<iati-activities version="2.03" generated-datetime="2026-11-23T14:42:51"><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-11-23T00:56:35" hierarchy="1"><iati-identifier>44000-P180549</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Sri Lanka Second Resilience, Stability and Economic Turnaround Development Policy Operation</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To support foundational reforms that restore macroeconomic stability and sustainability, mitigate the impact of current and future shocks on the poor and vulnerable, and support an inclusive and private-sector-led recovery and growth path.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Second Resilience, Stability, and Economic Turnaround Development Policy Operation for Sri Lanka is to support foundational reforms that restore macroeconomic stability and sustainability, mitigate the impact of current and future shocks on the poor and vulnerable, and support an inclusive and private-sector-led recovery and growth path. This will be achieved through three pillars aimed at: (i) improving economic governance through better fiscal and debt management, improving tax policy and administration, and addressing financial sector risks; (ii) enhancing growth and competitiveness through regulatory reforms, institutional restructuring and increasing competition in core sectors (i.e., electricity and broadband), and reforms to the trade regime; and (iii) protecting the poor and vulnerable through the rolling out of a new Welfare Benefit Payment Scheme (WBPS) and reducing gender discrimination. The operation supports results areas in the World Bank's corporate scorecard related to macroeconomic and fiscal management, protecting the poorest, digital connectivity, and providing affordable and sustainable energy.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0056439"><narrative>DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0056439"><narrative>DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="LK-COA-00007652"><narrative>Presidential Secretariat of Sri Lanka</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2024-09-11"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2024-09-11"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2025-09-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2025-09-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Richard Walker</narrative></person-name><telephone>+1-202-473-1000</telephone><email>rwalker3@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>






<contact-info type="2">
<mailing-address><narrative>
The Secretariat, Colombo 01, Sri Lanka, +94 112 484 600, info@mo.treasury.gov.lk

</narrative></mailing-address></contact-info>
<contact-info type="2">
<mailing-address><narrative>
The Secretariat, Colombo 01, Sri Lanka, +94 112 484 600, info@mo.treasury.gov.lk

</narrative></mailing-address></contact-info><recipient-country code="LK" percentage="100"><narrative xml:lang="en">SRI LANKA</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="1248991" />
                <name><narrative>Colombo</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>6.93548 79.848679</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="16011" percentage="23" xml:lang="en"/><sector vocabulary="1" code="24010" percentage="22" xml:lang="en"/><sector vocabulary="1" code="23111" percentage="11" xml:lang="en"/><sector vocabulary="1" code="22011" percentage="11" xml:lang="en"/><sector vocabulary="1" code="15119" percentage="11" xml:lang="en"/><sector vocabulary="1" code="15155" percentage="11" xml:lang="en"/><sector vocabulary="1" code="33110" percentage="11" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="DDI" percentage="11.0000000" xml:lang="en"><narrative>Digital Infrastructure</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LLP" percentage="11.0000000" xml:lang="en"><narrative>Public Administration - Energy</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BBC" percentage="22.0000000" xml:lang="en"><narrative>Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="FFA" percentage="23.0000000" xml:lang="en"><narrative>Banking Institutions</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YYY" percentage="11.0000000" xml:lang="en"><narrative>Trade</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SSA" percentage="22.0000000" xml:lang="en"><narrative>Social Protection</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">200000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">200000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">200000000</value><description xml:lang="en"><narrative>Total Commitment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-56440"><narrative>Ministry of Finance, Economic Stabilization and National Policies; Presidential Secretariat of Sri Lanka</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">200251314</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-56440"><narrative>Ministry of Finance, Economic Stabilization and National Policies; Presidential Secretariat of Sri Lanka</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-2196254</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-56440"><narrative>Ministry of Finance, Economic Stabilization and National Policies; Presidential Secretariat of Sri Lanka</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-2076302</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-56440"><narrative>Ministry of Finance, Economic Stabilization and National Policies; Presidential Secretariat of Sri Lanka</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-2045073</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-56440"><narrative>Ministry of Finance, Economic Stabilization and National Policies; Presidential Secretariat of Sri Lanka</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P180549"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P180549?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P180549"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Coverage of the poorest 20 percent by cash transfer programs (percent)
</narrative></title>
<baseline year="2022" iso-date="2022-12-07" value="43"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-07" />
<period-end iso-date="2025-12-07" />
<target value="60">
<comment><narrative>
Data not yet available
</narrative></comment>
</target>
<actual value="TBD">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Exposures to SOEs of total assets of two largest state-owned banks (percent)
</narrative></title>
<baseline year="2022" iso-date="2022-06-10" value="20.9"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-10" />
<period-end iso-date="2025-12-10" />
<target value="10">

</target>
<actual value="7">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Total tax revenue-to-GDP (percent)
</narrative></title>
<baseline year="2022" iso-date="2022-12-07" value="7.3"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-07" />
<period-end iso-date="2025-12-07" />
<target value="12.0">

</target>
<actual value="12.3">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Public Debt Management Office within the Ministry of Finance created, fully staffed and operational
</narrative></title>
<baseline year="2022" iso-date="2022-12-07" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-07" />
<period-end iso-date="2025-12-07" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private investment in broadband networks facilitated (US$ million)
</narrative></title>
<baseline year="2022" iso-date="2022-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-14" />
<period-end iso-date="2025-12-14" />
<target value="100">

</target>
<actual value="160">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
CEB unbundling initiated through a Cabinet approved Transfer Plan
</narrative></title>
<baseline year="2024" iso-date="2024-07-14" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-07-14" />
<period-end iso-date="2025-12-14" />
<target value="Yes">
<comment><narrative>
Cabinet approval of a final unbundling Transfer Plan is still expected before the end of 2025
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Millions of people using broadband internet
</narrative></title>
<baseline year="2022" iso-date="2022-12-14" value="8.8"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-14" />
<period-end iso-date="2025-12-14" />
<target value="12">
<comment><narrative>
There has been steady progress in the number of broadband internet users in Sri Lanka, with an increase of more than 2 million users since 2022. However, since DPO2's approval, the baseline value for this indicator for 2022 has been revised downwards (from 8.8 to 6.25 million) and, as a result, the original target of 12 million is not expected to be met by the end of 2025. GSMA, the global mobile networks association, revises data once it goes from estimates to actuals.
</narrative></comment>
</target>
<actual value="8.6">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reviews concluded on the infringement of women's rights following National Commission on Women's procedures (proportion of reviews)
</narrative></title>
<baseline year="2023" iso-date="2023-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-14" />
<period-end iso-date="2025-12-14" />
<target value="100">
<comment><narrative>
NCW still being established
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Coverage of female headed household by the new WBPS
</narrative></title>
<baseline year="2022" iso-date="2022-12-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-10" />
<period-end iso-date="2025-12-10" />
<target value="400,000">

</target>
<actual value="256418">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Coverage of the poorest 20 percent by cash transfer programs (percent)
</narrative></title>
<baseline year="2022" iso-date="2022-12-07" value="43"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-07" />
<period-end iso-date="2025-12-07" />
<target value="60">
<comment><narrative>
Data not yet available
</narrative></comment>
</target>
<actual value="TBD">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of the new Welfare Benefits Payment Scheme (WBPS) (number of households per year)
</narrative></title>
<baseline year="2022" iso-date="2022-12-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-11" />
<period-end iso-date="2025-12-11" />
<target value="2000000">

</target>
<actual value="1424548">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private investment in broadband networks facilitated (US$ million)
</narrative></title>
<baseline year="2022" iso-date="2022-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-14" />
<period-end iso-date="2025-12-14" />
<target value="100">

</target>
<actual value="160">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Trade (imports and exports) as a share of GDP (percent)
</narrative></title>
<baseline year="2021" iso-date="2021-12-07" value="41"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-07" />
<period-end iso-date="2025-12-07" />
<target value="45">

</target>
<actual value="42.4">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Exposures to SOEs of total assets of two largest state-owned banks (percent)
</narrative></title>
<baseline year="2022" iso-date="2022-06-10" value="20.9"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-10" />
<period-end iso-date="2025-12-10" />
<target value="10">

</target>
<actual value="7">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Exposures to SOEs of total assets of the banking sector (percent)
</narrative></title>
<baseline year="2022" iso-date="2022-06-07" value="8.7"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-07" />
<period-end iso-date="2025-12-07" />
<target value="4.5">

</target>
<actual value="3">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Use of electronic filing facilities for non-corporate tax declarations (percent)
</narrative></title>
<baseline year="2021" iso-date="2021-12-07" value="23"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-07" />
<period-end iso-date="2025-12-07" />
<target value="&amp;gt; 70">

</target>
<actual value="98">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Total tax revenue-to-GDP (percent)
</narrative></title>
<baseline year="2022" iso-date="2022-12-07" value="7.3"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-07" />
<period-end iso-date="2025-12-07" />
<target value="12.0">

</target>
<actual value="12.3">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Public Debt Management Office within the Ministry of Finance created, fully staffed and operational
</narrative></title>
<baseline year="2022" iso-date="2022-12-07" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-07" />
<period-end iso-date="2025-12-07" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Millions of people using broadband internet
</narrative></title>
<baseline year="2022" iso-date="2022-12-14" value="8.8"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-14" />
<period-end iso-date="2025-12-14" />
<target value="12">
<comment><narrative>
There has been steady progress in the number of broadband internet users in Sri Lanka, with an increase of more than 2 million users since 2022. However, since DPO2's approval, the baseline value for this indicator for 2022 has been revised downwards (from 8.8 to 6.25 million) and, as a result, the original target of 12 million is not expected to be met by the end of 2025. GSMA, the global mobile networks association, revises data once it goes from estimates to actuals.
</narrative></comment>
</target>
<actual value="8.6">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of the new Welfare Benefits Payment Scheme (WBPS) (number of households per year)
</narrative></title>
<baseline year="2022" iso-date="2022-12-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-11" />
<period-end iso-date="2025-12-11" />
<target value="2000000">

</target>
<actual value="1424548">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Exposures to SOEs of total assets of the banking sector (percent)
</narrative></title>
<baseline year="2022" iso-date="2022-06-07" value="8.7"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-07" />
<period-end iso-date="2025-12-07" />
<target value="4.5">

</target>
<actual value="3">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
CEB unbundling initiated through a Cabinet approved Transfer Plan
</narrative></title>
<baseline year="2024" iso-date="2024-07-14" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-07-14" />
<period-end iso-date="2025-12-14" />
<target value="Yes">
<comment><narrative>
Cabinet approval of a final unbundling Transfer Plan is still expected before the end of 2025
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Coverage of female headed household by the new WBPS
</narrative></title>
<baseline year="2022" iso-date="2022-12-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-10" />
<period-end iso-date="2025-12-10" />
<target value="400,000">

</target>
<actual value="256418">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
CEB unbundling initiated through a Cabinet approved Transfer Plan
</narrative></title>
<baseline year="2024" iso-date="2024-07-14" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-07-14" />
<period-end iso-date="2025-12-14" />
<target value="Yes">
<comment><narrative>
Cabinet approval of a final unbundling Transfer Plan is still expected before the end of 2025
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Millions of people using broadband internet
</narrative></title>
<baseline year="2022" iso-date="2022-12-14" value="8.8"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-14" />
<period-end iso-date="2025-12-14" />
<target value="12">
<comment><narrative>
There has been steady progress in the number of broadband internet users in Sri Lanka, with an increase of more than 2 million users since 2022. However, since DPO2's approval, the baseline value for this indicator for 2022 has been revised downwards (from 8.8 to 6.25 million) and, as a result, the original target of 12 million is not expected to be met by the end of 2025. GSMA, the global mobile networks association, revises data once it goes from estimates to actuals.
</narrative></comment>
</target>
<actual value="8.6">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reviews concluded on the infringement of women's rights following National Commission on Women's procedures (proportion of reviews)
</narrative></title>
<baseline year="2023" iso-date="2023-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-14" />
<period-end iso-date="2025-12-14" />
<target value="100">
<comment><narrative>
NCW still being established
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Coverage of female headed household by the new WBPS
</narrative></title>
<baseline year="2022" iso-date="2022-12-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-10" />
<period-end iso-date="2025-12-10" />
<target value="400,000">

</target>
<actual value="256418">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Coverage of the poorest 20 percent by cash transfer programs (percent)
</narrative></title>
<baseline year="2022" iso-date="2022-12-07" value="43"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-07" />
<period-end iso-date="2025-12-07" />
<target value="60">
<comment><narrative>
Data not yet available
</narrative></comment>
</target>
<actual value="TBD">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of the new Welfare Benefits Payment Scheme (WBPS) (number of households per year)
</narrative></title>
<baseline year="2022" iso-date="2022-12-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-11" />
<period-end iso-date="2025-12-11" />
<target value="2000000">

</target>
<actual value="1424548">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private investment in broadband networks facilitated (US$ million)
</narrative></title>
<baseline year="2022" iso-date="2022-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-14" />
<period-end iso-date="2025-12-14" />
<target value="100">

</target>
<actual value="160">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Trade (imports and exports) as a share of GDP (percent)
</narrative></title>
<baseline year="2021" iso-date="2021-12-07" value="41"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-07" />
<period-end iso-date="2025-12-07" />
<target value="45">

</target>
<actual value="42.4">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Exposures to SOEs of total assets of two largest state-owned banks (percent)
</narrative></title>
<baseline year="2022" iso-date="2022-06-10" value="20.9"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-10" />
<period-end iso-date="2025-12-10" />
<target value="10">

</target>
<actual value="7">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Exposures to SOEs of total assets of the banking sector (percent)
</narrative></title>
<baseline year="2022" iso-date="2022-06-07" value="8.7"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-07" />
<period-end iso-date="2025-12-07" />
<target value="4.5">

</target>
<actual value="3">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Use of electronic filing facilities for non-corporate tax declarations (percent)
</narrative></title>
<baseline year="2021" iso-date="2021-12-07" value="23"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-07" />
<period-end iso-date="2025-12-07" />
<target value="&amp;gt; 70">

</target>
<actual value="98">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Total tax revenue-to-GDP (percent)
</narrative></title>
<baseline year="2022" iso-date="2022-12-07" value="7.3"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-07" />
<period-end iso-date="2025-12-07" />
<target value="12.0">

</target>
<actual value="12.3">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Public Debt Management Office within the Ministry of Finance created, fully staffed and operational
</narrative></title>
<baseline year="2022" iso-date="2022-12-07" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-07" />
<period-end iso-date="2025-12-07" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Trade (imports and exports) as a share of GDP (percent)
</narrative></title>
<baseline year="2021" iso-date="2021-12-07" value="41"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-07" />
<period-end iso-date="2025-12-07" />
<target value="45">

</target>
<actual value="42.4">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reviews concluded on the infringement of women's rights following National Commission on Women's procedures (proportion of reviews)
</narrative></title>
<baseline year="2023" iso-date="2023-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-14" />
<period-end iso-date="2025-12-14" />
<target value="100">
<comment><narrative>
NCW still being established
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Use of electronic filing facilities for non-corporate tax declarations (percent)
</narrative></title>
<baseline year="2021" iso-date="2021-12-07" value="23"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-07" />
<period-end iso-date="2025-12-07" />
<target value="&amp;gt; 70">

</target>
<actual value="98">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-11-20T15:47:22" hierarchy="1"><iati-identifier>44000-P081771</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>LK: E-Sri Lanka Development</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><activity-status code="3" /><activity-date type="1" iso-date="2003-09-10"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2004-09-21"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2013-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2013-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Sriyani M. Hulugalle</narrative></person-name><telephone>+1-202-473-1000</telephone><email>shulugalle@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>

<recipient-country code="LK" percentage="100"><narrative xml:lang="en">SRI LANKA</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="1248991" />
                <name><narrative>Colombo</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>6.93548 79.848679</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="15126" percentage="25" xml:lang="en"/><sector vocabulary="1" code="15131" percentage="5" xml:lang="en"/><sector vocabulary="1" code="22020" percentage="30" xml:lang="en"/><sector vocabulary="1" code="22040" percentage="40" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="CI" percentage="30.0000000" xml:lang="en"><narrative>FY17 - ICT Infrastructure</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="CF" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Information and Communications Technologies</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="CZ" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Other Information and Communications Technologies</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BG" percentage="5.00000000" xml:lang="en"><narrative>FY17 - Law and Justice</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="15.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="CS" percentage="20.0000000" xml:lang="en"><narrative>FY17 - ICT Services</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="39" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000243" percentage="9" xml:lang="en"><narrative>MSME Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="33" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000431" percentage="33" xml:lang="en"><narrative>Administrative and Civil Service Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="6" xml:lang="en"><narrative>Urban Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000221" percentage="6" xml:lang="en"><narrative>Job Creation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000323" percentage="9" xml:lang="en"><narrative>MSME Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="39" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="33" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000723" percentage="39" xml:lang="en"><narrative>Rural Infrastructure and service delivery</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2004-09-01"/>
<period-end iso-date="2004-09-30"/>
<value currency="USD" value-date="2004-09-30">730027.55</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2004-10-01"/>
<period-end iso-date="2004-10-31"/>
<value currency="USD" value-date="2004-10-31">243342.52</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2004-11-01"/>
<period-end iso-date="2004-11-30"/>
<value currency="USD" value-date="2004-11-30">243342.52</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2004-12-01"/>
<period-end iso-date="2004-12-31"/>
<value currency="USD" value-date="2004-12-31">243342.51</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-01-01"/>
<period-end iso-date="2005-01-31"/>
<value currency="USD" value-date="2005-01-31">486685.03</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-02-01"/>
<period-end iso-date="2005-02-28"/>
<value currency="USD" value-date="2005-02-28">486685.03</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-03-01"/>
<period-end iso-date="2005-03-31"/>
<value currency="USD" value-date="2005-03-31">486685.04</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-04-01"/>
<period-end iso-date="2005-04-30"/>
<value currency="USD" value-date="2005-04-30">486685.03</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-05-01"/>
<period-end iso-date="2005-05-31"/>
<value currency="USD" value-date="2005-05-31">486685.03</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-06-01"/>
<period-end iso-date="2005-06-30"/>
<value currency="USD" value-date="2005-06-30">486685.04</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-07-01"/>
<period-end iso-date="2005-07-31"/>
<value currency="USD" value-date="2005-07-31">973370.07</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-08-01"/>
<period-end iso-date="2005-08-31"/>
<value currency="USD" value-date="2005-08-31">973370.07</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-09-01"/>
<period-end iso-date="2005-09-30"/>
<value currency="USD" value-date="2005-09-30">973370.06</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-10-01"/>
<period-end iso-date="2005-10-31"/>
<value currency="USD" value-date="2005-10-31">973370.07</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-11-01"/>
<period-end iso-date="2005-11-30"/>
<value currency="USD" value-date="2005-11-30">973370.07</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-12-01"/>
<period-end iso-date="2005-12-31"/>
<value currency="USD" value-date="2005-12-31">973370.06</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-01-01"/>
<period-end iso-date="2006-01-31"/>
<value currency="USD" value-date="2006-01-31">1460055.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-02-01"/>
<period-end iso-date="2006-02-28"/>
<value currency="USD" value-date="2006-02-28">1460055.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-03-01"/>
<period-end iso-date="2006-03-31"/>
<value currency="USD" value-date="2006-03-31">1460055.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-04-01"/>
<period-end iso-date="2006-04-30"/>
<value currency="USD" value-date="2006-04-30">1460055.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-05-01"/>
<period-end iso-date="2006-05-31"/>
<value currency="USD" value-date="2006-05-31">1460055.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-06-01"/>
<period-end iso-date="2006-06-30"/>
<value currency="USD" value-date="2006-06-30">1460055.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-07-01"/>
<period-end iso-date="2006-07-31"/>
<value currency="USD" value-date="2006-07-31">1946740.12</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-08-01"/>
<period-end iso-date="2006-08-31"/>
<value currency="USD" value-date="2006-08-31">1946740.12</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-09-01"/>
<period-end iso-date="2006-09-30"/>
<value currency="USD" value-date="2006-09-30">1946740.14</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-10-01"/>
<period-end iso-date="2006-10-31"/>
<value currency="USD" value-date="2006-10-31">1460055.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-11-01"/>
<period-end iso-date="2006-11-30"/>
<value currency="USD" value-date="2006-11-30">1460055.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-12-01"/>
<period-end iso-date="2006-12-31"/>
<value currency="USD" value-date="2006-12-31">1460055.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-01-01"/>
<period-end iso-date="2007-01-31"/>
<value currency="USD" value-date="2007-01-31">1460055.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-02-01"/>
<period-end iso-date="2007-02-28"/>
<value currency="USD" value-date="2007-02-28">1460055.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-03-01"/>
<period-end iso-date="2007-03-31"/>
<value currency="USD" value-date="2007-03-31">1460055.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-04-01"/>
<period-end iso-date="2007-04-30"/>
<value currency="USD" value-date="2007-04-30">1460055.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">1460055.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">1460055.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">1460055.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">1460055.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">1460055.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">973370.07</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">973370.07</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">973370.06</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">973370.07</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">973370.07</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">973370.06</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">973370.07</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">973370.07</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">973370.06</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">632690.54</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">632690.54</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">632690.55</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2004-09-01"/>
<period-end iso-date="2004-09-30"/>
<value currency="USD" value-date="2004-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2004-10-01"/>
<period-end iso-date="2004-10-31"/>
<value currency="USD" value-date="2004-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2004-11-01"/>
<period-end iso-date="2004-11-30"/>
<value currency="USD" value-date="2004-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2004-12-01"/>
<period-end iso-date="2004-12-31"/>
<value currency="USD" value-date="2004-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-01-01"/>
<period-end iso-date="2005-01-31"/>
<value currency="USD" value-date="2005-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-02-01"/>
<period-end iso-date="2005-02-28"/>
<value currency="USD" value-date="2005-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-03-01"/>
<period-end iso-date="2005-03-31"/>
<value currency="USD" value-date="2005-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-04-01"/>
<period-end iso-date="2005-04-30"/>
<value currency="USD" value-date="2005-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-05-01"/>
<period-end iso-date="2005-05-31"/>
<value currency="USD" value-date="2005-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-06-01"/>
<period-end iso-date="2005-06-30"/>
<value currency="USD" value-date="2005-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-07-01"/>
<period-end iso-date="2005-07-31"/>
<value currency="USD" value-date="2005-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-08-01"/>
<period-end iso-date="2005-08-31"/>
<value currency="USD" value-date="2005-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-09-01"/>
<period-end iso-date="2005-09-30"/>
<value currency="USD" value-date="2005-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-10-01"/>
<period-end iso-date="2005-10-31"/>
<value currency="USD" value-date="2005-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-11-01"/>
<period-end iso-date="2005-11-30"/>
<value currency="USD" value-date="2005-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-12-01"/>
<period-end iso-date="2005-12-31"/>
<value currency="USD" value-date="2005-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-01-01"/>
<period-end iso-date="2006-01-31"/>
<value currency="USD" value-date="2006-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-02-01"/>
<period-end iso-date="2006-02-28"/>
<value currency="USD" value-date="2006-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-03-01"/>
<period-end iso-date="2006-03-31"/>
<value currency="USD" value-date="2006-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-04-01"/>
<period-end iso-date="2006-04-30"/>
<value currency="USD" value-date="2006-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-05-01"/>
<period-end iso-date="2006-05-31"/>
<value currency="USD" value-date="2006-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-06-01"/>
<period-end iso-date="2006-06-30"/>
<value currency="USD" value-date="2006-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-07-01"/>
<period-end iso-date="2006-07-31"/>
<value currency="USD" value-date="2006-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-08-01"/>
<period-end iso-date="2006-08-31"/>
<value currency="USD" value-date="2006-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-09-01"/>
<period-end iso-date="2006-09-30"/>
<value currency="USD" value-date="2006-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-10-01"/>
<period-end iso-date="2006-10-31"/>
<value currency="USD" value-date="2006-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-11-01"/>
<period-end iso-date="2006-11-30"/>
<value currency="USD" value-date="2006-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-12-01"/>
<period-end iso-date="2006-12-31"/>
<value currency="USD" value-date="2006-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-01-01"/>
<period-end iso-date="2007-01-31"/>
<value currency="USD" value-date="2007-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-02-01"/>
<period-end iso-date="2007-02-28"/>
<value currency="USD" value-date="2007-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-03-01"/>
<period-end iso-date="2007-03-31"/>
<value currency="USD" value-date="2007-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-04-01"/>
<period-end iso-date="2007-04-30"/>
<value currency="USD" value-date="2007-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<capital-spend percentage="100" /><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P081771"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P081771?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P081771"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Improved access and use of ICT in target areas (1B)-E Society
</narrative></title>
<baseline year="2004" iso-date="2004-06-30" value="0.00"><comment><narrative>CAP is the community assistance program and PAP is the partnership assistance program.  The 80% is the rate of satisfaction withthe applications developed through the e-society Fund by users.</narrative></comment></baseline>
<period>
<period-start iso-date="2004-06-30" />
<period-end iso-date="2011-12-31" />
<target value="75.00">
<comment><narrative>
CAP - 25% low usage, 44% average, 31% high usage; PAP - 20% low usage, 80% high usage
</narrative></comment>
</target>
<actual value="80.00">
<comment><narrative>
The new survey to be carried out in Sept. 2013
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Effective citizen-centered and business friendly government
</narrative></title>
<baseline year="2004" iso-date="2004-06-30" value="0.00"><comment><narrative>0 services for private sector, 0 for public sector</narrative></comment></baseline>
<period>
<period-start iso-date="2004-06-30" />
<period-end iso-date="2013-12-31" />
<target value="165.00">
<comment><narrative>
The original target of 145 services was achieved  by the original project . The additional financing project added another 20services  to be developed to a total target of 165.
</narrative></comment>
</target>
<actual value="180.00">
<comment><narrative>
135 services for private sector, 20 for public sector
Another 25 eServices were
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Improved access and use of ICT in target areas (1B)
</narrative></title>
<baseline year="2004" iso-date="2004-06-30" value="0.00"><comment><narrative>CAP is the community assistance program and PAP is the partnership assistance program.  The 80% is the rate of satisfaction withthe applications developed through the e-society Fund by users.</narrative></comment></baseline>
<period>
<period-start iso-date="2004-06-30" />
<period-end iso-date="2011-12-31" />
<target value="75.00">
<comment><narrative>
CAP - 25% low usage, 44% average, 31% high usage; PAP - 20% low usage, 80% high usage
</narrative></comment>
</target>
<actual value="77.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Effective citizen-centered and business friendly government -e-services
</narrative></title>
<baseline year="2004" iso-date="2004-06-30" value="0.00"><comment><narrative>0 services for private sector, 0 for public sector</narrative></comment></baseline>
<period>
<period-start iso-date="2004-06-30" />
<period-end iso-date="2013-12-31" />
<target value="165.00">
<comment><narrative>
The original target of 145 services was achieved  by the original project . The additional financing project added another 20services  to be developed to a total target of 165.
</narrative></comment>
</target>
<actual value="155.00">
<comment><narrative>
135 services for private sector, 20 for public sector
</narrative></comment>
</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-11-20T15:47:22" hierarchy="1"><iati-identifier>44000-P086411</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>LK - Road Sector Assistance</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0000578"><narrative>External Resources Department</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="LK-COA-0000579"><narrative>Road Development Authority (RDA)</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2005-04-01"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2005-12-15"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2015-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2015-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Amali Rajapaksa</narrative></person-name><telephone>+1-202-473-1000</telephone><email>arajapaksa@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="LK" percentage="100"><narrative xml:lang="en">SRI LANKA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001224537" />
            <name><narrative>Walahanduwa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.0567999 80.247498</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001229396" />
            <name><narrative>Punewa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.6113005 80.471497</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001232950" />
            <name><narrative>Nittambuwa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.1426001 80.093803</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001235741" />
            <name><narrative>Mawanella</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.2519002 80.445297</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001241176" />
            <name><narrative>Karativu</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.3833299 81.833328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001245049" />
            <name><narrative>Hali-Ela</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.9535999 81.0299</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001245107" />
            <name><narrative>Hakmana</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.3166699 80.800003</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001245159" />
            <name><narrative>Habarana</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.0362997 80.746696</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001246005" />
            <name><narrative>Gampaha District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.1332998 80</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001246294" />
            <name><narrative>Galle</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.0366998 80.217003</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001246314" />
            <name><narrative>Galkulama</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.3000002 80.566673</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001248200" />
            <name><narrative>Deniyaya</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.3460999 80.551498</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001248228" />
            <name><narrative>Denagama West</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.1096001 80.6427</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001248990" />
            <name><narrative>Colombo District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.8663998 80.016602</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001252125" />
            <name><narrative>Akuressa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.1006999 80.469299</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001223569" />
            <name><narrative>Wellawaya</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.7263999 81.104599</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001223672" />
            <name><narrative>Welimada</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.9043999 80.904404</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001223696" />
            <name><narrative>Welikanda</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.95157 81.245232</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001223916" />
            <name><narrative>Weeraketiya</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.3666701 80.966667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001235510" />
            <name><narrative>Medawachchiya</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.5345001 80.492302</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001228435" />
            <name><narrative>Province of Sabaragamuwa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.75 80.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001227618" />
            <name><narrative>Southern Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.1666698 80.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001223421" />
            <name><narrative> Western Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.8333302 80.083328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001236090" />
            <name><narrative>Maradankadawalagama</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.1267996 80.562103</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001236153" />
            <name><narrative>Manampitiya</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.9000001 81.116669</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001236897" />
            <name><narrative>Maha Oya</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.2726998 79.841202</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001241621" />
            <name><narrative>Kandy District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.3044 80.707298</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001241622" />
            <name><narrative>Kandy</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.2954998 80.635597</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001241963" />
            <name><narrative>Kalutara District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.6030998 80.1026</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001242796" />
            <name><narrative>Jayanthipura</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8 81</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001243023" />
            <name><narrative>Ingiriya</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.7438002 80.176003</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001230110" />
            <name><narrative>Pitabeddara</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.2013998 80.459297</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001229293" />
            <name><narrative>Puttalam</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.0361996 79.8283</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001228730" />
            <name><narrative>Ratnapura</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.6827798 80.39917</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001227746" />
            <name><narrative>Siyambalanduwa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.9067001 81.546097</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001224679" />
            <name><narrative>Wadinagala</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.1262002 81.5672</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001224195" />
            <name><narrative>Warakapola</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.2226 80.188698</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001250503" />
            <name><narrative>Balane</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.2705998 80.4832</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007438747" />
            <name><narrative>Imaduwa Division</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.0358 80.358002</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001223655" />
            <name><narrative>Welipitiya</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.2670002 80.741096</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001250807" />
            <name><narrative>Attanagalla</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.1152 80.134102</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001250806" />
            <name><narrative>Attanagalu Oya</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.0868001 79.952003</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001250308" />
            <name><narrative>Bandarawela</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.8333998 80.985298</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001246390" />
            <name><narrative>Galigamuwa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.2398 80.3116</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001225756" />
            <name><narrative>Udu Nuwara and Yatinuwara</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.25 80.550003</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001235015" />
            <name><narrative>Minneriya</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.0465202 80.902512</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001249296" />
            <name><narrative>Central Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.3333302 80.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001234973" />
            <name><narrative>Mirigama</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.2438998 80.121201</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001234413" />
            <name><narrative>Mulatiyana</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.1690001 80.579399</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001230553" />
            <name><narrative>Peradeniya</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.2621999 80.584099</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001228975" />
            <name><narrative>Ramukkana</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.7072001 79.9823</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001242571" />
            <name><narrative>Kadugannawa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.2547002 80.5242</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007544204" />
            <name><narrative>Kegalla Division</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.2122998 80.365501</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001251459" />
            <name><narrative>Ampara</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.2975402 81.682022</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001232703" />
            <name><narrative>Okawela</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.1069002 80.715202</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001232426" />
            <name><narrative>Padeniya</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.6556001 80.222298</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><sector vocabulary="1" code="21023" percentage="100" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="4.00000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TI" percentage="90.0000000" xml:lang="en"><narrative>FY17 - Rural and Inter-Urban Roads</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="6.00000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="28" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000053" percentage="2" xml:lang="en"><narrative>Fragility, Conflict and Violence</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000512" percentage="15" xml:lang="en"><narrative>Other Excluded Groups</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000533" percentage="2" xml:lang="en"><narrative>Forced Displacement</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000512" percentage="15" xml:lang="en"><narrative>Other Excluded Groups</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="17" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000431" percentage="17" xml:lang="en"><narrative>Administrative and Civil Service Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="11" xml:lang="en"><narrative>Urban Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000533" percentage="2" xml:lang="en"><narrative>Forced Displacement</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000084" percentage="16" xml:lang="en"><narrative>Environmental policies and institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000221" percentage="11" xml:lang="en"><narrative>Job Creation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="28" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="17" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000723" percentage="28" xml:lang="en"><narrative>Rural Infrastructure and service delivery</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2006-01-01"/>
<period-end iso-date="2006-01-31"/>
<value currency="USD" value-date="2006-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-02-01"/>
<period-end iso-date="2006-02-28"/>
<value currency="USD" value-date="2006-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-03-01"/>
<period-end iso-date="2006-03-31"/>
<value currency="USD" value-date="2006-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-04-01"/>
<period-end iso-date="2006-04-30"/>
<value currency="USD" value-date="2006-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-05-01"/>
<period-end iso-date="2006-05-31"/>
<value currency="USD" value-date="2006-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-06-01"/>
<period-end iso-date="2006-06-30"/>
<value currency="USD" value-date="2006-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-07-01"/>
<period-end iso-date="2006-07-31"/>
<value currency="USD" value-date="2006-07-31">2692500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-08-01"/>
<period-end iso-date="2006-08-31"/>
<value currency="USD" value-date="2006-08-31">2692500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-09-01"/>
<period-end iso-date="2006-09-30"/>
<value currency="USD" value-date="2006-09-30">2692500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-10-01"/>
<period-end iso-date="2006-10-31"/>
<value currency="USD" value-date="2006-10-31">2692500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-11-01"/>
<period-end iso-date="2006-11-30"/>
<value currency="USD" value-date="2006-11-30">2692500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-12-01"/>
<period-end iso-date="2006-12-31"/>
<value currency="USD" value-date="2006-12-31">2692500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-01-01"/>
<period-end iso-date="2007-01-31"/>
<value currency="USD" value-date="2007-01-31">2692500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-02-01"/>
<period-end iso-date="2007-02-28"/>
<value currency="USD" value-date="2007-02-28">2692500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-03-01"/>
<period-end iso-date="2007-03-31"/>
<value currency="USD" value-date="2007-03-31">2692500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-04-01"/>
<period-end iso-date="2007-04-30"/>
<value currency="USD" value-date="2007-04-30">2692500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">2692500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">2692500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">2228333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">2228333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">2228333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">2228333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">2228333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">2228333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">2228333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">2228333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">2228333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">2228333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">2228333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">2228333.39</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">2307500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">2307500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">2307500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">2307500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">2307500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">2307500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">2307500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">2307500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">2307500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">2307500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">2307500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">2307500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">736666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">736666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">736666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">736666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">736666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">736666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">736666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">736666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">736666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">736666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">736666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">736666.61</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">184166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">184166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">184166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">184166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">184166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">184166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">184166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">184166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">184166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">184166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">184166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">184166.61</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">184166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">184166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">184166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">184166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">184166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">184166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">184166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">184166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">184166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">184166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">184166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">184166.61</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-01-01"/>
<period-end iso-date="2006-01-31"/>
<value currency="USD" value-date="2006-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-02-01"/>
<period-end iso-date="2006-02-28"/>
<value currency="USD" value-date="2006-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-03-01"/>
<period-end iso-date="2006-03-31"/>
<value currency="USD" value-date="2006-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-04-01"/>
<period-end iso-date="2006-04-30"/>
<value currency="USD" value-date="2006-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-05-01"/>
<period-end iso-date="2006-05-31"/>
<value currency="USD" value-date="2006-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-06-01"/>
<period-end iso-date="2006-06-30"/>
<value currency="USD" value-date="2006-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-07-01"/>
<period-end iso-date="2006-07-31"/>
<value currency="USD" value-date="2006-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-08-01"/>
<period-end iso-date="2006-08-31"/>
<value currency="USD" value-date="2006-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-09-01"/>
<period-end iso-date="2006-09-30"/>
<value currency="USD" value-date="2006-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-10-01"/>
<period-end iso-date="2006-10-31"/>
<value currency="USD" value-date="2006-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-11-01"/>
<period-end iso-date="2006-11-30"/>
<value currency="USD" value-date="2006-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-12-01"/>
<period-end iso-date="2006-12-31"/>
<value currency="USD" value-date="2006-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-01-01"/>
<period-end iso-date="2007-01-31"/>
<value currency="USD" value-date="2007-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-02-01"/>
<period-end iso-date="2007-02-28"/>
<value currency="USD" value-date="2007-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-03-01"/>
<period-end iso-date="2007-03-31"/>
<value currency="USD" value-date="2007-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-04-01"/>
<period-end iso-date="2007-04-30"/>
<value currency="USD" value-date="2007-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">184166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">184166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">184166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">184166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">184166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">184166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">184166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">184166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">184166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">184166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">184166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">184166.61</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2005-12-31"/><value value-date="2005-12-31">100000000</value><description xml:lang="en"><narrative>Total Commitment in December Month of 2005</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2008-07-31"/><value value-date="2008-07-31">98100000</value><description xml:lang="en"><narrative>Total Commitment in July Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2011-04-30"/><value value-date="2011-04-30">100000000</value><description xml:lang="en"><narrative>Total Commitment in April Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">-527304</value><description xml:lang="en"><narrative>Total Commitment Cancellations in April Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">-14540</value><description xml:lang="en"><narrative>Total Commitment Cancellations in April Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">-12050652</value><description xml:lang="en"><narrative>Total Commitment Cancellations in July Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-4402419</value><description xml:lang="en"><narrative>Total Commitment Cancellations in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2006-03-31"/><value value-date="2006-03-31">992410</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2006</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2006-04-30"/><value value-date="2006-04-30">3400000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2006</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2006-08-31"/><value value-date="2006-08-31">8719793</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2006</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2006-11-30"/><value value-date="2006-11-30">500000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2006</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2007-02-28"/><value value-date="2007-02-28">10980000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2007</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2007-07-31"/><value value-date="2007-07-31">230807</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2007</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2007-08-31"/><value value-date="2007-08-31">7497000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2007</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2007-10-31"/><value value-date="2007-10-31">352448</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2007</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-02-29"/><value value-date="2008-02-29">31822000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-05-31"/><value value-date="2008-05-31">357843</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-07-31"/><value value-date="2008-07-31">415681</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-08-31"/><value value-date="2008-08-31">8940000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-10-31"/><value value-date="2008-10-31">570893</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-11-30"/><value value-date="2008-11-30">2550510</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-02-28"/><value value-date="2009-02-28">876971</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-03-31"/><value value-date="2009-03-31">2578732</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-06-30"/><value value-date="2009-06-30">4842210</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-07-31"/><value value-date="2009-07-31">1584521</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-08-31"/><value value-date="2009-08-31">29093260</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-09-30"/><value value-date="2009-09-30">1587393</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-10-31"/><value value-date="2009-10-31">941120</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-10-31"/><value value-date="2009-10-31">35981112</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-12-31"/><value value-date="2009-12-31">1968984</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-04-30"/><value value-date="2010-04-30">1025129</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-12-31"/><value value-date="2010-12-31">1710787</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-03-31"/><value value-date="2011-03-31">3205509</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-07-31"/><value value-date="2011-07-31">1351024</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-08-31"/><value value-date="2011-08-31">2823444</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-11-30"/><value value-date="2011-11-30">1305900</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-12-31"/><value value-date="2011-12-31">346394</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-12-31"/><value value-date="2011-12-31">285860</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-01-31"/><value value-date="2012-01-31">10871331</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-02-29"/><value value-date="2012-02-29">802585</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">500000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-04-30"/><value value-date="2012-04-30">33000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-06-30"/><value value-date="2012-06-30">566209</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-07-31"/><value value-date="2012-07-31">300700</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-09-30"/><value value-date="2012-09-30">4883000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">8655576</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">2639456</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-01-31"/><value value-date="2013-01-31">9896050</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-01-31"/><value value-date="2013-01-31">1076059</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-04-30"/><value value-date="2013-04-30">12583243</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">1468669</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">8348</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">-8348</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">164058</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">10787338</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">6028531</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">164160</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">431913</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">3940202</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">15254634</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">955265</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">1634387</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">-1634387</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">4254</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">620000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">8000000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">-1121</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-01-31"/><value value-date="2015-01-31">-3451</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">9033527</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">1460000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-01-31"/><value value-date="2016-01-31">-747467</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">-1702583</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2006-09-30"/><value value-date="2006-09-30">-160980</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2006</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2007-03-31"/><value value-date="2007-03-31">-144890</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2007</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2007-09-30"/><value value-date="2007-09-30">-182370</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2007</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2008-03-31"/><value value-date="2008-03-31">-173850</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2008-09-30"/><value value-date="2008-09-30">-290113</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2009-03-31"/><value value-date="2009-03-31">-273623</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2009-09-30"/><value value-date="2009-09-30">-316465</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-03-31"/><value value-date="2010-03-31">-345703</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-03-31"/><value value-date="2010-03-31">-215617</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-09-30"/><value value-date="2010-09-30">-339837</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-09-30"/><value value-date="2010-09-30">-233031</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-03-31"/><value value-date="2011-03-31">-356570</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-03-31"/><value value-date="2011-03-31">-241866</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-09-30"/><value value-date="2011-09-30">-249836</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-09-30"/><value value-date="2011-09-30">-383616</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">-246716</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">-372233</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">-896</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-09-30"/><value value-date="2012-09-30">-292013</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-09-30"/><value value-date="2012-09-30">-372656</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">-5435</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">-327333</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">-386800</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">-36562</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">-331055</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">-375565</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">-111372</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">-343394</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">-390005</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">-167330</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">-336305</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">-383689</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">-225026</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">-306343</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">-353314</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">-238551</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">-312314</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">-360197</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">-289597</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-352823</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-311993</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-274778</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-313785</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-360914</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-268399</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-346711</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-302970</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-262404</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-310716</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-324690</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-278881</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-372000</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-327707</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-277690</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-315663</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-361540</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-268639</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-337977</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-297841</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-268767</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-276165</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-329123</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-266986</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-326767</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-261771</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-264565</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-170316</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-308034</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-275438</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-355743</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-323036</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-251868</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-218606</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-325783</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-287321</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-885511</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-204655</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-232868</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-173617</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-820699</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-159409</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-295057</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-163614</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-236212</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-147341</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-288883</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-203837</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-288273</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-133903</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-201132</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-52969</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-268765</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-166138</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-269465</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-66795</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-112853</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-183215</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-314588</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-190387</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-284699</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-91915</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-105182</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-957858</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-962373</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-927522</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-978524</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-998784</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-964016</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-4179323</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-4148515</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-956910</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-943721</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-4091338</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-4106206</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-947151</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-973596</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-4220857</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-4256134</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-981733</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-3729699</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-980029</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-4248745</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-3642154</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-947955</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-4109692</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-3449901</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-889936</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-3858164</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-3411533</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-914904</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-3966409</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-3480724</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-906300</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-3929106</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-3438442</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-915152</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-3967481</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-3430587</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-927316</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-4020218</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-3407955</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-915763</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-3966321</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-3496953</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-943694</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-4095148</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-3527103</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-1866522</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-4045991</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-3547194</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-579"><narrative>Road Development Authority (RDA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P086411"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P086411?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P086411"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
National roads on which perdiodic maintenance has been carried out - Indicator for 2nd AF
</narrative></title>
<baseline year="2011" iso-date="2011-03-15" value="0.00"><comment><narrative>New Indicator for IDA-49060</narrative></comment></baseline>
<period>
<period-start iso-date="2011-03-15" />
<period-end iso-date="2014-09-30" />
<target value="60.00">

</target>
<actual value="25.00">
<comment><narrative>
This relates to the completed road sections in packages 1,2, 7 and 8
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Reduction in network in poor and bad condition - Common indicator
</narrative></title>
<baseline year="2005" iso-date="2005-11-16" value="52%"><comment><narrative>Information based on the Road Condition Report for 2011.</narrative></comment></baseline>
<period>
<period-start iso-date="2005-11-16" />
<period-end iso-date="2014-09-30" />
<target value="35%">
<comment><narrative>
New end target for IDA-4906
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Reduction in Vehicle Operating Costs (VOC) on the national network - Common indicator
</narrative></title>
<baseline year="2005" iso-date="2005-11-16" value="23.9 Rs/km"><comment><narrative>Information based on the Road Condition Report for 2011.</narrative></comment></baseline>
<period>
<period-start iso-date="2005-11-16" />
<period-end iso-date="2014-09-30" />
<target value="10.5 Rs/km">
<comment><narrative>
Target for IDA-4138 was achieved. New end target for IDA-4906
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Reduction in IRI for Project roads - Indicator for original credit
</narrative></title>
<baseline year="2005" iso-date="2005-11-16" value="7.8"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-11-16" />
<period-end iso-date="2014-09-30" />
<target value="2.9">

</target>
<actual value="2.8">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads rehabilitated, Rural
</narrative></title>
<baseline year="2005" iso-date="2005-11-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-11-16" />
<period-end iso-date="2014-09-30" />
<target value="157.00">
<comment><narrative>
This has been achieved for IDA-41380.
</narrative></comment>
</target>
<actual value="157.00">
<comment><narrative>
Target for IDA-41380 was achieved in 2010/11 under the original credit. This indicators is discontinued for the second additionalfinance
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduced Travel Time on Project Roads - Indicator for 2nd AF
</narrative></title>
<baseline year="2011" iso-date="2011-03-15" value="2.30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-03-15" />
<period-end iso-date="2014-09-30" />
<target value="1.80">

</target>
<actual value="0.67">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
50% of staff in Planning and Maintenance Division of RDA trained in Road Asset Management - Indicator for original credit
</narrative></title>
<baseline year="2005" iso-date="2005-11-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-11-16" />
<period-end iso-date="2014-09-30" />
<target value="50.00">

</target>
<actual value="67.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduced Travel Time on Project Roads - Indicator for 2nd AF
</narrative></title>
<baseline year="2011" iso-date="2011-03-15" value="2.30"><comment><narrative>New Indicator for IDA-49060</narrative></comment></baseline>
<period>
<period-start iso-date="2011-03-15" />
<period-end iso-date="2014-09-30" />
<target value="1.80">

</target>
<actual value="0.67">
<comment><narrative>
This relates to the travel time for Phase 1 against a target of 0.7 hours.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Reduction in IRI for Project Roads - Indicator for 2nd AF
</narrative></title>
<baseline year="2011" iso-date="2011-03-15" value="6"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-03-15" />
<period-end iso-date="2014-09-30" />
<target value="2.9">

</target>
<actual value="2.29">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Reduction in average network IRI -  Common indicator
</narrative></title>
<baseline year="2005" iso-date="2005-11-16" value="9.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-11-16" />
<period-end iso-date="2014-09-30" />
<target value="5.9">

</target>
<actual value="6.1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Reduction in IRI for Project roads - Indicator for original credit
</narrative></title>
<baseline year="2005" iso-date="2005-11-16" value="7.8"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-11-16" />
<period-end iso-date="2014-09-30" />
<target value="2.9">
<comment><narrative>
Target for IDA-41380 was achieved. A new equivalent indicator was created for IDA-49060
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduced travel time on project rural roads  Indicator for original credit
</narrative></title>
<baseline year="2005" iso-date="2005-11-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-11-16" />
<period-end iso-date="2011-03-31" />
<target value="4.00">

</target>
<actual value="60.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Progress Increase in annual Road Maintenance Expenditure - Common indicator
</narrative></title>
<baseline year="2010" iso-date="2010-12-31" value="LKR 4.2 Billion"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-31" />
<period-end iso-date="2014-12-31" />
<target value="LKR 6.6 billion/year">

</target>
<actual value="LKR 5 billion">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Annual Road Maintenance Program is approved by RMTF - Indicator for 2nd AF
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="Not Approved"><comment><narrative>New Indicator for IDA-49060- Annual Indicator</narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2014-09-30" />
<target value="Approved annually">

</target>
<actual value="approved">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Reduction in network in poor and bad condition - Common indicator
</narrative></title>
<baseline year="2005" iso-date="2005-11-16" value="52%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-11-16" />
<period-end iso-date="2014-09-30" />
<target value="35%">

</target>
<actual value="35%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Improved level of Satisfaction of road-users - Indicator for 2nd AF
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="38.30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2014-09-30" />
<target value="0.00">

</target>
<actual value="38.30">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Reduction in Vehicle Operating Costs (VOC) on the national network - Common indicator
</narrative></title>
<baseline year="2005" iso-date="2005-11-16" value="23.9 Rs/km"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-11-16" />
<period-end iso-date="2014-09-30" />
<target value="10.5 Rs/km">

</target>
<actual value="14.13 Rs/km">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads rehabilitated, Rural
</narrative></title>
<baseline year="2005" iso-date="2005-11-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-11-16" />
<period-end iso-date="2014-09-30" />
<target value="157.00">

</target>
<actual value="157.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
50% of staff in Planning and Maintenance Division of RDA trained in Road Asset Management - Indicator for original credit

0%
</narrative></title>
<baseline year="2005" iso-date="2005-11-16" value="0%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-11-16" />
<period-end iso-date="2014-09-30" />
<target value="50%">
<comment><narrative>
Target for IDA-41380 was achieved
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Reduction in IRI for Project Roads - Indicator for 2nd AF
</narrative></title>
<baseline year="2011" iso-date="2011-03-15" value="6"><comment><narrative>New Indicator for IDA-49060</narrative></comment></baseline>
<period>
<period-start iso-date="2011-03-15" />
<period-end iso-date="2014-09-30" />
<target value="2.8">
<comment><narrative>
Indicator relates to road sections in Phase 1 and 2  under IDA-4906
</narrative></comment>
</target>
<actual value="2.29">
<comment><narrative>
The IRI is collected only at completion of civil works. The above relates to IRI for Phase 1 only.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Progress Increase in annual Road Maintenance Expenditure - Common indicator
</narrative></title>
<baseline year="2010" iso-date="2010-12-31" value="LKR 4.2 Billion"><comment><narrative>Actual allocation for 2013 has been LKR 7.5 billion.</narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-31" />
<period-end iso-date="2014-09-30" />
<target value="LKR 6.6 billion/year">
<comment><narrative>
New end target for IDA-4906
</narrative></comment>
</target>
<actual value="LKR 8.2 billion">
<comment><narrative>
Actual allocation for 2014 has been LKR  8.2  billion.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Improved level of Satisfaction of road-users - Indicator for 2nd AF
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="38.30"><comment><narrative>Baseline RUSS index for phase 2.</narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2014-09-30" />
<target value="0.00">

</target>
<actual value="38.30">
<comment><narrative>
The Baseline RUSS index for phase 2. the overall index for phase 1 through recall type evaluation was found to be 81.24
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Annual Road Maintenance Program is approved by RMTF - Indicator for 2nd AF
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="Not Approved"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2014-09-30" />
<target value="Approved annually">

</target>
<actual value="approved">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Reduced travel time on project rural roads - Indicator for original credit
</narrative></title>
<baseline year="2005" iso-date="2005-11-16" value="0%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-11-16" />
<period-end iso-date="2011-03-31" />
<target value="4%">
<comment><narrative>
Target for IDA-41380 was achieved
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
National roads on which perdiodic maintenance has been carried out - Indicator for 2nd AF
</narrative></title>
<baseline year="2011" iso-date="2011-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-03-15" />
<period-end iso-date="2014-09-30" />
<target value="60.00">

</target>
<actual value="64.50">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Reduction in average network IRI -  Common indicator
</narrative></title>
<baseline year="2005" iso-date="2005-11-16" value="9.5"><comment><narrative>Information based on the Road Condition Report.</narrative></comment></baseline>
<period>
<period-start iso-date="2005-11-16" />
<period-end iso-date="2014-09-30" />
<target value="5.9">
<comment><narrative>
Target for IDA-41380 was achieved. New end target for IDA-4906
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-11-20T15:47:22" hierarchy="1"><iati-identifier>44000-P086747</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>LK: Community Livelihoods in Conflict Ar</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="LK-COA-0000589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2004-08-13"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2004-06-22"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2014-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2014-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Seenithamby Manoharan</narrative></person-name><telephone>+1-202-473-1000</telephone><email>smanoharan@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>


<recipient-country code="LK" percentage="100"><narrative xml:lang="en">SRI LANKA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001229292" />
            <name><narrative>Puttalam District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.0453997 79.9319</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001234392" />
            <name><narrative>Mullaittivu District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.25 80.549896</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001236148" />
            <name><narrative>Mannar District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.8666697 80.083328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001251460" />
            <name><narrative>Ampara District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.0833001 81.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001242831" />
            <name><narrative>Jaffna District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.75 80.083328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001232443" />
            <name><narrative>Padawiya Tank Sanctuary</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.7728996 80.7556</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001228479" />
            <name><narrative>Rugam Wewa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.6461501 81.480782</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001234818" />
            <name><narrative>Monaragala District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.6666698 81.333328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001226258" />
            <name><narrative>Trincomalee District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.5833302 81.083328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001242952" />
            <name><narrative>Iranamadu Tank</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.3017998 80.4459</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001245734" />
            <name><narrative>Giants Tank</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.8663301 80.039688</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001250161" />
            <name><narrative>Batticaloa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.7101998 81.692398</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001251080" />
            <name><narrative>Anuradhapura District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.3333302 80.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001229899" />
            <name><narrative>Polonnaruwa District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8 81</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001240371" />
            <name><narrative>Kilinochchi District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.3948698 80.408943</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001225017" />
            <name><narrative>Vavuniya District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.8613396 80.475761</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001251917" />
            <name><narrative>Allai Tank</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.3666697 81.300003</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><sector vocabulary="1" code="15150" percentage="16" xml:lang="en"/><sector vocabulary="1" code="15250" percentage="16" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="16" xml:lang="en"/><sector vocabulary="1" code="31130" percentage="11" xml:lang="en"/><sector vocabulary="1" code="31140" percentage="11" xml:lang="en"/><sector vocabulary="1" code="31194" percentage="6" xml:lang="en"/><sector vocabulary="1" code="43042" percentage="24" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TI" percentage="5.00000000" xml:lang="en"><narrative>FY17 - Rural and Inter-Urban Roads</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="5.00000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AB" percentage="5.00000000" xml:lang="en"><narrative>FY17 - Agricultural Extension, Research, and Other Support Activities</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AI" percentage="75.0000000" xml:lang="en"><narrative>FY17 - Irrigation and Drainage</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000531" percentage="15" xml:lang="en"><narrative>Conflict Prevention</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="15" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000531" percentage="15" xml:lang="en"><narrative>Conflict Prevention</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="7" xml:lang="en"><narrative>Finance for Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="36" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000822" percentage="5" xml:lang="en"><narrative>Water Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000332" percentage="7" xml:lang="en"><narrative>Agriculture Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000053" percentage="30" xml:lang="en"><narrative>Fragility, Conflict and Violence</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000721" percentage="7" xml:lang="en"><narrative>Rural Markets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000053" percentage="30" xml:lang="en"><narrative>Fragility, Conflict and Violence</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000723" percentage="29" xml:lang="en"><narrative>Rural Infrastructure and service delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000513" percentage="14" xml:lang="en"><narrative>Participation and Civic Engagement</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000721" percentage="7" xml:lang="en"><narrative>Rural Markets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000332" percentage="7" xml:lang="en"><narrative>Agriculture Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="15" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="36" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="100" xml:lang="en"><narrative>Jobs</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2004-07-01"/>
<period-end iso-date="2004-07-31"/>
<value currency="USD" value-date="2004-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2004-08-01"/>
<period-end iso-date="2004-08-31"/>
<value currency="USD" value-date="2004-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2004-09-01"/>
<period-end iso-date="2004-09-30"/>
<value currency="USD" value-date="2004-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2004-10-01"/>
<period-end iso-date="2004-10-31"/>
<value currency="USD" value-date="2004-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2004-11-01"/>
<period-end iso-date="2004-11-30"/>
<value currency="USD" value-date="2004-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2004-12-01"/>
<period-end iso-date="2004-12-31"/>
<value currency="USD" value-date="2004-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-01-01"/>
<period-end iso-date="2005-01-31"/>
<value currency="USD" value-date="2005-01-31">540000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-02-01"/>
<period-end iso-date="2005-02-28"/>
<value currency="USD" value-date="2005-02-28">540000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-03-01"/>
<period-end iso-date="2005-03-31"/>
<value currency="USD" value-date="2005-03-31">540000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-04-01"/>
<period-end iso-date="2005-04-30"/>
<value currency="USD" value-date="2005-04-30">540000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-05-01"/>
<period-end iso-date="2005-05-31"/>
<value currency="USD" value-date="2005-05-31">540000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-06-01"/>
<period-end iso-date="2005-06-30"/>
<value currency="USD" value-date="2005-06-30">540000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-07-01"/>
<period-end iso-date="2005-07-31"/>
<value currency="USD" value-date="2005-07-31">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-08-01"/>
<period-end iso-date="2005-08-31"/>
<value currency="USD" value-date="2005-08-31">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-09-01"/>
<period-end iso-date="2005-09-30"/>
<value currency="USD" value-date="2005-09-30">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-10-01"/>
<period-end iso-date="2005-10-31"/>
<value currency="USD" value-date="2005-10-31">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-11-01"/>
<period-end iso-date="2005-11-30"/>
<value currency="USD" value-date="2005-11-30">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-12-01"/>
<period-end iso-date="2005-12-31"/>
<value currency="USD" value-date="2005-12-31">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-01-01"/>
<period-end iso-date="2006-01-31"/>
<value currency="USD" value-date="2006-01-31">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-02-01"/>
<period-end iso-date="2006-02-28"/>
<value currency="USD" value-date="2006-02-28">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-03-01"/>
<period-end iso-date="2006-03-31"/>
<value currency="USD" value-date="2006-03-31">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-04-01"/>
<period-end iso-date="2006-04-30"/>
<value currency="USD" value-date="2006-04-30">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-05-01"/>
<period-end iso-date="2006-05-31"/>
<value currency="USD" value-date="2006-05-31">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-06-01"/>
<period-end iso-date="2006-06-30"/>
<value currency="USD" value-date="2006-06-30">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-07-01"/>
<period-end iso-date="2006-07-31"/>
<value currency="USD" value-date="2006-07-31">883333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-08-01"/>
<period-end iso-date="2006-08-31"/>
<value currency="USD" value-date="2006-08-31">883333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-09-01"/>
<period-end iso-date="2006-09-30"/>
<value currency="USD" value-date="2006-09-30">883333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-10-01"/>
<period-end iso-date="2006-10-31"/>
<value currency="USD" value-date="2006-10-31">883333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-11-01"/>
<period-end iso-date="2006-11-30"/>
<value currency="USD" value-date="2006-11-30">883333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-12-01"/>
<period-end iso-date="2006-12-31"/>
<value currency="USD" value-date="2006-12-31">883333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-01-01"/>
<period-end iso-date="2007-01-31"/>
<value currency="USD" value-date="2007-01-31">883333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-02-01"/>
<period-end iso-date="2007-02-28"/>
<value currency="USD" value-date="2007-02-28">883333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-03-01"/>
<period-end iso-date="2007-03-31"/>
<value currency="USD" value-date="2007-03-31">883333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-04-01"/>
<period-end iso-date="2007-04-30"/>
<value currency="USD" value-date="2007-04-30">883333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">883333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">883333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">877155.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">877155.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">877155.18</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">877155.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">877155.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">877155.18</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">877155.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">877155.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">877155.18</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">877155.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">877155.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">877155.18</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">795008.02</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">795008.02</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">795008.02</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">795008.02</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">795008.02</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">795008.02</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">795008.02</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">795008.02</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">795008.02</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">795008.02</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">795008.02</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">795008.02</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">775833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">775833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">775833.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">775833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">775833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">775833.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">775833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">775833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">775833.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">775833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">775833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">775833.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">370000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">370000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">370000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">370000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">370000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">370000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2004-07-01"/>
<period-end iso-date="2004-07-31"/>
<value currency="USD" value-date="2004-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2004-08-01"/>
<period-end iso-date="2004-08-31"/>
<value currency="USD" value-date="2004-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2004-09-01"/>
<period-end iso-date="2004-09-30"/>
<value currency="USD" value-date="2004-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2004-10-01"/>
<period-end iso-date="2004-10-31"/>
<value currency="USD" value-date="2004-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2004-11-01"/>
<period-end iso-date="2004-11-30"/>
<value currency="USD" value-date="2004-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2004-12-01"/>
<period-end iso-date="2004-12-31"/>
<value currency="USD" value-date="2004-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-01-01"/>
<period-end iso-date="2005-01-31"/>
<value currency="USD" value-date="2005-01-31">540000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-02-01"/>
<period-end iso-date="2005-02-28"/>
<value currency="USD" value-date="2005-02-28">540000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-03-01"/>
<period-end iso-date="2005-03-31"/>
<value currency="USD" value-date="2005-03-31">540000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-04-01"/>
<period-end iso-date="2005-04-30"/>
<value currency="USD" value-date="2005-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-05-01"/>
<period-end iso-date="2005-05-31"/>
<value currency="USD" value-date="2005-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-06-01"/>
<period-end iso-date="2005-06-30"/>
<value currency="USD" value-date="2005-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-07-01"/>
<period-end iso-date="2005-07-31"/>
<value currency="USD" value-date="2005-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-08-01"/>
<period-end iso-date="2005-08-31"/>
<value currency="USD" value-date="2005-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-09-01"/>
<period-end iso-date="2005-09-30"/>
<value currency="USD" value-date="2005-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-10-01"/>
<period-end iso-date="2005-10-31"/>
<value currency="USD" value-date="2005-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-11-01"/>
<period-end iso-date="2005-11-30"/>
<value currency="USD" value-date="2005-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-12-01"/>
<period-end iso-date="2005-12-31"/>
<value currency="USD" value-date="2005-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-01-01"/>
<period-end iso-date="2006-01-31"/>
<value currency="USD" value-date="2006-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-02-01"/>
<period-end iso-date="2006-02-28"/>
<value currency="USD" value-date="2006-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-03-01"/>
<period-end iso-date="2006-03-31"/>
<value currency="USD" value-date="2006-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-04-01"/>
<period-end iso-date="2006-04-30"/>
<value currency="USD" value-date="2006-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-05-01"/>
<period-end iso-date="2006-05-31"/>
<value currency="USD" value-date="2006-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-06-01"/>
<period-end iso-date="2006-06-30"/>
<value currency="USD" value-date="2006-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-07-01"/>
<period-end iso-date="2006-07-31"/>
<value currency="USD" value-date="2006-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-08-01"/>
<period-end iso-date="2006-08-31"/>
<value currency="USD" value-date="2006-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-09-01"/>
<period-end iso-date="2006-09-30"/>
<value currency="USD" value-date="2006-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-10-01"/>
<period-end iso-date="2006-10-31"/>
<value currency="USD" value-date="2006-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-11-01"/>
<period-end iso-date="2006-11-30"/>
<value currency="USD" value-date="2006-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-12-01"/>
<period-end iso-date="2006-12-31"/>
<value currency="USD" value-date="2006-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-01-01"/>
<period-end iso-date="2007-01-31"/>
<value currency="USD" value-date="2007-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-02-01"/>
<period-end iso-date="2007-02-28"/>
<value currency="USD" value-date="2007-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-03-01"/>
<period-end iso-date="2007-03-31"/>
<value currency="USD" value-date="2007-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-04-01"/>
<period-end iso-date="2007-04-30"/>
<value currency="USD" value-date="2007-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2004-06-30"/><value value-date="2004-06-30">64700000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2004</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2009-12-31"/><value value-date="2009-12-31">12000000</value><description xml:lang="en"><narrative>Total Commitment in December Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2011-06-30"/><value value-date="2011-06-30">48000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">-3846719</value><description xml:lang="en"><narrative>Total Commitment Cancellations in May Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">-3634</value><description xml:lang="en"><narrative>Total Commitment Cancellations in May Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">-5350</value><description xml:lang="en"><narrative>Total Commitment Cancellations in May Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2005-04-30"/><value value-date="2005-04-30">57753</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2005</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2005-05-31"/><value value-date="2005-05-31">2290379</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2005</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2005-07-31"/><value value-date="2005-07-31">6154</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2005</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2005-08-31"/><value value-date="2005-08-31">30832</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2005</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2005-12-31"/><value value-date="2005-12-31">633000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2005</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2006-03-31"/><value value-date="2006-03-31">462000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2006</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2006-05-31"/><value value-date="2006-05-31">498000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2006</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2006-09-30"/><value value-date="2006-09-30">1506000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2006</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2006-11-30"/><value value-date="2006-11-30">1694000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2006</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2007-03-31"/><value value-date="2007-03-31">1838000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2007</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2007-06-30"/><value value-date="2007-06-30">1806187</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2007</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2007-09-30"/><value value-date="2007-09-30">1431000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2007</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-01-31"/><value value-date="2008-01-31">2335000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-04-30"/><value value-date="2008-04-30">949000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-06-30"/><value value-date="2008-06-30">1288000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-09-30"/><value value-date="2008-09-30">1073000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-12-31"/><value value-date="2008-12-31">1015000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-02-28"/><value value-date="2009-02-28">2009000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-03-31"/><value value-date="2009-03-31">-482170</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-06-30"/><value value-date="2009-06-30">2920000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-08-31"/><value value-date="2009-08-31">1791000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-11-30"/><value value-date="2009-11-30">4288000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-04-30"/><value value-date="2010-04-30">3573000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-06-30"/><value value-date="2010-06-30">2226000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-09-30"/><value value-date="2010-09-30">1545000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-11-30"/><value value-date="2010-11-30">2510000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-01-31"/><value value-date="2011-01-31">3191000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-03-31"/><value value-date="2011-03-31">2700000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-06-30"/><value value-date="2011-06-30">2415000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-06-30"/><value value-date="2011-06-30">1129000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-08-31"/><value value-date="2011-08-31">3690971</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-08-31"/><value value-date="2011-08-31">5703000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-12-31"/><value value-date="2011-12-31">862326</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-12-31"/><value value-date="2011-12-31">6273000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-02-29"/><value value-date="2012-02-29">7301000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">1284000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-04-30"/><value value-date="2012-04-30">5443000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">7991819</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-08-31"/><value value-date="2012-08-31">5277000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">6033000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-02-28"/><value value-date="2013-02-28">5596000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">226279</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">1423000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">815000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">2767000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">1451000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">895000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">2231000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">5241000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">990000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">2138000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">1158000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">-3146</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">803000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">801000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">-519</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">214565</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">-5295</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">-2204264</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2005-04-30"/><value value-date="2005-04-30">-124297</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2005</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2005-10-31"/><value value-date="2005-10-31">-116413</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2005</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2006-04-30"/><value value-date="2006-04-30">-102638</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2006</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2006-10-31"/><value value-date="2006-10-31">-107562</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2006</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2007-04-30"/><value value-date="2007-04-30">-85480</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2007</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2007-10-31"/><value value-date="2007-10-31">-98790</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2007</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2008-04-30"/><value value-date="2008-04-30">-82619</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2008-10-31"/><value value-date="2008-10-31">-91907</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2009-04-30"/><value value-date="2009-04-30">-68346</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2009-10-31"/><value value-date="2009-10-31">-84104</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-04-30"/><value value-date="2010-04-30">-107391</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-10-31"/><value value-date="2010-10-31">-126622</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-04-30"/><value value-date="2011-04-30">-10913</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-04-30"/><value value-date="2011-04-30">-145261</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-10-31"/><value value-date="2011-10-31">-166448</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-10-31"/><value value-date="2011-10-31">-21185</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-04-30"/><value value-date="2012-04-30">-194473</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-04-30"/><value value-date="2012-04-30">-39108</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">-12148</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-10-31"/><value value-date="2012-10-31">-220643</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-10-31"/><value value-date="2012-10-31">-42346</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">-67289</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-04-30"/><value value-date="2013-04-30">-224261</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-04-30"/><value value-date="2013-04-30">-42820</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">-105045</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">-224855</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">-42805</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">-127783</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">-44470</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">-244635</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">-157361</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">-42562</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">-239041</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">-163506</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">-222213</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">-39310</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">-155762</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">-213268</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">-39735</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">-162252</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">-39412</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">-199610</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-158344</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">-227842</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">-40654</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-156806</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">-202096</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">-38657</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-153329</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">-207508</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">-40226</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-162957</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">-212789</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">-41461</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-162261</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">-201329</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">-39766</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-156973</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">-198052</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">-39549</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-157048</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-192189</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-38804</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-156007</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-190596</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-38915</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-154592</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-38177</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-194609</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-160946</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-36324</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-193230</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-162654</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-190343</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-34186</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-160752</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-519989</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-31462</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-143630</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-476458</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-27348</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-100502</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-26828</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-175056</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-145708</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-169058</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-24352</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-126663</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-22627</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-168101</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-125087</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-145540</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-11352</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-104546</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-19151</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-162896</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-73512</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-169299</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-20020</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-119070</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-22771</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-175836</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-69174</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">-661271</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">-615373</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">-585457</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">-589144</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">-583575</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">-567286</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">-590888</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">-607845</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">-583563</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">-580373</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-569448</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-518869</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-571074</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-589725</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-535815</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-592276</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-538133</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-536256</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-590210</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-2128202</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-524366</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-577124</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-2015863</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-486189</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-535106</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-1993444</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-562428</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-511014</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-2033875</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-499523</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-549781</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-2009168</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-553418</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-502827</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-2004578</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-513012</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-1129255</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-1991354</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-1109813</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-504180</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-2043357</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-520810</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-1146421</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-2060974</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-1140576</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-518155</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-2072714</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-589"><narrative>Ministry of Policy Planning, Economic Affairs, Child Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P086747"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P086747?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P086747"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase of farm area due to increased supply of water resulting from irrigation rehabilitation.
</narrative></title>
<baseline year="2005" iso-date="2005-01-01" value="Nil"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-01-01" />
<period-end iso-date="2014-12-31" />
<target value="146,000 ha">

