and Honiara Airport aviation complex building underway. The AF D&amp;SS Phase I (Design) &amp; II (Procurement Support) Effective Date is May 16, 2025 and services will continue through to May 14, 2026. The AF D&amp;SS Phase III (Construction Supervision) is expected to start in Q2 2026.
</narrative></comment>
</target>
<actual value="The Design Reports for all the key infrastructure investments accepted, with the construction supervision of the Honiara Airport, Munda Airport, Santa Cruz Airfield, Noro Roads, and Malaita Bridges works underway.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Honiara Airport Automated Weather Observation System (AWOS) installed and operational
</narrative></title>
<baseline year="2022" iso-date="2022-01-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-30" />
<period-end iso-date="2029-06-29" />
<target value="Yes">
<comment><narrative>
This commissioning is expected to be completed by July 6, 2026.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National Airports Development Plan prepared
</narrative></title>
<baseline year="2022" iso-date="2022-01-25" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-25" />
<period-end iso-date="2029-06-24" />
<target value="Yes">
<comment><narrative>
The Bank team assisted in drafting the terms of reference (TOR) for an Integrated Aviation Sector and Airport Development Master Plan at MCA's request. The MCA, SIACL and CAASI reviewed the draft TOR and provided comments. The expanded scope of this TA is expected to increase both costs and the time required for preparation. Given the cost overruns in other project activities, this activity is proposed to be dropped from the project.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Honiara and Munda Airports air traffic control (ATC) towers constructed and operational
</narrative></title>
<baseline year="2022" iso-date="2022-01-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-25" />
<period-end iso-date="2029-06-24" />
<target value="2.00">
<comment><narrative>
The construction is expected to be completed by July 6, 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Successful implementation of agreed training plan for MCA, CAASI, SIACL, and Solomon Airlines
</narrative></title>
<baseline year="2022" iso-date="2022-01-09" value="No training"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-09" />
<period-end iso-date="2029-06-09" />
<target value="Training plan completed">
<comment><narrative>
Training plan was prepared for MCA, SIACL, CAASI, and Solomon Airlines through the training needs assessment under SIRAP. In Q1 2026, one from CAASI participated in Advanced Project Management Workshop in Brisbane; eight from SIACL participated in Finance System Implementation &amp; Transition Training in Honiara; one from MCA participated in Directorship Program, Solomon Islands Chamber of Commerce and Industry in Honiara; and one from Solomon Airlines participated in PT6 Series Hot Section Inspection in Sunshine Coast.
</narrative></comment>
</target>
<actual value="Training commenced.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regional Airport Asset Maintenance Contract in place
</narrative></title>
<baseline year="2022" iso-date="2022-01-25" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-25" />
<period-end iso-date="2029-06-24" />
<target value="Yes">
<comment><narrative>
The contract was signed on November 19, 2025, for 36 months.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women employed in technical or management positions within MCA
</narrative></title>
<baseline year="2022" iso-date="2022-01-25" value="20.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-25" />
<period-end iso-date="2029-06-24" />
<target value="40.00">
<comment><narrative>
19% (= 9/47 x 100%) where 9 = number of women employed in technical or management positions within MCA, and 47 = the total number of staff employed within MCA. The percentage of women employed within MCA is 36% (=17/47 x 100%) where 17 = number of women employed within MCA.
</narrative></comment>
</target>
<actual value="19">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Road upgraded using participatory design approaches
</narrative></title>
<baseline year="2022" iso-date="2022-01-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-25" />
<period-end iso-date="2029-06-24" />
<target value="43">
<comment><narrative>
For Noro Roads, the official handover and opening ceremony was held on February 13, 2026. For the Malaita Roads Improvement investments under the AF, works are expected to be completed by end-2027.
</narrative></comment>
</target>
<actual value="10">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Road safety audits completed
</narrative></title>
<baseline year="2022" iso-date="2022-01-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-25" />
<period-end iso-date="2029-06-24" />
<target value="2.00">
<comment><narrative>
A contract was signed for Road Safety Audits on May 24, 2023. The Road Safety Auditor was in Solomon Islands from Oct 4-11, 2023 and undertook a design stage road safety audit of the Noro Roads on Oct 6, 2023. He submitted the design stage road safety audit report on Oct 11, 2023. Letter of Variation#2 for additional services for AF activities and the Malaita Bridges was approved on July 31, 2025 and extending the completion date to Dec 1, 2026. The design stage road safety audit report of improvements on North and East Roads was also issued on Dec 5, 2025. Pre-Opening Road Safety Audit for Noro Road was undertaken through a joint inspection with Engineer, PST, MID and the Contractor on Jan 29, 2026. Project Completion Report for Noro Roads was submitted on Feb 19, 2026. For Malaita Bridges Improvement, a Pre-Opening Road Safety Audit was undertaken through a joint inspection with Engineer, PST, MID and the Contractor on Jan 26-27,2026, with the associate report submitted on Feb 18, 26
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Roads rehabilitated, which are equipped with gender responsive road safety infrastructure
</narrative></title>
<baseline year="2022" iso-date="2022-01-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-25" />
<period-end iso-date="2029-06-24" />
<target value="100.00">
<comment><narrative>
The construction of the Noro Roads is completed and the official handover &amp; opening ceremony was held on February 13, 2026. 23  is the percentage of the 10km of Noro Roads out of the total 43km (23 = 10/43). 

For the Malaita Roads Improvement investments under the AF, separate notifications for contract award for East Road and North Road were sent on June 5, 2026. The contracts are expected to signed by end of June 2026 and the works are expected to be completed by end-2027.
</narrative></comment>
</target>
<actual value="23">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Road network criticality and vulnerability assessments and sustainable road financing strategy completed and in use
</narrative></title>
<baseline year="2022" iso-date="2022-01-25" value="Road network criticality and vulnerability assessments done for Guadalcanal and Malaita under RTSIDS"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-25" />
<period-end iso-date="2029-06-24" />
<target value="Road network criticality and vulnerability assessments and sustainable transport financing strategy used to inform future investments">
<comment><narrative>
During discussions in February 2025 between WB/MID/PST, MID provided confirmation to move to other software that is easier to use and amend. Following the EOI evaluation, the RFP was issued on July 25, 2025 and closed on September 18, 2025. The contract was awarded on February 6, 2026. Services are continuing and the consultancy will run through to February 6, 2028.
</narrative></comment>
</target>
<actual value="Road network criticality and vulnerability assessments done for Guadalcanal and Malaita under RTSIDS">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievance registered related to delivery of project benefits that are addressed
</narrative></title>
<baseline year="2022" iso-date="2022-01-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-25" />
<period-end iso-date="2029-06-24" />
<target value="75.00">
<comment><narrative>
80% is 16/20 x 100% where 16 = number of addressed grievances concerning delivery of project benefits and 20 = the total number of grievances recorded under SIRAP2.

[Note: The “Actual (Previous)” value of 94% was incorrectly reported in the Q3 Quarterly Progress Report (QPR) as the calculation was based on complaints, whereas it should be calculated on grievances.]
</narrative></comment>
</target>
<actual value="80">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Honiara Airport rescue fire service vehicle station constructed and code of conduct established
</narrative></title>
<baseline year="2022" iso-date="2022-01-25" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-25" />
<period-end iso-date="2029-06-24" />
<target value="Yes">
<comment><narrative>
The construction is expected to be completed by December 15, 2025.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Successful implementation of agreed training plan for MCA, CAASI, SIACL, and Solomon Airlines
</narrative></title>
<baseline year="2022" iso-date="2022-01-09" value="No training"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-09" />
<period-end iso-date="2029-06-09" />
<target value="Training plan completed">
<comment><narrative>
Training plan was prepared for MCA, SIACL, CAASI, and Solomon Airlines through the training needs assessment under SIRAP. Based on the training needs assessment and the discussion with Solomon Airlines, it was agreed to use SIRAP2 funds to deliver Dash 8 type rating training course for their eight engineering staff. Web-based theorical training was provided from September 2-20, 2024, and the on-site practical training was provided in Honiara from September 23 to October 11, 2024. This enabled them to progress to licensed aircraft maintenance engineers who can sign off the aircraft after maintenance, and thus, can improve reliability of aircraft operations. Further training is currently being arranged (and undertaken) in consultation with MCA, SIACL, CAASI and Solomon Airlines.
</narrative></comment>
</target>
<actual value="Training commenced.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2025" iso-date="2025-01-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-01-14" />
<period-end iso-date="2029-06-14" />
<target value="385,100">
<comment><narrative>
The end target of 385,150 is set by aggregating people using climate resilient air and road infrastructure. 216,800 = Actual (Current) value for 3.3 + Actual (Current) value for 3.4 = 205,800 + 11,000. The End Target is expected to be achieved.
</narrative></comment>
</target>
<actual value="21,6800">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Modernization of air traffic and aviation safety management
</narrative></title>
<baseline year="2022" iso-date="2022-01-09" value="No ADS-B"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-09" />
<period-end iso-date="2029-06-08" />
<target value="ADS-B Ground Stations in Temotu and Makira-Ulawa Provines and CRV at Honiara Airport operational">
<comment><narrative>
For ADS-B ground stations, the contract was signed on September 24, 2024. The goods arrived at Honiara International Port on April 23, 2025 and delivered to storage site in Honiara on May 2, 2025. Packages for Lata, Temotu Province was delivered on-site on June 30, 2025, while those for Kirakira, Makira Province was delivered on-site on August 3, 2025. The forecasted completion date is November 30, 2025. The procurement of Common Regional Virtual Private Network (CRV) for Honiara Airport is underway.
</narrative></comment>
</target>
<actual value="No ADS-B Ground Stations in Temotu and Makira-Ulawa Provinces or CRV at Honiara Airport">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Successful implementation of agreed training plan for MCA, CAASI, SIACL, and Solomon Airlines
</narrative></title>
<baseline year="2022" iso-date="2022-01-09" value="No training"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-09" />
<period-end iso-date="2029-06-09" />
<target value="Training plan completed">
<comment><narrative>
Training plan was prepared for MCA, SIACL, CAASI, and Solomon Airlines through the training needs assessment under SIRAP. Dash 8 type rating training course for Solomon Airlines eight engineering staff was provided from September to October 2024. In Q3 2025, the following training has been organized for (CAASI): Singapore Aviation Academy, Civil Aviation Authority of Singapore: Safety Management System Implementation; and for SIACL: Taiga Advisory Pty Limited: Financial Management and Administrative Functions, and Regional Airports Consulting Pty Ltd ATF: Safety Management System.
</narrative></comment>
</target>
<actual value="Training commenced.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regional Airport Asset Maintenance Contract in place
</narrative></title>
<baseline year="2022" iso-date="2022-01-25" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-25" />
<period-end iso-date="2029-06-24" />
<target value="Yes">
<comment><narrative>
The Request for Proposals was issued on May 30, 2025, and closed on June 27, 2025.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Roads rehabilitated, which are equipped with gender responsive road safety infrastructure
</narrative></title>
<baseline year="2022" iso-date="2022-01-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-25" />
<period-end iso-date="2029-06-24" />
<target value="100.00">
<comment><narrative>
The construction of the Noro Roads is expected to be completed by January 27, 2026. For the Malaita Roads Improvement investments under the AF, detailed design is being finalized, and works are expected to be completed by end-2027.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads with climate resilience and safety measures constructed and in use
</narrative></title>
<baseline year="2022" iso-date="2022-01-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-09" />
<period-end iso-date="2029-06-08" />
<target value="43">
<comment><narrative>
The construction of the Noro Roads is expected to be completed by January 27, 2026. For the Malaita Roads Improvement investments under the AF, detailed design is underway, and works are expected to be completed by end-2027.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Honiara Airport Automated Weather Observation System (AWOS) installed and operational
</narrative></title>
<baseline year="2022" iso-date="2022-01-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-30" />
<period-end iso-date="2029-06-29" />
<target value="Yes">
<comment><narrative>
This commissioning is expected to be completed by July 6, 2026.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Enhanced climate resilience and operational safety at regional airports under preventative and corrective airport maintenance program for airport equipment and facilities
</narrative></title>
<baseline year="2022" iso-date="2022-01-09" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-09" />
<period-end iso-date="2029-06-08" />
<target value="Yes">
<comment><narrative>
The contract was signed on November 19, 2025, for 36 months.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Honiara Airport rescue fire service vehicle station constructed and code of conduct established
</narrative></title>
<baseline year="2022" iso-date="2022-01-25" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-25" />
<period-end iso-date="2029-06-24" />
<target value="Yes">
<comment><narrative>
The construction is expected to be completed by March 2, 2026.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women employed in technical or management positions within MCA
</narrative></title>
<baseline year="2022" iso-date="2022-01-25" value="20.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-25" />
<period-end iso-date="2029-06-24" />
<target value="40.00">
<comment><narrative>
31% = 11/36 x 100% where 11 = number of women employed in technical or management positions within MCA, and 36 = the total number of staff employed within MCA. The percentage of women employed within MCA = 44% (16/36 x 100%).
</narrative></comment>
</target>
<actual value="29">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Road safety audits completed
</narrative></title>
<baseline year="2022" iso-date="2022-01-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-25" />
<period-end iso-date="2029-06-24" />
<target value="2.00">
<comment><narrative>
A contract was signed for Road Safety Audits on May 24, 2023. The Road Safety Auditor was in Solomon Islands from October 4-11, 2023 and undertook a design stage road safety audit of the Noro Roads on October 6, 2023. He submitted the design stage road safety audit report on October 11, 2023. The timing of the pre-handing-over audit is expected in Q4 2025.
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women employed in technical or management positions within MCA
</narrative></title>
<baseline year="2022" iso-date="2022-01-25" value="20.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-25" />
<period-end iso-date="2029-06-24" />
<target value="40.00">
<comment><narrative>
21% = 9/43 x 100% where 9 = number of women employed in technical or management positions within MCA, and 43 = the total number of staff employed within MCA. The percentage of women employed within MCA = 37% (16/43 x 100%).
</narrative></comment>
</target>
<actual value="21">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Road upgraded using participatory design approaches
</narrative></title>
<baseline year="2022" iso-date="2022-01-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-25" />
<period-end iso-date="2029-06-24" />
<target value="43">
<comment><narrative>
For Noro Roads, the official Commencement Date is April 30, 2024 and the forecasted completion date is December 28, 2025. For the Malaita Roads Improvement investments under the AF, works are expected to be completed by mid-2027.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Bridges with climate resilience and safety measures constructed and in use
</narrative></title>
<baseline year="2022" iso-date="2022-01-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-14" />
<period-end iso-date="2029-06-13" />
<target value="4.00">
<comment><narrative>
The construction of Kolofe1 and Kolofe2 Bridges on North Road and Su'u Harbor and Bira Bridges on South Road in Malaita Province is expected to be completed by March 8, 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Bridges with climate resilience and safety measures constructed and in use
</narrative></title>
<baseline year="2022" iso-date="2022-01-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-14" />
<period-end iso-date="2029-06-13" />
<target value="4.00">
<comment><narrative>
The construction of Kolofe1 and Kolofe2 Bridges on North Road and Su'u Harbor and Bira Bridges on South Road in Malaita Province is expected to be completed by March 8, 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Road safety audits completed
</narrative></title>
<baseline year="2022" iso-date="2022-01-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-25" />
<period-end iso-date="2029-06-24" />
<target value="2.00">
<comment><narrative>
A contract was signed for Road Safety Audits on May 24, 2023. The Road Safety Auditor was in Solomon Islands from October 4-11, 2023 and undertook a design stage road safety audit of the Noro Roads on October 6, 2023. He submitted the design stage road safety audit report on October 11, 2023. Letter of Variation#2 for additional services for AF activities and the Malaita Bridges was approved on July 31, 2025 and extending the completion date to December 1, 2026. The design stage road safety audit report of improvements on North and East Roads was also issued on December 5, 2025.
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Airport or airfield runways with climate resilience and safety measures constructed and in use
</narrative></title>
<baseline year="2021" iso-date="2021-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-30" />
<period-end iso-date="2029-05-30" />
<target value="3.00">
<comment><narrative>
The contract for Honiara Runway Resurfacing and Airfield Ground Lighting (AGL) was completed on March 31, 2025, and the upgraded runway and AGL are in use. The contract for Santa Cruz (Lata) Airfield Runway Pavement is expected to be completed by April 27, 2026. For the Suavanao Airfield infrastructure investment under the AF, detailed design is underway, and works are expected to be completed by Q4 2027.
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2025" iso-date="2025-01-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-01-14" />
<period-end iso-date="2029-06-14" />
<target value="385,100">
<comment><narrative>
The end target of 385,150 is set by aggregating people using climate resilient air and road infrastructure.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Modernization of air traffic and aviation safety management
</narrative></title>
<baseline year="2022" iso-date="2022-01-09" value="No ADS-B"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-09" />
<period-end iso-date="2029-06-08" />
<target value="ADS-B Ground Stations in Temotu and Makira-Ulawa Provines and CRV at Honiara Airport operational">
<comment><narrative>
For ADS-B ground stations, the contract was signed on September 24, 2024. The goods arrived at Honiara International Port on April 23, 2025 and delivered to storage site in Honiara on May 2, 2025. Packages for Lata, Temotu Province were delivered on-site on June 30, 2025, while those for Kirakira, Makira Province were delivered on-site on August 3, 2025. The procurement of Common Regional Virtual Private Network (CRV) for Honiara Airport is underway.
</narrative></comment>
</target>
<actual value="No ADS-B Ground Stations in Temotu and Makira-Ulawa Provinces or CRV at Honiara Airport">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Honiara and Munda Airports air traffic control (ATC) towers constructed and operational
</narrative></title>
<baseline year="2022" iso-date="2022-01-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-25" />
<period-end iso-date="2029-06-24" />
<target value="2.00">
<comment><narrative>
The construction is expected to be completed by July 6, 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Honiara and Munda Airports air traffic control (ATC) towers constructed and operational
</narrative></title>
<baseline year="2022" iso-date="2022-01-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-25" />
<period-end iso-date="2029-06-24" />
<target value="2.00">
<comment><narrative>
The construction is expected to be completed by July 6, 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Road network criticality and vulnerability assessments and sustainable road financing strategy completed and in use
</narrative></title>
<baseline year="2022" iso-date="2022-01-25" value="Road network criticality and vulnerability assessments done for Guadalcanal and Malaita under RTSIDS"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-25" />
<period-end iso-date="2029-06-24" />
<target value="Road network criticality and vulnerability assessments and sustainable transport financing strategy used to inform future investments">
<comment><narrative>
During discussions in February 2025 between WB/MID/PST, MID provided confirmation to move to other software that is easier to use and amend. Following the EOI evaluation, the RFP was issued on July 25, 2025.
</narrative></comment>
</target>
<actual value="Road network criticality and vulnerability assessments done for Guadalcanal and Malaita under RTSIDS">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievance registered related to delivery of project benefits that are addressed
</narrative></title>
<baseline year="2022" iso-date="2022-01-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-25" />
<period-end iso-date="2029-06-24" />
<target value="75.00">
<comment><narrative>
98% = 126/128 x 100% where 126 = the number of addressed grievances concerning delivery of project benefits and 128 = the total number of grievances recorded under SIRAP2.
</narrative></comment>
</target>
<actual value="98">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievance registered related to delivery of project benefits that are addressed
</narrative></title>
<baseline year="2022" iso-date="2022-01-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-25" />
<period-end iso-date="2029-06-24" />
<target value="75.00">
<comment><narrative>
94% = 148/158 x 100% where 148 = the number of addressed grievances concerning delivery of project benefits and 158 = the total number of grievances recorded under SIRAP2.
</narrative></comment>
</target>
<actual value="94">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Consultancy for detailed design and supervision of building and civil works provided
</narrative></title>
<baseline year="2022" iso-date="2022-01-25" value="No contract with the consulting firm in place"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-25" />
<period-end iso-date="2029-06-24" />
<target value="Supervision of building and civil works completed with Defect Liability Period completed">
<comment><narrative>
The contract with the SIRAP2 D&amp;S consultant was executed on March 21, 2023. The design reports for all the key infrastructure investments under the original scope of SIRAP2 have been accepted, with the construction supervision of the Honiara Airport runway resurfacing, perimeter fence, standby generators, Noro Roads improvement, Santa Cruz Airfield upgrading, Malaita Bridges improvement, Honiara Airport rescue fire services station, Honiara and Munda Airports ATC tower, and Honiara Airport aviation complex building underway. The AF D&amp;SS Phase I (Design) &amp; II (Procurement Support) Effective Date is May 16, 2025 and services will continue through to May 14, 2026. The AF D&amp;SS Phase III (Construction Supervision) is expected to start in Q2 2026.
</narrative></comment>
</target>
<actual value="The Design Reports for all the key infrastructure investments accepted, with the construction supervision of the Honiara Airport, Munda Airport, Santa Cruz Airfield, Noro Roads, and Malaita Bridges works underway.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-01-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-01-10" />
<period-end iso-date="2029-06-10" />
<target value="385,100">
<comment><narrative>
The end target of 385,150 is set by aggregating people using air and road infrastructure.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-01-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-01-10" />
<period-end iso-date="2029-06-10" />
<target value="385,100">
<comment><narrative>
The end target of 385,150 is set by aggregating people using air and road infrastructure. 216,800 = Actual (Current) value for 3.3 + Actual (Current) value for 3.4 = 205,800 + 11,000. The End Target is expected to be achieved.
</narrative></comment>
</target>
<actual value="21,6800">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-01-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-01-10" />
<period-end iso-date="2029-06-10" />
<target value="385,100">
<comment><narrative>
The end target of 385,150 is set by aggregating people using air and road infrastructure. 301,000 = Actual (Current) value for 3.3 + Actual (Current) value for 3.4 = 214,900 + 86,100. 
The End Target is expected to be achieved.
</narrative></comment>
</target>
<actual value="30,1000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2025" iso-date="2025-01-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-01-14" />
<period-end iso-date="2029-06-14" />
<target value="385,100">
<comment><narrative>
The end target of 385,150 is set by aggregating people using climate resilient air and road infrastructure.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2025" iso-date="2025-01-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-01-14" />
<period-end iso-date="2029-06-14" />
<target value="385,100">
<comment><narrative>
The end target of 385,150 is set by aggregating people using climate resilient air and road infrastructure. 216,800 = Actual (Current) value for 3.3 + Actual (Current) value for 3.4 = 205,800 + 11,000. The End Target is expected to be achieved.
</narrative></comment>
</target>
<actual value="21,6800">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2025" iso-date="2025-01-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-01-14" />
<period-end iso-date="2029-06-14" />
<target value="385,100">
<comment><narrative>
The end target of 385,150 is set by aggregating people using climate resilient air and road infrastructure. 301,000 = Actual (Current) value for 3.3 + Actual (Current) value for 3.4 = 214,900 + 86,100. The End Target is expected to be achieved.
</narrative></comment>
</target>
<actual value="30,1000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Bridges with climate resilience and safety measures constructed and in use
</narrative></title>
<baseline year="2022" iso-date="2022-01-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-14" />
<period-end iso-date="2029-06-13" />
<target value="4.00">
<comment><narrative>
The construction of Kolofe1 and Kolofe2 Bridges on North Road and Su'u Harbor and Bira Bridges on South Road in Malaita Province is expected to be completed by March 8, 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Bridges with climate resilience and safety measures constructed and in use
</narrative></title>
<baseline year="2022" iso-date="2022-01-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-14" />
<period-end iso-date="2029-06-13" />
<target value="4.00">
<comment><narrative>
The construction of Kolofe1 and Kolofe2 Bridges on North Road and Su'u Harbor and Bira Bridges on South Road in Malaita Province is expected to be completed by March 8, 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Bridges with climate resilience and safety measures constructed and in use
</narrative></title>
<baseline year="2022" iso-date="2022-01-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-14" />
<period-end iso-date="2029-06-13" />
<target value="4.00">
<comment><narrative>
The construction of Kolofe1 and Kolofe2 Bridges on North Road and Su'u Harbor and Bira Bridges on South Road in Malaita Province completed and opening ceremonies were held on March 31 and April 1, 2026.
</narrative></comment>
</target>
<actual value="4">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads with climate resilience and safety measures constructed and in use
</narrative></title>
<baseline year="2022" iso-date="2022-01-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-09" />
<period-end iso-date="2029-06-08" />
<target value="43">
<comment><narrative>
The construction of the Noro Roads is expected to be completed by December 28, 2025. For the Malaita Roads Improvement investments under the AF, detailed design is underway, and works are expected to be completed by mid-2027.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads with climate resilience and safety measures constructed and in use
</narrative></title>
<baseline year="2022" iso-date="2022-01-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-09" />
<period-end iso-date="2029-06-08" />
<target value="43">
<comment><narrative>
The construction of the Noro Roads is expected to be completed by January 27, 2026. For the Malaita Roads Improvement investments under the AF, detailed design is underway, and works are expected to be completed by end-2027.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads with climate resilience and safety measures constructed and in use
</narrative></title>
<baseline year="2022" iso-date="2022-01-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-09" />
<period-end iso-date="2029-06-08" />
<target value="43">
<comment><narrative>
The construction of the Noro Roads is completed and opening ceremony held on February 13, 2026. For the Malaita Roads Improvement investments under the AF, the notifications for contract award sent on June 5, 2026, and the contracts are expected to be signed by end of June 2026. The works are expected to be completed by end-2027.
</narrative></comment>
</target>
<actual value="10">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Airport or airfield runways with climate resilience and safety measures constructed and in use
</narrative></title>
<baseline year="2021" iso-date="2021-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-30" />
<period-end iso-date="2029-05-30" />
<target value="3.00">
<comment><narrative>
The contract for Honiara Runway Resurfacing and Airfield Ground Lighting (AGL) was completed on March 31, 2025, and the upgraded runway and AGL are in use. The contract for Santa Cruz (Lata) Airfield Runway Pavement is expected to be completed by April 27, 2026. For the Suavanao Airfield infrastructure investment under the AF, detailed design is underway, and works are expected to be completed by Q4 2027.
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Airport or airfield runways with climate resilience and safety measures constructed and in use
</narrative></title>
<baseline year="2021" iso-date="2021-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-30" />
<period-end iso-date="2029-05-30" />
<target value="3.00">
<comment><narrative>
The contract for Honiara Runway Resurfacing and Airfield Ground Lighting (AGL) was completed on March 31, 2025, and the upgraded runway and AGL are in use. The contract for Santa Cruz (Lata) Airfield Runway Pavement is expected to be completed by April 27, 2026. For the Suavanao Airfield infrastructure investment under the AF, the RFB was issued on December 5, 2025, and the works are expected to be completed by the end of Q1 2028.
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Road upgraded using participatory design approaches
</narrative></title>
<baseline year="2022" iso-date="2022-01-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-25" />
<period-end iso-date="2029-06-24" />
<target value="43">
<comment><narrative>
For Noro Roads, the official Commencement Date is April 30, 2024 and the forecasted completion date is January 27, 2026. For the Malaita Roads Improvement investments under the AF, works are expected to be completed by end-2027.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Airport or airfield runways with climate resilience and safety measures constructed and in use
</narrative></title>
<baseline year="2021" iso-date="2021-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-30" />
<period-end iso-date="2029-05-30" />
<target value="3.00">
<comment><narrative>
The contract for Honiara Runway Resurfacing and Airfield Ground Lighting (AGL) was completed on March 31, 2025, and the upgraded runway and AGL are in use. 

The Taking Over Certificate for the Santa Cruz (Lata) Airfield runway pavement and airfield ground lighting was issued on May 28, 2026, with the completion date of February 20, 2026. For the Suavanao Airfield infrastructure investment under the AF, the contract is expected to be awarded by Q4 2026 and the works completed by the end of Q3 2028.
</narrative></comment>
</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Modernization of air traffic and aviation safety management
</narrative></title>
<baseline year="2022" iso-date="2022-01-09" value="No ADS-B"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-09" />
<period-end iso-date="2029-06-08" />
<target value="ADS-B Ground Stations in Temotu and Makira-Ulawa Provines and CRV at Honiara Airport operational">
<comment><narrative>
For ADS-B ground stations, the contract was signed on September 24, 2024. The goods arrived at Honiara International Port on April 23, 2025 and delivered to storage site in Honiara on May 2, 2025. Packages for Lata, Temotu Province was delivered on-site on June 30, 2025, while those for Kirakira, Makira Province was delivered on-site on August 3, 2025. The forecasted completion date is November 30, 2025. The procurement of Common Regional Virtual Private Network (CRV) for Honiara Airport is underway.
</narrative></comment>
</target>
<actual value="No ADS-B Ground Stations in Temotu and Makira-Ulawa Provinces or CRV at Honiara Airport">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Modernization of air traffic and aviation safety management
</narrative></title>
<baseline year="2022" iso-date="2022-01-09" value="No ADS-B"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-09" />
<period-end iso-date="2029-06-08" />
<target value="ADS-B Ground Stations in Temotu and Makira-Ulawa Provines and CRV at Honiara Airport operational">
<comment><narrative>
For ADS-B ground stations, the contract was signed on September 24, 2024. The goods arrived at Honiara International Port on April 23, 2025 and delivered to storage site in Honiara on May 2, 2025. Packages for Lata, Temotu Province were delivered on-site on June 30, 2025, while those for Kirakira, Makira Province were delivered on-site on August 3, 2025. The procurement of Common Regional Virtual Private Network (CRV) for Honiara Airport is underway.
</narrative></comment>
</target>
<actual value="No ADS-B Ground Stations in Temotu and Makira-Ulawa Provinces or CRV at Honiara Airport">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Modernization of air traffic and aviation safety management
</narrative></title>
<baseline year="2022" iso-date="2022-01-09" value="No ADS-B"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-09" />
<period-end iso-date="2029-06-08" />
<target value="ADS-B Ground Stations in Temotu and Makira-Ulawa Provines and CRV at Honiara Airport operational">
<comment><narrative>
For ADS-B ground stations, the contract was signed on September 24, 2024. The goods arrived at Honiara International Port on April 23, 2025 and delivered to storage site in Honiara on May 2, 2025. Packages for Lata, Temotu Province were delivered on-site on June 30, 2025, while those for Kirakira, Makira Province were delivered on-site on August 3, 2025. The contract for Common Regional Virtual Private Network (CRV) for Honiara Airport is signed on May 28, 2026 for 31 months.
</narrative></comment>
</target>
<actual value="No ADS-B Ground Stations in Temotu and Makira-Ulawa Provinces or CRV at Honiara Airport">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Enhanced climate resilience and operational safety at regional airports under preventative and corrective airport maintenance program for airport equipment and facilities
</narrative></title>
<baseline year="2022" iso-date="2022-01-09" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-09" />
<period-end iso-date="2029-06-08" />
<target value="Yes">
<comment><narrative>
The Request for Proposals was issued on May 30, 2025, and closed on June 27, 2025.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Honiara Airport Automated Weather Observation System (AWOS) installed and operational
</narrative></title>
<baseline year="2022" iso-date="2022-01-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-30" />
<period-end iso-date="2029-06-29" />
<target value="Yes">
<comment><narrative>
This commissioning is expected to be completed by July 6, 2026.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regional Airport Asset Maintenance Contract in place
</narrative></title>
<baseline year="2022" iso-date="2022-01-25" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-25" />
<period-end iso-date="2029-06-24" />
<target value="Yes">
<comment><narrative>
The contract was signed on November 19, 2025, for 36 months.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Enhanced climate resilience and operational safety at regional airports under preventative and corrective airport maintenance program for airport equipment and facilities
</narrative></title>
<baseline year="2022" iso-date="2022-01-09" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-09" />
<period-end iso-date="2029-06-08" />
<target value="Yes">
<comment><narrative>
The contract was signed on November 19, 2025, for 36 months.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Enhanced climate resilience and operational safety at regional airports under preventative and corrective airport maintenance program for airport equipment and facilities
</narrative></title>
<baseline year="2022" iso-date="2022-01-09" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-09" />
<period-end iso-date="2029-06-08" />
<target value="Yes">
<comment><narrative>
The contract was signed on November 19, 2025, for 36 months.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T00:13:13" hierarchy="1"><iati-identifier>44000-P177239</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Solomon Islands: Pacific Islands Regional Oceanscape Program - Second Phase for Economic Resilience</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Development Objective of the Series of Projects is to strengthen the shared management of selected Pacific Island oceanic and coastal fisheries, and the critical habitats upon which they depend.For the Solomon Islands second phase's project (“SB PROPER”), the proposed Project Development Objective (PDO) is to strengthen regional collaboration and national capacity for the management and the sustainable development of the oceanic and coastal fisheries sector in the Solomon Islands.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The Pacific Islands Regional Oceanscape Program - Second Phase for Economic Resilience (PROPER) project in the Solomon Islands (The Project) aims to strengthen regional collaboration and national capacity for the management and the sustainable development of the oceanic and coastal fisheries sector in the Solomon Islands. The Project is part of the Pacific Islands Regional Oceanscape Program (PROP) which aims to strengthen the shared management of selected Pacific Island oceanic and coastal fisheries, and the critical habitats upon which they depend.PROPER is a continuation of the PROP 1st Phase and will build on the lessons learned from the seven years of implementation. It will provide for continued support to national projects initiated under PROP and make it possible to address new regional and national requests. It is designed as a set of standalone regional and national projects linked in the collective aim of improved fisheries management, improved climate change adaptation and resilience. The Ministry of Fisheries and Marine Resources (MFMR) will be the implementing agency (IA) for the Project in the Solomon Islands. MFMR has significant experience with World Bank procedures as they have recently implemented PROP 1st Phase project (P151777).The Solomon Islands is highly prone to natural disasters such as earthquakes, volcanic eruptions, cyclones, tsunamis, coastal and river flooding, and landslides. The population of 721,455 persons (2019 National Population and Household Census), is young (over one-half of the population is under 20 years of age) and largely rural (around 80 percent), mostly living in small villages of just a few hundred people.Subsistence and semi-subsistence fisheries (and agriculture) remains of overwhelming importance to security, economic growth, and equity. It is of immediate and direct importance to the well-being of the rural population, as well as many urban residents. In rural areas, where most Solomon Islanders live, nearly half of all women and 90 percent of men fish or collect aquatic resources for food or income. Fisheries and marine resources also play a critical role in the national economy, as the second largest source of export income after forestry.PROPER is structured to allow national and regional projects to work in conjunction, and for all national projects to contribute towards regional policy objectives and focus on addressing national priorities. The Program has three thematic components and one project management component, each with regional and national activities. In each participating country the activities under each component are adapted to national context and needs. In the Solomon Islands the Project will consist of:Component 1: Strengthening Regional Collaboration and National Capacity for Oceanic FisheriesSubcomponent 1.1. Consolidating Fisheries Management - would support:i. Design of an extension of MFMR Headquarter Office, installation of solar energy system on current Office, and acquisition of office equipmentii. Construction of the National MCS Center in Noro and installation of a solar energy systemiii. Strengthening of MCS Officers capacityiv. Implementation of fishing vessel inspections at seav. Promotion of the e-Port initiativevi. Expansion of e-monitoring and e-reportingvii. Revitalization, adaptation and modernization of the Observer Programviii. Support for East New Britain initiative for regional development: profiling entire fisheries sector to identify national advantage Component 1.2. Harnessing Oceanic Fisheries to Regional Economy - would finance consultant services for studies aiming at improving the harnessing of the oceanic fisheries and their value chains to the Solomon Islands economy.Component 2: Strengthening Regional Collaboration and National Capacity for Coastal FisheriesSubcomponent 2.1. Strengthening policy and institutions - through the:i. Development and enhancement of the MFMR personnel's capacity and skillsii. Review and dissemination of policy frameworks and legislationiii. Support to provincial governmentsSubcomponent 2.2. Strengthening coastal fisheries management - through the;i. Empowerment of communities through CBRMii. Development of the statistical system for inshore and small-scale fisheriesiii. Development and implementation of monitoring tools for inshore fisheriesSubcomponent 2.3. Developing and diversifying local value chains - would support;i. FAD Program with goods for the construction of 75 submerged inshore FADsii. Feasibility studies for informing additional financing to PROPER or a future projectiii. Procurement of a FAD deployment vessel to aid deployment. Component 3: Project Management - would finance consultant services for the Project Management Unit (PMU) personnel, annual financial audits, operating costs, goods and training and workshops (e.g., inception, mid-term, and closure workshop) for the PMU. Test]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SB–P0049992"><narrative>Solomon Islands</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SB–P0049992"><narrative>Solomon Islands</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SB-COA-0049991"><narrative>Ministry of Fisheries and Marine Resources (MFMR)</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2022-03-31"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2022-06-01"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2028-06-20"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2028-06-20"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Milen F. Dyoulgerov Vollen</narrative></person-name><telephone>+1-202-473-1000</telephone><email>mdyoulgerov@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="SB" percentage="100"><narrative xml:lang="en">SOLOMON ISLANDS</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002106552" />
            <name><narrative>Malaita Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9 161</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002108262" />
            <name><narrative>Isabel Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.05379 159.13696</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002109495" />
            <name><narrative>Central Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.09667 160.24109</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002178472" />
            <name><narrative>Temotu Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.72754 165.93884</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002178730" />
            <name><narrative>Makira-Ulawa Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.55751 161.78517</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007280292" />
            <name><narrative>Choiseul</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-6.99186 156.86279</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007280293" />
            <name><narrative>Rennell and Bellona</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-11.60516 160.15457</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="74020" percentage="50" xml:lang="en"/><sector vocabulary="1" code="31310" percentage="50" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AK" percentage="81.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Agriculture, Fishing &amp; Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AF" percentage="19.0000000" xml:lang="en"><narrative>FY17 - Fisheries</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000083" percentage="100" xml:lang="en"><narrative>Renewable Natural Resources Asset Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000832" percentage="100" xml:lang="en"><narrative>Fisheries Policies and institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="55" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000083" percentage="100" xml:lang="en"><narrative>Renewable Natural Resources Asset Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000084" percentage="18" xml:lang="en"><narrative>Environmental policies and institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000836" percentage="66" xml:lang="en"><narrative>Coastal Zone Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="26" xml:lang="en"><narrative>Climate change</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">22000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">22000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">22000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">22000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">22000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">133333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">133333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">133333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">133333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">133333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">133333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">133333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">133333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">133333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">133333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">133333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">133333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">166666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">283333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">283333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">283333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">283333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">283333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">283333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">283333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">283333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">283333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">283333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">283333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">283333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">350000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">350000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">350000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">350000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">350000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">350000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">350000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">350000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">350000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">350000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">350000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">350000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">133333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">133333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">133333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">133333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">133333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">133333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">133333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">133333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">133333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">133333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">133333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">133333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">84285.71</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">84285.71</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">84285.71</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">84285.71</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">84285.71</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">84285.71</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">84285.74</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">22000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">22000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">22000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">22000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2028-06-20"/>
<value currency="USD" value-date="2028-06-20">7224271.79</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2028-06-20"/>
<value currency="USD" value-date="2028-06-20">7224271.79</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">8500000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49991"><narrative>Ministry of Fisheries and Marine Resources (MFMR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">5000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49991"><narrative>Ministry of Fisheries and Marine Resources (MFMR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">435304</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49991"><narrative>Ministry of Fisheries and Marine Resources (MFMR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">282234</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49991"><narrative>Ministry of Fisheries and Marine Resources (MFMR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">111806</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49991"><narrative>Ministry of Fisheries and Marine Resources (MFMR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">41424</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49991"><narrative>Ministry of Fisheries and Marine Resources (MFMR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">260465</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49991"><narrative>Ministry of Fisheries and Marine Resources (MFMR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">63687</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49991"><narrative>Ministry of Fisheries and Marine Resources (MFMR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">204580</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49991"><narrative>Ministry of Fisheries and Marine Resources (MFMR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">82788</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49991"><narrative>Ministry of Fisheries and Marine Resources (MFMR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">182870</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49991"><narrative>Ministry of Fisheries and Marine Resources (MFMR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">214772</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49991"><narrative>Ministry of Fisheries and Marine Resources (MFMR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">176608</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49991"><narrative>Ministry of Fisheries and Marine Resources (MFMR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">305316</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49991"><narrative>Ministry of Fisheries and Marine Resources (MFMR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">256814</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49991"><narrative>Ministry of Fisheries and Marine Resources (MFMR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">121395</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49991"><narrative>Ministry of Fisheries and Marine Resources (MFMR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">177151</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49991"><narrative>Ministry of Fisheries and Marine Resources (MFMR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">95643</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49991"><narrative>Ministry of Fisheries and Marine Resources (MFMR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">185233</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49991"><narrative>Ministry of Fisheries and Marine Resources (MFMR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">128049</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49991"><narrative>Ministry of Fisheries and Marine Resources (MFMR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">300538</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49991"><narrative>Ministry of Fisheries and Marine Resources (MFMR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">152867</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49991"><narrative>Ministry of Fisheries and Marine Resources (MFMR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">103738</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49991"><narrative>Ministry of Fisheries and Marine Resources (MFMR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">179297</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49991"><narrative>Ministry of Fisheries and Marine Resources (MFMR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">126470</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49991"><narrative>Ministry of Fisheries and Marine Resources (MFMR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">84050</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49991"><narrative>Ministry of Fisheries and Marine Resources (MFMR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">112804</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49991"><narrative>Ministry of Fisheries and Marine Resources (MFMR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">135204</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49991"><narrative>Ministry of Fisheries and Marine Resources (MFMR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">246522</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49991"><narrative>Ministry of Fisheries and Marine Resources (MFMR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">132087</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49991"><narrative>Ministry of Fisheries and Marine Resources (MFMR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">79165</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49991"><narrative>Ministry of Fisheries and Marine Resources (MFMR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">87774</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49991"><narrative>Ministry of Fisheries and Marine Resources (MFMR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">177656</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49991"><narrative>Ministry of Fisheries and Marine Resources (MFMR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">116935</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49991"><narrative>Ministry of Fisheries and Marine Resources (MFMR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">47330</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49991"><narrative>Ministry of Fisheries and Marine Resources (MFMR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">86170</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49991"><narrative>Ministry of Fisheries and Marine Resources (MFMR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">126844</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49991"><narrative>Ministry of Fisheries and Marine Resources (MFMR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">49888</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49991"><narrative>Ministry of Fisheries and Marine Resources (MFMR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">14241</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49991"><narrative>Ministry of Fisheries and Marine Resources (MFMR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">142627</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49991"><narrative>Ministry of Fisheries and Marine Resources (MFMR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">83127</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49991"><narrative>Ministry of Fisheries and Marine Resources (MFMR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">40521</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49991"><narrative>Ministry of Fisheries and Marine Resources (MFMR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">27058</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49991"><narrative>Ministry of Fisheries and Marine Resources (MFMR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">148007</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49991"><narrative>Ministry of Fisheries and Marine Resources (MFMR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">148668</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49991"><narrative>Ministry of Fisheries and Marine Resources (MFMR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-1674</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49991"><narrative>Ministry of Fisheries and Marine Resources (MFMR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-2144</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49991"><narrative>Ministry of Fisheries and Marine Resources (MFMR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-3623</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49991"><narrative>Ministry of Fisheries and Marine Resources (MFMR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-4982</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49991"><narrative>Ministry of Fisheries and Marine Resources (MFMR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-6319</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49991"><narrative>Ministry of Fisheries and Marine Resources (MFMR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-7590</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49991"><narrative>Ministry of Fisheries and Marine Resources (MFMR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-9967</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-49991"><narrative>Ministry of Fisheries and Marine Resources (MFMR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P177239"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P177239?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P177239"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
MCS officers benefitting from new and refresher training (cumulative)
</narrative></title>
<baseline year="2022" iso-date="2022-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-04-01" />
<period-end iso-date="2027-07-20" />
<target value="50.00">
<comment><narrative>
Measure the MCS and Compliance officers' capacity enhancement through training.
</narrative></comment>
</target>
<actual value="53.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Time for registered project-related grievances to be addressed through the Grievance Redress Mechanisms (average)
</narrative></title>
<baseline year="2022" iso-date="2022-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-04-01" />
<period-end iso-date="2027-12-31" />
<target value="21.00">
<comment><narrative>
With the open grievance for absence of payment of compensation claim by one consultant the indicator cannot be met in the future. In November 2025, out of 10 grievances received since progress started, 9 were processed in less than 21 days. This indicator will be revised in the restructuring to Grievances addressed within 21 days (cumulative) (Percentage)
</narrative></comment>
</target>
<actual value="&amp;gt;21.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Sex-disaggregated data is collected in new MFMR central inshore database
</narrative></title>
<baseline year="2022" iso-date="2022-04-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-04-01" />
<period-end iso-date="2027-07-20" />
<target value="Yes">
<comment><narrative>
The indicator will measure the inclusion of sex-disaggregated data in the MFMR central database, e.g., sex of operator, sex-ratio in fishing vessel crew, sex of the owner(s) of fishing assets, all disaggregated by fishing type, in order to better statistically describe sex-balance and its evolution in the fisheries sector.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Community-Based Resource Management (CBRM) Committees established for the preparation and implementation of Community Fisheries Management Plans (cumulative).
</narrative></title>
<baseline year="2022" iso-date="2022-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-04-01" />
<period-end iso-date="2027-07-20" />
<target value="10.00">
<comment><narrative>
Measure the establishment of CBRM Committees for the preparation and implementation of Community Fisheries Management Plans.
</narrative></comment>
</target>
<actual value="10.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Minimum number of new communities adopting climate-informed Community Fisheries Management Plans (cumulative).
</narrative></title>
<baseline year="2022" iso-date="2022-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-04-01" />
<period-end iso-date="2027-07-19" />
<target value="5.00">
<comment><narrative>
This indicator measures the end result of a behavioral and organizational process to establish community consensus toward fisheries management.
The process includes consultations, training on MCS and resource monitoring, and decision on management measures.
</narrative></comment>
</target>
<actual value="10.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Review of MFMR structure and functions completed
</narrative></title>
<baseline year="2022" iso-date="2022-04-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-04-01" />
<period-end iso-date="2027-07-20" />
<target value="Yes">
<comment><narrative>
Completion of the Policy Note for the MFMR institutional review.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Provincial Fisheries Ordinances prepared and submitted for endorsement by Provincial Assemblies (cumulative)
</narrative></title>
<baseline year="2022" iso-date="2022-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-04-01" />
<period-end iso-date="2027-07-20" />
<target value="3.00">
<comment><narrative>
Validation done for three provinces. Two provincial ordinances prepared under PROP were submitted for endorsement.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Community members participating in project-supported livelihoods and development activities (cumulative)
</narrative></title>
<baseline year="2022" iso-date="2022-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-04-01" />
<period-end iso-date="2027-07-19" />
<target value="200.00">
<comment><narrative>
This indicator measures the end result of a livelihood diversification process to offset climate change and fisheries management impacts, and increase resilience in case of shocks.
</narrative></comment>
</target>
<actual value="1002.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Fishing vessels inspections in the archipelagic waters or territorial sea each year
</narrative></title>
<baseline year="2022" iso-date="2022-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-04-01" />
<period-end iso-date="2027-07-20" />
<target value="60.00">
<comment><narrative>
Fishing vessels inspected by Compliance Officers, while present in the Solomon Islands' archipelagic waters or territorial sea. The indicator will illustrate the improvement of MFMR capacity as currently vessels who are coming at anchor to transship or unloaded teir catch are not inspected.
</narrative></comment>
</target>
<actual value="516.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Fisheries management informed by timely access to data by national and regional stakeholders
</narrative></title>
<baseline year="2022" iso-date="2022-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-04-01" />
<period-end iso-date="2027-07-20" />
<target value="3.00">
<comment><narrative>
The number corresponds to interim targets of the sub-indicators achieved in the covered period. This indicator measures both the regional collaboration and national capacity aspects of the PDO.