</target>
<actual value="133,200">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New piped household water connections that are resulting from the project intervention
</narrative></title>
<baseline year="2005" iso-date="2005-01-01" value="0.00"><comment><narrative>Note: Indicator reflected again as core sector indicator</narrative></comment></baseline>
<period>
<period-start iso-date="2005-01-01" />
<period-end iso-date="2014-12-31" />
<target value="10000.00">

</target>
<actual value="60213.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increased housholds benefitting from increased income and village level social and economic infrastructure.
</narrative></title>
<baseline year="2005" iso-date="2005-01-01" value="Nil"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-01-01" />
<period-end iso-date="2014-12-31" />
<target value="213,000">

</target>
<actual value="283,087">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads rehabilitated, Rural
</narrative></title>
<baseline year="2005" iso-date="2005-01-01" value="0.00"><comment><narrative>Note: Indicator reflected again as core sector indicator</narrative></comment></baseline>
<period>
<period-start iso-date="2005-01-01" />
<period-end iso-date="2014-12-31" />
<target value="1542.00">

</target>
<actual value="2382.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of commercially oriented agriculture business plans developed and implemented by farmer organizations and farmer federations.
</narrative></title>
<baseline year="2005" iso-date="2005-01-01" value="Nil"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-01-01" />
<period-end iso-date="2014-12-31" />
<target value="10">

</target>
<actual value="10">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of annual business turnover (LKR M)
</narrative></title>
<baseline year="2005" iso-date="2005-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-01-01" />
<period-end iso-date="2014-12-31" />
<target value="45.00">

</target>
<actual value="32.00">
<comment><narrative>
This unit of measure is in LKR Rs.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Satisfactory reports received by Dam Safety Panel
</narrative></title>
<baseline year="2005" iso-date="2005-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-01-01" />
<period-end iso-date="2014-12-31" />
<target value="9.00">

</target>
<actual value="10.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Household assured of irrigation water
</narrative></title>
<baseline year="2005" iso-date="2005-10-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-01" />
<period-end iso-date="2014-12-31" />
<target value="8600.00">

</target>
<actual value="8663.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increased cropping intensity
</narrative></title>
<baseline year="2005" iso-date="2005-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-01-01" />
<period-end iso-date="2014-12-31" />
<target value="50.00">

</target>
<actual value="70.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-11-20T15:47:22" hierarchy="1"><iati-identifier>44000-P087145</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>LK: 2nd Comm Devt &amp; Livelihood Improveme</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0000607"><narrative>Ministry of Economic Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0000607"><narrative>Ministry of Economic Development</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="LK-COA-0000608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2007-06-28"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2009-09-10"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2014-09-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2014-09-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Pushina Kunda Ng'andwe</narrative></person-name><telephone>+1-202-473-1000</telephone><email>pngandwe@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="LK" percentage="100"><narrative xml:lang="en">SRI LANKA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001227618" />
            <name><narrative>Southern Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.1666698 80.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001228435" />
            <name><narrative>Province of Sabaragamuwa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.75 80.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001229899" />
            <name><narrative>Polonnaruwa District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8 81</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001234818" />
            <name><narrative>Monaragala District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.6666698 81.333328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001246292" />
            <name><narrative>Galle District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.25 80.25</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001249296" />
            <name><narrative>Central Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.3333302 80.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001228729" />
            <name><narrative>Ratnapura District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.5830998 80.583298</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001232870" />
            <name><narrative>North Central Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.3333302 80.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001225265" />
            <name><narrative>Province of Uva</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.9847202 81.056389</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001235845" />
            <name><narrative>Matara District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.1329002 80.528</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001250614" />
            <name><narrative>Badulla District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.9847202 81.056389</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001240722" />
            <name><narrative>Kegalla District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.1167002 80.333298</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001232781" />
            <name><narrative>Nuwara Eliya District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.9784999 80.713303</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001244925" />
            <name><narrative>Hambantota District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.25 81.166672</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="15129" percentage="33" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="33" xml:lang="en"/><sector vocabulary="1" code="25010" percentage="33" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AZ" percentage="20.0000000" xml:lang="en"><narrative>FY17 - Other Agriculture, Fishing and Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="50.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YA" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Agricultural markets, commercialization and agri-business</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WC" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Water Supply</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="100" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000332" percentage="9" xml:lang="en"><narrative>Agriculture Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="25" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000721" percentage="9" xml:lang="en"><narrative>Rural Markets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000332" percentage="9" xml:lang="en"><narrative>Agriculture Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="14" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="53" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="9" xml:lang="en"><narrative>Finance for Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000723" percentage="28" xml:lang="en"><narrative>Rural Infrastructure and service delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000513" percentage="25" xml:lang="en"><narrative>Participation and Civic Engagement</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000722" percentage="16" xml:lang="en"><narrative>Rural Non-farm Income Generation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000721" percentage="9" xml:lang="en"><narrative>Rural Markets</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">952000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">952000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">952000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">952000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">952000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">952000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">952000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">952000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">952000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">952000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">952000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">952000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">2083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">2083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">2083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">2083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">627935.62</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">627935.62</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2009-09-30"/><value value-date="2009-09-30">75000000</value><description xml:lang="en"><narrative>Total Commitment in September Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-3040609</value><description xml:lang="en"><narrative>Total Commitment Cancellations in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-06-30"/><value value-date="2009-06-30">171816</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2009</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-09-30"/><value value-date="2009-09-30">107361</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2009</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-12-31"/><value value-date="2009-12-31">3000000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-01-31"/><value value-date="2010-01-31">-82210</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2010</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-02-28"/><value value-date="2010-02-28">81217</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2010</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-02-28"/><value value-date="2010-02-28">8964980</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-06-30"/><value value-date="2010-06-30">5965989</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-01-31"/><value value-date="2011-01-31">1444226</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-04-30"/><value value-date="2011-04-30">4181615</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-07-31"/><value value-date="2011-07-31">4155999</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-09-30"/><value value-date="2011-09-30">2011379</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-11-30"/><value value-date="2011-11-30">6905288</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-04-30"/><value value-date="2012-04-30">1616107</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-06-30"/><value value-date="2012-06-30">3232081</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-09-30"/><value value-date="2012-09-30">2423947</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">1230000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-01-31"/><value value-date="2013-01-31">6474398</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">3990185</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">2274921</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">2500000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">5097856</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-02-28"/><value value-date="2014-02-28">6000000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">3000000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">-203642</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">-1236</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-170214</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-03-31"/><value value-date="2010-03-31">-5591</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-09-30"/><value value-date="2010-09-30">-60895</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-03-31"/><value value-date="2011-03-31">-71629</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-09-30"/><value value-date="2011-09-30">-96116</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">-126586</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-09-30"/><value value-date="2012-09-30">-145420</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">-178648</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">-203027</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">-235892</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">-272396</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">-249254</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">-253408</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-253074</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-253863</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-245132</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-251400</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-265147</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-257113</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-251871</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-248272</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-236715</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-162940</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-287674</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-202630</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-190549</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-163886</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-156449</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-143056</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-132416</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-66854</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-74806</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-176805</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-99016</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-3310293</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-3322322</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-3415086</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-3443628</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-3437650</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-3325143</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-3121632</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-3209212</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-3179030</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-3210080</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-3252749</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-3212226</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-3310196</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-3273602</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-608"><narrative>Ministry of Policy Planning, Economic Affairs, Child, Youth and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P087145"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P087145?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P087145"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
At least 70 % of Pradeshiya Sabhas have accessed funds and   have completed at least one cluster level sub-project as per the rulesagreed within two years
</narrative></title>
<baseline year="2010" iso-date="2010-05-18" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-18" />
<period-end iso-date="2014-03-31" />
<target value="70%">

</target>
<actual value="100.00">
<comment><narrative>
New indicator and needs to be measured.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
At least 70 % of households benefiting from inter-connectivity sub-projects
</narrative></title>
<baseline year="2010" iso-date="2010-05-18" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-18" />
<period-end iso-date="2014-03-31" />
<target value="">

</target>
<actual value="83.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
At least 70 % of households benefiting from improved community infrastructure and social services sub-projects
</narrative></title>
<baseline year="2010" iso-date="2010-05-13" value="0 %"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-13" />
<period-end iso-date="2014-09-30" />
<target value="70 %">

</target>
<actual value="83.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
At least 80 % of VSCOs  (Phase 1 &amp; 2) with an on-time repayment rate of 95 % and above, and PAR of less than 5% on both internal and external loans
</narrative></title>
<baseline year="2010" iso-date="2010-05-18" value="40 %"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-18" />
<period-end iso-date="2014-09-30" />
<target value="80 %">

</target>
<actual value="48.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
At least 65 % of households in the poor and poorest category as identified through participatory identification of poor and poorestmethodology have accessed at least once VSCO loans and engaged in th
</narrative></title>
<baseline year="2010" iso-date="2010-05-18" value="0 %"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-18" />
<period-end iso-date="2014-03-31" />
<target value="65 %">

</target>
<actual value="50.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
At least 70 % of process monitoring recommendations implemented by management though taking actions
</narrative></title>
<baseline year="2010" iso-date="2010-05-18" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-18" />
<period-end iso-date="2014-03-31" />
<target value="">

</target>
<actual value="">
<comment><narrative>
Not relevant and have to be dropped
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
At least 70 % of PS have implemented intra and inter-connectivity sub-projects in accordance with agreed rules
</narrative></title>
<baseline year="2010" iso-date="2010-05-18" value="0 %"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-18" />
<period-end iso-date="2014-09-30" />
<target value="70%">

</target>
<actual value="100">
<comment><narrative>
All 11 PSs have implemented intra/inter connectivity sub-projects
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
At least 60% of villages (VOs) are utilizing interconnectivity infrastructure for intended purpose
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2014-09-30" />
<target value="60.00">

</target>
<actual value="83.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
At least 50 % of decision-making positions (Chairperson or Treasurer of various sub-committees) are occupied  by women, at village level
</narrative></title>
<baseline year="2010" iso-date="2010-05-18" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-18" />
<period-end iso-date="2014-09-30" />
<target value="50%">

</target>
<actual value="68.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
60 % of planned and approved interconnectivity sub-projects within PS have been completed
</narrative></title>
<baseline year="2010" iso-date="2010-05-18" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-18" />
<period-end iso-date="2014-09-30" />
<target value="60.00">

</target>
<actual value="57.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
At least 50 % of project villages benefit from linkages with other government program including infrastructure
</narrative></title>
<baseline year="2010" iso-date="2010-05-18" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-18" />
<period-end iso-date="2014-09-30" />
<target value="50%">

</target>
<actual value="46.00">
<comment><narrative>
Sample survey Results
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
GDF has a Grievance redressal system functioning and 80% of complaints received have been addressed within agreed service standards
</narrative></title>
<baseline year="2010" iso-date="2010-05-18" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-18" />
<period-end iso-date="2014-09-30" />
<target value="80%">

</target>
<actual value="100.00">
<comment><narrative>
System functioning but record and service standard not recorded
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Establish O&amp;M Unit and O&amp;M fund in 60% project PS
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2014-09-30" />
<target value="70.00">

</target>
<actual value="100.00">
<comment><narrative>
All PS have established O&amp;M unit
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
At least 70% of village organizations covered during Phase 1 have formed network of federations  at cluster and district level and have been linked to private sector and/or other partners for income
</narrative></title>
<baseline year="2010" iso-date="2010-05-18" value="20"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-18" />
<period-end iso-date="2014-03-31" />
<target value="70">

</target>
<actual value="">
<comment><narrative>
This indicator has been dropped as per the Level -1 restructuring processed in June 2013.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
At least 100 partnerships established and linked with producer groups
</narrative></title>
<baseline year="2010" iso-date="2010-05-18" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-18" />
<period-end iso-date="2014-09-30" />
<target value="100.00">

</target>
<actual value="379.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
At least 80 % of sub-projects are completed (and ratified by Maha Sabha) operated and maintained by VOs
</narrative></title>
<baseline year="2010" iso-date="2010-05-18" value="0 %"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-18" />
<period-end iso-date="2014-09-30" />
<target value="80">

</target>
<actual value="91.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
At least 75 % of VO federations and VSCO federations  (Phase 1) are rated as A or B, and are providing the services on VDP 11
</narrative></title>
<baseline year="2010" iso-date="2010-05-18" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-18" />
<period-end iso-date="2014-03-31" />
<target value="50.00">

</target>
<actual value="66.00">
<comment><narrative>
Phase 1 -50%
Phas e 2 not done
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
At least 70 % of households targeted households utilizing improved communtiy intra-village  infrastructure infrastructure and social services for intended purposes
</narrative></title>
<baseline year="2010" iso-date="2010-05-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-13" />
<period-end iso-date="2014-09-30" />
<target value="70.00">

</target>
<actual value="83.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
At least 40 % of Gama Neguma and Samurdhi villages receiving and managing  direct funds  are  planning,  implementing, and maintaining sub-projects according to the rules set out in the COM
</narrative></title>
<baseline year="2010" iso-date="2010-05-18" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-18" />
<period-end iso-date="2014-09-30" />
<target value="40%">

</target>
<actual value="65.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
At least 20 % increase in incremental income against base year for 50 % of targted households by the end of project
</narrative></title>
<baseline year="2010" iso-date="2010-06-30" value="0.00"><comment><narrative>Baseline survey collection is under progress</narrative></comment></baseline>
<period>
<period-start iso-date="2010-06-30" />
<period-end iso-date="2014-09-30" />
<target value="20.00">

</target>
<actual value="0.00">
<comment><narrative>
Data will be provided through an Independent Impact Assessment
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
At least 75% of  the special group beneficiaries targeted (disabled, one-time grantee, vulnerable youth, aged, orphans) have benefitted from livelihood funds and started either employment and/or incom
</narrative></title>
<baseline year="2010" iso-date="2010-05-18" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-18" />
<period-end iso-date="2014-09-30" />
<target value="75">

</target>
<actual value="89.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-11-20T15:47:22" hierarchy="1"><iati-identifier>44000-P093132</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>LK:Dam Safety &amp; Water Resources Planning</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0000867"><narrative>Ministry of Finance and Planning</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="LK-COA-0000866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2005-09-15"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2008-03-27"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2018-05-15"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2018-05-15"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Shyam KC</narrative></person-name><telephone>+1-202-473-1000</telephone><email>skc@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="LK" percentage="100"><narrative xml:lang="en">SRI LANKA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001232773" />
            <name><narrative>Nuwarawewa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.3500004 80.416672</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001232859" />
            <name><narrative>Norton</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.9136 80.524597</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001235010" />
            <name><narrative>Minneriya Wewa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.0307798 80.880814</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001243028" />
            <name><narrative>Inginimitiya</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.9468002 80.127701</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001229929" />
            <name><narrative>Polgolla Dam</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.2666702 80.650002</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001251182" />
            <name><narrative>Angamuwa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.1812 80.201302</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001227469" />
            <name><narrative>Tabbowa Wewa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.4000001 79.883301</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001231000" />
            <name><narrative>Parakrama Samudra</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.9074998 80.978607</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001224452" />
            <name><narrative>Walawe Ganga</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.1054001 81.014702</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001224812" />
            <name><narrative>Victoria Dam</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.21667 80.783333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001224874" />
            <name><narrative>Vendarasan Kulam</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.3958998 81.003799</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001228869" />
            <name><narrative>Rantembe Dam</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.1999998 80.916672</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001228931" />
            <name><narrative>Randenigala Dam</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.1999998 80.900002</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001249308" />
            <name><narrative>Castlereagh</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.8663998 80.556702</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001239039" />
            <name><narrative>Kotmale Dam</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.0666699 80.550003</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001237262" />
            <name><narrative>Maduru Oya</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.8715401 81.522591</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001237799" />
            <name><narrative>Laxapana</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.8347998 80.531197</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001248743" />
            <name><narrative>Dambulu Oya Reservoir</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.8666701 80.616669</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001249241" />
            <name><narrative>Chandrika Wewa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.3084002 80.859497</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001249547" />
            <name><narrative>Bowatenna Reservoir</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.6644001 80.658096</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001233870" />
            <name><narrative>Nalanda Reservoir</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.6760001 80.617203</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001234555" />
            <name><narrative>Mousakelle</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.8512998 80.549301</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001240864" />
            <name><narrative>Kaudulla Wewa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.1499996 80.916672</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001241760" />
            <name><narrative>Kandalama Tank</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.8666701 80.699997</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001242237" />
            <name><narrative>Kalawewa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.0166702 80.51667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001245654" />
            <name><narrative>Giritale Wewa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.9833298 80.916672</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001228600" />
            <name><narrative>Ridiyagama Tank</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.20889 80.985558</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001243699" />
            <name><narrative>Hurulu Wewa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.21667 80.716667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><sector vocabulary="1" code="14010" percentage="17" xml:lang="en"/><sector vocabulary="1" code="14015" percentage="10" xml:lang="en"/><sector vocabulary="1" code="14040" percentage="73" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="27.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="1.00000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WZ" percentage="72.0000000" xml:lang="en"><narrative>FY17 - Other Water Supply, Sanitation and Waste Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="30" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000723" percentage="20" xml:lang="en"><narrative>Rural Infrastructure and service delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000751" percentage="10" xml:lang="en"><narrative>Disaster Response and Recovery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="10" xml:lang="en"><narrative>Finance for Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000752" percentage="10" xml:lang="en"><narrative>Disaster Risk Reduction</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="40" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000723" percentage="20" xml:lang="en"><narrative>Rural Infrastructure and service delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="20" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000753" percentage="10" xml:lang="en"><narrative>Disaster Preparedness</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000331" percentage="10" xml:lang="en"><narrative>Disaster Risk Finance</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">636666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">636666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">636666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">838818.30</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">838818.30</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">838818.31</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">866079.90</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">866079.90</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">866079.90</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">1750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">1750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">1750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">1843333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">1843333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">1843333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">920000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">920000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">920000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">166666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">636666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">636666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">636666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">838818.30</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">838818.30</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">838818.31</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">866079.90</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">866079.90</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">866079.90</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">1666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">1750000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">1750000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">1750000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">1666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">1666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">833333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">833333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">833333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">920000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">920000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">920000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-15"/>
<value currency="USD" value-date="2018-05-15">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-15"/>
<value currency="USD" value-date="2018-05-15">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2008-03-31"/><value value-date="2008-03-31">65327700</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">83000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">-2316301</value><description xml:lang="en"><narrative>Total Commitment Cancellations in January Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-08-31"/><value value-date="2008-08-31">403430</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-09-30"/><value value-date="2009-09-30">15861</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-10-31"/><value value-date="2009-10-31">8140827</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-12-31"/><value value-date="2009-12-31">90248</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-12-31"/><value value-date="2010-12-31">5587357</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-06-30"/><value value-date="2011-06-30">8222876</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-07-31"/><value value-date="2012-07-31">5944552</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">6969657</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">6384636</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">3623621</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">4040744</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">5624753</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-07-31"/><value value-date="2014-07-31">5976597</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">5000000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">3872748</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">2415621</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">4556142</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">2981234</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-01-31"/><value value-date="2016-01-31">8620014</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">3978229</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">4860867</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">6108275</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">9951270</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-07-31"/><value value-date="2017-07-31">5379050</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">10016379</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-01-31"/><value value-date="2018-01-31">9775252</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">-2097116</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2009-03-31"/><value value-date="2009-03-31">-1749</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2009-09-30"/><value value-date="2009-09-30">-1437</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-03-31"/><value value-date="2010-03-31">-25331</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-09-30"/><value value-date="2010-09-30">-30569</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-03-31"/><value value-date="2011-03-31">-43148</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-09-30"/><value value-date="2011-09-30">-71392</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">-81155</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-09-30"/><value value-date="2012-09-30">-79803</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">-126666</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">-151131</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">-178047</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">-209269</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-01-31"/><value value-date="2015-01-31">-18406</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">-202898</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">-79118</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">-215408</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-01-31"/><value value-date="2016-01-31">-140224</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-215187</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">-258297</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-216423</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">-350406</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-208963</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-07-31"/><value value-date="2017-07-31">-492082</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-214306</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-01-31"/><value value-date="2018-01-31">-617014</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-226025</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-07-31"/><value value-date="2018-07-31">-751346</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-217718</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">-731031</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-205426</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">-724231</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-190476</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-01-31"/><value value-date="2020-01-31">-700622</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-180548</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">-666657</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-117470</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">-727724</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-222804</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">-720368</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-150776</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-01-31"/><value value-date="2022-01-31">-1127416</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-141154</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">-1038714</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-119747</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">-577701</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-112848</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">-638723</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-101624</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">-594796</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-92355</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">-584086</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-36533</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">-557613</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-46070</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">-546488</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-126366</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">-577081</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-63395</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-2882549</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-2861300</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">-1188658</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-2821864</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-01-31"/><value value-date="2020-01-31">-1185842</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-2832119</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">-1193499</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-2911195</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">-1236436</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-2935526</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">-1222856</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-2930430</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-01-31"/><value value-date="2022-01-31">-1208538</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-2834523</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">-1123909</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-2661040</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">-1157472</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-2735698</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">-1162708</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-2709970</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">-1146862</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-2736438</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">-1139317</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-2772812</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">-1113969</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-2735638</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">-1174237</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-2824492</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">-1170932</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-2790587</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-866"><narrative>MASL/Ministry of Mahaweli Development and Environment (MoMDE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P093132"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P093132?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P093132"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Dam Safety Inspectorate with essential guidelines and procedures established and operational
</narrative></title>
<baseline year="2008" iso-date="2008-07-01" value="Dam Safety Inspectorate does not exist."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-07-01" />
<period-end iso-date="2018-05-15" />
<target value="Mixed Progres">
<comment><narrative>
The National Center for Dam Safety (NCDS) was formally established but is not yet fully operational.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
(Reduced) Number of Large Dams with Unacceptable Risk Index
</narrative></title>
<baseline year="2008" iso-date="2008-07-01" value="63.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-07-01" />
<period-end iso-date="2018-05-15" />
<target value="0.00">
<comment><narrative>
Additional financing project paper in 2014 proposed an increase in total dams to be rehabilitated to about 62. This was changed to 63 shortly afterward.  The indicator was also modified and the word &quot;reduced&quot; was deleted.  100% target achieved.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Hydrology and meteorology databases developed and accessible by different users
</narrative></title>
<baseline year="2008" iso-date="2008-07-01" value="Databases do not exist."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-07-01" />
<period-end iso-date="2018-05-15" />
<target value="Databases developed, accessible, and in use by IAs.">
<comment><narrative>
100% target achieved.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Dams with need-based operation and maintenance (O&amp;M) plans operationalized.
</narrative></title>
<baseline year="2008" iso-date="2008-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-07-01" />
<period-end iso-date="2018-09-28" />
<target value="63.00">
<comment><narrative>
55% target achieved at project closing date.  100% target achieved by end-September 2018.
</narrative></comment>
</target>
<actual value="63.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improved water database utilized by IAs for flood forecasting, dam operations, and water allocations.
</narrative></title>
<baseline year="2008" iso-date="2008-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-07-01" />
<period-end iso-date="2018-05-15" />
<target value="32.00">
<comment><narrative>
100% target achieved.
</narrative></comment>
</target>
<actual value="32.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Core team, in number of staff, trained for multi-sectoral water resources planning.
</narrative></title>
<baseline year="2008" iso-date="2008-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-07-01" />
<period-end iso-date="2018-05-15" />
<target value="10.00">
<comment><narrative>
67% target achieved.  Government realized that only 10 core staff were needed for multi-sectoral water resources planning.
</narrative></comment>
</target>
<actual value="15.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="2008" iso-date="2008-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-07-01" />
<period-end iso-date="2018-05-15" />
<target value="1348000.00">
<comment><narrative>
131% of the target achieved.
</narrative></comment>
</target>
<actual value="1030000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Mahaweli basin development plan updated
</narrative></title>
<baseline year="2008" iso-date="2008-07-01" value="Plan exists but outdated."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-07-01" />
<period-end iso-date="2018-05-15" />
<target value="Plan fully updated.">
<comment><narrative>
100% target achieved.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Hydrometric stations and agro-meteorological stations established/upgraded and functional
</narrative></title>
<baseline year="2008" iso-date="2008-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-07-01" />
<period-end iso-date="2018-05-15" />
<target value="167.00">
<comment><narrative>
118% of the target achieved.
</narrative></comment>
</target>
<actual value="142.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Staff trained for O&amp;M of HMIS
</narrative></title>
<baseline year="2008" iso-date="2008-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-07-01" />
<period-end iso-date="2018-05-15" />
<target value="167.00">
<comment><narrative>
118% of the target achieved.
</narrative></comment>
</target>
<actual value="142.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National Water Use Master Plan and at Least One River Basin Development Plan adopted by the Cabinet of Ministers
</narrative></title>
<baseline year="2008" iso-date="2008-07-01" value="No National Water Use Plan and river basin plan exist."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-07-01" />
<period-end iso-date="2018-05-15" />
<target value="National Water Use Master Plan and at 2 River Basin Development Plans adopted by the Cabinet of Ministers.">
<comment><narrative>
100% achieved for two basin development plans and National Water Use plan adopted by cabinet.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Feasibility studies prepared for key interventions identified in the various Plans
</narrative></title>
<baseline year="2008" iso-date="2008-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-07-01" />
<period-end iso-date="2018-05-15" />
<target value="8.00">
<comment><narrative>
133% target achieved.
</narrative></comment>
</target>
<actual value="6.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Timely completion/update of annual work programs, progress reports, FMRs, procurement plans
</narrative></title>
<baseline year="2008" iso-date="2008-07-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-07-01" />
<period-end iso-date="2018-05-15" />
<target value="Yes">
<comment><narrative>
100% target achieved.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Dams provided with basic safety facilities
</narrative></title>
<baseline year="2008" iso-date="2008-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-07-01" />
<period-end iso-date="2018-05-15" />
<target value="80.00">
<comment><narrative>
100% target achieved.
</narrative></comment>
</target>
<actual value="80.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Basic groundwater monitoring system with sufficient number of observation points established
</narrative></title>
<baseline year="2008" iso-date="2008-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-07-01" />
<period-end iso-date="2018-05-15" />
<target value="8.00">
<comment><narrative>
100% target achieved.  Eight pilot groundwater monitoring systems established.
</narrative></comment>
</target>
<actual value="8.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Large dams rehabilitated with necessary remedial measures.
</narrative></title>
<baseline year="2008" iso-date="2008-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-07-01" />
<period-end iso-date="2018-05-15" />
<target value="63.00">
<comment><narrative>
100% target achieved.
</narrative></comment>
</target>
<actual value="63.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Cumulative physical and disbursement performance targets do not fall below 80% of trhe cumulative targets after Year 1
</narrative></title>
<baseline year="2008" iso-date="2008-07-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-07-01" />
<period-end iso-date="2018-05-15" />
<target value="Yes">
<comment><narrative>
100% target achieved after Year 3.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Water resources development plan for Mundeni Aru river basin developed
</narrative></title>
<baseline year="2008" iso-date="2008-07-01" value="Plan does not exist."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-07-01" />
<period-end iso-date="2018-05-15" />
<target value="Plan fully developed.">
<comment><narrative>
100% target achieved.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A national water use master plan developed
</narrative></title>
<baseline year="2008" iso-date="2008-07-01" value="Plan does not exist."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-07-01" />
<period-end iso-date="2018-05-15" />
<target value="Plan fully developed.">
<comment><narrative>
100% target achieved.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-11-20T15:47:22" hierarchy="1"><iati-identifier>44000-P097329</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>SL: Public Sector Capacity Building</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><activity-status code="3" /><activity-date type="1" iso-date="2005-12-06"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2008-06-05"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2013-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2013-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Farah Zahir</narrative></person-name><telephone>+1-202-473-1000</telephone><email>fzahir@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>

<recipient-country code="LK" percentage="100"><narrative xml:lang="en">SRI LANKA</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="1248991" />
                <name><narrative>Colombo</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>6.93548 79.848679</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="15117" percentage="47" xml:lang="en"/><sector vocabulary="1" code="16062" percentage="53" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="100.000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="17" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="17" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000431" percentage="17" xml:lang="en"><narrative>Administrative and Civil Service Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="34" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000024" percentage="33" xml:lang="en"><narrative>Enterprise Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000411" percentage="17" xml:lang="en"><narrative>Public Expenditure Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000243" percentage="33" xml:lang="en"><narrative>MSME Development</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">416666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">416666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">416666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">416666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">466666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">466666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">466666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">466666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">466666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">466666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">466666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">466666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">466666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">466666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">466666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">466666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">166666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">416666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">416666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">416666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">416666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">833333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">833333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">833333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">833333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">466666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">466666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">466666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">466666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">466666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">466666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">466666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">466666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">466666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">466666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">466666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">466666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">166666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">166666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">166666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">166666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">8851143.05</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">8851143.05</value>
</budget>
<capital-spend percentage="100" /><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P097329"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P097329?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P097329"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Improved audit quality and timeliness at AGD
</narrative></title>
<baseline year="2008" iso-date="2008-03-18" value="0.00"><comment><narrative>Audit 2-4 years late</narrative></comment></baseline>
<period>
<period-start iso-date="2008-03-18" />
<period-end iso-date="2012-12-31" />
<target value="100.00">
<comment><narrative>
100 perecnt within annual plan
</narrative></comment>
</target>
<actual value="100.00">
<comment><narrative>
AGD has achieved
100% of audits within annual plan. All the reports relating to FY 2011 have been tabled in
Parliament and areposted to AGD website together with reports of previous years.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved access to data and dissemination of data outputs; facilitating user-education through workshops and website
</narrative></title>
<baseline year="2008" iso-date="2008-03-18" value="A data sharing policy has been articulated; Inadequate user education"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-03-18" />
<period-end iso-date="2011-05-30" />
<target value="Review of new data sharing policy based on feedback from users; regular user eduaction.">

</target>
<actual value="">
<comment><narrative>
DCS component cancelled in December 2011.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Widened public audit coverage
</narrative></title>
<baseline year="2008" iso-date="2008-03-18" value="50.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-03-18" />
<period-end iso-date="2011-12-31" />
<target value="100.00">

</target>
<actual value="100.00">
<comment><narrative>
100% coverage. All the SOES are audited by the AGD except Government owned Companies incorporated under
the Companies Act whicharenot covered by the mandate of AG.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Decreased processing times and increased quality for key national economic and social surveys produced by DCS
</narrative></title>
<baseline year="2008" iso-date="2008-03-18" value="48 month processing time (National Census) and 18 months for household surveys"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-03-18" />
<period-end iso-date="2012-07-31" />
<target value="National census reduced to 24 months">

</target>
<actual value="">
<comment><narrative>
Component cancelled in December 2011.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Evidence that improved public audit functions by AGD have increased accountability and transparency in the use of public funds, as reflected in the annual public audit cycle submissions by AGD to Parl
</narrative></title>
<baseline year="2008" iso-date="2008-02-05" value="AGD submissions to Parliament indicate that audits are 2-4 years late and 50% of SOEs covered by audit"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-02-05" />
<period-end iso-date="2012-05-17" />
<target value="Audit delay reduced to max 1 yr and 100% of SOEs covered by audit">

</target>
<actual value="Max audit delay is less than 6 months and 100% of SOEs are covered by the Audit">
<comment><narrative>
The achievement under this indicator has increased accountability and transparency in public fund use thereby improving andstrengthening evidence based decision making
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
DCS is the main source of national statistical data for the country, as reflected in the National Data Committee reports.
</narrative></title>
<baseline year="2008" iso-date="2008-02-05" value="National Accounts data not harmonized within the statistical system"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-02-05" />
<period-end iso-date="2011-12-30" />
<target value="Quarterly/Biannual NDC meetings.">

</target>
<actual value="N.A.">
<comment><narrative>
DCS component was cancelled in 2011
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Data processing of next HIES survey incorporates to a reasonable extent the data entry methodology as tested by the HIES pilot
</narrative></title>
<baseline year="2008" iso-date="2008-03-18" value="Fully centralized data entry"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-03-18" />
<period-end iso-date="2011-12-30" />
<target value="HIES surevey completed according to  a new data collection scheme.">

</target>
<actual value="">
<comment><narrative>
Component closed in December 2011
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Evidence of the improved effectiveness, efficiency, and productivity for two key public sector agencies (DCS and AGD)
</narrative></title>
<baseline year="2008" iso-date="2008-03-18" value="No evidence of effectiveness and productivity"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-03-18" />
<period-end iso-date="2011-12-30" />
<target value="Strong evidence of effectiveness and productivity (as measured by surveys at MTR and ICR)">

</target>
<actual value="In addition to enhanced timeliness, expanded coverage and introduction of performance and investigative audits, quality offinancial audits greatly enhanced through use of electronic audit working papers and development and use of a 1000-page financialaudit manual completely in line with international standards">
<comment><narrative>
DCS component had started picking up well with new National Data Committee being set-up, improvement in HH survey design andlimiting the delays in reporting with substantial training being conducted, national account strengthening and devleopment of ICTplans for linking various regional offices through a LAN system.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increasing percentage of investigative and performance audits conducted over total audits by AGD
</narrative></title>
<baseline year="2008" iso-date="2008-03-18" value="zero"><comment><narrative>Following Level 1 Restructuring in July 2012, the above indicator was revised. Instead of '% age&quot;, number of IA and PA are tracked</narrative></comment></baseline>
<period>
<period-start iso-date="2008-03-18" />
<period-end iso-date="2012-12-31" />
<target value="50 (in number)">

</target>
<actual value="14 PAs completed and another 8 PA's are in progress; 30 investigative audits completed and another  9 IA's are in progress">
<comment><narrative>
New performance audit and investigative audit departments have been established and staffed
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percent of technical staff trained and using recommended practices (including IT-based audits)
</narrative></title>
<baseline year="2008" iso-date="2008-03-18" value="0 percent"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-03-18" />
<period-end iso-date="2013-12-31" />
<target value="75 percent">

</target>
<actual value="Computer 419 = 42% Post Graduate 77 =
8%
Financial Audit 590 =
60%
Investigative Audit 83
= 8%
Performance Audit
130= 13%
IFRS693=70% Outward bound training i Leadership skills- 205-21% Construction Audits
120 officers- 12%">
<comment><narrative>
Number and % of technical staff trained :
English (NIBM) 544 = 54%
Advanced English Training -British Council (419officers)-31%
Computer 419 = 42%
Post Graduate 77 = 8%
Financial Audit 590 = 60%
Investigative Audit 83 = 8%
Performance Audit 130=13%
IFRS 693 = 70%
Outward bound training i Leadership skills- 205-21%
Construction Audits 120 officers- 12%
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the percentage of designated technical staff trained on relevant statistical training, as planned
</narrative></title>
<baseline year="2008" iso-date="2008-03-18" value="0.00"><comment><narrative>Insufficient Training</narrative></comment></baseline>
<period>
<period-start iso-date="2008-03-18" />
<period-end iso-date="2011-12-31" />
<target value="50.00">

</target>
<actual value="0.00">
<comment><narrative>
DCS component was closed in December 2011.
</narrative></comment>
</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-11-20T15:47:22" hierarchy="1"><iati-identifier>44000-P107847</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>LK: Provincial Roads Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0001983"><narrative>Democratic Socialist Republic of Sri Lanka</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="LK-COA-0001982"><narrative>Ministry of Local Government and Provinical Councils</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2009-05-28"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2009-12-17"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2015-03-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2015-03-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Amali Rajapaksa</narrative></person-name><telephone>+1-202-473-1000</telephone><email>arajapaksa@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="LK" percentage="100"><narrative xml:lang="en">SRI LANKA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001223569" />
            <name><narrative>Wellawaya</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.7263999 81.104599</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001223672" />
            <name><narrative>Welimada</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.9043999 80.904404</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001223930" />
            <name><narrative>Wedikumbura</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.8348999 81.387901</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001225265" />
            <name><narrative>Province of Uva</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.9847202 81.056389</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001232460" />
            <name><narrative>Padagoda</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.2093 81.594803</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001234808" />
            <name><narrative>Monaragala</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.8713999 81.348701</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001234818" />
            <name><narrative>Monaragala District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.6666698 81.333328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001242831" />
            <name><narrative>Jaffna District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.75 80.083328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001245114" />
            <name><narrative>Hakgala</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.9205999 80.8302</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001249222" />
            <name><narrative>Chavakachcheri</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.6599998 80.151001</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001250614" />
            <name><narrative>Badulla District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.9847202 81.056389</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001250615" />
            <name><narrative>Badulla</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.9895 81.055702</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001251460" />
            <name><narrative>Ampara District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.0833001 81.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001222933" />
            <name><narrative>Yalagamuwa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.0468998 80.952499</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001225473" />
            <name><narrative>Upper Heeloya</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.3499999 80.816673</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001227140" />
            <name><narrative>Tambiluvil</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.1325998 81.851402</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001229724" />
            <name><narrative>Pottuvil</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.8762002 81.826698</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001231279" />
            <name><narrative>Pandiruppu</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.4166698 81.816673</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001232629" />
            <name><narrative>Oluvil</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.28333 81.849998</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001233019" />
            <name><narrative>Nilgala</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.1925001 81.3759</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001233376" />
            <name><narrative>Neethai</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.1799998 81.766701</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001233977" />
            <name><narrative>Nagapooshani Amman Kovil</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.6192999 79.772301</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001235581" />
            <name><narrative>Medagama</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.5833302 80.400002</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001236696" />
            <name><narrative>Mahiyangana</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.3166699 80.98333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001237583" />
            <name><narrative>Lower Heeloya</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.3333302 80.816673</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001239133" />
            <name><narrative>Kotagoda</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.0664001 81.555801</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001240538" />
            <name><narrative>Kendaketiya</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.1694999 81.002998</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001241292" />
            <name><narrative>Karametiya</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.184 81.0429</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001242110" />
            <name><narrative>Kalmunai</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.4090199 81.834717</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001252160" />
            <name><narrative>Akkaraipattu</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.2164998 81.853798</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001241587" />
            <name><narrative>Kankesanturai</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.8095503 80.042953</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001237900" />
            <name><narrative>Kuttiyagolla</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.0198002 81.077202</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001237862" />
            <name><narrative>Lahugala</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.4000001 81.300003</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001235871" />
            <name><narrative>Maspanna</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.0166702 80.949997</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001235443" />
            <name><narrative>Meditale</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.0170999 81.052803</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001231046" />
            <name><narrative>Paragahakele</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.25 81.599998</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001229989" />
            <name><narrative>Point Pedro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.8166704 80.23333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001228320" />
            <name><narrative>Sammanturai</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.3572502 81.797012</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001236386" />
            <name><narrative>Malwatta</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.3333302 81.73333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001244858" />
            <name><narrative>Handapangala Wewa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.6664 81.151901</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001248815" />
            <name><narrative>Dambagalla</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.9556999 81.366997</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001250992" />
            <name><narrative>Arasadi</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.3333302 81.849998</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001248369" />
            <name><narrative>Deliwa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.0369 81.390503</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001246572" />
            <name><narrative>Galanda</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.0339999 80.986099</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001248847" />
            <name><narrative>Damana</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.2006998 81.654198</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001231897" />
            <name><narrative>Palawatta</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.1275001 81.068001</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="21012" percentage="50" xml:lang="en"/><sector vocabulary="1" code="21023" percentage="50" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TI" percentage="100.000000" xml:lang="en"><narrative>FY17 - Rural and Inter-Urban Roads</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="42" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="13" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="17" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="13" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="17" xml:lang="en"><narrative>Urban Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="17" xml:lang="en"><narrative>Urban Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="13" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="42" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="13" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000723" percentage="42" xml:lang="en"><narrative>Rural Infrastructure and service delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000411" percentage="13" xml:lang="en"><narrative>Public Expenditure Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="17" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">1916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">1916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">1916666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">1916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">1916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">1916666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">1916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">1916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">1916666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">1916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">1916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">1916666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">3333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">3333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">3333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">3333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">2083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">2083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">2083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">2083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">786904.76</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">786904.76</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">786904.76</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">786904.76</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">786904.76</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">786904.76</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">786904.76</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">786904.76</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">786904.76</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">786904.76</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">786904.76</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">786904.76</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">1916666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">1916666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">1916666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">1916666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">1916666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">1916666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">1916666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">1916666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">1916666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">1916666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">1916666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">1916666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">3333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">3333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">3333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">3333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">3333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">3333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">3333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">3333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">3333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">3333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">3333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">3333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">2083333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">2083333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">2083333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">2083333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">2083333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">2083333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">2083333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">2083333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">2083333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">2083333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">2083333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">2083333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">786904.76</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">786904.76</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">786904.76</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">786904.76</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">786904.76</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">786904.76</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">8703841.44</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">8703841.44</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2009-12-31"/><value value-date="2009-12-31">105000000</value><description xml:lang="en"><narrative>Total Commitment in December Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">-1999988</value><description xml:lang="en"><narrative>Total Commitment Cancellations in April Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">-2409971</value><description xml:lang="en"><narrative>Total Commitment Cancellations in October Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-07-31"/><value value-date="2010-07-31">826087</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-08-31"/><value value-date="2010-08-31">13716776</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-11-30"/><value value-date="2010-11-30">702440</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-07-31"/><value value-date="2011-07-31">7150286</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-11-30"/><value value-date="2011-11-30">8100667</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">1814717</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-04-30"/><value value-date="2012-04-30">275230</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">5595462</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-06-30"/><value value-date="2012-06-30">8039934</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-01-31"/><value value-date="2013-01-31">5073104</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-02-28"/><value value-date="2013-02-28">3831347</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">14905596</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">3553864</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">6620881</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">2778251</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">2543813</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">4713037</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">187199</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">1247477</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">3914000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-01-31"/><value value-date="2015-01-31">750000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">272282</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">1118768</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">-1435060</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-03-31"/><value value-date="2011-03-31">-67900</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-09-30"/><value value-date="2011-09-30">-61200</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">-109827</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-09-30"/><value value-date="2012-09-30">-147528</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">-178168</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">-232443</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">-274736</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">-327296</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">-314335</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">-334590</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-330221</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-331470</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-320040</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-328223</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-346171</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-335683</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-328838</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-324139</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-325317</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-229142</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-392754</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-281364</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-265073</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-229249</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-219969</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-202336</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-188596</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-102948</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-113232</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-247407</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-145362</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-4337563</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-4458673</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-4495938</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-4488133</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-4341245</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-4075545</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-4189889</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-4150484</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-4191022</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-4246730</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-4193823</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-4321732</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-4273955</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-1982"><narrative>Ministry of Local Government and Provinical Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P107847"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P107847?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P107847"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the level of road user satisfaction with provincial roads condition
</narrative></title>
<baseline year="2009" iso-date="2009-11-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-11-30" />
<period-end iso-date="2015-03-31" />
<target value="20.00">

</target>
<actual value="72.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Roads in good and fair condition as a share of total classified roads
</narrative></title>
<baseline year="2009" iso-date="2009-11-30" value="9.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-11-30" />
<period-end iso-date="2015-03-31" />
<target value="18.00">

</target>
<actual value="40.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Milestones in project-related GAAP met
</narrative></title>
<baseline year="2009" iso-date="2009-11-30" value="00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-11-30" />
<period-end iso-date="2015-03-31" />
<target value="100%">

</target>
<actual value="85%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of roads rehabilitated in Northern Province (Jaffna District)
</narrative></title>
<baseline year="2009" iso-date="2009-11-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-11-30" />
<period-end iso-date="2015-03-31" />
<target value="56.00">

</target>
<actual value="55.74">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of roads rehabiliatated in Eastern Province (Ampara District)
</narrative></title>
<baseline year="2009" iso-date="2009-11-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-11-30" />
<period-end iso-date="2015-03-31" />
<target value="56.00">

</target>
<actual value="56.18">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Km of roads receiving routine maintenance annually (Northern Province)
</narrative></title>
<baseline year="2009" iso-date="2009-11-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-11-30" />
<period-end iso-date="2015-03-31" />
<target value="132.00">

</target>
<actual value="90.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction in average travel time to socio-economic centers in Eastern Province
</narrative></title>
<baseline year="2009" iso-date="2009-11-30" value="95.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-11-30" />
<period-end iso-date="2015-03-31" />
<target value="76.00">

</target>
<actual value="17.50">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Roads in good and fair condition as a share of total classified roads
</narrative></title>
<baseline year="2009" iso-date="2009-11-30" value="21.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-11-30" />
<period-end iso-date="2015-03-31" />
<target value="30.00">

</target>
<actual value="50.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of roads rehabiliated in Uva Province
</narrative></title>
<baseline year="2009" iso-date="2009-11-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-11-30" />
<period-end iso-date="2015-03-31" />
<target value="118.00">

</target>
<actual value="117.29">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Road Asset Management System (RAMS) developed, rolled in and used by PRDDs
</narrative></title>
<baseline year="2009" iso-date="2009-11-30" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-11-30" />
<period-end iso-date="2015-03-31" />
<target value="100%">

</target>
<actual value="66%">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction in average travel time to socio-economic centers in Uva Province
</narrative></title>
<baseline year="2009" iso-date="2009-11-11" value="79.80"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-11-11" />
<period-end iso-date="2015-03-31" />
<target value="63.84">

</target>
<actual value="32.40">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Grievance redressal mechanism established
</narrative></title>
<baseline year="2009" iso-date="2009-11-30" value="0%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-11-30" />
<period-end iso-date="2015-03-31" />
<target value="100%">

</target>
<actual value="100%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Km of roads receiving routine maintenance annually (Uva Province)
</narrative></title>
<baseline year="2009" iso-date="2009-11-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-11-30" />
<period-end iso-date="2015-03-31" />
<target value="515.00">

</target>
<actual value="692.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Km of roads receiving routine maintenance annually (Eastern Province)
</narrative></title>
<baseline year="2009" iso-date="2009-11-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-11-30" />
<period-end iso-date="2015-03-31" />
<target value="350.00">

</target>
<actual value="320.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Building of in-house capacity of PRDDs in safeguards and fiduciary management
</narrative></title>
<baseline year="2009" iso-date="2009-11-11" value="No in-house capacity"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-11-11" />
<period-end iso-date="2015-03-31" />
<target value="Capacity built for efficient implementation fo project.">

</target>
<actual value="90%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Annual maintenance plans developed
</narrative></title>
<baseline year="2012" iso-date="2012-05-18" value="10%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-05-18" />
<period-end iso-date="2015-03-31" />
<target value="100%">

</target>
<actual value="100%">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Roads in good and fair condition as a share of total classified roads
</narrative></title>
<baseline year="2009" iso-date="2009-11-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-11-30" />
<period-end iso-date="2015-03-31" />
<target value="5.00">

</target>
<actual value="26.30">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction in average travel time to socio-economic centers in Northern Province
</narrative></title>
<baseline year="2009" iso-date="2009-11-30" value="31.72"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-11-30" />
<period-end iso-date="2015-03-31" />
<target value="25.37">

</target>
<actual value="19.60">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Maintenance strategy developed and approved.
</narrative></title>
<baseline year="2012" iso-date="2012-05-18" value="0%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-05-18" />
<period-end iso-date="2015-03-31" />
<target value="100%">

</target>
<actual value="50%">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-11-20T15:47:22" hierarchy="1"><iati-identifier>44000-P113036</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>North East Local Services Improvement Project (NELSIP)</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0002554"><narrative>Government of Sri Lanka</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0002554"><narrative>Government of Sri Lanka</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0002555"><narrative>Ministry of Finance</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0002555"><narrative>Ministry of Finance</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="LK-COA-0002556"><narrative>Ministry of Provincial Councils and Regional Development</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2010-01-14"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2010-05-13"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2017-08-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2017-08-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Yarissa Lyngdoh Sommer</narrative></person-name><telephone>+1-202-473-1000</telephone><email>ylyngdoh@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>











<recipient-country code="LK" percentage="100"><narrative xml:lang="en">SRI LANKA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001225018" />
            <name><narrative>Vavuniya</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.7514 80.497101</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001229293" />
            <name><narrative>Puttalam</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.0361996 79.8283</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001229901" />
            <name><narrative>Polonnaruwa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.9396501 81.002739</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001234393" />
            <name><narrative>Mullaittivu</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.2679996 80.815002</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001234808" />
            <name><narrative>Monaragala</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.8713999 81.348701</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001236150" />
            <name><narrative>Mannar</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.9894505 79.878418</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001240372" />
            <name><narrative>Kilinochchi</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.3961 80.398201</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001242833" />
            <name><narrative>Jaffna</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.6684504 80.007423</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001250161" />
            <name><narrative>Batticaloa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.7101998 81.692398</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001251081" />
            <name><narrative>Anuradhapura</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.3122301 80.413063</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001251459" />
            <name><narrative>Ampara</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.2975402 81.682022</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001226260" />
            <name><narrative>Trincomalee</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.5711002 81.233498</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="15126" percentage="5" xml:lang="en"/><sector vocabulary="1" code="15117" percentage="7" xml:lang="en"/><sector vocabulary="1" code="43042" percentage="88" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AI" percentage="15.0000000" xml:lang="en"><narrative>FY17 - Irrigation and Drainage</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="30.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TI" percentage="40.0000000" xml:lang="en"><narrative>FY17 - Rural and Inter-Urban Roads</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WC" percentage="15.0000000" xml:lang="en"><narrative>FY17 - Water Supply</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000532" percentage="13" xml:lang="en"><narrative>Post-conflict reconstruction</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000531" percentage="13" xml:lang="en"><narrative>Conflict Prevention</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="13" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="25" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000053" percentage="26" xml:lang="en"><narrative>Fragility, Conflict and Violence</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000532" percentage="13" xml:lang="en"><narrative>Post-conflict reconstruction</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="13" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="13" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000411" percentage="13" xml:lang="en"><narrative>Public Expenditure Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000723" percentage="25" xml:lang="en"><narrative>Rural Infrastructure and service delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000531" percentage="13" xml:lang="en"><narrative>Conflict Prevention</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="13" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="25" xml:lang="en"><narrative>Rural Development</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">880000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">880000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">880000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">660000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">660000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">660000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">660000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">660000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">660000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">660000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">660000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">660000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">880000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">880000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">880000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">880000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">880000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">880000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">880000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">880000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">880000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">660000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">660000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">660000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">660000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">660000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">660000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">880000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">880000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">880000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">660000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">660000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">660000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">660000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">660000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">660000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">660000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">660000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">660000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">880000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">880000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">880000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">880000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">880000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">880000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">880000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">880000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">880000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">660000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">660000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">660000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">660000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">660000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">660000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2010-05-31"/><value value-date="2010-05-31">50000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">20000000</value><description xml:lang="en"><narrative>Total Commitment in August Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2018-01-31"/><value value-date="2018-01-31">-68307</value><description xml:lang="en"><narrative>Total Commitment Cancellations in January Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-113574</value><description xml:lang="en"><narrative>Total Commitment Cancellations in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-12-31"/><value value-date="2010-12-31">302125</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-01-31"/><value value-date="2011-01-31">11001919</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-11-30"/><value value-date="2011-11-30">8160154</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-04-30"/><value value-date="2012-04-30">10379806</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">7899709</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">4085080</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-02-28"/><value value-date="2014-02-28">8130817</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">42304</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-01-31"/><value value-date="2015-01-31">211</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">7095329</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">500000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">6681461</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">140000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">6123616</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-113574</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-03-31"/><value value-date="2011-03-31">-16543</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-09-30"/><value value-date="2011-09-30">-43955</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">-60014</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-09-30"/><value value-date="2012-09-30">-104946</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">-130338</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">-137917</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">-151837</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">-188703</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">-167069</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">-170325</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-170150</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-172314</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">-127843</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-167532</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">-209393</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-171821</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">-205933</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-181216</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">-201279</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-175726</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">-196120</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-172142</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">-196737</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-169683</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">-194945</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-170299</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">-196235</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-128543</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">-196409</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-214591</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">-207285</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-156092</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">-195974</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-147293</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-303359</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-128010</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-272967</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-123376</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-199123</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-114068</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-160609</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-106955</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-176293</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-62093</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-162297</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-67425</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">-161498</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-138190</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-164495</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-84518</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-160865</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-2334059</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">-337440</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-2353566</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">-337719</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-2349480</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">-327716</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-2272587</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-312528</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-2133496</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-312291</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-2193353</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-313188</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-2172725</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-314633</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-2193947</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-309196</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-2223109</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-307643</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-2195413</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">-320030</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-2262371</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-321140</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-2237361</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-320878</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2558"><narrative>Ministry of Provincial Councils and Local Government; Ministry of Provincial Councils and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P113036"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P113036?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P113036"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Construction and Rehabilitation of Rural Electrification
</narrative></title>
<baseline year="2015" iso-date="2015-05-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-05-13" />
<period-end iso-date="2017-09-01" />
<target value="11.00">
<comment><narrative>
Fully achieved.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Fund Released to LAs for subproject Implementation
</narrative></title>
<baseline year="2010" iso-date="2010-05-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-13" />
<period-end iso-date="2017-09-01" />
<target value="100.00">
<comment><narrative>
Fully achieved.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of people in the project area aware of the subproject priority targeting criteria.
</narrative></title>
<baseline year="2010" iso-date="2010-05-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-13" />
<period-end iso-date="2017-09-01" />
<target value="100.00">
<comment><narrative>
Fully achieved.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Construction and Rehabilitation of Waste Collection Facilities
</narrative></title>
<baseline year="2010" iso-date="2010-05-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-13" />
<period-end iso-date="2017-09-01" />
<target value="1.00">
<comment><narrative>
This indicator was introduced in the 2015 Additional Financing, and reported there as a current value of 50.  This value continued to be reported in the ISRs, but not included in the monitoring reports.  The full sub-project list indicates only one solid waste project.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries that feel project investments reflected their needs (percentage)
</narrative></title>
<baseline year="2010" iso-date="2010-05-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-13" />
<period-end iso-date="2017-09-01" />
<target value="97.70">
<comment><narrative>
The beneficiary satisfaction indicators were measured as percentages, but targets were set as numbers and vice versa.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Construction and Rehabilitation of Markets and Maternity Homes
</narrative></title>
<baseline year="2010" iso-date="2010-05-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-13" />
<period-end iso-date="2017-09-01" />
<target value="155.00">
<comment><narrative>
Substantially achieved - 78%
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of LAs with budgets prepared in a participatory manner
</narrative></title>
<baseline year="2010" iso-date="2010-05-13" value="15.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-13" />
<period-end iso-date="2017-09-01" />
<target value="100.00">
<comment><narrative>
Fully achieved.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Acceptable financial audits of accounts
</narrative></title>
<baseline year="2010" iso-date="2010-05-13" value="18.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-13" />
<period-end iso-date="2017-09-01" />
<target value="100.00">
<comment><narrative>
Fully achieved.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads rehabilitated, Rural
</narrative></title>
<baseline year="2010" iso-date="2010-05-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-13" />
<period-end iso-date="2017-09-01" />
<target value="789.71">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Construction of drainage systems
</narrative></title>
<baseline year="2010" iso-date="2010-05-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-13" />
<period-end iso-date="2017-09-01" />
<target value="49898.00">
<comment><narrative>
The Additional Financing document notes &quot;this target is not achievable within the closing date since many LAs prepared master plans first using project funds and then started with prioritized drainages.&quot;  However, the target was not officially revised.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of LAs preparing annual financial statements within 3 months after close of the financial year.
</narrative></title>
<baseline year="2010" iso-date="2010-05-13" value="28.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-13" />
<period-end iso-date="2017-09-01" />
<target value="100.00">
<comment><narrative>
Fully achieved.
</narrative></comment>
</target>
<actual value="70.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievance registered related to delivery of project benefits that are actually addressed within a quarter
</narrative></title>
<baseline year="2010" iso-date="2010-05-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-13" />
<period-end iso-date="2017-09-01" />
<target value="98.70">
<comment><narrative>
Fully achieved.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of LAs whose revenues, expenditures and procurement decisions are publicly disclosed
</narrative></title>
<baseline year="2010" iso-date="2010-05-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-13" />
<period-end iso-date="2017-09-01" />
<target value="101.00">
<comment><narrative>
Fully achieved. This indicator was not monitored in progress reports, but reported in ISRs as such.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Subprojects for which arrangements for community engagement in post project sustainability and O&amp;M are established.
</narrative></title>
<baseline year="2010" iso-date="2010-05-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-05" />
<period-end iso-date="2017-09-01" />
<target value="96.40">
<comment><narrative>
Fully achieved.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Construction and Rehabilitation of Playgrounds and Nurseries
</narrative></title>
<baseline year="2010" iso-date="2010-05-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-13" />
<period-end iso-date="2017-09-01" />
<target value="84.00">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New piped household water connections that are resulting from the project intervention
</narrative></title>
<baseline year="2010" iso-date="2010-05-13" value="7.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-13" />
<period-end iso-date="2017-09-01" />
<target value="2275.00">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Quarterly progress reports including status of project processes, submitted by PCU before end of the following month
</narrative></title>
<baseline year="2010" iso-date="2010-05-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-13" />
<period-end iso-date="2017-09-01" />
<target value="4.00">
<comment><narrative>
Fully achieved.  This indicator was not monitored in progress reports, but reported in ISRs as such.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of capital grants released against allocation
</narrative></title>
<baseline year="2010" iso-date="2010-05-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-13" />
<period-end iso-date="2017-09-01" />
<target value="99.00">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Sub projects with community contribution
</narrative></title>
<baseline year="2013" iso-date="2013-05-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-05-13" />
<period-end iso-date="2017-09-01" />
<target value="98.40">
<comment><narrative>
Substantially achieved - 98.4%
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-11-20T15:47:22" hierarchy="1"><iati-identifier>44000-P113402</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>LK:Higher Educ. for Twenty First Century</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0002616"><narrative>Ministry of National Policies and Economic Affairs</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0002616"><narrative>Ministry of National Policies and Economic Affairs</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="LK-COA-0002615"><narrative>Ministry of Higher Education and Highways</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2009-12-15"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2010-05-13"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2016-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2016-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>D. H. C. Aturupane</narrative></person-name><telephone>+1-202-473-1000</telephone><email>daturupane@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>

