November 2025 result is 2 (minimum percentage of observer reports submitted via e-reporting and minimum percentage of licensed tuna fishing vessels reporting via VMS to the Noro MCS Centre)
</narrative></comment>
</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Provincial officers benefitting from training (cumulative)
</narrative></title>
<baseline year="2022" iso-date="2022-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-04-01" />
<period-end iso-date="2027-07-20" />
<target value="22.00">
<comment><narrative>
Measure the provincial officers' capacity enhancement through training.
</narrative></comment>
</target>
<actual value="104.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Observers trained according to the Observer Career Development Program (cumulative)
</narrative></title>
<baseline year="2022" iso-date="2022-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-04-01" />
<period-end iso-date="2027-07-20" />
<target value="90.00">
<comment><narrative>
To be changed at restructuring as the Observer Career Development Program was developed during COVID-19 pandemic, but return to normal does not allow for its implementation. It will not be progressed further and training is done according to PIRFO. On November 24, 2025, 71 observers were active, and 19 new ones were contracted and being trained.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Community-Based Resource Management (CBRM) Committees established for the preparation and implementation of Community Fisheries Management Plans (cumulative).
</narrative></title>
<baseline year="2022" iso-date="2022-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-04-01" />
<period-end iso-date="2027-07-20" />
<target value="10.00">
<comment><narrative>
Measure the establishment of CBRM Committees for the preparation and implementation of Community Fisheries Management Plans.
</narrative></comment>
</target>
<actual value="9.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Sex-disaggregated data is collected in new MFMR central inshore database
</narrative></title>
<baseline year="2022" iso-date="2022-04-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-04-01" />
<period-end iso-date="2027-07-20" />
<target value="Yes">
<comment><narrative>
The indicator will measure the inclusion of sex-disaggregated data in the MFMR central database, e.g., sex of operator, sex-ratio in fishing vessel crew, sex of the owner(s) of fishing assets, all disaggregated by fishing type, in order to better statistically describe sex-balance and its evolution in the fisheries sector.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Provincial Fisheries Ordinances prepared and submitted for endorsement by Provincial Assemblies (cumulative)
</narrative></title>
<baseline year="2022" iso-date="2022-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-04-01" />
<period-end iso-date="2027-07-20" />
<target value="3.00">
<comment><narrative>
Validation done for three provinces. Two provincial ordinances prepared under PROP were submitted for endorsement.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
MCS officers benefitting from new and refresher training (cumulative)
</narrative></title>
<baseline year="2022" iso-date="2022-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-04-01" />
<period-end iso-date="2027-07-20" />
<target value="50.00">
<comment><narrative>
Measure the MCS and Compliance officers' capacity enhancement through training.
Jan – March: Induction training (59): Honiara (41) &amp; Noro(18) PCCR training (20)
</narrative></comment>
</target>
<actual value="132.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Time for registered project-related grievances to be addressed through the Grievance Redress Mechanisms (average)
</narrative></title>
<baseline year="2022" iso-date="2022-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-04-01" />
<period-end iso-date="2027-12-31" />
<target value="21.00">
<comment><narrative>
With the open grievance for absence of payment of compensation claim by one consultant the indicator cannot be met in the future. All other grievances have been resolved. This indicator will be revised in the restructuring to Grievances addressed within 21 days (cumulative) (Percentage)
</narrative></comment>
</target>
<actual value="&amp;gt;21.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Provincial officers benefitting from training (cumulative)
</narrative></title>
<baseline year="2022" iso-date="2022-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-04-01" />
<period-end iso-date="2027-07-20" />
<target value="22.00">
<comment><narrative>
Measure the provincial officers' capacity enhancement through training.
</narrative></comment>
</target>
<actual value="123.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Observers trained according to the Observer Career Development Program (cumulative)
</narrative></title>
<baseline year="2022" iso-date="2022-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-04-01" />
<period-end iso-date="2027-07-20" />
<target value="90.00">
<comment><narrative>
To be changed at restructuring as the Observer Career Development Program was developed during COVID-19 pandemic, but return to normal does not allow for its implementation. It will not be progressed further and training is done according to PIRFO. On November 24, 2025, 71 observers were active, and 19 new ones were contracted and being trained.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Fishing vessels inspections in the archipelagic waters or territorial sea each year
</narrative></title>
<baseline year="2022" iso-date="2022-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-04-01" />
<period-end iso-date="2027-07-20" />
<target value="60.00">
<comment><narrative>
Jan - March 26: Honiara (38) and Noro (29)
</narrative></comment>
</target>
<actual value="67.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Review of MFMR structure and functions completed
</narrative></title>
<baseline year="2022" iso-date="2022-04-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-04-01" />
<period-end iso-date="2027-07-20" />
<target value="Yes">
<comment><narrative>
Completion of the Policy Note for the MFMR institutional review.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Community members participating in project-supported livelihoods and development activities (cumulative)
</narrative></title>
<baseline year="2022" iso-date="2022-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-04-01" />
<period-end iso-date="2027-07-19" />
<target value="200.00">
<comment><narrative>
This indicator measures the end result of a livelihood diversification process to offset climate change and fisheries management impacts, and increase resilience in case of shocks.
</narrative></comment>
</target>
<actual value="1415.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Community members participating in project-supported livelihoods and development activities (cumulative)
</narrative></title>
<baseline year="2022" iso-date="2022-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-04-01" />
<period-end iso-date="2027-07-19" />
<target value="200.00">
<comment><narrative>
This indicator measures the end result of a livelihood diversification process to offset climate change and fisheries management impacts, and increase resilience in case of shocks.
</narrative></comment>
</target>
<actual value="1002.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Minimum number of new communities adopting climate-informed Community Fisheries Management Plans (cumulative).
</narrative></title>
<baseline year="2022" iso-date="2022-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-04-01" />
<period-end iso-date="2027-07-19" />
<target value="5.00">
<comment><narrative>
The total went down to 9 following Susuka withdrawal from the process. With 4 CFMPs in preparation: with 3 communities (Nusa Simbo, Narovo, Tapurai) in Western Province, and one in Malaita (Ofu – drafted CFMP), Susuka is now back to draft status after some community issues.
</narrative></comment>
</target>
<actual value="9.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Minimum number of new communities adopting climate-informed Community Fisheries Management Plans (cumulative).
</narrative></title>
<baseline year="2022" iso-date="2022-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-04-01" />
<period-end iso-date="2027-07-19" />
<target value="5.00">
<comment><narrative>
This indicator measures the end result of a behavioral and organizational process to establish community consensus toward fisheries management.
The process includes consultations, training on MCS and resource monitoring, and decision on management measures.
</narrative></comment>
</target>
<actual value="10.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Fisheries management informed by timely access to data by national and regional stakeholders
</narrative></title>
<baseline year="2022" iso-date="2022-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-04-01" />
<period-end iso-date="2027-07-20" />
<target value="3.00">
<comment><narrative>
The number corresponds to interim targets of the sub-indicators achieved in the covered period. This indicator measures both the regional collaboration and national capacity aspects of the PDO.

November 2025 result is 2 (minimum percentage of observer reports submitted via e-reporting and minimum percentage of licensed tuna fishing vessels reporting via VMS to the Noro MCS Centre)
</narrative></comment>
</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Fisheries management informed by timely access to data by national and regional stakeholders
</narrative></title>
<baseline year="2022" iso-date="2022-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-04-01" />
<period-end iso-date="2027-07-20" />
<target value="3.00">
<comment><narrative>
The number corresponds to interim targets of the sub-indicators achieved in the covered period. This indicator measures both the regional collaboration and national capacity aspects of the PDO.

November 2025 result is 2 (minimum percentage of observer reports submitted via e-reporting and minimum percentage of licensed tuna fishing vessels reporting via VMS to the Noro MCS Centre)
</narrative></comment>
</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Community members participating in project-supported livelihoods and development activities (cumulative)
</narrative></title>
<baseline year="2022" iso-date="2022-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-04-01" />
<period-end iso-date="2027-07-19" />
<target value="200.00">
<comment><narrative>
This indicator measures the end result of a livelihood diversification process to offset climate change and fisheries management impacts, and increase resilience in case of shocks.
</narrative></comment>
</target>
<actual value="1415.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Community members participating in project-supported livelihoods and development activities (cumulative)
</narrative></title>
<baseline year="2022" iso-date="2022-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-04-01" />
<period-end iso-date="2027-07-19" />
<target value="200.00">
<comment><narrative>
This indicator measures the end result of a livelihood diversification process to offset climate change and fisheries management impacts, and increase resilience in case of shocks.
</narrative></comment>
</target>
<actual value="1002.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Minimum number of new communities adopting climate-informed Community Fisheries Management Plans (cumulative).
</narrative></title>
<baseline year="2022" iso-date="2022-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-04-01" />
<period-end iso-date="2027-07-19" />
<target value="5.00">
<comment><narrative>
The total went down to 9 following Susuka withdrawal from the process. With 4 CFMPs in preparation: with 3 communities (Nusa Simbo, Narovo, Tapurai) in Western Province, and one in Malaita (Ofu – drafted CFMP), Susuka is now back to draft status after some community issues.
</narrative></comment>
</target>
<actual value="9.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Minimum number of new communities adopting climate-informed Community Fisheries Management Plans (cumulative).
</narrative></title>
<baseline year="2022" iso-date="2022-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-04-01" />
<period-end iso-date="2027-07-19" />
<target value="5.00">
<comment><narrative>
This indicator measures the end result of a behavioral and organizational process to establish community consensus toward fisheries management.
The process includes consultations, training on MCS and resource monitoring, and decision on management measures.
</narrative></comment>
</target>
<actual value="10.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Fisheries management informed by timely access to data by national and regional stakeholders
</narrative></title>
<baseline year="2022" iso-date="2022-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-04-01" />
<period-end iso-date="2027-07-20" />
<target value="3.00">
<comment><narrative>
The number corresponds to interim targets of the sub-indicators achieved in the covered period. This indicator measures both the regional collaboration and national capacity aspects of the PDO.

November 2025 result is 2 (minimum percentage of observer reports submitted via e-reporting and minimum percentage of licensed tuna fishing vessels reporting via VMS to the Noro MCS Centre)
</narrative></comment>
</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Fisheries management informed by timely access to data by national and regional stakeholders
</narrative></title>
<baseline year="2022" iso-date="2022-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-04-01" />
<period-end iso-date="2027-07-20" />
<target value="3.00">
<comment><narrative>
The number corresponds to interim targets of the sub-indicators achieved in the covered period. This indicator measures both the regional collaboration and national capacity aspects of the PDO.

November 2025 result is 2 (minimum percentage of observer reports submitted via e-reporting and minimum percentage of licensed tuna fishing vessels reporting via VMS to the Noro MCS Centre)
</narrative></comment>
</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T00:13:13" hierarchy="1"><iati-identifier>44000-P178676</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>The First Solomon Islands Resilience DPO with a Catastrophe Deferred Drawdown Option</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The proposed series of two operations supports the Solomon Islands Government in its efforts to improve fiscal management, private sector development, and climate and disaster resilience.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of The First Solomon Islands Resilience DPO with a Catastrophe Deferred Drawdown Option Project for Solomon Islands aims to support the Solomon Islands government through two series in its efforts to improve fiscal management, private sector development, and climate and disaster resilience. The series supports the government's objective to improve fiscal management, support private sector development, enhance resilience to climate change, natural disasters and health emergencies. Pillar 1 aims to support fiscal management by reforming the tax system, improving the fiscal regime of the extractives sector and a better management of public investments. This is aligned with the government's policy to implement tax reforms for revenue mobilization. Pillar 2 serves to improve the business environment by reducing energy costs, enhancing private sector credit and foreign investment, aligned with the government's policy statement to create and promote more opportunities for business. Finally, pillar 3 is aligned with the government's objective to enhance resilience to climate, natural disasters and health emergencies by updating the climate change policy, increasing resilience of buildings and improving the institutional and regulatory framework for health emergencies.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SB–P0055020"><narrative>Solomon Islands</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SB-COA-273"><narrative>Ministry of Finance and Treasury</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2022-11-15"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2023-11-30"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2026-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2026-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Marko Kwaramba</narrative></person-name><telephone>+1-202-473-1000</telephone><email>mkwaramba@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="SB" percentage="100"><narrative xml:lang="en">SOLOMON ISLANDS</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="2108502" />
                <name><narrative>Honiara</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-9.43333 159.95</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="74020" percentage="20" xml:lang="en"/><sector vocabulary="1" code="32210" percentage="13" xml:lang="en"/><sector vocabulary="1" code="25010" percentage="13" xml:lang="en"/><sector vocabulary="1" code="24010" percentage="13" xml:lang="en"/><sector vocabulary="1" code="15124" percentage="12" xml:lang="en"/><sector vocabulary="1" code="23631" percentage="12" xml:lang="en"/><sector vocabulary="1" code="15116" percentage="12" xml:lang="en"/><sector vocabulary="1" code="32310" percentage="5" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LT" percentage="12.0000000" xml:lang="en"><narrative>FY17 - Energy Transmission and Distribution</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LM" percentage="12.0000000" xml:lang="en"><narrative>FY17 - Mining</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="25.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YH" percentage="5.00000000" xml:lang="en"><narrative>FY17 - Housing Construction</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YZ" percentage="13.0000000" xml:lang="en"><narrative>FY17 - Other Industry, Trade and Services</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="FA" percentage="13.0000000" xml:lang="en"><narrative>FY17 - Banking Institutions</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="20.0000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="0" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000412" percentage="0" xml:lang="en"><narrative>Domestic Revenue Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="0" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="0" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="0" xml:lang="en"><narrative>Finance for Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000114" percentage="0" xml:lang="en"><narrative>Tax policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="0" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000011" percentage="0" xml:lang="en"><narrative>Fiscal Policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="0" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000086" percentage="0" xml:lang="en"><narrative>Energy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="0" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="0" xml:lang="en"><narrative>Public Finance Management</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">20000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">20000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">15000000</value><description xml:lang="en"><narrative>Total Commitment in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-55019"><narrative>Ministry of Finance and Treasury</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">5000000</value><description xml:lang="en"><narrative>Total Commitment in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-55019"><narrative>Ministry of Finance and Treasury</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">15269240</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-55019"><narrative>Ministry of Finance and Treasury</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">5338125</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-55019"><narrative>Ministry of Finance and Treasury</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P178676"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P178676?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P178676"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The number of foreign enterprises registered in the Solomon Islands
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="63"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-07-01" />
<target value="75">
<comment><narrative>
Indicator surpassed the target, indicative of reform success.
</narrative></comment>
</target>
<actual value="218">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of public health emergency preparedness and response drills conducted at provincial level, incorporating gender-based violence survivors
</narrative></title>
<baseline year="2023" iso-date="2023-06-01" value="0 (2023)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-01" />
<period-end iso-date="2027-06-01" />
<target value="9 (2024-2027)">
<comment><narrative>
The results indicator has not yet changed. The new government has decided to review and revise the entire legal framework for the health sector, prioritizing the development of a new health policy.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Commercial electricity tariff differential relative to structural peers in the region (Kiribati, Samoa, and Vanuatu, US$/KWh)
</narrative></title>
<baseline year="2021" iso-date="2021-06-01" value="0.3"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-06-01" />
<period-end iso-date="2027-06-01" />
<target value="0.2">
<comment><narrative>
The tariff differential has decreased, indicating that tariff adjustments are on track to meet the target.
</narrative></comment>
</target>
<actual value="0.29">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Non-logging domestic revenue (as a percent of GDP)
</narrative></title>
<baseline year="2023" iso-date="2023-07-01" value="20.4 percent (2022-2023 average)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-01" />
<period-end iso-date="2027-06-01" />
<target value="22.4 percent (2026-2027 average)">
<comment><narrative>
There has been good progress toward achieving the target. The implementation of the VAT Act, along with adjustments to non-tax revenue fees, will further support efforts to reach the target.
</narrative></comment>
</target>
<actual value="20.9">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of externally financed project proposals analyzed following PIM Appraisal Guidelines
</narrative></title>
<baseline year="2023" iso-date="2023-07-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-01" />
<period-end iso-date="2027-06-01" />
<target value="100">
<comment><narrative>
An estimated 70 percent of externally financed projects appraised following PIM Guidelines, so the results indicator is on track for a 100 percent by June 2027.
</narrative></comment>
</target>
<actual value="70">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Loans granted to women (as a percent of total)
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="12"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-07-01" />
<target value="17">
<comment><narrative>
The results indicator has not changed, as the Credit Reporting Regulations were only gazetted in September 2025 and the credit bureau is not yet operational.
</narrative></comment>
</target>
<actual value="12">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Development applications screened against the climate and disaster risk ordinances developed in at least 2 provincial government areas
</narrative></title>
<baseline year="2023" iso-date="2023-07-01" value="0 percent (2023)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-01" />
<period-end iso-date="2027-07-01" />
<target value="100 percent (2027)">
<comment><narrative>
The results indicator has not yet been achieved, as the development of ordinances related to development approvals is expected to proceed only after the overarching Climate Change Bill is enacted.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Nickel royalty per dry tonne (in constant US$)
</narrative></title>
<baseline year="2023" iso-date="2023-07-01" value="US$1.2 (2023)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-01" />
<period-end iso-date="2027-07-01" />
<target value="US$3 (2027)">
<comment><narrative>
As of December 2023, one nickel shipment occurred, which applied the old nickel valuation method. With capacity coming in place and the mining Regulations issued, the new valuation method is expected to be applied for future nickel shipments.
</narrative></comment>
</target>
<actual value="1.2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of renewable energy in the energy mix (excl. Tina River)
</narrative></title>
<baseline year="2023" iso-date="2023-06-01" value="2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-01" />
<period-end iso-date="2027-07-01" />
<target value="5">
<comment><narrative>
The results indicator has not changed, as energy reforms have stalled.
</narrative></comment>
</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Share of permit applications assessed for compliance with the building regulations and code (percent of total)
</narrative></title>
<baseline year="2023" iso-date="2023-07-01" value="0 percent (2023)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-01" />
<period-end iso-date="2027-07-01" />
<target value="100 percent (2027)">
<comment><narrative>
There is no change in the results indicator, as implementation of the Building Approval Authority has been delayed and is now expected in 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Domestic credit to private sector (as share of GDP)
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="32.1 percent (2021-2022 average)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-07-01" />
<target value="35 percent (2026-2027 average)">
<comment><narrative>
The indicator has declined, reflecting a slowdown in economic activity. However, it is expected to reach the target following the approval of the Credit Reporting Regulations.
</narrative></comment>
</target>
<actual value="30.3">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of public health emergency preparedness and response drills conducted at provincial level, incorporating gender-based violence survivors
</narrative></title>
<baseline year="2023" iso-date="2023-06-01" value="0 (2023)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-01" />
<period-end iso-date="2027-06-01" />
<target value="9 (2024-2027)">
<comment><narrative>
The results indicator has not yet changed. The new government has decided to review and revise the entire legal framework for the health sector, prioritizing the development of a new health policy.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Share of permit applications assessed for compliance with the building regulations and code (percent of total)
</narrative></title>
<baseline year="2023" iso-date="2023-07-01" value="0 percent (2023)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-01" />
<period-end iso-date="2027-07-01" />
<target value="100 percent (2027)">
<comment><narrative>
There is no change in the results indicator, as implementation of the Building Approval Authority has been delayed and is now expected in 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Development applications screened against the climate and disaster risk ordinances developed in at least 2 provincial government areas
</narrative></title>
<baseline year="2023" iso-date="2023-07-01" value="0 percent (2023)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-01" />
<period-end iso-date="2027-07-01" />
<target value="100 percent (2027)">
<comment><narrative>
The results indicator has not yet been achieved, as the development of ordinances related to development approvals is expected to proceed only after the overarching Climate Change Bill is enacted.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The number of foreign enterprises registered in the Solomon Islands
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="63"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-07-01" />
<target value="75">
<comment><narrative>
Indicator surpassed the target, indicative of reform success.
</narrative></comment>
</target>
<actual value="218">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Loans granted to women (as a percent of total)
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="12"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-07-01" />
<target value="17">
<comment><narrative>
The results indicator has not changed, as the Credit Reporting Regulations were only gazetted in September 2025 and the credit bureau is not yet operational.
</narrative></comment>
</target>
<actual value="12">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Domestic credit to private sector (as share of GDP)
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="32.1 percent (2021-2022 average)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-07-01" />
<target value="35 percent (2026-2027 average)">
<comment><narrative>
The indicator has declined, reflecting a slowdown in economic activity. However, it is expected to reach the target following the approval of the Credit Reporting Regulations.
</narrative></comment>
</target>
<actual value="30.3">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of renewable energy in the energy mix (excl. Tina River)
</narrative></title>
<baseline year="2023" iso-date="2023-06-01" value="2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-01" />
<period-end iso-date="2027-07-01" />
<target value="5">
<comment><narrative>
The results indicator has not changed, as energy reforms have stalled.
</narrative></comment>
</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Commercial electricity tariff differential relative to structural peers in the region (Kiribati, Samoa, and Vanuatu, US$/KWh)
</narrative></title>
<baseline year="2021" iso-date="2021-06-01" value="0.3"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-06-01" />
<period-end iso-date="2027-06-01" />
<target value="0.2">
<comment><narrative>
The tariff differential has decreased, indicating that tariff adjustments are on track to meet the target.
</narrative></comment>
</target>
<actual value="0.29">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of externally financed project proposals analyzed following PIM Appraisal Guidelines
</narrative></title>
<baseline year="2023" iso-date="2023-07-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-01" />
<period-end iso-date="2027-06-01" />
<target value="100">
<comment><narrative>
An estimated 70 percent of externally financed projects appraised following PIM Guidelines, so the results indicator is on track for a 100 percent by June 2027.
</narrative></comment>
</target>
<actual value="70">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Nickel royalty per dry tonne (in constant US$)
</narrative></title>
<baseline year="2023" iso-date="2023-07-01" value="US$1.2 (2023)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-01" />
<period-end iso-date="2027-07-01" />
<target value="US$3 (2027)">
<comment><narrative>
As of December 2023, one nickel shipment occurred, which applied the old nickel valuation method. With capacity coming in place and the mining Regulations issued, the new valuation method is expected to be applied for future nickel shipments.
</narrative></comment>
</target>
<actual value="1.2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Non-logging domestic revenue (as a percent of GDP)
</narrative></title>
<baseline year="2023" iso-date="2023-07-01" value="20.4 percent (2022-2023 average)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-01" />
<period-end iso-date="2027-06-01" />
<target value="22.4 percent (2026-2027 average)">
<comment><narrative>
There has been good progress toward achieving the target. The implementation of the VAT Act, along with adjustments to non-tax revenue fees, will further support efforts to reach the target.
</narrative></comment>
</target>
<actual value="20.9">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of public health emergency preparedness and response drills conducted at provincial level, incorporating gender-based violence survivors
</narrative></title>
<baseline year="2023" iso-date="2023-06-01" value="0 (2023)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-01" />
<period-end iso-date="2027-06-01" />
<target value="9 (2024-2027)">
<comment><narrative>
The results indicator has not yet changed. The new government has decided to review and revise the entire legal framework for the health sector, prioritizing the development of a new health policy.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Share of permit applications assessed for compliance with the building regulations and code (percent of total)
</narrative></title>
<baseline year="2023" iso-date="2023-07-01" value="0 percent (2023)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-01" />
<period-end iso-date="2027-07-01" />
<target value="100 percent (2027)">
<comment><narrative>
There is no change in the results indicator, as implementation of the Building Approval Authority has been delayed and is now expected in 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Development applications screened against the climate and disaster risk ordinances developed in at least 2 provincial government areas
</narrative></title>
<baseline year="2023" iso-date="2023-07-01" value="0 percent (2023)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-01" />
<period-end iso-date="2027-07-01" />
<target value="100 percent (2027)">
<comment><narrative>
The results indicator has not yet been achieved, as the development of ordinances related to development approvals is expected to proceed only after the overarching Climate Change Bill is enacted.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The number of foreign enterprises registered in the Solomon Islands
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="63"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-07-01" />
<target value="75">
<comment><narrative>
Indicator surpassed the target, indicative of reform success.
</narrative></comment>
</target>
<actual value="218">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Loans granted to women (as a percent of total)
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="12"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-07-01" />
<target value="17">
<comment><narrative>
The results indicator has not changed, as the Credit Reporting Regulations were only gazetted in September 2025 and the credit bureau is not yet operational.
</narrative></comment>
</target>
<actual value="12">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Domestic credit to private sector (as share of GDP)
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="32.1 percent (2021-2022 average)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-07-01" />
<target value="35 percent (2026-2027 average)">
<comment><narrative>
The indicator has declined, reflecting a slowdown in economic activity. However, it is expected to reach the target following the approval of the Credit Reporting Regulations.
</narrative></comment>
</target>
<actual value="30.3">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of renewable energy in the energy mix (excl. Tina River)
</narrative></title>
<baseline year="2023" iso-date="2023-06-01" value="2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-01" />
<period-end iso-date="2027-07-01" />
<target value="5">
<comment><narrative>
The results indicator has not changed, as energy reforms have stalled.
</narrative></comment>
</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Commercial electricity tariff differential relative to structural peers in the region (Kiribati, Samoa, and Vanuatu, US$/KWh)
</narrative></title>
<baseline year="2021" iso-date="2021-06-01" value="0.3"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-06-01" />
<period-end iso-date="2027-06-01" />
<target value="0.2">
<comment><narrative>
The tariff differential has decreased, indicating that tariff adjustments are on track to meet the target.
</narrative></comment>
</target>
<actual value="0.29">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of externally financed project proposals analyzed following PIM Appraisal Guidelines
</narrative></title>
<baseline year="2023" iso-date="2023-07-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-01" />
<period-end iso-date="2027-06-01" />
<target value="100">
<comment><narrative>
An estimated 70 percent of externally financed projects appraised following PIM Guidelines, so the results indicator is on track for a 100 percent by June 2027.
</narrative></comment>
</target>
<actual value="70">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Nickel royalty per dry tonne (in constant US$)
</narrative></title>
<baseline year="2023" iso-date="2023-07-01" value="US$1.2 (2023)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-01" />
<period-end iso-date="2027-07-01" />
<target value="US$3 (2027)">
<comment><narrative>
As of December 2023, one nickel shipment occurred, which applied the old nickel valuation method. With capacity coming in place and the mining Regulations issued, the new valuation method is expected to be applied for future nickel shipments.
</narrative></comment>
</target>
<actual value="1.2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Non-logging domestic revenue (as a percent of GDP)
</narrative></title>
<baseline year="2023" iso-date="2023-07-01" value="20.4 percent (2022-2023 average)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-01" />
<period-end iso-date="2027-06-01" />
<target value="22.4 percent (2026-2027 average)">
<comment><narrative>
There has been good progress toward achieving the target. The implementation of the VAT Act, along with adjustments to non-tax revenue fees, will further support efforts to reach the target.
</narrative></comment>
</target>
<actual value="20.9">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T00:13:13" hierarchy="1"><iati-identifier>44000-P180220</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Solomon Islands Community Benefits Sharing Project -- Phase 2</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[to enable Target Communities to benefit from improved access to and use of basic infrastructure and services, and to operationalize the Community Benefit Sharing Fund (CBSF). ]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The Community Benefit Sharing Pilot Project (CBSP) has been implemented by the Solomon Islands Government (SIG) from 2018 to 2023 with the support of the World Bank. The CBSP pilot aimed to establish a benefit sharing scheme between the Tina River Hydropower Development Project (TRHDP) and the project area communities. The benefits to be shared with these communities are based on an agreed-upon formula between SIG and the dam operator-- Tina Hydro Limited-- that will allocate a portion of the annual revenues from the power generated by the dam for an estimated 30 years after the hydropower plant comes into operation. By enabling the benefits of TRHDP to be shared more broadly with the Malango and Bahomea communities in Malango Ward who may not necessarily receive compensation and royalties from TRHDP, the pilot is expected to reduce the inequality between the members of the core land owning tribes and other residents. The pilot project thereby also served the purpose of sustaining broader community support for the hydropower facility and reducing the risk of disruption to ongoing dam construction.Construction on the TRHDP has been delayed and it is now expected that power-- and therefore revenues to support community benefits-- would not begin to be generated for at least four to five years. Therefore, with the CBSP pilot phase having closed in May 2023, SIG has requested that a phase 2 be prepared to continue to provide benefits to the CBSP target communities. Phase 2 of the Community Benefit Sharing Project (CBSP-2) will build on the pilot CBSP foundation and framework. The Project, like the pilot phase, will be implemented by a Project Management Unit (PMU) within the Ministry of Mines, Energy, and Rural Electrification (MMERE) and by Solomon Islands Electricity Authority (Solomon Power) for sub-component 2(c), rural electrification (see below). The Project will expand investments started under the pilot in water and electricity access, and include solar where feasible, to ensure that all community members benefit.The project will have four components as follows:-- Component 1: to operationalize the Community Benefits Sharing Fund (CBSF or “Fund”) by establishing the institutional arrangements for the Fund, building the capacity for the oversight and management of the Fund, supporting updates to the Fund Operation Manual and financing community subprojects supporting basic services. The component will consist of two sub-components: 1(a) institutional support to the Fund, and 1(b) small-scale rural infrastructure identified by the communities through a participatory process and screened and approved in accordance with the procedures of the Fund Operations Manual.-- Component 2: to improve access to and use of basic infrastructure and services for the project's target communities. The component will consist of three sub-components: 2(a) rural water supply, 2(b) rural road improvements, and 2(c) rural electrification. Several infrastructure options have been pre-identified under the component and will be confirmed by communities and assessed for final feasibility during the early stages of implementation.  Component 2 will include the financing of necessary preparatory activities, such as technical assessments, survey and design and the supervision of the implementation of component 2 civil works.  The component would also further inform and test the design, and refine the operational procedures that will be used for component 1(b).-- Component 3: to enhance skills of CBSP community members to  increase their knowledge and confidence to participate in the CBSF processes and local economic development activities, and to provide knowledge and skills aimed at income-generating opportunities in both the formal and informal sectors. This would be accomplished through three sub-components that address: 3(a) literacy and numeracy development; 3(b) short technical training focused on existing livelihood activities (such as in agriculture) or linked to work readiness and life-skills training ; and 3(c) employment support services to develop income generation strategies, apply for jobs, obtain references, and so on.-- Component 4: to support project management, monitoring and evaluation (M&amp;E). As with the CBSP Pilot, a Project Management Unit (PMU) will continue to service CBSP-2 and will be co-located with the Project Office of TRHDP, which would continue to provide support on communications, environmental and social standards, gender, citizen engagement and grievance redress. Short-term technical assistance and support through consultant services for specific technical issues will be provided under each of the components described above (i.e., fund advisors, infrastructure engineer, water engineer, skills development specialist etc.).  Component 4 will also finance external audits, M&amp;E reports (mid-term and final project review), office equipment (vehicle, furniture, computers), and operating costs necessary to carry out all project-related activities. ]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SB–P0053671"><narrative>Solomon Islands</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SB-COA-00003877"><narrative>Solomon Islands Electricity Authority</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2023-09-22"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2023-09-22"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2028-12-29"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2028-12-29"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Ifeta Smajic</narrative></person-name><telephone>+1-202-473-1000</telephone><email>ismajic@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<contact-info type="2">
<mailing-address><narrative>
PO Box 6, Honiara