<recipient-country code="LK" percentage="100"><narrative xml:lang="en">SRI LANKA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001223569" />
            <name><narrative>Wellawaya</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.7263999 81.104599</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001225018" />
            <name><narrative>Vavuniya</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.7514 80.497101</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001226260" />
            <name><narrative>Trincomalee</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.5711002 81.233498</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001229017" />
            <name><narrative>Rambewa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.4422998 80.505402</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001235846" />
            <name><narrative>Matara</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.9485102 80.535278</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001240372" />
            <name><narrative>Kilinochchi</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.3961 80.398201</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001240723" />
            <name><narrative>Kegalle</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.2522998 80.343597</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001241621" />
            <name><narrative>Kandy District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.3044 80.707298</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001242831" />
            <name><narrative>Jaffna District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.75 80.083328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001244926" />
            <name><narrative>Hambantota</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.1241002 81.1185</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001250614" />
            <name><narrative>Badulla District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.9847202 81.056389</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001234633" />
            <name><narrative>Moratuwa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.7729998 79.881599</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001227037" />
            <name><narrative>Tangalla</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.0240002 80.7911</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001237978" />
            <name><narrative>Kurunegala District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.75 80.25</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001248423" />
            <name><narrative>Dehiwala</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.8562598 79.861588</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="11130" percentage="25" xml:lang="en"/><sector vocabulary="1" code="11182" percentage="25" xml:lang="en"/><sector vocabulary="1" code="11420" percentage="25" xml:lang="en"/><sector vocabulary="1" code="11430" percentage="25" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="ET" percentage="90.0000000" xml:lang="en"><narrative>FY17 - Tertiary Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EF" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000651" percentage="29" xml:lang="en"><narrative>Access to Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="100" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000653" percentage="21" xml:lang="en"><narrative>Science and Technology</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000652" percentage="8" xml:lang="en"><narrative>Education Financing</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">156250.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">156250.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">208333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">650000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">650000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">390625.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">390625.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">390625.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">390625.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">390625.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">390625.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">390625.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">390625.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">390625.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">390625.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">390625.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">390625.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">520833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">520833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">520833.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">520833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">520833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">520833.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">520833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">520833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">520833.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">520833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">520833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">520833.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">598958.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">598958.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">598958.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">598958.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">598958.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">598958.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">598958.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">598958.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">598958.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">598958.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">598958.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">598958.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">677083.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">677083.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">677083.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">677083.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">677083.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">677083.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">677083.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">677083.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">677083.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">677083.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">677083.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">677083.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">677083.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">677083.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">677083.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">772916.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">772916.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">772916.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">268750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">268750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">268750.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">156250.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">156250.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">208333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">208333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">208333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">650000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">650000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">520833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">520833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">520833.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">520833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">520833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">520833.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">598958.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">598958.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">598958.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">598958.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">598958.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">598958.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">598958.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">598958.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">598958.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">598958.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">598958.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">598958.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">625000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">625000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">625000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">625000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">3033664.12</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">3033664.12</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2010-05-31"/><value value-date="2010-05-31">40000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-1210184</value><description xml:lang="en"><narrative>Total Commitment Cancellations in November Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-11-30"/><value value-date="2010-11-30">3000000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-10-31"/><value value-date="2011-10-31">1006666</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-12-31"/><value value-date="2011-12-31">1695840</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">2817719</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">-33442</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">3024115</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">1011942</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">2658304</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">1501432</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">3509309</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-02-28"/><value value-date="2014-02-28">2071389</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">1534484</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">2527145</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">2509205</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">4475168</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">1508889</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">1503000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">507201</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">1000578</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-862608</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-05-31"/><value value-date="2011-05-31">-11683</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-11-30"/><value value-date="2011-11-30">-11428</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">-20363</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">-30897</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">-41414</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">-57663</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">-79147</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">-88449</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">-95591</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">-124823</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-127952</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-131239</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-125134</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-132992</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-132424</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-128108</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-128169</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-127319</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-126165</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-120851</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-110805</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-123925</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-98710</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-64012</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-100103</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-84872</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-83574</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-67038</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-41462</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-78022</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-37568</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-1680556</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-1755263</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-1778604</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-1736856</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-1645175</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-1626878</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-1659874</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-1639710</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-1635965</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-1625172</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-1667613</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-1681990</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-1691571</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2615"><narrative>Ministry of Higher Education and Highways; University Grants Commission</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P113402"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P113402?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P113402"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
SLQF protocols for horizontal and vertical mobility
</narrative></title>
<baseline year="2010" iso-date="2010-11-16" value="There are no protocols for horizontal and vertical mobility among higher education institutions"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-16" />
<period-end iso-date="2016-06-30" />
<target value="Level indicators and award types applied for horizontal and vertical mobility in the full higher education sector">

</target>
<actual value="All universities and SLIATE are using the level types and award types for horizontal and vertical mobility in the higher educationsector.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
English Language Skills
</narrative></title>
<baseline year="2010" iso-date="2010-11-16" value="English language skills certification programs are not linked to the labor market"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-16" />
<period-end iso-date="2016-06-30" />
<target value="At least 80% of target students complete 
English language skills certification programs">

</target>
<actual value="76% of students are participating in and benefiting from the English language skills certification programs.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
University Development Grants
</narrative></title>
<baseline year="2010" iso-date="2010-11-16" value="University Development Grant guidelines developed"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-16" />
<period-end iso-date="2016-06-30" />
<target value="100% of the University Development Grant Batch 1 and Batch 2 targets achieved">

</target>
<actual value="UDG Batches I &amp; II have been completed.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Human resource development of academic staff
</narrative></title>
<baseline year="2010" iso-date="2010-11-16" value="89 percent of SLIATE staff do not have Masters degrees and 60 percent of university staff do not have Ph.D degrees."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-16" />
<period-end iso-date="2016-06-30" />
<target value="At least 80% of the chosen academic staff complete Ph.D and Masters programs">

</target>
<actual value="60% of the chosen academic staff have completed their master's programs">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Sri Lanka Qualification Framework
</narrative></title>
<baseline year="2010" iso-date="2010-11-16" value="A National Qualification Framework does not exist."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-16" />
<period-end iso-date="2016-06-30" />
<target value="The Sri Lanka Qualification Framework operational for the full higher education sector">

</target>
<actual value="The SLQF is being fine tuned based on implementation experience in the Universities. This fine tuning is expected to be completedby the end of December 2015.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Human resource development of academic staff
</narrative></title>
<baseline year="2010" iso-date="2010-11-16" value="89 percent of SLIATE staff do not have Masters degrees and 60 percent of university staff do not have Ph.D degrees."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-16" />
<period-end iso-date="2016-06-30" />
<target value="At least 80% of the chosen academic staff complete Ph.D and Masters programs">

</target>
<actual value="66% of the chosen academic staff have completed their master's programs">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
English Language Skills
</narrative></title>
<baseline year="2010" iso-date="2010-11-16" value="English language skills certification programs are not linked to the labor market"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-16" />
<period-end iso-date="2016-06-30" />
<target value="At least 80% of target students complete 
English language skills certification programs">

</target>
<actual value="84% of students are participating in and benefiting from the English language skills certification programs.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Higher Education Management Information System
</narrative></title>
<baseline year="2010" iso-date="2010-11-16" value="HEMIS covers universities but does not cover SLIATE institutions"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-16" />
<period-end iso-date="2016-06-30" />
<target value="HEMIS operational for 100 percent of SLIATE institutions">

</target>
<actual value="The SLIATE HEMIS has been completed.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Curriculum deve;ivery of SLIATE programs
</narrative></title>
<baseline year="2010" iso-date="2010-11-16" value="Analysis of SLIATE curricula delivery against international norms and standards undertaken"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-16" />
<period-end iso-date="2016-06-30" />
<target value="Modern curriculum delivery methods introduced in 100% of beneficiary SLIATE programs">

</target>
<actual value="Modernized curricula delivery methods has been introduced in 100% of beneficiary SLIATE programs.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Higher Education Management Information System
</narrative></title>
<baseline year="2010" iso-date="2010-11-16" value="HEMIS covers universities but does not cover SLIATE institutions"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-16" />
<period-end iso-date="2016-06-30" />
<target value="HEMIS operational for 100 percent of SLIATE institutions">

</target>
<actual value="The SLIATE HEMIS has been 90 percent completed. The HEMIS is on target to be fully completed in early 2016.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Quality assurance
</narrative></title>
<baseline year="2010" iso-date="2010-11-16" value="UGC Standing Committee and Council for QA appointed

QA cycle for undergraduate education commenced"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-16" />
<period-end iso-date="2016-06-30" />
<target value="QA cycle implemented 100% for alternative HEIs 

QA cycle implemented
100% for universities">

</target>
<actual value="The QA cycle has been implemented in 100% of universities and 100% of SLIATE ATIs.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
University Development Grants
</narrative></title>
<baseline year="2010" iso-date="2010-11-16" value="University Development Grant guidelines developed"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-16" />
<period-end iso-date="2016-06-30" />
<target value="100% of the University Development Grant Batch 1 and Batch 2 targets achieved">

</target>
<actual value="UDG Batch I has been completed. The UDG Batch II (IDAS) is on course to be completed by December 2015.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
SLQF protocols for horizontal and vertical mobility
</narrative></title>
<baseline year="2010" iso-date="2010-11-16" value="There are no protocols for horizontal and vertical mobility among higher education institutions"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-16" />
<period-end iso-date="2016-06-30" />
<target value="Level indicators and award types applied for horizontal and vertical mobility in the full higher education sector">

</target>
<actual value="All universities and SLIATE are using the level types and award types for horizontal and vertical mobility in the higher educationsector.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Quality and Innovation Grants
</narrative></title>
<baseline year="2010" iso-date="2010-11-16" value="Quality and Innovation Grants guidelines developed"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-16" />
<period-end iso-date="2016-06-30" />
<target value="Quality and Innovation Grants completed 100 percent.">

</target>
<actual value="Quality and Innovation Grants will be completed in 55 study programs by March 2016. This exceeds the intial project target of 51study programs.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Sri Lanka Qualification Framework
</narrative></title>
<baseline year="2010" iso-date="2010-11-16" value="A National Qualification Framework does not exist."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-16" />
<period-end iso-date="2016-06-30" />
<target value="The Sri Lanka Qualification Framework operational for the full higher education sector">

</target>
<actual value="Fine tuning of SLQF based on implementation experience in the Universities has been completed.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Quality assurance
</narrative></title>
<baseline year="2010" iso-date="2010-11-16" value="UGC Standing Committee and Council for QA appointed

QA cycle for undergraduate education commenced"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-16" />
<period-end iso-date="2016-06-30" />
<target value="QA cycle implemented 100% for alternative HEIs 

QA cycle implemented
100% for universities">

</target>
<actual value="The QA cycle has been implemented in 80% of universities and 90% of SLIATE ATIs.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Human resource development of managerial staff in the higher education institutions
</narrative></title>
<baseline year="2010" iso-date="2010-11-16" value="Formal HRD Programs for HEI management cadre do not exist"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-16" />
<period-end iso-date="2016-06-30" />
<target value="At least 80% of HEI management staff complete HRD programs">

</target>
<actual value="100% of HEI management staff have been trained">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Promotion of multi-ethnic interactions of different ethnic communities
</narrative></title>
<baseline year="2010" iso-date="2010-11-16" value="There is no explicit promotion of multi-ethnic interactions in educational activities in universities."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-16" />
<period-end iso-date="2016-06-30" />
<target value="100% of universities promote multi-ethnic interactions in educational activities within the university">

</target>
<actual value="100% of universities are promoting multi-ethnic activities within their universities and 100% of universities engagecross-university multi-ethnic interactions.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved regional equity of access to alternative higher education
</narrative></title>
<baseline year="2010" iso-date="2010-11-16" value="Expansion plans for SLIATE completed"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-16" />
<period-end iso-date="2016-06-30" />
<target value="The new Advanced Technological Institutes complete a cycle of study programs.">

</target>
<actual value="Two ATIs have now commenced the third year of their study programs in 2016 and one ATI has commenced the second year study programin 2016.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Curriculum deve;ivery of SLIATE programs
</narrative></title>
<baseline year="2010" iso-date="2010-11-16" value="Analysis of SLIATE curricula delivery against international norms and standards undertaken"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-16" />
<period-end iso-date="2016-06-30" />
<target value="Modern curriculum delivery methods introduced in 100% of beneficiary SLIATE programs">

</target>
<actual value="Modernized curriculum delivery methods have been introduced in 100% of beneficiary SLIATE programs.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Information Technology Skills
</narrative></title>
<baseline year="2010" iso-date="2010-11-16" value="General IT skills certification programs do not exist in universities"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-16" />
<period-end iso-date="2016-06-30" />
<target value="At least 85% of target students complete relevant IT skills certification programs">

</target>
<actual value="89% of students are participating in and benefiting from the IT skills certification programs.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Information Technology Skills
</narrative></title>
<baseline year="2010" iso-date="2010-11-16" value="General IT skills certification programs do not exist in universities"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-16" />
<period-end iso-date="2016-06-30" />
<target value="At least 85% of target students complete relevant IT skills certification programs">

</target>
<actual value="82% of students are participating in and benefiting from the IT skills certification programs.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Access to job-oriented higher education in SLIATE
</narrative></title>
<baseline year="2010" iso-date="2010-11-16" value="8000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-16" />
<period-end iso-date="2016-06-30" />
<target value="12500.00">

</target>
<actual value="15500.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved regional equity of access to alternative higher education
</narrative></title>
<baseline year="2010" iso-date="2010-11-16" value="Expansion plans for SLIATE completed"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-16" />
<period-end iso-date="2016-06-30" />
<target value="The new Advanced Technological Institutes complete a cycle of study programs.">

</target>
<actual value="Two ATIs have now commenced the third year of their study programs in 2015 and one ATI has commenced the second year study programin 2015.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Access to job-oriented higher education in SLIATE
</narrative></title>
<baseline year="2010" iso-date="2010-11-16" value="8000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-16" />
<period-end iso-date="2016-06-30" />
<target value="12500.00">

</target>
<actual value="17600.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Promotion of multi-ethnic interactions of different ethnic communities
</narrative></title>
<baseline year="2010" iso-date="2010-11-16" value="There is no explicit promotion of multi-ethnic interactions in educational activities in universities."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-16" />
<period-end iso-date="2016-06-30" />
<target value="100% of universities promote multi-ethnic interactions in educational activities within the university">

</target>
<actual value="100% of universities are promoting multi-ethnic activities within their universities and 100% of universities engagecross-university multi-ethnic interactions.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Quality and Innovation Grants
</narrative></title>
<baseline year="2010" iso-date="2010-11-16" value="Quality and Innovation Grants guidelines developed"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-16" />
<period-end iso-date="2016-06-30" />
<target value="Quality and Innovation Grants completed 100 percent.">

</target>
<actual value="Quality and Innovation Grants have been completed in 55 study programs. This exceeds the intial project target of 51 study programs.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Human resource development of managerial staff in the higher education institutions
</narrative></title>
<baseline year="2010" iso-date="2010-11-16" value="Formal HRD Programs for HEI management cadre do not exist"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-16" />
<period-end iso-date="2016-06-30" />
<target value="At least 80% of HEI management staff complete HRD programs">

</target>
<actual value="100% of HEI management staff have been trained">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-11-20T15:47:22" hierarchy="1"><iati-identifier>44000-P113488</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>LK: Transforming School Education</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0002655"><narrative>Democratic Socialist Republic of Sri Lanka</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0002655"><narrative>Democratic Socialist Republic of Sri Lanka</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="LK-COA-0002654"><narrative>Ministry of Local Government and Provincial Councils</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2011-09-29"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2011-11-29"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2018-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2018-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>D. H. C. Aturupane</narrative></person-name><telephone>+1-202-473-1000</telephone><email>daturupane@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>







<recipient-country code="LK" percentage="100"><narrative xml:lang="en">SRI LANKA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001223421" />
            <name><narrative> Western Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.8333302 80.083328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001225265" />
            <name><narrative> Province of Uva</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.9847202 81.056389</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001227618" />
            <name><narrative> Southern Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.1666698 80.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001228435" />
            <name><narrative> Province of Sabaragamuwa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.75 80.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001232860" />
            <name><narrative> North Western Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.75 80.166672</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001232870" />
            <name><narrative> North Central Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.3333302 80.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001249296" />
            <name><narrative> Central Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.3333302 80.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0008133521" />
            <name><narrative> Eastern Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.6061401 81.202011</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007671049" />
            <name><narrative> Northern Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.1666698 80.416672</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="11231" percentage="60" xml:lang="en"/><sector vocabulary="1" code="11220" percentage="40" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="ES" percentage="50.0000000" xml:lang="en"><narrative>FY17 - Secondary Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EP" percentage="40.0000000" xml:lang="en"><narrative>FY17 - Primary Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EF" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000651" percentage="33" xml:lang="en"><narrative>Access to Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000653" percentage="18" xml:lang="en"><narrative>Science and Technology</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="102" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000654" percentage="18" xml:lang="en"><narrative>Teachers</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000652" percentage="15" xml:lang="en"><narrative>Education Financing</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">3333333.32</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">3333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">3333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">3333333.32</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">3333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">3333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">3333333.32</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">3333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">3333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">3666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">3666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">3666666.68</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">3666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">3666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">3666666.68</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">3666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">3666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">3666666.68</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">3666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">3666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">3666666.68</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">3666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">3666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">3666666.68</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">3666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">3666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">3666666.68</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">854666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">854666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">854666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">3333333.32</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">3333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">3333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">3333333.32</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">3333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">3333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">3333333.32</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">3333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">3333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">3666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">3666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">3666666.68</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">3666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">3666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">3666666.68</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">3666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">3666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">3666666.68</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">3666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">3666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">3666666.68</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">7622847.14</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">7622847.14</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2011-11-30"/><value value-date="2011-11-30">100000000</value><description xml:lang="en"><narrative>Total Commitment in November Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-872372</value><description xml:lang="en"><narrative>Total Commitment Cancellations in November Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-08-31"/><value value-date="2012-08-31">60000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-09-30"/><value value-date="2012-09-30">1800000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-10-31"/><value value-date="2012-10-31">8198728</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">2250000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-04-30"/><value value-date="2013-04-30">6615000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">8965000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">8421230</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">725000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">911500</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">5500600</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">7000000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">3250000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">7500000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">650000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">7600000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">8100000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">3727593</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">1248813</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">3174818</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">1050187</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">1014689</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">4613995</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">-332</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">-122755</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">-207933</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">-335732</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">-362273</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">-442927</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">-509694</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-600363</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-676590</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-693561</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-817859</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-838797</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-833090</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-818868</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-797669</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-778985</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-791389</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-780858</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-774717</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-1187530</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-1110657</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-706131</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-666786</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-657288</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-627411</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-604816</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-645948</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-594641</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-1449361</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-1494396</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-1510557</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-1461323</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-1446608</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-1438425</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-1422601</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-1485841</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-1505599</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-1470259</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-1392651</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-1377162</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-1405093</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-1388025</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-1384854</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-1375718</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-1411645</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-1423815</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-1431926</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-2656"><narrative>Ministry of Education; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P113488"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P113488?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P113488"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
The survival rate of students up to Grade 11 (age 16 years) in the education system.
</narrative></title>
<baseline year="2011" iso-date="2011-10-25" value="82.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-10-25" />
<period-end iso-date="2018-06-15" />
<target value="88.00">
<comment><narrative>
The target was fully achieved.
</narrative></comment>
</target>
<actual value="88.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="2011" iso-date="2011-10-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-10-25" />
<period-end iso-date="2018-06-15" />
<target value="4379329.00">
<comment><narrative>
The target was exceeded.
</narrative></comment>
</target>
<actual value="4000000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Program for School Improvement
</narrative></title>
<baseline year="2011" iso-date="2011-10-25" value="PSI defined and circular developed."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-10-25" />
<period-end iso-date="2018-06-15" />
<target value="Schools in 100 percent of zones have completed the PSI annual cycle.">
<comment><narrative>
The target was fully achieved.
</narrative></comment>
</target>
<actual value="Schools in 100 percent of zones have completed the PSI annual cycle.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
System for learning assessment at the primary level
</narrative></title>
<baseline year="2011" iso-date="2011-10-25" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-10-25" />
<period-end iso-date="2018-06-15" />
<target value="Y">
<comment><narrative>
The target was fully achieved.
</narrative></comment>
</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Teacher development
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2017-12-29" />
<target value="100.00">
<comment><narrative>
The target was fully achieved.
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Bilingual Education
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="A Content and Language Integrated Learning Framework does not exist."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2018-06-15" />
<target value="The CLIL framework has now been introduced for secondary education">
<comment><narrative>
The target was fully achieved.
</narrative></comment>
</target>
<actual value="A Content and Language Integrated Learning Framework introduced for secondary education.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Education sector plan
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="Initial Education Sector Rolling Plan prepared for FY12."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2018-06-15" />
<target value="The Education Sector Rolling Plan for FY17 was completed and is under implementation. The plan for FY18 has been drafted by the Ministry of Education and the Provincial Councils.">
<comment><narrative>
The target was fully achieved.
</narrative></comment>
</target>
<actual value="Education Sector Rolling Plan for FY17 updated by the MOE and Provinces.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Enhanced Program for School Improvement
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="A model of school based management is in place under the Program for School Improvement"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2018-06-15" />
<target value="The enhanced model of school based management has been developed">
<comment><narrative>
The target was fully achieved.
</narrative></comment>
</target>
<actual value="The enhanced model of school based management is developed and notified">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
School Inspectorate System
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="The government has announced a policy to establish a School Inspectorate System"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2018-06-15" />
<target value="A framework is being developed.">
<comment><narrative>
The target was fully achieved.
</narrative></comment>
</target>
<actual value="A framework for a School Inspectorate system is developed and notified">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Program for School Improvement
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2018-06-15" />
<target value="100.00">
<comment><narrative>
The target was fully achieved.
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Strengthening education zones and divisions
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2018-06-15" />
<target value="100.00">
<comment><narrative>
The target was fully achieved.
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-11-20T15:47:22" hierarchy="1"><iati-identifier>44000-P113709</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>LK: Sustainable Tourism Development Proj</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><activity-status code="3" /><activity-date type="1" iso-date="2009-05-30"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2010-05-13"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2014-01-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2014-01-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Sriyani M. Hulugalle</narrative></person-name><telephone>+1-202-473-1000</telephone><email>shulugalle@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>

<recipient-country code="LK" percentage="100"><narrative xml:lang="en">SRI LANKA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001223569" />
            <name><narrative>Wellawaya</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.7263999 81.104599</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001225018" />
            <name><narrative>Vavuniya</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.7514 80.497101</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001226258" />
            <name><narrative>Trincomalee District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.5833302 81.083328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001226260" />
            <name><narrative>Trincomalee</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.5711002 81.233498</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001227037" />
            <name><narrative>Tangalla</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.0240002 80.7911</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001229017" />
            <name><narrative>Rambewa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.4422998 80.505402</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001229293" />
            <name><narrative>Puttalam</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.0361996 79.8283</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001229724" />
            <name><narrative>Pottuvil</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.8762002 81.826698</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001229989" />
            <name><narrative>Point Pedro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.8166704 80.23333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001233028" />
            <name><narrative>Nilaveli</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.6728001 81.200897</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001233369" />
            <name><narrative>Negombo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.2083001 79.8358</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001234633" />
            <name><narrative>Moratuwa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.7729998 79.881599</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001234808" />
            <name><narrative>Monaragala</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.8713999 81.348701</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001235846" />
            <name><narrative>Matara</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.9485102 80.535278</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001236150" />
            <name><narrative>Mannar</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.9894505 79.878418</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001236694" />
            <name><narrative>Maho</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.8249998 80.274963</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001240372" />
            <name><narrative>Kilinochchi</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.3961 80.398201</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001240723" />
            <name><narrative>Kegalle</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.2522998 80.343597</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001241964" />
            <name><narrative>Kalutara</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.5830998 79.959297</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001242110" />
            <name><narrative>Kalmunai</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.4090199 81.834717</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001244926" />
            <name><narrative>Hambantota</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.1241002 81.1185</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001245159" />
            <name><narrative>Habarana</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.0362997 80.746696</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001246314" />
            <name><narrative>Galkulama</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.3000002 80.566673</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001248423" />
            <name><narrative>Dehiwala</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.8562598 79.861588</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001250159" />
            <name><narrative>Batticaloa District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.75 81.499702</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001250161" />
            <name><narrative>Batticaloa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.7101998 81.692398</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001251081" />
            <name><narrative>Anuradhapura</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.3122301 80.413063</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001251459" />
            <name><narrative>Ampara</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.2975402 81.682022</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001251460" />
            <name><narrative>Ampara District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.0833001 81.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001227395" />
            <name><narrative>Talaimannar</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.1000004 79.716667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001234136" />
            <name><narrative>Mutur</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.4499998 81.26667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001250936" />
            <name><narrative>Arugam Bay</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.8544002 81.8395</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001248523" />
            <name><narrative>Dedduwa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.4052 80.030899</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001242185" />
            <name><narrative>Kalkudah</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.7191 81.587402</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001242089" />
            <name><narrative>Kalpitiya</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.2371998 79.762802</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001229462" />
            <name><narrative>Pulmoddai</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.9403 80.981003</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001238417" />
            <name><narrative>Kumana</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.5166998 81.703201</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001241076" />
            <name><narrative>Kataragama</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.4134002 81.334602</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001247183" />
            <name><narrative>Elephant Pass</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.5242004 80.4049</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001249145" />
            <name><narrative>Chilaw</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.57583 79.79528</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001462565" />
            <name><narrative>Kattankudy</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.6824002 81.733398</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001249978" />
            <name><narrative>Bentota</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.4259801 79.99575</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="25010" percentage="50" xml:lang="en"/><sector vocabulary="1" code="33210" percentage="50" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YH" percentage="13.0000000" xml:lang="en"><narrative>FY17 - Housing Construction</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YZ" percentage="13.0000000" xml:lang="en"><narrative>FY17 - Other Industry, Trade and Services</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="74.0000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000323" percentage="13" xml:lang="en"><narrative>MSME Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000021" percentage="28" xml:lang="en"><narrative>Business Enabling Environment</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="46" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000024" percentage="13" xml:lang="en"><narrative>Enterprise Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000323" percentage="13" xml:lang="en"><narrative>MSME Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000023" percentage="10" xml:lang="en"><narrative>Public Private Partnerships</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="46" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000021" percentage="28" xml:lang="en"><narrative>Business Enabling Environment</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000023" percentage="10" xml:lang="en"><narrative>Public Private Partnerships</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000024" percentage="13" xml:lang="en"><narrative>Enterprise Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000032" percentage="13" xml:lang="en"><narrative>Financial Infrastructure and Access</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="46" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000723" percentage="46" xml:lang="en"><narrative>Rural Infrastructure and service delivery</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">17881351.18</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">17881351.18</value>
</budget>
<capital-spend percentage="100" /><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P113709"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P113709?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P113709"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Tourism Receipts
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="319000000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2014-12-31" />
<target value="1000000000.00">

</target>
<actual value="1000000000.00">
<comment><narrative>
With the end of the war, the tourism sector revenue has increased substantially.  The sector is one of the major growth sectors inthe country.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in the number of Star classified graded hotels
</narrative></title>
<baseline year="2008" iso-date="2008-12-30" value="80.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-30" />
<period-end iso-date="2014-12-31" />
<target value="180.00">

</target>
<actual value="114.00">
<comment><narrative>
With the increased development in the sector more star grade accomodations are constructed.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of local employed in the tourism cluster in the East
</narrative></title>
<baseline year="2008" iso-date="2008-12-30" value="0.00"><comment><narrative>Given the conflict situation in 2008 the figure was not available.</narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-30" />
<period-end iso-date="2013-12-30" />
<target value="5210.00">

</target>
<actual value="0.00">
<comment><narrative>
Substantial number of hotels and guest houses are in the East and it has created significant number of  direct and indirectemployment. The statistics are not available.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Tourism Receipts
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="319000000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2014-12-31" />
<target value="1000000000.00">

</target>
<actual value="1450000000.00">
<comment><narrative>
With the end of the war, the tourism sector revenue has increased substantially.  The sector is one of the major growth sectors inthe country.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in the number of Star classified graded hotels
</narrative></title>
<baseline year="2008" iso-date="2008-12-30" value="80.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-30" />
<period-end iso-date="2014-12-31" />
<target value="180.00">

</target>
<actual value="114.00">
<comment><narrative>
With the increased development in the sector more star grade accomodations are constructed.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase occupancy rates in the East
</narrative></title>
<baseline year="2008" iso-date="2008-12-30" value="21.60"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-30" />
<period-end iso-date="2014-12-31" />
<target value="80.00">

</target>
<actual value="68.00">
<comment><narrative>
Reason indicated above
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase occupancy rates in the East
</narrative></title>
<baseline year="2008" iso-date="2008-12-30" value="21.60"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-30" />
<period-end iso-date="2014-12-31" />
<target value="80.00">

</target>
<actual value="68.00">
<comment><narrative>
Reason indicated above
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of local employed in the tourism cluster in the East
</narrative></title>
<baseline year="2008" iso-date="2008-12-30" value="0.00"><comment><narrative>Given the conflict situation in 2008 the figure was not available.</narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-30" />
<period-end iso-date="2013-12-30" />
<target value="5210.00">

</target>
<actual value="0.00">
<comment><narrative>
Substantial number of hotels and guest houses are in the East and it has created significant number of  direct and indirectemployment. The statistics are not available.
</narrative></comment>
</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-11-20T15:47:22" hierarchy="1"><iati-identifier>44000-P118806</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>LK: Second Health Sector Development</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0003661"><narrative>Ministry of Finance and Mass Media</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0003661"><narrative>Ministry of Finance and Mass Media</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="LK-COA-0003662"><narrative>Ministry of Health</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2012-01-31"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2013-03-27"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2018-09-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2018-09-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Kari L. Hurt</narrative></person-name><telephone>+1-202-473-1000</telephone><email>khurt@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>







<recipient-country code="LK" percentage="100"><narrative xml:lang="en">SRI LANKA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001223421" />
            <name><narrative>Western Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.8333302 80.083328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001225265" />
            <name><narrative>Province of Uva</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.9847202 81.056389</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001227618" />
            <name><narrative>Southern Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.1666698 80.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001228435" />
            <name><narrative>Province of Sabaragamuwa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.75 80.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001232860" />
            <name><narrative>North Western Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.75 80.166672</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001232870" />
            <name><narrative>North Central Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.3333302 80.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001249296" />
            <name><narrative>Central Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.3333302 80.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007671049" />
            <name><narrative>Northern Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.1666698 80.416672</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0008133521" />
            <name><narrative>Eastern Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.6061401 81.202011</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="12240" percentage="30" xml:lang="en"/><sector vocabulary="1" code="12110" percentage="30" xml:lang="en"/><sector vocabulary="1" code="12230" percentage="19" xml:lang="en"/><sector vocabulary="1" code="12261" percentage="19" xml:lang="en"/><sector vocabulary="1" code="12220" percentage="0" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HF" percentage="37.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="63.0000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000671" percentage="6" xml:lang="en"><narrative>Nutrition</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="33" xml:lang="en"><narrative>Disease Control</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000067" percentage="12" xml:lang="en"><narrative>Nutrition and Food Security</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="55" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000637" percentage="12" xml:lang="en"><narrative>Child Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="33" xml:lang="en"><narrative>Disease Control</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000625" percentage="33" xml:lang="en"><narrative>Non-communicable diseases</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000067" percentage="12" xml:lang="en"><narrative>Nutrition and Food Security</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000672" percentage="6" xml:lang="en"><narrative>Food Security</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000671" percentage="6" xml:lang="en"><narrative>Nutrition</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="55" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">4420000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">4420000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">4420000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">7290000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">7290000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">7290000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">1920000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">1920000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">1920000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">7290000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">7290000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">7290000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">7956666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">7956666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">7956666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">7290000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">7290000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">7290000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">7956666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">7956666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">7956666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">7290000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">7290000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">7290000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">7960000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">7960000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">7960000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">7293333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">7293333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">7293333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">4420000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">4420000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">4420000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">7290000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">7290000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">7290000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">1920000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">1920000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">1920000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">7290000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">7290000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">7290000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">7956666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">7956666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">7956666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">7290000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">7290000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">7290000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">7956666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">7956666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">7956666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">7290000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">7290000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">15980811.46</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">15980811.46</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">200000000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">-858091</value><description xml:lang="en"><narrative>Total Commitment Cancellations in February Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">11250000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">21880000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">2000000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">2580000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">21870000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">17745416</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">19984000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">700000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">700000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">20370922</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">19500000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-07-31"/><value value-date="2017-07-31">1400000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">700000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">20304946</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">1400000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">700000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">21033448</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">700000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">-799544</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">-83491</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">-384255</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">-342900</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">-549901</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-767942</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-953952</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-913503</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-1422529</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-1582797</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-1601450</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-1738832</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-1655056</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-1690847</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-1672938</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-1671191</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-1611830</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-2539602</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-2382744</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-1409221</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-1427044</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-1361969</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-1350720</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-1204226</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-1461506</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-1306119</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-3072547</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-2968696</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-2957062</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-2941163</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-2918274</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-3008553</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-3060449</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-3006806</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-2865035</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-2740165</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-2872217</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-2790015</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-2802057</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-2837286</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-2885794</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-2895064</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-2928120</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-3662"><narrative>Ministry of Health; Ministry of Local Government and Provincial Councils</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P118806"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P118806?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P118806"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of provincially managed health facilities with ETUs for that level of facility based on standard guidelines (DLI 2)
</narrative></title>
<baseline year="2012" iso-date="2012-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-09-30" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="82.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of fully functioning quality management Units (QMUs) in provincially managed base hospitals and above (DLI 8)
</narrative></title>
<baseline year="2012" iso-date="2012-09-30" value="6.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-09-30" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="95.90">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of fully functioning quality management Units (QMUs) in MOH managed base hospitals and above (DLI 7)
</narrative></title>
<baseline year="2012" iso-date="2012-09-30" value="9.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-09-30" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of CEMOC facilities providing 24x7 CEMOC services.
</narrative></title>
<baseline year="2012" iso-date="2012-09-30" value="45.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-09-30" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="73.60">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
No. of provinces with at least one health facility providing rehabilitation services
</narrative></title>
<baseline year="2012" iso-date="2012-09-30" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-09-30" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="8.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of MOH managed health facilities sending indoor morbidity data through e-IMMR  (DLI 3)
</narrative></title>
<baseline year="2012" iso-date="2012-09-30" value="2.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-09-30" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="83.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of centrally managed health facilities with ETUs for that level of facility based on standard guidelines (DLI 1)
</narrative></title>
<baseline year="2012" iso-date="2012-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-09-30" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="46.40">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of hospitals (base hospitals and above) that have obtained EPL and HWL
</narrative></title>
<baseline year="2012" iso-date="2012-09-30" value="5.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-09-30" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="17.30">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of MCH clinics that have an agreed package of equipment and supplies for the provision of care for pregnant women and children under five years. (DLI 5)
</narrative></title>
<baseline year="2012" iso-date="2012-09-30" value="20.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-09-30" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="95.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of Medical Officer of Health areas with at least three health and nutrition community support groups
</narrative></title>
<baseline year="2012" iso-date="2012-09-30" value="10.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-09-30" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="97.60">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of laboratories in health facilities (base hospitals A and above) participating in the external quality assurance program for selected tests conducted by the Medical Research Institute
</narrative></title>
<baseline year="2012" iso-date="2012-09-30" value="10.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-09-30" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="95.70">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of National Competitive Bidding (NCB) contracts awarded within the first nine months of the previous calendar year from 2014 onwards
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="47.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;There is some irregularity with the baseline which is shown as N/A in the PAD and then in 2013 reported as more than 70%. There was consistent year on year progress since 2015 (mid term review). Therefore for the purpose of measuring variance with the expected progress, 2015 is taken as baseline. The achievement is 69.7%.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="70.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of training institutes managed by the Ministry of Health meeting national standards
</narrative></title>
<baseline year="2012" iso-date="2012-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-09-30" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="47.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of persons (over 40 years) screened for selected NCDs (diabetes, hypertension, cancer breast and oral) at healthy lifestyle centers
</narrative></title>
<baseline year="2012" iso-date="2012-09-30" value="3.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-09-30" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="27.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of pregnant women with anaemia after the second trimester
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="34.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="26.23">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of Medical Officer of Health areas with at least two healthy lifestyle centers (DLI 6)
</narrative></title>
<baseline year="2012" iso-date="2012-09-30" value="10.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-09-30" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="94.20">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Case detection rate for tuberculosis
</narrative></title>
<baseline year="2012" iso-date="2012-09-30" value="69.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-09-30" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="60.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of the six-monthly cash forecast (for non-salary recurring and capital expenditures) released (DLI 9)
</narrative></title>
<baseline year="2012" iso-date="2012-09-30" value="81.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-09-30" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="90.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of provincially managed health facilities sending indoor morbidity data through e-IMMR (DLI 4)
</narrative></title>
<baseline year="2012" iso-date="2012-09-30" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-09-30" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="82.23">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of primary health care institutions having one months buffer stock for 16 selected NCD drugs
</narrative></title>
<baseline year="2012" iso-date="2012-09-30" value="2.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-09-30" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="81.20">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-11-20T15:47:22" humanitarian="1"  hierarchy="1"><iati-identifier>44000-P118870</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>LK: Emergency Northern Recovery Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><activity-status code="3" /><activity-date type="1" iso-date="2009-11-25"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2009-12-17"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2013-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2013-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Seenithamby Manoharan</narrative></person-name><telephone>+1-202-473-1000</telephone><email>smanoharan@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>

<recipient-country code="LK" percentage="100"><narrative xml:lang="en">SRI LANKA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001225017" />
            <name><narrative>Vavuniya District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.8613396 80.475761</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001234393" />
            <name><narrative>Mullaittivu</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.2679996 80.815002</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001236148" />
            <name><narrative>Mannar District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.8666697 80.083328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001240371" />
            <name><narrative>Kilinochchi District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.3948698 80.408943</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001242831" />
            <name><narrative>Jaffna District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.75 80.083328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="16011" percentage="33" xml:lang="en"/><sector vocabulary="1" code="16020" percentage="33" xml:lang="en"/><sector vocabulary="1" code="73010" percentage="33" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AI" percentage="18.0000000" xml:lang="en"><narrative>FY17 - Irrigation and Drainage</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WC" percentage="18.0000000" xml:lang="en"><narrative>FY17 - Water Supply</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="5.00000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TI" percentage="15.0000000" xml:lang="en"><narrative>FY17 - Rural and Inter-Urban Roads</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="44.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000532" percentage="50" xml:lang="en"><narrative>Post-conflict reconstruction</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000053" percentage="100" xml:lang="en"><narrative>Fragility, Conflict and Violence</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000053" percentage="100" xml:lang="en"><narrative>Fragility, Conflict and Violence</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">169519.16</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">169519.16</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">169519.14</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">333740.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">333740.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">333740.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">630000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">630000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">630000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">630000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">630000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">630000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">1663406.69</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">1663406.69</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">1663406.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">2002444.99</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">2002444.99</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">2002444.99</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">2834148.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">2834148.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">2834148.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">3337408.31</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">3337408.31</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">3337408.31</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">3337408.31</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">3337408.31</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">3337408.31</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">3337408.31</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">3337408.31</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">3337408.31</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">2648736.77</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">2648736.77</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">2648736.76</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">169519.16</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">169519.16</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">169519.14</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">333740.83</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">333740.83</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">333740.83</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">630000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">630000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">630000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">630000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">630000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">630000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">1663406.69</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">1663406.69</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">1663406.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">2002444.99</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">2002444.99</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">2002444.99</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">2834148.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">2834148.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">2834148.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">3337408.31</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">3337408.31</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">3337408.31</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">3337408.31</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">3337408.31</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">3337408.31</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">3337408.31</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">3337408.31</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">3337408.31</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">2648736.77</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">2648736.77</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">2648736.76</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">2442812.89</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">2442812.89</value>
</budget>
<capital-spend percentage="100" /><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P118870"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P118870?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P118870"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Jungle growth of farmlands cleared and made ready for cultivation
</narrative></title>
<baseline year="2010" iso-date="2010-01-01" value="0.00"><comment><narrative>19,000 Ha of farm lands that belong to IDPs cannot be farmed due to thick
vegetative growth</narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-01" />
<period-end iso-date="2013-12-31" />
<target value="7600.00">

</target>
<actual value="7106.00">
<comment><narrative>
7,106 ha farm cleared and 385.3 km defense bunds removed for peoples use.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers/ fishermen receiving seeds orImplements for first time after return.
</narrative></title>
<baseline year="2010" iso-date="2010-01-01" value="0.00"><comment><narrative>Returnees do not have seeds/implements or cash to purchase seeds and implements</narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-01" />
<period-end iso-date="2013-12-30" />
<target value="6000.00">
<comment><narrative>
This component is successfully completed.
</narrative></comment>
</target>
<actual value="9603.00">
<comment><narrative>
9,603 households received seeds for first cultivation after return. 72,010 coconut seedlings were distributed from a nurseryrehabilitated under the project.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="2009" iso-date="2009-01-06" value="0.00"><comment><narrative>On June 2009, nearly 279,000 IDPs were housed in government camps pending return and resettlement in their villages of origin. Theproject expects to reach 100,000 people after their return to help reestablish their livelihoods.</narrative></comment></baseline>
<period>
<period-start iso-date="2009-01-06" />
<period-end iso-date="2013-12-31" />
<target value="100000.00">
<comment><narrative>
The Government has resettled 585,458 people in entire Northern Province at present.
</narrative></comment>
</target>
<actual value="476013.00">
<comment><narrative>
The Government has resettled a total of 476,013 people in 284 Grama Niladhari divisions. These include 140,000 IDPs who lived inGovernment's welfare camps in Vavuniya at the time of project approval in December 2009.  The target has therefore been achievedand in fact exceeded.  The project has benefited not only the IDPs who came from the camps but other IDPs returned too.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Retunees are provided with at least 50 days of employment in their villages immediately soon after the return
</narrative></title>
<baseline year="2010" iso-date="2010-01-01" value="0.00"><comment><narrative>No employment opportunities for IDPs in the first 50- 60 days after return</narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="27000.00">
<comment><narrative>
This component is successfully completed.
</narrative></comment>
</target>
<actual value="2150098.00">
<comment><narrative>
About 2,150,098 person days of labor created, 44,612 families in 283 GNDs benefitted and received cash grants worth of Rs 1184million.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Jungle growth of farmlands cleared and made ready for cultivation
</narrative></title>
<baseline year="2010" iso-date="2010-01-01" value="0.00"><comment><narrative>19,000 Ha of farm lands that belong to IDPs cannot be farmed due to thick
vegetative growth</narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-01" />
<period-end iso-date="2013-12-31" />
<target value="7600.00">

</target>
<actual value="7106.00">
<comment><narrative>
7,106 ha farm cleared and 385.3 km defense bunds removed for peoples use.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Retunees are provided with at least 50 days of employment in their villages immediately soon after the return
</narrative></title>
<baseline year="2010" iso-date="2010-01-01" value="0.00"><comment><narrative>No employment opportunities for IDPs in the first 50- 60 days after return</narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="27000.00">
<comment><narrative>
This component is successfully completed.
</narrative></comment>
</target>
<actual value="2150098.00">
<comment><narrative>
About 2,150,098 person days of labor created, 44,612 families in 283 GNDs benefitted and received cash grants worth of Rs 1184million.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Regular CSIAs completed quarterly in project year 1 and 2and lessons incorporated
</narrative></title>
<baseline year="2010" iso-date="2010-01-01" value="0.00"><comment><narrative>It was felt that Comprehensive social assessments are needed to evaluate quality of return and impact of the project</narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-01" />
<period-end iso-date="2013-12-31" />
<target value="6.00">
<comment><narrative>
SIA was completed in Jan 31, 2014
</narrative></comment>
</target>
<actual value="3.00">
<comment><narrative>
The SIA has been completed.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Employment generated for the IDP households
</narrative></title>
<baseline year="2010" iso-date="2010-01-01" value="0.00"><comment><narrative>Zero emplyment opportunities to the IDP households in the villages soon after the return</narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-01" />
<period-end iso-date="2012-12-31" />
<target value="1070000.00">

</target>
<actual value="2150098.00">
<comment><narrative>
Adequate employment opportunities for the IDP households soon after their return from the camps to villages of origin.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Rural road rehabilitated
</narrative></title>
<baseline year="2010" iso-date="2010-01-31" value="0.00"><comment><narrative>1,200 Km rural roads badly damaged</narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-31" />
<period-end iso-date="2013-12-31" />
<target value="875.00">
<comment><narrative>
717 Km roads have been completed.
</narrative></comment>
</target>
<actual value="682.00">
<comment><narrative>
718 Km rural roads completed.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmlands brought back to production (as a result of jungle clearing, seed provisions, and irrigation rehabilitation):
</narrative></title>
<baseline year="2010" iso-date="2010-01-01" value="0.00"><comment><narrative>53,000 Ha of paddy lands had not been cultivated (abandoned) due to  non-availability of irrigation facilities</narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="16200.00">
<comment><narrative>
107 schemes totaling 19,071 Ha will be irrigated.
</narrative></comment>
</target>
<actual value="16332.00">
<comment><narrative>
101 Irrigation schemes totaling 16,332 Ha completed. Another 6 schemes are ongoing.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Returning people provided with access to safe drinking water supply
</narrative></title>
<baseline year="2010" iso-date="2010-01-01" value="0.00"><comment><narrative>Approximately about 80,000 IDPs lack safe and regular water supplies as most  water supply schemes in the North are damaged andnon-functional</narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-01" />
<period-end iso-date="2013-12-31" />
<target value="30000.00">
<comment><narrative>
All 9 WSSs have been completed and 605 connections have been provided against 1,200 applications. 630 connections will berealized.
51,226 people will be benefited by 2020.
</narrative></comment>
</target>
<actual value="17620.00">
<comment><narrative>
All 9 WSSs have been handed over for the use 605 connections have been provided against 1,200 applications
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers/ fishermen receiving seeds orImplements for first time after return.
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative>Returnees do not have seeds/implements or cash to purchase seeds and implements</narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2013-12-31" />
<target value="6000.00">
<comment><narrative>
9,603 households received seeds for first cultivation after return. 72,010 coconut seedlings were distributed from a nurseryrehabilitated under the project.
</narrative></comment>
</target>
<actual value="9603.00">
<comment><narrative>
9,603 households received seeds for first cultivation after return. 72,010 coconut seedlings were distributed from a nurseryrehabilitated under the project.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Returning people provided with access to safe drinking water supply
</narrative></title>
<baseline year="2010" iso-date="2010-01-01" value="0.00"><comment><narrative>Approximately about 80,000 IDPs lack safe and regular water supplies as most  water supply schemes in the North are damaged andnon-functional</narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-01" />
<period-end iso-date="2013-12-31" />
<target value="30000.00">
<comment><narrative>
All 9 WSSs will be completed before end of December 2013. 
51,226 people will be benefitted
</narrative></comment>
</target>
<actual value="17620.00">
<comment><narrative>
4 WSSs have been handed over for the use of 17620 people. Another 3 are ready to be commissioned. Balance 2 WSSs are nearingcompletion.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Employment generated for the IDP households
</narrative></title>
<baseline year="2010" iso-date="2010-01-01" value="0.00"><comment><narrative>Zero emplyment opportunities to the IDP households in the villages soon after the return</narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-01" />
<period-end iso-date="2013-12-31" />
<target value="1070000.00">

</target>
<actual value="2150098.00">
<comment><narrative>
Adequate employment opportunities for the IDP households soon after their return from the camps to villages of origin.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Jungle growth of farmlands cleared and made ready for cultivation
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="19000.00"><comment><narrative>19,000 Ha of farm lands that belong to IDPs cannot be farmed due to thick
vegetative growth</narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2013-12-31" />
<target value="7106.00">
<comment><narrative>
7,106 ha farm cleared and 385.3 km defense bunds removed for peoples use. This sub component is successfully completed
</narrative></comment>
</target>
<actual value="7600.00">
<comment><narrative>
6,965 ha farm cleared and 369 km defense bunds removed for peoples use.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmlands brought back to production (as a result of jungle clearing, seed provisions, and irrigation rehabilitation):
</narrative></title>
<baseline year="2010" iso-date="2010-01-01" value="0.00"><comment><narrative>53,000 Ha of paddy lands had not been cultivated (abandoned) due to  non-availability of irrigation facilities</narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-01" />
<period-end iso-date="2013-12-31" />
<target value="16200.00">
<comment><narrative>
107 schemes totaling 19,071 Ha have been irrigated.
</narrative></comment>
</target>
<actual value="16332.00">
<comment><narrative>
107 Irrigation schemes totaling 19,511 Ha completed.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="2009" iso-date="2009-01-06" value="0.00"><comment><narrative>On June 2009, nearly 279,000 IDPs were housed in government camps pending return and resettlement in their villages of origin. Theproject expects to reach 100,000 people after their return to help reestablish their livelihoods.</narrative></comment></baseline>
<period>
<period-start iso-date="2009-01-06" />
<period-end iso-date="2013-12-31" />
<target value="100000.00">

</target>
<actual value="476013.00">
<comment><narrative>
The Government has resettled a total of 476,013 people in 284 Grama Niladhari divisions. These include 140,000 IDPs who lived inGovernment's welfare camps in Vavuniya at the time of project approval in December 2009.  The target has therefore been achievedand in fact exceeded.  The project has benefited not only the IDPs who came from the camps but other IDPs returned too.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public buildings restored and functional
</narrative></title>
<baseline year="2010" iso-date="2010-01-01" value="0.00"><comment><narrative>A large number of public buildings are destroyed or severely damaged</narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-01" />
<period-end iso-date="2013-12-31" />
<target value="400.00">
<comment><narrative>
471 buildings will be rehabilitated.
</narrative></comment>
</target>
<actual value="461.00">
<comment><narrative>
461 buildings have been rehabilitation. This includes 60 MPCs, Fertilizer / Paddy 50, School 173, Health buildings 32, Agrarian 22&amp; Other Government buildings 154
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public buildings restored and functional
</narrative></title>
<baseline year="2010" iso-date="2010-01-01" value="0.00"><comment><narrative>A large number of public buildings are destroyed or severely damaged</narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-01" />
<period-end iso-date="2013-12-31" />
<target value="400.00">
<comment><narrative>
472 have been rehabilitated.
</narrative></comment>
</target>
<actual value="461.00">
<comment><narrative>
466 buildings have been rehabilitation. This includes MPCs, Fertilizer / Paddy, Schools, Health buildings, Agrarian &amp; OtherGovernment buildings.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Regular CSIAs completed quarterly in project year 1 and 2and lessons incorporated
</narrative></title>
<baseline year="2010" iso-date="2010-01-01" value="0.00"><comment><narrative>It was felt that Comprehensive social assessments are needed to evaluate quality of return and impact of the project</narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-01" />
<period-end iso-date="2013-12-31" />
<target value="6.00">
<comment><narrative>
SIA will be completed by mid-November 2013.
</narrative></comment>
</target>
<actual value="3.00">
<comment><narrative>
The RFP was issued to RDC on single source selection to submit the proposals. After obtaining Bank concurrence, the assessmentwillbe started in early September 2013.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Rural road rehabilitated
</narrative></title>
<baseline year="2010" iso-date="2010-01-31" value="0.00"><comment><narrative>1,200 Km rural roads badly damaged</narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-31" />
<period-end iso-date="2013-12-31" />
<target value="875.00">
<comment><narrative>
717 Km roads will be completed
</narrative></comment>
</target>
<actual value="682.00">
<comment><narrative>
682 Km rural roads completed. Another 25 Km ongoing.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers/ fishermen receiving seeds orImplements for first time after return.
</narrative></title>
<baseline year="2010" iso-date="2010-01-01" value="0.00"><comment><narrative>Returnees do not have seeds/implements or cash to purchase seeds and implements</narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-01" />
<period-end iso-date="2013-12-31" />
<target value="6000.00">
<comment><narrative>
This component is successfully completed.
</narrative></comment>
</target>
<actual value="9603.00">
<comment><narrative>
9,603 households received seeds for first cultivation after return. 72,010 coconut seedlings were distributed from a nurseryrehabilitated under the project.
</narrative></comment>
</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-11-20T15:47:22" hierarchy="1"><iati-identifier>44000-P121328</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>LK: SME Development Facility</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0004261"><narrative>Ministry of Finance and Planning</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0004261"><narrative>Ministry of Finance and Planning</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0004263"><narrative>Ministry of Finance and Planning</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0004263"><narrative>Ministry of Finance and Planning</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="LK-COA-0004260"><narrative>Ministry of Finance and Planning</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2010-07-22"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2010-09-07"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2015-09-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2015-09-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Korotoumou (Koro) Ouattara</narrative></person-name><telephone>+1-202-473-1000</telephone><email>kouattara@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>









<recipient-country code="LK" percentage="100"><narrative xml:lang="en">SRI LANKA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001223421" />
            <name><narrative>Western Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.8333302 80.083328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001225265" />
            <name><narrative>Province of Uva</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.9847202 81.056389</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001227618" />
            <name><narrative>Southern Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.1666698 80.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001228435" />
            <name><narrative>Province of Sabaragamuwa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.75 80.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001232860" />
            <name><narrative>North Western Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.75 80.166672</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001232870" />
            <name><narrative>North Central Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.3333302 80.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001249296" />
            <name><narrative>Central Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.3333302 80.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007671049" />
            <name><narrative>Northern Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.1666698 80.416672</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0008133521" />
            <name><narrative>Eastern Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.6061401 81.202011</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="24010" percentage="50" xml:lang="en"/><sector vocabulary="1" code="24030" percentage="50" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="FA" percentage="53.0000000" xml:lang="en"><narrative>FY17 - Banking Institutions</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YZ" percentage="31.0000000" xml:lang="en"><narrative>FY17 - Other Industry, Trade and Services</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="FP" percentage="8.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Financial Sector</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="FL" percentage="8.00000000" xml:lang="en"><narrative>FY17 - Other Non-bank Financial Institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="100" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000243" percentage="50" xml:lang="en"><narrative>MSME Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000243" percentage="50" xml:lang="en"><narrative>MSME Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000032" percentage="50" xml:lang="en"><narrative>Financial Infrastructure and Access</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000323" percentage="50" xml:lang="en"><narrative>MSME Finance</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">555555.56</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">555555.56</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">555555.55</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">555555.56</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">555555.56</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">555555.55</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">555555.56</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">555555.56</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">555555.55</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">1916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">1916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">1916666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">1916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">1916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">1916666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">1916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">1916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">1916666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">1916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">1916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">1916666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">2083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">2083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">2083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">2083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">488888.89</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">488888.89</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">488888.89</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">488888.89</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">488888.89</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">488888.89</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">488888.89</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">488888.89</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">488888.89</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">555555.56</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">555555.56</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">555555.55</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">555555.56</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">555555.56</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">555555.55</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">1916666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">1916666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">1916666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">1916666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">1916666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">1916666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">1916666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">1916666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">1916666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">1916666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">1916666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">1916666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">2083333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">2083333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">2083333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">2083333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">2083333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">2083333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">2083333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">2083333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">2083333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">488888.89</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">488888.89</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">488888.89</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">488888.89</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">488888.89</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">488888.89</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">5737040.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">5737040.66</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2010-09-30"/><value value-date="2010-09-30">57400000</value><description xml:lang="en"><narrative>Total Commitment in September Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4260"><narrative>Ministry of Finance and Planning</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">-5513569</value><description xml:lang="en"><narrative>Total Commitment Cancellations in February Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4260"><narrative>Ministry of Finance and Planning</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-06-30"/><value value-date="2011-06-30">29826200</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4260"><narrative>Ministry of Finance and Planning</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">23173</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4260"><narrative>Ministry of Finance and Planning</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">5380689</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4260"><narrative>Ministry of Finance and Planning</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">996982</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4260"><narrative>Ministry of Finance and Planning</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">3103785</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4260"><narrative>Ministry of Finance and Planning</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">8530608</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4260"><narrative>Ministry of Finance and Planning</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">1662646</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4260"><narrative>Ministry of Finance and Planning</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">3591535</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4260"><narrative>Ministry of Finance and Planning</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-01-31"/><value value-date="2016-01-31">-1452659</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4260"><narrative>Ministry of Finance and Planning</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-09-30"/><value value-date="2011-09-30">-46656</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4260"><narrative>Ministry of Finance and Planning</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">-107031</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4260"><narrative>Ministry of Finance and Planning</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-09-30"/><value value-date="2012-09-30">-105249</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4260"><narrative>Ministry of Finance and Planning</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">-108857</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4260"><narrative>Ministry of Finance and Planning</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">-105007</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4260"><narrative>Ministry of Finance and Planning</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">-126350</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4260"><narrative>Ministry of Finance and Planning</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">-129448</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4260"><narrative>Ministry of Finance and Planning</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">-124767</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4260"><narrative>Ministry of Finance and Planning</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">-164240</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4260"><narrative>Ministry of Finance and Planning</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-184891</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4260"><narrative>Ministry of Finance and Planning</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-176978</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4260"><narrative>Ministry of Finance and Planning</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-172133</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4260"><narrative>Ministry of Finance and Planning</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-176540</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4260"><narrative>Ministry of Finance and Planning</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-186194</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4260"><narrative>Ministry of Finance and Planning</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-180552</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4260"><narrative>Ministry of Finance and Planning</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-176871</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4260"><narrative>Ministry of Finance and Planning</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-174344</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4260"><narrative>Ministry of Finance and Planning</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-174977</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4260"><narrative>Ministry of Finance and Planning</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-132074</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4260"><narrative>Ministry of Finance and Planning</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-220486</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4260"><narrative>Ministry of Finance and Planning</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-160380</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4260"><narrative>Ministry of Finance and Planning</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-151339</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4260"><narrative>Ministry of Finance and Planning</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-131526</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4260"><narrative>Ministry of Finance and Planning</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-126765</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4260"><narrative>Ministry of Finance and Planning</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-117201</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4260"><narrative>Ministry of Finance and Planning</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-109893</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4260"><narrative>Ministry of Finance and Planning</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-63798</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4260"><narrative>Ministry of Finance and Planning</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-69277</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4260"><narrative>Ministry of Finance and Planning</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-141986</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4260"><narrative>Ministry of Finance and Planning</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-86840</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4260"><narrative>Ministry of Finance and Planning</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-2398171</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4260"><narrative>Ministry of Finance and Planning</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-2418215</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4260"><narrative>Ministry of Finance and Planning</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-2414017</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4260"><narrative>Ministry of Finance and Planning</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-2335011</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4260"><narrative>Ministry of Finance and Planning</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-2192100</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4260"><narrative>Ministry of Finance and Planning</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-2253601</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4260"><narrative>Ministry of Finance and Planning</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-2232407</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4260"><narrative>Ministry of Finance and Planning</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-2254211</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4260"><narrative>Ministry of Finance and Planning</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-2284174</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4260"><narrative>Ministry of Finance and Planning</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-2255717</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4260"><narrative>Ministry of Finance and Planning</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-2324515</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4260"><narrative>Ministry of Finance and Planning</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-2298817</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4260"><narrative>Ministry of Finance and Planning</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P121328"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P121328?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P121328"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of SMEs trained
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="4500.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="2015-09-30" />
<target value="9000.00">

</target>
<actual value="14598.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cumulative total number of SME loans
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="306.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="2015-09-30" />
<target value="1000.00">

</target>
<actual value="729.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cumulative number of active SME loans (&amp;gt;36 months maturity)
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="243.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="2015-09-30" />
<target value="500.00">

</target>
<actual value="599.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cumulative volume of loans to SMEs (&amp;gt;36 months maturity, US$ equivalent)
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="17000000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="2015-09-30" />
<target value="25200000.00">

</target>
<actual value="35290000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PFI SMEDeF Project  Portfolio Quality (NPL (% ) of  &amp;gt;90 days)
</narrative></title>
<baseline year="2010" iso-date="2010-09-07" value="10.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-09-07" />
<period-end iso-date="2015-09-30" />
<target value="8.00">

</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cumulative total volume of loans to SMEs
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="19100000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="2015-09-30" />
<target value="50400000.00">

</target>
<actual value="38800000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cumulative no. of PFI loan officers trained  in SME Banking products and credit risk management
</narrative></title>
<baseline year="2010" iso-date="2010-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-09-30" />
<period-end iso-date="2015-09-30" />
<target value="8000.00">

</target>
<actual value="8819.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cumulative no. of PFI introducing processes/products/management systems specific to SME
</narrative></title>
<baseline year="2010" iso-date="2010-09-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-09-07" />
<period-end iso-date="2015-09-30" />
<target value="8.00">

</target>
<actual value="8.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of Bank Support: Lines of Credit - SME
</narrative></title>
<baseline year="2010" iso-date="2010-09-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-09-07" />
<period-end iso-date="2015-09-30" />
<target value="50400000.00">

</target>
<actual value="38800000.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-11-20T15:47:22" hierarchy="1"><iati-identifier>44000-P122735</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Metro Colombo Urban Development Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0004819"><narrative>Democratic Socialist Republic of Sri Lanka</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0004819"><narrative>Democratic Socialist Republic of Sri Lanka</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0004819"><narrative>Democratic Socialist Republic of Sri Lanka</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="LK-COA-0004820"><narrative>Ministry of Urban Development and Housing</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2011-10-12"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2012-03-15"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2021-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2021-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Nandya Thalyta Yuwono</narrative></person-name><telephone>+1-202-473-1000</telephone><email>tyuwono@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>







<recipient-country code="LK" percentage="100"><narrative xml:lang="en">SRI LANKA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001234132" />
            <name><narrative>Mutwal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.9499998 79.866669</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001234569" />
            <name><narrative>Dehiwala-Mount Lavinia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.8401899 79.871162</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001248990" />
            <name><narrative>Colombo District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.8663998 80.016602</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001238992" />
            <name><narrative>Sri Jayewardenepura Kotte</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.8829699 79.907082</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001228379" />
            <name><narrative>Saint Sebastian Canal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.93222 79.85778</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001245302" />
            <name><narrative>Gotatuwa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.9278002 79.903603</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007545421" />
            <name><narrative>Kolonnawa Division</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.9352002 79.913803</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="74020" percentage="76" xml:lang="en"/><sector vocabulary="1" code="15129" percentage="24" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="7.00000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="6.00000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WB" percentage="6.00000000" xml:lang="en"><narrative>FY17 - Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WZ" percentage="53.0000000" xml:lang="en"><narrative>FY17 - Other Water Supply, Sanitation and Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="11.0000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TZ" percentage="11.0000000" xml:lang="en"><narrative>FY17 - Other Transportation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TC" percentage="6.00000000" xml:lang="en"><narrative>FY17 - Urban Transport</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="76" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000331" percentage="9" xml:lang="en"><narrative>Disaster Risk Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000753" percentage="9" xml:lang="en"><narrative>Disaster Preparedness</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000851" percentage="35" xml:lang="en"><narrative>Water Institutions, Policies and Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="27" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="76" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000751" percentage="9" xml:lang="en"><narrative>Disaster Response and Recovery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000751" percentage="9" xml:lang="en"><narrative>Disaster Response and Recovery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="30" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000752" percentage="9" xml:lang="en"><narrative>Disaster Risk Reduction</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000752" percentage="9" xml:lang="en"><narrative>Disaster Risk Reduction</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="30" xml:lang="en"><narrative>Urban Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="9" xml:lang="en"><narrative>Finance for Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="27" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">6833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">6833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">6833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">16666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">16666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">16666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">20666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">20666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">20666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">17333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">17333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">17333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">8166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">8166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">8166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">13940882.52</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">13940882.52</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">213000000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">-13940883</value><description xml:lang="en"><narrative>Total Commitment Cancellations in July Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-07-31"/><value value-date="2012-07-31">532500</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-08-31"/><value value-date="2012-08-31">2000000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-01-31"/><value value-date="2013-01-31">2119394</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-02-28"/><value value-date="2013-02-28">29996961</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">10106373</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">8050168</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">13621000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">5127000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">11762000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">11457835</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">10000000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">15000000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">10000000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">5000000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">10000000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-01-31"/><value value-date="2020-01-31">10000000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">6000000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">4000000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">6000000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">6000000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">5000000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">8000000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">6000000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">3293694</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">-7807</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-07-31"/><value value-date="2012-07-31">-532500</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">-10016</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">-117760</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">-200116</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">-184659</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">-282833</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">-273459</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">-414822</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-470265</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-702158</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-881537</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-1010693</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-1050203</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-1878011</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-2052081</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-1955625</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-1797935</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-1019325</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-744262</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-704548</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-748063</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-2981026</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-3136325</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-3024330</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-2912334</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-2800317</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-2688251</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-2576237</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-2464190</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-2369331</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-2369331</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-2369331</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-3044331</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-3322331</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-3322331</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-4057331</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-4360331</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-4892431</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-5150831</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-5350631</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-5463994</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-5463994</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-5463994</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-5463994</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-5463994</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-5463994</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-5463994</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-5463994</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-4820"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P122735"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P122735?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P122735"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.2 Km of road/drainage built/rehabilitated based on prescribed standards
</narrative></title>
<baseline year="2012" iso-date="2012-07-16" value="10.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-07-16" />
<period-end iso-date="2012-07-16" />
<target value="45.00">
<comment><narrative>
&lt;p&amp;gt;Major road around Colombo Metro Area were rehabilitated. In total, 47 km road rehabilitated including sidewalks. This exceeded the target and all were completed within the first 4 years of project implementation.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="47.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction in the area under risk of flooding (50-year return period) in the project area.
</narrative></title>
<baseline year="2012" iso-date="2012-07-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-07-16" />
<period-end iso-date="2017-09-18" />
<target value="3.00">
<comment><narrative>
&lt;p&amp;gt;On June 10, 2016, the Project Management Unit&amp;nbsp;provided an update of the impact on the PDO if Madiwela Diversion&amp;nbsp;is notcompleted. The end target was&amp;nbsp;revised as part of the restructuring in 2017. The revised end target was based on technical analysis to better align with the indicator and likelihood to achieve the target by project closing date.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="3.03">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
2.6 Users satisfied with area-based demonstration projects in Colombo City
</narrative></title>
<baseline year="2014" iso-date="2014-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-30" />
<period-end iso-date="2012-07-16" />
<target value="70.00">
<comment><narrative>
&lt;p&amp;gt;Direct beneficiaries indicated satisfaction of improved public parks including Linear Park, Townhall area, and Viharamadevi Park.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="78.21">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.8  Public convenience complexes maintained by PLAs that are in good and fair condition.
</narrative></title>
<baseline year="2014" iso-date="2014-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-30" />
<period-end iso-date="2012-07-16" />
<target value="16.00">
<comment><narrative>
&lt;p&amp;gt;16 public toilets around Colombo, including within public parks and wetland parks were improved and maintained by the municipal council.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="16.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.2 Increase in drainage capacity (gravity system)
</narrative></title>
<baseline year="2012" iso-date="2012-07-16" value="100.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-07-16" />
<period-end iso-date="2012-07-16" />
<target value="185.00">
<comment><narrative>
&lt;p&amp;gt;Drainage capacity was improved following completion of macro-drainage interventions and it exceeded the target.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="220.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
3.1 RTC developed and integrated into SLLRDC's operation
</narrative></title>
<baseline year="2012" iso-date="2012-07-16" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-07-16" />
<period-end iso-date="2012-07-16" />
<target value="Y">
<comment><narrative>
&lt;p&amp;gt;Real Time Center developed under the project, located in a building constructed using GOSL funds under the project. The IFMS is housed in this building and managed by SLLDC and integrated to its system.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.7  Number of public spaces / parks upgraded and revitalized by the project
</narrative></title>
<baseline year="2014" iso-date="2014-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-30" />
<period-end iso-date="2012-07-16" />
<target value="3.00">
<comment><narrative>
&lt;p&amp;gt;3 major public parks in the heart of Colombo were successfully improved and maintained by the municipal council and the urban development authority.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
1.6 Users satisfaction with the condition of Beira Lake  and Beddagana and Rampart Park
</narrative></title>
<baseline year="2014" iso-date="2014-04-30" value="31.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-30" />
<period-end iso-date="2012-07-16" />
<target value="80.00">
<comment><narrative>
&lt;p&amp;gt;Beneficiary satisfaction survey was conducted for Beddagana Wetland Park, Viharamadevi Park, and Kotte Rampart. Respondents were direct beneficiaries, of which 83 percent were satisfied with the completed interventions under the project.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="83.26">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.1 Length of primary canals improved by the project
</narrative></title>
<baseline year="2012" iso-date="2012-07-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-07-16" />
<period-end iso-date="2012-07-16" />
<target value="9.20">
<comment><narrative>
&lt;p&amp;gt;All interventions for improved primary canals were fully completed and exceeded the indicator target.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="10.62">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of total urban roads maintained by PLAs that are in good and fair condition in the 4 PLAs
</narrative></title>
<baseline year="2012" iso-date="2012-07-16" value="50.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-07-16" />
<period-end iso-date="2017-09-18" />
<target value="">

</target>
<actual value="70.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.4 Micro-drainage subprojects implemented under the Project that reduce risk of flooding in localised areas (10 year return period)
</narrative></title>
<baseline year="2012" iso-date="2012-07-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-07-16" />
<period-end iso-date="2020-06-22" />
<target value="6.00">
<comment><narrative>
&lt;p&amp;gt;At appraisal, 15 micro drainage was proposed by the municipal council. At implementation, the project focused on 6 micro drainage improvements based on their feasibility. At closure, the project completed 5 and partially completed Norris Canal diversion.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="5.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.3 Increase in drainage capacity (pumping system, subject to the results of the hydrological model)
</narrative></title>
<baseline year="2012" iso-date="2012-07-16" value="3.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-07-16" />
<period-end iso-date="2012-07-16" />
<target value="25.00">
<comment><narrative>
&lt;p&amp;gt;Fully achieved by completion of North Lock pumping station, St. Sebastian South, and Ambatale pumping station. The total capacity of these 3 pumping stations are 60 m3.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="60.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-11-20T15:47:22" hierarchy="1"><iati-identifier>44000-P130548</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Sri Lanka Strategic Cities Dev Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0009142"><narrative>Democratic Socialist Republic of Sri Lanka</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0009142"><narrative>Democratic Socialist Republic of Sri Lanka</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0009142"><narrative>Democratic Socialist Republic of Sri Lanka</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="LK-COA-0009143"><narrative>Ministry of Urban Development and Housing</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2012-12-06"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2014-05-05"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2021-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2021-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Nandya Thalyta Yuwono</narrative></person-name><telephone>+1-202-473-1000</telephone><email>tyuwono@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>







<recipient-country code="LK" percentage="100"><narrative xml:lang="en">SRI LANKA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001241622" />
            <name><narrative>Kandy</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.2954998 80.635597</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001242833" />
            <name><narrative>Jaffna</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.6684504 80.007423</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001246294" />
            <name><narrative>Galle</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.0366998 80.217003</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001237413" />
            <name><narrative>Madawala</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.1499996 80.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001248056" />
            <name><narrative>Digana</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.9183002 80.252098</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001240994" />
            <name><narrative>Katugastota</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.3276 80.621201</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="43032" percentage="100" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TC" percentage="45.0000000" xml:lang="en"><narrative>FY17 - Urban Transport</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WZ" percentage="35.0000000" xml:lang="en"><narrative>FY17 - Other Water Supply, Sanitation and Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="20.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000021" percentage="10" xml:lang="en"><narrative>Business Enabling Environment</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000822" percentage="5" xml:lang="en"><narrative>Water Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="20" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="15" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="48" xml:lang="en"><narrative>Urban Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="8" xml:lang="en"><narrative>Finance for Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000021" percentage="10" xml:lang="en"><narrative>Business Enabling Environment</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000334" percentage="8" xml:lang="en"><narrative>Housing Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="15" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000211" percentage="10" xml:lang="en"><narrative>Investment and Business Climate</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000821" percentage="5" xml:lang="en"><narrative>Air quality management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000431" percentage="6" xml:lang="en"><narrative>Administrative and Civil Service Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000437" percentage="14" xml:lang="en"><narrative>Municipal Institution Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000821" percentage="5" xml:lang="en"><narrative>Air quality management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000823" percentage="5" xml:lang="en"><narrative>Soil Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000714" percentage="8" xml:lang="en"><narrative>Urban Planning</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">667821.78</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">667821.78</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">667821.78</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">6666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">3333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">6666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">6666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">6666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">3333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">6666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">3333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">3333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">59046664.12</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">59046664.12</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">147000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">55000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-65000001</value><description xml:lang="en"><narrative>Total Commitment Cancellations in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-27000034</value><description xml:lang="en"><narrative>Total Commitment Cancellations in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">-9119632</value><description xml:lang="en"><narrative>Total Commitment Cancellations in July Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">6800000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">3000000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">10000000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">650000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">3000000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">4000000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-01-31"/><value value-date="2018-01-31">2500000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">2500000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">5800000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">6700000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">1300000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">1300000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">4700000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">3300000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">4000000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">3000000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">1000000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">3300000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">1000000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">3000000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">2500000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">4000000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">1750000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">357015</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">1000000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">1500000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">7800000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">-1803679</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">-85616</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-01-31"/><value value-date="2016-01-31">-98732</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">-95779</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">-211003</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-3275</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-07-31"/><value value-date="2017-07-31">-205304</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-6834</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-01-31"/><value value-date="2018-01-31">-281627</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-18223</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-07-31"/><value value-date="2018-07-31">-339795</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-42619</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">-420086</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-48785</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">-443569</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-85962</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-01-31"/><value value-date="2020-01-31">-439968</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-87714</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">-458041</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-95274</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">-558045</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-112276</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">-632184</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-142428</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-01-31"/><value value-date="2022-01-31">-1002374</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-347939</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">-923510</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-300057</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">-513628</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-185234</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">-567882</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-175606</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">-528826</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-173515</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">-519304</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-166549</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">-495768</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-161913</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">-485876</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-171964</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">-513076</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-160189</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">-2170580</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-01-31"/><value value-date="2020-01-31">-2165439</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">-1061127</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">-1099302</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">-1087228</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-491164</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-01-31"/><value value-date="2022-01-31">-1074498</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-465238</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">-999255</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-305320</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">-1029096</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-311513</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">-1033751</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-307729</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">-1019663</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-307026</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">-1012954</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-305000</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">-990417</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-312965</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">-1044001</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-315664</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">-1041063</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-317462</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-9143"><narrative>Ministry of Urban Development and Housing</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P130548"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P130548?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P130548"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
3.4 Length of storm water drainage reinstated
</narrative></title>
<baseline year="2016" iso-date="2016-03-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-03-10" />
<period-end iso-date="2021-03-01" />
<target value="1.60">

</target>
<actual value="1.63">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.2 Length of water transmission and distribution pipes replaced
</narrative></title>
<baseline year="2014" iso-date="2014-05-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-05-05" />
<period-end iso-date="2020-04-05" />
<target value="13.00">

</target>
<actual value="13.73">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.4  Length of new or rehabilitated ocean pathway
</narrative></title>
<baseline year="2014" iso-date="2014-05-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-05-05" />
<period-end iso-date="2020-04-05" />
<target value="1.20">

</target>
<actual value="1.50">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Aggregate number of people benefiting from improved urban services in participating city regions (disaggregated by gender)
</narrative></title>
<baseline year="2014" iso-date="2014-05-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-05-05" />
<period-end iso-date="2020-04-30" />
<target value="570000.00">

</target>
<actual value="575924.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New or rehabilitated urban public spaces in participating city regions
</narrative></title>
<baseline year="2014" iso-date="2014-05-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-05-05" />
<period-end iso-date="2020-04-05" />
<target value="100000.00">

</target>
<actual value="222326.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
2.5 Asset Management system  with maintenance program for municipal infrastructure developed and adopted  in Galle City Region
</narrative></title>
<baseline year="2014" iso-date="2014-05-05" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-05-05" />
<period-end iso-date="2021-12-31" />
<target value="Y">

</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.2  Number of bridges rehabilitated
</narrative></title>
<baseline year="2014" iso-date="2014-05-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-05-05" />
<period-end iso-date="2018-06-19" />
<target value="7.00">

</target>
<actual value="8.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
3.1  Roads rehabilitated, Non-rural
</narrative></title>
<baseline year="2016" iso-date="2016-03-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-03-10" />
<period-end iso-date="2016-05-03" />
<target value="25.00">

</target>
<actual value="23.56">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
3.6 Completion of strategic plans/ studies in Public Transport and Traffic Management, Drainage and Spatial Development
</narrative></title>
<baseline year="2016" iso-date="2016-03-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-03-10" />
<period-end iso-date="2016-03-10" />
<target value="3.00">

</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.3  Length of new or rehabilitated streets with sidewalks
</narrative></title>
<baseline year="2014" iso-date="2014-05-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-05-05" />
<period-end iso-date="2018-06-19" />
<target value="2.00">

</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Percentage of female beneficiaries benefiting from improved basic services across all three cities
</narrative></title>
<baseline year="2014" iso-date="2014-05-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-05-05" />
<period-end iso-date="2021-12-31" />
<target value="290700.00">

</target>
<actual value="301153.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.1   Number of silt traps implemented around Kandy Lake
</narrative></title>
<baseline year="2014" iso-date="2014-05-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-05-05" />
<period-end iso-date="2020-04-05" />
<target value="5.00">

</target>
<actual value="5.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
1.6 Municipal infrastructure and maintenance program developed and adopted in Kandy City Region.
</narrative></title>
<baseline year="2014" iso-date="2014-05-05" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-05-05" />
<period-end iso-date="2020-04-30" />
<target value="Y">

</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
3.5 Number of public conveniences constructed or rehabilitated
</narrative></title>
<baseline year="2016" iso-date="2016-03-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-03-10" />
<period-end iso-date="2021-03-01" />
<target value="6.00">

</target>
<actual value="6.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
3.7 Number of community consultative committees with at least one third of women representative, for pond related activities established as part of the project design and implementation
</narrative></title>
<baseline year="2016" iso-date="2016-03-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-03-10" />
<period-end iso-date="2021-03-01" />
<target value="2.00">

</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.1  Length of major canals and local drains improved under the project
</narrative></title>
<baseline year="2014" iso-date="2014-05-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-05-05" />
<period-end iso-date="2018-06-19" />
<target value="14.00">

</target>
<actual value="13.74">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.4  Roads rehabilitated, Non-rural
</narrative></title>
<baseline year="2014" iso-date="2014-05-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-05-05" />
<period-end iso-date="2020-04-05" />
<target value="9.00">

</target>
<actual value="9.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.5 Number of bus facilities constructed/ rehabilitated
</narrative></title>
<baseline year="2014" iso-date="2014-05-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-05-05" />
<period-end iso-date="2020-04-30" />
<target value="3.00">

</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.3  Length of Underground and surface storm water drainage rehabilitated
</narrative></title>
<baseline year="2014" iso-date="2014-05-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-05-05" />
<period-end iso-date="2020-04-05" />
<target value="4.00">

</target>
<actual value="4.38">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-11-20T15:47:22" hierarchy="1"><iati-identifier>44000-P132698</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Skills Development</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0010952"><narrative>Ministry of Finance, Economic and Policy Development</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="LK-COA-0010953"><narrative>Ministry of Skills Development, Employment and Labour Relations</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2013-12-19"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2014-06-20"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2019-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2019-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Shobhana Sosale</narrative></person-name><telephone>+1-202-473-1000</telephone><email>ssosale@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="LK" percentage="100"><narrative xml:lang="en">SRI LANKA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001223421" />
            <name><narrative>Western Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.8333302 80.083328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001225265" />
            <name><narrative>Province of Uva</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.9847202 81.056389</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001227618" />
            <name><narrative>Southern Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.1666698 80.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001228435" />
            <name><narrative>Province of Sabaragamuwa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.75 80.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001232860" />
            <name><narrative>North Western Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.75 80.166672</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001232870" />
            <name><narrative>North Central Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.3333302 80.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001249296" />
            <name><narrative>Central Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.3333302 80.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007671049" />
            <name><narrative>Northern Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.1666698 80.416672</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0008133521" />
            <name><narrative>Eastern Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.6061401 81.202011</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="11330" percentage="70" xml:lang="en"/><sector vocabulary="1" code="11420" percentage="30" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="ET" percentage="30.0000000" xml:lang="en"><narrative>FY17 - Tertiary Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EW" percentage="70.0000000" xml:lang="en"><narrative>FY17 - Workforce Development and Vocational Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000521" percentage="20" xml:lang="en"><narrative>Social Safety Nets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="100" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000662" percentage="10" xml:lang="en"><narrative>Labor Market Institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000052" percentage="20" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000066" percentage="20" xml:lang="en"><narrative>Labor Market Policy and Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000663" percentage="10" xml:lang="en"><narrative>Active Labor Market Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000521" percentage="20" xml:lang="en"><narrative>Social Safety Nets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000657" percentage="15" xml:lang="en"><narrative>Standards, Curriculum and Textbooks</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000653" percentage="15" xml:lang="en"><narrative>Science and Technology</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000654" percentage="15" xml:lang="en"><narrative>Teachers</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000662" percentage="10" xml:lang="en"><narrative>Labor Market Institutions</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">833333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">1941666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">1941666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">1941666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">1941666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">1941666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">1941666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">1941666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">1941666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">1941666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">1941666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">1941666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">1941666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">1950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">1950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">1950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">1950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">1950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">1950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">1950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">1950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">1950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">1950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">1950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">1950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">1950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">1950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">1950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">1950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">1950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">1950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">1950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">1950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">1950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">1950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">1950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">1950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">1708333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">1708333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">1708333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">1708333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">1708333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">1708333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">1708333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">1708333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">1708333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">1708333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">1708333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">1708333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">75000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">75000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">75000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">75000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">75000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">75000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">75000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">75000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">75000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">75000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">75000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">75000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">53687981.21</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">53687981.21</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">21700000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-10953"><narrative>Ministry of Skills Development, Employment and Labour Relations</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">79800000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-10953"><narrative>Ministry of Skills Development, Employment and Labour Relations</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-23676538</value><description xml:lang="en"><narrative>Total Commitment Cancellations in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-10953"><narrative>Ministry of Skills Development, Employment and Labour Relations</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-19319397</value><description xml:lang="en"><narrative>Total Commitment Cancellations in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-10953"><narrative>Ministry of Skills Development, Employment and Labour Relations</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">6579659</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-10953"><narrative>Ministry of Skills Development, Employment and Labour Relations</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">10976160</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-10953"><narrative>Ministry of Skills Development, Employment and Labour Relations</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">4286194</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-10953"><narrative>Ministry of Skills Development, Employment and Labour Relations</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">4211501</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-10953"><narrative>Ministry of Skills Development, Employment and Labour Relations</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">8603213</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-10953"><narrative>Ministry of Skills Development, Employment and Labour Relations</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">6587568</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-10953"><narrative>Ministry of Skills Development, Employment and Labour Relations</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-01-31"/><value value-date="2018-01-31">27144</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-10953"><narrative>Ministry of Skills Development, Employment and Labour Relations</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">4383350</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-10953"><narrative>Ministry of Skills Development, Employment and Labour Relations</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">2157230</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-10953"><narrative>Ministry of Skills Development, Employment and Labour Relations</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">-83351</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-10953"><narrative>Ministry of Skills Development, Employment and Labour Relations</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">-66528</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-10953"><narrative>Ministry of Skills Development, Employment and Labour Relations</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">-225134</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-10953"><narrative>Ministry of Skills Development, Employment and Labour Relations</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">-258787</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-10953"><narrative>Ministry of Skills Development, Employment and Labour Relations</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">-425059</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-10953"><narrative>Ministry of Skills Development, Employment and Labour Relations</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">-432086</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-10953"><narrative>Ministry of Skills Development, Employment and Labour Relations</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">-454545</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-10953"><narrative>Ministry of Skills Development, Employment and Labour Relations</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">-460946</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-10953"><narrative>Ministry of Skills Development, Employment and Labour Relations</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">-457686</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-10953"><narrative>Ministry of Skills Development, Employment and Labour Relations</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">-436874</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-10953"><narrative>Ministry of Skills Development, Employment and Labour Relations</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-491121</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-10953"><narrative>Ministry of Skills Development, Employment and Labour Relations</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">-453915</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-10953"><narrative>Ministry of Skills Development, Employment and Labour Relations</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">-732307</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-10953"><narrative>Ministry of Skills Development, Employment and Labour Relations</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-686574</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-10953"><narrative>Ministry of Skills Development, Employment and Labour Relations</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-396880</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-10953"><narrative>Ministry of Skills Development, Employment and Labour Relations</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-399196</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-10953"><narrative>Ministry of Skills Development, Employment and Labour Relations</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-383309</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-10953"><narrative>Ministry of Skills Development, Employment and Labour Relations</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-362640</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-10953"><narrative>Ministry of Skills Development, Employment and Labour Relations</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-382352</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-10953"><narrative>Ministry of Skills Development, Employment and Labour Relations</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-369130</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-10953"><narrative>Ministry of Skills Development, Employment and Labour Relations</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-364898</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-10953"><narrative>Ministry of Skills Development, Employment and Labour Relations</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">-1170156</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-10953"><narrative>Ministry of Skills Development, Employment and Labour Relations</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">-767852</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-10953"><narrative>Ministry of Skills Development, Employment and Labour Relations</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">-791531</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-10953"><narrative>Ministry of Skills Development, Employment and Labour Relations</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-808976</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-10953"><narrative>Ministry of Skills Development, Employment and Labour Relations</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">-797522</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-10953"><narrative>Ministry of Skills Development, Employment and Labour Relations</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">-786567</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-10953"><narrative>Ministry of Skills Development, Employment and Labour Relations</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-741394</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-10953"><narrative>Ministry of Skills Development, Employment and Labour Relations</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-750934</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-10953"><narrative>Ministry of Skills Development, Employment and Labour Relations</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-748110</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-10953"><narrative>Ministry of Skills Development, Employment and Labour Relations</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-742759</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-10953"><narrative>Ministry of Skills Development, Employment and Labour Relations</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-751602</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-10953"><narrative>Ministry of Skills Development, Employment and Labour Relations</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-735813</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-10953"><narrative>Ministry of Skills Development, Employment and Labour Relations</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-768840</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-10953"><narrative>Ministry of Skills Development, Employment and Labour Relations</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-773905</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-10953"><narrative>Ministry of Skills Development, Employment and Labour Relations</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P132698"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P132698?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P132698"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of providers with NVQ 1-6 with QMS
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="8.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;68 percent achieved against the EOP target&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="234.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Average earnings of TVET graduates relative to earnings of GCE-O level graduates
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="Total: 1.08Male: 1.00Female: 1.14"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="2019-12-16" />
<target value="Total: 1.12Male: 1.04Female: 1.16">

</target>
<actual value="Total: 1.03 Male: 0.99 Female: 1.08">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Teacher vacancy ratio
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="34.46"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2019-12-16" />
<target value="10.00">

</target>
<actual value="34.20">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Recurrent and capital releases spent in accordance with the imprest plan
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="Recurrent 98%
Capital 75%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;100 percent achieved against EOP target for recurrent budget expenditure; 250 percent achieved against EOP target for capital budget expenditure&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Recurrent 98%, Capital : 100%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of active registered institutions
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="1081.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2019-12-16" />
<target value="2481.00">

</target>
<actual value="883.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Employment Rate of TVET graduates
</narrative></title>
<baseline year="2012" iso-date="2012-11-01" value="Total: 86
Male: 88
Female: 82"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-11-01" />
<period-end iso-date="2019-12-16" />
<target value="Total: 88
Male: 90
Female: 84">

</target>
<actual value="77.4% based on national definition, 57.5% within 6 months, based on ADB tracer study">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Industry Sector Skills Councils (ISSCs) or equivalent functional in priority sectors
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;100&amp;nbsp;percent achieved against EOP target.&amp;nbsp;&amp;nbsp;&lt;/p&amp;gt;

&lt;p&amp;gt;Note: As of December 2019,&amp;nbsp;there were 4 ISSCs registered under the Company&amp;rsquo;s Act. A fifth ISSC in the area of Healthcare is yet to be registered.&lt;/p&amp;gt;

&lt;p&amp;gt;&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="4.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Timely submission (by June 30th) of entity audit reports of MYSAD and participating agencies
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="Only 2 out of 9 entities had timely audit reports"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2019-12-16" />
<target value="45">

</target>
<actual value="All 9 entities submitted audited reports by May 16, 2017.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Industry Sector Skills Councils (ISSCs) or equivalent functional in priority sectors
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2019-12-16" />
<target value="4.00">

</target>
<actual value="4.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of students with  NVQ 5-6 diplomas received
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="Total: 162; Male: 99Female: 63"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;95 percent achieved against EOP target for total; 99 percent achieved against EOP target for males and 87 percent achieved&amp;nbsp;against EOP target for females&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Total: 7247; Male: 4,646; Female: 2,601">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of public institutions covered by performance based funding
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2019-12-16" />
<target value="80.00">

</target>
<actual value="57.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Timely submission (by June 30th) of entity audit reports of MYSAD and participating agencies
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="Only 2 out of 9 entities had timely audit reports"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2019-12-16" />
<target value="45">

</target>
<actual value="All 9 entities submitted audited reports by May 16, 2017.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of students benefiting from implementation of the ETA model
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2019-12-16" />
<target value="3500.00">

</target>
<actual value="1619.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of courses accredited
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="1,601.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2019-12-16" />
<target value="3,601.00">

</target>
<actual value="1,850.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Teacher vacancy ratio
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="34.46"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;- 4 percent achieved against the EOP target&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="33.40">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of students receiving NVQ certification/ diploma
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="Total:18,399
Male: 11,254
Female: 7,145"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;169 percent achieved against EOP target for total students; 164 percent achieved against EOP target for males and 177 percent achieved against EOP target for female students&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Total: 291,397 Male: 173,015 Female: 118,383">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Completion rate of trainees enrolled in public institutions
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="All: 77Male: 74Female: 81"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="2019-12-16" />
<target value="All: 81Male: 78Female: 84">

</target>
<actual value="All: 65 Male: 65 Female: 66 (2016 data)">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of courses accredited
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="1601.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2019-12-16" />
<target value="3601.00">

</target>
<actual value="1850.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of students receiving NVQ certification/ diploma
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="Total:18,399
Male: 11,254
Female: 7,145"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2019-12-16" />
<target value="T: 180,000
M: 110,100
F: 69,900">

</target>
<actual value="Total: 172,422; Male: 103,629; Female: 68,793">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of students receiving NVQ certification/ diploma
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="Total:18,399Male: 11,254Female: 7,145"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2019-12-16" />
<target value="T: 180,000M: 110,100F: 69,900">

</target>
<actual value="Total: 172,422; Male: 103,629; Female: 68,793">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of providers with NVQ 1-6 with QMS
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="8.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2019-12-16" />
<target value="340.00">

</target>
<actual value="180.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of providers with NVQ 1-6 with QMS
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="8.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2019-12-16" />
<target value="340.00">

</target>
<actual value="180.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Average earnings of TVET graduates relative to earnings of GCE-O level graduates
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="Total: 1.08
Male: 1.00
Female: 1.14"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;175 percent achieved against the EOP target for total; 450 percent achieved against the EOP target for male and -500 percent achieved against the EOP target for females.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Total: 1.15 Male: 1.18 Female: 1.04">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Employer satisfaction index
</narrative></title>
<baseline year="2012" iso-date="2012-11-30" value="43.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-11-30" />
<period-end iso-date="2019-12-16" />
<target value="55.00">

</target>
<actual value="43.20">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Completion rate of trainees enrolled in public institutions
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="All: 77
Male: 74
Female: 81"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="2019-12-16" />
<target value="All: 81
Male: 78
Female: 84">

</target>
<actual value="All: 65 Male: 65 Female: 66 (2016 data)">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Timely submission (by June 30th) of entity audit reports of MYSAD and participating agencies
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="Only 2 out of 9 entities had timely audit reports"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;86 percent achieved against the EOP target.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="39">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of students benefiting from implementation of the ETA model
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;145 percent achieved against EOP target.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="5092.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Employer satisfaction index
</narrative></title>
<baseline year="2012" iso-date="2012-11-30" value="43.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-11-30" />
<period-end iso-date="2019-12-16" />
<target value="55.00">

</target>
<actual value="43.20">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Employment Rate of TVET graduates
</narrative></title>
<baseline year="2012" iso-date="2012-11-01" value="Total: 86
Male: 88
Female: 82"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-11-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;A comparable updated indicator was not available as of 2019.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Not Available">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of active registered institutions
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="1,081.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2019-12-16" />
<target value="2,481.00">

</target>
<actual value="883.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Industry Sector Skills Councils (ISSCs) or equivalent functional in priority sectors
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2019-12-16" />
<target value="4.00">

</target>
<actual value="4.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Timely availability of reliable data on institutional and sector performance
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;100 percent achieved against EOP target&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="5">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of staff participating in professional development programs
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="Teachers: (T): 0
Assessor (A): 0
Management of Industrial Training (MIT): 0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2019-12-16" />
<target value="At least
T: 2,640
A: 1,000
MIT: 480">

</target>
<actual value="(T): 4053; (A): 1011; MIT:478">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Recurrent and capital releases spent in accordance with the imprest plan
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="Recurrent 98%Capital 75%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2019-12-16" />
<target value="Recurrent 98%Capital 85%">

</target>
<actual value="Recurrent 98%, Capital 86%">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Average earnings of TVET graduates relative to earnings of GCE-O level graduates
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="Total: 1.08
Male: 1.00
Female: 1.14"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="2019-12-16" />
<target value="Total: 1.12
Male: 1.04
Female: 1.16">

</target>
<actual value="Total: 1.03 Male: 0.99 Female: 1.08">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of trainees enrolled in public and private training institutions
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="Total: 148,131Male: 81,047Female: 67,084"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="2019-12-16" />
<target value="T: 827,241M:452,609F:374,632">

</target>
<actual value="Total: 540,511 Male: 314,793 Female: 225,718 (cumulative for three years)">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of public institutions covered by performance based funding
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The PBF model could not be fully implemented as government policy did not support&amp;nbsp;incentive-based additional financing to&amp;nbsp;the public institutions.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of courses accredited
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="1601.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;55 percent of the EOP target achieved&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="2691.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Employment Rate of TVET graduates
</narrative></title>
<baseline year="2012" iso-date="2012-11-01" value="Total: 86Male: 88Female: 82"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-11-01" />
<period-end iso-date="2019-12-16" />
<target value="Total: 88Male: 90Female: 84">

</target>
<actual value="77.4% based on national definition, 57.5% within 6 months, based on ADB tracer study">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Teacher vacancy ratio
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="34.46"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2019-12-16" />
<target value="10.00">

</target>
<actual value="34.20">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of staff participating in professional development programs
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="Teachers: (T): 0Assessor (A): 0Management of Industrial Training (MIT): 0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2019-12-16" />
<target value="At leastT: 2,640A: 1,000MIT: 480">

</target>
<actual value="(T): 4053; (A): 1011; MIT:478">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of students benefiting from implementation of the ETA model
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2019-12-16" />
<target value="3,500.00">

</target>
<actual value="1,619.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of trainees enrolled in public and private training institutions
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="Total: 148,131
Male: 81,047
Female: 67,084"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;117 percent achieved against the EOP target for total trainees; 123 percent achieved against the EOP target for male&amp;nbsp;trainees; and 109 percent achieved against the EOP target for&amp;nbsp;female&amp;nbsp;trainees&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Total: 940,848 Male: 538,781 Female: 402,067">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of staff participating in professional development programs
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="Teachers: (T): 0
Assessor (A): 0
Management of Industrial Training (MIT): 0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;229 percent achieved against EOP target for teachers; 149 percent acheieved against EOP target for assessors and 107 percent achieved against EOP target for managers.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="(T): 6049; (A): 1492 ; MIT:: 513">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Recurrent and capital releases spent in accordance with the imprest plan
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="Recurrent 98%
Capital 75%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2019-12-16" />
<target value="Recurrent 98%
Capital 85%">

</target>
<actual value="Recurrent 98%, Capital 86%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Timely availability of reliable data on institutional and sector performance
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2019-12-16" />
<target value="at least 5">

</target>
<actual value="4">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of students with  NVQ 5-6 diplomas received
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="Total: 162Male: 99Female: 63"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2019-12-16" />
<target value="T: 7,650M: 4,679F: 2,971">

</target>
<actual value="Total: 3,204; Male: 2,170; Female: 1,034">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of active registered institutions
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="1081.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;15 percent of the EOP target achieved.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="1290.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of trainees enrolled in public and private training institutions
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="Total: 148,131
Male: 81,047
Female: 67,084"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="2019-12-16" />
<target value="T: 827,241
M:452,609
F:374,632">

</target>
<actual value="Total: 540,511 Male: 314,793 Female: 225,718 (cumulative for three years)">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Completion rate of trainees enrolled in public institutions
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="All: 77
Male: 74
Female: 81"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;-250 percent achieved against EOP target for All; -250 percent achieved against EOP target for males; and -300 percent achieved against EOP target for females.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="All: 67 Male: 64 Female: 72">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of students with  NVQ 5-6 diplomas received
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="Total: 162
Male: 99
Female: 63"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2019-12-16" />
<target value="T: 7,650
M: 4,679
F: 2,971">

</target>
<actual value="Total: 3,204; Male: 2,170; Female: 1,034">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of public institutions covered by performance based funding
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2019-12-16" />
<target value="80.00">

</target>
<actual value="57.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Employer satisfaction index
</narrative></title>
<baseline year="2012" iso-date="2012-11-30" value="43.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-11-30" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;1.67 percent achieved against the EOP target&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="43.20">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Timely availability of reliable data on institutional and sector performance
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2019-12-16" />
<target value="at least 5">

</target>
<actual value="4">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-11-20T15:47:22" hierarchy="1"><iati-identifier>44000-P132833</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Transport Sector Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0011118"><narrative>Department of External Affairs</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0011118"><narrative>Department of External Affairs</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="LK-COA-0011119"><narrative>Roads Development Authority</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2014-05-06"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2016-05-09"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2023-09-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2023-09-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Dung Anh Hoang</narrative></person-name><telephone>+1-202-473-1000</telephone><email>dhoang1@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>







<recipient-country code="LK" percentage="100"><narrative xml:lang="en">SRI LANKA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001233368" />
            <name><narrative>Negombo Lagoon</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.1528 79.8478</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001233369" />
            <name><narrative>Negombo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.2083 79.8358</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001242835" />
            <name><narrative>Ja Ela</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.0744 79.8919</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001249145" />
            <name><narrative>Chilaw</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.57583 79.79528</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001237464" />
            <name><narrative>Madampe</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.4807 79.8267</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001223522" />
            <name><narrative>Wennappuwa Town</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.3454 79.8386</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007437417" />
            <name><narrative>Marawila North</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.4194 79.8179</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001233609" />
            <name><narrative>Nattandiya Town</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.4123 79.8624</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001239882" />
            <name><narrative>Kochchikade</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.2657 79.8603</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007437516" />
            <name><narrative>Waikkala North</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.2751 79.8566</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="21023" percentage="82" xml:lang="en"/><sector vocabulary="1" code="21012" percentage="18" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TF" percentage="18.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Transportation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TI" percentage="82.0000000" xml:lang="en"><narrative>FY17 - Rural and Inter-Urban Roads</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000023" percentage="10" xml:lang="en"><narrative>Public Private Partnerships</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000834" percentage="17" xml:lang="en"><narrative>Biodiversity</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="17" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000725" percentage="17" xml:lang="en"><narrative>Land Administration and Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000083" percentage="34" xml:lang="en"><narrative>Renewable Natural Resources Asset Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="50" xml:lang="en"><narrative>Urban Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000023" percentage="10" xml:lang="en"><narrative>Public Private Partnerships</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000834" percentage="17" xml:lang="en"><narrative>Biodiversity</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000835" percentage="17" xml:lang="en"><narrative>Landscape Management</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">6333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">6333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">6333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">3.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">3.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">3.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">2333333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">784333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">784333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">784333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">784333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">784333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">784333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">784333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">784333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">784333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">784333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">784333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">784333.36</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">416666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">416666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">416666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">1833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">1833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">1833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">1833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">1833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">1833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">1833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">1833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">1833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">1833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">1833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">1833333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">166666.63</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">56859860.29</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">56859860.29</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">125000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-11120"><narrative>Ministry of Public Administration, Home Affairs, Provincial Councils and Local Government; Roads Development Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">-35000000</value><description xml:lang="en"><narrative>Total Commitment Cancellations in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-11120"><narrative>Ministry of Public Administration, Home Affairs, Provincial Councils and Local Government; Roads Development Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-19988478</value><description xml:lang="en"><narrative>Total Commitment Cancellations in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-11120"><narrative>Ministry of Public Administration, Home Affairs, Provincial Councils and Local Government; Roads Development Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">-623492</value><description xml:lang="en"><narrative>Total Commitment Cancellations in July Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-11120"><narrative>Ministry of Public Administration, Home Affairs, Provincial Councils and Local Government; Roads Development Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">1530730</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-11120"><narrative>Ministry of Public Administration, Home Affairs, Provincial Councils and Local Government; Roads Development Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">2319187</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-11120"><narrative>Ministry of Public Administration, Home Affairs, Provincial Councils and Local Government; Roads Development Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">1000000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-11120"><narrative>Ministry of Public Administration, Home Affairs, Provincial Councils and Local Government; Roads Development Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">2805532</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-11120"><narrative>Ministry of Public Administration, Home Affairs, Provincial Councils and Local Government; Roads Development Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">7800183</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-11120"><narrative>Ministry of Public Administration, Home Affairs, Provincial Councils and Local Government; Roads Development Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">4777383</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-11120"><narrative>Ministry of Public Administration, Home Affairs, Provincial Councils and Local Government; Roads Development Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">3151392</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-11120"><narrative>Ministry of Public Administration, Home Affairs, Provincial Councils and Local Government; Roads Development Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">1000000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-11120"><narrative>Ministry of Public Administration, Home Affairs, Provincial Councils and Local Government; Roads Development Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">3835661</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-11120"><narrative>Ministry of Public Administration, Home Affairs, Provincial Councils and Local Government; Roads Development Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">1500000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-11120"><narrative>Ministry of Public Administration, Home Affairs, Provincial Councils and Local Government; Roads Development Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-01-31"/><value value-date="2022-01-31">5500000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-11120"><narrative>Ministry of Public Administration, Home Affairs, Provincial Councils and Local Government; Roads Development Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">206328</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-11120"><narrative>Ministry of Public Administration, Home Affairs, Provincial Councils and Local Government; Roads Development Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">4000000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-11120"><narrative>Ministry of Public Administration, Home Affairs, Provincial Councils and Local Government; Roads Development Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">312066</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-11120"><narrative>Ministry of Public Administration, Home Affairs, Provincial Councils and Local Government; Roads Development Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">2472498</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-11120"><narrative>Ministry of Public Administration, Home Affairs, Provincial Councils and Local Government; Roads Development Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">1400000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-11120"><narrative>Ministry of Public Administration, Home Affairs, Provincial Councils and Local Government; Roads Development Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">6000000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-11120"><narrative>Ministry of Public Administration, Home Affairs, Provincial Councils and Local Government; Roads Development Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">1022999</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-11120"><narrative>Ministry of Public Administration, Home Affairs, Provincial Councils and Local Government; Roads Development Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">8000000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-11120"><narrative>Ministry of Public Administration, Home Affairs, Provincial Councils and Local Government; Roads Development Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">1529031</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-11120"><narrative>Ministry of Public Administration, Home Affairs, Provincial Councils and Local Government; Roads Development Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">2000000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-11120"><narrative>Ministry of Public Administration, Home Affairs, Provincial Councils and Local Government; Roads Development Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">832893</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-11120"><narrative>Ministry of Public Administration, Home Affairs, Provincial Councils and Local Government; Roads Development Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">246077</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-11120"><narrative>Ministry of Public Administration, Home Affairs, Provincial Councils and Local Government; Roads Development Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">3136637</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-11120"><narrative>Ministry of Public Administration, Home Affairs, Provincial Councils and Local Government; Roads Development Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">919182</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-11120"><narrative>Ministry of Public Administration, Home Affairs, Provincial Councils and Local Government; Roads Development Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">842361</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-11120"><narrative>Ministry of Public Administration, Home Affairs, Provincial Councils and Local Government; Roads Development Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-7213</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-11120"><narrative>Ministry of Public Administration, Home Affairs, Provincial Councils and Local Government; Roads Development Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-14586</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-11120"><narrative>Ministry of Public Administration, Home Affairs, Provincial Councils and Local Government; Roads Development Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-14600</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-11120"><narrative>Ministry of Public Administration, Home Affairs, Provincial Councils and Local Government; Roads Development Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-14399</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-11120"><narrative>Ministry of Public Administration, Home Affairs, Provincial Councils and Local Government; Roads Development Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-47149</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-11120"><narrative>Ministry of Public Administration, Home Affairs, Provincial Councils and Local Government; Roads Development Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-49521</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-11120"><narrative>Ministry of Public Administration, Home Affairs, Provincial Councils and Local Government; Roads Development Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-123150</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-11120"><narrative>Ministry of Public Administration, Home Affairs, Provincial Councils and Local Government; Roads Development Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-214765</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-11120"><narrative>Ministry of Public Administration, Home Affairs, Provincial Councils and Local Government; Roads Development Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-498317</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-11120"><narrative>Ministry of Public Administration, Home Affairs, Provincial Councils and Local Government; Roads Development Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-579013</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-11120"><narrative>Ministry of Public Administration, Home Affairs, Provincial Councils and Local Government; Roads Development Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-395196</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-11120"><narrative>Ministry of Public Administration, Home Affairs, Provincial Councils and Local Government; Roads Development Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-527130</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-11120"><narrative>Ministry of Public Administration, Home Affairs, Provincial Councils and Local Government; Roads Development Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-533829</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-11120"><narrative>Ministry of Public Administration, Home Affairs, Provincial Councils and Local Government; Roads Development Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-577924</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-11120"><narrative>Ministry of Public Administration, Home Affairs, Provincial Councils and Local Government; Roads Development Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-524422</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-11120"><narrative>Ministry of Public Administration, Home Affairs, Provincial Councils and Local Government; Roads Development Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-626117</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-11120"><narrative>Ministry of Public Administration, Home Affairs, Provincial Councils and Local Government; Roads Development Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-566232</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-11120"><narrative>Ministry of Public Administration, Home Affairs, Provincial Councils and Local Government; Roads Development Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-1508327</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-11120"><narrative>Ministry of Public Administration, Home Affairs, Provincial Councils and Local Government; Roads Development Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-1437209</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-11120"><narrative>Ministry of Public Administration, Home Affairs, Provincial Councils and Local Government; Roads Development Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-1374570</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-11120"><narrative>Ministry of Public Administration, Home Affairs, Provincial Councils and Local Government; Roads Development Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-1440812</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-11120"><narrative>Ministry of Public Administration, Home Affairs, Provincial Councils and Local Government; Roads Development Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-1056791</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-11120"><narrative>Ministry of Public Administration, Home Affairs, Provincial Councils and Local Government; Roads Development Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-1061352</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-11120"><narrative>Ministry of Public Administration, Home Affairs, Provincial Councils and Local Government; Roads Development Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-1063182</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-11120"><narrative>Ministry of Public Administration, Home Affairs, Provincial Councils and Local Government; Roads Development Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-1081359</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-11120"><narrative>Ministry of Public Administration, Home Affairs, Provincial Councils and Local Government; Roads Development Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-1084833</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-11120"><narrative>Ministry of Public Administration, Home Affairs, Provincial Councils and Local Government; Roads Development Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-1097219</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-11120"><narrative>Ministry of Public Administration, Home Affairs, Provincial Councils and Local Government; Roads Development Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P132833"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P132833?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P132833"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Average Vehicle Operating Cost (VOC) (per vehicle) for sample project-financed roads in 3 selected Provinces (Western, North-Western and Southern Provinces)
</narrative></title>
<baseline year="2019" iso-date="2019-12-02" value="VOC per veh-km (LKR) (Baseline) NWP = 18.6 WP = 12.4 Uva = 28.6"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-02" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;*Percentages in the actual achieved are the percentage change in the the VOC compared to baseline.&lt;/p&amp;gt;

&lt;p&amp;gt;The indicator&amp;#39;s achievement has exceeded the expected target as the VOC of the roads of three sample provinces has reduced more than the 10% target.&lt;/p&amp;gt;

&lt;p&amp;gt;Note:&amp;nbsp;No ex-post surveys were made of actual vehicle operating costs (VOCs). Instead,&amp;nbsp;the ex-post VOCs were estimated based on the type of terrain and reduction in road roughness, and compared these with those indicated in the ex-ante survey. The estimates are based on the HDM4 values and have been estimated for each of nine vehicle types, then weighted by the distribution of these vehicle types on the improved roads in each province. Therefore, while the estimated reductions in VOCs are&amp;nbsp;higher thanhe 10%&amp;nbsp;anticipated target, it should be noted that these are only estimates based on the expected reduction in road roughness. The actual outcome roughness&amp;nbsp;may provide different results.&lt;/p&amp;gt;

&lt;p&amp;gt;&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="NWP = 15.96: (-14%) WP = 10.73: (-13%) Uva = 25.01: (-13%)">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of GRM complaints resolved
</narrative></title>
<baseline year="2019" iso-date="2019-05-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-15" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The achievement of this indicator exceeded the target.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="95.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Road Sector Strategy and Policy developed and approved
</narrative></title>
<baseline year="2016" iso-date="2016-07-01" value="No comprehensive strategy available at present."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-07-01" />
<period-end iso-date="2023-03-31" />
<target value="Road Sector Strategy and Policy developed and approved.">
<comment><narrative>
&lt;p&amp;gt;The indicator was only partially achieved as the road policy is yet to be approved. However, the RDA expects to update the policy and have it&amp;nbsp;approved in the future.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Road sector policy was drafted, but not approved. The National Audit Office for Evaluating the Role of Related Government Institutions to Reduce the Traffic Congestion in Colombo City and Surrounding Access Road has requested that the draft policy to be updated to address SDG requirements. Furthermore, given that the policy was drafted in 2018, there's now a need for a complete review and update of the draft to address the current requirements of the road sector, including considerations of climate and disaster risk resilience">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of the value of new investments on existing road links selected by the RDA using the asset management system.
</narrative></title>
<baseline year="2016" iso-date="2016-07-01" value="20% of the value of investments are selected by the RDA using the pavement management system"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-07-01" />
<period-end iso-date="2023-03-31" />
<target value="70% of the value of the investments selected through the RAMS">
<comment><narrative>
&lt;p&amp;gt;The achievement of the indicator&amp;nbsp;exceeded the original target and was achieved earlier than the the originally expected timeline.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="76.24%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Asset management system fully operationalized
</narrative></title>
<baseline year="2016" iso-date="2016-07-01" value="System developed, not yet operational"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-07-01" />
<period-end iso-date="2023-03-31" />
<target value="Continuous data collection and updating of all 10 modules through the asset management system.">
<comment><narrative>
&lt;p&amp;gt;The achievement of the indicator exceeded the original target, and was achieved earlier than the originally expected timeline.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="RAMS operationalized and in use with 15 modules, out of which 11 modules are fully operationalized , 1 new module fully activated and partially updated with data, 3 new modules in development stage. Data collection for all modules is being done continuously.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Development of a strategy to promote road safety for national and provincial roads developed
</narrative></title>
<baseline year="2019" iso-date="2019-05-15" value="None in place"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-15" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The indicator was only partially achieved as the road safety strategy was not developed. However, the road safety action plan was developed.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="A strategy was not developed. However, a Road safety Action plan was developed under the pilot iRAP surveys.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Free Flow travel time for sample project financed roads in selected provinces (kmph)
</narrative></title>
<baseline year="2019" iso-date="2019-05-15" value="Car: 26, Bus: 19, Truck: 21"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-15" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The average speeds of the three vehicle categories in Western, North-Western and Southern Provinces were considered for this indicator. The achievement of the indicator exceeded the target.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Car: 43, Bus: 36, Truck: 34">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of female workers employed in civil works under the project
</narrative></title>
<baseline year="2019" iso-date="2019-05-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-15" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The achievement of this indicator was exceeded compared to the target.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="12.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads rehablitated
</narrative></title>
<baseline year="2019" iso-date="2019-05-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-15" />
<period-end iso-date="2023-09-30" />
<target value="392.00">
<comment><narrative>
&lt;p&amp;gt;The indicator has been substantially achieved compared to the revised target. The slight shortfall is due to the termination of three contracts due to poor performance. However, the critical sections of these roads have been completed.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="385.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Kms of roads covered by new signage and markings to enhance safety
</narrative></title>
<baseline year="2019" iso-date="2019-05-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-15" />
<period-end iso-date="2023-09-30" />
<target value="392.00">
<comment><narrative>
&lt;p&amp;gt;The indicator has been substantially achieved. The slight shortfall is due to termination of three contracts due to poor performance.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="355.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Asset Management Unit created for coordination of asset management activities.
</narrative></title>
<baseline year="2016" iso-date="2016-07-01" value="A separate Asset Management Unit is currently not in place"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-07-01" />
<period-end iso-date="2023-03-31" />
<target value="Asset management unit coordinating asset management contracts and asset management system.">
<comment><narrative>
&lt;p&amp;gt;The achievement of the indicator exceeded the originally expected target;&amp;nbsp;while the Project only envisioned the establishment of an AMU, by Project closure, a formal division dedicated to Road Asset Management was established. The indicator was also achieved earlier than the originally expected timeline.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="The Asset Management Unit (AMU) as envisioned by the Project was established with required staff during the project period. By Project closure, the RDA formally established a separate division for Road Asset Management, with Approval from the Management Services Department of the Ministry of Finance. The Division is headed by a Deputy Director General and the AMU has been absorbed into the division.">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-11-20T15:47:22" hierarchy="1"><iati-identifier>44000-P146314</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Improving Climate Resilience</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0014977"><narrative>Democratic Socialist Republic of Sri Lanka</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="LK-COA-0014978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2014-03-27"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2014-04-22"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2021-04-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2021-04-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Asmita Tiwari</narrative></person-name><telephone>+1-202-473-1000</telephone><email>atiwari1@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="LK" percentage="100"><narrative xml:lang="en">SRI LANKA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001223569" />
            <name><narrative>Wellawaya</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.7263999 81.104599</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001226260" />
            <name><narrative>Trincomalee</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.5711002 81.233498</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001227646" />
            <name><narrative>Somawathie</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.1166697 81.166672</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001228596" />
            <name><narrative>Rikillagaskada</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.1440001 80.783401</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001228730" />
            <name><narrative>Ratnapura</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.6827798 80.39917</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001229462" />
            <name><narrative>Pulmoddai</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.9403 80.981003</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001229901" />
            <name><narrative>Polonnaruwa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.9396501 81.002739</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001230553" />
            <name><narrative>Peradeniya</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.2621999 80.584099</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001235855" />
            <name><narrative>Matale</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.4698 80.621696</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001236696" />
            <name><narrative>Mahiyangana</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.3166699 80.98333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001236854" />
            <name><narrative>Maharagama</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.848 79.926498</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001240723" />
            <name><narrative>Kegalle</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.2522998 80.343597</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001241622" />
            <name><narrative>Kandy</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.2954998 80.635597</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001246000" />
            <name><narrative>Gampola</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.1643 80.569603</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001248423" />
            <name><narrative>Dehiwala</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.8562598 79.861588</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001248991" />
            <name><narrative>Colombo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.9319401 79.847778</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001249170" />
            <name><narrative>Chenkalady</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.7859998 81.591003</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001250161" />
            <name><narrative>Batticaloa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.7101998 81.692398</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001250615" />
            <name><narrative>Badulla</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.9895 81.055702</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001243220" />
            <name><narrative>Illukkumbura</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.5493002 80.768799</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001226796" />
            <name><narrative>Tennekumbura</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.2809 80.653099</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007544254" />
            <name><narrative>Karawanella</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.0258999 80.256599</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001230622" />
            <name><narrative>Pelanegama</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.3508 80.524002</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001227536" />
            <name><narrative>Sungawila</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.0666704 81.099998</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001249605" />
            <name><narrative>Boralesgamuwa South</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.8382001 79.9104</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001229131" />
            <name><narrative>Ragala</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.0047002 80.866096</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001249435" />
            <name><narrative>Bulathkohupitiya</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.1032 80.334396</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001226719" />
            <name><narrative>Thambala</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.0166702 81.083328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001249785" />
            <name><narrative>Bogahawewa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.3169003 80.240097</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001232408" />
            <name><narrative>Padiyatalawa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.4001799 81.242828</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001233497" />
            <name><narrative>Nawalapitiya</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.0534 80.532097</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001245878" />
            <name><narrative>Gangodawila North</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.8648 79.8908</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="74020" percentage="100" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TI" percentage="20.0000000" xml:lang="en"><narrative>FY17 - Rural and Inter-Urban Roads</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WZ" percentage="45.0000000" xml:lang="en"><narrative>FY17 - Other Water Supply, Sanitation and Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="30.0000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TZ" percentage="5.00000000" xml:lang="en"><narrative>FY17 - Other Transportation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000752" percentage="25" xml:lang="en"><narrative>Disaster Risk Reduction</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000331" percentage="25" xml:lang="en"><narrative>Disaster Risk Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="75" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000751" percentage="25" xml:lang="en"><narrative>Disaster Response and Recovery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="25" xml:lang="en"><narrative>Finance for Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000331" percentage="25" xml:lang="en"><narrative>Disaster Risk Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000753" percentage="25" xml:lang="en"><narrative>Disaster Preparedness</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">672368.42</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">672368.42</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">672368.42</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">672368.42</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">672368.42</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">672368.42</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">672368.42</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">672368.42</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">672368.42</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">672368.42</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">672368.42</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">672368.42</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">1833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">1833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">1833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">1833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">1833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">1833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">1833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">1833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">1833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">1833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">1833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">1833333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">896491.23</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">896491.23</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">896491.23</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">896491.23</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">896491.23</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">896491.23</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">896491.23</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">896491.23</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">896491.23</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">896491.23</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">896491.23</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">896491.25</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">110000000</value><description xml:lang="en"><narrative>Total Commitment in April Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">42000000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-3592227</value><description xml:lang="en"><narrative>Total Commitment Cancellations in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-884817</value><description xml:lang="en"><narrative>Total Commitment Cancellations in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">15000000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">3529943</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">6383562</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">5463663</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">2167628</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">3424363</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">2000000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">9410398</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">3509235</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">1012136</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">2698775</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">6608751</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">-175420</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">4498454</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">2109776</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">2768753</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">8243278</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">1289687</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">4023792</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">7014900</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">5115832</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">6243517</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">3000000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">3807482</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">4000000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">2000000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">1168484</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">1085634</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">3000000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">6006250</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">2000000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">1000000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">4000000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">2900000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">1740000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">1809298</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-109581</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-729485</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">-155292</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">-144699</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-201431</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-291277</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-377338</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-25582</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-495447</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-46705</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-560876</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-86331</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-657919</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-149704</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-685959</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-229954</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-725067</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-248831</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-771743</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-312351</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-828781</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-387716</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-875155</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-402342</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-930791</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-641894</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-1434568</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-589042</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-1345673</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-353255</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-854609</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-343859</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-808831</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-341083</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-798233</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-323705</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-764016</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-319536</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-739558</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-354762</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-787699</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-326516</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-729361</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-1635366</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-1626114</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-1608226</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-1679718</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-1702054</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-717635</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-1662102</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-635378</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-1559123</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-596491</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-1541783</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-613226</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-1573053</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-607459</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-1553944</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-613392</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-1550394</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-621545</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-1540166</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-613802</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-1580387</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-632522</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-1594013</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-625530</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-1603092</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14978"><narrative>Ministry of Mahaweli, Agriculture, Irrigation and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P146314"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P146314?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P146314"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of improved distribution canals
</narrative></title>
<baseline year="2014" iso-date="2014-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-01" />
<period-end iso-date="2020-06-30" />
<target value="600.00">
<comment><narrative>
&lt;p&amp;gt;Achievement has exceeded the target because of the additional packages awarded to utilizing the project savings from the appreciation of the US$ against LKR&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="1129.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of improved farm link roads
</narrative></title>
<baseline year="2014" iso-date="2014-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Achievement has exceeded the target because of the additional packages awarded to utilizing&amp;nbsp;the project savings due to appreciation&amp;nbsp;of the US$ against LKR&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="381.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
DEM and hydro-meteorological data for the nine basins collected and compiled for analysis
</narrative></title>
<baseline year="2014" iso-date="2014-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;There was no change to the original indicator or the target which was achieved at the end of the project&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of school children protected from reduced landslide risks in selected schools
</narrative></title>
<baseline year="2014" iso-date="2014-08-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-08-05" />
<period-end iso-date="2019-05-30" />
<target value="29000.00">
<comment><narrative>
&lt;p&amp;gt;The Original indicator at project appraisal was&amp;nbsp;Number of schools&amp;nbsp;protected against landslides and it was changed to&amp;nbsp;Number of school children protected from reduced landslide risks in selected schools when the project was restructured in 2016. The target was achieved by providing protection to 28,801 school children and approximately 500 staff in 18 schools vulnerable to landslide risk.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="28801.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Detailed school landslide stabilization designs completed
</narrative></title>
<baseline year="2014" iso-date="2014-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;NBRO complete all the detailed designs on time&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefitted from reduced weather related transport interruptions
</narrative></title>
<baseline year="2014" iso-date="2014-08-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-08-05" />
<period-end iso-date="2020-06-30" />
<target value="1800000.00">
<comment><narrative>
&lt;p&amp;gt;The scope of the&amp;nbsp;Component 2.2 Transport Continuity was expanded with the Additional Financing in 2016, therefore the original target was revised and the work extended to reduce the transport interruptions in UVa Provincial Roads and the target was increased to 1,220,000 which was later revised to 1,800,000 in 2018 restructuring as new additional bridge improvement packages were awarded to ensure transport continuity utilizing the savings incurred as a result of the appreciation of dollar against the LKR???????&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="1799000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Flood and drought risk models developed
</narrative></title>
<baseline year="2014" iso-date="2014-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The Original target was not changed and achieved at the end of the project&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of roads with transport connectivity ensured
</narrative></title>
<baseline year="2014" iso-date="2014-08-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-08-05" />
<period-end iso-date="2020-06-30" />
<target value="560.00">
<comment><narrative>
&lt;p&amp;gt;The original&amp;nbsp; indicator Length of road side slopes stabilized against landslides was revised to&amp;nbsp;Length of roads with transport connectivity ensured when the project was restructured in 2016 and the length was increased to 410Km from 3.03 Km as additional funding was available, which was formally revised to 560 Km when the project was restructured in 2018. The target was far exceeded at the end due to additional bridges reconstructed or rehabilitated from&amp;nbsp;savings incurred as a result of the appreciation of dollar against the LKR&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="2448.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of schools protected against landslides
</narrative></title>
<baseline year="2014" iso-date="2014-08-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-08-05" />
<period-end iso-date="2019-05-30" />
<target value="18.00">
<comment><narrative>
&lt;p&amp;gt;The Original Indicator Vulnerable school&amp;nbsp;areas protected from landslide was revised to&amp;nbsp;Number of schools protected against landslides when the project was restructured in 2016. The original target 5.85 is&amp;nbsp;Hectares&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="18.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of improved flood drainage canal
</narrative></title>
<baseline year="2014" iso-date="2014-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-01" />
<period-end iso-date="2020-06-30" />
<target value="103.00">
<comment><narrative>
&lt;p&amp;gt;ID expected to improve 778&amp;nbsp; km of flood drainage canals at the inception stage, however, &amp;nbsp; after assessing the&amp;nbsp;changes in the&amp;nbsp; ID&amp;nbsp; activities due to changes in the&amp;nbsp;irrigation schemes selected at the time of restructuring in 2018&amp;nbsp;, the target was revised to 103 km. The revision of the target did not affect the PDO achievement&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="104.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of improved structures in distribution canals
</narrative></title>
<baseline year="2014" iso-date="2014-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-01" />
<period-end iso-date="2020-06-30" />
<target value="6200.00">
<comment><narrative>
&lt;p&amp;gt;Achievement has exceeded the target because of the additional packages awarded to utilizing the project savings from the appreciation of the US$ against LKR&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="10720.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Detailed flood mitigation designs completed
</narrative></title>
<baseline year="2014" iso-date="2014-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The flood mitigation designs were completed on time&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area benefitted with reduced annual crop losses due to weather related events in the selected schemes
</narrative></title>
<baseline year="2014" iso-date="2014-08-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-08-05" />
<period-end iso-date="2020-06-30" />
<target value="113000.00">
<comment><narrative>
&lt;p&amp;gt;&amp;nbsp;&lt;/p&amp;gt;

&lt;p&amp;gt;The original target was reduced to 113,00 in 2018 project restructuring.&amp;nbsp;The new target was set&amp;nbsp;after assessing the&amp;nbsp;the changes in the&amp;nbsp;of ID and MASL activities. There were changes in the&amp;nbsp; irrigation schemes selected by ID and MASL. At project closure, the area benefitted with reduced annual crop losses due to weather related events in the selected schemes exceeded the target.&amp;nbsp;This was achieved by effectively utilizing the&amp;nbsp;&amp;nbsp;the savings incurred as a result of the appreciation of dollar against the LKR.&amp;nbsp;&amp;nbsp;the gains from exchange fluctuations were used to award a large number of new civil works packages to improve the dilapidated structures to reduce the flood and drought risks.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="172491.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries that feel project investments reflect their needs
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;??????????????This is a new indicator added when the project was restructured following AF in 2016 to measure Citizen Engagement&lt;/p&amp;gt;

&lt;ul&amp;gt;
 &lt;li&amp;gt;Overall assessment of citizen engagement = 70.6%&lt;/li&amp;gt;
 &lt;li&amp;gt;Citizen engagement in irrigation subprojects =72.4%&lt;/li&amp;gt;
 &lt;li&amp;gt;Citizen engagement in road subprojects = 68.2%&lt;/li&amp;gt;
 &lt;li&amp;gt;Citizen engagement in school subproject =72.7%&lt;/li&amp;gt;
&lt;/ul&amp;gt;

&lt;p&amp;gt;These figures were obtained based on the Citizen Engagement assessment study conducted by independent consultant hired for the GoSL ICR by PMU&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="70.60">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of MIWRM staff trained in modeling climate risks
</narrative></title>
<baseline year="2014" iso-date="2014-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-01" />
<period-end iso-date="2020-06-30" />
<target value="40.00">
<comment><narrative>
&lt;p&amp;gt;The indicator target was revised when the project was restructured in 2018 as there were more training opportunities&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="72.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Detailed road side slope stabilization and bridge designs completed
</narrative></title>
<baseline year="2014" iso-date="2014-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;All designs were completed on time&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Local flood risk analyses and modeling to support immediate mitigation
</narrative></title>
<baseline year="2014" iso-date="2014-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of rehabilitated flood bund
</narrative></title>
<baseline year="2014" iso-date="2014-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-01" />
<period-end iso-date="2020-06-30" />
<target value="45.00">
<comment><narrative>
&lt;p&amp;gt;ID expected to improve 399&amp;nbsp;km of flood bunds at the inception stage, however, &amp;nbsp;after assessing the&amp;nbsp; changes in the&amp;nbsp; ID&amp;nbsp; activities due to changes in the&amp;nbsp;irrigation schemes selected at the time of restructuring in 2018&amp;nbsp;, the target was revised to 45 km. The revision of the target did not affect the PDO achievement&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="47.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of risk mitigation feasibility studies developed
</narrative></title>
<baseline year="2014" iso-date="2014-08-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-08-05" />
<period-end iso-date="2020-06-30" />
<target value="10.00">
<comment><narrative>
&lt;p&amp;gt;The Original Indicator at appraisal was strategic environmental assessment&amp;nbsp;developed (target was 1),&amp;nbsp;which was changedto&amp;nbsp;Number of risk mitigation feasibility studies developed, when the project was restructure with AF in 2016. The target of the Feasibility Studies (FS) was revised &amp;nbsp;to 10 from 15 in the second restructuring in 2018 considering the identified investments and information available under BIPs at the time of restructuring. However, only 8 feasibility studies were identified from the pre feasibility studies and at the end completed only 7 feasibility studies.&lt;/p&amp;gt;

&lt;p&amp;gt;FS completed for Kelani flood mitigation, Wee oya, Gampaha-Jaela city flood, Anuradhapura city floods, Kandekaduwa diversion, Mundeniary and Ambatale salinity barrier;&lt;/p&amp;gt;

&lt;p&amp;gt;UpperDaraniyagala FS was not awarded due to the decision taken by ministers of the cabinet in 2020&lt;/p&amp;gt;

&lt;p&amp;gt;The Project has completed 4&amp;nbsp;Strategic Environmental Assessments (SEA) and 4 Strategic Social Assessments (SSA) for the proposed investment plans&amp;nbsp;for four river basins (Kelani, Mahaweli, Attanagalu and Mundeni Aru river basins under BIP component )&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="7.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Development of basin investment plans that are based on integrated understanding of climate risk
</narrative></title>
<baseline year="2014" iso-date="2014-08-05" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-08-05" />
<period-end iso-date="2019-05-30" />
<target value="10.00">
<comment><narrative>
&lt;p&amp;gt;The number was increased to 10 as the client also prioritized Malwathu Oya River Basin as it is increasingly flood&amp;nbsp;prone&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="10.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of improved culverts and small bridges
</narrative></title>
<baseline year="2014" iso-date="2014-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-01" />
<period-end iso-date="2020-06-30" />
<target value="460.00">
<comment><narrative>
&lt;p&amp;gt;Achievement has exceeded the target because of the additional packages awarded to utilize the project savings from appreciation of the US$ against LKR&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="640.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of bridges raised and causeways replaced
</narrative></title>
<baseline year="2014" iso-date="2014-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-01" />
<period-end iso-date="2020-06-30" />
<target value="16.00">
<comment><narrative>
&lt;p&amp;gt;The target of 16 bridges were initially identified and prioritized by RDA. However, another&amp;nbsp;15 new bridges were constructedwith the project&amp;nbsp;savings incurred as a result of the appreciation of dollar against the LKR under the RDA sub component. In addition MASL constructed two bridges and Uva constructed another 2 bridges while the CERC component completed another 3 bridges making the total number of bridges 38.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="38.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of improved spill tail canal
</narrative></title>
<baseline year="2014" iso-date="2014-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-01" />
<period-end iso-date="2020-06-30" />
<target value="70.00">
<comment><narrative>
&lt;p&amp;gt;ID expected to improve 173 km of spill tail canals at the inception stage, however, after assessing the&amp;nbsp;changes in the&amp;nbsp; ID&amp;nbsp; activities due to changes in the&amp;nbsp;irrigation schemes selected at the time of restructuring in 2018&amp;nbsp;, the target was revised&amp;nbsp;to 70 km. The revision of the target did not affect the PDO achievement&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="70.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-11-20T15:47:22" hierarchy="1"><iati-identifier>44000-P147454</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>CATASTROPHE DEFERRED DRAWDOWN OPTION (DPL with DDO)</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0016241"><narrative>Department of National Planning, Ministry of Policy Planning and Economic Affair</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0016241"><narrative>Department of National Planning, Ministry of Policy Planning and Economic Affair</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0016243"><narrative>Ministry of Finance</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0016243"><narrative>Ministry of Finance</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="LK-COA-0016242"><narrative>Ministry of Disaster Management</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2014-03-27"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2014-04-22"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2017-05-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2017-05-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Suranga Sooriya Kumara Kahandawa</narrative></person-name><telephone>+1-202-473-1000</telephone><email>skahandawa@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>