</narrative></mailing-address></contact-info>
<recipient-country code="SB" percentage="100"><narrative xml:lang="en">SOLOMON ISLANDS</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="2108502" />
                <name><narrative>Honiara</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-9.43333 159.95</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="21022" percentage="39" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="36" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="15" xml:lang="en"/><sector vocabulary="1" code="23111" percentage="6" xml:lang="en"/><sector vocabulary="1" code="14021" percentage="4" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SG" percentage="23.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="40.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WC" percentage="1.00000000" xml:lang="en"><narrative>FY17 - Water Supply</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TI" percentage="3.00000000" xml:lang="en"><narrative>FY17 - Rural and Inter-Urban Roads</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LZ" percentage="33.0000000" xml:lang="en"><narrative>FY17 - Other Energy and Extractives</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000086" percentage="0" xml:lang="en"><narrative>Energy</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">39999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">39999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">39999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">39999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">39999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">39999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">39999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">39999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">39999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">40009.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">66665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">66665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">66665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">66665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">66665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">66665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">66665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">66665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">66665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">66665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">66665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">66677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">99999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">99999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">99999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">99999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">99999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">99999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">99999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">99999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">99999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">99999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">99999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">100011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">99999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">99999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">99999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">99999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">99999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">99999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">99999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">99999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">99999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">99999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">99999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">100011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">66665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">66665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">66665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">66665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">66665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">66665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">66665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">66665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">66665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">66665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">66665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">66677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">59999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">59999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">59999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">59999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">59999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">59999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">59999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">59999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">59999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">60009.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">39999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">39999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">39999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">39999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">39999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">39999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">39999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">39999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">39999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">40009.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">66665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">66665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">66665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">66665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">66665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">66665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">66665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">66665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">66665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">66665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">66665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">66677.63</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">99999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">99999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">99999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">99999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">99999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">99999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">99999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">99999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">99999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">99999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">99999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">100011.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">99999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">99999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">99999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">99999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">99999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">99999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">99999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">99999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">99999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">99999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">99999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">100011.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">66665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">66665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">66665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">66665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">66665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">66665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">66665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">66665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">66665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">66665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">66665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">66677.63</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">59999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">59999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">59999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">59999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">59999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">59999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">59999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">59999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">59999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">60009.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-29"/>
<value currency="USD" value-date="2028-12-29">2392824.70</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-29"/>
<value currency="USD" value-date="2028-12-29">2392824.70</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">5000000</value><description xml:lang="en"><narrative>Total Commitment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-53670"><narrative>Ministry of Mines, Energy and Rural Electrification; Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">353400</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-53670"><narrative>Ministry of Mines, Energy and Rural Electrification; Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">180795</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-53670"><narrative>Ministry of Mines, Energy and Rural Electrification; Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">118337</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-53670"><narrative>Ministry of Mines, Energy and Rural Electrification; Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">101526</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-53670"><narrative>Ministry of Mines, Energy and Rural Electrification; Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">163620</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-53670"><narrative>Ministry of Mines, Energy and Rural Electrification; Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">357598</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-53670"><narrative>Ministry of Mines, Energy and Rural Electrification; Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">106087</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-53670"><narrative>Ministry of Mines, Energy and Rural Electrification; Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">101196</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-53670"><narrative>Ministry of Mines, Energy and Rural Electrification; Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">232238</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-53670"><narrative>Ministry of Mines, Energy and Rural Electrification; Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">631276</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-53670"><narrative>Ministry of Mines, Energy and Rural Electrification; Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">261103</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-53670"><narrative>Ministry of Mines, Energy and Rural Electrification; Solomon Islands Electricity Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P180220"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P180220?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P180220"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people who successfully complete training.
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2028-11-01" />
<target value="800">
<comment><narrative>
This will be cumulative over the life of the project and will capture all people who successfully complete training under Component 3 activities. The target is based on an expected 600 spaces for literacy/numeracy, plus 720 spaces for technical skills, minus 320 to account for overlap.
</narrative></comment>
</target>
<actual value="651">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of infrastructure subprojects which include climate adaptation measures
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2028-12-01" />
<target value="50">
<comment><narrative>
This will be monitored by reviewing subproject designs under components 2 and 1b and identifying which have incorporated relevant climate adaptation measures for the respective sectors (roads &amp; bridges, water, buildings, rural electrification). The current measure refers to water system and road designs.
</narrative></comment>
</target>
<actual value="80">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
CBSF Operational Index Score
</narrative></title>
<baseline year="2023" iso-date="2023-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-08-31" />
<period-end iso-date="2028-12-29" />
<target value="35">
<comment><narrative>
Measured from year 3 of implementation onwards. The score is based on the CBSF achieving a number (10) of key characteristics of a well-functioning benefits sharing scheme. Each characteristic is given a score between 3-5 and is either absolutely achieved (to earn the full score for the characteristic) or relatively achieved (graded from 0 highest score depending on relative achievement). Current score (17.5/40) reflects: 4/4 (quarterly Board meetings held and minutes disclosed) + 2/4 member satisfaction (13 percent satisfaction against 20 percent annual target for 2025) + all 3 FMO consultants in place + Board perception of CBSF (4.5/5).
</narrative></comment>
</target>
<actual value="17.5">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of participants who pass literacy and numeracy training.
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2028-12-01" />
<target value="80">
<comment><narrative>
Literacy and numeracy training is tailored to the needs of the participants and will include a pass/fail test to check knowledge.
</narrative></comment>
</target>
<actual value="77">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Project beneficiaries with improved access to basic services and infrastructure supported under the project (cumulative)
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2028-12-29" />
<target value="5,000.00">
<comment><narrative>
The number will be calculated by adding: i) the total number of people benefitting from infrastructure investments, and; ii) the number of people who complete training under the project. The target is based on an estimated 4200 beneficiaries under components 1b and 2, and 800 people being trained under component 3. It is probable that beneficiaries will benefit from more than one investment type. Current quarter figure (746) is derived from training graduates (454) + total Antioch village population benefitting from road upgrade (292).
</narrative></comment>
</target>
<actual value="746">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
CBSF Operational Index Score
</narrative></title>
<baseline year="2023" iso-date="2023-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-08-31" />
<period-end iso-date="2028-12-29" />
<target value="35">
<comment><narrative>
Measured from year 3 of implementation onwards. The score is based on the CBSF achieving a number (10) of key characteristics of a well-functioning benefits sharing scheme. Each characteristic is given a score between 3-5 and is either absolutely achieved (to earn the full score for the characteristic) or relatively achieved (graded from 0 highest score depending on relative achievement). Current score (5/40) reflects: 3/3 (quarterly Board meetings held) + 2/4 member satisfaction (13 percent satisfaction against 20 percent annual target for 2025).
</narrative></comment>
</target>
<actual value="5">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Project beneficiaries with improved access to basic services and infrastructure supported under the project (cumulative)
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2028-12-29" />
<target value="5,000.00">
<comment><narrative>
The number will be calculated by adding: i) the total number of people benefitting from infrastructure investments, and; ii) the number of people who complete training under the project. The target is based on an estimated 4200 beneficiaries under components 1b and 2, and 800 people being trained under component 3. It is probable that beneficiaries will benefit from more than one investment type. Current quarter figure (746) is derived from training graduates (454) + total Antioch village population benefitting from road upgrade (292).
</narrative></comment>
</target>
<actual value="746">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Project beneficiaries with improved access to basic services and infrastructure supported under the project (cumulative)
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2028-12-29" />
<target value="5,000.00">
<comment><narrative>
The number will be calculated by adding: i) the total number of people benefitting from infrastructure investments, and; ii) the number of people who complete training under the project. The target is based on an estimated 4200 beneficiaries under components 1b and 2, and 800 people being trained under component 3. It is probable that beneficiaries will benefit from more than one investment type. Current quarter figure (746) is derived from training graduates (454) + total Antioch village population benefitting from road upgrade (292).
</narrative></comment>
</target>
<actual value="746">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Project beneficiaries with improved access to basic services and infrastructure supported under the project (cumulative)
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2028-12-29" />
<target value="5,000.00">
<comment><narrative>
The number will be calculated by adding: i) the total number of people benefitting from infrastructure investments, and; ii) the number of people who complete training under the project. The target is based on an estimated 4200 beneficiaries under components 1b and 2, and 800 people being trained under component 3. It is probable that beneficiaries will benefit from more than one investment type. Current quarter figure (1,843) is derived from training graduates (450) + beneficiaries of 3 water systems (1,393). Antioch Road beneficiaries not included in the count to avoid double-counting.
</narrative></comment>
</target>
<actual value="1,843">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Project beneficiaries with improved access to basic services and infrastructure supported under the project (cumulative)
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2028-12-29" />
<target value="5,000.00">
<comment><narrative>
The number will be calculated by adding: i) the total number of people benefitting from infrastructure investments, and; ii) the number of people who complete training under the project. The target is based on an estimated 4200 beneficiaries under components 1b and 2, and 800 people being trained under component 3. It is probable that beneficiaries will benefit from more than one investment type. Current quarter figure (1,843) is derived from training graduates (450) + beneficiaries of 3 water systems (1,393). Antioch Road beneficiaries not included in the count to avoid double-counting.
</narrative></comment>
</target>
<actual value="1,843">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
CBSF Operational Index Score
</narrative></title>
<baseline year="2023" iso-date="2023-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-08-31" />
<period-end iso-date="2028-12-29" />
<target value="35">
<comment><narrative>
Measured from year 3 of implementation onwards. The score is based on the CBSF achieving a number (10) of key characteristics of a well-functioning benefits sharing scheme. Each characteristic is given a score between 3-5 and is either absolutely achieved (to earn the full score for the characteristic) or relatively achieved (graded from 0 highest score depending on relative achievement). Current score (5/40) reflects: 3/3 (quarterly Board meetings held) + 2/4 member satisfaction (13 percent satisfaction against 20 percent annual target for 2025).
</narrative></comment>
</target>
<actual value="5">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
CBSF Operational Index Score
</narrative></title>
<baseline year="2023" iso-date="2023-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-08-31" />
<period-end iso-date="2028-12-29" />
<target value="35">
<comment><narrative>
Measured from year 3 of implementation onwards. The score is based on the CBSF achieving a number (10) of key characteristics of a well-functioning benefits sharing scheme. Each characteristic is given a score between 3-5 and is either absolutely achieved (to earn the full score for the characteristic) or relatively achieved (graded from 0 highest score depending on relative achievement). Current score (17.5/40) reflects: 4/4 (quarterly Board meetings held and minutes disclosed) + 2/4 member satisfaction (13 percent satisfaction against 20 percent annual target for 2025) + all 3 FMO consultants in place + Board perception of CBSF (4.5/5).
</narrative></comment>
</target>
<actual value="17.5">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of individuals trained who report the training has improved their ability to engage with the CBSF process and in local economic development.
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2028-12-29" />
<target value="70.00">
<comment><narrative>
Results recorded under first Community Survey (September 2025).
</narrative></comment>
</target>
<actual value="53">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of individuals trained who report the training has improved their ability to engage with the CBSF process and in local economic development.
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2028-12-29" />
<target value="70.00">
<comment><narrative>
Results recorded under first Community Survey (September 2025).
</narrative></comment>
</target>
<actual value="53">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of CBSP community members who feel the CBSP investments reflect their needs
</narrative></title>
<baseline year="2023" iso-date="2023-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-08-31" />
<period-end iso-date="2028-12-29" />
<target value="60">
<comment><narrative>
This is a citizen engagement indicator. Results are based on the first Community Survey completed in September 2025. Survey covered 39 of 80 communities across Bahomea and Malongo areas. The sample size was 480 representing a population of 1,735 community members.
</narrative></comment>
</target>
<actual value="45">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of CBSP community members who feel the CBSP investments reflect their needs
</narrative></title>
<baseline year="2023" iso-date="2023-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-08-31" />
<period-end iso-date="2028-12-29" />
<target value="60">
<comment><narrative>
This is a citizen engagement indicator. Results are based on the first Community Survey completed in September 2025. Survey covered 39 of 80 communities across Bahomea and Malongo areas. The sample size was 480 representing a population of 1,735 community members.
</narrative></comment>
</target>
<actual value="45">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of individuals trained who report the training has improved their ability to engage with the CBSF process and in local economic development.
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2028-12-29" />
<target value="70.00">
<comment><narrative>
Results recorded under first Community Survey (September 2025).
</narrative></comment>
</target>
<actual value="53">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of CBSP community members who feel the CBSP investments reflect their needs
</narrative></title>
<baseline year="2023" iso-date="2023-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-08-31" />
<period-end iso-date="2028-12-29" />
<target value="60">
<comment><narrative>
This is a citizen engagement indicator. Results are based on the first Community Survey completed in September 2025. Survey covered 39 of 80 communities across Bahomea and Malongo areas. The sample size was 480 representing a population of 1,735 community members.
</narrative></comment>
</target>
<actual value="45">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of CBSF communities which submit a proposal under Component 1b
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2028-12-01" />
<target value="20">
<comment><narrative>
Measured as of year 3 of implementation when first cycle of subprojects is released. This indicator will monitor community engagement with the CBSF process. There are approx. 80 communities within the CBSF area. The project anticipates up to 10 proposals in year 3 (when component 1b begins implementation) with the number increasing after that. Not all proposals are expected to be approved and implemented.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Project beneficiaries with improved access to basic services and infrastructure supported under the project (cumulative)
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2028-12-29" />
<target value="5,000.00">
<comment><narrative>
The number will be calculated by adding: i) the total number of people benefitting from infrastructure investments, and; ii) the number of people who complete training under the project. The target is based on an estimated 4200 beneficiaries under components 1b and 2, and 800 people being trained under component 3. It is probable that beneficiaries will benefit from more than one investment type. Current quarter figure (1,843) is derived from training graduates (450) + beneficiaries of 3 water systems (1,393). Antioch Road beneficiaries not included in the count to avoid double-counting.
</narrative></comment>
</target>
<actual value="1,843">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of infrastructure subprojects which include climate adaptation measures
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2028-12-01" />
<target value="50">
<comment><narrative>
This will be monitored by reviewing subproject designs under components 2 and 1b and identifying which have incorporated relevant climate adaptation measures for the respective sectors (roads &amp; bridges, water, buildings, rural electrification). The current measure refers to water system and road designs.
</narrative></comment>
</target>
<actual value="60">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of members of the Association that are satisfied with the effectiveness of the Fund
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2028-12-29" />
<target value="60">
<comment><narrative>
Measured through the Community Survey completed in September 2025. Monitored through a random sample survey of 18+ year old's from the CBSF communities, not just those who are direct beneficiaries of CBSP-2 interventions. Different aspects of effectiveness (communications, engagement, readiness, etc.) were inquired about. Both yes/no questions were asked and a satisfaction scale was used to define satisfaction level.
</narrative></comment>
</target>
<actual value="13">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of members of the Association that are satisfied with the effectiveness of the Fund
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2028-12-29" />
<target value="60">
<comment><narrative>
Measured through the Community Survey completed in September 2025. Monitored through a random sample survey of 18+ year old's from the CBSF communities, not just those who are direct beneficiaries of CBSP-2 interventions. Different aspects of effectiveness (communications, engagement, readiness, etc.) were inquired about. Both yes/no questions were asked and a satisfaction scale was used to define satisfaction level.
</narrative></comment>
</target>
<actual value="13">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of HEC employees who are women from CBSP communities.
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2028-12-01" />
<target value="20">
<comment><narrative>
HEC has a target of 30% female employees and will aim to have two thirds of that (20% of total employees) coming from the CBSF communities. Based on TRHDP quarterly reports (for Q3 2025, total benefit sharing community employees (M&amp;F) for HEC is 64 of which 11 are women).
</narrative></comment>
</target>
<actual value="17">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Timely procurement of project goods, works and services
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2028-12-01" />
<target value="100">
<comment><narrative>
Defined as: percentage of contracts planned that are let (signed) within each quarter (average per year).
</narrative></comment>
</target>
<actual value="41">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Timely procurement of project goods, works and services
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2028-12-01" />
<target value="100">
<comment><narrative>
Defined as: percentage of contracts planned that are let (signed) within each quarter (average per year).
</narrative></comment>
</target>
<actual value="63">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of grievances related to project activities which are addressed within a timely manner
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2028-12-01" />
<target value="80">
<comment><narrative>
Grievances are tracked through the TRHDP (as done under CBSP) and each grievance is reviewed and directed to the relevant project. Timely means within 3 months. For the quarter ending September 30, 8 out of 9 grievances received have been addressed in a timely manner.
</narrative></comment>
</target>
<actual value="67">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Project beneficiaries with improved access to basic services and infrastructure supported under the project (cumulative)
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2028-12-29" />
<target value="5,000.00">
<comment><narrative>
The number will be calculated by adding: i) the total number of people benefitting from infrastructure investments, and; ii) the number of people who complete training under the project. The target is based on an estimated 4200 beneficiaries under components 1b and 2, and 800 people being trained under component 3. It is probable that beneficiaries will benefit from more than one investment type. Current quarter figure (746) is derived from training graduates (454) + total Antioch village population benefitting from road upgrade (292).
</narrative></comment>
</target>
<actual value="746">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of grievances related to project activities which are addressed within a timely manner
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2028-12-01" />
<target value="80">
<comment><narrative>
Grievances are tracked through the TRHDP (as done under CBSP) and each grievance is reviewed and directed to the relevant project. Timely means within 3 months. For the quarter ending September 30, 8 out of 9 grievances received have been addressed in a timely manner.
</narrative></comment>
</target>
<actual value="89">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of works contracts completed per annual workplan.
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2028-12-01" />
<target value="100">
<comment><narrative>
This will be measured quarterly. Results recorded are cumulative across the year compared with annual workplan.
</narrative></comment>
</target>
<actual value="60">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of participants who pass literacy and numeracy training.
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2028-12-01" />
<target value="80">
<comment><narrative>
Literacy and numeracy training is tailored to the needs of the participants and will include a pass/fail test to check knowledge.
</narrative></comment>
</target>
<actual value="80">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Project beneficiaries with improved access to basic services and infrastructure supported under the project (cumulative)
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2028-12-29" />
<target value="5,000.00">
<comment><narrative>
The number will be calculated by adding: i) the total number of people benefitting from infrastructure investments, and; ii) the number of people who complete training under the project. The target is based on an estimated 4200 beneficiaries under components 1b and 2, and 800 people being trained under component 3. It is probable that beneficiaries will benefit from more than one investment type. Current quarter figure (1,843) is derived from training graduates (450) + beneficiaries of 3 water systems (1,393). Antioch Road beneficiaries not included in the count to avoid double-counting.
</narrative></comment>
</target>
<actual value="1,843">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of CBSP community members who feel the CBSP investments reflect their needs
</narrative></title>
<baseline year="2023" iso-date="2023-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-08-31" />
<period-end iso-date="2028-12-29" />
<target value="60">
<comment><narrative>
This is a citizen engagement indicator. Results are based on the first Community Survey completed in September 2025. Survey covered 39 of 80 communities across Bahomea and Malongo areas. The sample size was 480 representing a population of 1,735 community members.
</narrative></comment>
</target>
<actual value="45">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of works contracts completed per annual workplan.
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2028-12-01" />
<target value="100">
<comment><narrative>
This will be measured quarterly. Results recorded are cumulative across the year compared with annual workplan.
</narrative></comment>
</target>
<actual value="22">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people who successfully complete training.
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2028-11-01" />
<target value="800">
<comment><narrative>
This will be cumulative over the life of the project and will capture all people who successfully complete training under Component 3 activities. The target is based on an expected 600 spaces for literacy/numeracy, plus 720 spaces for technical skills, minus 320 to account for overlap.
</narrative></comment>
</target>
<actual value="454">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of individuals trained who report the training has improved their ability to engage with the CBSF process and in local economic development.
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2028-12-29" />
<target value="70.00">
<comment><narrative>
Results recorded under first Community Survey (September 2025).
</narrative></comment>
</target>
<actual value="53">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Project beneficiaries with improved access to basic services and infrastructure supported under the project (cumulative)
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2028-12-29" />
<target value="5,000.00">
<comment><narrative>
The number will be calculated by adding: i) the total number of people benefitting from infrastructure investments, and; ii) the number of people who complete training under the project. The target is based on an estimated 4200 beneficiaries under components 1b and 2, and 800 people being trained under component 3. It is probable that beneficiaries will benefit from more than one investment type. Current quarter figure (746) is derived from training graduates (454) + total Antioch village population benefitting from road upgrade (292).
</narrative></comment>
</target>
<actual value="746">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Project beneficiaries with improved access to basic services and infrastructure supported under the project (cumulative)
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2028-12-29" />
<target value="5,000.00">
<comment><narrative>
The number will be calculated by adding: i) the total number of people benefitting from infrastructure investments, and; ii) the number of people who complete training under the project. The target is based on an estimated 4200 beneficiaries under components 1b and 2, and 800 people being trained under component 3. It is probable that beneficiaries will benefit from more than one investment type. Current quarter figure (746) is derived from training graduates (454) + total Antioch village population benefitting from road upgrade (292).
</narrative></comment>
</target>
<actual value="746">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Project beneficiaries with improved access to basic services and infrastructure supported under the project (cumulative)
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2028-12-29" />
<target value="5,000.00">
<comment><narrative>
The number will be calculated by adding: i) the total number of people benefitting from infrastructure investments, and; ii) the number of people who complete training under the project. The target is based on an estimated 4200 beneficiaries under components 1b and 2, and 800 people being trained under component 3. It is probable that beneficiaries will benefit from more than one investment type. Current quarter figure (1,843) is derived from training graduates (450) + beneficiaries of 3 water systems (1,393). Antioch Road beneficiaries not included in the count to avoid double-counting.
</narrative></comment>
</target>
<actual value="1,843">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Project beneficiaries with improved access to basic services and infrastructure supported under the project (cumulative)
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2028-12-29" />
<target value="5,000.00">
<comment><narrative>
The number will be calculated by adding: i) the total number of people benefitting from infrastructure investments, and; ii) the number of people who complete training under the project. The target is based on an estimated 4200 beneficiaries under components 1b and 2, and 800 people being trained under component 3. It is probable that beneficiaries will benefit from more than one investment type. Current quarter figure (1,843) is derived from training graduates (450) + beneficiaries of 3 water systems (1,393). Antioch Road beneficiaries not included in the count to avoid double-counting.
</narrative></comment>
</target>
<actual value="1,843">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
CBSF Operational Index Score
</narrative></title>
<baseline year="2023" iso-date="2023-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-08-31" />
<period-end iso-date="2028-12-29" />
<target value="35">
<comment><narrative>
Measured from year 3 of implementation onwards. The score is based on the CBSF achieving a number (10) of key characteristics of a well-functioning benefits sharing scheme. Each characteristic is given a score between 3-5 and is either absolutely achieved (to earn the full score for the characteristic) or relatively achieved (graded from 0 highest score depending on relative achievement). Current score (5/40) reflects: 3/3 (quarterly Board meetings held) + 2/4 member satisfaction (13 percent satisfaction against 20 percent annual target for 2025).
</narrative></comment>
</target>
<actual value="5">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of CBSF communities which submit a proposal under Component 1b
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2028-12-01" />
<target value="20">
<comment><narrative>
Measured as of year 3 of implementation when first cycle of subprojects is released. This indicator will monitor community engagement with the CBSF process. There are approx. 80 communities within the CBSF area. The project anticipates up to 10 proposals in year 3 (when component 1b begins implementation) with the number increasing after that. Not all proposals are expected to be approved and implemented.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of CBSP community members who feel the CBSP investments reflect their needs
</narrative></title>
<baseline year="2023" iso-date="2023-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-08-31" />
<period-end iso-date="2028-12-29" />
<target value="60">
<comment><narrative>
This is a citizen engagement indicator. Results are based on the first Community Survey completed in September 2025. Survey covered 39 of 80 communities across Bahomea and Malongo areas. The sample size was 480 representing a population of 1,735 community members.
</narrative></comment>
</target>
<actual value="45">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of CBSP community members who feel the CBSP investments reflect their needs
</narrative></title>
<baseline year="2023" iso-date="2023-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-08-31" />
<period-end iso-date="2028-12-29" />
<target value="60">
<comment><narrative>
This is a citizen engagement indicator. Results are based on the first Community Survey completed in September 2025. Survey covered 39 of 80 communities across Bahomea and Malongo areas. The sample size was 480 representing a population of 1,735 community members.
</narrative></comment>
</target>
<actual value="45">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of individuals trained who report the training has improved their ability to engage with the CBSF process and in local economic development.
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2028-12-29" />
<target value="70.00">
<comment><narrative>
Results recorded under first Community Survey (September 2025).
</narrative></comment>
</target>
<actual value="53">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of individuals trained who report the training has improved their ability to engage with the CBSF process and in local economic development.
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2028-12-29" />
<target value="70.00">
<comment><narrative>
Results recorded under first Community Survey (September 2025).
</narrative></comment>
</target>
<actual value="53">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
CBSF Operational Index Score
</narrative></title>
<baseline year="2023" iso-date="2023-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-08-31" />
<period-end iso-date="2028-12-29" />
<target value="35">
<comment><narrative>
Measured from year 3 of implementation onwards. The score is based on the CBSF achieving a number (10) of key characteristics of a well-functioning benefits sharing scheme. Each characteristic is given a score between 3-5 and is either absolutely achieved (to earn the full score for the characteristic) or relatively achieved (graded from 0 highest score depending on relative achievement). Current score (17.5/40) reflects: 4/4 (quarterly Board meetings held and minutes disclosed) + 2/4 member satisfaction (13 percent satisfaction against 20 percent annual target for 2025) + all 3 FMO consultants in place + Board perception of CBSF (4.5/5).
</narrative></comment>
</target>
<actual value="17.5">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of HEC employees who are women from CBSP communities.
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2028-12-01" />
<target value="20">
<comment><narrative>
HEC has a target of 30% female employees and will aim to have two thirds of that (20% of total employees) coming from the CBSF communities. Based on TRHDP quarterly reports (for Q3 2025, total benefit sharing community employees (M&amp;F) for HEC is 64 of which 11 are women).
</narrative></comment>
</target>
<actual value="37">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T00:13:13" hierarchy="1"><iati-identifier>44000-P180723</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Building Capacity in Statistics and Audit Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To improve the availability and quality of official statistics and audits in Solomon Islands]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[This project aims to build the capacity of the Solomon Islands National Statistics Office (SINSO) and the Office of the Auditor General of Solomon Islands (OAG) to meet their respective mandates in contributing to evidence-based policy-making and improved government accountability.The SINSO component will finance 1) the implementation of the Household Income and Expenditure Survey with improved methodologies, 2) improvements to national accounts and economic statistics, and 3) a suite of technical and institutional capacity- building activities. The OAG component will finance 1) strengthening quality assurance practices and improving audit quality, and 2) improving the public impact of audits.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SB–00004238"><narrative>Solomon Islands</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SB-COA-0054904"><narrative>Solomon Islands National Statistics office                                                          </narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2023-11-28"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2023-11-28"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2028-12-28"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2028-12-28"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Shohei Nakamura</narrative></person-name><telephone>+1-202-473-1000</telephone><email>snakamura2@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>




<recipient-country code="SB" percentage="100"><narrative xml:lang="en">SOLOMON ISLANDS</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="2108502" />
                <name><narrative>Honiara</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-9.43333 159.95</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="16062" percentage="82" xml:lang="en"/><sector vocabulary="1" code="16062" percentage="52" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="48" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="18" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="100.000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000441" percentage="0" xml:lang="en"><narrative>Data production, accessibility and use</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="0" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000441" percentage="0" xml:lang="en"><narrative>Data production, accessibility and use</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">256713.29</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">256713.29</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">256713.29</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">256713.29</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">256713.29</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">256713.29</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">256720.26</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">210332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">210332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">210332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">210332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">210332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">210332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">210332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">210332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">210332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">210332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">210332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">210344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">81999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">81999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">81999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">81999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">81999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">81999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">81999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">81999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">81999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">81999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">81999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">82011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">41165.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">41165.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">41165.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">41165.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">41165.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">41165.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">41165.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">41165.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">41165.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">41165.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">41165.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">41177.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">39082.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">39082.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">39082.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">39082.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">39082.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">39082.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">39082.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">39082.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">39082.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">39082.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">39082.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">39094.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">33141.86</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">33141.86</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">33141.86</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">33141.86</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">33141.86</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">33141.86</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-28"/>
<value currency="USD" value-date="2028-12-28">1878549.56</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-28"/>
<value currency="USD" value-date="2028-12-28">1878549.56</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">6500000</value><description xml:lang="en"><narrative>Total Commitment in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-54906"><narrative>Office of the Auditor General of Solomon Islands                                                ; Solomon Islands National Statistics office                                                          </narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">429480</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-54906"><narrative>Office of the Auditor General of Solomon Islands                                                ; Solomon Islands National Statistics office                                                          </narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">166880</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-54906"><narrative>Office of the Auditor General of Solomon Islands                                                ; Solomon Islands National Statistics office                                                          </narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">329868</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-54906"><narrative>Office of the Auditor General of Solomon Islands                                                ; Solomon Islands National Statistics office                                                          </narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">278856</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-54906"><narrative>Office of the Auditor General of Solomon Islands                                                ; Solomon Islands National Statistics office                                                          </narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">348779</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-54906"><narrative>Office of the Auditor General of Solomon Islands                                                ; Solomon Islands National Statistics office                                                          </narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">368046</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-54906"><narrative>Office of the Auditor General of Solomon Islands                                                ; Solomon Islands National Statistics office                                                          </narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">139210</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-54906"><narrative>Office of the Auditor General of Solomon Islands                                                ; Solomon Islands National Statistics office                                                          </narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">276229</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-54906"><narrative>Office of the Auditor General of Solomon Islands                                                ; Solomon Islands National Statistics office                                                          </narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">139943</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-54906"><narrative>Office of the Auditor General of Solomon Islands                                                ; Solomon Islands National Statistics office                                                          </narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">176613</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-54906"><narrative>Office of the Auditor General of Solomon Islands                                                ; Solomon Islands National Statistics office                                                          </narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">202521</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-54906"><narrative>Office of the Auditor General of Solomon Islands                                                ; Solomon Islands National Statistics office                                                          </narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">240278</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-54906"><narrative>Office of the Auditor General of Solomon Islands                                                ; Solomon Islands National Statistics office                                                          </narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">196416</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-54906"><narrative>Office of the Auditor General of Solomon Islands                                                ; Solomon Islands National Statistics office                                                          </narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">183406</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-54906"><narrative>Office of the Auditor General of Solomon Islands                                                ; Solomon Islands National Statistics office                                                          </narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">213556</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-54906"><narrative>Office of the Auditor General of Solomon Islands                                                ; Solomon Islands National Statistics office                                                          </narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">189091</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-54906"><narrative>Office of the Auditor General of Solomon Islands                                                ; Solomon Islands National Statistics office                                                          </narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">24189</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-54906"><narrative>Office of the Auditor General of Solomon Islands                                                ; Solomon Islands National Statistics office                                                          </narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">401705</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-54906"><narrative>Office of the Auditor General of Solomon Islands                                                ; Solomon Islands National Statistics office                                                          </narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">92113</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-54906"><narrative>Office of the Auditor General of Solomon Islands                                                ; Solomon Islands National Statistics office                                                          </narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">70841</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-54906"><narrative>Office of the Auditor General of Solomon Islands                                                ; Solomon Islands National Statistics office                                                          </narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">153432</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-54906"><narrative>Office of the Auditor General of Solomon Islands                                                ; Solomon Islands National Statistics office                                                          </narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P180723"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P180723?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P180723"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National poverty indicator estimated in line with the regional standard approach endorsed by the PSMB
</narrative></title>
<baseline year="2023" iso-date="2023-12-01" value="No poverty indicator based on improved HIES data available"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-01" />
<period-end iso-date="2026-12-02" />
<target value="The methodology used for poverty estimation is documented and made public for transparency and replicability">
<comment><narrative>
The HIES fieldwork is in progress as planned.
</narrative></comment>
</target>
<actual value="Not estimated yet.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Financial, performance and compliance audits conducted by OAG staff in line with ISSAIs
</narrative></title>
<baseline year="2023" iso-date="2023-12-01" value="Not compliant"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-01" />
<period-end iso-date="2028-12-01" />
<target value="Compliant with minor areas for improvement">
<comment><narrative>
Due to recruitment challenges to fill the Quality Audit Management role, there is no progress update to report for this indicator.
</narrative></comment>
</target>
<actual value="Not assessed">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of gender indicators available using data collected within the last 5 years
</narrative></title>
<baseline year="2023" iso-date="2023-12-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-01" />
<period-end iso-date="2027-12-01" />
<target value="15">
<comment><narrative>
To be achieved once the HIES report is published (by June 2026).
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Reports are produced based on feedback from data users
</narrative></title>
<baseline year="2023" iso-date="2023-12-01" value="No feedback reports"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-01" />
<period-end iso-date="2028-12-01" />
<target value="Feedback surveys are sent to individuals who have accessed the HIES microdata and a report is produced based on the survey results">
<comment><narrative>
No feedback survey is sent yet
</narrative></comment>
</target>
<actual value="No feedback reports">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Gross number of staff trained
</narrative></title>
<baseline year="2023" iso-date="2023-12-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-01" />
<period-end iso-date="2028-12-02" />
<target value="50">
<comment><narrative>
HIES CAPI Training - 4 participants
HIES Training of Trainers - 25 participants
NEEC Training of Trainers - 10 participants
Data Visualization and Manipulation Training - 11
</narrative></comment>
</target>
<actual value="50">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Reduction in backlog of statutory audit opinions issued
</narrative></title>
<baseline year="2023" iso-date="2023-01-01" value="49% backlog of audits &amp;gt; 3 years; 38% backlog of audits 1-2 years"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-01" />
<period-end iso-date="2028-12-01" />
<target value="2% backlog &amp;gt; 3 years; 10% backlog 1-2 years">
<comment><narrative>
The Technical Lead (Financial Audit) has drafted a strategy to reduce the audit backlog which is expected to be finalized in November 2025 and rolled out immediately thereafter.
</narrative></comment>
</target>
<actual value="49% backlog of audits &amp;gt; 3 years; 38% backlog of audits 1-2 years">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Publish citizen friendly annual audit insight reports by thematic area
</narrative></title>
<baseline year="2023" iso-date="2023-12-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-01" />
<period-end iso-date="2028-12-01" />
<target value="3">
<comment><narrative>
The Technical Lead (Performance Audit) supported by the Communications Advisor will spearhead delivery of a strategy to develop citizen friendly audit reports.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of annual public events to disseminate audit report findings by thematic area
</narrative></title>
<baseline year="2023" iso-date="2023-12-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-01" />
<period-end iso-date="2028-12-01" />
<target value="2">
<comment><narrative>
Year 1 target has been met with one event held in 2024 to disseminate audit findings. A second event is envisaged to be held by end 2025.
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of data and publications made available from new HIES and business statistics for open access
</narrative></title>
<baseline year="2023" iso-date="2023-12-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-01" />
<period-end iso-date="2028-12-02" />
<target value="11. Media release with statistical tables from an annual business survey. 12. Media release with statistical tables from the SBR.">
<comment><narrative>
The NEEC final result has been published. The HIES fieldwork has been completed.
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Reduction in backlog of statutory audit opinions issued
</narrative></title>
<baseline year="2023" iso-date="2023-01-01" value="49% backlog of audits &amp;gt; 3 years; 38% backlog of audits 1-2 years"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-01" />
<period-end iso-date="2028-12-01" />
<target value="2% backlog &amp;gt; 3 years; 10% backlog 1-2 years">
<comment><narrative>
The Technical Lead (Financial Audit) has drafted a strategy to reduce the audit backlog which is expected to be finalized in November 2025 and rolled out immediately thereafter.
</narrative></comment>
</target>
<actual value="49% backlog of audits &amp;gt; 3 years; 38% backlog of audits 1-2 years">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National poverty indicator estimated in line with the regional standard approach endorsed by the PSMB
</narrative></title>
<baseline year="2023" iso-date="2023-12-01" value="No poverty indicator based on improved HIES data available"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-01" />
<period-end iso-date="2026-12-02" />
<target value="The methodology used for poverty estimation is documented and made public for transparency and replicability">
<comment><narrative>
The HIES data collection has been completed and welfare and poverty measurement in progress, with the results to be published by July 2026.
</narrative></comment>
</target>
<actual value="Not estimated yet.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National poverty indicator estimated in line with the regional standard approach endorsed by the PSMB
</narrative></title>
<baseline year="2023" iso-date="2023-12-01" value="No poverty indicator based on improved HIES data available"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-01" />
<period-end iso-date="2026-12-02" />
<target value="The methodology used for poverty estimation is documented and made public for transparency and replicability">
<comment><narrative>
The HIES fieldwork is in progress as planned.
</narrative></comment>
</target>
<actual value="Not estimated yet.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of data and publications made available from new HIES and business statistics for open access
</narrative></title>
<baseline year="2023" iso-date="2023-12-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-01" />
<period-end iso-date="2028-12-02" />
<target value="11. Media release with statistical tables from an annual business survey. 12. Media release with statistical tables from the SBR.">
<comment><narrative>
The NEEC final result has been published. Publications from AES, SBR and HIES (both a basic report and a poverty report) expected by July 2026.
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of data and publications made available from new HIES and business statistics for open access
</narrative></title>
<baseline year="2023" iso-date="2023-12-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-01" />
<period-end iso-date="2028-12-02" />
<target value="11. Media release with statistical tables from an annual business survey. 12. Media release with statistical tables from the SBR.">
<comment><narrative>
The NEEC final result has been published. The HIES fieldwork has been completed.
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Publish citizen friendly annual audit insight reports by thematic area
</narrative></title>
<baseline year="2023" iso-date="2023-12-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-01" />
<period-end iso-date="2028-12-01" />
<target value="3">
<comment><narrative>
The Technical Lead (Performance Audit) supported by the Communications Advisor will spearhead delivery of a strategy to develop citizen friendly audit reports.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increased integration of information technology tools in the audit process
</narrative></title>
<baseline year="2023" iso-date="2023-12-01" value="TeamMate not used to maximum functionality/integrated computer assisted audit techniques (iCAATs) not utilized"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-01" />
<period-end iso-date="2028-12-01" />
<target value="Implement one additional recommendation on use of information technology to increase audit efficiency">
<comment><narrative>
Indicator is on track as targets for Years 1, 2 and 3 have been met.
</narrative></comment>
</target>
<actual value="The Year 2 and Year 3 targets have been completed: The IT Audit Advisor has been appointed as the Champion for the TeamMate + audit application and staff have received training on the use of Excel for data analysis.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of annual public events to disseminate audit report findings by thematic area
</narrative></title>
<baseline year="2023" iso-date="2023-12-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-01" />
<period-end iso-date="2028-12-01" />
<target value="2">
<comment><narrative>
Year 1 target has been met with one event held in 2024 to disseminate audit findings. A second event is envisaged to be held by end 2025.
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of annual public events to disseminate audit report findings by thematic area
</narrative></title>
<baseline year="2023" iso-date="2023-12-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-01" />
<period-end iso-date="2028-12-01" />
<target value="2">
<comment><narrative>
Year 1 target has been met with one event held in 2024 to disseminate audit findings. A second event is envisaged to be held by end 2025.
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Financial, performance and compliance audits conducted by OAG staff in line with ISSAIs
</narrative></title>
<baseline year="2023" iso-date="2023-12-01" value="Not compliant"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-01" />
<period-end iso-date="2028-12-01" />
<target value="Compliant with minor areas for improvement">
<comment><narrative>
Due to recruitment challenges to fill the Quality Audit Management role, there is no progress update to report for this indicator.
</narrative></comment>
</target>
<actual value="Not assessed">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Financial, performance and compliance audits conducted by OAG staff in line with ISSAIs
</narrative></title>
<baseline year="2023" iso-date="2023-12-01" value="Not compliant"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-01" />
<period-end iso-date="2028-12-01" />
<target value="Compliant with minor areas for improvement">
<comment><narrative>
Due to recruitment challenges to fill the Quality Audit Management role, there is no progress update to report for this indicator.
</narrative></comment>
</target>
<actual value="Not assessed">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increased integration of information technology tools in the audit process
</narrative></title>
<baseline year="2023" iso-date="2023-12-01" value="TeamMate not used to maximum functionality/integrated computer assisted audit techniques (iCAATs) not utilized"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-01" />
<period-end iso-date="2028-12-01" />
<target value="Implement one additional recommendation on use of information technology to increase audit efficiency">
<comment><narrative>
Indicator is on track as targets for Years 1, 2 and 3 have been met.
</narrative></comment>
</target>
<actual value="The Year 2 and Year 3 targets have been completed: The IT Audit Advisor has been appointed as the Champion for the TeamMate + audit application and staff have received training on the use of Excel for data analysis.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National poverty indicator estimated in line with the regional standard approach endorsed by the PSMB
</narrative></title>
<baseline year="2023" iso-date="2023-12-01" value="No poverty indicator based on improved HIES data available"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-01" />
<period-end iso-date="2026-12-02" />
<target value="The methodology used for poverty estimation is documented and made public for transparency and replicability">
<comment><narrative>
The HIES data collection has been completed and welfare and poverty measurement in progress, with the results to be published by July 2026.
</narrative></comment>
</target>
<actual value="Not estimated yet.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National poverty indicator estimated in line with the regional standard approach endorsed by the PSMB
</narrative></title>
<baseline year="2023" iso-date="2023-12-01" value="No poverty indicator based on improved HIES data available"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-01" />
<period-end iso-date="2026-12-02" />
<target value="The methodology used for poverty estimation is documented and made public for transparency and replicability">
<comment><narrative>
The HIES fieldwork is in progress as planned.
</narrative></comment>
</target>
<actual value="Not estimated yet.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of data and publications made available from new HIES and business statistics for open access
</narrative></title>
<baseline year="2023" iso-date="2023-12-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-01" />
<period-end iso-date="2028-12-02" />
<target value="11. Media release with statistical tables from an annual business survey. 12. Media release with statistical tables from the SBR.">
<comment><narrative>
The NEEC final result has been published. Publications from AES, SBR and HIES (both a basic report and a poverty report) expected by July 2026.
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of data and publications made available from new HIES and business statistics for open access
</narrative></title>
<baseline year="2023" iso-date="2023-12-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-01" />
<period-end iso-date="2028-12-02" />
<target value="11. Media release with statistical tables from an annual business survey. 12. Media release with statistical tables from the SBR.">
<comment><narrative>
The NEEC final result has been published. The HIES fieldwork has been completed.
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of annual public events to disseminate audit report findings by thematic area
</narrative></title>
<baseline year="2023" iso-date="2023-12-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-01" />
<period-end iso-date="2028-12-01" />
<target value="2">
<comment><narrative>
Year 1 target has been met with one event held in 2024 to disseminate audit findings. A second event is envisaged to be held by end 2025.
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of annual public events to disseminate audit report findings by thematic area
</narrative></title>
<baseline year="2023" iso-date="2023-12-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-01" />
<period-end iso-date="2028-12-01" />
<target value="2">
<comment><narrative>
Year 1 target has been met with one event held in 2024 to disseminate audit findings. A second event is envisaged to be held by end 2025.
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Financial, performance and compliance audits conducted by OAG staff in line with ISSAIs
</narrative></title>
<baseline year="2023" iso-date="2023-12-01" value="Not compliant"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-01" />
<period-end iso-date="2028-12-01" />
<target value="Compliant with minor areas for improvement">
<comment><narrative>
Due to recruitment challenges to fill the Quality Audit Management role, there is no progress update to report for this indicator.
</narrative></comment>
</target>
<actual value="Not assessed">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Financial, performance and compliance audits conducted by OAG staff in line with ISSAIs
</narrative></title>
<baseline year="2023" iso-date="2023-12-01" value="Not compliant"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-01" />
<period-end iso-date="2028-12-01" />
<target value="Compliant with minor areas for improvement">
<comment><narrative>
Due to recruitment challenges to fill the Quality Audit Management role, there is no progress update to report for this indicator.
</narrative></comment>
</target>
<actual value="Not assessed">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Reports are produced based on feedback from data users
</narrative></title>
<baseline year="2023" iso-date="2023-12-01" value="No feedback reports"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-01" />
<period-end iso-date="2028-12-01" />
<target value="Feedback surveys are sent to individuals who have accessed the HIES microdata and a report is produced based on the survey results">
<comment><narrative>
Feedback surveys will be sent once the anonymized HIES microdata becomes accessible on a website (expected July 2026)
</narrative></comment>
</target>
<actual value="No feedback reports">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of gender indicators available using data collected within the last 5 years
</narrative></title>
<baseline year="2023" iso-date="2023-12-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-01" />
<period-end iso-date="2027-12-01" />
<target value="15">
<comment><narrative>
To be achieved once the HIES report is published (by July 2026).
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Gross number of staff trained
</narrative></title>
<baseline year="2023" iso-date="2023-12-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-01" />
<period-end iso-date="2028-12-02" />
<target value="50">
<comment><narrative>
45% of participants were female.
</narrative></comment>
</target>
<actual value="59">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T00:13:13" hierarchy="1"><iati-identifier>44000-P181295</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Community Access and Urban Services Enhancement Project II</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To improve climate resilient infrastructure, services and spatial planning benefits for residents in Honiara City and selected townships; and provide skills training and income to vulnerable populations in project areas.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Second Community Access and Urban Services Enhancement Project is to improve access to climate resilient infrastructure and services, enhance economic inclusion, and strengthen the capacity of public authorities to deliver services in Targeted Urban Centers. There are five components to the project. The first component being resilient township development.  This component will enhance economic productivity and growth, as well as climate and disaster resilience by improving access to basic services and climate-resilient economic infrastructure in Honiara City and selected townships, aligning with NUP Goals 3 and 5. The second component is the safe and inclusive communities. This component will enhance the safety and resilience of residents in informal, densely populated settlements by improving access to community infrastructure and waste collection services, and by building local capacity for essential infrastructure maintenance. The third component is the enhanced urban productivity. This component includes three subcomponents: Literacy and Numeracy Skills Development, Work Readiness and Skills Training, and Support and Referral Services. The fourth component is the land administration and urban management and maintenance. This component will develop the capacity, tools, policies, and resources for improved urban management focused on land administration, revenue mobilization systems and management of public assets. This component includes three subcomponents: land administration, revenue mobilization, and urban management and maintenance. Finally, the fifth component is the project management. This component will support joint Project management, oversight, monitoring, and evaluation audits, communications, media support, technical assistance, training, financial management, procurement, and provision of goods and operating costs.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SB–00004679"><narrative>Solomon Islands </narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SB-COA-00004681"><narrative>Honiara City Council</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2024-10-15"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2024-10-15"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2030-09-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2030-09-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Ifeta Smajic</narrative></person-name><telephone>+1-202-473-1000</telephone><email>ismajic@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>

<contact-info type="2">
<mailing-address><narrative>
P.O. Box 26, Honiara 

</narrative></mailing-address></contact-info>

<contact-info type="2">
<mailing-address><narrative>
HX77+9RV, Honiara, Solomon Islands, +677 21141, nrgagahe@mid.gov.sb

</narrative></mailing-address></contact-info>
<recipient-country code="SB" percentage="100"><narrative xml:lang="en">SOLOMON ISLANDS</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="2108502" />
                <name><narrative>Honiara</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-9.43333 159.95</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="43032" percentage="85" xml:lang="en"/><sector vocabulary="1" code="43031" percentage="15" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BBH" percentage="92.0000000" xml:lang="en"><narrative>Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="NNC" percentage="8.00000000" xml:lang="en"><narrative>Social Cohesion and Resilience</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">355554.56</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">355554.56</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">355554.56</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">355554.56</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">355554.56</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">355554.56</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">355554.56</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">355554.56</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">355563.52</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">808332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">808332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">808332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">808332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">808332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">808332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">808332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">808332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">808332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">808332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">808332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">808344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">914165.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">914165.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">914165.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">914165.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">914165.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">914165.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">914165.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">914165.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">914165.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">914165.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">914165.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">914177.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">647499.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">647499.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">647499.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">647499.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">647499.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">647499.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">647499.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">647499.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">647499.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">647499.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">647499.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">647511.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">369999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">369999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">369999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">369999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">369999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">369999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">369999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">369999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">369999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">369999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">369999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">370011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">122499.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">122499.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">122499.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">122499.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">122499.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">122499.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">122499.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">122499.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">122499.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">122499.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">122499.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">122511.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">15823361.03</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">15823361.03</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">7000000</value><description xml:lang="en"><narrative>Total Commitment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-4681"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">13200000</value><description xml:lang="en"><narrative>Total Commitment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-4681"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">1195000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-4681"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">506102</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-4681"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">700214</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-4681"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">417370</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-4681"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">100</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-4681"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">122400</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-4681"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">365120</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-4681"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">323620</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-4681"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">250901</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-4681"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">144849</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-4681"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">263962</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-4681"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">87001</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-4681"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-5153</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-4681"><narrative>Honiara City Council; Ministry of Infrastructure Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P181295"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P181295?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P181295"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the number of beneficiaries that report being engaged in income generating activities after completing CAUSE II training and work placements
</narrative></title>
<baseline year="2024" iso-date="2024-09-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-13" />
<period-end iso-date="2030-09-13" />
<target value="20">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Residents in project areas with increased access to climate resilient infrastructure and/or services
</narrative></title>
<baseline year="2024" iso-date="2024-09-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-13" />
<period-end iso-date="2030-09-13" />
<target value="118,285">