<recipient-country code="LK" percentage="100"><narrative xml:lang="en">SRI LANKA</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="1248991" />
                <name><narrative>Colombo</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>6.93548 79.848679</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="74020" percentage="83" xml:lang="en"/><sector vocabulary="1" code="15126" percentage="17" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="FL" percentage="40.0000000" xml:lang="en"><narrative>FY17 - Other Non-bank Financial Institutions</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="60.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000751" percentage="25" xml:lang="en"><narrative>Disaster Response and Recovery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000331" percentage="25" xml:lang="en"><narrative>Disaster Risk Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000753" percentage="25" xml:lang="en"><narrative>Disaster Preparedness</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000751" percentage="25" xml:lang="en"><narrative>Disaster Response and Recovery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000752" percentage="25" xml:lang="en"><narrative>Disaster Risk Reduction</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000752" percentage="25" xml:lang="en"><narrative>Disaster Risk Reduction</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="100" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="25" xml:lang="en"><narrative>Finance for Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="100" xml:lang="en"><narrative>Adaptation</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">102000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">102000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">102000000</value><description xml:lang="en"><narrative>Total Commitment in April Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16242"><narrative>Ministry of Disaster Management</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">510000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16242"><narrative>Ministry of Disaster Management</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">101490000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16242"><narrative>Ministry of Disaster Management</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">-510000</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16242"><narrative>Ministry of Disaster Management</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">-3029</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16242"><narrative>Ministry of Disaster Management</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">-2450</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16242"><narrative>Ministry of Disaster Management</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-2965</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16242"><narrative>Ministry of Disaster Management</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-333249</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16242"><narrative>Ministry of Disaster Management</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-958998</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16242"><narrative>Ministry of Disaster Management</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-1057553</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16242"><narrative>Ministry of Disaster Management</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-1100508</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16242"><narrative>Ministry of Disaster Management</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-1516372</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16242"><narrative>Ministry of Disaster Management</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-1606461</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16242"><narrative>Ministry of Disaster Management</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-1463054</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16242"><narrative>Ministry of Disaster Management</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-1108475</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16242"><narrative>Ministry of Disaster Management</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-567239</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16242"><narrative>Ministry of Disaster Management</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-372604</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16242"><narrative>Ministry of Disaster Management</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-352717</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16242"><narrative>Ministry of Disaster Management</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-347578</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16242"><narrative>Ministry of Disaster Management</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-1336262</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16242"><narrative>Ministry of Disaster Management</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-1257923</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16242"><narrative>Ministry of Disaster Management</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-1246449</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16242"><narrative>Ministry of Disaster Management</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-1265254</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16242"><narrative>Ministry of Disaster Management</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-1218158</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16242"><narrative>Ministry of Disaster Management</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-1132558</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16242"><narrative>Ministry of Disaster Management</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-1087415</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16242"><narrative>Ministry of Disaster Management</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-1004398</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16242"><narrative>Ministry of Disaster Management</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-2998800</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16242"><narrative>Ministry of Disaster Management</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-2998800</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16242"><narrative>Ministry of Disaster Management</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-2998800</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16242"><narrative>Ministry of Disaster Management</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-2998800</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16242"><narrative>Ministry of Disaster Management</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-2998800</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16242"><narrative>Ministry of Disaster Management</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-2998800</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16242"><narrative>Ministry of Disaster Management</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-2998800</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16242"><narrative>Ministry of Disaster Management</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-2998800</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16242"><narrative>Ministry of Disaster Management</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-2998800</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16242"><narrative>Ministry of Disaster Management</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-2998800</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16242"><narrative>Ministry of Disaster Management</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-2998800</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16242"><narrative>Ministry of Disaster Management</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-2998800</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16242"><narrative>Ministry of Disaster Management</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-2998800</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16242"><narrative>Ministry of Disaster Management</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-2998800</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16242"><narrative>Ministry of Disaster Management</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-2998800</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16242"><narrative>Ministry of Disaster Management</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-2998800</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16242"><narrative>Ministry of Disaster Management</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-2998800</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16242"><narrative>Ministry of Disaster Management</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-2998800</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16242"><narrative>Ministry of Disaster Management</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-2998800</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16242"><narrative>Ministry of Disaster Management</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P147454"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P147454?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P147454"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Geospatial data sharing platform established to share disaster risk information amongst relevant stakeholders
</narrative></title>
<baseline year="2014" iso-date="2014-09-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-01" />
<period-end iso-date="2016-12-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Fiscal disaster risk assessment completed
</narrative></title>
<baseline year="2014" iso-date="2014-09-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-01" />
<period-end iso-date="2014-12-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
National Disaster Risk Financing and Insurance strategy
</narrative></title>
<baseline year="2014" iso-date="2014-09-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-01" />
<period-end iso-date="2017-07-10" />
<target value="100.00">

</target>
<actual value="40.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
9 basin-wide risk mitigation investment plans developed
</narrative></title>
<baseline year="2014" iso-date="2014-09-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-01" />
<period-end iso-date="2017-07-10" />
<target value="9.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Approval of a national monitoring framework to measure implementation of the Comprehensive Disaster Management Plan
</narrative></title>
<baseline year="2014" iso-date="2014-09-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-01" />
<period-end iso-date="2014-12-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-11-20T15:47:22" hierarchy="1"><iati-identifier>44000-P147827</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>LK Water and Sanitation Improvement Proj</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0016657"><narrative>Democratic Socialist Republic of Sri Lanka</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="LK-COA-0016656"><narrative>National Water Supply and Drainage Board</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2015-05-19"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2015-06-24"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2025-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2025-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Amelia Midgley</narrative></person-name><telephone>+1-202-473-1000</telephone><email>amidgley@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>




<recipient-country code="LK" percentage="100"><narrative xml:lang="en">SRI LANKA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001228729" />
            <name><narrative>Ratnapura District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.5831 80.5833</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001232781" />
            <name><narrative>Nuwara Eliya District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.9785 80.7133</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001234392" />
            <name><narrative>Mullaitivu District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.25 80.5499</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001240371" />
            <name><narrative>Kilinochchi District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.39487 80.40894</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001240722" />
            <name><narrative>Kegalle District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.1167 80.3333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001250614" />
            <name><narrative>Badulla District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.98472 81.05639</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="14021" percentage="90" xml:lang="en"/><sector vocabulary="1" code="14010" percentage="10" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WA" percentage="46.0000000" xml:lang="en"><narrative>FY17 - Sanitation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WC" percentage="46.0000000" xml:lang="en"><narrative>FY17 - Water Supply</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WF" percentage="8.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Water, Sanitation and Waste Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="5" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="45" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="5" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000723" percentage="45" xml:lang="en"><narrative>Rural Infrastructure and service delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="45" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="45" xml:lang="en"><narrative>Urban Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000851" percentage="5" xml:lang="en"><narrative>Water Institutions, Policies and Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="5" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="5" xml:lang="en"><narrative>Public Administration</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">1333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">1333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">1333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">1333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">1333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">1333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">2083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">2083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">2083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">2083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">2916666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">2916666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">2916666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">2916666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">3333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">3333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">3333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">3333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">4166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">4166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">9600000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">14200000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">20800000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">21400000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">24000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">5000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">5000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">6000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">10000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">10000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">8000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">165000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">40000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">-3261</value><description xml:lang="en"><narrative>Total Commitment Cancellations in July Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-2343</value><description xml:lang="en"><narrative>Total Commitment Cancellations in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">9600000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">14200000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">20800000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">21400000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">24000000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">5000000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">5000000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">6000000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">10000000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">10000000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">8000000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">5000000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">100000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">4000000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">5000000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">4000000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">5000000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">290877</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">735086</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">57577</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">116558</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">366303</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">224947</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">26759</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">18673</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">14160960</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">9069868</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">222546</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">165666</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">212237</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">455393</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">41892</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">416353</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">99174</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">384437</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">71476</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">3000000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">9000000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">13510</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">3000000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">1773135</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">156088</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">818489</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">132332</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">306620</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">1327367</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">292954</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">88031</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">16876</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">-52972</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">-92763</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">-94042</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">-268151</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">-500274</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">-657252</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">-815437</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">-881706</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">-921905</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">-1003762</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">-1305696</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-100000</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">-1365021</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">-28811</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-2219244</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-70066</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-2066347</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-176976</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-1554126</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-465756</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-1317001</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-686219</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-1454895</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-1089898</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-1339705</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-1185939</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">-1333105</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-1099875</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-1357845</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-1065572</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-1327880</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">-2785511</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">-2787816</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">-2705238</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-2579869</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-2577912</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-2585312</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-2597244</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-2552362</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-2539476</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">-2641733</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-2650896</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-2648726</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-16658"><narrative>Ministry of Water Supply; National Water Supply and Drainage Board</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P147827"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P147827?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P147827"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Comprehensive sector program prepared and approved by Ministry
</narrative></title>
<baseline year="2015" iso-date="2015-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-09-30" />
<period-end iso-date="2025-06-30" />
<target value="1.00">

</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New piped household water connections that are resulting from the project intervention (Rural)
</narrative></title>
<baseline year="2015" iso-date="2015-06-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-24" />
<period-end iso-date="2025-06-30" />
<target value="57,400.00">
<comment><narrative>
93% of target achieved.
</narrative></comment>
</target>
<actual value="53,603">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people in urban areas provided with access to Improved Water Sources under the project
</narrative></title>
<baseline year="2015" iso-date="2015-06-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-24" />
<period-end iso-date="2025-06-30" />
<target value="240,260.00">
<comment><narrative>
100% of target achieved.
</narrative></comment>
</target>
<actual value="240496">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Fully functioning CBOs
</narrative></title>
<baseline year="2015" iso-date="2015-06-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-24" />
<period-end iso-date="2025-06-30" />
<target value="100.00">
<comment><narrative>
100% of target of achieved.
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to Improved Sanitation (Rural)
</narrative></title>
<baseline year="2015" iso-date="2015-06-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-24" />
<period-end iso-date="2025-06-30" />
<target value="64,000.00">

</target>
<actual value="54,556.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Schools provided with access to improved sanitation
</narrative></title>
<baseline year="2019" iso-date="2019-02-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-02-25" />
<period-end iso-date="2025-06-30" />
<target value="54.00">

</target>
<actual value="53">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of other water service providers that the project is supporting
</narrative></title>
<baseline year="2015" iso-date="2015-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-15" />
<period-end iso-date="2025-06-15" />
<target value="5991">

</target>
<actual value="5991">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="2015" iso-date="2015-06-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-24" />
<period-end iso-date="2025-06-30" />
<target value="1,144,500.00">
<comment><narrative>
89% of target achieved
</narrative></comment>
</target>
<actual value="1018027">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
DNCWS organizational structure designed and approved by Ministry
</narrative></title>
<baseline year="2015" iso-date="2015-06-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-24" />
<period-end iso-date="2025-06-30" />
<target value="1.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of CBOs visited and evaluated by DNCWS
</narrative></title>
<baseline year="2015" iso-date="2015-06-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-24" />
<period-end iso-date="2025-06-30" />
<target value="1,405.00">
<comment><narrative>
Will be determined after completion of baseline surveys
</narrative></comment>
</target>
<actual value="1,437.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
New CBOs established under additional financing with at least one woman in a leadership position
</narrative></title>
<baseline year="2021" iso-date="2021-05-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-05-13" />
<period-end iso-date="2025-06-30" />
<target value="100.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to &quot;improved sanitation facilities” under the proj.
</narrative></title>
<baseline year="2015" iso-date="2015-06-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-24" />
<period-end iso-date="2025-06-30" />
<target value="203,100.00">
<comment><narrative>
101% of target achieved.
</narrative></comment>
</target>
<actual value="205,128">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to Improved Water Sources (Rural + Estates)
</narrative></title>
<baseline year="2015" iso-date="2015-06-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-24" />
<period-end iso-date="2025-06-30" />
<target value="455,200.00">
<comment><narrative>
112% of target achieved.
</narrative></comment>
</target>
<actual value="510,094">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people in urban areas provided with access to Improved Water Sources under the project
</narrative></title>
<baseline year="2015" iso-date="2015-06-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-24" />
<period-end iso-date="2025-06-30" />
<target value="240,260.00">
<comment><narrative>
100% of target achieved.
</narrative></comment>
</target>
<actual value="240496">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Fully functioning CBOs
</narrative></title>
<baseline year="2015" iso-date="2015-06-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-24" />
<period-end iso-date="2025-06-30" />
<target value="100.00">
<comment><narrative>
100% of target of achieved.
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Rural M&amp;E system established, populated and used in decision making
</narrative></title>
<baseline year="2015" iso-date="2015-06-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-24" />
<period-end iso-date="2025-06-30" />
<target value="100.00">
<comment><narrative>
100% of target achieved.
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="2015" iso-date="2015-06-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-24" />
<period-end iso-date="2025-06-30" />
<target value="1,144,500.00">
<comment><narrative>
89% of target achieved
</narrative></comment>
</target>
<actual value="1018027">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of grievances registered related to project delivery that have been redressed
</narrative></title>
<baseline year="2015" iso-date="2015-06-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-24" />
<period-end iso-date="2025-06-30" />
<target value="95.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Piped household water connections that are benefiting from rehabilitation works undertaken by the project
</narrative></title>
<baseline year="2015" iso-date="2015-06-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-24" />
<period-end iso-date="2025-06-30" />
<target value="48,500.00">
<comment><narrative>
Number of piped household water connections benefiting from rehabilitation works. This indicator is measured as the number of piped household water connections benefiting from rehabilitation works. Rehabilitation works are undertaken so that existing customers see the quantity and/or quality of their water supply services enhanced.
</narrative></comment>
</target>
<actual value="64,563">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New piped household water connections resulting from project intervention (Estates)
</narrative></title>
<baseline year="2015" iso-date="2015-06-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-24" />
<period-end iso-date="2025-06-30" />
<target value="8,050.00">

</target>
<actual value="7486">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People trained to improve hygiene behavior/sanitation practices under the proj
</narrative></title>
<baseline year="2015" iso-date="2015-06-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-24" />
<period-end iso-date="2025-06-30" />
<target value="203,800.00">
<comment><narrative>
This indicator measures the cumulative number of people who have participated in a training activity to conduct improved hygiene behavior or sanitation practices.  This does not include people who have been educated and/or informed through public information or mass publication campaigns.    The baseline value for this indicator is expected to be zero.
</narrative></comment>
</target>
<actual value="215,326">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New piped household water connections that are resulting from the project intervention (Urban)
</narrative></title>
<baseline year="2015" iso-date="2015-06-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-24" />
<period-end iso-date="2025-06-30" />
<target value="57,850.00">
<comment><narrative>
104% of target achieved.
</narrative></comment>
</target>
<actual value="60,124">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Households gaining access to safe disposal of fecal sludge in urban areas contributing to reductions in GHG emissions
</narrative></title>
<baseline year="2015" iso-date="2015-06-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-24" />
<period-end iso-date="2025-06-30" />
<target value="80,500.00">
<comment><narrative>
Service area of septage plants
</narrative></comment>
</target>
<actual value="31,500">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to Improved Water Sources (Rural + Estates)
</narrative></title>
<baseline year="2015" iso-date="2015-06-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-24" />
<period-end iso-date="2025-06-30" />
<target value="455,200.00">
<comment><narrative>
112% of target achieved.
</narrative></comment>
</target>
<actual value="510,094">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to &quot;improved sanitation facilities” under the proj.
</narrative></title>
<baseline year="2015" iso-date="2015-06-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-24" />
<period-end iso-date="2025-06-30" />
<target value="203,100.00">
<comment><narrative>
101% of target achieved.
</narrative></comment>
</target>
<actual value="205,128">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to Improved Water Sources (Rural + Estates)
</narrative></title>
<baseline year="2015" iso-date="2015-06-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-24" />
<period-end iso-date="2025-06-30" />
<target value="455,200.00">
<comment><narrative>
112% of target achieved.
</narrative></comment>
</target>
<actual value="510,094">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people in urban areas provided with access to Improved Water Sources under the project
</narrative></title>
<baseline year="2015" iso-date="2015-06-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-24" />
<period-end iso-date="2025-06-30" />
<target value="240,260.00">
<comment><narrative>
100% of target achieved.
</narrative></comment>
</target>
<actual value="240496">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Fully functioning CBOs
</narrative></title>
<baseline year="2015" iso-date="2015-06-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-24" />
<period-end iso-date="2025-06-30" />
<target value="100.00">
<comment><narrative>
100% of target of achieved.
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Rural M&amp;E system established, populated and used in decision making
</narrative></title>
<baseline year="2015" iso-date="2015-06-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-24" />
<period-end iso-date="2025-06-30" />
<target value="100.00">
<comment><narrative>
100% of target achieved.
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="2015" iso-date="2015-06-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-24" />
<period-end iso-date="2025-06-30" />
<target value="1,144,500.00">
<comment><narrative>
89% of target achieved
</narrative></comment>
</target>
<actual value="1018027">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to improved sanitation outside water supply service areas
</narrative></title>
<baseline year="2019" iso-date="2019-02-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-02-25" />
<period-end iso-date="2025-06-30" />
<target value="127,000.00">

</target>
<actual value="141,437">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Sanitation units for differently abled beneficiaries and indigenous communities
</narrative></title>
<baseline year="2019" iso-date="2019-02-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-02-25" />
<period-end iso-date="2025-06-30" />
<target value="660.00">

</target>
<actual value="617.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People trained in improved hygiene behavior or sanitation practices (Estates)
</narrative></title>
<baseline year="2015" iso-date="2015-06-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-24" />
<period-end iso-date="2025-06-30" />
<target value="45,600.00">
<comment><narrative>
From each household, minimum two heads of HH are trained
</narrative></comment>
</target>
<actual value="69,604">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to &quot;improved sanitation facilities” under the proj.
</narrative></title>
<baseline year="2015" iso-date="2015-06-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-24" />
<period-end iso-date="2025-06-30" />
<target value="203,100.00">
<comment><narrative>
101% of target achieved.
</narrative></comment>
</target>
<actual value="205,128">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to Improved Sanitation - Estates
</narrative></title>
<baseline year="2015" iso-date="2015-06-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-24" />
<period-end iso-date="2025-06-30" />
<target value="12,080.00">

</target>
<actual value="9,135">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Rural M&amp;E system established, populated and used in decision making
</narrative></title>
<baseline year="2015" iso-date="2015-06-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-24" />
<period-end iso-date="2025-06-30" />
<target value="100.00">
<comment><narrative>
100% of target achieved.
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-11-20T15:47:22" hierarchy="1"><iati-identifier>44000-P151916</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Early Childhood Development Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0021146"><narrative>Democratic Socialist Republic of Sri Lanka</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="LK-COA-0021145"><narrative>Ministry of Women and Child Affairs and Social Empowerment (MWCASE)</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2015-09-30"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2015-06-24"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2023-06-15"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2023-06-15"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Shobhana Sosale</narrative></person-name><telephone>+1-202-473-1000</telephone><email>ssosale@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="LK" percentage="100"><narrative xml:lang="en">SRI LANKA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001223421" />
            <name><narrative>Western Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.83333 80.08333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001225265" />
            <name><narrative>Province of Uva</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.98472 81.05639</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001227618" />
            <name><narrative>Southern Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.16667 80.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001228435" />
            <name><narrative>Province of Sabaragamuwa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.75 80.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001232860" />
            <name><narrative>North Western Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.75 80.16667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001232870" />
            <name><narrative>North Central Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.33333 80.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001249296" />
            <name><narrative>Central Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.33333 80.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007671049" />
            <name><narrative>Northern Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.16667 80.41667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0008133521" />
            <name><narrative>Eastern Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.60614 81.20201</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="11240" percentage="84" xml:lang="en"/><sector vocabulary="1" code="12240" percentage="16" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EF" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EC" percentage="90.0000000" xml:lang="en"><narrative>FY17 - Early Childhood Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000651" percentage="45" xml:lang="en"><narrative>Access to Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="90" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000636" percentage="3" xml:lang="en"><narrative>Adolescent Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000652" percentage="45" xml:lang="en"><narrative>Education Financing</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000636" percentage="3" xml:lang="en"><narrative>Adolescent Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000632" percentage="5" xml:lang="en"><narrative>Health Service Delivery</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">3333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">3333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">2333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">2000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">2000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">2000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2023-06-15"/>
<value currency="USD" value-date="2023-06-15">10723911.04</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2023-06-15"/>
<value currency="USD" value-date="2023-06-15">10723911.04</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">50000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-21145"><narrative>Ministry of Women and Child Affairs and Social Empowerment (MWCASE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-5000000</value><description xml:lang="en"><narrative>Total Commitment Cancellations in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-21145"><narrative>Ministry of Women and Child Affairs and Social Empowerment (MWCASE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-5172442</value><description xml:lang="en"><narrative>Total Commitment Cancellations in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-21145"><narrative>Ministry of Women and Child Affairs and Social Empowerment (MWCASE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">1454000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-21145"><narrative>Ministry of Women and Child Affairs and Social Empowerment (MWCASE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">4475441</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-21145"><narrative>Ministry of Women and Child Affairs and Social Empowerment (MWCASE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">6875213</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-21145"><narrative>Ministry of Women and Child Affairs and Social Empowerment (MWCASE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">3000000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-21145"><narrative>Ministry of Women and Child Affairs and Social Empowerment (MWCASE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">3000000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-21145"><narrative>Ministry of Women and Child Affairs and Social Empowerment (MWCASE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">1500000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-21145"><narrative>Ministry of Women and Child Affairs and Social Empowerment (MWCASE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">4000000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-21145"><narrative>Ministry of Women and Child Affairs and Social Empowerment (MWCASE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">3000000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-21145"><narrative>Ministry of Women and Child Affairs and Social Empowerment (MWCASE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">1613609</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-21145"><narrative>Ministry of Women and Child Affairs and Social Empowerment (MWCASE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">2056872</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-21145"><narrative>Ministry of Women and Child Affairs and Social Empowerment (MWCASE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">5000000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-21145"><narrative>Ministry of Women and Child Affairs and Social Empowerment (MWCASE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">3821193</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-21145"><narrative>Ministry of Women and Child Affairs and Social Empowerment (MWCASE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">496623</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-21145"><narrative>Ministry of Women and Child Affairs and Social Empowerment (MWCASE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-1012182</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-21145"><narrative>Ministry of Women and Child Affairs and Social Empowerment (MWCASE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-4679</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-21145"><narrative>Ministry of Women and Child Affairs and Social Empowerment (MWCASE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">-10555</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-21145"><narrative>Ministry of Women and Child Affairs and Social Empowerment (MWCASE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">-13935</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-21145"><narrative>Ministry of Women and Child Affairs and Social Empowerment (MWCASE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">-40823</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-21145"><narrative>Ministry of Women and Child Affairs and Social Empowerment (MWCASE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">-62172</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-21145"><narrative>Ministry of Women and Child Affairs and Social Empowerment (MWCASE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">-95493</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-21145"><narrative>Ministry of Women and Child Affairs and Social Empowerment (MWCASE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">-125272</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-21145"><narrative>Ministry of Women and Child Affairs and Social Empowerment (MWCASE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">-126319</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-21145"><narrative>Ministry of Women and Child Affairs and Social Empowerment (MWCASE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">-157155</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-21145"><narrative>Ministry of Women and Child Affairs and Social Empowerment (MWCASE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">-195732</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-21145"><narrative>Ministry of Women and Child Affairs and Social Empowerment (MWCASE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">-221521</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-21145"><narrative>Ministry of Women and Child Affairs and Social Empowerment (MWCASE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">-296886</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-21145"><narrative>Ministry of Women and Child Affairs and Social Empowerment (MWCASE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">-299302</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-21145"><narrative>Ministry of Women and Child Affairs and Social Empowerment (MWCASE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-508350</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-21145"><narrative>Ministry of Women and Child Affairs and Social Empowerment (MWCASE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-468289</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-21145"><narrative>Ministry of Women and Child Affairs and Social Empowerment (MWCASE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-391657</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-21145"><narrative>Ministry of Women and Child Affairs and Social Empowerment (MWCASE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-315683</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-21145"><narrative>Ministry of Women and Child Affairs and Social Empowerment (MWCASE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-336621</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-21145"><narrative>Ministry of Women and Child Affairs and Social Empowerment (MWCASE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-309179</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-21145"><narrative>Ministry of Women and Child Affairs and Social Empowerment (MWCASE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">-307541</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-21145"><narrative>Ministry of Women and Child Affairs and Social Empowerment (MWCASE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-313248</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-21145"><narrative>Ministry of Women and Child Affairs and Social Empowerment (MWCASE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-306336</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-21145"><narrative>Ministry of Women and Child Affairs and Social Empowerment (MWCASE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">-844669</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-21145"><narrative>Ministry of Women and Child Affairs and Social Empowerment (MWCASE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">-845368</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-21145"><narrative>Ministry of Women and Child Affairs and Social Empowerment (MWCASE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">-820328</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-21145"><narrative>Ministry of Women and Child Affairs and Social Empowerment (MWCASE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-782311</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-21145"><narrative>Ministry of Women and Child Affairs and Social Empowerment (MWCASE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-781718</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-21145"><narrative>Ministry of Women and Child Affairs and Social Empowerment (MWCASE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-783962</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-21145"><narrative>Ministry of Women and Child Affairs and Social Empowerment (MWCASE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-696591</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-21145"><narrative>Ministry of Women and Child Affairs and Social Empowerment (MWCASE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-684554</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-21145"><narrative>Ministry of Women and Child Affairs and Social Empowerment (MWCASE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-585845</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-21145"><narrative>Ministry of Women and Child Affairs and Social Empowerment (MWCASE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">-609435</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-21145"><narrative>Ministry of Women and Child Affairs and Social Empowerment (MWCASE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-611549</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-21145"><narrative>Ministry of Women and Child Affairs and Social Empowerment (MWCASE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-611049</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-21145"><narrative>Ministry of Women and Child Affairs and Social Empowerment (MWCASE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P151916"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P151916?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P151916"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Development of ECD Curriculum Guideline and Monitoring Framework
</narrative></title>
<baseline year="2021" iso-date="2021-09-30" value="Draft curriculum tabled to the National ECD committee."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-30" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="Curriculum Framework approved and teacher training completed.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
ECD centers established in unserved/ underserved areas
</narrative></title>
<baseline year="2015" iso-date="2015-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-01-01" />
<period-end iso-date="2023-06-15" />
<target value="191.00">
<comment><narrative>
&lt;p&amp;gt;Non Plantation = 31&lt;/p&amp;gt;

&lt;p&amp;gt;Plantation = 125&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="156.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Children ECD morning meal program
</narrative></title>
<baseline year="2022" iso-date="2022-11-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-30" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The indicator was introduced following the 2022 economic crisis in Sri Lanka. The Morning Meal Program (MMP) was to alleviate the problem of food and fuel crisis for vulnerable children, and to facilitate their continued attendance at the ECD Centers.&lt;/p&amp;gt;

&lt;p&amp;gt;Non Plantation = 86,211&lt;/p&amp;gt;

&lt;p&amp;gt;Plantation = 23,386&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="109597.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Students benefiting from direct interventions to enhance learning
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;This was a newly introduced Corporate Indicator that became mandatory to track after project implementation commenced.&lt;/p&amp;gt;

&lt;p&amp;gt;&amp;nbsp;&lt;/p&amp;gt;

&lt;p&amp;gt;&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="1913805.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
ECD centers receiving facility improvement grants
</narrative></title>
<baseline year="2015" iso-date="2015-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-01-01" />
<period-end iso-date="2023-06-15" />
<target value="7500.00">

</target>
<actual value="6637.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Beneficiary feedback survey from Provinces through Social Audits
</narrative></title>
<baseline year="2015" iso-date="2015-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The indicator was labelled originally as: Community monitoring, evaluation and&amp;nbsp;oversight in Provinces through social audits (Text, Custom).&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Social audit final Report received.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Children enrolled in ECD centers
</narrative></title>
<baseline year="2015" iso-date="2015-01-01" value="512620.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="657520.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Awareness programs conducted by SMWCD, PCs and ECD  centers
</narrative></title>
<baseline year="2015" iso-date="2015-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-01-01" />
<period-end iso-date="2023-06-15" />
<target value="2550.00">

</target>
<actual value="4045.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
ECD teachers and teacher assistants completing standardized short-term training
</narrative></title>
<baseline year="2015" iso-date="2015-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-01-01" />
<period-end iso-date="2023-06-15" />
<target value="20000.00">
<comment><narrative>
&lt;p&amp;gt;Non Plantation = 19,499&lt;/p&amp;gt;

&lt;p&amp;gt;Plantation = 611&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="21492.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
ECD centers conducting annual child development assessments
</narrative></title>
<baseline year="2015" iso-date="2015-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-01-01" />
<period-end iso-date="2021-05-18" />
<target value="7500.00">
<comment><narrative>
&lt;p&amp;gt;Non Plantation = 10,423&lt;/p&amp;gt;

&lt;p&amp;gt;Plantation = 620&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="11043.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Children receiving tuition fee support through the project
</narrative></title>
<baseline year="2015" iso-date="2015-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-01-01" />
<period-end iso-date="2021-05-18" />
<target value="53475.00">

</target>
<actual value="57778.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Establishment and utilization of M &amp; E system
</narrative></title>
<baseline year="2015" iso-date="2015-01-01" value="No M&amp;E system exists"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="The M&amp;E system is functional. Regular data processing is ongoing, as also performance tracking.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of project beneficiaries
</narrative></title>
<baseline year="2015" iso-date="2015-01-01" value="520000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="1686218.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
ECD centers aligned with national quality standards
</narrative></title>
<baseline year="2015" iso-date="2015-01-01" value="1000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-01-01" />
<period-end iso-date="2021-05-18" />
<target value="6000.00">
<comment><narrative>
&lt;p&amp;gt;Non Plantation = 7,961&lt;/p&amp;gt;

&lt;p&amp;gt;Plantation = 695&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="7961.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-11-20T15:47:22" hierarchy="1"><iati-identifier>44000-P156019</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Sri Lanka Agriculture Sector Modernization Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0025512"><narrative>Ministry of Finance</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0025512"><narrative>Ministry of Finance</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="LK-COA-0025511"><narrative>Ministry of Plantation Industries</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2016-03-30"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2016-06-28"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2024-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2024-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>John C. Keyser</narrative></person-name><telephone>+1-202-473-1000</telephone><email>jkeyser@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>







<recipient-country code="LK" percentage="100"><narrative xml:lang="en">SRI LANKA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001225265" />
            <name><narrative>Province of Uva</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.98472 81.05639</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001229899" />
            <name><narrative>Polonnaruwa District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8 81</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001232870" />
            <name><narrative>North Central Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.33333 80.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001234392" />
            <name><narrative>Mullaitivu District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.25 80.5499</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001235845" />
            <name><narrative>Matara District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.1329 80.528</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001235854" />
            <name><narrative>Matale District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.6598 80.7073</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001240371" />
            <name><narrative>Kilinochchi District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.39487 80.40894</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001241621" />
            <name><narrative>Kandy District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.3044 80.7073</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001242831" />
            <name><narrative>Jaffna District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.75 80.08333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001249296" />
            <name><narrative>Central Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.33333 80.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001250159" />
            <name><narrative>Batticaloa District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.75 81.4997</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001251080" />
            <name><narrative>Anuradhapura District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.33333 80.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001251460" />
            <name><narrative>Ampara District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.0833 81.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0008133521" />
            <name><narrative>Eastern Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.60614 81.20201</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001227603" />
            <name><narrative>Democratic Socialist Republic of Sri Lanka</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.75 80.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="31182" percentage="28" xml:lang="en"/><sector vocabulary="1" code="32130" percentage="24" xml:lang="en"/><sector vocabulary="1" code="31193" percentage="24" xml:lang="en"/><sector vocabulary="1" code="31110" percentage="10" xml:lang="en"/><sector vocabulary="1" code="31191" percentage="7" xml:lang="en"/><sector vocabulary="1" code="31140" percentage="7" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AZ" percentage="11.0000000" xml:lang="en"><narrative>FY17 - Other Agriculture, Fishing and Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YA" percentage="46.0000000" xml:lang="en"><narrative>FY17 - Agricultural markets, commercialization and agri-business</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AB" percentage="27.0000000" xml:lang="en"><narrative>FY17 - Agricultural Extension, Research, and Other Support Activities</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AI" percentage="6.00000000" xml:lang="en"><narrative>FY17 - Irrigation and Drainage</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AK" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Agriculture, Fishing &amp; Forestry</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000024" percentage="13" xml:lang="en"><narrative>Enterprise Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000024" percentage="13" xml:lang="en"><narrative>Enterprise Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000243" percentage="13" xml:lang="en"><narrative>MSME Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000723" percentage="27" xml:lang="en"><narrative>Rural Infrastructure and service delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000721" percentage="46" xml:lang="en"><narrative>Rural Markets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="73" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="100" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000332" percentage="3" xml:lang="en"><narrative>Agriculture Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000323" percentage="13" xml:lang="en"><narrative>MSME Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="73" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="3" xml:lang="en"><narrative>Finance for Development</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">2720966.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">9960385.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">4916233.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">2274413.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">4801006.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">3880674.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">2000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">2000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">6089562.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">2161495.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">13448798.47</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">13448798.47</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">125000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">-10005390</value><description xml:lang="en"><narrative>Total Commitment Cancellations in July Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-793589</value><description xml:lang="en"><narrative>Total Commitment Cancellations in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">2720966</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">9960385</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">4916233</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">2274413</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">4801006</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">3880674</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">2000000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">2000000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">6089562</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">2161495</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">2260000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">4080000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">2290000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">4725044</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">3073797</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">4000000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-01-31"/><value value-date="2022-01-31">3000000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">5553420</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">88499</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">42621</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">50684</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">2471211</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">63931</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">2500000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">106552</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">5097118</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">3338667</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">71034</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">6066375</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">63931</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">14750</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">3184422</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">106551</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">81049</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">172121</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">3194685</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">1000000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">150735</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">2052547</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">826443</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">6480306</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">4500000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-499899</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">1026604</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">140568</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">-105908</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-505121</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-16269</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">-26586</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">-131972</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">-171528</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">-207708</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">-241056</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">-303177</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">-409159</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">-504266</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">-550360</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-1044938</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-927884</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-793182</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-699297</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-845968</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-880595</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">-948698</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-969439</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-946574</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">-2055428</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-1960173</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-1958686</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-1964308</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-1795064</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-1764044</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-1755181</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">-1825857</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-1832189</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-1815338</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25513"><narrative>Ministry of Agriculture and Plantation Industries; Ministry of Plantation Industries</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P156019"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P156019?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P156019"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of commercial partnerships or market contracts signed between producer groups and domestic/international agribusiness actors (processors, wholesalers, retailers, exporters, etc.)
</narrative></title>
<baseline year="2017" iso-date="2017-06-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-01" />
<period-end iso-date="2024-12-31" />
<target value="105.00">

</target>
<actual value="72">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of project-supported farmer producer organizations under Components 1 and 2 making profit
</narrative></title>
<baseline year="2016" iso-date="2016-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-15" />
<period-end iso-date="2024-12-31" />
<target value="70.00">
<comment><narrative>
C1: Total FPOs = 9; profit making FPOs = 7; share making a profit = 77.7% (no change since last mission).
C2: Due to conversion of FPOs to PUCs, now have 78 FPOs/PUCs (previously had 140 total FPOs/PUCs) of which 24 are making a profit = 30.8% making a profit.
Overall: 87 total FPOs of which 31 are making a profit = 35.6% making a profit.
Decrease since previous mission largely reflects progress with C2 PUC establishment meaning many of the FPOs counted here are brand new businesses and with crops that are still immature.
</narrative></comment>
</target>
<actual value="35.6">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Client days of training provided female under Components 1 and 2
</narrative></title>
<baseline year="2016" iso-date="2016-10-15" value="3,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-15" />
<period-end iso-date="2024-12-31" />
<target value="68,000.00">
<comment><narrative>
C1 = 42,172
C2 = 59,784
</narrative></comment>
</target>
<actual value="101,956">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Targeted clients satisfied with agricultural services - female - (Core)
</narrative></title>
<baseline year="2016" iso-date="2016-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-15" />
<period-end iso-date="2021-10-31" />
<target value="75.00">

</target>
<actual value="90.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Clients who have adopted an improved agr. technology promoted by the project
</narrative></title>
<baseline year="2016" iso-date="2016-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-15" />
<period-end iso-date="2024-12-31" />
<target value="90,500.00">
<comment><narrative>
C1 = 39,536
C2 = 21,745
</narrative></comment>
</target>
<actual value="61,281">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Clients who have adopted an improved agr. technology promoted by the project
</narrative></title>
<baseline year="2016" iso-date="2016-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-15" />
<period-end iso-date="2024-12-31" />
<target value="90,500.00">
<comment><narrative>
C1 = 38,203
C2 = 16,986
</narrative></comment>
</target>
<actual value="55,189">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of new farmer producer organizations registered
</narrative></title>
<baseline year="2016" iso-date="2016-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-15" />
<period-end iso-date="2023-06-30" />
<target value="80.00">

</target>
<actual value="142">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of research reports and policy notes completed
</narrative></title>
<baseline year="2016" iso-date="2016-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-15" />
<period-end iso-date="2024-12-31" />
<target value="20.00">

</target>
<actual value="25">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Small and Cluster Matching Grants approved (Window A)
</narrative></title>
<baseline year="2016" iso-date="2016-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-15" />
<period-end iso-date="2024-12-31" />
<target value="1,000.00">

</target>
<actual value="1,278">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Targeted clients satisfied with agricultural services
</narrative></title>
<baseline year="2016" iso-date="2016-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-15" />
<period-end iso-date="2024-12-31" />
<target value="75.00">
<comment><narrative>
Data are from a survey in early 2021; repeat survey planned for early 2023.
</narrative></comment>
</target>
<actual value="67">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Client days of training provided female under Components 1 and 2
</narrative></title>
<baseline year="2016" iso-date="2016-10-15" value="3,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-15" />
<period-end iso-date="2024-12-31" />
<target value="68,000.00">
<comment><narrative>
C1 = 39,722
C2 = 38,668
</narrative></comment>
</target>
<actual value="78,390">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area provided with new/improved irrigation or drainage services
</narrative></title>
<baseline year="2017" iso-date="2017-06-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-01" />
<period-end iso-date="2024-12-31" />
<target value="10,000.00">

</target>
<actual value="7,627">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of project-supported farmer producer organizations under Components 1 and 2 making profit
</narrative></title>
<baseline year="2016" iso-date="2016-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-15" />
<period-end iso-date="2024-12-31" />
<target value="70.00">
<comment><narrative>
C1: 9 FPOs of which 7 are making a profit (77.7%)

C2: Due to conversion of FPOs to PUCs, now have 79 FPOs/PUCs of which 24 are making a profit (30.4%)

C1 and C2: overall 88 FPOs of which 31 making profit= 35.2%.
</narrative></comment>
</target>
<actual value="35.2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of large matching grants approved (Window B)
</narrative></title>
<baseline year="2016" iso-date="2016-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-15" />
<period-end iso-date="2024-12-31" />
<target value="160.00">

</target>
<actual value="171">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers adopting improved agricultural technology
</narrative></title>
<baseline year="2017" iso-date="2017-06-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-01" />
<period-end iso-date="2024-12-31" />
<target value="26,500.00">

</target>
<actual value="16,986">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of new farmer producer organizations registered
</narrative></title>
<baseline year="2016" iso-date="2016-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-15" />
<period-end iso-date="2023-06-30" />
<target value="80.00">

</target>
<actual value="140">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of research reports and policy notes completed
</narrative></title>
<baseline year="2016" iso-date="2016-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-15" />
<period-end iso-date="2024-12-31" />
<target value="20.00">

</target>
<actual value="11">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of farmer producer organizations functional
</narrative></title>
<baseline year="2016" iso-date="2016-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-15" />
<period-end iso-date="2021-10-31" />
<target value="75.00">
<comment><narrative>
Have registered 140 FOs overall. Of these 82 are FPOs, 58 are PUCs.
Of the 82 FPOs, 62 have been absorbed by PUCs. Of the remaining 20 FPOs 1 is functional, and 19 are non-functional.
Of the 58 PUCs registered by the project, 57 are functional and 1 is non-functional.
Thus 58 of 78 total organizations (excluding FPOs absorbed by PUCs) are functional = 58/78 = 74.4%.
Number has reduced since last mission due to absorption of some FPOs into larger PUCs.
</narrative></comment>
</target>
<actual value="74.4">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Targeted clients satisfied with agricultural services - female - (Core)
</narrative></title>
<baseline year="2016" iso-date="2016-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-15" />
<period-end iso-date="2021-10-31" />
<target value="75.00">

</target>
<actual value="67">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Client days of training provided female under Components 1 and 2
</narrative></title>
<baseline year="2016" iso-date="2016-10-15" value="3,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-15" />
<period-end iso-date="2024-12-31" />
<target value="68,000.00">
<comment><narrative>
As of May 2024: C1 = 38.210; C2 = 38,629.
</narrative></comment>
</target>
<actual value="76,839">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of clusters completed in accordance with cluster development plans
</narrative></title>
<baseline year="2016" iso-date="2016-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-15" />
<period-end iso-date="2024-12-31" />
<target value="33.00">

</target>
<actual value="37">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of Matching Grant recipients operating based on approved business plans
</narrative></title>
<baseline year="2016" iso-date="2016-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-15" />
<period-end iso-date="2024-12-31" />
<target value="80.00">

</target>
<actual value="95.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Training taken by project staff at all levels
</narrative></title>
<baseline year="2016" iso-date="2016-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-15" />
<period-end iso-date="2024-12-31" />
<target value="500.00">
<comment><narrative>
C1 = 231
C2 = 350
</narrative></comment>
</target>
<actual value="581">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in average value of sales of agriculture products due to project interventions (Market Access Indicator)
</narrative></title>
<baseline year="2016" iso-date="2016-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-15" />
<period-end iso-date="2024-12-31" />
<target value="25.00">

</target>
<actual value="44.16">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of clusters completed in accordance with cluster development plans
</narrative></title>
<baseline year="2016" iso-date="2016-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-15" />
<period-end iso-date="2024-12-31" />
<target value="33.00">

</target>
<actual value="6">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of research reports and policy notes completed
</narrative></title>
<baseline year="2016" iso-date="2016-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-15" />
<period-end iso-date="2024-12-31" />
<target value="20.00">

</target>
<actual value="11">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of large matching grants approved (Window B)
</narrative></title>
<baseline year="2016" iso-date="2016-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-15" />
<period-end iso-date="2024-12-31" />
<target value="160.00">

</target>
<actual value="171">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Client days of training provided under Components 1 and 2
</narrative></title>
<baseline year="2016" iso-date="2016-10-15" value="10,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-15" />
<period-end iso-date="2024-12-31" />
<target value="170,000.00">
<comment><narrative>
C1 = 81,768
C2 = 102,400
</narrative></comment>
</target>
<actual value="184,168">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New Jobs generated through investments in agribusiness organizations under the project.
</narrative></title>
<baseline year="2016" iso-date="2016-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-15" />
<period-end iso-date="2024-12-31" />
<target value="10,100.00">
<comment><narrative>
C1 = 7,283
C2 = 126
</narrative></comment>
</target>
<actual value="7409">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of matching grant recipients reporting improved access to markets
</narrative></title>
<baseline year="2017" iso-date="2017-06-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-01" />
<period-end iso-date="2024-12-31" />
<target value="50.00">

</target>
<actual value="90.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers adopting improved agricultural technology
</narrative></title>
<baseline year="2017" iso-date="2017-06-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-01" />
<period-end iso-date="2024-12-31" />
<target value="26,500.00">

</target>
<actual value="14,734">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of Matching Grant recipients operating based on approved business plans
</narrative></title>
<baseline year="2016" iso-date="2016-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-15" />
<period-end iso-date="2024-12-31" />
<target value="80.00">

</target>
<actual value="95.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of commercial partnerships or market contracts signed between producer groups and domestic/international agribusiness actors (processors, wholesalers, retailers, exporters, etc.)
</narrative></title>
<baseline year="2017" iso-date="2017-06-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-01" />
<period-end iso-date="2024-12-31" />
<target value="105.00">

</target>
<actual value="58">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Small and Cluster Matching Grants approved (Window A)
</narrative></title>
<baseline year="2016" iso-date="2016-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-15" />
<period-end iso-date="2024-12-31" />
<target value="1,000.00">

</target>
<actual value="1,177">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Client days of training provided under Components 1 and 2
</narrative></title>
<baseline year="2016" iso-date="2016-10-15" value="10,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-15" />
<period-end iso-date="2024-12-31" />
<target value="170,000.00">
<comment><narrative>
C1 = 83,334
C2 = 151,196
</narrative></comment>
</target>
<actual value="234,530">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Client days of training provided under Components 1 and 2
</narrative></title>
<baseline year="2016" iso-date="2016-10-15" value="10,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-15" />
<period-end iso-date="2024-12-31" />
<target value="170,000.00">
<comment><narrative>
As of May 2024: C1 = 78,982; C2 =  97,679.
</narrative></comment>
</target>
<actual value="176,661">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in average value of sales of agriculture products due to project interventions (Market Access Indicator)
</narrative></title>
<baseline year="2016" iso-date="2016-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-15" />
<period-end iso-date="2024-12-31" />
<target value="25.00">
<comment><narrative>
Weighted average based on number of beneficiaries reported by each component. 
C1 = 45.3
C2 = 40.0
</narrative></comment>
</target>
<actual value="45.04">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in average value of sales of agriculture products due to project interventions (Market Access Indicator)
</narrative></title>
<baseline year="2016" iso-date="2016-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-15" />
<period-end iso-date="2024-12-31" />
<target value="25.00">
<comment><narrative>
Weighted average based on number of beneficiaries reported by each component. 
C1 = 45.3
C2 = 40.0
</narrative></comment>
</target>
<actual value="44.17">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Training taken by project staff at all levels
</narrative></title>
<baseline year="2016" iso-date="2016-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-15" />
<period-end iso-date="2024-12-31" />
<target value="500.00">
<comment><narrative>
C1 = 209
C2 = 205
</narrative></comment>
</target>
<actual value="414">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="2016" iso-date="2016-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-15" />
<period-end iso-date="2024-12-31" />
<target value="135,000.00">
<comment><narrative>
C1 = 131,529
C2 = 39,721
</narrative></comment>
</target>
<actual value="171,250">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="2016" iso-date="2016-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-15" />
<period-end iso-date="2024-12-31" />
<target value="135,000.00">

</target>
<actual value="156,852">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers adopting improved agricultural technology
</narrative></title>
<baseline year="2017" iso-date="2017-06-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-01" />
<period-end iso-date="2024-12-31" />
<target value="26,500.00">

</target>
<actual value="21,745">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New Jobs generated through investments in agribusiness organizations under the project.
</narrative></title>
<baseline year="2016" iso-date="2016-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-15" />
<period-end iso-date="2024-12-31" />
<target value="10,100.00">
<comment><narrative>
C1 = 10,054
C2 = 882
</narrative></comment>
</target>
<actual value="10,936">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Clients who have adopted an improved agr. technology promoted by the project
</narrative></title>
<baseline year="2016" iso-date="2016-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-15" />
<period-end iso-date="2024-12-31" />
<target value="90,500.00">
<comment><narrative>
As of May 2024: C1 = 37,151 and C2 = 14,734.
</narrative></comment>
</target>
<actual value="51,885">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Targeted clients satisfied with agricultural services
</narrative></title>
<baseline year="2016" iso-date="2016-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-15" />
<period-end iso-date="2024-12-31" />
<target value="75.00">
<comment><narrative>
New data per the 2024 indicator tracking survey. Composite figure for all beneficiaries, including a large number of new farmers who have yet to produce a yield.
</narrative></comment>
</target>
<actual value="67">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Small and Cluster Matching Grants approved (Window A)
</narrative></title>
<baseline year="2016" iso-date="2016-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-15" />
<period-end iso-date="2024-12-31" />
<target value="1,000.00">

</target>
<actual value="1,277">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
km roads constructed and rehabilitated under the project
</narrative></title>
<baseline year="2017" iso-date="2017-06-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-01" />
<period-end iso-date="2024-12-31" />
<target value="80.00">

</target>
<actual value="222">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area provided with new/improved irrigation or drainage services
</narrative></title>
<baseline year="2017" iso-date="2017-06-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-01" />
<period-end iso-date="2024-12-31" />
<target value="10,000.00">

</target>
<actual value="7,627">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of clusters completed in accordance with cluster development plans
</narrative></title>
<baseline year="2016" iso-date="2016-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-15" />
<period-end iso-date="2024-12-31" />
<target value="33.00">

</target>
<actual value="6">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of commercial partnerships or market contracts signed between producer groups and domestic/international agribusiness actors (processors, wholesalers, retailers, exporters, etc.)
</narrative></title>
<baseline year="2017" iso-date="2017-06-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-01" />
<period-end iso-date="2024-12-31" />
<target value="105.00">
<comment><narrative>
Number has reduced since last mission due to PMU correcting its counting method. Now only counting repeat group sales by to commercial entities (not individual sales in local markets).
</narrative></comment>
</target>
<actual value="35.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New Jobs generated through investments in agribusiness organizations under the project.
</narrative></title>
<baseline year="2016" iso-date="2016-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-15" />
<period-end iso-date="2024-12-31" />
<target value="10,100.00">
<comment><narrative>
Permanent full time jobs only. 
C1 reports 5,753 total jobs of which 3,073 (53%) are female.
C2 reports 126 total jobs of which 60 (48%) are female.
</narrative></comment>
</target>
<actual value="5,879">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Targeted clients satisfied with agricultural services - female - (Core)
</narrative></title>
<baseline year="2016" iso-date="2016-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-15" />
<period-end iso-date="2021-10-31" />
<target value="75.00">
<comment><narrative>
New data per the 2024 indicator tracking survey. Composite figure for female beneficiaries, including a large number of new farmers who have yet to produce a yield.
</narrative></comment>
</target>
<actual value="67">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
km roads constructed and rehabilitated under the project
</narrative></title>
<baseline year="2017" iso-date="2017-06-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-01" />
<period-end iso-date="2024-12-31" />
<target value="80.00">

</target>
<actual value="113">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of farmer producer organizations functional
</narrative></title>
<baseline year="2016" iso-date="2016-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-15" />
<period-end iso-date="2021-10-31" />
<target value="75.00">

</target>
<actual value="74.7">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of matching grant recipients reporting improved access to markets
</narrative></title>
<baseline year="2017" iso-date="2017-06-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-01" />
<period-end iso-date="2024-12-31" />
<target value="50.00">

</target>
<actual value="92.5">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of matching grant recipients reporting improved access to markets
</narrative></title>
<baseline year="2017" iso-date="2017-06-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-01" />
<period-end iso-date="2024-12-31" />
<target value="50.00">

</target>
<actual value="90.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="2016" iso-date="2016-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-15" />
<period-end iso-date="2024-12-31" />
<target value="135,000.00">
<comment><narrative>
C1 = 125,932
C2 = 34,174
</narrative></comment>
</target>
<actual value="160,106">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
km roads constructed and rehabilitated under the project
</narrative></title>
<baseline year="2017" iso-date="2017-06-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-01" />
<period-end iso-date="2024-12-31" />
<target value="80.00">

</target>
<actual value="113">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Training taken by project staff at all levels
</narrative></title>
<baseline year="2016" iso-date="2016-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-15" />
<period-end iso-date="2024-12-31" />
<target value="500.00">

</target>
<actual value="315">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of new farmer producer organizations registered
</narrative></title>
<baseline year="2016" iso-date="2016-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-15" />
<period-end iso-date="2023-06-30" />
<target value="80.00">

</target>
<actual value="141">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of large matching grants approved (Window B)
</narrative></title>
<baseline year="2016" iso-date="2016-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-15" />
<period-end iso-date="2024-12-31" />
<target value="160.00">

</target>
<actual value="170">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area provided with new/improved irrigation or drainage services
</narrative></title>
<baseline year="2017" iso-date="2017-06-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-01" />
<period-end iso-date="2024-12-31" />
<target value="10,000.00">

</target>
<actual value="10,233">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of farmer producer organizations functional
</narrative></title>
<baseline year="2016" iso-date="2016-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-15" />
<period-end iso-date="2021-10-31" />
<target value="75.00">

</target>
<actual value="73.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Targeted clients satisfied with agricultural services
</narrative></title>
<baseline year="2016" iso-date="2016-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-15" />
<period-end iso-date="2024-12-31" />
<target value="75.00">

</target>
<actual value="78.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of project-supported farmer producer organizations under Components 1 and 2 making profit
</narrative></title>
<baseline year="2016" iso-date="2016-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-15" />
<period-end iso-date="2024-12-31" />
<target value="70.00">

</target>
<actual value="31.5">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of Matching Grant recipients operating based on approved business plans
</narrative></title>
<baseline year="2016" iso-date="2016-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-15" />
<period-end iso-date="2024-12-31" />
<target value="80.00">

</target>
<actual value="95.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-11-20T15:47:22" hierarchy="1"><iati-identifier>44000-P156021</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Ecosystem Conservation and Management</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0025517"><narrative>Democratic Socialist Republic of Sri Lanka</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="LK-COA-0025514"><narrative>Department of Wildlife Conservation</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2016-02-18"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2016-04-25"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2023-05-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2023-05-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Anders Jensen</narrative></person-name><telephone>+1-202-473-1000</telephone><email>ajensen1@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="LK" percentage="100"><narrative xml:lang="en">SRI LANKA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001225017" />
            <name><narrative>Vavuniya District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.86134 80.47576</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001226258" />
            <name><narrative>Trincomalee District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.58333 81.08333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001228729" />
            <name><narrative>Ratnapura District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.5831 80.5833</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001229292" />
            <name><narrative>Puttalam District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.0454 79.9319</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001229899" />
            <name><narrative>Polonnaruwa District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8 81</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001232781" />
            <name><narrative>Nuwara Eliya District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.9785 80.7133</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001234392" />
            <name><narrative>Mullaitivu District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.25 80.5499</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001235845" />
            <name><narrative>Matara District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.1329 80.528</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001235854" />
            <name><narrative>Matale District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.6598 80.7073</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001236148" />
            <name><narrative>Mannar District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.86667 80.08333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001237978" />
            <name><narrative>Kurunegala District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.75 80.25</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001240371" />
            <name><narrative>Kilinochchi District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.39487 80.40894</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001240722" />
            <name><narrative>Kegalle District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.1167 80.3333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001241621" />
            <name><narrative>Kandy District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.3044 80.7073</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001241963" />
            <name><narrative>Kalutara District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.6031 80.1026</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001242831" />
            <name><narrative>Jaffna District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.75 80.08333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001244925" />
            <name><narrative>Hambantota District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.25 81.16667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001246005" />
            <name><narrative>Gampaha District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.1333 80</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001246292" />
            <name><narrative>Galle District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.25 80.25</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001248990" />
            <name><narrative>Colombo District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.8664 80.0166</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001250159" />
            <name><narrative>Batticaloa District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.75 81.4997</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001250614" />
            <name><narrative>Badulla District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.98472 81.05639</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001251080" />
            <name><narrative>Anuradhapura District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.33333 80.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001251460" />
            <name><narrative>Ampara District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.0833 81.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="41030" percentage="85" xml:lang="en"/><sector vocabulary="1" code="41010" percentage="15" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AT" percentage="83.0000000" xml:lang="en"><narrative>FY17 - Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AK" percentage="17.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Agriculture, Fishing &amp; Forestry</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000822" percentage="5" xml:lang="en"><narrative>Water Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000084" percentage="15" xml:lang="en"><narrative>Environmental policies and institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000823" percentage="5" xml:lang="en"><narrative>Soil Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="7" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="7" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="7" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="14" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000834" percentage="71" xml:lang="en"><narrative>Biodiversity</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">880200.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">880200.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">880200.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">793266.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">793266.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">793266.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">793266.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">793266.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">793266.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">793266.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">793266.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">793266.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">845185.18</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">845185.19</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">845185.19</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">845185.18</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">845185.19</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">845185.19</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">845185.18</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">845185.19</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">845185.19</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">845185.18</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">845185.19</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">845185.19</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">791666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">791666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">791666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">791666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">10375850.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">10375850.34</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">45000000</value><description xml:lang="en"><narrative>Total Commitment in April Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25514"><narrative>Department of Wildlife Conservation; Forest Department; Ministry of Wildlife and Forest Conservation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">-10000000</value><description xml:lang="en"><narrative>Total Commitment Cancellations in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25514"><narrative>Department of Wildlife Conservation; Forest Department; Ministry of Wildlife and Forest Conservation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-477543</value><description xml:lang="en"><narrative>Total Commitment Cancellations in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25514"><narrative>Department of Wildlife Conservation; Forest Department; Ministry of Wildlife and Forest Conservation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">1117228</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25514"><narrative>Department of Wildlife Conservation; Forest Department; Ministry of Wildlife and Forest Conservation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">1763162</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25514"><narrative>Department of Wildlife Conservation; Forest Department; Ministry of Wildlife and Forest Conservation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">3000000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25514"><narrative>Department of Wildlife Conservation; Forest Department; Ministry of Wildlife and Forest Conservation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">1700000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25514"><narrative>Department of Wildlife Conservation; Forest Department; Ministry of Wildlife and Forest Conservation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">1000000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25514"><narrative>Department of Wildlife Conservation; Forest Department; Ministry of Wildlife and Forest Conservation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">2000000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25514"><narrative>Department of Wildlife Conservation; Forest Department; Ministry of Wildlife and Forest Conservation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">2500000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25514"><narrative>Department of Wildlife Conservation; Forest Department; Ministry of Wildlife and Forest Conservation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">1800000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25514"><narrative>Department of Wildlife Conservation; Forest Department; Ministry of Wildlife and Forest Conservation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">1500000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25514"><narrative>Department of Wildlife Conservation; Forest Department; Ministry of Wildlife and Forest Conservation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">4700000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25514"><narrative>Department of Wildlife Conservation; Forest Department; Ministry of Wildlife and Forest Conservation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">2000000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25514"><narrative>Department of Wildlife Conservation; Forest Department; Ministry of Wildlife and Forest Conservation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">1200000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25514"><narrative>Department of Wildlife Conservation; Forest Department; Ministry of Wildlife and Forest Conservation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">1700000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25514"><narrative>Department of Wildlife Conservation; Forest Department; Ministry of Wildlife and Forest Conservation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">2000000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25514"><narrative>Department of Wildlife Conservation; Forest Department; Ministry of Wildlife and Forest Conservation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">2000000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25514"><narrative>Department of Wildlife Conservation; Forest Department; Ministry of Wildlife and Forest Conservation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">2500000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25514"><narrative>Department of Wildlife Conservation; Forest Department; Ministry of Wildlife and Forest Conservation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">2519610</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25514"><narrative>Department of Wildlife Conservation; Forest Department; Ministry of Wildlife and Forest Conservation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">101692</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25514"><narrative>Department of Wildlife Conservation; Forest Department; Ministry of Wildlife and Forest Conservation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-477543</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25514"><narrative>Department of Wildlife Conservation; Forest Department; Ministry of Wildlife and Forest Conservation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">-5059</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25514"><narrative>Department of Wildlife Conservation; Forest Department; Ministry of Wildlife and Forest Conservation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">-23492</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25514"><narrative>Department of Wildlife Conservation; Forest Department; Ministry of Wildlife and Forest Conservation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">-30751</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25514"><narrative>Department of Wildlife Conservation; Forest Department; Ministry of Wildlife and Forest Conservation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">-65158</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25514"><narrative>Department of Wildlife Conservation; Forest Department; Ministry of Wildlife and Forest Conservation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">-85609</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25514"><narrative>Department of Wildlife Conservation; Forest Department; Ministry of Wildlife and Forest Conservation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-124868</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25514"><narrative>Department of Wildlife Conservation; Forest Department; Ministry of Wildlife and Forest Conservation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-143138</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25514"><narrative>Department of Wildlife Conservation; Forest Department; Ministry of Wildlife and Forest Conservation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-161777</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25514"><narrative>Department of Wildlife Conservation; Forest Department; Ministry of Wildlife and Forest Conservation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-232642</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25514"><narrative>Department of Wildlife Conservation; Forest Department; Ministry of Wildlife and Forest Conservation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-247909</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25514"><narrative>Department of Wildlife Conservation; Forest Department; Ministry of Wildlife and Forest Conservation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-436676</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25514"><narrative>Department of Wildlife Conservation; Forest Department; Ministry of Wildlife and Forest Conservation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-438231</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25514"><narrative>Department of Wildlife Conservation; Forest Department; Ministry of Wildlife and Forest Conservation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-262771</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25514"><narrative>Department of Wildlife Conservation; Forest Department; Ministry of Wildlife and Forest Conservation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-327567</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25514"><narrative>Department of Wildlife Conservation; Forest Department; Ministry of Wildlife and Forest Conservation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-300727</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25514"><narrative>Department of Wildlife Conservation; Forest Department; Ministry of Wildlife and Forest Conservation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-299138</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25514"><narrative>Department of Wildlife Conservation; Forest Department; Ministry of Wildlife and Forest Conservation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-270324</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25514"><narrative>Department of Wildlife Conservation; Forest Department; Ministry of Wildlife and Forest Conservation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-321423</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25514"><narrative>Department of Wildlife Conservation; Forest Department; Ministry of Wildlife and Forest Conservation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-290628</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25514"><narrative>Department of Wildlife Conservation; Forest Department; Ministry of Wildlife and Forest Conservation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-588356</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25514"><narrative>Department of Wildlife Conservation; Forest Department; Ministry of Wildlife and Forest Conservation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-569137</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25514"><narrative>Department of Wildlife Conservation; Forest Department; Ministry of Wildlife and Forest Conservation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-531941</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25514"><narrative>Department of Wildlife Conservation; Forest Department; Ministry of Wildlife and Forest Conservation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-564482</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25514"><narrative>Department of Wildlife Conservation; Forest Department; Ministry of Wildlife and Forest Conservation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-545867</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25514"><narrative>Department of Wildlife Conservation; Forest Department; Ministry of Wildlife and Forest Conservation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-548555</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25514"><narrative>Department of Wildlife Conservation; Forest Department; Ministry of Wildlife and Forest Conservation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-556698</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25514"><narrative>Department of Wildlife Conservation; Forest Department; Ministry of Wildlife and Forest Conservation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-554861</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25514"><narrative>Department of Wildlife Conservation; Forest Department; Ministry of Wildlife and Forest Conservation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-559067</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25514"><narrative>Department of Wildlife Conservation; Forest Department; Ministry of Wildlife and Forest Conservation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-563166</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25514"><narrative>Department of Wildlife Conservation; Forest Department; Ministry of Wildlife and Forest Conservation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P156021"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P156021?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P156021"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in crop and property damages in areas of community fencing
</narrative></title>
<baseline year="2016" iso-date="2016-04-25" value="25.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-04-25" />
<period-end iso-date="2023-05-31" />
<target value="45.00">
<comment><narrative>
&lt;p&amp;gt;&lt;strong&amp;gt;Achieved (166%). &lt;/strong&amp;gt;The indicator measures beneficiaries&amp;rsquo; perceived reduction in damages to crops and property as a result of community fences to mitigate HEC. It relates to the pathway on &lt;strong&amp;gt;reduced likelihood and severity of HEC&lt;/strong&amp;gt;. At completion, the Community Beneficiary Survey shows that 71 percent of beneficiaries state that their stored crops are better protected and 87 percent of beneficiaries state that their properties are better protected as a result of permanent village fences. Overall, 75 percent of beneficiaries state that damages to their livelihoods have been reduced as a result of community fencing to mitigate HEC. Data source: Community Beneficiary Survey (www.escamp.lk).&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="75.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People whose assets protected as a result of HECOEX interventions
</narrative></title>
<baseline year="2016" iso-date="2016-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-07-01" />
<period-end iso-date="2023-05-31" />
<target value="16000.00">
<comment><narrative>
&lt;p&amp;gt;&lt;strong&amp;gt;Partially Achieved (86%). &lt;/strong&amp;gt;This indicator to the pathway of &lt;strong&amp;gt;reduced likelihood and severity of HEC&lt;/strong&amp;gt;. The indicator was introduced in April 2020. The target was revised upwards in June 2020 in proportion to the expected increased number of villages and agricultural plots fenced to protect against HEC (see linked intermediate indicator 6 below). Based on the istallation of electrical fences in 31 villages, the crops and properties of 3,295 households are better protected as a result of project interventions (see Annex 9). With an average of 4.2 members per household according to the 2021 Census of Population and Housing that means that the assets - and lives - of 13,839 people are better protected at project closing. The difference of achievement between this indicator (5) and linked intermediate 6 below is explained by the relatively larger size of villages where fences were completed (average of 106 households per village) than what was estimated at appraisal (average of 35 households per village. Data source: Community Beneficiary Survey (www.escampl.lk)&amp;nbsp;and 2021 Census of Population and Housing.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="13839.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with improved access to income generating activities as a result of project interventions
</narrative></title>
<baseline year="2016" iso-date="2016-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-07-01" />
<period-end iso-date="2023-05-31" />
<target value="12000.00">
<comment><narrative>
&lt;p&amp;gt;&lt;strong&amp;gt;Partially Achieved (68%). &lt;/strong&amp;gt;The project sought to improve access to improved alternative IGA to reduce pressure on natural resources inside PAs, i.e. to reduce livelihood dependency on PAs. The indicator is linked to pathway of &lt;strong&amp;gt;wide use of improved livelihood activities&lt;/strong&amp;gt;. The target was defined based on the number of beneficiaries identified in the CAPSs (see intermediate indicator 2). At project completion, the final Community Beneficiary Survey showed that 21,803 people participated inncome-generating and nature-based tourism activities realized on the basis of 60 CAPs (comp. 2.A and 3.B combined) and has been corrected for double counting.&amp;nbsp; Livelihood activities fell into three categories of support. First, agriculture-related activities, such as aloe vera, cinnamon, ginger, pepper, mushroom, and tea cultivation, home gardening, bee keeping, floriculture, kittul production, and nursery management. Second, livestock-related activities, such as goat keeping, poultry farming, and dairy production. Third, nature-based tourism and other off-farm activities, such as homestays, dress-making, food processing, tour guiding, and other small business (see Annex 9&lt;strong&amp;gt; &lt;/strong&amp;gt;for an overview of IGA and their beneficiaries). The final CBS finds that 69% of participants report that they benefitted from &amp;ldquo;improved access to income-generating activities as a result of project interventions&amp;rdquo;. Beyond the CAPs, opportunities for providing manual labor for i.e. removal of invasive species have helped create additional income in local communities while supporting conservation outcomes. Data source: Community Beneficiary Survey (www.escamp.lk).&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="8105.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Conservation status &amp; enforcement monitoring and reporting systems
</narrative></title>
<baseline year="2016" iso-date="2016-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-07-01" />
<period-end iso-date="2023-05-31" />
<target value="2.00">
<comment><narrative>
&lt;p&amp;gt;&lt;strong&amp;gt;Achieved (100%). &lt;/strong&amp;gt;The indicator follows the pathway of &lt;strong&amp;gt;strengthened management capacity&lt;/strong&amp;gt; as it was defined as the number of monitoring systems developed by end of the 3rd year to track conservation status of PAs under the FD and DWC. A target of two was set to track the implementation of the Spatial Monitoring and Reporting Tool (SMART) and of the National Frest Inventory (NFI). In a first for Sri Lanka, the project introduced SMART devices in 28 wildlife PAs in 2018.&amp;nbsp; At closing, the project had distributed a total of 100 devices to DWC park officers and delivered 11 training sessions to a total of 556 participants (including repeat participants). Training on using SMART for patrolling is now included in the curriculum of the regular training programs for DWC field staff. The Director General of DG DWC has issued a circular for continuous implementation of SMART&lt;em&amp;gt;. &lt;/em&amp;gt;The NFI was completed in&lt;strong&amp;gt; &lt;/strong&amp;gt;April 2023, and Sri Lanka is now seeking support to undertake the next round of data collection for the NFI with 4,550 sample plots over 5 years. The updated NFI has informed the development of the LMPs and the FSMP. Data sources: expert consultation, NFI database.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Strategically planned pilot landscapes with citizen participation
</narrative></title>
<baseline year="2016" iso-date="2016-07-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-07-25" />
<period-end iso-date="2023-05-31" />
<target value="2.00">
<comment><narrative>
&lt;p&amp;gt;&lt;strong&amp;gt;Achieved (150%). &lt;/strong&amp;gt;The project piloted the development of two landscape management plans (LMP) in two different ecologically important zones, and on that basis prepared an Integrated Landscape Management Policy (ILMP). The indicator follows the pathway of a &lt;strong&amp;gt;strong landscape planning framework&lt;/strong&amp;gt;. The documents were adopted by the National Planning Department (NPD) in May 2023 and have been submitted to the Cabinet for approval. The LMPs were developed with citizen participation in an inclusive process involving a national workshop in 2017, district-level workshops in 2020, and stakeholder consultations and dissemination workshops in 2018 to 2022 (delayed because of the pandemic). The need for an Integrated Landscape Management Policy arose from theack of institutional mechanisms to implement cross-sectoral ecosystem management using a landscape approach. If approved by the Cabinet, the ILMP will enter above other sector policies, such as infrastructure, environment, forest, and agriculture policies, to pilot integrated landscape-level management planning that enables more effective conservation of Sri Lanka&amp;rsquo;s unique landscapes and biologically diverse zones while promoting sustainable socio-economic development. Data sources: IMPs, ILMP (www.escamp.lk).&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="2016" iso-date="2016-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-07-01" />
<period-end iso-date="2023-05-31" />
<target value="27000.00">
<comment><narrative>
&lt;p&amp;gt;&lt;strong&amp;gt;Achieved (106%). &lt;/strong&amp;gt;The indicator measures the number of people benefitting directly from project activities. This is not an outcome indicator per-se and is not linked to a specific pathway. The result was assessed in the final Community Beneficiry Survey based on beneficiaries of sub-components 2(a), 2(b) and 3(b). At project completion, the number of direct beneficiaries included: (i) 8,105 people involved in income-generating activities and nature-based tourism activities (see intermediate indicator 4); 6,702 people benefitting from community development activities; and (ii) 13,839 people benefitting from HEC mitigation activities (see intermediate indicator 5). Gender target was&amp;nbsp;&lt;strong&amp;gt;Achieved (183%). &lt;/strong&amp;gt;The indicator measures the proportion of drect beneficiaries that are female with a target set at 30 percent. At project completion, women account for 53 percent of project beneficiaries for component 2.a and 3.b. Data source: Community Beneficiary Survey (www.escamp.lk)&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="28646.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Villages and agriculture plots protected as a result of human-elephant co-existence activities
</narrative></title>
<baseline year="2016" iso-date="2016-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-07-01" />
<period-end iso-date="2023-05-31" />
<target value="107.00">
<comment><narrative>
&lt;table border=&quot;0&quot; cellpadding=&quot;0&quot; cellspacing=&quot;0&quot; style=&quot;width:103%&quot;&amp;gt;
 &lt;tbody&amp;gt;
  &lt;tr&amp;gt;
   &lt;td style=&quot;width:538px&quot;&amp;gt;
   &lt;p&amp;gt;&lt;strong&amp;gt;Not Achieved (29%).&lt;/strong&amp;gt; As with the indicator above, the pathway is &lt;strong&amp;gt;reduced likelihood and severity of HEC&lt;/strong&amp;gt;. The poject supported the installation of three types of community-based fences to protect against human-elephant conflicts: (i) permanent village fences; (ii) seasonal paddy field fences; and (iii) hybrid village/agricultural fences. The revised target of 107 fences was based on the expected installation of 47 village fences and 60 agricultural fences, or a blend thereof. Village fencing at closing: the project installed 160 kilometers of permanent electric fences benefitting 3,295 households in 31 villages (20 in Kurunegala District and 11 in Anuradhapura District). Some of those fences fall in the third category of hybrid fences. Seven more fences were under construction at project closing. The remaining 9 planned village fences will be constructed with the support of the DSs. Agricultural fencing at closing: Partial equipment has been procured for 52 paddy-field fences. The remaining material, which includes fence posts for all agricultural fences, will be procured with support of the ADB-financed Mahaweli Water Security Investment Program (MWSIP) and other WB financed projects. Once all material has been acquired, the DAD has agreed to erect the seasonal paddy-fences (see intermediate indicator 7 on institutionalization). Data source: Community Beneficiary Survey.&lt;/p&amp;gt;
   &lt;/td&amp;gt;
  &lt;/tr&amp;gt;
 &lt;/tbody&amp;gt;
&lt;/table&amp;gt;
</narrative></comment>
</target>
<actual value="31.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries that agree project investments reflected their needs
</narrative></title>
<baseline year="2016" iso-date="2016-07-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-07-25" />
<period-end iso-date="2023-05-31" />
<target value="75.00">
<comment><narrative>
&lt;p&amp;gt;&lt;strong&amp;gt;Achieved (103%). &lt;/strong&amp;gt;The indicator measures the perception of beneficiaries that project support for livelihood activities, community development, and HEC mitigation activities reflected the needs and priorities of communities. It is a corporately required indicator on citizen engagement, but it is not an outcome indicator and therefore not directly related to a pathway to the improved management of ecosystem management. At completion, the Community Beneficiary Survey shows that 77 percent of beneficiaries report that the project has responded satisfactorily to their needs by delivering benefits through livelihood and HECOEX activities Data source: Community Beneficiary Survey (www.escamp.lk).&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="77.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Local policies and/or measures influenced by integrated decision-making
</narrative></title>
<baseline year="2020" iso-date="2020-04-21" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-21" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;&lt;strong&amp;gt;Achieved (100%).&lt;/strong&amp;gt; The indicator refers to the pathway to improved ecosystem management through development of a &lt;strong&amp;gt;strong planning framework for both community and conservation benefits&lt;/strong&amp;gt;. It tracks local policies and plans influenced by integrated decision-making processes supported by the project. At completion, the project has developed four plans and policies based on integrated decision-making processes to balance conservation and development needs, and generated research and knowledge that provides the foundation for integrated decision-making on different aspects of ecosystem management going forward. Specifically, the project has introduced a landscape management approach to Sri Lanka through the completion of two Landscape Management Plans for Hurulu-Kaudulla-Kanthale Complex and the Sinharaja Forest Reserve, respectively, selected for their biodiversity-rich, sociologically and economically important and environmentally sensitive forest ecosystems in the dry and wet zones (see intermediate indicator 1). This work culminated in the preparation of an Integrated Landscape Management Policy for Sri Lanka developed by the MoWFRC. Itlso prepared a 10-year Forestry Sector Master Plan for 2020-2030, based on data obtained from updating the National Forest Inventory, the LMPs, and community participation in forest conservation and management through ESCAMP. The FSMP is being finalized at the time of project closing (editing and lay-out). In addition, the project generated several knowledge products on the elephant population in Sri Lanka to provide an evidence-base for decision-making going forward (see intermediate indicator 8). Data sources: landscape management plans, Forest Sector Master Plan, Integrated Landscape Management Policy (www.escamp.lk).&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="4.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Areas brought under enhanced biodiversity protection (ha)
</narrative></title>
<baseline year="2016" iso-date="2016-07-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-07-25" />
<period-end iso-date="2023-05-31" />
<target value="350000.00">
<comment><narrative>
&lt;p&amp;gt;&lt;strong&amp;gt;Achieved (141%). &lt;/strong&amp;gt;The indicator relates to the pathways of &lt;strong&amp;gt;improved PA management for carrying capacity and protection of wildlife&lt;/strong&amp;gt;. This is a proxy indicator that measures biodiversity protection as a result of the World Bank operation through formally converting an area into a protected area and establishing a functioning management system or improving the management system of an existing protected area. It is assessed using the Management Effectiveness Tracking Tool (METT) for Protectd Areas. At appraisal, the areas included in the target of 200,000 ha were not identified. When the target was revised upwards to 350,000 ha, it was defined based on the actual PAs that would benefit from project investments with a combined area of 363,648 ha (see Annex 9). At project closing, a total of 493,675 ha were benefitting from enhanced biodiversity protection through investments to strengthen PA management. First, 315,799 ha were benefitting from activities aimed at reducing forest and habitat degradation including demarcation of PA boundaries to protect against encroachment on 212,000 ha. Second, the project improved facilities used by forest rangers to patrol PAs covering an area of 393,116 ha, of which 215,240 ha&amp;nbsp;are inside participating PAs (see Annex 9). At such, an additional 177,876 ha&amp;nbsp;outside participating PAs are benefitting from improved biodiversity protection through rehabilitation and/or establishment of beat offices to strengthen the presence of forest rangers (see Annex 9). Combined, a total area of 493,675 ha&amp;nbsp;are&amp;nbsp;better protected against threats to biodiversity. METT assessments were not undertaken at project completion. Data sources: patrol logbooks, expert views, direct observation.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="493675.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Supportive infrastructure upgraded for long-term capacity building
</narrative></title>
<baseline year="2016" iso-date="2016-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-07-01" />
<period-end iso-date="2023-05-31" />
<target value="3.00">
<comment><narrative>
&lt;p&amp;gt;&lt;strong&amp;gt;Achieved (100%). &lt;/strong&amp;gt;The pathway that this indicator tracks is &lt;strong&amp;gt;strengthened management capacity&lt;/strong&amp;gt; as the project upgraded three national conservation training and research facilities to build the long-term capacity of the FD and DWC the Sri Lanka Forestry Institute in Nuwera Eliya, the SLFI Field Training Center in Inamaluwa, and the National Wildlife Research and Training Centre in Giritale. All three facilities have been completed and handed over to the MoWFRC. The new facilities: (i) have raised the capacity of the centers to accommodate a larger number of trainees and visitors under improved conditions; (ii) are built to international standards; and have strengthened the profile of SLFI and the NWRTC as leading international research and training institutes on forestry, wildlife, and environmental conservation. Data sources: project and activity records, direct observation.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Knowledge products on elephant management in place
</narrative></title>
<baseline year="2016" iso-date="2016-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-07-01" />
<period-end iso-date="2023-05-31" />
<target value="3.00">
<comment><narrative>
&lt;p&amp;gt;&lt;strong&amp;gt;Achieved (167%). &lt;/strong&amp;gt;The indicator tracks the number of knowledge products on elephant management produced and is in line with the pathway on &lt;strong&amp;gt;improved management capacity&lt;/strong&amp;gt;. At completion, the project had produced five such knowledge products. First, a DNA study to identify the genetic composition of the elephant population island-wide to inform decision-making on conservation of the elephant population, i.e. whether to translocate elephants between regions (June 2022). Second, an Elephant Collaring Programme to analyse movement and distribution patterns to identify the home range of elephants has been completed with the participation of 39 elephants. The final report is still outstanding at project closing. Third, an elephant early warning system ha been installed in 2 villages in the Kurunegala District and is reportedly working well. Fourth, a technical guide on construction and maintenance of electric fences. Fifth, a HECOEX study for the HKK Cluster in the dry zone.&amp;nbsp; In addition, two publications in peer reviewed scientific journals have been produced. Updating the National Master Plan was originally part of planned project activities, but the activity was dropped in June 2020 (during the partial credit cancellation) and covered by the GoSL itself. The knowledge generated is helping to inform elephant management in response to the human-elephant conflict in Sri Lanka and will feed into the next update of the National Master Plan. Data sources: various reports.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="5.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Trained staff demonstrating improved capacity for ecosystem management (index)
</narrative></title>
<baseline year="2016" iso-date="2016-07-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-07-25" />
<period-end iso-date="2023-05-31" />
<target value="2.00">
<comment><narrative>
&lt;p&amp;gt;&lt;strong&amp;gt;Achieved (100%).&lt;/strong&amp;gt; The indicator measures the demonstrated improved capacity of FD and DWC staff from training supported by the project on various dimensions of ecosystem management (see Annex 10) and pertains to the pathway of &lt;strong&amp;gt;strengthened management capacity&lt;/strong&amp;gt;. By project closing, a total of 835 FD staff members had received training at the Sri Lanka Forestry Institute and 74 staff members from DWC had received training at the National Wildlife Research and Training Centre (see Annex 10). The result is assessed in a two-part survey, administered in August 2022, which invited staff members and their supervisors to evaluate training delivered between 2017 and 2022. The questionnaire was administered to the trainees and their immediate supervisors with a different set of questions for each group of respondents. Questions were perception-based and related to quality and content of the training (trainees) and improvement in work performance (supervisors). Rating scale: 1 = Very Low,&amp;nbsp; 2 = Low,&amp;nbsp; 3 = Medium, 4 = High, and 5 = Very High. Improved capacity was achieved if at least 50 percent of the respondents (simple average) rated the training as &amp;lsquo;Satisfactory&amp;rsquo;. The results are 87 percent for FD and 52 percent for DWC, and the overall target of &amp;lsquo;2&amp;rsquo; was achieved. A total of 61 staff members from FD and 23 staff members from DWC participated in the survey, i.e. a low participation rate of 7 percent and 31 percent, respectively. Survey participation was voluntary but not anonymous. Data source: Capacity building survey and database.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area of habitat improvement activities
</narrative></title>
<baseline year="2016" iso-date="2016-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-07-01" />
<period-end iso-date="2023-05-31" />
<target value="350000.00">
<comment><narrative>
&lt;p&amp;gt;&lt;strong&amp;gt;Achieved (90%). &lt;/strong&amp;gt;The indicator accounts for the area of PAs to benefit from investments in habitat improvement. The indicator follows the pathways of &lt;strong&amp;gt;strengthened PA management for carrying capacity and protection of wildlife and improved tourism experience&lt;/strong&amp;gt;. The target of 350,000 (ha) is the estimated area at the time of restructuring in April 2020 (see Annex 8). However, the actual combined area of participating PAs is 315,799 ha. The difference of 34,201 ha relates to Yala NP, where only Block I and II of a total of five blocks actually participated in the project (see Project Area&lt;strong&amp;gt; &lt;/strong&amp;gt;in Annex 9). Thus, it may be stated that the indicator target was achieved. By project closing, the project had improved wildlife habitats on an area of 315,799 hectares (see also related outcome indicator 3). Activities included direct investments to enhance wildlife habitats in protected areas through assisted natural regeneration, catchment development and rehabilitation of large rainfed water tanks, construction of smaller serviced water holes, removal of invasive alien plants, and implementation of fire control measures (fire lines). Data sources: project and activity records, direct observation&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="315799.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Community Action Plans prepared
</narrative></title>
<baseline year="2016" iso-date="2016-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-07-01" />
<period-end iso-date="2023-05-31" />
<target value="60.00">
<comment><narrative>
&lt;p&amp;gt;&lt;strong&amp;gt;Achieved (100%)&lt;/strong&amp;gt;. The indicator tracks the number of CAPs prepared by FD and DWC, respectively, and follows the pathway of &lt;strong&amp;gt;wide use of improved livelihood activities&lt;/strong&amp;gt;. At closing, a total of 60 CAPs had been prepared to identify community needs in a participatory process for rural communities living near PAs. The result includes 47 CAPs prepared by FD and 13 CAPs prepared by DWC with livelihood and infrastructure activities targeting families in the buffer zones of participating PAs (see Annex 9 for an overview of activities by project areas). CAPs were developed in consultation with selected communities, journalists environmentalists, politicians and other community leaders over the design and proposals of livelihood activities in environmentally sensitive areas activities. Activities focused on a range of alternative livelihood options with income-generating potential related to agriculture and livestock-farming, off-farm activities, and community development programs (see Annex 1.B for an overview). Data sources: CAPs.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="60.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Staff trained
</narrative></title>
<baseline year="2016" iso-date="2016-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-07-01" />
<period-end iso-date="2023-05-31" />
<target value="310.00">
<comment><narrative>
&lt;p&amp;gt;&lt;strong&amp;gt;Achieved&lt;/strong&amp;gt; &lt;strong&amp;gt;(654%).&lt;/strong&amp;gt; The indicator tracks training and capacity building activities aimed at strengthening skills of FD and DWC staff and related to the pathway of &lt;strong&amp;gt;strengthened management capacity&lt;/strong&amp;gt;. The project delivered training and capacity building to 2,027 participants from the FD and DWC under Comp. 3.A and 3.C (see Annex 10 for a complete overview of training and capacity building delivered by ESCAMP). At the park level (Comp. 3.A), some FD and DWC staff have likely prticipated in more than one training session (repeat participants), where training focused on operation of SMART patrolling devices (556 DWC participants trained) and on implementation of environmental and social safeguards instruments (562 FD and DWC participant trained). At the institutional level (Comp. 3.C), 835 FD officers and 74 DWC officers received training at the SLFI in Nuwara Eliya and NWRTC in Giritale, respectively. Upon completion, successful participation was noted in individual staff files and each staff member was invited to participate in a survey to evaluate the training (linked to OI 2). Beyond this achievement, the project trained an additional 615 participants from FD and DWC and many other public departments, private sector, and CBOs in landscape planning and management for the development of the LMPs (see intermediate indicator 1). Data source: attendance lists.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="2027.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Long-term training programs developed
</narrative></title>
<baseline year="2016" iso-date="2016-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-07-01" />
<period-end iso-date="2023-05-31" />
<target value="2.00">
<comment><narrative>
&lt;p&amp;gt;&lt;strong&amp;gt;Achieved (150%). &lt;/strong&amp;gt;The indicator follows the pathway of &lt;strong&amp;gt;strengthened management capacity&lt;/strong&amp;gt; and tracked the development of two long-term training programs. At completion, the project had supported the development of FD Diploma &amp;amp; Certificate Courses and DWC Training Programs, including revisions to the curriculum with coursework on i.e. Landscape Management Planning, SMART Patrolling and Environmental and Social Safeguards. Data sources: course curriculums.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Institutional framework for sustainable management of the fencing program in place
</narrative></title>
<baseline year="2016" iso-date="2016-07-01" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-07-01" />
<period-end iso-date="2023-05-31" />
<target value="Y">
<comment><narrative>
&lt;p&amp;gt;&lt;strong&amp;gt;Achieved (100%).&lt;/strong&amp;gt; The project has achieved institutionalization to ensure sustainable management of the fencing program which related to the pathway of &lt;strong&amp;gt;reduced likelihood and severity of HEC&lt;/strong&amp;gt;. First, a formal agreement was reached in February 2023 with MoPAs that community-based permanent village fences will be institutionalized within the two participating Divisional Secretariats (DSs) (Kurunegala and Anuradhapura). This agreement obligates the DSs to undertake implementation, facilitation and monitoring of the permanent village fences. Awareness training of Divisional Secretariats and a Training-of-Trainers program is scheduled to take place in fall of 2023. Second, a formal agreement was reached with the Department of Agrarian Development (DAD to institutionalize the paddy-fences within the DAD. This obligates the DAD to erect the seasonal paddy-fences with the respective farmer organizations once all material is acquired. &amp;nbsp;Data sources: signed agreements.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Visitors agree that investments and visitor management improvements have enhanced the quality of nature-based tourism
</narrative></title>
<baseline year="2016" iso-date="2016-07-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-07-25" />
<period-end iso-date="2023-05-31" />
<target value="50.00">
<comment><narrative>
&lt;p&amp;gt;&lt;strong&amp;gt;Achieved (170%). &lt;/strong&amp;gt;The indicator is linked to the pathway of &lt;strong&amp;gt;improved tourism experience&lt;/strong&amp;gt;. At appraisal, the &amp;ldquo;Visitor revenue of selected PAs increased as a result of project interventions&amp;rdquo; with a target of 10 percent was included. It was revised due to difficulties in isolating externalities influencing PAs revenue from the attribution of project activities. The revised indicator measures the experience by recurring visitors of improved quality of tourism facilities in proteced areas supported by ESCAMP. The assessment is based on a Tourism Survey (itemized by sites with completed tourism infrastructure), which was administered to national tourists, who made repeat visits to the protected areas during the health crisis (foreign tourists tend to be one-time visitors and have only recently been able to visit SL again following the lock-down). The survey found that 85 percent of returning visitors have noticed an improvement in the quality of NBT facilities. The survey was undertaken in 2022 and did not include the visitor centers at Patanangala and Sinharaja as the site was still under construction. Data source: Beneficiary Response Survey of Local Tourists 2022. &amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="85.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Range level PA management plans implemented
</narrative></title>
<baseline year="2016" iso-date="2016-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-07-01" />
<period-end iso-date="2023-05-31" />
<target value="11.00">
<comment><narrative>
&lt;p&amp;gt;&lt;strong&amp;gt;Achieved (100%). &lt;/strong&amp;gt;The indicator tracks the number of PA management plans that have been supported in their implementation as part of the project. This indicator tracks the pathway of &lt;strong&amp;gt;strengthened PA management for carrying capacity and protection of wildlife and improved tourism experience&lt;/strong&amp;gt;. At completion, the project has supported the implementation of 11 range-level PA management plans. These include the following ranges within the protected areas and national parks of the project area: (1) Udawalwa NP, (2) Lunugamvehera NP, (3) Bundala NP, (4) Yala NP, (5) Galoya NP, (6) Sinharaja WHS, (7) Kanneliya F.R., (8) Knuckles World Heritage Site (WHS) (Kandy), (9) Knuckles WHS (Matale), (10) Hurulu Forest Reserve (FR), and (11) Weerakkodocholai FR&amp;nbsp;and Wanniyagama FR&amp;nbsp;(located in the same range). Activities included direct investments to enhance wildlife habitats in protected areas through assisted natural regeneration, catchment development and rehabilitation of large rainfed water tanks, construction of smaller serviced water holes, removal of invasive alien plants, and implementation of fire control measure (fire lines). Furtherore, activities aimed at enhancing protection against encroachment on PAs (demarcation and patrolling) and reducing communities&amp;rsquo; dependency on forest resources (alternative IGAs) are equally important in improving wildlife habitats by preventing unsustainable practices and pressure on natural resources. Data sources: Project and activity records, direct observation.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="11.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Protected Area level nature-based tourism plans
</narrative></title>
<baseline year="2016" iso-date="2016-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-07-01" />
<period-end iso-date="2023-05-31" />
<target value="7.00">
<comment><narrative>
&lt;p&amp;gt;&lt;strong&amp;gt;Achieved (100%). &lt;/strong&amp;gt;The indicator tracks the number of nature-based tourism plans developed at the level of PAs and thus relates to the pathway of &lt;strong&amp;gt;improved tourism experience&lt;/strong&amp;gt;. A target of seven NBT plans was set and included three for DWC (Bundala, Udawalawe, and Yala) and four for FD (Hurulu, Kanneliya, Knuckles, and Sinharaja). At project closing, all NBT plans have been finalized. For Yala, the existing NBT plan was reviewed and updated but not publicly disclosed. In a decision by the Cabinet of August 28, 2023 the plans have been recommended for implementation to help rebuild the economy. Data sources: NBT plans (www.escamp.lk).&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="7.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-11-20T15:47:22" hierarchy="1"><iati-identifier>44000-P156056</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>LK-Social Safety Nets Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0025544"><narrative>Department of External Affairs</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="LK-COA-0025545"><narrative>Ministry of Finance</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2016-03-31"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2016-12-02"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2023-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2023-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Francesca Lamanna</narrative></person-name><telephone>+1-202-473-1000</telephone><email>flamanna@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="LK" percentage="100"><narrative xml:lang="en">SRI LANKA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001227603" />
            <name><narrative>Democratic Socialist Republic of Sri Lanka</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.75 80.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="16011" percentage="100" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="87.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SG" percentage="13.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000523" percentage="100" xml:lang="en"><narrative>Social protection delivery systems</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000052" percentage="100" xml:lang="en"><narrative>Social Protection</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">875000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">875000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">875000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">875000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">875000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">875000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">875000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">875000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">875000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">875000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">875000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">875000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">1583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">1583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">1583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">1583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">1583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">1583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">1583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">1583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">1583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">1583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">1583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">1583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">1583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">1583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">1583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">1583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">1583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">1583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">1583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">1583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">1583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">1583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">1583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">1583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">1816552.44</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">1816552.44</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">75000000</value><description xml:lang="en"><narrative>Total Commitment in December Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25545"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-222286</value><description xml:lang="en"><narrative>Total Commitment Cancellations in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25545"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">181906</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25545"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">129904</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25545"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">2543151</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25545"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">205233</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25545"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">47848</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25545"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">103878</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25545"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">200000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25545"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">4878981</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25545"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">45341513</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25545"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">8887606</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25545"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">497602</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25545"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">1840067</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25545"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">1471949</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25545"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">6925067</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25545"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-71257</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25545"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">-181906</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25545"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">-89786</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25545"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">-127514</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25545"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">-132271</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25545"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">-129515</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25545"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">-130174</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25545"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">-131527</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25545"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">-481660</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25545"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-793053</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25545"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">-867674</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25545"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">-859658</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25545"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-807216</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25545"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-773808</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25545"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-795204</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25545"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-821652</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25545"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-798783</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25545"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-838531</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25545"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-799290</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25545"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-782387</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25545"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">-1880628</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25545"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-1772624</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25545"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-1795433</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25545"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-1788680</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25545"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-1775886</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25545"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-1797030</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25545"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-1752762</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25545"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-1831436</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25545"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-1843500</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-25545"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P156056"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P156056?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P156056"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Annual reports published on the WBS
</narrative></title>
<baseline year="2016" iso-date="2016-04-01" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-04-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="N">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Divisional Secretariats using the social registry to enter and update data on welfare beneficiaries
</narrative></title>
<baseline year="2016" iso-date="2016-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-04-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Welfare Beneficiary Information System populated with data of potential welfare beneficiaries (DLI 4)
</narrative></title>
<baseline year="2016" iso-date="2016-04-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-04-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Coverage of the poorest 20 percent in welfare programs
</narrative></title>
<baseline year="2016" iso-date="2016-12-01" value="37.10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-12-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="43.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances with welfare programs resolved within 4 weeks
</narrative></title>
<baseline year="2016" iso-date="2016-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-04-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Social protection strategy developed and approved by competent authority
</narrative></title>
<baseline year="2016" iso-date="2016-04-01" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-04-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="N">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiary satisfaction with appeals mechanism for selection decisions
</narrative></title>
<baseline year="2016" iso-date="2016-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-04-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of welfare beneficiaries in the poorest 20 percent
</narrative></title>
<baseline year="2016" iso-date="2016-04-01" value="39.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-04-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="48.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Annual assessment of SRIS functionality and security conducted
</narrative></title>
<baseline year="2016" iso-date="2016-04-01" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-04-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="N">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
WBIS active and operational (DLI 2)
</narrative></title>
<baseline year="2016" iso-date="2016-04-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-04-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
WBB established and fully functional (DLI 1)
</narrative></title>
<baseline year="2016" iso-date="2016-04-01" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-04-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average application processing time for welfare programs
</narrative></title>
<baseline year="2016" iso-date="2016-04-01" value="30.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-04-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="90.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Action plan developed and approved for expansion of the new safety net system
</narrative></title>
<baseline year="2016" iso-date="2016-04-01" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-04-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Welfare beneficiary lists published
</narrative></title>
<baseline year="2016" iso-date="2016-04-01" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-04-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-11-20T15:47:22" hierarchy="1"><iati-identifier>44000-P157804</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Sri Lanka Competitiveness DPL</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0027323"><narrative>Ministry of National Policies and Economic Affairs</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="LK-COA-0027322"><narrative>Ministry of Development Strategies and International Trade</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2016-03-18"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2016-07-29"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2017-09-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2017-09-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Tatiana Nenova</narrative></person-name><telephone>+1-202-473-1000</telephone><email>tnenova@ifc.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="LK" percentage="100"><narrative xml:lang="en">SRI LANKA</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="1248991" />
                <name><narrative>Colombo</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>6.93548 79.848679</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="15117" percentage="63" xml:lang="en"/><sector vocabulary="1" code="33120" percentage="24" xml:lang="en"/><sector vocabulary="1" code="24030" percentage="13" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="62.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YY" percentage="25.0000000" xml:lang="en"><narrative>FY17 - Trade</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="FA" percentage="13.0000000" xml:lang="en"><narrative>FY17 - Banking Institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000211" percentage="13" xml:lang="en"><narrative>Investment and Business Climate</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="36" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000321" percentage="13" xml:lang="en"><narrative>Credit Infrastructure</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000021" percentage="13" xml:lang="en"><narrative>Business Enabling Environment</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000021" percentage="13" xml:lang="en"><narrative>Business Enabling Environment</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000411" percentage="36" xml:lang="en"><narrative>Public Expenditure Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000413" percentage="13" xml:lang="en"><narrative>Debt Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000141" percentage="25" xml:lang="en"><narrative>Trade Facilitation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="36" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000014" percentage="25" xml:lang="en"><narrative>Trade</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000141" percentage="25" xml:lang="en"><narrative>Trade Facilitation</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">100000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">100000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">100000000</value><description xml:lang="en"><narrative>Total Commitment in July Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-27322"><narrative>Ministry of Development Strategies and International Trade</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">100000000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-27322"><narrative>Ministry of Development Strategies and International Trade</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-250000</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-27322"><narrative>Ministry of Development Strategies and International Trade</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-1155208</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-27322"><narrative>Ministry of Development Strategies and International Trade</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-1835000</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-27322"><narrative>Ministry of Development Strategies and International Trade</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-1835000</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-27322"><narrative>Ministry of Development Strategies and International Trade</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-1835000</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-27322"><narrative>Ministry of Development Strategies and International Trade</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-1835000</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-27322"><narrative>Ministry of Development Strategies and International Trade</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-1835000</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-27322"><narrative>Ministry of Development Strategies and International Trade</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-1835000</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-27322"><narrative>Ministry of Development Strategies and International Trade</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-1835000</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-27322"><narrative>Ministry of Development Strategies and International Trade</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-1835000</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-27322"><narrative>Ministry of Development Strategies and International Trade</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-1835000</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-27322"><narrative>Ministry of Development Strategies and International Trade</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-1835000</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-27322"><narrative>Ministry of Development Strategies and International Trade</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-1835000</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-27322"><narrative>Ministry of Development Strategies and International Trade</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-1835000</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-27322"><narrative>Ministry of Development Strategies and International Trade</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-1835000</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-27322"><narrative>Ministry of Development Strategies and International Trade</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-1835000</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-27322"><narrative>Ministry of Development Strategies and International Trade</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-1835000</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-27322"><narrative>Ministry of Development Strategies and International Trade</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-1789125</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-27322"><narrative>Ministry of Development Strategies and International Trade</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-1743250</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-27322"><narrative>Ministry of Development Strategies and International Trade</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-1697375</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-27322"><narrative>Ministry of Development Strategies and International Trade</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-2500000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-27322"><narrative>Ministry of Development Strategies and International Trade</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-2500000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-27322"><narrative>Ministry of Development Strategies and International Trade</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-2500000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-27322"><narrative>Ministry of Development Strategies and International Trade</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-2500000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-27322"><narrative>Ministry of Development Strategies and International Trade</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P157804"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P157804?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P157804"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-11-20T15:47:22" hierarchy="1"><iati-identifier>44000-P159303</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Sri Lanka Financial Sector Modernization</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0028690"><narrative>Democratic Socialist Republic of Sri Lanka</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="LK-COA-0028691"><narrative>Sri Lanka Insurance Regulatory Commission (formerly known as Insurance Board of Sri Lanka )</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2016-12-15"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2017-04-05"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2023-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2023-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Tatsiana Kliatskova</narrative></person-name><telephone>+1-202-473-1000</telephone><email>tkliatskova@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="LK" percentage="100"><narrative xml:lang="en">SRI LANKA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001227603" />
            <name><narrative>Democratic Socialist Republic of Sri Lanka</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.75 80.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001248991" />
            <name><narrative>Colombo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.93194 79.84778</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="24020" percentage="37" xml:lang="en"/><sector vocabulary="1" code="24010" percentage="37" xml:lang="en"/><sector vocabulary="1" code="24030" percentage="26" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="FP" percentage="61.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Financial Sector</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="CI" percentage="39.0000000" xml:lang="en"><narrative>FY17 - ICT Infrastructure</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000322" percentage="80" xml:lang="en"><narrative>Payment &amp; markets infrastructure</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">88125.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">206175.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">116475.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">260625.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">294900.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">325575.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">356625.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">196350.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">427200.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">458025.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">473175.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">240600.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">494700.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">508500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">512700.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">501900.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">246825.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">496725.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">516750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">555300.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">577500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">295125.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">615225.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">663300.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">695775.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">729525.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">382650.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">810675.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">851250.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">871275.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">916275.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">483525.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">1016775.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">1054125.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">1109025.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">582675.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">1231650.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">1307925.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">1381425.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">1456875.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">756525.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">1580025.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">1663725.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">1731075.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">1781700.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">912975.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">1883175.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">1946925.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">2003400.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">2074350.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">1069950.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">2185500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">2224725.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">2252700.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">2278050.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">1156500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">2343900.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">2373225.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">66046409.86</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">66046409.86</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">75000000</value><description xml:lang="en"><narrative>Total Commitment in April Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-28693"><narrative>Central Bank of Sri Lanka; Securities and Exchange Commission of Sri Lanka; Sri Lanka Insurance Regulatory Commission (formerly known as Insurance Board of Sri Lanka )</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-65071561</value><description xml:lang="en"><narrative>Total Commitment Cancellations in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-28693"><narrative>Central Bank of Sri Lanka; Securities and Exchange Commission of Sri Lanka; Sri Lanka Insurance Regulatory Commission (formerly known as Insurance Board of Sri Lanka )</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">200594</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-28693"><narrative>Central Bank of Sri Lanka; Securities and Exchange Commission of Sri Lanka; Sri Lanka Insurance Regulatory Commission (formerly known as Insurance Board of Sri Lanka )</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">3820000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-28693"><narrative>Central Bank of Sri Lanka; Securities and Exchange Commission of Sri Lanka; Sri Lanka Insurance Regulatory Commission (formerly known as Insurance Board of Sri Lanka )</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">522544</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-28693"><narrative>Central Bank of Sri Lanka; Securities and Exchange Commission of Sri Lanka; Sri Lanka Insurance Regulatory Commission (formerly known as Insurance Board of Sri Lanka )</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">1450302</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-28693"><narrative>Central Bank of Sri Lanka; Securities and Exchange Commission of Sri Lanka; Sri Lanka Insurance Regulatory Commission (formerly known as Insurance Board of Sri Lanka )</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">258509</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-28693"><narrative>Central Bank of Sri Lanka; Securities and Exchange Commission of Sri Lanka; Sri Lanka Insurance Regulatory Commission (formerly known as Insurance Board of Sri Lanka )</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">256313</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-28693"><narrative>Central Bank of Sri Lanka; Securities and Exchange Commission of Sri Lanka; Sri Lanka Insurance Regulatory Commission (formerly known as Insurance Board of Sri Lanka )</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">258933</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-28693"><narrative>Central Bank of Sri Lanka; Securities and Exchange Commission of Sri Lanka; Sri Lanka Insurance Regulatory Commission (formerly known as Insurance Board of Sri Lanka )</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-01-31"/><value value-date="2020-01-31">64455</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-28693"><narrative>Central Bank of Sri Lanka; Securities and Exchange Commission of Sri Lanka; Sri Lanka Insurance Regulatory Commission (formerly known as Insurance Board of Sri Lanka )</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">192355</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-28693"><narrative>Central Bank of Sri Lanka; Securities and Exchange Commission of Sri Lanka; Sri Lanka Insurance Regulatory Commission (formerly known as Insurance Board of Sri Lanka )</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">11254</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-28693"><narrative>Central Bank of Sri Lanka; Securities and Exchange Commission of Sri Lanka; Sri Lanka Insurance Regulatory Commission (formerly known as Insurance Board of Sri Lanka )</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">8185</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-28693"><narrative>Central Bank of Sri Lanka; Securities and Exchange Commission of Sri Lanka; Sri Lanka Insurance Regulatory Commission (formerly known as Insurance Board of Sri Lanka )</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">1067618</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-28693"><narrative>Central Bank of Sri Lanka; Securities and Exchange Commission of Sri Lanka; Sri Lanka Insurance Regulatory Commission (formerly known as Insurance Board of Sri Lanka )</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">519159</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-28693"><narrative>Central Bank of Sri Lanka; Securities and Exchange Commission of Sri Lanka; Sri Lanka Insurance Regulatory Commission (formerly known as Insurance Board of Sri Lanka )</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">2097060</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-28693"><narrative>Central Bank of Sri Lanka; Securities and Exchange Commission of Sri Lanka; Sri Lanka Insurance Regulatory Commission (formerly known as Insurance Board of Sri Lanka )</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">514091</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-28693"><narrative>Central Bank of Sri Lanka; Securities and Exchange Commission of Sri Lanka; Sri Lanka Insurance Regulatory Commission (formerly known as Insurance Board of Sri Lanka )</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">4208</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-28693"><narrative>Central Bank of Sri Lanka; Securities and Exchange Commission of Sri Lanka; Sri Lanka Insurance Regulatory Commission (formerly known as Insurance Board of Sri Lanka )</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">648240</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-28693"><narrative>Central Bank of Sri Lanka; Securities and Exchange Commission of Sri Lanka; Sri Lanka Insurance Regulatory Commission (formerly known as Insurance Board of Sri Lanka )</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">3733</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-28693"><narrative>Central Bank of Sri Lanka; Securities and Exchange Commission of Sri Lanka; Sri Lanka Insurance Regulatory Commission (formerly known as Insurance Board of Sri Lanka )</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">1149</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-28693"><narrative>Central Bank of Sri Lanka; Securities and Exchange Commission of Sri Lanka; Sri Lanka Insurance Regulatory Commission (formerly known as Insurance Board of Sri Lanka )</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-200544</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-28693"><narrative>Central Bank of Sri Lanka; Securities and Exchange Commission of Sri Lanka; Sri Lanka Insurance Regulatory Commission (formerly known as Insurance Board of Sri Lanka )</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-2772982</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-28693"><narrative>Central Bank of Sri Lanka; Securities and Exchange Commission of Sri Lanka; Sri Lanka Insurance Regulatory Commission (formerly known as Insurance Board of Sri Lanka )</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">30251</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-28693"><narrative>Central Bank of Sri Lanka; Securities and Exchange Commission of Sri Lanka; Sri Lanka Insurance Regulatory Commission (formerly known as Insurance Board of Sri Lanka )</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-1834</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-28693"><narrative>Central Bank of Sri Lanka; Securities and Exchange Commission of Sri Lanka; Sri Lanka Insurance Regulatory Commission (formerly known as Insurance Board of Sri Lanka )</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">-200594</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-28693"><narrative>Central Bank of Sri Lanka; Securities and Exchange Commission of Sri Lanka; Sri Lanka Insurance Regulatory Commission (formerly known as Insurance Board of Sri Lanka )</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">-130982</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-28693"><narrative>Central Bank of Sri Lanka; Securities and Exchange Commission of Sri Lanka; Sri Lanka Insurance Regulatory Commission (formerly known as Insurance Board of Sri Lanka )</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">-99553</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-28693"><narrative>Central Bank of Sri Lanka; Securities and Exchange Commission of Sri Lanka; Sri Lanka Insurance Regulatory Commission (formerly known as Insurance Board of Sri Lanka )</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">-183624</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-28693"><narrative>Central Bank of Sri Lanka; Securities and Exchange Commission of Sri Lanka; Sri Lanka Insurance Regulatory Commission (formerly known as Insurance Board of Sri Lanka )</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">-193793</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-28693"><narrative>Central Bank of Sri Lanka; Securities and Exchange Commission of Sri Lanka; Sri Lanka Insurance Regulatory Commission (formerly known as Insurance Board of Sri Lanka )</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">-203364</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-28693"><narrative>Central Bank of Sri Lanka; Securities and Exchange Commission of Sri Lanka; Sri Lanka Insurance Regulatory Commission (formerly known as Insurance Board of Sri Lanka )</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-218021</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-28693"><narrative>Central Bank of Sri Lanka; Securities and Exchange Commission of Sri Lanka; Sri Lanka Insurance Regulatory Commission (formerly known as Insurance Board of Sri Lanka )</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">-223609</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-28693"><narrative>Central Bank of Sri Lanka; Securities and Exchange Commission of Sri Lanka; Sri Lanka Insurance Regulatory Commission (formerly known as Insurance Board of Sri Lanka )</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">-239379</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-28693"><narrative>Central Bank of Sri Lanka; Securities and Exchange Commission of Sri Lanka; Sri Lanka Insurance Regulatory Commission (formerly known as Insurance Board of Sri Lanka )</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-255766</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-28693"><narrative>Central Bank of Sri Lanka; Securities and Exchange Commission of Sri Lanka; Sri Lanka Insurance Regulatory Commission (formerly known as Insurance Board of Sri Lanka )</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-183997</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-28693"><narrative>Central Bank of Sri Lanka; Securities and Exchange Commission of Sri Lanka; Sri Lanka Insurance Regulatory Commission (formerly known as Insurance Board of Sri Lanka )</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-237448</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-28693"><narrative>Central Bank of Sri Lanka; Securities and Exchange Commission of Sri Lanka; Sri Lanka Insurance Regulatory Commission (formerly known as Insurance Board of Sri Lanka )</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-132094</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-28693"><narrative>Central Bank of Sri Lanka; Securities and Exchange Commission of Sri Lanka; Sri Lanka Insurance Regulatory Commission (formerly known as Insurance Board of Sri Lanka )</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-96201</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-28693"><narrative>Central Bank of Sri Lanka; Securities and Exchange Commission of Sri Lanka; Sri Lanka Insurance Regulatory Commission (formerly known as Insurance Board of Sri Lanka )</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-3935</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-28693"><narrative>Central Bank of Sri Lanka; Securities and Exchange Commission of Sri Lanka; Sri Lanka Insurance Regulatory Commission (formerly known as Insurance Board of Sri Lanka )</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-1834779</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-28693"><narrative>Central Bank of Sri Lanka; Securities and Exchange Commission of Sri Lanka; Sri Lanka Insurance Regulatory Commission (formerly known as Insurance Board of Sri Lanka )</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-1871883</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-28693"><narrative>Central Bank of Sri Lanka; Securities and Exchange Commission of Sri Lanka; Sri Lanka Insurance Regulatory Commission (formerly known as Insurance Board of Sri Lanka )</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-1855498</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-28693"><narrative>Central Bank of Sri Lanka; Securities and Exchange Commission of Sri Lanka; Sri Lanka Insurance Regulatory Commission (formerly known as Insurance Board of Sri Lanka )</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-1840527</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-28693"><narrative>Central Bank of Sri Lanka; Securities and Exchange Commission of Sri Lanka; Sri Lanka Insurance Regulatory Commission (formerly known as Insurance Board of Sri Lanka )</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-1018506</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-28693"><narrative>Central Bank of Sri Lanka; Securities and Exchange Commission of Sri Lanka; Sri Lanka Insurance Regulatory Commission (formerly known as Insurance Board of Sri Lanka )</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P159303"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P159303?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P159303"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Citizen engagement indicator of percentage of project beneficiaries that feel project activities/services/results reflected their needs.
</narrative></title>
<baseline year="2016" iso-date="2016-09-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-09-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Achieved. Intermediate survey was not conducted due to COVID.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="75.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Outstanding MSME Loans from commercial banks (Note: Value of total loans granted by commercial /development banks)
</narrative></title>
<baseline year="2016" iso-date="2016-09-01" value="Published disaggregated data not N/A.

(total estimated around LKR 685 Billion)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-09-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Partially achieved. Data provided by 21 LCBs, out of a total 24 LCBs. Achievement of the target was impacted by adverse macroeconomic conditions due to COVID and macroeconomic crisis.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Outstanding MSME loans from licensed commercial banks (LCBs) -Rs. 1,227.3 Bn">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Year-end stock market capitalization (% of GDP)
</narrative></title>
<baseline year="2016" iso-date="2016-09-01" value="27.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-09-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Achievement of the target was impacted by adverse macroeconomic conditions due to COVID and macroeconomic crisis.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="18.80">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
(3) Increased share of private insurance companies (newly issued) insurance policies (measured by the growth of insurance premiums to GDPtarget 3%)
</narrative></title>
<baseline year="2016" iso-date="2016-09-01" value="1.05"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-09-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Achievement of the target was impacted by adverse macroeconomic conditions due to COVID and the macroeconomic crisis.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="1.10">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
(1) Increased transactions of retail electronic payments on the modernized infrastructure (measured by the cards issued under NCS to total debit cards in the system target 15%)
</narrative></title>
<baseline year="2016" iso-date="2016-09-01" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-09-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Achievement of the target was impacted by low demand for national cards due to high competition from international cards and lack of incentives to use domestic cards. ??????????????&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="0.63">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IBSLs regulatory framework and supervisory practices have a significantly high level of observance of the International Association of Insurance Supervisors- Insurance Core Principles (IAIS-ICPs)
</narrative></title>
<baseline year="2016" iso-date="2016-09-01" value="Largely observed (6 of 26 principles; partially observed 3 of 26 principles; assessed yet not finalized 10 of 26 principles; not assessed 7 of 26 principles)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-09-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Not achieved.&amp;nbsp;Self-assessment and peer reviews of observance of&amp;nbsp; ICPs was conducted in 2011 on ICPs 1 &amp;amp; 2 and the assessment results were Largely observed (LO) and Partly Observed (PO) respectively.&amp;nbsp;&amp;nbsp;Further review was done in 2022, on ICPs 9 and 10, and the assessment results were LO for both ICPs.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Review of all ICPs are being carried out by a committee formed by the Ministry of Justice to make amendments to the Insurance Act. The Insurance Act is not enacted.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Outstanding Corporate Debt (% of GDP)
</narrative></title>
<baseline year="2016" iso-date="2016-09-01" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-09-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Achievement of the target was impacted by adverse macroeconomic conditions due to COVID and macroeconomic crisis.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="0.93">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Outstanding Microfinance lending from licensed microfinance institutions
</narrative></title>
<baseline year="2016" iso-date="2016-09-01" value="None (not licensed yet)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-09-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Data was not collected since the microfinance sector was not under the purview of the CBSL. ???????&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="None (not licensed yet)">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Audit reports completed and submitted within six months of closing of the financial year.
</narrative></title>
<baseline year="2016" iso-date="2016-09-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-09-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Partially achieved.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="IUFRs submitted, audit reports submitted with delays.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
RTGS new system with multi-currency settlement and convertibility features and the Scripless Securities Settlement System (SSSS) with Central Depository System operational
</narrative></title>
<baseline year="2016" iso-date="2016-09-01" value="New system Not operational"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-09-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Partially achieved, full achievement is expected after the project closure.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="RTGS test environment installed and testing in progress. The system will go live Q1 2024.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regulatory and supervisory framework with proportionate risk-based supervision for microfinance established and operational
</narrative></title>
<baseline year="2016" iso-date="2016-09-01" value="Non-operational"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-09-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Data was not collected since the microfinance sector was not under purview of the CBSL.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Non-compliant">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Plans and reports are generated and discussed in a timely manner
</narrative></title>
<baseline year="2016" iso-date="2016-09-01" value="Procurement Plans approved"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-09-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Fully achieved.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Procurement Plans implemented; Operations Manual agreed with IAs">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increased participation (trading) in the secondary market Central Government bonds (measured by the growth in secondary market trades of Central Government Debt in value termstarget 5%)
</narrative></title>
<baseline year="2016" iso-date="2016-09-01" value="LKR 6,591 Billion"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-09-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Outcome Indicator fully achieved. ???????&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="LKR 26,080 bn">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Central Counter Party system established for the securities market
</narrative></title>
<baseline year="2016" iso-date="2016-09-01" value="Non operational"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-09-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Partially achieved, full achievement is expected after the project closure.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="The policy framework was approved. The CSE is in the process of obtaining requisite IT infrastructure. The system delivery is expected by the end of December 2023 and the target date to go-live is 2Q 2024.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
CBSL has undertaken consolidated risk-based supervision of banks on both solo and group wide basis, and performs risk assessment on a stand-alone and consolidated basis (Basel Core Principles for effe
</narrative></title>
<baseline year="2016" iso-date="2016-09-01" value="Non compliant"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-09-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Fully achieved.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Bank Supervision Department completed 1 consolidated risk-based examination during the first half of 2023. Another 2 risk-based consolidated examinations are to be carried-out in the second half of 2023. In total 3 supervisions were completed (2 in 2022 and 1 in 2023)">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
SECs regulatory framework and supervisory practices have a significantly high level of observance of the International Organization of Securities Commissions (IOSCO)  Objectives and Principles of Se
</narrative></title>
<baseline year="2016" iso-date="2016-09-01" value="3 of 38 principles fully implemented, 13 of 38 Broadly implemented, 17 of 38 partially implemented; 6 of 38 not implemented; 1 of 38 not applicable"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-09-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Partially achieved, formal assessment is required to confirm achievement.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Securities and Exchange Commission Act No. 19 of 2021 came into effect in September 2021. Majority of the requirements identified by the IOSCO Objectives and Principles of Securities Regulation is addressed through the new Securities Law and the subordinate regulations.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regulatory and supervisory framework for financial consumer protection established and in use
</narrative></title>
<baseline year="2016" iso-date="2016-09-01" value="Non-existent"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-09-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Partially achieved, full operationalization of regulations is expected after the project closure.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Monetary Board approved the FCP regulations on 18 July 2023 and FCRD published it in the government gazette on 09 August 2023.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Change in investment portfolio composition of EPF (% in government securities)
</narrative></title>
<baseline year="2016" iso-date="2016-09-01" value="90-95% in government securities"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-09-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;&amp;nbsp;Not achieved.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="93.94">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
CBSL &amp; LankaClear Assessment of Observance of the CPSS_IOSCO Principles for Financial Market Infrastructures completed
</narrative></title>
<baseline year="2016" iso-date="2016-09-01" value="Not assessed"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-09-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Fully achieved.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="CBSL completed the self-assessment of CPSS-IOSCO-PFMI compliance. For RTGS, 17/17 relevant PFMIs are observed or broadly observed; for CDS, 19/19 relevant PFMIs are observed or broadly observed.">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-11-20T15:47:22" hierarchy="1"><iati-identifier>44000-P159995</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Accelerating Higher Education Expansion and Development Operation</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0029384"><narrative>Ministry of Finance</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0029384"><narrative>Ministry of Finance</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="LK-COA-0029383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2016-12-08"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2017-05-12"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2023-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2023-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Maya Sherpa</narrative></person-name><telephone>+1-202-473-1000</telephone><email>msherpa@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="LK" percentage="100"><narrative xml:lang="en">SRI LANKA</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="1248991" />
                <name><narrative>Colombo</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>6.93548 79.848679</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="11420" percentage="42" xml:lang="en"/><sector vocabulary="1" code="22040" percentage="27" xml:lang="en"/><sector vocabulary="1" code="11182" percentage="25" xml:lang="en"/><sector vocabulary="1" code="11130" percentage="6" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="ET" percentage="100.000000" xml:lang="en"><narrative>FY17 - Tertiary Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="100" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000654" percentage="13" xml:lang="en"><narrative>Teachers</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000653" percentage="41" xml:lang="en"><narrative>Science and Technology</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000651" percentage="24" xml:lang="en"><narrative>Access to Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000652" percentage="46" xml:lang="en"><narrative>Education Financing</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="1900-01-01"/>
<period-end iso-date="1900-01-01"/>
<value currency="USD" value-date="1900-01-01">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="1900-01-01"/>
<period-end iso-date="1900-01-01"/>
<value currency="USD" value-date="1900-01-01">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">1378676.56</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">1378676.56</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">33000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">67000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-2155160</value><description xml:lang="en"><narrative>Total Commitment Cancellations in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">167500</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">823984</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">320000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">2561634</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">2143811</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">1570000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">2529833</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">3700000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">2587838</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">4500000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-01-31"/><value value-date="2020-01-31">400000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">2000000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">2050680</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">4141170</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">500000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">3000000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">3000000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">5500000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">3100000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">3800000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">4304500</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">5697040</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">373000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">7002550</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">5000000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-01-31"/><value value-date="2022-01-31">4000000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">260000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">4000000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">150000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">1500000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">2831787</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">2230140</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">3500000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">1010000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">50274</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">4000000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">425000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">4000000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-108784</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-634</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">-167500</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-967</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-112866</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-117321</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-32741</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-176520</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-62840</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-70878</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-193543</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-111326</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-231815</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-175456</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-155995</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-211960</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-165507</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-250282</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-187004</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-284658</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-450474</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-431375</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-1065853</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-1093913</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-321254</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-1369552</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-310030</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-1584776</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-306452</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-1608612</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-294297</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-1510957</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-286325</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-1532953</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-303946</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-283436</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-1460107</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-535768</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-529810</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-540555</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-533989</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-532769</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-529254</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-543075</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-547757</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-550878</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29383"><narrative>Ministry of Higher Education and Cultural Affairs</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P159995"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P159995?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P159995"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of entity audit reports available within stipulated time period after end of financial year
</narrative></title>
<baseline year="2017" iso-date="2017-03-28" value="10 out of 17 entities had the FY14 audit reports available within 12 months of the end of the financial year, that is, by December 31, 2015."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-28" />
<period-end iso-date="2022-12-27" />
<target value="All 17 entities have the FY20 audit reports available within 9 months of the end of the financial year, that is, by September 30, 2021.">
<comment><narrative>
12 Universities, UGC and SLIATE received audit reports within the stipulated time period.  Other institutions need more time, due to the disruptions caused by the economic crisis.
</narrative></comment>
</target>
<actual value="70%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
SLIATE STEM programs increase intake
</narrative></title>
<baseline year="2017" iso-date="2017-03-28" value="2,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-28" />
<period-end iso-date="2022-12-27" />
<target value="5,200.00">
<comment><narrative>
The target has been exceeded.
</narrative></comment>
</target>
<actual value="5,357">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Enrollment in SLIATE STEM programs increased
</narrative></title>
<baseline year="2017" iso-date="2017-03-28" value="6,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-28" />
<period-end iso-date="2022-12-27" />
<target value="9,200.00">
<comment><narrative>
The target has been exceeded.
</narrative></comment>
</target>
<actual value="10,321">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Citizen engagement: Stakeholder feedback surveys conducted
</narrative></title>
<baseline year="2017" iso-date="2017-03-28" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-28" />
<period-end iso-date="2022-12-27" />
<target value="Satisfaction levels of stakeholders have increased by well over 30 percent of the baseline.">
<comment><narrative>
The OMST has prepared a report using stakeholder feedback to assess satisfaction levels.  Satisfaction levels show an increase of well above 30 percent of the baseline.  The target has been exceeded.
</narrative></comment>
</target>
<actual value="The OMST is using stakeholder feedback to assess satisfaction levels.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Faculty-level systems for ELTA and ELSE through competitive grants developed and outcomes achieved
</narrative></title>
<baseline year="2017" iso-date="2017-03-28" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-28" />
<period-end iso-date="2022-12-27" />
<target value="At least 20 faculties awarded ELTA-ELSE grants have achieved 80 percent of their outcome targets related to the promotion of academic learning combined with interactions between university students and the world of work.">
<comment><narrative>
The target has been exceeded.
</narrative></comment>
</target>
<actual value="35 faculties awarded ELTA-ELSE grants have achieved 80 percent or more of their outcome targets to date.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
University-level systems for Research and Development Innovation, and Commercialization (RDIC) programs developed and outcomes achieved
</narrative></title>
<baseline year="2017" iso-date="2017-03-28" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-28" />
<period-end iso-date="2022-12-27" />
<target value="80 percent of their outcome targets.">
<comment><narrative>
The target has been exceeded.
</narrative></comment>
</target>
<actual value="91 RDIC projects achieved 80 percent or more of their outcomes.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increased quality assurance of the university system
</narrative></title>
<baseline year="2017" iso-date="2017-03-28" value="A QA review system has been developed. A new sequence of QA reviews of universities, based on updated manuals, will be implemented from 2018 onwards."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-28" />
<period-end iso-date="2022-12-27" />
<target value="Quality assurance reviews of at least 90 percent of the universities completed and ratings published.">
<comment><narrative>
Target has been achieved.
</narrative></comment>
</target>
<actual value="Quality assurance reviews of 100% of universities completed.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Enrollment in HEI STEM undergraduate degree programs increased
</narrative></title>
<baseline year="2017" iso-date="2017-03-28" value="42,800.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-28" />
<period-end iso-date="2022-12-27" />
<target value="53,100.00">
<comment><narrative>
The target has been exceeded.
</narrative></comment>
</target>
<actual value="69,029.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Students benefiting from direct interventions to enhance learning
</narrative></title>
<baseline year="2017" iso-date="2017-08-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-08-28" />
<period-end iso-date="2023-03-28" />
<target value="100,000.00">

</target>
<actual value="120,000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of cash released, by Treasury against the cash requests, for the items in the program expenditure framework channeled through the regular treasury system
</narrative></title>
<baseline year="2017" iso-date="2017-03-28" value="95.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-28" />
<period-end iso-date="2022-12-27" />
<target value="95.00">
<comment><narrative>
The target has been achieved.
</narrative></comment>
</target>
<actual value="97.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
University IQAUs function to specified standards
</narrative></title>
<baseline year="2017" iso-date="2017-03-28" value="80.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-28" />
<period-end iso-date="2022-12-27" />
<target value="90.00">
<comment><narrative>
The target has been exceeded.
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Universities develop business linkage (UBL) offices functioning to specified standards
</narrative></title>
<baseline year="2017" iso-date="2017-03-28" value="UBL guidelines issued by UGC"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-28" />
<period-end iso-date="2022-12-27" />
<target value="UBL offices functioning to specified standards in at least 80 percent of the universities">
<comment><narrative>
The target has been exceeded.
</narrative></comment>
</target>
<actual value="UBL offices functioning to specified standards in 100 percent of the universities.">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-11-20T15:47:22" hierarchy="1"><iati-identifier>44000-P160005</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>CRes MPA</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0029402"><narrative>Democratic Socialist Republic of Sri Lanka</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="LK-COA-0029403"><narrative>Ministry of Irrigation</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2017-09-29"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2019-06-25"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2026-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="2" iso-date="2026-12-31"><narrative>Projected end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Anna-Maria Bogdanova</narrative></person-name><telephone>+1-202-473-1000</telephone><email>ambogdanova@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="LK" percentage="100"><narrative xml:lang="en">SRI LANKA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001228729" />
            <name><narrative>Ratnapura District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.5831 80.5833</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001228856" />
            <name><narrative>Ranwala</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.2792 80.2565</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001229611" />
            <name><narrative>Pugoda</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.9911 80.1197</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001230613" />
            <name><narrative>Peliyagoda</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.9685 79.8836</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001232781" />
            <name><narrative>Nuwara Eliya District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.9785 80.7133</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001233002" />
            <name><narrative>Nilwala Ganga</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.93333 80.53333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001234308" />
            <name><narrative>Mundeni Aru</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.7787 81.5506</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001236396" />
            <name><narrative>Malwana</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.6143 80.2301</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001236901" />
            <name><narrative>Maha Oya</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.95 80.1</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001240624" />
            <name><narrative>Kelani Ganga</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.9785 79.868</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001240722" />
            <name><narrative>Kegalle District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.1167 80.3333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001241621" />
            <name><narrative>Kandy District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.3044 80.7073</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001241963" />
            <name><narrative>Kalutara District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.6031 80.1026</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001242288" />
            <name><narrative>Kala Oya</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.2982 79.8335</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001242510" />
            <name><narrative>Kaduwela</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.4 80.65</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001244774" />
            <name><narrative>Hanwella</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.5867 80.1769</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001245719" />
            <name><narrative>Gin Ganga</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.0626 80.1719</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001246005" />
            <name><narrative>Gampaha District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.1333 80</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001248506" />
            <name><narrative>Deduru Oya</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.6126 79.7947</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001248990" />
            <name><narrative>Colombo District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.8664 80.0166</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001250447" />
            <name><narrative>Bambalapitiya</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.8914 79.855</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001250806" />
            <name><narrative>Attanagalu Oya</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.0868 79.952</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001251531" />
            <name><narrative>Ambatale</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.9368 79.9349</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007474404" />
            <name><narrative>Mahaweli Ganga</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.196 80.816</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007435319" />
            <name><narrative>Malwatu Oya</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.0135 80.4149</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007624581" />
            <name><narrative>Gal Oya</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.1339 80.64</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><sector vocabulary="1" code="43060" percentage="42" xml:lang="en"/><sector vocabulary="1" code="14040" percentage="36" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="11" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="7" xml:lang="en"/><sector vocabulary="1" code="22040" percentage="4" xml:lang="en"/><sector vocabulary="1" code="41010" percentage="0" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="34.0000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WZ" percentage="63.0000000" xml:lang="en"><narrative>FY17 - Other Water Supply, Sanitation and Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="CI" percentage="3.00000000" xml:lang="en"><narrative>FY17 - ICT Infrastructure</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000753" percentage="100" xml:lang="en"><narrative>Disaster Preparedness</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000751" percentage="21" xml:lang="en"><narrative>Disaster Response and Recovery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="100" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000521" percentage="21" xml:lang="en"><narrative>Social Safety Nets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000026" percentage="4" xml:lang="en"><narrative>ICT</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="100" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="64" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000261" percentage="4" xml:lang="en"><narrative>ICT Solutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="64" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="21" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000026" percentage="4" xml:lang="en"><narrative>ICT</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="100" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000851" percentage="64" xml:lang="en"><narrative>Water Institutions, Policies and Reform</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">771900.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">925970.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">1077250.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">592720.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">1283710.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">1404920.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">1568910.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">1765760.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">1893170.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">1955790.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">2007250.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">2078550.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">2114510.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">1059890.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">2074520.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">2041040.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">2085680.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">2209370.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">2355070.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">2420170.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">2542930.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">2741640.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">2875870.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">1486140.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">3110850.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">3350790.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">3518500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">3601270.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">3787270.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">4073400.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">4285440.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">4455940.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">4735870.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">2498600.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">5258220.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">5555820.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">5866440.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">6176440.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">6530770.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">6876730.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">7155110.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">7364360.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">7629100.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">3928320.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">8047290.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">8280720.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">8573980.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">8912500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">9125780.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">9261250.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">9348980.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">9510180.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">9688120.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">9809330.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">4963410.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">10070660.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">10244260.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">10401430.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">10557050.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">10715770.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">10877900.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">8519420.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">266739277.71</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">266739277.71</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">310000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29403"><narrative>Ministry of Irrigation</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-218000000</value><description xml:lang="en"><narrative>Total Commitment Cancellations in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29403"><narrative>Ministry of Irrigation</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-16000000</value><description xml:lang="en"><narrative>Total Commitment Cancellations in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29403"><narrative>Ministry of Irrigation</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">230000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29403"><narrative>Ministry of Irrigation</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">580000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29403"><narrative>Ministry of Irrigation</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">2791276</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29403"><narrative>Ministry of Irrigation</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">1060988</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29403"><narrative>Ministry of Irrigation</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">1155510</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29403"><narrative>Ministry of Irrigation</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">2192948</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29403"><narrative>Ministry of Irrigation</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">3000000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29403"><narrative>Ministry of Irrigation</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">3000000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29403"><narrative>Ministry of Irrigation</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">2500000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29403"><narrative>Ministry of Irrigation</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">1500000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29403"><narrative>Ministry of Irrigation</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">1500000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29403"><narrative>Ministry of Irrigation</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">3000000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29403"><narrative>Ministry of Irrigation</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">5000000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29403"><narrative>Ministry of Irrigation</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">3300000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29403"><narrative>Ministry of Irrigation</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">12450000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29403"><narrative>Ministry of Irrigation</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-230000</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29403"><narrative>Ministry of Irrigation</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-75960</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29403"><narrative>Ministry of Irrigation</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-123488</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29403"><narrative>Ministry of Irrigation</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-135632</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29403"><narrative>Ministry of Irrigation</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-191154</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29403"><narrative>Ministry of Irrigation</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-262027</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29403"><narrative>Ministry of Irrigation</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-307348</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29403"><narrative>Ministry of Irrigation</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-426865</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29403"><narrative>Ministry of Irrigation</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-618964</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29403"><narrative>Ministry of Irrigation</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-650381</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-29403"><narrative>Ministry of Irrigation</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P160005"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P160005?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P160005"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of irrigation and storm-water infrastructure improved
</narrative></title>
<baseline year="2023" iso-date="2023-01-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-14" />
<period-end iso-date="2026-12-14" />
<target value="100">