</target>
<actual value="16434.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Economic Infrastructure built or improved to climate resilient standards
</narrative></title>
<baseline year="2024" iso-date="2024-08-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-31" />
<period-end iso-date="2030-02-28" />
<target value="25">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Trainees that receive placements in CAUSE II community contracts.
</narrative></title>
<baseline year="2024" iso-date="2024-08-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-31" />
<period-end iso-date="2030-09-12" />
<target value="4700">

</target>
<actual value="932.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Residents in project areas with increased access to climate resilient infrastructure and/or services
</narrative></title>
<baseline year="2024" iso-date="2024-09-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-13" />
<period-end iso-date="2030-09-13" />
<target value="118,285">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Trainees that access employment, referral and well-being support services in CAUSE II.
</narrative></title>
<baseline year="2024" iso-date="2024-08-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-31" />
<period-end iso-date="2030-09-12" />
<target value="2,360">

</target>
<actual value="623.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Residents in project areas who report improved access to transport and services
</narrative></title>
<baseline year="2024" iso-date="2024-08-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-31" />
<period-end iso-date="2030-09-10" />
<target value="90">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Participants reporting that project interventions addressed their needs
</narrative></title>
<baseline year="2024" iso-date="2024-09-07" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-07" />
<period-end iso-date="2030-09-15" />
<target value="90">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Residents who report environmental improvement due to CAUSE II activities
</narrative></title>
<baseline year="2024" iso-date="2024-08-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-31" />
<period-end iso-date="2030-09-10" />
<target value="90">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Climate resilient community infrastructure constructed
</narrative></title>
<baseline year="2024" iso-date="2024-08-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-31" />
<period-end iso-date="2030-09-10" />
<target value="166">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Economic Infrastructure built or improved to climate resilient standards
</narrative></title>
<baseline year="2024" iso-date="2024-08-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-31" />
<period-end iso-date="2030-02-28" />
<target value="25">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Kilometres of road rehabilitated or improved to climate resilient standards
</narrative></title>
<baseline year="2024" iso-date="2024-08-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-31" />
<period-end iso-date="2030-09-10" />
<target value="12.80">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the number of beneficiaries that report being engaged in income generating activities after completing CAUSE II training and work placements
</narrative></title>
<baseline year="2024" iso-date="2024-09-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-13" />
<period-end iso-date="2030-09-13" />
<target value="20">
<comment><narrative>
Indicator measured first at mid-term (2027)
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
&amp;gt; Of which women
</narrative></title>
<baseline year="2024" iso-date="2024-08-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-31" />
<period-end iso-date="2030-09-10" />
<target value="50">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Physical progress of infrastructure investments
</narrative></title>
<baseline year="2024" iso-date="2024-08-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-31" />
<period-end iso-date="2030-09-10" />
<target value="100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Residents who report environmental improvement due to CAUSE II activities
</narrative></title>
<baseline year="2024" iso-date="2024-08-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-31" />
<period-end iso-date="2030-09-10" />
<target value="90">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
&amp;gt; Of which women
</narrative></title>
<baseline year="2024" iso-date="2024-08-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-31" />
<period-end iso-date="2030-09-10" />
<target value="50">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Residents in project areas who report improved access to transport and services
</narrative></title>
<baseline year="2024" iso-date="2024-08-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-31" />
<period-end iso-date="2030-09-10" />
<target value="90">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Contract management system is operational in MID
</narrative></title>
<baseline year="2024" iso-date="2024-09-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-12" />
<period-end iso-date="2030-03-12" />
<target value="100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
&amp;gt; Of which women
</narrative></title>
<baseline year="2024" iso-date="2024-08-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-31" />
<period-end iso-date="2030-09-10" />
<target value="50">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Trainees that are assessed as successfully completing literacy training
</narrative></title>
<baseline year="2024" iso-date="2024-08-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-31" />
<period-end iso-date="2030-09-12" />
<target value="705">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Participants reporting that project interventions addressed their needs
</narrative></title>
<baseline year="2024" iso-date="2024-09-07" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-07" />
<period-end iso-date="2030-09-15" />
<target value="90">
<comment><narrative>
Not measured until mid-term (2027)
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Tertiary roads under sustained routine maintenance through low-cost community contracts
</narrative></title>
<baseline year="2024" iso-date="2024-08-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-31" />
<period-end iso-date="2030-09-10" />
<target value="440">

</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved land information and revenue collection systems deployed and operating.
</narrative></title>
<baseline year="2024" iso-date="2024-09-10" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-10" />
<period-end iso-date="2030-09-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the annual combined land rent and property rates revenue to MLHS and HCC/GPG
</narrative></title>
<baseline year="2024" iso-date="2024-09-06" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-06" />
<period-end iso-date="2030-09-13" />
<target value="40">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Digitization of land registry records
</narrative></title>
<baseline year="2024" iso-date="2024-08-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-31" />
<period-end iso-date="2030-09-13" />
<target value="10,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Contract management system is operational in MID
</narrative></title>
<baseline year="2024" iso-date="2024-09-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-12" />
<period-end iso-date="2030-03-12" />
<target value="100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Trainees that access employment, referral and well-being support services in CAUSE II.
</narrative></title>
<baseline year="2024" iso-date="2024-08-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-31" />
<period-end iso-date="2030-09-12" />
<target value="2,360">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Labour days worked by CAUSE II trainees.
</narrative></title>
<baseline year="2024" iso-date="2024-08-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-31" />
<period-end iso-date="2030-09-12" />
<target value="265,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Labour days worked by CAUSE II trainees.
</narrative></title>
<baseline year="2024" iso-date="2024-08-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-31" />
<period-end iso-date="2030-09-12" />
<target value="265,000">

</target>
<actual value="16841.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Trainees that are assessed as successfully completing literacy training
</narrative></title>
<baseline year="2024" iso-date="2024-08-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-31" />
<period-end iso-date="2030-09-12" />
<target value="705">

</target>
<actual value="136.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
&amp;gt; Of which women
</narrative></title>
<baseline year="2024" iso-date="2024-08-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-31" />
<period-end iso-date="2030-09-10" />
<target value="50">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the annual combined land rent and property rates revenue to MLHS and HCC/GPG
</narrative></title>
<baseline year="2024" iso-date="2024-09-06" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-06" />
<period-end iso-date="2030-09-13" />
<target value="40">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Trainees that receive placements in CAUSE II community contracts.
</narrative></title>
<baseline year="2024" iso-date="2024-08-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-31" />
<period-end iso-date="2030-09-12" />
<target value="4700">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved land information and revenue collection systems deployed and operating.
</narrative></title>
<baseline year="2024" iso-date="2024-09-10" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-10" />
<period-end iso-date="2030-09-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Tertiary roads under sustained routine maintenance through low-cost community contracts
</narrative></title>
<baseline year="2024" iso-date="2024-08-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-31" />
<period-end iso-date="2030-09-10" />
<target value="440">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Climate resilient community infrastructure constructed
</narrative></title>
<baseline year="2024" iso-date="2024-08-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-31" />
<period-end iso-date="2030-09-10" />
<target value="166">

</target>
<actual value="29.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Digitization of land registry records
</narrative></title>
<baseline year="2024" iso-date="2024-08-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-31" />
<period-end iso-date="2030-09-13" />
<target value="10,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries from communities ranked as “highest priority” in the CAUSE II Vulnerability Index
</narrative></title>
<baseline year="2024" iso-date="2024-08-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-31" />
<period-end iso-date="2030-09-11" />
<target value="50">

</target>
<actual value="67.02">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Physical progress of infrastructure investments
</narrative></title>
<baseline year="2024" iso-date="2024-08-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-31" />
<period-end iso-date="2030-09-10" />
<target value="100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Kilometres of road rehabilitated or improved to climate resilient standards
</narrative></title>
<baseline year="2024" iso-date="2024-08-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-31" />
<period-end iso-date="2030-09-10" />
<target value="12.80">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries from communities ranked as “highest priority” in the CAUSE II Vulnerability Index
</narrative></title>
<baseline year="2024" iso-date="2024-08-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-31" />
<period-end iso-date="2030-09-11" />
<target value="50">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the number of beneficiaries that report being engaged in income generating activities after completing CAUSE II training and work placements
</narrative></title>
<baseline year="2024" iso-date="2024-09-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-13" />
<period-end iso-date="2030-09-13" />
<target value="20">
<comment><narrative>
Indicator measured first at mid-term (2027)
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the number of beneficiaries that report being engaged in income generating activities after completing CAUSE II training and work placements
</narrative></title>
<baseline year="2024" iso-date="2024-09-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-13" />
<period-end iso-date="2030-09-13" />
<target value="20">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Residents in project areas with increased access to climate resilient infrastructure and/or services
</narrative></title>
<baseline year="2024" iso-date="2024-09-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-13" />
<period-end iso-date="2030-09-13" />
<target value="118,285">

</target>
<actual value="16434.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Residents in project areas with increased access to climate resilient infrastructure and/or services
</narrative></title>
<baseline year="2024" iso-date="2024-09-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-13" />
<period-end iso-date="2030-09-13" />
<target value="118,285">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved land information and revenue collection systems deployed and operating.
</narrative></title>
<baseline year="2024" iso-date="2024-09-10" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-10" />
<period-end iso-date="2030-09-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved land information and revenue collection systems deployed and operating.
</narrative></title>
<baseline year="2024" iso-date="2024-09-10" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-10" />
<period-end iso-date="2030-09-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the number of beneficiaries that report being engaged in income generating activities after completing CAUSE II training and work placements
</narrative></title>
<baseline year="2024" iso-date="2024-09-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-13" />
<period-end iso-date="2030-09-13" />
<target value="20">
<comment><narrative>
Indicator measured first at mid-term (2027)
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the number of beneficiaries that report being engaged in income generating activities after completing CAUSE II training and work placements
</narrative></title>
<baseline year="2024" iso-date="2024-09-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-13" />
<period-end iso-date="2030-09-13" />
<target value="20">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Residents in project areas with increased access to climate resilient infrastructure and/or services
</narrative></title>
<baseline year="2024" iso-date="2024-09-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-13" />
<period-end iso-date="2030-09-13" />
<target value="118,285">