</target>
<actual value="79">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Enhanced capacity for hazard monitoring, severe weather forecasting, and emergency management
</narrative></title>
<baseline year="2025" iso-date="2025-04-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-13" />
<period-end iso-date="2026-12-12" />
<target value="2">
<comment><narrative>
Target: at least two aspects of hazard monitoring, severe weather forecasting, and emergency management systems are improved [equipment, personnel, facilities, and/or information management system]
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Enhanced capacity for hazard monitoring, severe weather forecasting, and emergency management
</narrative></title>
<baseline year="2025" iso-date="2025-04-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-13" />
<period-end iso-date="2026-12-12" />
<target value="2">
<comment><narrative>
Target: at least two aspects of hazard monitoring, severe weather forecasting, and emergency management systems are improved [equipment, personnel, facilities, and/or information management system]
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Operation centers modernized at implementing agencies
</narrative></title>
<baseline year="2021" iso-date="2021-12-05" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-05" />
<period-end iso-date="2026-12-05" />
<target value="4">
<comment><narrative>
NBRO's operation center has been modernized.
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Climate resilient designs ready for construction for improved flood risk reduction infrastructure in Kelani basin
</narrative></title>
<baseline year="2021" iso-date="2021-12-14" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-14" />
<period-end iso-date="2026-12-14" />
<target value="Yes">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Community members benefitting from irrigation and storm water irrigation improvement activities
</narrative></title>
<baseline year="2023" iso-date="2023-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-01" />
<period-end iso-date="2026-12-01" />
<target value="240,000">

</target>
<actual value="305,000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2025" iso-date="2025-04-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-12" />
<period-end iso-date="2026-12-12" />
<target value="440">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Decision support system established
</narrative></title>
<baseline year="2021" iso-date="2021-12-05" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-05" />
<period-end iso-date="2026-12-05" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Operation centers modernized at implementing agencies
</narrative></title>
<baseline year="2021" iso-date="2021-12-05" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-05" />
<period-end iso-date="2026-12-05" />
<target value="4">
<comment><narrative>
NBRO's operation center has been modernized.
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Improved performance of risk-based warning
</narrative></title>
<baseline year="2019" iso-date="2019-02-05" value="10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-02-05" />
<period-end iso-date="2026-12-05" />
<target value="66">

</target>
<actual value="38">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Enhanced capacity for hazard monitoring, severe weather forecasting, and emergency management
</narrative></title>
<baseline year="2025" iso-date="2025-04-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-13" />
<period-end iso-date="2026-12-12" />
<target value="2">
<comment><narrative>
Target: at least two aspects of hazard monitoring, severe weather forecasting, and emergency management systems are improved [equipment, personnel, facilities, and/or information management system]
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People who can take action to protect their lives, livelihood, and property based on early warnings
</narrative></title>
<baseline year="2021" iso-date="2021-12-05" value="15,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-05" />
<period-end iso-date="2026-12-05" />
<target value="3,500,000.00">

</target>
<actual value="568,000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Government professionals trained for forecasting and early warning
</narrative></title>
<baseline year="2021" iso-date="2021-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-14" />
<period-end iso-date="2026-12-14" />
<target value="100">

</target>
<actual value="65">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances addressed
</narrative></title>
<baseline year="2021" iso-date="2021-12-09" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-09" />
<period-end iso-date="2026-12-09" />
<target value="100">

</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Government professionals trained for forecasting and early warning
</narrative></title>
<baseline year="2021" iso-date="2021-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-14" />
<period-end iso-date="2026-12-14" />
<target value="100">

</target>
<actual value="65">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Operation centers modernized at implementing agencies
</narrative></title>
<baseline year="2021" iso-date="2021-12-05" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-05" />
<period-end iso-date="2026-12-05" />
<target value="4">
<comment><narrative>
NBRO's operation center has been modernized.
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Improved performance of risk-based warning
</narrative></title>
<baseline year="2019" iso-date="2019-02-05" value="10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-02-05" />
<period-end iso-date="2026-12-05" />
<target value="66">

</target>
<actual value="50">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Improved performance of risk-based warning
</narrative></title>
<baseline year="2019" iso-date="2019-02-05" value="10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-02-05" />
<period-end iso-date="2026-12-05" />
<target value="66">

</target>
<actual value="10">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2025" iso-date="2025-04-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-12" />
<period-end iso-date="2026-12-12" />
<target value="440">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2025" iso-date="2025-04-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-12" />
<period-end iso-date="2026-12-12" />
<target value="440">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of irrigation and storm-water infrastructure improved
</narrative></title>
<baseline year="2023" iso-date="2023-01-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-14" />
<period-end iso-date="2026-12-14" />
<target value="100">

</target>
<actual value="141">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Climate resilient designs ready for construction for improved flood risk reduction infrastructure in Kelani basin
</narrative></title>
<baseline year="2021" iso-date="2021-12-14" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-14" />
<period-end iso-date="2026-12-14" />
<target value="Yes">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Community members benefitting from irrigation and storm water irrigation improvement activities
</narrative></title>
<baseline year="2023" iso-date="2023-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-01" />
<period-end iso-date="2026-12-01" />
<target value="240,000">

</target>
<actual value="35,0000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances addressed
</narrative></title>
<baseline year="2021" iso-date="2021-12-09" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-09" />
<period-end iso-date="2026-12-09" />
<target value="100">

</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Improved performance of risk-based warning
</narrative></title>
<baseline year="2019" iso-date="2019-02-05" value="10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-02-05" />
<period-end iso-date="2026-12-05" />
<target value="66">

</target>
<actual value="50">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Improved performance of risk-based warning
</narrative></title>
<baseline year="2019" iso-date="2019-02-05" value="10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-02-05" />
<period-end iso-date="2026-12-05" />
<target value="66">

</target>
<actual value="38">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Improved performance of risk-based warning
</narrative></title>
<baseline year="2019" iso-date="2019-02-05" value="10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-02-05" />
<period-end iso-date="2026-12-05" />
<target value="66">

</target>
<actual value="10">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People who can take action to protect their lives, livelihood, and property based on early warnings
</narrative></title>
<baseline year="2021" iso-date="2021-12-05" value="15,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-05" />
<period-end iso-date="2026-12-05" />
<target value="3,500,000.00">

</target>
<actual value="568,000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People who can take action to protect their lives, livelihood, and property based on early warnings
</narrative></title>
<baseline year="2021" iso-date="2021-12-05" value="15,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-05" />
<period-end iso-date="2026-12-05" />
<target value="3,500,000.00">

</target>
<actual value="56,8000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People who can take action to protect their lives, livelihood, and property based on early warnings
</narrative></title>
<baseline year="2021" iso-date="2021-12-05" value="15,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-05" />
<period-end iso-date="2026-12-05" />
<target value="3,500,000.00">

</target>
<actual value="449,856">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2025" iso-date="2025-04-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-12" />
<period-end iso-date="2026-12-12" />
<target value="440">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2025" iso-date="2025-04-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-12" />
<period-end iso-date="2026-12-12" />
<target value="440">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2025" iso-date="2025-04-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-12" />
<period-end iso-date="2026-12-12" />
<target value="440">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Enhanced capacity for hazard monitoring, severe weather forecasting, and emergency management
</narrative></title>
<baseline year="2025" iso-date="2025-04-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-13" />
<period-end iso-date="2026-12-12" />
<target value="2">
<comment><narrative>
Target: at least two aspects of hazard monitoring, severe weather forecasting, and emergency management systems are improved [equipment, personnel, facilities, and/or information management system]
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Enhanced capacity for hazard monitoring, severe weather forecasting, and emergency management
</narrative></title>
<baseline year="2025" iso-date="2025-04-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-13" />
<period-end iso-date="2026-12-12" />
<target value="2">
<comment><narrative>
Target: at least two aspects of hazard monitoring, severe weather forecasting, and emergency management systems are improved [equipment, personnel, facilities, and/or information management system]
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Enhanced capacity for hazard monitoring, severe weather forecasting, and emergency management
</narrative></title>
<baseline year="2025" iso-date="2025-04-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-13" />
<period-end iso-date="2026-12-12" />
<target value="2">
<comment><narrative>
Target: at least two aspects of hazard monitoring, severe weather forecasting, and emergency management systems are improved [equipment, personnel, facilities, and/or information management system]
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Community members benefitting from irrigation and storm water irrigation improvement activities
</narrative></title>
<baseline year="2023" iso-date="2023-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-01" />
<period-end iso-date="2026-12-01" />
<target value="240,000">

</target>
<actual value="40,8000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Community members benefitting from irrigation and storm water irrigation improvement activities
</narrative></title>
<baseline year="2023" iso-date="2023-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-01" />
<period-end iso-date="2026-12-01" />
<target value="240,000">

</target>
<actual value="35,0000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Community members benefitting from irrigation and storm water irrigation improvement activities
</narrative></title>
<baseline year="2023" iso-date="2023-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-01" />
<period-end iso-date="2026-12-01" />
<target value="240,000">

</target>
<actual value="305,000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People who can take action to protect their lives, livelihood, and property based on early warnings
</narrative></title>
<baseline year="2021" iso-date="2021-12-05" value="15,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-05" />
<period-end iso-date="2026-12-05" />
<target value="3,500,000.00">

</target>
<actual value="449,856">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Community members benefitting from irrigation and storm water irrigation improvement activities
</narrative></title>
<baseline year="2023" iso-date="2023-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-01" />
<period-end iso-date="2026-12-01" />
<target value="240,000">

</target>
<actual value="40,8000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People who can take action to protect their lives, livelihood, and property based on early warnings
</narrative></title>
<baseline year="2021" iso-date="2021-12-05" value="15,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-05" />
<period-end iso-date="2026-12-05" />
<target value="3,500,000.00">

</target>
<actual value="56,8000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Decision support system established
</narrative></title>
<baseline year="2021" iso-date="2021-12-05" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-05" />
<period-end iso-date="2026-12-05" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Decision support system established
</narrative></title>
<baseline year="2021" iso-date="2021-12-05" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-05" />
<period-end iso-date="2026-12-05" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Disaster and emergency preparedness  plans developed for Divisional Secretariats
</narrative></title>
<baseline year="2021" iso-date="2021-12-06" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-06" />
<period-end iso-date="2026-12-06" />
<target value="20">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Government professionals trained for forecasting and early warning
</narrative></title>
<baseline year="2021" iso-date="2021-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-14" />
<period-end iso-date="2026-12-14" />
<target value="100">

</target>
<actual value="65">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Disaster and emergency preparedness  plans developed for Divisional Secretariats
</narrative></title>
<baseline year="2021" iso-date="2021-12-06" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-06" />
<period-end iso-date="2026-12-06" />
<target value="20">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of irrigation and storm-water infrastructure improved
</narrative></title>
<baseline year="2023" iso-date="2023-01-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-14" />
<period-end iso-date="2026-12-14" />
<target value="100">

</target>
<actual value="141">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Climate resilient designs ready for construction for improved flood risk reduction infrastructure in Kelani basin
</narrative></title>
<baseline year="2021" iso-date="2021-12-14" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-14" />
<period-end iso-date="2026-12-14" />
<target value="Yes">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Improved performance of risk-based warning
</narrative></title>
<baseline year="2019" iso-date="2019-02-05" value="10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-02-05" />
<period-end iso-date="2026-12-05" />
<target value="66">

</target>
<actual value="50">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Improved performance of risk-based warning
</narrative></title>
<baseline year="2019" iso-date="2019-02-05" value="10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-02-05" />
<period-end iso-date="2026-12-05" />
<target value="66">

</target>
<actual value="38">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Improved performance of risk-based warning
</narrative></title>
<baseline year="2019" iso-date="2019-02-05" value="10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-02-05" />
<period-end iso-date="2026-12-05" />
<target value="66">

</target>
<actual value="10">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People who can take action to protect their lives, livelihood, and property based on early warnings
</narrative></title>
<baseline year="2021" iso-date="2021-12-05" value="15,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-05" />
<period-end iso-date="2026-12-05" />
<target value="3,500,000.00">

</target>
<actual value="568,000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People who can take action to protect their lives, livelihood, and property based on early warnings
</narrative></title>
<baseline year="2021" iso-date="2021-12-05" value="15,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-05" />
<period-end iso-date="2026-12-05" />
<target value="3,500,000.00">

</target>
<actual value="56,8000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People who can take action to protect their lives, livelihood, and property based on early warnings
</narrative></title>
<baseline year="2021" iso-date="2021-12-05" value="15,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-05" />
<period-end iso-date="2026-12-05" />
<target value="3,500,000.00">

</target>
<actual value="449,856">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2025" iso-date="2025-04-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-12" />
<period-end iso-date="2026-12-12" />
<target value="440">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2025" iso-date="2025-04-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-12" />
<period-end iso-date="2026-12-12" />
<target value="440">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2025" iso-date="2025-04-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-12" />
<period-end iso-date="2026-12-12" />
<target value="440">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Enhanced capacity for hazard monitoring, severe weather forecasting, and emergency management
</narrative></title>
<baseline year="2025" iso-date="2025-04-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-13" />
<period-end iso-date="2026-12-12" />
<target value="2">
<comment><narrative>
Target: at least two aspects of hazard monitoring, severe weather forecasting, and emergency management systems are improved [equipment, personnel, facilities, and/or information management system]
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Enhanced capacity for hazard monitoring, severe weather forecasting, and emergency management
</narrative></title>
<baseline year="2025" iso-date="2025-04-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-13" />
<period-end iso-date="2026-12-12" />
<target value="2">
<comment><narrative>
Target: at least two aspects of hazard monitoring, severe weather forecasting, and emergency management systems are improved [equipment, personnel, facilities, and/or information management system]
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Enhanced capacity for hazard monitoring, severe weather forecasting, and emergency management
</narrative></title>
<baseline year="2025" iso-date="2025-04-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-13" />
<period-end iso-date="2026-12-12" />
<target value="2">
<comment><narrative>
Target: at least two aspects of hazard monitoring, severe weather forecasting, and emergency management systems are improved [equipment, personnel, facilities, and/or information management system]
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Community members benefitting from irrigation and storm water irrigation improvement activities
</narrative></title>
<baseline year="2023" iso-date="2023-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-01" />
<period-end iso-date="2026-12-01" />
<target value="240,000">

</target>
<actual value="40,8000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Community members benefitting from irrigation and storm water irrigation improvement activities
</narrative></title>
<baseline year="2023" iso-date="2023-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-01" />
<period-end iso-date="2026-12-01" />
<target value="240,000">

</target>
<actual value="35,0000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Community members benefitting from irrigation and storm water irrigation improvement activities
</narrative></title>
<baseline year="2023" iso-date="2023-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-01" />
<period-end iso-date="2026-12-01" />
<target value="240,000">

</target>
<actual value="305,000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Disaster and emergency preparedness  plans developed for Divisional Secretariats
</narrative></title>
<baseline year="2021" iso-date="2021-12-06" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-06" />
<period-end iso-date="2026-12-06" />
<target value="20">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances addressed
</narrative></title>
<baseline year="2021" iso-date="2021-12-09" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-09" />
<period-end iso-date="2026-12-09" />
<target value="100">

</target>
<actual value="100">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-11-20T15:47:22" hierarchy="1"><iati-identifier>44000-P162949</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>SL Public Sector Efficiency Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0032347"><narrative>Democratic Socialist Republic of Sri Lanka</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="LK-COA-0032348"><narrative>Ministry of Finance</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2018-03-15"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2019-12-17"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2024-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2024-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Mohan Gopalakrishnan</narrative></person-name><telephone>+1-202-473-1000</telephone><email>mgopalakrishnan@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>




<recipient-country code="LK" percentage="100"><narrative xml:lang="en">SRI LANKA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001227603" />
            <name><narrative>Democratic Socialist Republic of Sri Lanka</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.75 80.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="15117" percentage="48" xml:lang="en"/><sector vocabulary="1" code="15155" percentage="29" xml:lang="en"/><sector vocabulary="1" code="15125" percentage="19" xml:lang="en"/><sector vocabulary="1" code="15210" percentage="4" xml:lang="en"/><sector vocabulary="1" code="15126" percentage="0" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="100.000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="71" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="71" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="38" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="38" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000024" percentage="38" xml:lang="en"><narrative>Enterprise Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000243" percentage="38" xml:lang="en"><narrative>MSME Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000133" percentage="37" xml:lang="en"><narrative>Green Growth</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000114" percentage="30" xml:lang="en"><narrative>Tax policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000435" percentage="30" xml:lang="en"><narrative>Public Assets and Investment Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000024" percentage="38" xml:lang="en"><narrative>Enterprise Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="71" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="2" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="38" xml:lang="en"><narrative>Gender</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">308333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">308333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">308333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">308333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">308333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">308333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">308333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">308333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">308333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">308333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">308333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">308333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">108333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">108333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">108333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">108333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">108333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">108333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">108333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">108333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">108333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">108333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">108333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">108333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">33333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">33333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">33333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">33333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">33333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">33333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">33333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">33333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">33333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">33333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">33333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">33333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">541666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">541666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">541666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">541666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">541666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">541666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">541666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">541666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">541666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">541666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">541666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">541666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">650000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">650000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">650000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">650000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">650000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">650000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">650000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">650000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">650000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">650000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">650000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">650000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">1060000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">1060000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">1060000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">1060000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">1060000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">308333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">308333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">308333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">308333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">308333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">308333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">308333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">308333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">308333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">308333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">308333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">308333.37</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">108333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">108333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">108333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">108333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">108333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">108333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">108333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">108333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">108333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">108333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">108333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">108333.37</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">33333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">33333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">33333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">33333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">33333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">33333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">33333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">33333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">33333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">33333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">33333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">33333.37</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">541666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">541666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">541666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">541666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">541666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">541666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">541666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">541666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">541666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">541666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">541666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">541666.63</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">650000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">650000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">650000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">650000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">650000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">650000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">650000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">650000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">650000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">650000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">650000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">650000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">1060000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">1060000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">1060000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">1060000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">1060000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">25000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">25000000.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">25000000</value><description xml:lang="en"><narrative>Total Commitment in December Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-32348"><narrative>Ministry of Finance; National Audit Office of Sri Lanka</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-25000000</value><description xml:lang="en"><narrative>Total Commitment Cancellations in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-32348"><narrative>Ministry of Finance; National Audit Office of Sri Lanka</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-10-31"/><value value-date="2026-10-31">0</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-32348"><narrative>Ministry of Finance; National Audit Office of Sri Lanka</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P162949"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P162949?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P162949"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved efficiency and predictability of excise  management
</narrative></title>
<baseline year="2018" iso-date="2018-09-30" value="Absence of a Information Mgt system and outdated excise policy and regulations"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-30" />
<period-end iso-date="2024-12-31" />
<target value="DLR 2.3 New risk-based excise control system has been rolled out to the largest liquor producer and the largest beer producer in the Borrower's territory.">
<comment><narrative>
As per DLI/ DLR Verification Protocol
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improve efficiency of procurement function
</narrative></title>
<baseline year="2018" iso-date="2018-09-30" value="In 2018 there was no electronic procurement system in the Borrower's territory."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-30" />
<period-end iso-date="2024-12-31" />
<target value="E-procurement system core design functionalities are being used by over 70% of the procuring entities">
<comment><narrative>
Measures the progress in the development, implementation and roll out and use of the e-procurement system
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improvements in performance ratings of NAOSL in selected priority indicators as per SAI-PMF assessment.
</narrative></title>
<baseline year="2018" iso-date="2018-07-31" value="Scores in Domain B and E between 0 and 1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-07-31" />
<period-end iso-date="2024-12-31" />
<target value="Scores in Domain B and E increased to between 2-3">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of large projects that are vetted by the new Public Investment Management Committee
</narrative></title>
<baseline year="2019" iso-date="2019-09-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-27" />
<period-end iso-date="2024-12-31" />
<target value="80.00">
<comment><narrative>
% of large projects vetted, prioritized and approved by the Public Investment Committee
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in availability of information to the public on contracts approved and awarded at the Cabinet level
</narrative></title>
<baseline year="2019" iso-date="2019-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-04-30" />
<period-end iso-date="2024-12-31" />
<target value="100.00">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of accredited Procurement staff who are women
</narrative></title>
<baseline year="2019" iso-date="2019-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-30" />
<period-end iso-date="2024-09-30" />
<target value="35.00">
<comment><narrative>
Percentage of total accredited staff who are women
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Capacity of officials in the civil division of the Attorney General Office enhanced
</narrative></title>
<baseline year="2019" iso-date="2019-09-30" value="Low level of investment in enhancing the capacity of officials in the office of Attorney General"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-30" />
<period-end iso-date="2024-09-30" />
<target value="80 % of the Officers have received training consistent with the identified training needs">
<comment><narrative>
% of officers from the civil division having received the capacity building
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Proactive disclosure of information by ministries
</narrative></title>
<baseline year="2017" iso-date="2017-09-30" value="2017: 15% of ministries scored MS on their online statutory proactive disclosure."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-09-30" />
<period-end iso-date="2024-09-30" />
<target value="50% of all ministries score moderately satisfactory or above for their statutory online proactive disclosure.">
<comment><narrative>
Measures the improvement in capacity to and the quality of proactive disclosures by ministries as per the RTI and
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increased vetting and transparency of public investments
</narrative></title>
<baseline year="2017" iso-date="2017-09-30" value="In 2017 there was no integrated institutional arrangement to review and vet public investments; guidelines were outdated and did not include climate risks."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-09-30" />
<period-end iso-date="2024-12-31" />
<target value="DLR 1.3 80% of Large Investments submitted to NPD for review and/or approval have an independent pre-feasibility review published along with the project proposal on NPD's official website.">
<comment><narrative>
As per DLI/ DLR Verification Protocol
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Capacity of NAOSL to deliver against their mandate enhanced
</narrative></title>
<baseline year="2019" iso-date="2019-09-30" value="NAOSL performing between the founding and established levels as per SAI-PMF assessment in 2018 at an aggregate level with low scores in Domain B -Internal Governance and Domain E- Human Resources and Training"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-30" />
<period-end iso-date="2024-09-30" />
<target value="Improvement in SAI-PMF Assessment over priority indicator in baseline assessment in Domains B, C (Audit Quality and Reporting) and E">
<comment><narrative>
Improvement prioritized indicators as per SAI-PMF re-assessment over baseline
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Enhanced operational efficiency of processes in Excise Management
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="Manual processes deployed for application, processing and issue of licenses and permits"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2024-12-31" />
<target value="100% of the licenses, permits and passes are applied for and issued online using the excise management system">
<comment><narrative>
% increase in permits, licences and passes issued online
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction in time taken for procurement of standard goods and services
</narrative></title>
<baseline year="2019" iso-date="2019-04-30" value="265.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-04-30" />
<period-end iso-date="2024-12-31" />
<target value="159.00">
<comment><narrative>
% in reduction of average time from advertising to award
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Accredited Procurement staff
</narrative></title>
<baseline year="2019" iso-date="2019-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-30" />
<period-end iso-date="2024-09-30" />
<target value="1,000.00">
<comment><narrative>
No. of total accredited staff
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-11-20T15:47:22" hierarchy="1"><iati-identifier>44000-P163305</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Local Development Support Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0032676"><narrative>Democratic Socialist Republic of Sri Lanka</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="LK-COA-0032675"><narrative>Ministry of State for Provincial Councils and Local Government</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2018-05-31"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2019-03-14"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2024-11-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2024-11-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Phoram Shah</narrative></person-name><telephone>+1-202-473-1000</telephone><email>pshah5@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="LK" percentage="100"><narrative xml:lang="en">SRI LANKA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001225017" />
            <name><narrative>Vavuniya District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.86134 80.47576</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001226258" />
            <name><narrative>Trincomalee District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.58333 81.08333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001229899" />
            <name><narrative>Polonnaruwa District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8 81</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001234392" />
            <name><narrative>Mullaitivu District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.25 80.5499</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001236148" />
            <name><narrative>Mannar District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.86667 80.08333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001240371" />
            <name><narrative>Kilinochchi District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.39487 80.40894</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001242831" />
            <name><narrative>Jaffna District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.75 80.08333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001250159" />
            <name><narrative>Batticaloa District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.75 81.4997</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001250614" />
            <name><narrative>Badulla District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.98472 81.05639</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001251080" />
            <name><narrative>Anuradhapura District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.33333 80.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001251460" />
            <name><narrative>Ampara District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.0833 81.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="15129" percentage="36" xml:lang="en"/><sector vocabulary="1" code="43042" percentage="33" xml:lang="en"/><sector vocabulary="1" code="43060" percentage="29" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="2" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="1.00000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="99.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="93" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000221" percentage="7" xml:lang="en"><narrative>Job Creation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="29" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000437" percentage="100" xml:lang="en"><narrative>Municipal Institution Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000723" percentage="93" xml:lang="en"><narrative>Rural Infrastructure and service delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000513" percentage="7" xml:lang="en"><narrative>Participation and Civic Engagement</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="100" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="1" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="93" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000723" percentage="93" xml:lang="en"><narrative>Rural Infrastructure and service delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="29" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="82" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000437" percentage="100" xml:lang="en"><narrative>Municipal Institution Building</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">514166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">514166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">514166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">514166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">514166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">514166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">514166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">514166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">514166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">514166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">514166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">514166.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">1510833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">1510833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">1510833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">1510833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">1510833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">1510833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">1510833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">1510833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">1510833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">1510833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">1510833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">1510833.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">1874166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">1874166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">1874166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">1874166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">1874166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">1874166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">1874166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">1874166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">1874166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">1874166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">1874166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">1874166.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">1930000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">1930000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">1930000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">1930000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">1930000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">1930000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">1930000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">1930000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">1930000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">1930000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">1930000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">1930000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">4166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">4166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">4166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">4166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">4166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">4166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">4166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">4166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">4166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">4166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">4166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">4166.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">514166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">514166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">514166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">514166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">514166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">514166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">514166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">514166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">20203993.87</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">20203993.87</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">70000000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-32675"><narrative>Ministry of State for Provincial Councils and Local Government</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-20000000</value><description xml:lang="en"><narrative>Total Commitment Cancellations in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-32675"><narrative>Ministry of State for Provincial Councils and Local Government</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">-203994</value><description xml:lang="en"><narrative>Total Commitment Cancellations in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-32675"><narrative>Ministry of State for Provincial Councils and Local Government</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">175000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-32675"><narrative>Ministry of State for Provincial Councils and Local Government</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">1672676</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-32675"><narrative>Ministry of State for Provincial Councils and Local Government</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">555684</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-32675"><narrative>Ministry of State for Provincial Councils and Local Government</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">36103</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-32675"><narrative>Ministry of State for Provincial Councils and Local Government</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">2840000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-32675"><narrative>Ministry of State for Provincial Councils and Local Government</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">4702972</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-32675"><narrative>Ministry of State for Provincial Councils and Local Government</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">7976845</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-32675"><narrative>Ministry of State for Provincial Councils and Local Government</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">2777725</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-32675"><narrative>Ministry of State for Provincial Councils and Local Government</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">1500000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-32675"><narrative>Ministry of State for Provincial Councils and Local Government</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">4412325</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-32675"><narrative>Ministry of State for Provincial Councils and Local Government</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">2300000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-32675"><narrative>Ministry of State for Provincial Councils and Local Government</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">0</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-32675"><narrative>Ministry of State for Provincial Councils and Local Government</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">3000000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-32675"><narrative>Ministry of State for Provincial Councils and Local Government</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">411416</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-32675"><narrative>Ministry of State for Provincial Councils and Local Government</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">2500000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-32675"><narrative>Ministry of State for Provincial Councils and Local Government</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">2470935</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-32675"><narrative>Ministry of State for Provincial Councils and Local Government</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">2000000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-32675"><narrative>Ministry of State for Provincial Councils and Local Government</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">4000000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-32675"><narrative>Ministry of State for Provincial Councils and Local Government</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">2324561</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-32675"><narrative>Ministry of State for Provincial Councils and Local Government</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">3620718</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-32675"><narrative>Ministry of State for Provincial Councils and Local Government</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">13965</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-32675"><narrative>Ministry of State for Provincial Councils and Local Government</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">501163</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-32675"><narrative>Ministry of State for Provincial Councils and Local Government</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">3918</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-32675"><narrative>Ministry of State for Provincial Councils and Local Government</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">-175000</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-32675"><narrative>Ministry of State for Provincial Councils and Local Government</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">-115701</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-32675"><narrative>Ministry of State for Provincial Councils and Local Government</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">-114051</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-32675"><narrative>Ministry of State for Provincial Councils and Local Government</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-101672</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-32675"><narrative>Ministry of State for Provincial Councils and Local Government</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">-162192</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-32675"><narrative>Ministry of State for Provincial Councils and Local Government</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">-207660</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-32675"><narrative>Ministry of State for Provincial Councils and Local Government</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-220676</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-32675"><narrative>Ministry of State for Provincial Councils and Local Government</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-872114</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-32675"><narrative>Ministry of State for Provincial Councils and Local Government</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-760804</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-32675"><narrative>Ministry of State for Provincial Councils and Local Government</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-963660</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-32675"><narrative>Ministry of State for Provincial Councils and Local Government</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-997698</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-32675"><narrative>Ministry of State for Provincial Councils and Local Government</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-1141513</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-32675"><narrative>Ministry of State for Provincial Councils and Local Government</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-1239519</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-32675"><narrative>Ministry of State for Provincial Councils and Local Government</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-1241286</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-32675"><narrative>Ministry of State for Provincial Councils and Local Government</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P163305"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P163305?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P163305"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Tele-education broadcasts available in all nine provinces
</narrative></title>
<baseline year="2020" iso-date="2020-11-16" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-16" />
<period-end iso-date="2024-09-30" />
<target value="Yes">
<comment><narrative>
This component was managed by the Department of National Planning, Ministry of Finance with support from the World Bank Country Office (as part of pooled CERC) and has been completed.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of LGAs implementing participatory planning processes at the ward and LGA levels
</narrative></title>
<baseline year="2018" iso-date="2018-12-18" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-18" />
<period-end iso-date="2024-09-30" />
<target value="67.00">
<comment><narrative>
Indicator measures the percentage of LGAs who implement a participatory planning process and successfully adopt four of the five measures: communicate ward-level public planning meeting announcements, invite women-led CBOs, record attendance, record meeting minutes, and disseminate meeting decisions. All 134 participating LGAs have organized public consultations for the selection of sub-projects under BT4 and PT3. The consultations included women-led CBOs and all consultations have been recorded. The final decisions have been disseminated.  This target was  achieved for all three &quot;periods&quot; of the split rating as no changes were made to this indicator.
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of institutions benefiting from improved digital tools for secure and resilient continuity of operations
</narrative></title>
<baseline year="2020" iso-date="2020-11-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-16" />
<period-end iso-date="2024-09-30" />
<target value="80.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of beneficiaries benefiting from project investments
</narrative></title>
<baseline year="2018" iso-date="2018-12-18" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-18" />
<period-end iso-date="2024-09-30" />
<target value="800,000.00">
<comment><narrative>
The PCU revised the methodology to eliminate double counting and devised a methodology based on catchment areas. This target was  achieved for all three &quot;periods&quot; of the split rating as no changes were made to this indicator.
</narrative></comment>
</target>
<actual value="1,056,700">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Establishment of a citizen centric geo-referenced smart M&amp;E system in MPCLGS and LGAs
</narrative></title>
<baseline year="2018" iso-date="2018-12-18" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-18" />
<period-end iso-date="2024-09-30" />
<target value="Yes">
<comment><narrative>
A geo-referenced dashboard is fully developed.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Project Progress Reports submittted on time by the PCU
</narrative></title>
<baseline year="2018" iso-date="2018-12-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-15" />
<period-end iso-date="2024-09-15" />
<target value="25.00">
<comment><narrative>
The PCU submitted three Semi-annual Reports since July 2020 (2020 July, 2020 December, and 2021 July). In addition, since July 2022, the PCU submitted 25 monthly progress reports. This target was  achieved for all three &quot;periods&quot; of the split rating as no changes were made to this indicator.
</narrative></comment>
</target>
<actual value="28.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Performance Transfer system established and operationalized
</narrative></title>
<baseline year="2018" iso-date="2018-12-18" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-18" />
<period-end iso-date="2024-09-30" />
<target value="Yes">
<comment><narrative>
Preparatory grant and first cycle of performance transfer (PT1) are fully disbursed. The second and third cycles of performance transfer (PT2 and PT3)
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Establishment of a citizen centric geo-referenced smart M&amp;E system in MPCLGS and LGAs
</narrative></title>
<baseline year="2018" iso-date="2018-12-18" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-18" />
<period-end iso-date="2024-09-30" />
<target value="Yes">
<comment><narrative>
A geo-referenced dashboard is currently under development, expected to be fully established by September 2024.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of LGAs preparing annual financial statements within three months after close of the financial year
</narrative></title>
<baseline year="2018" iso-date="2018-12-18" value="101.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-18" />
<period-end iso-date="2024-09-30" />
<target value="134.00">

</target>
<actual value="134.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of basic transfers disbursed on a timely basis to eligible LGAs (measured by Province)
</narrative></title>
<baseline year="2018" iso-date="2018-12-18" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-18" />
<period-end iso-date="2024-09-30" />
<target value="4.00">
<comment><narrative>
Three cycles of BTs (BT1, 2, 3) have been completed. Implementation of BT4, which was launched in October 2023, is now complete. The target was revised from 5 to 4 in the third period of the split rating so the indicator achieved 4/5 in the first two periods of the split rating, and  4/4 in the last period.
</narrative></comment>
</target>
<actual value="4.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of LAPDPs updated at least twice during project implementation, with consultations at the village and ward level
</narrative></title>
<baseline year="2018" iso-date="2018-12-18" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-18" />
<period-end iso-date="2024-09-30" />
<target value="77.00">
<comment><narrative>
This indicator measures the number of LAPDPs updated under the project in a participatory manner at least two times during the four year implementation period.
The first update of 134 LAPDPs was completed by December 2020, while the second update was completed in February 2023. The third update was completed in October 2023 through a reprioritization of the list of sub-projects identified in earlier LAPDPs.
</narrative></comment>
</target>
<actual value="134.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of basic transfers disbursed on a timely basis to eligible LGAs (measured by Province)
</narrative></title>
<baseline year="2018" iso-date="2018-12-18" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-18" />
<period-end iso-date="2024-09-30" />
<target value="4.00">
<comment><narrative>
Three cycles of BTs (BT1, 2, 3) have been completed. Implementation of BT4, which was launched in October 2023, is now complete.
</narrative></comment>
</target>
<actual value="4.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of LGAs preparing annual financial statements within three months after close of the financial year
</narrative></title>
<baseline year="2018" iso-date="2018-12-18" value="101.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-18" />
<period-end iso-date="2024-09-30" />
<target value="134.00">
<comment><narrative>
This target was  achieved for all three &quot;periods&quot; of the split rating as no changes were made to this indicator.
</narrative></comment>
</target>
<actual value="134.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of basic transfers disbursed on a timely basis to eligible LGAs (measured by Province)
</narrative></title>
<baseline year="2018" iso-date="2018-12-18" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-18" />
<period-end iso-date="2024-09-30" />
<target value="4.00">
<comment><narrative>
Three cycles of BTs (BT1, 2, 3) have been completed. The last cycle of BT4, which was launched in October 2023, is under implementation.
</narrative></comment>
</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of beneficiaries benefiting from project investments
</narrative></title>
<baseline year="2018" iso-date="2018-12-18" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-18" />
<period-end iso-date="2024-09-30" />
<target value="800,000.00">
<comment><narrative>
This indicator measures the number of project beneficiaries in the sub-project pre-defined catchment area.
</narrative></comment>
</target>
<actual value="4,406,241.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
CERC Pool implemented in line with the Emergency Action Plan
</narrative></title>
<baseline year="2020" iso-date="2020-11-16" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-16" />
<period-end iso-date="2024-09-30" />
<target value="Yes">
<comment><narrative>
All activities described in the Sri Lanka CERC Pool Emergency Action Plan have been completed. The CERC pool was only activated in the second &quot;Period&quot; of the split rating, so achievement is only record for the periods 2 and 3.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of grievances received by the PCU in MPCLGS and the PIUs in the participating provinces that are addressed within a quarter
</narrative></title>
<baseline year="2018" iso-date="2018-12-18" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-18" />
<period-end iso-date="2024-09-30" />
<target value="75.00">
<comment><narrative>
In all, 24 Grievances were reported as of February 29, 2024, and 23 were reported as resolved. A court case is pending in Jaffna for the remaining grievance. A further 23 Grievances were reported from March 1 to November 30, 2024, of which three are pending resolution.
</narrative></comment>
</target>
<actual value="85.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of planned LGA spending aligned with community needs and priorities as indicated in the Local Authority Participatory Development Plans (LAPDPs)
</narrative></title>
<baseline year="2018" iso-date="2018-12-18" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-18" />
<period-end iso-date="2024-09-30" />
<target value="50.00">
<comment><narrative>
All sub projects in the basic tranche were selected as per the prioritized list of the LAPDPs.
</narrative></comment>
</target>
<actual value="56.66%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of LGAs that implement new citizen engagement and social accountability tools
</narrative></title>
<baseline year="2018" iso-date="2018-12-18" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-18" />
<period-end iso-date="2024-09-30" />
<target value="80.00">
<comment><narrative>
Indicator measures the number of LGAs that implement citizen engagement and social accountability tools. The tools include information campaigns, Social Audit Committees, geotagging, and public consultations.
134 Local Authorities have implemented information campaigns and 151 social audit committees have been established. They have also utilized GRMs by keeping a paper record of complaints received.
</narrative></comment>
</target>
<actual value="134.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of LAPDPs updated at least twice during project implementation, with consultations at the village and ward level
</narrative></title>
<baseline year="2018" iso-date="2018-12-18" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-18" />
<period-end iso-date="2024-09-30" />
<target value="77.00">
<comment><narrative>
This indicator measures the number of LAPDPs updated under the project in a participatory manner at least two times during the four year implementation period.
The first update of 134 LAPDPs was completed by December 2020, while the second update was completed in February 2023. The third update was completed in October 2023 through a reprioritization of the list of sub-projects identified in earlier LAPDPs. This target was  achieved for all three &quot;periods&quot; of the split rating as no changes were made to this indicator.
</narrative></comment>
</target>
<actual value="134.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of planned LGA spending aligned with community needs and priorities as indicated in the Local Authority Participatory Development Plans (LAPDPs)
</narrative></title>
<baseline year="2018" iso-date="2018-12-18" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-18" />
<period-end iso-date="2024-09-30" />
<target value="50.00">
<comment><narrative>
All sub projects in the basic tranche were selected according to the prioritized list of the LAPDPs.
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of direct project beneficiaries reached with seeds, planting material, compensation, equipment, works and services for COVID-19 recovery, segregated by gender
</narrative></title>
<baseline year="2020" iso-date="2020-11-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-16" />
<period-end iso-date="2024-09-30" />
<target value="100,000.00">
<comment><narrative>
This component was managed by the Department of National Planning, Ministry of Finance with support from the World Bank Country Office (as part of pooled CERC) and has been completed. During the crisis, it provided much-needed assistance to beneficiaries.
</narrative></comment>
</target>
<actual value="265,274.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of institutions benefiting from improved digital tools for secure and resilient continuity of operations
</narrative></title>
<baseline year="2020" iso-date="2020-11-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-16" />
<period-end iso-date="2024-09-30" />
<target value="80.00">
<comment><narrative>
This component was managed by the Department of National Planning, Ministry of Finance with support from the World Bank Country Office (as part of pooled CERC) and has been completed.
</narrative></comment>
</target>
<actual value="49.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of LGAs preparing annual financial statements within three months after close of the financial year
</narrative></title>
<baseline year="2018" iso-date="2018-12-18" value="101.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-18" />
<period-end iso-date="2024-09-30" />
<target value="134.00">

</target>
<actual value="134.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of LGAs that implement new citizen engagement and social accountability tools
</narrative></title>
<baseline year="2018" iso-date="2018-12-18" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-18" />
<period-end iso-date="2024-09-30" />
<target value="80.00">
<comment><narrative>
Indicator measures the number of LGAs that implement citizen engagement and social accountability tools. The tools include information campaigns, Social Audit Committees, geotagging, and public consultations.
134 Local Authorities have implemented information campaigns and 151 social audit committees have been established. They have also utilized GRMs by keeping a paper record of complaints received.  This target was  achieved for all three &quot;periods&quot; of the split rating as no changes were made to this indicator.
</narrative></comment>
</target>
<actual value="134.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
CERC Pool implemented in line with the Emergency Action Plan
</narrative></title>
<baseline year="2020" iso-date="2020-11-16" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-16" />
<period-end iso-date="2024-09-30" />
<target value="Yes">
<comment><narrative>
All activities described in the Sri Lanka CERC Pool Emergency Action Plan have been completed.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of beneficiaries benefiting from project investments
</narrative></title>
<baseline year="2018" iso-date="2018-12-18" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-18" />
<period-end iso-date="2024-09-30" />
<target value="800,000.00">
<comment><narrative>
The PCU revised the methodolgoy to eliminate double counting and devised a methodology based on catchment areas.
</narrative></comment>
</target>
<actual value="1,056,700">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Tele-education broadcasts available in all nine provinces
</narrative></title>
<baseline year="2020" iso-date="2020-11-16" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-16" />
<period-end iso-date="2024-09-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Project Progress Reports submittted on time by the PCU
</narrative></title>
<baseline year="2018" iso-date="2018-12-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-15" />
<period-end iso-date="2024-09-15" />
<target value="25.00">

</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Tele-education broadcasts available in all nine provinces
</narrative></title>
<baseline year="2020" iso-date="2020-11-16" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-16" />
<period-end iso-date="2024-09-30" />
<target value="Yes">
<comment><narrative>
This component was managed by the Department of National Planning, Ministry of Finance with support from the World Bank Country Office (as part of pooled CERC) and has been completed. This component is only evaluated from the moment it was activated in Period 2 of the split rating.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of respondents satisfied with LGA sub-projects (measured by Province)
</narrative></title>
<baseline year="2018" iso-date="2018-12-18" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-18" />
<period-end iso-date="2024-09-30" />
<target value="50.00">
<comment><narrative>
The independent survey is planned for 2024. The indicator value will be updated based on the survey results.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage increase of ward-level consultation meetings on the LAPDP, which are chaired by women ward councilors
</narrative></title>
<baseline year="2018" iso-date="2018-12-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-15" />
<period-end iso-date="2024-09-15" />
<target value="20.00">

</target>
<actual value="25.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage increase of ward-level consultation meetings on the LAPDP, which are chaired by women ward councilors
</narrative></title>
<baseline year="2018" iso-date="2018-12-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-15" />
<period-end iso-date="2024-09-15" />
<target value="20.00">

</target>
<actual value="25.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regularization of Social Audit Committees, with at least 30% women as chairpersons, to ensure community engagement with LGAs
</narrative></title>
<baseline year="2018" iso-date="2018-12-18" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-18" />
<period-end iso-date="2024-09-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of direct project beneficiaries reached with seeds, planting material, compensation, equipment, works and services for COVID-19 recovery, segregated by gender
</narrative></title>
<baseline year="2020" iso-date="2020-11-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-16" />
<period-end iso-date="2024-09-30" />
<target value="100,000.00">
<comment><narrative>
This component was managed by the Department of National Planning, Ministry of Finance with support from the World Bank Country Office (as part of pooled CERC) and has been completed. During the crisis, it provided much-needed assistance to beneficiaries. This component is only evaluated from the moment it was activated in Period 2 of the split rating.
</narrative></comment>
</target>
<actual value="265,274.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regularization of Social Audit Committees, with at least 30% women as chairpersons, to ensure community engagement with LGAs
</narrative></title>
<baseline year="2018" iso-date="2018-12-18" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-18" />
<period-end iso-date="2024-09-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
CERC Pool implemented in line with the Emergency Action Plan
</narrative></title>
<baseline year="2020" iso-date="2020-11-16" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-16" />
<period-end iso-date="2024-09-30" />
<target value="Yes">
<comment><narrative>
The activities, described in the Sri Lanka CERC Pool Emergency Action Plan, were completed.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of LGAs that increase their overall performance scores in deliverying improved services
</narrative></title>
<baseline year="2018" iso-date="2018-12-18" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-18" />
<period-end iso-date="2024-09-30" />
<target value="35.00">
<comment><narrative>
Three performance assessments have been conducted so far, with the last one conducted in October-November 2023. The LAs have shown good improvements in their performance scores.
</narrative></comment>
</target>
<actual value="90.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of elected ward representatives trained under the project (measured by Province)
</narrative></title>
<baseline year="2018" iso-date="2018-12-18" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-18" />
<period-end iso-date="2024-09-30" />
<target value="1,500.00">
<comment><narrative>
2,756 ward councilors are in the LDSP project area, of which 2,204 have been trained under the Capacity Development for Local Government (CDLG) Project during 2020 - 2023 March. Since March 19, 2023, the councils have been dissolved and at present, there are no ward councilors in LGAs. This target was  achieved for all three &quot;periods&quot; of the split rating as no changes were made to this indicator.
</narrative></comment>
</target>
<actual value="2,204.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of LGAs that increase their overall performance scores in deliverying improved services
</narrative></title>
<baseline year="2018" iso-date="2018-12-18" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-18" />
<period-end iso-date="2024-09-30" />
<target value="35.00">
<comment><narrative>
Three performance assessments have been conducted so far, with the last one conducted in October-November 2023. The LAs have shown good improvements in their performance scores. The value is for service delivery improvement.
</narrative></comment>
</target>
<actual value="79.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of elected ward representatives trained under the project (measured by Province)
</narrative></title>
<baseline year="2018" iso-date="2018-12-18" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-18" />
<period-end iso-date="2024-09-30" />
<target value="1,500.00">
<comment><narrative>
2,756 ward councilors are in the LDSP project area, of which 2,204 have been trained under the Capacity Development for Local Government (CDLG) Project during 2020 - 2023 March. Since March 19, 2023, the councils have been dissolved and at present, there are no ward councilors in LGAs.
</narrative></comment>
</target>
<actual value="2,204.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of respondents satisfied with LGA sub-projects (measured by Province)
</narrative></title>
<baseline year="2018" iso-date="2018-12-18" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-18" />
<period-end iso-date="2024-09-30" />
<target value="50.00">
<comment><narrative>
The independent survey was implemented in November 2024. The value is based on the survey result.
</narrative></comment>
</target>
<actual value="69.5">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of grievances received by the PCU in MPCLGS and the PIUs in the participating provinces that are addressed within a quarter
</narrative></title>
<baseline year="2018" iso-date="2018-12-18" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-18" />
<period-end iso-date="2024-09-30" />
<target value="75.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of respondents satisfied with LGA sub-projects (measured by Province)
</narrative></title>
<baseline year="2018" iso-date="2018-12-18" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-18" />
<period-end iso-date="2024-09-30" />
<target value="50.00">
<comment><narrative>
The independent survey was implemented in November 2024. The value is based on the survey result.  This target was  achieved for all three &quot;periods&quot; of the split rating as no changes were made to this indicator.
</narrative></comment>
</target>
<actual value="69.5">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Establishment of a citizen centric geo-referenced smart M&amp;E system in MPCLGS and LGAs
</narrative></title>
<baseline year="2018" iso-date="2018-12-18" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-18" />
<period-end iso-date="2024-09-30" />
<target value="Yes">
<comment><narrative>
A geo-referenced dashboard is fully developed.  This target was  achieved for all three &quot;periods&quot; of the split rating as no changes were made to this indicator.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of LGAs that increase their overall performance scores in deliverying improved services
</narrative></title>
<baseline year="2018" iso-date="2018-12-18" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-18" />
<period-end iso-date="2024-09-30" />
<target value="35.00">
<comment><narrative>
Three performance assessments have been conducted so far, with the last one conducted in October-November 2023. The LAs have shown good improvements in their performance scores. The value is for service delivery improvement. The targets were achieved across all three &quot;periods&quot; of the split rating (the targets were not revised throughout the project).
</narrative></comment>
</target>
<actual value="79.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of institutions benefiting from improved digital tools for secure and resilient continuity of operations
</narrative></title>
<baseline year="2020" iso-date="2020-11-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-16" />
<period-end iso-date="2024-09-30" />
<target value="80.00">
<comment><narrative>
This component was managed by the Department of National Planning, Ministry of Finance with support from the World Bank Country Office (as part of pooled CERC) and has been completed.
</narrative></comment>
</target>
<actual value="49.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of elected ward representatives trained under the project (measured by Province)
</narrative></title>
<baseline year="2018" iso-date="2018-12-18" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-18" />
<period-end iso-date="2024-09-30" />
<target value="1,500.00">
<comment><narrative>
2756 ward councilors are on LDSP project area, of which 2204 are trained under Capacity Development for Local Government (CDLG) project during 2020 - 2023 March. Since March 19 2023, the councils have been dissolved and there are no ward councilors in LGA at present.
</narrative></comment>
</target>
<actual value="2,204.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of planned LGA spending aligned with community needs and priorities as indicated in the Local Authority Participatory Development Plans (LAPDPs)
</narrative></title>
<baseline year="2018" iso-date="2018-12-18" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-18" />
<period-end iso-date="2024-09-30" />
<target value="50.00">
<comment><narrative>
All sub projects in the basic tranche were selected as per the prioritized list of the LAPDPs. This target was  achieved for all three &quot;periods&quot; of the split rating as no changes were made to this indicator.
</narrative></comment>
</target>
<actual value="56.66%">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of LGAs implementing participatory planning processes at the ward and LGA levels
</narrative></title>
<baseline year="2018" iso-date="2018-12-18" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-18" />
<period-end iso-date="2024-09-30" />
<target value="67.00">
<comment><narrative>
Indicator measures the percentage of LGAs who implement a participatory planning process and successfully adopt 4 of the 5 measures: communicate ward-level public planning meeting announcements, invite women-led CBOs, record attendance, record meeting minutes, and disseminate meeting decisions. All 134 participating LGAs have organized public consultations for the selection of sub-projects under the new cycles of BT4 and PT3. The consultations included women-led CBOs and these consultations were duly recorded. The fina decisions were disseminated.&amp;nbsp;
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of LGAs implementing participatory planning processes at the ward and LGA levels
</narrative></title>
<baseline year="2018" iso-date="2018-12-18" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-18" />
<period-end iso-date="2024-09-30" />
<target value="67.00">
<comment><narrative>
Indicator measures the percentage of LGAs who implement a participatory planning process and successfully adopt four of the five measures: communicate ward-level public planning meeting announcements, invite women-led CBOs, record attendance, record meeting minutes, and disseminate meeting decisions. All 134 participating LGAs have organized public consultations for the selection of sub-projects under BT4 and PT3. The consultations included women-led CBOs and all consultations have been recorded. The final decisions have been disseminated.
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regularization of Social Audit Committees, with at least 30% women as chairpersons, to ensure community engagement with LGAs
</narrative></title>
<baseline year="2018" iso-date="2018-12-18" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-18" />
<period-end iso-date="2024-09-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of LGAs that implement new citizen engagement and social accountability tools
</narrative></title>
<baseline year="2018" iso-date="2018-12-18" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-18" />
<period-end iso-date="2024-09-30" />
<target value="80.00">
<comment><narrative>
Indicator measures the number of LGAs that implement citizen engagement and social accountability tools. The tools include information campaigns, Social Audit Committees, geotagging, and public consultations.
134 Local Authorities have implemented information campaigns and 151 social audit committees have been established. 134 local authorities have implemented GRMs by keeping a paper record of complaints received. GRM tools have also been utilized.&amp;nbsp;
</narrative></comment>
</target>
<actual value="134.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Project Progress Reports submittted on time by the PCU
</narrative></title>
<baseline year="2018" iso-date="2018-12-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-15" />
<period-end iso-date="2024-09-15" />
<target value="25.00">
<comment><narrative>
The PCU submitted three Semi-annual Reports since July 2020 (2020 July, 2020 December, and 2021 July). In addition, since July 2022, the PCU submitted 25 monthly progress reports.
</narrative></comment>
</target>
<actual value="28.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of direct project beneficiaries reached with seeds, planting material, compensation, equipment, works and services for COVID-19 recovery, segregated by gender
</narrative></title>
<baseline year="2020" iso-date="2020-11-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-16" />
<period-end iso-date="2024-09-30" />
<target value="100,000.00">
<comment><narrative>
This indicator measures the cumulative number of direct beneficiaries, who access project interventions offered through the Provincial Departments of Agriculture.
</narrative></comment>
</target>
<actual value="265,274.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of grievances received by the PCU in MPCLGS and the PIUs in the participating provinces that are addressed within a quarter
</narrative></title>
<baseline year="2018" iso-date="2018-12-18" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-18" />
<period-end iso-date="2024-09-30" />
<target value="75.00">
<comment><narrative>
In all, 24 Grievances were reported as of February 29, 2024, and 23 were reported as resolved. A court case is pending in Jaffna for the remaining grievance. A further 23 Grievances were reported from March 1 to November 30, 2024, of which three are pending resolution. This target was  achieved for all three &quot;periods&quot; of the split rating as no changes were made to this indicator.
</narrative></comment>
</target>
<actual value="85.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Performance Transfer system established and operationalized
</narrative></title>
<baseline year="2018" iso-date="2018-12-18" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-18" />
<period-end iso-date="2024-09-30" />
<target value="Yes">
<comment><narrative>
The preparatory grant and three tranches of PT grants have been disbursed. This target was  achieved for all three &quot;periods&quot; of the split rating as no changes were made to this indicator.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of LAPDPs updated at least twice during project implementation, with consultations at the village and ward level
</narrative></title>
<baseline year="2018" iso-date="2018-12-18" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-18" />
<period-end iso-date="2024-09-30" />
<target value="77.00">
<comment><narrative>
This indicator measures the number of LAPDPs updated under the project in a participatory manner at least two times during the four year implementation period.

The first update of 134 LAPDPs was completed by December 2020, while the second update was completed in February 2023. The third update was completed in October 2023 through a reprioritization of the list of sub-projects identified in earlier LAPDPs.&amp;nbsp;
</narrative></comment>
</target>
<actual value="134.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Performance Transfer system established and operationalized
</narrative></title>
<baseline year="2018" iso-date="2018-12-18" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-18" />
<period-end iso-date="2024-09-30" />
<target value="Yes">
<comment><narrative>
The preparatory grant and three tranches of PT grants have been disbursed.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage increase of ward-level consultation meetings on the LAPDP, which are chaired by women ward councilors
</narrative></title>
<baseline year="2018" iso-date="2018-12-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-15" />
<period-end iso-date="2024-09-15" />
<target value="20.00">

</target>
<actual value="25.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-11-20T15:47:22" hierarchy="1"><iati-identifier>44000-P163714</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>General Education Modernization Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0033051"><narrative>The Democratic Socialist Republic of Sri Lanka</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0033051"><narrative>The Democratic Socialist Republic of Sri Lanka</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="LK-COA-0033052"><narrative>Ministry of Education</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2018-03-22"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2018-04-26"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2027-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="2" iso-date="2027-12-31"><narrative>Projected end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>D. H. C. Aturupane</narrative></person-name><telephone>+1-202-473-1000</telephone><email>daturupane@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="LK" percentage="100"><narrative xml:lang="en">SRI LANKA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001223421" />
            <name><narrative>Western Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.83333 80.08333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001225265" />
            <name><narrative>Province of Uva</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.98472 81.05639</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001227618" />
            <name><narrative>Southern Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.16667 80.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001228435" />
            <name><narrative>Province of Sabaragamuwa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.75 80.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001232860" />
            <name><narrative>North Western Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.75 80.16667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001232870" />
            <name><narrative>North Central Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.33333 80.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001249296" />
            <name><narrative>Central Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.33333 80.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007671049" />
            <name><narrative>Northern Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.16667 80.41667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0008133521" />
            <name><narrative>Eastern Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.60614 81.20201</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="11320" percentage="37" xml:lang="en"/><sector vocabulary="1" code="11220" percentage="37" xml:lang="en"/><sector vocabulary="1" code="11130" percentage="10" xml:lang="en"/><sector vocabulary="1" code="11120" percentage="10" xml:lang="en"/><sector vocabulary="1" code="11110" percentage="6" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EF" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EP" percentage="45.0000000" xml:lang="en"><narrative>FY17 - Primary Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="ES" percentage="45.0000000" xml:lang="en"><narrative>FY17 - Secondary Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="100" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000652" percentage="30" xml:lang="en"><narrative>Education Financing</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000656" percentage="42" xml:lang="en"><narrative>Education Governance, School-Based Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000654" percentage="34" xml:lang="en"><narrative>Teachers</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000651" percentage="18" xml:lang="en"><narrative>Access to Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000655" percentage="17" xml:lang="en"><narrative>Student Assessment</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000657" percentage="34" xml:lang="en"><narrative>Standards, Curriculum and Textbooks</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="100" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000657" percentage="34" xml:lang="en"><narrative>Standards, Curriculum and Textbooks</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">1300000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">1300000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">1300000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">1300000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">1300000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">1300000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">1300000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">1300000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">1300000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">1300000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">1300000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">1300000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">1406666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">1406666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">1406666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">1406666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">1406666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">1406666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">1406666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">1406666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">1406666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">1406666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">1406666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">1406666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">1406666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">1406666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">1406666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">1406666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">1406666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">1406666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">1406666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">1406666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">1406666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">1406666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">1406666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">1406666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">1406666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">1406666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">1406666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">1406666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">1406666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">1406666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">1406666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">1406666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">1406666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">1406666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">1406666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">1406666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">1406666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">1406666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">1406666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">1406666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">1406666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">1406666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">1406666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">1406666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">1406666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">1406666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">1406666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">1406666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">1688000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">1688000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">1688000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">1688000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">1688000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">1688000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">1688000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">1688000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">1688000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">1688000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">4491111.61</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">4491111.61</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">100000000</value><description xml:lang="en"><narrative>Total Commitment in April Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33052"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">24465090</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33052"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">25534910</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33052"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">250000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33052"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">231214</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33052"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">4100000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33052"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">394440</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33052"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">4140540</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33052"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">10900000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33052"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">12935704</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33052"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">2499953</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33052"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">1350000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33052"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">6471093</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33052"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">7500000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33052"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">0</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33052"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">3488592</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33052"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">2700000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33052"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">370274</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33052"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">6750000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33052"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">2250000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33052"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">577078</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33052"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">6750000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33052"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">2250000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33052"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">11250000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33052"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">2800000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33052"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">300000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33052"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">5250000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33052"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-250000</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33052"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-37975</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33052"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-128184</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33052"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-195962</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33052"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-183199</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33052"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-173982</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33052"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-216278</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33052"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-287964</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33052"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-318005</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33052"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-1101356</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33052"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-1179054</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33052"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-1286592</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33052"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-1593521</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33052"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-2050241</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33052"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-2102743</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33052"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-2118612</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33052"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-1967958</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33052"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-1967121</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33052"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-2665536</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33052"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-2674896</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33052"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-2843946</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33052"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-2843946</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33052"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P163714"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P163714?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P163714"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase in the quantity of new professionally qualified teachers
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
This DLI is designed to measure the increase in the number of professionally qualified teachers in the school system, who obtained professional qualification required to enter the teacher service.

This indicator will be met when the target number of additional professionally qualified teachers are appointed into the school system in a given year. At least 50% of those should be female.

Note: The target is a cumulative number.
</narrative></comment>
</target>
<actual value="28,732 additional professionally qualified teachers (83.66% of whom are female) have been recruited.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase in the quantity of new professionally qualified teachers
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="Zero"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
This DLI is designed to measure the increase in the number of professionally qualified teachers in the school system, who obtained professional qualification required to enter the teacher service.

This indicator will be met when the target number of additional professionally qualified teachers are appointed into the school system in a given year. At least 50% of those should be female.