</target>
<actual value="16434.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Residents in project areas with increased access to climate resilient infrastructure and/or services
</narrative></title>
<baseline year="2024" iso-date="2024-09-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-13" />
<period-end iso-date="2030-09-13" />
<target value="118,285">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved land information and revenue collection systems deployed and operating.
</narrative></title>
<baseline year="2024" iso-date="2024-09-10" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-10" />
<period-end iso-date="2030-09-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved land information and revenue collection systems deployed and operating.
</narrative></title>
<baseline year="2024" iso-date="2024-09-10" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-10" />
<period-end iso-date="2030-09-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T00:13:13" hierarchy="1"><iati-identifier>44000-P511758</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>The Second  Resilience Development Policy Operation</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The proposed series of two operations supports the Solomon Islands Government in its efforts to improve fiscal management, create the enabling environment for private sector development, and enhance resilience to climate change, natural disasters and health emergencies.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Second Resilience Development Policy Operation for Solomon Islands is to improve fiscal management, create the enabling environment for private sector development, and enhance resilience to climate change, natural disasters and health emergencies. The operation will help create better jobs for Solomon Islanders while also contributing to the World Bank Corporate Scorecard indicators. The reform program will contribute to sustainable growth and job creation by: (i) restoring fiscal space through updated fees, mining royalty rules, and improved public investment management to support labor-intensive infrastructure and services; (ii) expanding micro-, small, and medium enterprises (MSME) access to finance and attracting foreign direct investment (FDI) through credit reporting and investment promotion reforms, fostering entrepreneurship, youth employment, and women-led firms; and (iii) safeguarding livelihoods by reducing the economic impact of disasters and health shocks through strengthened disaster risk financing, and health policies. Pillar 1 aims to support fiscal management by reforming the tax system, improving the fiscal regime of the extractives sector, and strengthening the management of public investments. Pillar 2 seeks to improve the business environment by reducing energy costs, expanding access to credit, and promoting foreign investment. Pillar 3 supports climate and disaster resilience by strengthening building standards, improving the institutional and regulatory framework for disaster risk management, and enhancing preparedness and response in the health sector; this aligns with the government's broader objective of improving access to quality health for all and of protecting communities from climate and other external shocks.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="SB–00010999"><narrative>Solomon Islands</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="SB-COA-273"><narrative>Ministry of Finance and Treasury </narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2025-12-19"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2025-12-19"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2027-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2027-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Marko Kwaramba</narrative></person-name><telephone>+1-202-473-1000</telephone><email>mkwaramba@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="SB" percentage="100"><narrative xml:lang="en">SOLOMON ISLANDS</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="2108502" />
                <name><narrative>Honiara</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-9.43333 159.95</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="74020" percentage="28" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="28" xml:lang="en"/><sector vocabulary="1" code="23111" percentage="22" xml:lang="en"/><sector vocabulary="1" code="23111" percentage="22" xml:lang="en"/><sector vocabulary="1" code="24010" percentage="11" xml:lang="en"/><sector vocabulary="1" code="24010" percentage="11" xml:lang="en"/><sector vocabulary="1" code="25010" percentage="11" xml:lang="en"/><sector vocabulary="1" code="25010" percentage="11" xml:lang="en"/><sector vocabulary="1" code="12191" percentage="11" xml:lang="en"/><sector vocabulary="1" code="12191" percentage="11" xml:lang="en"/><sector vocabulary="1" code="15155" percentage="6" xml:lang="en"/><sector vocabulary="1" code="15155" percentage="6" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AAK" percentage="6.00000000" xml:lang="en"><narrative>Public Administration - Agriculture, Fishing, and Forestry </narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LLM" percentage="11.0000000" xml:lang="en"><narrative>Mining Sustainability and Mine Closure</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YYZ" percentage="11.0000000" xml:lang="en"><narrative>Other - Industry, Trade, and Services </narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LLP" percentage="11.0000000" xml:lang="en"><narrative>Public Administration - Energy</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HHF" percentage="11.0000000" xml:lang="en"><narrative>Public Administration - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BBC" percentage="17.0000000" xml:lang="en"><narrative>Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="FFA" percentage="11.0000000" xml:lang="en"><narrative>Banking Institutions</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BBZ" percentage="22.0000000" xml:lang="en"><narrative>Other - Public Administration</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">20000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">20000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">20000000</value><description xml:lang="en"><narrative>Total Commitment in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-11000"><narrative>Ministry of Finance and Treasury </narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">20000000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-11000"><narrative>Ministry of Finance and Treasury </narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-60406</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="SB-COA-11000"><narrative>Ministry of Finance and Treasury </narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P511758"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P511758?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P511758"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Operational efficiency proxied by actual non-fuel cost (SBD/kWh)
</narrative></title>
<baseline year="2021" iso-date="2021-06-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-06-14" />
<period-end iso-date="2027-06-14" />
<target value="-10">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Domestic credit to private sector as share of GDP
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="32.1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2027-06-15" />
<target value="35">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Domestic credit to private sector as share of GDP
</narrative></title>
<baseline year="2022" iso-date="2022-12-15" value="32.1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-15" />
<period-end iso-date="2027-12-15" />
<target value="35">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Domestic credit to private sector as share of GDP
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="32.1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2027-06-15" />
<target value="35">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of public health emergency preparedness simulation drills conducted in the provinces, including gender-responsive provision and GBV referrals and functional training
</narrative></title>
<baseline year="2023" iso-date="2023-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-15" />
<period-end iso-date="2027-06-15" />
<target value="3">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
VAT revenue as percent  of GDP
</narrative></title>
<baseline year="2023" iso-date="2023-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-15" />
<period-end iso-date="2027-06-15" />
<target value="0.2">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Foreign enterprises registered in Solomon Islands
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="63"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2027-06-15" />
<target value="167">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Development applications screened against the climate and disaster risk ordinances developed in at least 2 local government areas.
</narrative></title>
<baseline year="2023" iso-date="2023-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-15" />
<period-end iso-date="2027-06-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Development applications screened against the climate and disaster risk ordinances developed in at least 2 local government areas.
</narrative></title>
<baseline year="2023" iso-date="2023-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-15" />
<period-end iso-date="2027-06-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Foreign enterprises registered in Solomon Islands
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="63"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2027-06-15" />
<target value="167">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Domestic revenue as percent of GDP
</narrative></title>
<baseline year="2023" iso-date="2023-12-15" value="23"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-15" />
<period-end iso-date="2027-12-15" />
<target value="24">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of externally financed project proposals appraised in accordance with the new PIM Guidelines
</narrative></title>
<baseline year="2023" iso-date="2023-06-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-14" />
<period-end iso-date="2027-06-14" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of new  disaster risk financing instruments.
</narrative></title>
<baseline year="2023" iso-date="2023-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-14" />
<period-end iso-date="2027-12-14" />
<target value="1">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Domestic credit to private sector as share of GDP
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="32.1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2027-06-15" />
<target value="35">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Development applications screened against the climate and disaster risk ordinances developed in at least 2 local government areas.
</narrative></title>
<baseline year="2023" iso-date="2023-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-15" />
<period-end iso-date="2027-06-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Nickel royalty per dry tonne in constant US$
</narrative></title>
<baseline year="2023" iso-date="2023-12-14" value="1.2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-14" />
<period-end iso-date="2027-12-14" />
<target value="3">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Foreign enterprises registered in Solomon Islands
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="63"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2027-06-15" />
<target value="167">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of public health emergency preparedness simulation drills conducted in the provinces, including gender-responsive provision and GBV referrals and functional training
</narrative></title>
<baseline year="2023" iso-date="2023-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-15" />
<period-end iso-date="2027-06-15" />
<target value="3">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
The number of foreign enterprises registered in Solomon Islands.
</narrative></title>
<baseline year="2022" iso-date="2022-12-15" value="63"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-15" />
<period-end iso-date="2027-12-15" />
<target value="167">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
VAT revenue as percent  of GDP
</narrative></title>
<baseline year="2023" iso-date="2023-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-15" />
<period-end iso-date="2027-06-15" />
<target value="0.2">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of externally financed project proposals appraised in accordance with the new PIM Guidelines
</narrative></title>
<baseline year="2023" iso-date="2023-06-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-14" />
<period-end iso-date="2027-06-14" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Commercial electricity tariff differential relative to structural peers in the region (Kiribati, Samoa, and Vanuatu, US$/kwh)
</narrative></title>
<baseline year="2023" iso-date="2023-12-15" value="0.34"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-15" />
<period-end iso-date="2027-12-15" />
<target value="0.2">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of construction permit applications (residential and non-residential) assessed  against the National Building Code and approved in  2 local government areas
</narrative></title>
<baseline year="2023" iso-date="2023-06-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-14" />
<period-end iso-date="2027-06-14" />
<target value="90">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Nickel royalty per dry tonne in constant US$
</narrative></title>
<baseline year="2023" iso-date="2023-06-15" value="1.2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-15" />
<period-end iso-date="2027-06-15" />
<target value="3">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Operational efficiency proxied by actual non-fuel cost (SBD/kWh)
</narrative></title>
<baseline year="2021" iso-date="2021-06-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-06-14" />
<period-end iso-date="2027-06-14" />
<target value="-10">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of public health emergency preparedness simulation drills conducted in the provinces, including gender-responsive provision and GBV referrals and functional training
</narrative></title>
<baseline year="2023" iso-date="2023-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-15" />
<period-end iso-date="2027-06-15" />
<target value="3">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Nickel royalty per dry tonne in constant US$
</narrative></title>
<baseline year="2023" iso-date="2023-06-15" value="1.2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-15" />
<period-end iso-date="2027-06-15" />
<target value="3">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of externally financed project proposals analyzed following PIM Appraisal Guidelines
</narrative></title>
<baseline year="2023" iso-date="2023-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-15" />
<period-end iso-date="2027-12-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of construction permit applications (residential and non-residential) assessed  against the National Building Code and approved in  2 local government areas
</narrative></title>
<baseline year="2023" iso-date="2023-06-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-14" />
<period-end iso-date="2027-06-14" />
<target value="90">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Nickel royalty per dry tonne in constant US$
</narrative></title>
<baseline year="2023" iso-date="2023-06-15" value="1.2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-15" />
<period-end iso-date="2027-06-15" />
<target value="3">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of public health emergency preparedness and response functional training and simulation drills conducted, including gender-responsive provision for GBV referral
</narrative></title>
<baseline year="2023" iso-date="2023-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-14" />
<period-end iso-date="2027-12-14" />
<target value="3">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of construction permit applications (residential and non-residential) assessed  against the National Building Code and approved in  2 local government areas
</narrative></title>
<baseline year="2023" iso-date="2023-06-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-14" />
<period-end iso-date="2027-06-14" />
<target value="90">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
VAT revenue as percent  of GDP
</narrative></title>
<baseline year="2023" iso-date="2023-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-15" />
<period-end iso-date="2027-06-15" />
<target value="0.2">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of permit applications assessed for compliance with the building regulations and code
</narrative></title>
<baseline year="2023" iso-date="2023-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-15" />
<period-end iso-date="2027-12-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of externally financed project proposals appraised in accordance with the new PIM Guidelines
</narrative></title>
<baseline year="2023" iso-date="2023-06-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-14" />
<period-end iso-date="2027-06-14" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Operational efficiency proxied by actual non-fuel cost (SBD/kWh)
</narrative></title>
<baseline year="2021" iso-date="2021-06-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-06-14" />
<period-end iso-date="2027-06-14" />
<target value="-10">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of public health emergency preparedness simulation drills conducted in the provinces, including gender-responsive provision and GBV referrals and functional training
</narrative></title>
<baseline year="2023" iso-date="2023-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-15" />
<period-end iso-date="2027-06-15" />
<target value="3">
<comment><narrative>
Progress has commenced and the target can be achieved with additional drills.
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of public health emergency preparedness simulation drills conducted in the provinces, including gender-responsive provision and GBV referrals and functional training
</narrative></title>
<baseline year="2023" iso-date="2023-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-15" />
<period-end iso-date="2027-06-15" />
<target value="3">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of public health emergency preparedness simulation drills conducted in the provinces, including gender-responsive provision and GBV referrals and functional training
</narrative></title>
<baseline year="2023" iso-date="2023-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-15" />
<period-end iso-date="2027-06-15" />
<target value="3">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of public health emergency preparedness simulation drills conducted in the provinces, including gender-responsive provision and GBV referrals and functional training
</narrative></title>
<baseline year="2023" iso-date="2023-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-15" />
<period-end iso-date="2027-06-15" />
<target value="3">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of public health emergency preparedness and response functional training and simulation drills conducted, including gender-responsive provision for GBV referral
</narrative></title>
<baseline year="2023" iso-date="2023-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-14" />
<period-end iso-date="2027-12-14" />
<target value="3">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of construction permit applications (residential and non-residential) assessed  against the National Building Code and approved in  2 local government areas
</narrative></title>
<baseline year="2023" iso-date="2023-06-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-14" />
<period-end iso-date="2027-06-14" />
<target value="90">
<comment><narrative>
There is no change in the results indicator, as implementation of the Building Approval Authority has been delayed and is now expected by December 2026. Once established, the role of screening new building application against the NBC will be delegated to the Architect and Building Management Services (ABMS) within the Ministry of Infrastructure Development.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of construction permit applications (residential and non-residential) assessed  against the National Building Code and approved in  2 local government areas
</narrative></title>
<baseline year="2023" iso-date="2023-06-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-14" />
<period-end iso-date="2027-06-14" />
<target value="90">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of construction permit applications (residential and non-residential) assessed  against the National Building Code and approved in  2 local government areas
</narrative></title>
<baseline year="2023" iso-date="2023-06-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-14" />
<period-end iso-date="2027-06-14" />
<target value="90">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of construction permit applications (residential and non-residential) assessed  against the National Building Code and approved in  2 local government areas
</narrative></title>
<baseline year="2023" iso-date="2023-06-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-14" />
<period-end iso-date="2027-06-14" />
<target value="90">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of permit applications assessed for compliance with the building regulations and code
</narrative></title>
<baseline year="2023" iso-date="2023-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-15" />
<period-end iso-date="2027-12-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Development applications screened against the climate and disaster risk ordinances developed in at least 2 local government areas.
</narrative></title>
<baseline year="2023" iso-date="2023-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-15" />
<period-end iso-date="2027-06-15" />
<target value="100">
<comment><narrative>
Though the results indicator has not yet been achieved, progress is notable as SIG has developed climate risk-informed planning tool to inform investment planning, designs and resilience standards at the subnational level. This tool has been rolled out in more than 2 provinces through Provincial Capacity Development Fund, which is a performance-based grant mechanism.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Development applications screened against the climate and disaster risk ordinances developed in at least 2 local government areas.
</narrative></title>
<baseline year="2023" iso-date="2023-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-15" />
<period-end iso-date="2027-06-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Development applications screened against the climate and disaster risk ordinances developed in at least 2 local government areas.
</narrative></title>
<baseline year="2023" iso-date="2023-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-15" />
<period-end iso-date="2027-06-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Development applications screened against the climate and disaster risk ordinances developed in at least 2 local government areas.
</narrative></title>
<baseline year="2023" iso-date="2023-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-15" />
<period-end iso-date="2027-06-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of new  disaster risk financing instruments.
</narrative></title>
<baseline year="2023" iso-date="2023-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-14" />
<period-end iso-date="2027-12-14" />
<target value="1">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Foreign enterprises registered in Solomon Islands
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="63"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2027-06-15" />
<target value="167">
<comment><narrative>
Indicator on track to reach target
</narrative></comment>
</target>
<actual value="133">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Foreign enterprises registered in Solomon Islands
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="63"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2027-06-15" />
<target value="167">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Foreign enterprises registered in Solomon Islands
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="63"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2027-06-15" />
<target value="167">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Foreign enterprises registered in Solomon Islands
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="63"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2027-06-15" />
<target value="167">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
The number of foreign enterprises registered in Solomon Islands.
</narrative></title>
<baseline year="2022" iso-date="2022-12-15" value="63"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-15" />
<period-end iso-date="2027-12-15" />
<target value="167">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Domestic credit to private sector as share of GDP
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="32.1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2027-06-15" />
<target value="35">
<comment><narrative>
Notable increase in 2025
</narrative></comment>
</target>
<actual value="33.7">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Domestic credit to private sector as share of GDP
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="32.1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2027-06-15" />
<target value="35">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Domestic credit to private sector as share of GDP
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="32.1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2027-06-15" />
<target value="35">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Domestic credit to private sector as share of GDP
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="32.1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2027-06-15" />
<target value="35">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Domestic credit to private sector as share of GDP
</narrative></title>
<baseline year="2022" iso-date="2022-12-15" value="32.1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-15" />
<period-end iso-date="2027-12-15" />
<target value="35">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Operational efficiency proxied by actual non-fuel cost (SBD/kWh)
</narrative></title>
<baseline year="2021" iso-date="2021-06-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-06-14" />
<period-end iso-date="2027-06-14" />
<target value="-10">
<comment><narrative>
This indicates operational efficiency has improved and the target can be achieved.
</narrative></comment>
</target>
<actual value="-3">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Operational efficiency proxied by actual non-fuel cost (SBD/kWh)
</narrative></title>
<baseline year="2021" iso-date="2021-06-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-06-14" />
<period-end iso-date="2027-06-14" />
<target value="-10">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Operational efficiency proxied by actual non-fuel cost (SBD/kWh)
</narrative></title>
<baseline year="2021" iso-date="2021-06-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-06-14" />
<period-end iso-date="2027-06-14" />
<target value="-10">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Operational efficiency proxied by actual non-fuel cost (SBD/kWh)
</narrative></title>
<baseline year="2021" iso-date="2021-06-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-06-14" />
<period-end iso-date="2027-06-14" />
<target value="-10">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Commercial electricity tariff differential relative to structural peers in the region (Kiribati, Samoa, and Vanuatu, US$/kwh)
</narrative></title>
<baseline year="2023" iso-date="2023-12-15" value="0.34"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-15" />
<period-end iso-date="2027-12-15" />
<target value="0.2">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of externally financed project proposals appraised in accordance with the new PIM Guidelines
</narrative></title>
<baseline year="2023" iso-date="2023-06-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-14" />
<period-end iso-date="2027-06-14" />
<target value="100">
<comment><narrative>
An estimated 80 percent of externally financed projects appraised following PIM Guidelines, so the results indicator is on track for a 100 percent by June 2027.
</narrative></comment>
</target>
<actual value="80">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of externally financed project proposals appraised in accordance with the new PIM Guidelines
</narrative></title>
<baseline year="2023" iso-date="2023-06-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-14" />
<period-end iso-date="2027-06-14" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of externally financed project proposals appraised in accordance with the new PIM Guidelines
</narrative></title>
<baseline year="2023" iso-date="2023-06-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-14" />
<period-end iso-date="2027-06-14" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of externally financed project proposals appraised in accordance with the new PIM Guidelines
</narrative></title>
<baseline year="2023" iso-date="2023-06-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-14" />
<period-end iso-date="2027-06-14" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of externally financed project proposals analyzed following PIM Appraisal Guidelines
</narrative></title>
<baseline year="2023" iso-date="2023-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-15" />
<period-end iso-date="2027-12-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Nickel royalty per dry tonne in constant US$
</narrative></title>
<baseline year="2023" iso-date="2023-06-15" value="1.2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-15" />
<period-end iso-date="2027-06-15" />
<target value="3">
<comment><narrative>
As of December 2023, one nickel shipment occurred, which applied the old nickel valuation method. With capacity coming in place and the mining Regulations issued, the new valuation method is expected to be applied for future nickel shipments
</narrative></comment>
</target>
<actual value="1.09">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Nickel royalty per dry tonne in constant US$
</narrative></title>
<baseline year="2023" iso-date="2023-06-15" value="1.2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-15" />
<period-end iso-date="2027-06-15" />
<target value="3">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Nickel royalty per dry tonne in constant US$
</narrative></title>
<baseline year="2023" iso-date="2023-06-15" value="1.2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-15" />
<period-end iso-date="2027-06-15" />
<target value="3">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Nickel royalty per dry tonne in constant US$
</narrative></title>
<baseline year="2023" iso-date="2023-06-15" value="1.2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-15" />
<period-end iso-date="2027-06-15" />
<target value="3">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Nickel royalty per dry tonne in constant US$
</narrative></title>
<baseline year="2023" iso-date="2023-12-14" value="1.2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-14" />
<period-end iso-date="2027-12-14" />
<target value="3">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
VAT revenue as percent  of GDP
</narrative></title>
<baseline year="2023" iso-date="2023-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-15" />
<period-end iso-date="2027-06-15" />
<target value="0.2">
<comment><narrative>
The VAT reform implementation remains pending
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
VAT revenue as percent  of GDP
</narrative></title>
<baseline year="2023" iso-date="2023-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-15" />
<period-end iso-date="2027-06-15" />
<target value="0.2">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
VAT revenue as percent  of GDP
</narrative></title>
<baseline year="2023" iso-date="2023-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-15" />
<period-end iso-date="2027-06-15" />
<target value="0.2">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
VAT revenue as percent  of GDP
</narrative></title>
<baseline year="2023" iso-date="2023-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-15" />
<period-end iso-date="2027-06-15" />
<target value="0.2">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Domestic revenue as percent of GDP
</narrative></title>
<baseline year="2023" iso-date="2023-12-15" value="23"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-15" />
<period-end iso-date="2027-12-15" />
<target value="24">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of public health emergency preparedness simulation drills conducted in the provinces, including gender-responsive provision and GBV referrals and functional training
</narrative></title>
<baseline year="2023" iso-date="2023-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-15" />
<period-end iso-date="2027-06-15" />
<target value="3">
<comment><narrative>
Progress has commenced and the target can be achieved with additional drills.
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of public health emergency preparedness simulation drills conducted in the provinces, including gender-responsive provision and GBV referrals and functional training
</narrative></title>
<baseline year="2023" iso-date="2023-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-15" />
<period-end iso-date="2027-06-15" />
<target value="3">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of public health emergency preparedness simulation drills conducted in the provinces, including gender-responsive provision and GBV referrals and functional training
</narrative></title>
<baseline year="2023" iso-date="2023-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-15" />
<period-end iso-date="2027-06-15" />
<target value="3">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of public health emergency preparedness simulation drills conducted in the provinces, including gender-responsive provision and GBV referrals and functional training
</narrative></title>
<baseline year="2023" iso-date="2023-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-15" />
<period-end iso-date="2027-06-15" />
<target value="3">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of public health emergency preparedness and response functional training and simulation drills conducted, including gender-responsive provision for GBV referral
</narrative></title>
<baseline year="2023" iso-date="2023-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-14" />
<period-end iso-date="2027-12-14" />
<target value="3">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of construction permit applications (residential and non-residential) assessed  against the National Building Code and approved in  2 local government areas
</narrative></title>
<baseline year="2023" iso-date="2023-06-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-14" />
<period-end iso-date="2027-06-14" />
<target value="90">
<comment><narrative>
There is no change in the results indicator, as implementation of the Building Approval Authority has been delayed and is now expected by December 2026. Once established, the role of screening new building application against the NBC will be delegated to the Architect and Building Management Services (ABMS) within the Ministry of Infrastructure Development.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of construction permit applications (residential and non-residential) assessed  against the National Building Code and approved in  2 local government areas
</narrative></title>
<baseline year="2023" iso-date="2023-06-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-14" />
<period-end iso-date="2027-06-14" />
<target value="90">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of construction permit applications (residential and non-residential) assessed  against the National Building Code and approved in  2 local government areas
</narrative></title>
<baseline year="2023" iso-date="2023-06-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-14" />
<period-end iso-date="2027-06-14" />
<target value="90">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of construction permit applications (residential and non-residential) assessed  against the National Building Code and approved in  2 local government areas
</narrative></title>
<baseline year="2023" iso-date="2023-06-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-14" />
<period-end iso-date="2027-06-14" />
<target value="90">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of permit applications assessed for compliance with the building regulations and code
</narrative></title>
<baseline year="2023" iso-date="2023-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-15" />
<period-end iso-date="2027-12-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Development applications screened against the climate and disaster risk ordinances developed in at least 2 local government areas.
</narrative></title>
<baseline year="2023" iso-date="2023-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-15" />
<period-end iso-date="2027-06-15" />
<target value="100">
<comment><narrative>
Though the results indicator has not yet been achieved, progress is notable as SIG has developed climate risk-informed planning tool to inform investment planning, designs and resilience standards at the subnational level. This tool has been rolled out in more than 2 provinces through Provincial Capacity Development Fund, which is a performance-based grant mechanism.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Development applications screened against the climate and disaster risk ordinances developed in at least 2 local government areas.
</narrative></title>
<baseline year="2023" iso-date="2023-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-15" />
<period-end iso-date="2027-06-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Development applications screened against the climate and disaster risk ordinances developed in at least 2 local government areas.
</narrative></title>
<baseline year="2023" iso-date="2023-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-15" />
<period-end iso-date="2027-06-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Development applications screened against the climate and disaster risk ordinances developed in at least 2 local government areas.
</narrative></title>
<baseline year="2023" iso-date="2023-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-15" />
<period-end iso-date="2027-06-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of new  disaster risk financing instruments.
</narrative></title>
<baseline year="2023" iso-date="2023-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-14" />
<period-end iso-date="2027-12-14" />
<target value="1">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Foreign enterprises registered in Solomon Islands
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="63"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2027-06-15" />
<target value="167">
<comment><narrative>
Indicator on track to reach target
</narrative></comment>
</target>
<actual value="133">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Foreign enterprises registered in Solomon Islands
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="63"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2027-06-15" />
<target value="167">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Foreign enterprises registered in Solomon Islands
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="63"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2027-06-15" />
<target value="167">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Foreign enterprises registered in Solomon Islands
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="63"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2027-06-15" />
<target value="167">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
The number of foreign enterprises registered in Solomon Islands.
</narrative></title>
<baseline year="2022" iso-date="2022-12-15" value="63"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-15" />
<period-end iso-date="2027-12-15" />
<target value="167">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Domestic credit to private sector as share of GDP
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="32.1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2027-06-15" />
<target value="35">
<comment><narrative>
Notable increase in 2025
</narrative></comment>
</target>
<actual value="33.7">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Domestic credit to private sector as share of GDP
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="32.1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2027-06-15" />
<target value="35">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Domestic credit to private sector as share of GDP
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="32.1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2027-06-15" />
<target value="35">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Domestic credit to private sector as share of GDP
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="32.1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2027-06-15" />
<target value="35">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Domestic credit to private sector as share of GDP
</narrative></title>
<baseline year="2022" iso-date="2022-12-15" value="32.1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-15" />
<period-end iso-date="2027-12-15" />
<target value="35">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Operational efficiency proxied by actual non-fuel cost (SBD/kWh)
</narrative></title>
<baseline year="2021" iso-date="2021-06-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-06-14" />
<period-end iso-date="2027-06-14" />
<target value="-10">
<comment><narrative>
This indicates operational efficiency has improved and the target can be achieved.
</narrative></comment>
</target>
<actual value="-3">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Operational efficiency proxied by actual non-fuel cost (SBD/kWh)
</narrative></title>
<baseline year="2021" iso-date="2021-06-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-06-14" />
<period-end iso-date="2027-06-14" />
<target value="-10">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Operational efficiency proxied by actual non-fuel cost (SBD/kWh)
</narrative></title>
<baseline year="2021" iso-date="2021-06-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-06-14" />
<period-end iso-date="2027-06-14" />
<target value="-10">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Operational efficiency proxied by actual non-fuel cost (SBD/kWh)
</narrative></title>
<baseline year="2021" iso-date="2021-06-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-06-14" />
<period-end iso-date="2027-06-14" />
<target value="-10">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Commercial electricity tariff differential relative to structural peers in the region (Kiribati, Samoa, and Vanuatu, US$/kwh)
</narrative></title>
<baseline year="2023" iso-date="2023-12-15" value="0.34"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-15" />
<period-end iso-date="2027-12-15" />
<target value="0.2">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of externally financed project proposals appraised in accordance with the new PIM Guidelines
</narrative></title>
<baseline year="2023" iso-date="2023-06-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-14" />
<period-end iso-date="2027-06-14" />
<target value="100">
<comment><narrative>
An estimated 80 percent of externally financed projects appraised following PIM Guidelines, so the results indicator is on track for a 100 percent by June 2027.
</narrative></comment>
</target>
<actual value="80">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of externally financed project proposals appraised in accordance with the new PIM Guidelines
</narrative></title>
<baseline year="2023" iso-date="2023-06-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-14" />
<period-end iso-date="2027-06-14" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of externally financed project proposals appraised in accordance with the new PIM Guidelines
</narrative></title>
<baseline year="2023" iso-date="2023-06-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-14" />
<period-end iso-date="2027-06-14" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of externally financed project proposals appraised in accordance with the new PIM Guidelines
</narrative></title>
<baseline year="2023" iso-date="2023-06-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-14" />
<period-end iso-date="2027-06-14" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of externally financed project proposals analyzed following PIM Appraisal Guidelines
</narrative></title>
<baseline year="2023" iso-date="2023-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-15" />
<period-end iso-date="2027-12-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Nickel royalty per dry tonne in constant US$
</narrative></title>
<baseline year="2023" iso-date="2023-06-15" value="1.2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-15" />
<period-end iso-date="2027-06-15" />
<target value="3">
<comment><narrative>
As of December 2023, one nickel shipment occurred, which applied the old nickel valuation method. With capacity coming in place and the mining Regulations issued, the new valuation method is expected to be applied for future nickel shipments
</narrative></comment>
</target>
<actual value="1.09">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Nickel royalty per dry tonne in constant US$
</narrative></title>
<baseline year="2023" iso-date="2023-06-15" value="1.2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-15" />
<period-end iso-date="2027-06-15" />
<target value="3">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Nickel royalty per dry tonne in constant US$
</narrative></title>
<baseline year="2023" iso-date="2023-06-15" value="1.2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-15" />
<period-end iso-date="2027-06-15" />
<target value="3">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Nickel royalty per dry tonne in constant US$
</narrative></title>
<baseline year="2023" iso-date="2023-06-15" value="1.2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-15" />
<period-end iso-date="2027-06-15" />
<target value="3">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Nickel royalty per dry tonne in constant US$
</narrative></title>
<baseline year="2023" iso-date="2023-12-14" value="1.2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-14" />
<period-end iso-date="2027-12-14" />
<target value="3">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
VAT revenue as percent  of GDP
</narrative></title>
<baseline year="2023" iso-date="2023-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-15" />
<period-end iso-date="2027-06-15" />
<target value="0.2">
<comment><narrative>
The VAT reform implementation remains pending
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
VAT revenue as percent  of GDP
</narrative></title>
<baseline year="2023" iso-date="2023-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-15" />
<period-end iso-date="2027-06-15" />
<target value="0.2">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
VAT revenue as percent  of GDP
</narrative></title>
<baseline year="2023" iso-date="2023-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-15" />
<period-end iso-date="2027-06-15" />
<target value="0.2">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
VAT revenue as percent  of GDP
</narrative></title>
<baseline year="2023" iso-date="2023-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-15" />
<period-end iso-date="2027-06-15" />
<target value="0.2">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Domestic revenue as percent of GDP
</narrative></title>
<baseline year="2023" iso-date="2023-12-15" value="23"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-15" />
<period-end iso-date="2027-12-15" />
<target value="24">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result></iati-activity></iati-activities>