Note: The target is a cumulative number.
</narrative></comment>
</target>
<actual value="28,732 additional professionally qualified teachers (83.66% of whom are female) have been recruited.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National system for school quality assurance established
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
This indicator is designed to measure progress in the establishment of a national system for school quality assurance. The indicator will be met when school community-based quality assurance self-reviews and external reviews are completed in accordance with the quality assurance protocols and guidelines in the number of schools in agreed target. Note: This target is a cumulative number. The quality assurance process is based on school self-evaluations conducted by the school stakeholders. These results of the quality assurance process feed back into the school development plan. Note: The target number is a cumulative number.
</narrative></comment>
</target>
<actual value="School community based quality assurance reviews completed in 3,523 schools.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average monthly reduction of absenteeism among girls aged 13-15 in the 500 schools as a result of the MHM interventions implemented under the School Health and Well-Being Program
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2027-12-15" />
<target value="1">
<comment><narrative>
Not applicable, AF not yet signed.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved English language learning outcomes
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="English Language Learning Enhancement (ELLE) program designed."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2027-12-15" />
<target value="English language learning outcomes of at least 80 percent of students in the 500 target schools improved">
<comment><narrative>
Target has been exceeded.
</narrative></comment>
</target>
<actual value="English Language learning outcomes of 82.45% of students in the 500 target schools have improved.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved English language learning outcomes
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="English Language Learning Enhancement (ELLE) program designed."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2027-12-15" />
<target value="English language learning outcomes of at least 80 percent of students in the 500 target schools improved">
<comment><narrative>
Target has been exceeded.
</narrative></comment>
</target>
<actual value="English Language learning outcomes of 82.45% of students in the 500 target schools have improved.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved mathematics learning outcomes
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="Mathematics learning enhancement (MLE) program designed"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2027-12-15" />
<target value="Mathematics learning outcomes of at least 80 percent of students in the 500 target schools improved">
<comment><narrative>
Target has been exceeded.
</narrative></comment>
</target>
<actual value="Mathematics learning outcomes of 83.92% of students in the 500 target schools have improved.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved mathematics learning outcomes
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="Mathematics learning enhancement (MLE) program designed"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2027-12-15" />
<target value="Mathematics learning outcomes of at least 80 percent of students in the 500 target schools improved">
<comment><narrative>
Target has been exceeded.
</narrative></comment>
</target>
<actual value="Mathematics learning outcomes of 83.92% of students in the 500 target schools have improved.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
School-based professional teacher development (SBPTD) programs results achieved
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="SBTD program has been designed and implemented"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2027-12-15" />
<target value="Schools in at least 85 percent of zones achieve the SBPTD results">
<comment><narrative>
Target has been achieved. Third party verification confirmed.
</narrative></comment>
</target>
<actual value="Schools in 85 percent of zones achieved the SBPTD results.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
School-based professional teacher development (SBPTD) programs results achieved
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="SBTD program has been designed and implemented"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2027-12-15" />
<target value="Schools in at least 85 percent of zones achieve the SBPTD results">
<comment><narrative>
Target has been exceeded.
</narrative></comment>
</target>
<actual value="Schools in 89 percent of zones achieved the SBPTD results.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Enhanced Program for School Improvement (EPSI) results achieved
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="EPSI defined and policy circular completed"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2027-12-15" />
<target value="Schools in at least 85 percent of zones achieve the EPSI results">
<comment><narrative>
Target has been achieved. Third party verification confirmed.
</narrative></comment>
</target>
<actual value="Schools in 85 percent of zones have achieved the EPSI results.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Enhanced Program for School Improvement (EPSI) results achieved
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="EPSI defined and policy circular completed"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2027-12-15" />
<target value="Schools in at least 85 percent of zones achieve the EPSI results">
<comment><narrative>
Target has been exceeded.
</narrative></comment>
</target>
<actual value="Schools in 89 percent of zones have achieved the EPSI results.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Inclusive education program developed and implemented
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="Inclusive education program and guidelines defined"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2027-12-15" />
<target value="Inclusive education program available within schools in at least 85 percent of zones">
<comment><narrative>
Target achieved.
</narrative></comment>
</target>
<actual value="The inclusive education program is available within schools in 88 percent of zones.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Adequate and timely release of treasury funds requested to education sector program
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="Inconsistent release of requested funds to education sector program"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2027-12-15" />
<target value="At least 90% of requested funds released">
<comment><narrative>
Target achieved.
</narrative></comment>
</target>
<actual value="The funds requested as per the allocation has been released.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Human resource development of education academic and administrative service staff
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="Zero"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2027-12-15" />
<target value="At least 65 master's degrees completed for teacher educators, curriculum developers and education administrators (at least 50% of those are female)">
<comment><narrative>
Target exceeded.
</narrative></comment>
</target>
<actual value="More than 100 master's degrees been completed by teacher educators, curriculum developers, and education administrators (of whom more than 50% are female).">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved mathematics learning outcomes
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="Mathematics learning enhancement (MLE) program designed"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2027-12-15" />
<target value="Mathematics learning outcomes of at least 80 percent of students in the 500 target schools improved">
<comment><narrative>
Target has been exceeded.
</narrative></comment>
</target>
<actual value="Mathematics learning outcomes of 83.92% of students in the 500 target schools have improved.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Students supported with better education
</narrative></title>
<baseline year="2024" iso-date="2024-03-28" value="3,600,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-28" />
<period-end iso-date="2027-12-15" />
<target value="4,550,000.00">
<comment><narrative>
Target achieved.
</narrative></comment>
</target>
<actual value="3,900,000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase in the quantity of new professionally qualified teachers
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="Zero"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2027-12-15" />
<target value="27,500 additional professionally qualified teachers (at least 50% of those are female)">
<comment><narrative>
Target has been exceeded.
</narrative></comment>
</target>
<actual value="28,732 additional professionally qualified teachers (83.66% of whom are female) have been hired.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved English language learning outcomes
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="English Language Learning Enhancement (ELLE) program designed."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2027-12-15" />
<target value="English language learning outcomes of at least 80 percent of students in the 500 target schools improved">
<comment><narrative>
Target has been exceeded.
</narrative></comment>
</target>
<actual value="English Language learning outcomes of 82.45% of students in the 500 target schools have improved.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Students benefiting from direct interventions to enhance learning
</narrative></title>
<baseline year="2018" iso-date="2018-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-03-15" />
<period-end iso-date="2027-12-15" />
<target value="4550000">
<comment><narrative>
Target exceeded
</narrative></comment>
</target>
<actual value="3900000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average monthly reduction of absenteeism among girls aged 13-15 in the 500 schools as a result of the MHM interventions implemented under the School Health and Well-Being Program
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2027-12-15" />
<target value="1">
<comment><narrative>
Ongoing.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved mathematics learning outcomes
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="Mathematics learning enhancement (MLE) program designed"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2027-12-15" />
<target value="Mathematics learning outcomes of at least 80 percent of students in the 500 target schools improved">
<comment><narrative>
Target has been exceeded.
</narrative></comment>
</target>
<actual value="Mathematics learning outcomes of 83.92% of students in the 500 target schools have improved.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National system for school quality assurance established
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="Framework for a school community- based quality assurance and external review, new protocols, and guidelines developed, policy circular issued"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2027-12-15" />
<target value="School community-based quality assurance self-reviews and external reviews completed in at least 3,500 schools">
<comment><narrative>
Target 
slightly exceeded.
</narrative></comment>
</target>
<actual value="School community based quality assurance reviews completed in 3,523 schools.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Adequate and timely release of treasury funds requested to education sector program
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="Inconsistent release of requested funds to education sector program"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2027-12-15" />
<target value="At least 90% of requested funds released">
<comment><narrative>
Target achieved.
</narrative></comment>
</target>
<actual value="The funds requested as per the allocation has been released.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
School-based professional teacher development (SBPTD) programs results achieved
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="SBTD program has been designed and implemented"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2027-12-15" />
<target value="Schools in at least 85 percent of zones achieve the SBPTD results">
<comment><narrative>
Target has been exceeded.
</narrative></comment>
</target>
<actual value="Schools in 89 percent of zones achieved the SBPTD results.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved English language learning outcomes
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="English Language Learning Enhancement (ELLE) program designed."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2027-12-15" />
<target value="English language learning outcomes of at least 80 percent of students in the 500 target schools improved">
<comment><narrative>
Target has been exceeded.
</narrative></comment>
</target>
<actual value="English Language learning outcomes of 82.45% of students in the 500 target schools have improved.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved English language learning outcomes
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="English Language Learning Enhancement (ELLE) program designed."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2027-12-15" />
<target value="English language learning outcomes of at least 80 percent of students in the 500 target schools improved">
<comment><narrative>
Target has been exceeded.
</narrative></comment>
</target>
<actual value="English Language learning outcomes of 82.45% of students in the 500 target schools have improved.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved mathematics learning outcomes
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="Mathematics learning enhancement (MLE) program designed"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2027-12-15" />
<target value="Mathematics learning outcomes of at least 80 percent of students in the 500 target schools improved">
<comment><narrative>
Target has been exceeded.
</narrative></comment>
</target>
<actual value="Mathematics learning outcomes of 83.92% of students in the 500 target schools have improved.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved mathematics learning outcomes
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="Mathematics learning enhancement (MLE) program designed"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2027-12-15" />
<target value="Mathematics learning outcomes of at least 80 percent of students in the 500 target schools improved">
<comment><narrative>
Target has been exceeded.
</narrative></comment>
</target>
<actual value="Mathematics learning outcomes of 83.92% of students in the 500 target schools have improved.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Expanded school health and nutrition program developed and implemented and results achieved
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="School health and nutrition program expanded to include psycho-social well-being of students"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2027-12-15" />
<target value="Expanded school health and nutrition program including promotion of hygiene practices at school levels practiced to specified levels in at least 1,350 schools">
<comment><narrative>
Target achieved.
</narrative></comment>
</target>
<actual value="Expanded school health and nutrition program practiced to specified levels in 1,350 schools.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Enhanced Program for School Improvement (EPSI) results achieved
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="EPSI defined and policy circular completed"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2027-12-15" />
<target value="Schools in at least 85 percent of zones achieve the EPSI results">
<comment><narrative>
Target has been exceeded.
</narrative></comment>
</target>
<actual value="Schools in 89 percent of zones have achieved the EPSI results.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Enhanced Program for School Improvement (EPSI) results achieved
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="EPSI defined and policy circular completed"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2027-12-15" />
<target value="Schools in at least 85 percent of zones achieve the EPSI results">
<comment><narrative>
Target has been achieved. Third party verification confirmed.
</narrative></comment>
</target>
<actual value="Schools in 85 percent of zones have achieved the EPSI results.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
School-based professional teacher development (SBPTD) programs results achieved
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="SBTD program has been designed and implemented"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2027-12-15" />
<target value="Schools in at least 85 percent of zones achieve the SBPTD results">
<comment><narrative>
Target has been exceeded.
</narrative></comment>
</target>
<actual value="Schools in 89 percent of zones achieved the SBPTD results.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
School-based professional teacher development (SBPTD) programs results achieved
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="SBTD program has been designed and implemented"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2027-12-15" />
<target value="Schools in at least 85 percent of zones achieve the SBPTD results">
<comment><narrative>
Target has been achieved. Third party verification confirmed.
</narrative></comment>
</target>
<actual value="Schools in 85 percent of zones achieved the SBPTD results.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National system for school quality assurance established
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="Framework for a school community- based quality assurance and external review, new protocols, and guidelines developed, policy circular issued"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2027-12-15" />
<target value="School community-based quality assurance self-reviews and external reviews completed in at least 3,500 schools">
<comment><narrative>
Target has been exceeded.
</narrative></comment>
</target>
<actual value="School community based quality assurance reviews completed in 3,578 schools.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Enhanced Program for School Improvement (EPSI) results achieved
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="EPSI defined and policy circular completed"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2027-12-15" />
<target value="Schools in at least 85 percent of zones achieve the EPSI results">
<comment><narrative>
Target has been exceeded.
</narrative></comment>
</target>
<actual value="Schools in 89 percent of zones have achieved the EPSI results.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Students benefiting from direct interventions to enhance learning
</narrative></title>
<baseline year="2018" iso-date="2018-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-03-15" />
<period-end iso-date="2027-12-15" />
<target value="4550000">
<comment><narrative>
Target has been achieved
</narrative></comment>
</target>
<actual value="3700000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Students supported with better education
</narrative></title>
<baseline year="2024" iso-date="2024-03-28" value="3,600,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-28" />
<period-end iso-date="2027-12-15" />
<target value="4,550,000.00">
<comment><narrative>
Target achieved.
</narrative></comment>
</target>
<actual value="3,700,000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase in the quantity of new professionally qualified teachers
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="Zero"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2027-12-15" />
<target value="27,500 additional professionally qualified teachers (at least 50% of those are female)">
<comment><narrative>
Target 
slightly exceeded.
</narrative></comment>
</target>
<actual value="28,732 additional professionally qualified teachers (83.66% of whom are female) have been recruited.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Inclusive education program developed and implemented
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="Inclusive education program and guidelines defined"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2027-12-15" />
<target value="Inclusive education program available within schools in at least 85 percent of zones">
<comment><narrative>
Target achieved.
</narrative></comment>
</target>
<actual value="The inclusive education program is available within schools in 85 percent of zones.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Promoting good citizenship engagement
</narrative></title>
<baseline year="2017" iso-date="2017-12-15" value="Good citizenship program and guidelines defined"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-15" />
<period-end iso-date="2027-12-15" />
<target value="Good citizenship program implemented in at least 85 percent of zones">
<comment><narrative>
Targe achieved.
</narrative></comment>
</target>
<actual value="The good citizenship program has been implemented in 85 percent of zones.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
School-based professional teacher development (SBPTD) programs results achieved
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="SBTD program has been designed and implemented"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2027-12-15" />
<target value="Schools in at least 85 percent of zones achieve the SBPTD results">
<comment><narrative>
Target has been achieved. Third party verification confirmed.
</narrative></comment>
</target>
<actual value="Schools in 85 percent of zones achieved the SBPTD results.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved English language learning outcomes
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="English Language Learning Enhancement (ELLE) program designed."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2027-12-15" />
<target value="English language learning outcomes of at least 80 percent of students in the 500 target schools improved">
<comment><narrative>
Target has been exceeded.
</narrative></comment>
</target>
<actual value="English Language learning outcomes of 82.45% of students in the 500 target schools have improved.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Large scale primary/secondary learning assessments completed
</narrative></title>
<baseline year="2018" iso-date="2018-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-03-31" />
<period-end iso-date="2027-12-15" />
<target value="2.00">
<comment><narrative>
Target achieved
</narrative></comment>
</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Expanded school health and nutrition program developed and implemented and results achieved
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="School health and nutrition program expanded to include psycho-social well-being of students"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2027-12-15" />
<target value="Expanded school health and nutrition program including promotion of hygiene practices at school levels practiced to specified levels in at least 1,350 schools">
<comment><narrative>
Target achieved.
</narrative></comment>
</target>
<actual value="Expanded school health and nutrition program practiced to specified levels in 1,350 schools.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Enhanced Program for School Improvement (EPSI) results achieved
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="EPSI defined and policy circular completed"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2027-12-15" />
<target value="Schools in at least 85 percent of zones achieve the EPSI results">
<comment><narrative>
Target has been achieved. Third party verification confirmed.
</narrative></comment>
</target>
<actual value="Schools in 85 percent of zones have achieved the EPSI results.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Promotion of digitally enabled books for English language and mathematics learning
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="Production of digitally enabled books for English language and mathematics learning in schools commenced."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2027-12-15" />
<target value="Digital learning material used in schools in all 9 provinces.">
<comment><narrative>
Target achieved.
</narrative></comment>
</target>
<actual value="Digital learning material is being used in all 9 provinces.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Large scale primary/secondary learning assessments completed
</narrative></title>
<baseline year="2018" iso-date="2018-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-03-31" />
<period-end iso-date="2027-12-15" />
<target value="2.00">
<comment><narrative>
Target achieved
</narrative></comment>
</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Promoting good citizenship engagement
</narrative></title>
<baseline year="2017" iso-date="2017-12-15" value="Good citizenship program and guidelines defined"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-15" />
<period-end iso-date="2027-12-15" />
<target value="Good citizenship program implemented in at least 85 percent of zones">
<comment><narrative>
Targe achieved.
</narrative></comment>
</target>
<actual value="The good citizenship program has been implemented in 85 percent of zones.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Promotion of digitally enabled books for English language and mathematics learning
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="Production of digitally enabled books for English language and mathematics learning in schools commenced."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2027-12-15" />
<target value="Digital learning material used in schools in all 9 provinces.">
<comment><narrative>
Target achieved.
</narrative></comment>
</target>
<actual value="Digital learning material is being used in all 9 provinces.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Human resource development of education academic and administrative service staff
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="Zero"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2027-12-15" />
<target value="At least 65 master's degrees completed for teacher educators, curriculum developers and education administrators (at least 50% of those are female)">
<comment><narrative>
Target exceeded.
</narrative></comment>
</target>
<actual value="More than 100 master's degrees been completed by teacher educators, curriculum developers, and education administrators (of whom more than 50% are female).">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved mathematics learning outcomes
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="Mathematics learning enhancement (MLE) program designed"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
This DLI is designed to measure the effective implementation of an upgraded mathematics learning program.

Initially, this target will be met when students in the agreed-upon target number of schools benefit from direct interventions to improve their mathematics skills. The improvements mathematics learning will be measured through annual assessments of learning outcomes for grades 4 and 8. These assessments will be based on international modules of PISA and curriculum referenced learning outcomes. The improvement is defined as achieving the minimum learning competencies (MLCs) in the curriculum framework for children below the MLCs. Where children are above the MLCs, it will mean rising at least one level higher on the scale of learning competencies.

Note: The targets are cumulative numbers and cumulative percentages.
</narrative></comment>
</target>
<actual value="Mathematics learning outcomes of 83.92% of students in the 500 target schools have improved.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved mathematics learning outcomes
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="Mathematics learning enhancement (MLE) program designed"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
This DLI is designed to measure the effective implementation of an upgraded mathematics learning program.

Initially, this target will be met when students in the agreed-upon target number of schools benefit from direct interventions to improve their mathematics skills. The improvements mathematics learning will be measured through annual assessments of learning outcomes for grades 4 and 8. These assessments will be based on international modules of PISA and curriculum referenced learning outcomes. The improvement is defined as achieving the minimum learning competencies (MLCs) in the curriculum framework for children below the MLCs. Where children are above the MLCs, it will mean rising at least one level higher on the scale of learning competencies.

Note: The targets are cumulative numbers and cumulative percentages.
</narrative></comment>
</target>
<actual value="Mathematics learning outcomes of 83.92% of students in the 500 target schools have improved.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved English language learning outcomes
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="English Language Learning Enhancement (ELLE) program designed."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
This indicator is designed to measure progress in the design and implementation of a new and improved English language program to enhance the English language skills of students in the general education system. 

Initially, progress will be measured in terms the number of target school which benefit from direct interventions to improve the English language skills of their students. The improvements in English language learning will be measured through annual assessments of learning outcomes for grades 4 and 8. These assessments will be based on international modules of PISA and curriculum referenced learning outcomes. The improvement is defined as achieving the minimum learning competencies (MLCs) in the curriculum framework for children below the MLCs. Where children are above the MLCs, it will mean rising at least one level higher on the scale of learning competencies.

Note: The targets are cumulative numbers and cumulative percentages.
</narrative></comment>
</target>
<actual value="English Language learning outcomes of 82.45% of students in the 500 target schools have improved.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved English language learning outcomes
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="English Language Learning Enhancement (ELLE) program designed."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
This indicator is designed to measure progress in the design and implementation of a new and improved English language program to enhance the English language skills of students in the general education system. 

Initially, progress will be measured in terms the number of target school which benefit from direct interventions to improve the English language skills of their students. The improvements in English language learning will be measured through annual assessments of learning outcomes for grades 4 and 8. These assessments will be based on international modules of PISA and curriculum referenced learning outcomes. The improvement is defined as achieving the minimum learning competencies (MLCs) in the curriculum framework for children below the MLCs. Where children are above the MLCs, it will mean rising at least one level higher on the scale of learning competencies.

Note: The targets are cumulative numbers and cumulative percentages.
</narrative></comment>
</target>
<actual value="English Language learning outcomes of 82.45% of students in the 500 target schools have improved.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Enhanced Program for School Improvement (EPSI) results achieved
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="EPSI defined and policy circular completed"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
This DLI is designed to measure the effective implementation of the EPSI program, which is measured against a set of agreed-upon results, specified in the OM.

This indicator will be met when the EPSI program results are achieved in at least 90% of schools in the percent of zones in the agreed target: SMCs and/or SDCs engaged in activities to improve learning outcomes and/or socio-emotional sills of students.  Socio-emotional skills should be promoted by either curriculum based activities or extra- or co-curricular activities or any combination or all of the above. This will be assessed through stakeholder feedback surveys.

Note: Engagement of school community in planning, decision making, and implementation of school activities is a key part of the EPSI strategy. Thus, this indicator captures and monitors citizen engagement. The target is a cumulative percentage.
</narrative></comment>
</target>
<actual value="Schools in 89 percent of zones have achieved the EPSI results.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Enhanced Program for School Improvement (EPSI) results achieved
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="EPSI defined and policy circular completed"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
This DLI is designed to measure the effective implementation of the EPSI program, which is measured against a set of agreed-upon results, specified in the OM.

This indicator will be met when the EPSI program results are achieved in at least 90% of schools in the percent of zones in the agreed target: SMCs and/or SDCs engaged in activities to improve learning outcomes and/or socio-emotional sills of students.  Socio-emotional skills should be promoted by either curriculum based activities or extra- or co-curricular activities or any combination or all of the above. This will be assessed through stakeholder feedback surveys.

Note: Engagement of school community in planning, decision making, and implementation of school activities is a key part of the EPSI strategy. Thus, this indicator captures and monitors citizen engagement. The target is a cumulative percentage.
</narrative></comment>
</target>
<actual value="Schools in 85 percent of zones have achieved the EPSI results.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National system for school quality assurance established
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="Framework for a school community- based quality assurance and external review, new protocols, and guidelines developed, policy circular issued"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
This indicator is designed to measure progress in the establishment of a national system for school quality assurance. The indicator will be met when school community-based quality assurance self-reviews and external reviews are completed in accordance with the quality assurance protocols and guidelines in the number of schools in agreed target. Note: This target is a cumulative number. The quality assurance process is based on school self-evaluations conducted by the school stakeholders. These results of the quality assurance process feed back into the school development plan. Note: The target number is a cumulative number.
</narrative></comment>
</target>
<actual value="School community based quality assurance reviews completed in 3,578 schools.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
School-based professional teacher development (SBPTD) programs results achieved
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="SBTD program has been designed and implemented"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
This DLI is designed to measure the effective implementation of the SBPTD, which is measured against a set of agreed-upon results specified in the OM.

This indicator will be met when the SBPTD program results are achieved in at least 90% of schools in the percent of zones in the agreed target. Due to SBPTD activities, there should be improvement in teacher knowledge, pedagogical skills, teacher motivation, or classroom management skills or any combination or all of the above. This will be assessed through beneficiary feedback surveys.

Note: The target is a cumulative percentage.
</narrative></comment>
</target>
<actual value="Schools in 89 percent of zones achieved the SBPTD results.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
School-based professional teacher development (SBPTD) programs results achieved
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="SBTD program has been designed and implemented"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
This DLI is designed to measure the effective implementation of the SBPTD, which is measured against a set of agreed-upon results specified in the OM.

This indicator will be met when the SBPTD program results are achieved in at least 90% of schools in the percent of zones in the agreed target. Due to SBPTD activities, there should be improvement in teacher knowledge, pedagogical skills, teacher motivation, or classroom management skills or any combination or all of the above. This will be assessed through beneficiary feedback surveys.

Note: The target is a cumulative percentage.
</narrative></comment>
</target>
<actual value="Schools in 85 percent of zones achieved the SBPTD results.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Expanded school health and nutrition program developed and implemented and results achieved
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="School health and nutrition program expanded to include psycho-social well-being of students"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
This indicator is designed to measure progress on the implementation of the expanded school health and nutrition program, which will include mental health and well-being and intiatives to prevent the spread of infectious disease, including the COVID 19 pandemic. Progress will be measured in terms of the number of schools implementing the expanded program and achieving the results specified in the OM. 

This indicator will be achieved when students in the target number of schools have benefitted from counseling, school heath inspection services, and COVID 19 response measures. 

Note: The target number is cumulative.
</narrative></comment>
</target>
<actual value="Expanded school health and nutrition program practiced to specified levels in 1,350 schools.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Expanded school health and nutrition program developed and implemented and results achieved
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
This indicator is designed to measure progress on the implementation of the expanded school health and nutrition program, which will include mental health and well-being and intiatives to prevent the spread of infectious disease, including the COVID 19 pandemic. Progress will be measured in terms of the number of schools implementing the expanded program and achieving the results specified in the OM. 

This indicator will be achieved when students in the target number of schools have benefitted from counseling, school heath inspection services, and COVID 19 response measures. 

Note: The target number is cumulative.
</narrative></comment>
</target>
<actual value="Expanded school health and nutrition program practiced to specified levels in 1,350 schools.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Human resource development of education academic and administrative service staff
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="Zero"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
This indicator measures progress in the number of master's degree enrollments are awarded and the degree studies completed by teacher educators, curriculum developers and education administrators. The targets are cumulative. At least 50% of those should be female.

Note: By &quot;awarded&quot; we mean that the target number of candidates have been given scholarships.

In  Y1 progress will be measured in terms of the number of candidates awarded scholarships. From Y2 onwards, progress will be measured in terms of the number of awarded candidates who have commenced study. In Y5 (end target)  progress will be measured in terms of the number of candidates who have completed their Masters degrees or above.
</narrative></comment>
</target>
<actual value="More than 100 master's degrees been completed by teacher educators, curriculum developers, and education administrators (of whom more than 50% are female).">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Human resource development of education academic and administrative service staff
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
This indicator measures progress in the number of master's degree enrollments are awarded and the degree studies completed by teacher educators, curriculum developers and education administrators. The targets are cumulative. At least 50% of those should be female.

Note: By &quot;awarded&quot; we mean that the target number of candidates have been given scholarships.

In  Y1 progress will be measured in terms of the number of candidates awarded scholarships. From Y2 onwards, progress will be measured in terms of the number of awarded candidates who have commenced study. In Y5 (end target)  progress will be measured in terms of the number of candidates who have completed their Masters degrees or above.
</narrative></comment>
</target>
<actual value="More than 100 master's degrees been completed by teacher educators, curriculum developers, and education administrators (of whom more than 50% are female).">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Promotion of digitally enabled books for English language and mathematics learning
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="Production of digitally enabled books for English language and mathematics learning in schools commenced."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
This indicator is designed to measure progress in the implementation of digitally enabled learning material for mathematics and English language learning. 

Description: This indicator will be met when the digitally enabled learning materials are made available to the target grades in all schools. This will include posting on the EPD website, and supplying a DVD/CD of the book to all children in the relevant grades each year.
</narrative></comment>
</target>
<actual value="Digital learning material is being used in all 9 provinces.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Promotion of digitally enabled books for English language and mathematics learning
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="Production of digitally enabled books for English language and mathematics learning in schools commenced."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
This indicator is designed to measure progress in the implementation of digitally enabled learning material for mathematics and English language learning. 

Description: This indicator will be met when the digitally enabled learning materials are made available to the target grades in all schools. This will include posting on the EPD website, and supplying a DVD/CD of the book to all children in the relevant grades each year.
</narrative></comment>
</target>
<actual value="Digital learning material is being used in all 9 provinces.">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-11-20T15:47:22" hierarchy="1"><iati-identifier>44000-P163721</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Sri Lanka: PSSP</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0033059"><narrative>Democratic Socialist Republic of Sri Lanka</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0033059"><narrative>Democratic Socialist Republic of Sri Lanka</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="LK-COA-0033058"><narrative>Ministry of Health, Nutrition and Indigenous Medicine</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2018-06-28"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2018-06-27"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2024-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2024-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Deepika Eranjanie Attygalle</narrative></person-name><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="LK" percentage="100"><narrative xml:lang="en">SRI LANKA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001223421" />
            <name><narrative>Western Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.83333 80.08333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001225265" />
            <name><narrative>Province of Uva</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.98472 81.05639</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001227618" />
            <name><narrative>Southern Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.16667 80.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001228435" />
            <name><narrative>Province of Sabaragamuwa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.75 80.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001232860" />
            <name><narrative>North Western Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.75 80.16667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001232870" />
            <name><narrative>North Central Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.33333 80.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001249296" />
            <name><narrative>Central Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.33333 80.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007671049" />
            <name><narrative>Northern Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.16667 80.41667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0008133521" />
            <name><narrative>Eastern Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.60614 81.20201</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="12220" percentage="50" xml:lang="en"/><sector vocabulary="1" code="12110" percentage="50" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HF" percentage="100.000000" xml:lang="en"><narrative>FY17 - Public Administration - Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="100" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="100" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000625" percentage="100" xml:lang="en"><narrative>Non-communicable diseases</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000625" percentage="100" xml:lang="en"><narrative>Non-communicable diseases</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000632" percentage="25" xml:lang="en"><narrative>Health Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="100" xml:lang="en"><narrative>Disease Control</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="100" xml:lang="en"><narrative>Disease Control</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">1750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">1750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">1750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">1750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">1750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">1750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">1750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">1750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">1750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">1750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">1750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">1750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">2916666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">3250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">3250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">3250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">3250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">3250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">3250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">3250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">3250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">3250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">3250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">3250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">3250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">4166666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">4166666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">555555.56</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">555555.56</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">555555.56</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">555555.56</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">555555.56</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">555555.56</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">555555.56</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">555555.56</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">555555.52</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">555555.56</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">555555.56</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">555555.56</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">555555.52</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">2427537.41</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">2427537.41</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">200000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33058"><narrative>Ministry of Health, Nutrition and Indigenous Medicine</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">-2427537</value><description xml:lang="en"><narrative>Total Commitment Cancellations in January Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33058"><narrative>Ministry of Health, Nutrition and Indigenous Medicine</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">1194622</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33058"><narrative>Ministry of Health, Nutrition and Indigenous Medicine</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">23575000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33058"><narrative>Ministry of Health, Nutrition and Indigenous Medicine</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">450000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33058"><narrative>Ministry of Health, Nutrition and Indigenous Medicine</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">8725000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33058"><narrative>Ministry of Health, Nutrition and Indigenous Medicine</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">15262235</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33058"><narrative>Ministry of Health, Nutrition and Indigenous Medicine</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">142137</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33058"><narrative>Ministry of Health, Nutrition and Indigenous Medicine</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">7010000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33058"><narrative>Ministry of Health, Nutrition and Indigenous Medicine</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">2493454</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33058"><narrative>Ministry of Health, Nutrition and Indigenous Medicine</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">15665454</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33058"><narrative>Ministry of Health, Nutrition and Indigenous Medicine</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">350000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33058"><narrative>Ministry of Health, Nutrition and Indigenous Medicine</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">960049</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33058"><narrative>Ministry of Health, Nutrition and Indigenous Medicine</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">22356965</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33058"><narrative>Ministry of Health, Nutrition and Indigenous Medicine</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">11835000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33058"><narrative>Ministry of Health, Nutrition and Indigenous Medicine</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">19981125</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33058"><narrative>Ministry of Health, Nutrition and Indigenous Medicine</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">1600000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33058"><narrative>Ministry of Health, Nutrition and Indigenous Medicine</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">219422</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33058"><narrative>Ministry of Health, Nutrition and Indigenous Medicine</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">5250000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33058"><narrative>Ministry of Health, Nutrition and Indigenous Medicine</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">34218656</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33058"><narrative>Ministry of Health, Nutrition and Indigenous Medicine</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">26289688</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33058"><narrative>Ministry of Health, Nutrition and Indigenous Medicine</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-6344</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33058"><narrative>Ministry of Health, Nutrition and Indigenous Medicine</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-500000</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33058"><narrative>Ministry of Health, Nutrition and Indigenous Medicine</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-410897</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33058"><narrative>Ministry of Health, Nutrition and Indigenous Medicine</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-598672</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33058"><narrative>Ministry of Health, Nutrition and Indigenous Medicine</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-710069</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33058"><narrative>Ministry of Health, Nutrition and Indigenous Medicine</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-534729</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33058"><narrative>Ministry of Health, Nutrition and Indigenous Medicine</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-574387</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33058"><narrative>Ministry of Health, Nutrition and Indigenous Medicine</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-662586</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33058"><narrative>Ministry of Health, Nutrition and Indigenous Medicine</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-1471736</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33058"><narrative>Ministry of Health, Nutrition and Indigenous Medicine</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-2911781</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33058"><narrative>Ministry of Health, Nutrition and Indigenous Medicine</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-2984884</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33058"><narrative>Ministry of Health, Nutrition and Indigenous Medicine</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-3940719</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33058"><narrative>Ministry of Health, Nutrition and Indigenous Medicine</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-5026989</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33058"><narrative>Ministry of Health, Nutrition and Indigenous Medicine</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-5042306</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33058"><narrative>Ministry of Health, Nutrition and Indigenous Medicine</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-4864134</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33058"><narrative>Ministry of Health, Nutrition and Indigenous Medicine</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-4554103</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33058"><narrative>Ministry of Health, Nutrition and Indigenous Medicine</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-3655208</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33058"><narrative>Ministry of Health, Nutrition and Indigenous Medicine</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-3655088</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33058"><narrative>Ministry of Health, Nutrition and Indigenous Medicine</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-3655088</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33058"><narrative>Ministry of Health, Nutrition and Indigenous Medicine</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-3655088</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33058"><narrative>Ministry of Health, Nutrition and Indigenous Medicine</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P163721"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P163721?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P163721"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of PMCIs providing a standard primary oral health care package
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2023-12-31" />
<target value="55.00">
<comment><narrative>
This is available in 460 of the 1031 PMCIs in Sri Lanka. The end target for this indicator has been met.
</narrative></comment>
</target>
<actual value="60.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of annual procurement by MSD that is less than or equal to defined performance benchmarks (DLR 6.3)
</narrative></title>
<baseline year="2016" iso-date="2016-12-31" value="50.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-12-31" />
<period-end iso-date="2023-12-31" />
<target value="70.00">
<comment><narrative>
This was calculated for a defined set of tracer NCD drugs. The lead time for standard procurement (from receipt of procurement request to confirmed order being placed) was compared to performance benchmarks in the new procurement guideline.
</narrative></comment>
</target>
<actual value="90.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of PMCIs with capability for primary detection and management of dengue
</narrative></title>
<baseline year="2017" iso-date="2017-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-31" />
<period-end iso-date="2023-12-31" />
<target value="55.00">
<comment><narrative>
The target for this indicator has been met.
</narrative></comment>
</target>
<actual value="58.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
MoH and Provinces endorse policies and standards for reorganizing PHC (DLI 1)
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="Policies and standards sufficient to guide PHC Reorganization do not exist"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2019-06-30" />
<target value="MoH and Provinces endorse the package of circulars and guidelines necessary for PHC model implementation">
<comment><narrative>
The end target for this result has been achieved.
</narrative></comment>
</target>
<actual value="Completed">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of annual progress reviews on MoH Action Plan, including Project Results Indicators at the central MoH
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2023-12-31" />
<target value="3.00">
<comment><narrative>
The end target for this indicator has been achieved.
</narrative></comment>
</target>
<actual value="7.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentages of PMCIs with basic emergency care facilities
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="10.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2023-12-31" />
<target value="50.00">
<comment><narrative>
The end target for this indicator has been achieved.
</narrative></comment>
</target>
<actual value="69.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of institutions benefiting from improved digital tools for secure and resilient continuity of operations
</narrative></title>
<baseline year="2020" iso-date="2020-12-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-01" />
<period-end iso-date="2023-12-31" />
<target value="80.00">
<comment><narrative>
This indicator will track the number of government ministries, departments and agencies that benefit from the digital tools implemented under the CERC, including VC facilities, document management and workflow systems, and email systems. These tools are intended to enable continuity of public services in case of future emergencies, and will be implemented in a secure manner that is resilient to cyber-attacks.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
The number of primary medical care institutions that have the required capabilities for providing comprehensive and quality care. (DLI 3)
</narrative></title>
<baseline year="2017" iso-date="2017-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-31" />
<period-end iso-date="2023-12-31" />
<target value="550.00">
<comment><narrative>
550 PMCIs have also been verified as having additional capabilities.
</narrative></comment>
</target>
<actual value="550.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of patient-friendly services provided on the basis of 4 types of services at the PMCIs (DLI 4)
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2023-12-31" />
<target value="550.00">
<comment><narrative>
The target was achieved in 2020, and verification confirmed the continuity of services.
</narrative></comment>
</target>
<actual value="871.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of PMCIs with active community engagement committees (DLR 7.5)
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2023-12-31" />
<target value="550.00">
<comment><narrative>
The target for this indicator has been met
</narrative></comment>
</target>
<actual value="550.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of MoH and district training/capacity building plans developed and monitored
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2023-12-31" />
<target value="40.00">
<comment><narrative>
This indicator was revised and it was agreed that training programmes would be conducted as needed.
</narrative></comment>
</target>
<actual value="34.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
CERC implemented according to the Emergency Action Plan
</narrative></title>
<baseline year="2020" iso-date="2020-12-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-01" />
<period-end iso-date="2023-12-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of PMCIs with capability for TB screening and referral
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2023-12-31" />
<target value="45.00">
<comment><narrative>
The end target for this indicator has been achieved.
</narrative></comment>
</target>
<actual value="53.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of women at age 35 and at age 45 years who are screened for cervical cancer at a network of public health facilities (DLI 8)
</narrative></title>
<baseline year="2017" iso-date="2017-12-31" value="107,551.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-31" />
<period-end iso-date="2023-12-31" />
<target value="213,000.00">
<comment><narrative>
The actual number of women at age 35 and at age 45 who are screened at any public health facility, in each calendar year.  The baseline was established for the calendar year 2017, but only for those aged 35 as the information system of the program did not capture the mandate for age 45 cohort since this was being added as a new addition to the program.
</narrative></comment>
</target>
<actual value="238,000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of screened adults with high risk for non-communicable diseases who are registered and actively followed-up at primary medical care institutions (DLI 9)
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2023-12-31" />
<target value="25.00">
<comment><narrative>
Male: The denominator for this indicator is the total number of adult men in selected communities who are screened and found to be high-risk. The numerator is the number of these adult men who are registered and followed up within the last 3 months of the reporting period. A minimum number of adult men screened per year is set at 375 per PMCI meeting the required capabilities.
Female: The denominator for this indicator is the total number of adult women in selected communities who are screened and found to be high-risk. The numerator is the number of these adult women who are registered and followed up within the last 3 months of the reporting period. A minimum number of adult women screened per year is set at 375 per PMCI meeting the required capabilities.
</narrative></comment>
</target>
<actual value="68.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
MoH adopts and updates clinical protocols for selected health conditions (DLI 2)
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="No clinical protocols targeted for the PHC level exist for the defined tracer conditions"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2019-06-30" />
<target value="Package of protocols adopted for defined selected health conditions">
<comment><narrative>
The end target for this result has been achieved.
</narrative></comment>
</target>
<actual value="Package of protocols adopted for defined selected health conditions.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Community Engagement Mechanism for health sector operational, including grievance redressal mechanism (DLI 7)
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="There is no operational community engagement and grievance redressal mechanism"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2022-12-31" />
<target value="MoH makes public consolidated annual report for the health sector grievance redressal mechanism">
<comment><narrative>
MoH makes a public consolidated annual report for the health sector grievance redressal mechanism
</narrative></comment>
</target>
<actual value="Completed">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of PMCIs connected to and using the Medical Supplies Management Information System (DLR 6.1)
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2023-12-31" />
<target value="550.00">
<comment><narrative>
The end target for this indicator has been achieved.
</narrative></comment>
</target>
<actual value="550.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Adequate and timely release of treasury funds requested to health sector program
</narrative></title>
<baseline year="2017" iso-date="2017-12-31" value="75.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-31" />
<period-end iso-date="2023-12-31" />
<target value="85.00">
<comment><narrative>
Numerator:  funds released for the health sector program by treasury / the funds requested by MoH and MPCLGS for the health sector
</narrative></comment>
</target>
<actual value="75.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
The use of the urgent procurement procedure as a percent of total medical supplies procurement that is reduced from the established baseline (DLR 6.5)
</narrative></title>
<baseline year="2017" iso-date="2017-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-31" />
<period-end iso-date="2023-12-31" />
<target value="40.00">
<comment><narrative>
&quot;Urgent&quot; or &quot;local&quot; procurement procedure excludes procurement used in case of emergency.  This procedure is used at the provincial or facility level in cases of potential stock-out.
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of Medical Officers (both Medical Officers of Health in the Public Health stream and Medical Officers at PMCIs) trained on essential service package on NCDs
</narrative></title>
<baseline year="2018" iso-date="2018-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-07-01" />
<period-end iso-date="2023-12-31" />
<target value="70.00">
<comment><narrative>
The denominator for this indicator at baseline is 2664.  The percentage reported annually will be a cumulative value.
</narrative></comment>
</target>
<actual value="65.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of Medical Officer of Health areas offering mental health services in at least one PMCI
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2023-12-31" />
<target value="35.00">
<comment><narrative>
The end target for this indicator has been achieved.
</narrative></comment>
</target>
<actual value="75.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of innovative subprojects supported, evaluated and disseminated
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2023-12-31" />
<target value="11.00">
<comment><narrative>
The target for this indicator was revised.
</narrative></comment>
</target>
<actual value="8.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of public sector schools implementing health promoting programs (health promoting schools)
</narrative></title>
<baseline year="2017" iso-date="2017-12-31" value="31.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-31" />
<period-end iso-date="2023-12-31" />
<target value="35.00">
<comment><narrative>
The end target for this indicator was revised and the target has been achieved.
</narrative></comment>
</target>
<actual value="33.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of direct project beneficiaries reached with seeds, planting material, compensation, equipment, works and services for COVID-19 recovery, segregated by gender
</narrative></title>
<baseline year="2020" iso-date="2020-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-30" />
<period-end iso-date="2022-12-30" />
<target value="100.00">
<comment><narrative>
This indicator measures the cumulative number of direct beneficiaries who access project interventions offered through the Provincial Departments of Agriculture
</narrative></comment>
</target>
<actual value="265.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of PMCIs with transport facilities for dispatching the samples for investigations to apex laboratories
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2023-12-31" />
<target value="55.00">
<comment><narrative>
The target for this indicator has been met..
</narrative></comment>
</target>
<actual value="57.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of Medical Officer of Health areas offering minimum COVID-19/emergency outbreak, epidemic management responses at OPD or and Emergency Department (ETU)
</narrative></title>
<baseline year="2020" iso-date="2020-01-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-30" />
<period-end iso-date="2023-12-31" />
<target value="35.00">
<comment><narrative>
The target for this indicator has not been met
</narrative></comment>
</target>
<actual value="33.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of PMCIs that use personal health records to coordinate patient care over time and through the referral chain (DLI 5)
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2023-12-31" />
<target value="550.00">
<comment><narrative>
The end target for this indicator has been achieved.
</narrative></comment>
</target>
<actual value="550.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Tele-education broadcasts available in all nine provinces
</narrative></title>
<baseline year="2020" iso-date="2020-12-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-01" />
<period-end iso-date="2022-12-30" />
<target value="Yes">
<comment><narrative>
This indicator will track the availability of tele-education programs in line with the school curriculum in the geographical regions covered by the 9 provincial education authorities. Status:  High-speed Wi-fi connections, computers, smart boards, and TVs are being provided to 651 rural schools.  A formula-based school grant has been provided directly to all 10,165 government schools to strengthen their capacity to implement remote learning to recover the learning loss and to support activities.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-11-20T15:47:22" hierarchy="1"><iati-identifier>44000-P163742</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Climate Smart Irrigated Agriculture</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0033076"><narrative>Democratic Socialist Republic of Sri Lanka</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="LK-COA-0033077"><narrative>Ministry of Agriculture</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2018-05-30"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2019-03-07"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2025-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2025-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Sheu Salau</narrative></person-name><telephone>+1-202-473-1000</telephone><email>ssalau@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="LK" percentage="100"><narrative xml:lang="en">SRI LANKA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001225017" />
            <name><narrative>Vavuniya District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.86134 80.47576</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001226258" />
            <name><narrative>Trincomalee District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.58333 81.08333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001229292" />
            <name><narrative>Puttalam District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.0454 79.9319</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001229899" />
            <name><narrative>Polonnaruwa District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8 81</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001234392" />
            <name><narrative>Mullaitivu District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.25 80.5499</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001234818" />
            <name><narrative>Moneragala District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.66667 81.33333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001236148" />
            <name><narrative>Mannar District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.86667 80.08333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001237978" />
            <name><narrative>Kurunegala District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.75 80.25</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001240371" />
            <name><narrative>Kilinochchi District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.39487 80.40894</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001242831" />
            <name><narrative>Jaffna District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.75 80.08333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001244925" />
            <name><narrative>Hambantota District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.25 81.16667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001250159" />
            <name><narrative>Batticaloa District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.75 81.4997</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001251080" />
            <name><narrative>Anuradhapura District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.33333 80.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001251460" />
            <name><narrative>Ampara District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.0833 81.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="43060" percentage="31" xml:lang="en"/><sector vocabulary="1" code="31140" percentage="31" xml:lang="en"/><sector vocabulary="1" code="31166" percentage="8" xml:lang="en"/><sector vocabulary="1" code="31120" percentage="8" xml:lang="en"/><sector vocabulary="1" code="32161" percentage="6" xml:lang="en"/><sector vocabulary="1" code="22040" percentage="6" xml:lang="en"/><sector vocabulary="1" code="31191" percentage="5" xml:lang="en"/><sector vocabulary="1" code="31110" percentage="5" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AK" percentage="4.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Agriculture, Fishing &amp; Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AB" percentage="15.0000000" xml:lang="en"><narrative>FY17 - Agricultural Extension, Research, and Other Support Activities</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AI" percentage="66.0000000" xml:lang="en"><narrative>FY17 - Irrigation and Drainage</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="CS" percentage="7.00000000" xml:lang="en"><narrative>FY17 - ICT Services</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YA" percentage="8.00000000" xml:lang="en"><narrative>FY17 - Agricultural markets, commercialization and agri-business</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000026" percentage="4" xml:lang="en"><narrative>ICT</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="40" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000332" percentage="8" xml:lang="en"><narrative>Agriculture Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="23" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="8" xml:lang="en"><narrative>Finance for Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000851" percentage="29" xml:lang="en"><narrative>Water Institutions, Policies and Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="29" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000332" percentage="8" xml:lang="en"><narrative>Agriculture Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000721" percentage="8" xml:lang="en"><narrative>Rural Markets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="13" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000026" percentage="4" xml:lang="en"><narrative>ICT</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="40" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000723" percentage="36" xml:lang="en"><narrative>Rural Infrastructure and service delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="23" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="9" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000723" percentage="36" xml:lang="en"><narrative>Rural Infrastructure and service delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="29" xml:lang="en"><narrative>Water Resource Management</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">416666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">1666666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">2916666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">21050660.35</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">21050660.35</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">125000000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33077"><narrative>Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-15000000</value><description xml:lang="en"><narrative>Total Commitment Cancellations in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33077"><narrative>Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">2612500</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33077"><narrative>Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">2000000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33077"><narrative>Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">2000000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33077"><narrative>Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">62844</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33077"><narrative>Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">3000000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33077"><narrative>Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">4232675</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33077"><narrative>Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">2499953</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33077"><narrative>Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">1350000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33077"><narrative>Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">8000000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33077"><narrative>Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">3971093</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33077"><narrative>Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">5000000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33077"><narrative>Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">0</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33077"><narrative>Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">3150000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33077"><narrative>Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">2700000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33077"><narrative>Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">3000000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33077"><narrative>Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">8370274</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33077"><narrative>Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">5000000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33077"><narrative>Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">6000000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33077"><narrative>Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">12000000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33077"><narrative>Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">5000000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33077"><narrative>Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">8000000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33077"><narrative>Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">4000000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33077"><narrative>Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">12000000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33077"><narrative>Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">-312500</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33077"><narrative>Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">-73184</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33077"><narrative>Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">-193630</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33077"><narrative>Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">-223916</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33077"><narrative>Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-177727</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33077"><narrative>Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">-205404</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33077"><narrative>Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">-264647</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33077"><narrative>Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-294566</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33077"><narrative>Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-1112184</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33077"><narrative>Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-1208770</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33077"><narrative>Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-1721510</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33077"><narrative>Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-2212031</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33077"><narrative>Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-2165089</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33077"><narrative>Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-2245886</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33077"><narrative>Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-2505198</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33077"><narrative>Ministry of Agriculture</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P163742"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P163742?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P163742"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Farmers adopted Improved Climate Smart Technologies and Practices for increased yield
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2025-12-31" />
<target value="70">

</target>
<actual value="61">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area under improved Climate Smart Agriculture(CSA) practices
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="2,800.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2025-12-31" />
<target value="35,000.00">
<comment><narrative>
reformulated indicator
</narrative></comment>
</target>
<actual value="49.7">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area under improved Climate Smart Agriculture(CSA) practices
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="2,800.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2025-12-31" />
<target value="35,000.00">

</target>
<actual value="53,500.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area under improved Climate Smart Agriculture(CSA) practices
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="2,800.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2025-12-31" />
<target value="35,000.00">

</target>
<actual value="55,000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances registered related to delivery of project benefits,actually addressed percentage disaggregated by Gender
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2025-12-31" />
<target value="100">
<comment><narrative>
A grievance Register will be maintained at all project offices, where grievances related to the project will be recorded by name of complainant, date of receipt of complaint, nature of complaint, brief on resolution of the grievances, with  date of such resolutio.
</narrative></comment>
</target>
<actual value="99">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Length of seasonal fences established
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="False"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2024-06-28" />
<target value="False">

</target>
<actual value="1973">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Millions of people with enhanced resilience to climate
</narrative></title>
<baseline year="2019" iso-date="2019-05-21" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-21" />
<period-end iso-date="2025-12-31" />
<target value="300,000.00">

</target>
<actual value="0.27">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Length of seasonal fences established
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2024-06-28" />
<target value="">

</target>
<actual value="1,139">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
CERC implemented according to the Emergency Action Plan
</narrative></title>
<baseline year="2020" iso-date="2020-10-20" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-20" />
<period-end iso-date="2022-12-31" />
<target value="Yes">
<comment><narrative>
Self explanatory and implementation completed satisfactorily.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total of project beneficiaries
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2025-12-31" />
<target value="360">
<comment><narrative>
This will be the sum of project beneficiaries &amp;ndash; men and women - of all project interventions including those that benefited from CERC activities.&amp;nbsp;Multiple counting is to be avoided and this value will be confirmed at MTR.
</narrative></comment>
</target>
<actual value="372">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Producer Associations established and linked to markets
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2025-12-31" />
<target value="40">

</target>
<actual value="45">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total of project beneficiaries
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2025-12-31" />
<target value="360">
<comment><narrative>
This will be the sum of project beneficiaries &amp;ndash; men and women - of all project interventions including those that benefited from CERC activities.&amp;nbsp;Multiple counting is to be avoided and this value will be confirmed at MTR.
</narrative></comment>
</target>
<actual value="372">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers reached with agriculture assets or services - Total
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2025-12-31" />
<target value="36">

</target>
<actual value="66.04">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Farmers adopted improved Climate Smart technologies and Practices for increased yield - Female
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2025-12-31" />
<target value="40">

</target>
<actual value="230">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Functional FOs managing irrigation and drainage structures effectively.
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2025-12-31" />
<target value="800">

</target>
<actual value="180">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Trainings delivered using agreed capacity development approach.
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2025-12-31" />
<target value="90">
<comment><narrative>
This will measure the number of training events conducted under the project.
</narrative></comment>
</target>
<actual value="70">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers graduating from Farmer Business Schools- Total
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2025-12-31" />
<target value="15">
<comment><narrative>
This will be the sum of all farmers &amp;ndash; men and women - who attended the FBSs and who have adopted improved CSTs and practices as a result of participation in the FBSs. FBS is yet to start.
</narrative></comment>
</target>
<actual value="11.36">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers reached with agriculture assets and extension services – Female
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2025-12-31" />
<target value="20">

</target>
<actual value="29.72">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Functional CMCs managing irrigation and drainage structures effectively
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2025-12-31" />
<target value="25">

</target>
<actual value="60">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Producer Societies formed and operational
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2025-12-31" />
<target value="500">

</target>
<actual value="544">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Producer Societies formed and operational
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2025-12-31" />
<target value="500">

</target>
<actual value="544">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Farmers adopted Improved Climate Smart Technologies and Practices for increased yield
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2025-12-31" />
<target value="70">

</target>
<actual value="124">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries reached with seeds, planting material, compensation, equipment, works and services for COVID-19 recovery, segregated by gender
</narrative></title>
<baseline year="2020" iso-date="2020-11-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-12" />
<period-end iso-date="2025-12-31" />
<target value="100,000.00">
<comment><narrative>
Self explanatory
</narrative></comment>
</target>
<actual value="265,274.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Functional CMCs managing irrigation and drainage structures effectively
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2025-12-31" />
<target value="25">

</target>
<actual value="60">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Farmers adopted improved Climate Smart technologies and Practices for increased yield - Female
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2025-12-31" />
<target value="40">

</target>
<actual value="61">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Length of seasonal fences established
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2024-06-28" />
<target value="">

</target>
<actual value="1,139">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Trainings delivered using agreed capacity development approach.
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2025-12-31" />
<target value="90">
<comment><narrative>
This will measure the number of training events conducted under the project.
</narrative></comment>
</target>
<actual value="90">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers graduating from Farmer Business Schools - Female
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2025-12-31" />
<target value="5">
<comment><narrative>
This will be the sum of all women who attended the FBSs and who have adopted improved CSTs and practices as a result of participation in the FBSs. FBS is yet to start.
</narrative></comment>
</target>
<actual value="4.99">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People fed as a result of increased agricultural/food production
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of canals rehabilitated
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2025-12-31" />
<target value="75">

</target>
<actual value="183.6">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Demonstration plots established
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2025-12-31" />
<target value="450">

</target>
<actual value="728">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Trainers with competencies in CSA practices
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2025-12-31" />
<target value="1,800.00">

</target>
<actual value="2,946.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of non-paddy crops in the command area
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2025-12-31" />
<target value="30">

</target>
<actual value="49.7">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers reached with agriculture assets and extension services – Female
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2025-12-31" />
<target value="20">

</target>
<actual value="29.72">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Producer Associations established and linked to markets
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2025-12-31" />
<target value="40">

</target>
<actual value="45">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Cropping Intensity
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2025-12-31" />
<target value="130">

</target>
<actual value="150.8">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total of project beneficiaries – female
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2025-12-31" />
<target value="150">
<comment><narrative>
This will be the sum of only female project beneficiaries of all project interventions. Multiple counting is to be avoided&amp;nbsp;and this value will be confirmed at MTR.
</narrative></comment>
</target>
<actual value="163">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Home garden established with project support
</narrative></title>
<baseline year="2022" iso-date="2022-12-30" value="5,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-30" />
<period-end iso-date="2025-12-31" />
<target value="68,000.00">

</target>
<actual value="66.04">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cascades with hydrology assessment and modeling
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2025-12-31" />
<target value="120">

</target>
<actual value="121">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area provided with improved irrigation and drainage services
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2025-12-31" />
<target value="5">

</target>
<actual value="4120">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area under improved Climate Smart Agriculture(CSA) practices
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="2,800.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2025-12-31" />
<target value="35,000.00">

</target>
<actual value="55,000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area under improved Climate Smart Agriculture(CSA) practices
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="2,800.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2025-12-31" />
<target value="35,000.00">

</target>
<actual value="53,500.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Rehabilitated and modernized cascade and individual tanks/anicuts/barrages
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2025-12-31" />
<target value="400">

</target>
<actual value="462">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Demonstration plots established
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2025-12-31" />
<target value="450">

</target>
<actual value="300">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Producer Associations established and linked to markets
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2025-12-31" />
<target value="40">

</target>
<actual value="45">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2023" iso-date="2023-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-15" />
<period-end iso-date="2025-12-15" />
<target value="30,0000">

</target>
<actual value="26,6000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Progress reports meet World Bank quality and timely delivery requirements.
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="yes"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2025-12-31" />
<target value="yes">
<comment><narrative>
Submit quarterly, and annual Progress Reports (both for the period and cumulative) related to physical and financial statuses, with complete details on all inputs, outputs, processes, outcomes of project interventions, and including progress on indicators of the Results Framework, with issues hampering pace and quality of works, and actions taken to address the issues. The quarterly report will be submitted within one month of the completion for the preceding quarter, while Annual Report will be required to be submitte within three months of the preceding year.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers reached with agriculture assets or services - Total
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2025-12-31" />
<target value="36">

</target>
<actual value="66.04">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Trainers with competencies in CSA practices
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2025-12-31" />
<target value="1,800.00">

</target>
<actual value="2,542.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total of project beneficiaries – female
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2025-12-31" />
<target value="150">
<comment><narrative>
This will be the sum of only female project beneficiaries of all project interventions. Multiple counting is to be avoided&amp;nbsp;and this value will be confirmed at MTR.
</narrative></comment>
</target>
<actual value="163">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in yield for selected crops in targeted households benefiting directly from the project - Cereals/Pulses and vegetables / fruits
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2025-12-31" />
<target value="20">
<comment><narrative>
Yield was calculated using improved method and data from the latest Yala season and Maha seasons, and covered Paddy, Green gram and Ground nut.
</narrative></comment>
</target>
<actual value="28">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Millions of people with enhanced resilience to climate
</narrative></title>
<baseline year="2019" iso-date="2019-05-21" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-21" />
<period-end iso-date="2025-12-31" />
<target value="300,000.00">

</target>
<actual value="0.27">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Cropping Intensity
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2025-12-31" />
<target value="130">

</target>
<actual value="148">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers graduating from Farmer Business Schools - Female
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2025-12-31" />
<target value="5">
<comment><narrative>
This will be the sum of all women who attended the FBSs and who have adopted improved CSTs and practices as a result of participation in the FBSs. FBS is yet to start.
</narrative></comment>
</target>
<actual value="4.53">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries that feel project investement reflected their needs disaggregated by gender
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2025-12-31" />
<target value="80">
<comment><narrative>
&amp;nbsp;It is to be a perception survey, carried out annually at 95% confidence level with interval of 5%;This will be evaluated at MTR
</narrative></comment>
</target>
<actual value="94">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People fed as a result of increased agricultural/food production
</narrative></title>
<baseline year="2023" iso-date="2023-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-15" />
<period-end iso-date="2025-12-15" />
<target value="30,0000">

</target>
<actual value="24,4000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Progress reports meet World Bank quality and timely delivery requirements.
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="yes"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2025-12-31" />
<target value="yes">
<comment><narrative>
Submit quarterly, and annual Progress Reports (both for the period and cumulative) related to physical and financial statuses, with complete details on all inputs, outputs, processes, outcomes of project interventions, and including progress on indicators of the Results Framework, with issues hampering pace and quality of works, and actions taken to address the issues. The quarterly report will be submitted within one month of the completion for the preceding quarter, while Annual Report will be required to be submitte within three months of the preceding year.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of canals rehabilitated
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2025-12-31" />
<target value="75">

</target>
<actual value="183.6">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries reached with seeds, planting material, compensation, equipment, works and services for COVID-19 recovery, segregated by gender
</narrative></title>
<baseline year="2020" iso-date="2020-11-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-12" />
<period-end iso-date="2025-12-31" />
<target value="100,000.00">
<comment><narrative>
Self explanatory
</narrative></comment>
</target>
<actual value="265,274.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
CERC implemented according to the Emergency Action Plan
</narrative></title>
<baseline year="2020" iso-date="2020-10-20" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-20" />
<period-end iso-date="2022-12-31" />
<target value="Yes">
<comment><narrative>
Self explanatory and implementation completed satisfactorily.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Millions of people with enhanced resilience to climate
</narrative></title>
<baseline year="2019" iso-date="2019-05-21" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-21" />
<period-end iso-date="2025-12-31" />
<target value="300,000.00">

</target>
<actual value="264,000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of non-paddy crops in the command area
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2025-12-31" />
<target value="30">

</target>
<actual value="42">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Home garden established with project support
</narrative></title>
<baseline year="2022" iso-date="2022-12-30" value="5,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-30" />
<period-end iso-date="2025-12-31" />
<target value="68,000.00">

</target>
<actual value="66.04">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries that feel project investement reflected their needs disaggregated by gender
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2025-12-31" />
<target value="80">
<comment><narrative>
&amp;nbsp;It is to be a perception survey, carried out annually at 95% confidence level with interval of 5%;This will be evaluated at MTR
</narrative></comment>
</target>
<actual value="94">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Rehabilitated and modernized cascade and individual tanks/anicuts/barrages
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2025-12-31" />
<target value="400">

</target>
<actual value="485">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in yield for selected crops in targeted households benefiting directly from the project - Cereals/Pulses and vegetables / fruits
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2025-12-31" />
<target value="20">
<comment><narrative>
Yield was calculated using improved method and data from the latest Yala season and Maha seasons, and covered Paddy, Green gram and Ground nut.
</narrative></comment>
</target>
<actual value="66">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers graduating from Farmer Business Schools- Total
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2025-12-31" />
<target value="15">
<comment><narrative>
This will be the sum of all farmers &amp;ndash; men and women - who attended the FBSs and who have adopted improved CSTs and practices as a result of participation in the FBSs. FBS is yet to start.
</narrative></comment>
</target>
<actual value="10.30">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Functional FOs managing irrigation and drainage structures effectively.
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2025-12-31" />
<target value="800">

</target>
<actual value="520">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area provided with improved irrigation and drainage services
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2025-12-31" />
<target value="5">

</target>
<actual value="4120">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cascades with hydrology assessment and modeling
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2025-12-31" />
<target value="120">

</target>
<actual value="121">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Producer Societies formed and operational
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2025-12-31" />
<target value="500">

</target>
<actual value="544">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area provided with improved irrigation and drainage services
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2025-12-31" />
<target value="5">
<comment><narrative>
The final achievement is the absolute value and not in &quot;thousands&quot;. This change was done in order to allow this result to be captured and contribute to the water for food corporate target.
</narrative></comment>
</target>
<actual value="5180">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Trainers with competencies in CSA practices
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2025-12-31" />
<target value="1,800.00">

</target>
<actual value="2,946.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of canals rehabilitated
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2025-12-31" />
<target value="75">

</target>
<actual value="183.6">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Demonstration plots established
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2025-12-31" />
<target value="450">

</target>
<actual value="360">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Rehabilitated and modernized cascade and individual tanks/anicuts/barrages
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2025-12-31" />
<target value="400">

</target>
<actual value="642">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Home garden established with project support
</narrative></title>
<baseline year="2022" iso-date="2022-12-30" value="5,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-30" />
<period-end iso-date="2025-12-31" />
<target value="68,000.00">

</target>
<actual value="66.04">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cascades with hydrology assessment and modeling
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2025-12-31" />
<target value="120">

</target>
<actual value="121">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area under improved Climate Smart Agriculture(CSA) practices
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="2,800.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2025-12-31" />
<target value="35,000.00">

</target>
<actual value="55,000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area under improved Climate Smart Agriculture(CSA) practices
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="2,800.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2025-12-31" />
<target value="35,000.00">

</target>
<actual value="53,500.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area under improved Climate Smart Agriculture(CSA) practices
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="2,800.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2025-12-31" />
<target value="35,000.00">
<comment><narrative>
reformulated indicator
</narrative></comment>
</target>
<actual value="49.7">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers graduating from Farmer Business Schools - Female
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2025-12-31" />
<target value="5">
<comment><narrative>
This will be the sum of all women who attended the FBSs and who have adopted improved CSTs and practices as a result of participation in the FBSs. FBS is yet to start.
</narrative></comment>
</target>
<actual value="4.99">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of non-paddy crops in the command area
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2025-12-31" />
<target value="30">

</target>
<actual value="49.7">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of non-paddy crops in the command area
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2025-12-31" />
<target value="30">

</target>
<actual value="42">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of non-paddy crops in the command area
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2025-12-31" />
<target value="30">
<comment><narrative>
reformulated indicator
</narrative></comment>
</target>
<actual value="38">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers graduating from Farmer Business Schools- Total
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2025-12-31" />
<target value="15">
<comment><narrative>
This will be the sum of all farmers &amp;ndash; men and women - who attended the FBSs and who have adopted improved CSTs and practices as a result of participation in the FBSs. FBS is yet to start.
</narrative></comment>
</target>
<actual value="11.36">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Farmers adopted improved Climate Smart technologies and Practices for increased yield - Female
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2025-12-31" />
<target value="40">

</target>
<actual value="61">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Progress reports meet World Bank quality and timely delivery requirements.
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="yes"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2025-12-31" />
<target value="yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Cropping Intensity
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2025-12-31" />
<target value="130">

</target>
<actual value="150.8">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Cropping Intensity
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2025-12-31" />
<target value="130">

</target>
<actual value="148">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Cropping Intensity
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2025-12-31" />
<target value="130">
<comment><narrative>
New indicator
</narrative></comment>
</target>
<actual value="205">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Farmers adopted Improved Climate Smart Technologies and Practices for increased yield
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2025-12-31" />
<target value="70">

</target>
<actual value="61">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Trainings delivered using agreed capacity development approach.
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2025-12-31" />
<target value="90">

</target>
<actual value="70">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Functional CMCs managing irrigation and drainage structures effectively
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2025-12-31" />
<target value="25">

</target>
<actual value="60">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total of project beneficiaries – female
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2025-12-31" />
<target value="150">
<comment><narrative>
This will be the sum of only female project beneficiaries of all project interventions. Multiple counting is to be avoided&amp;nbsp;and this value will be confirmed at MTR.
</narrative></comment>
</target>
<actual value="163">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total of project beneficiaries – female
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2025-12-31" />
<target value="150">
<comment><narrative>
This will be the sum of only female project beneficiaries of all project interventions. Multiple counting is to be avoided&amp;nbsp;and this value will be confirmed at MTR.
</narrative></comment>
</target>
<actual value="163">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total of project beneficiaries – female
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2025-12-31" />
<target value="150">
<comment><narrative>
This is the total number of female project beneficiaries across all project interventions, excluding CERC beneficiaries
</narrative></comment>
</target>
<actual value="163">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Functional FOs managing irrigation and drainage structures effectively.
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2025-12-31" />
<target value="800">

</target>
<actual value="520">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers reached with agriculture assets and extension services – Female
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2025-12-31" />
<target value="20">

</target>
<actual value="29.72">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries that feel project investement reflected their needs disaggregated by gender
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2025-12-31" />
<target value="80">

</target>
<actual value="94">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries reached with seeds, planting material, compensation, equipment, works and services for COVID-19 recovery, segregated by gender
</narrative></title>
<baseline year="2020" iso-date="2020-11-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-12" />
<period-end iso-date="2025-12-31" />
<target value="100,000.00">

</target>
<actual value="265,274.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total of project beneficiaries
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2025-12-31" />
<target value="360">
<comment><narrative>
This will be the sum of project beneficiaries &amp;ndash; men and women - of all project interventions including those that benefited from CERC activities.&amp;nbsp;Multiple counting is to be avoided and this value will be confirmed at MTR.
</narrative></comment>
</target>
<actual value="372">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total of project beneficiaries
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2025-12-31" />
<target value="360">
<comment><narrative>
This will be the sum of project beneficiaries &amp;ndash; men and women - of all project interventions including those that benefited from CERC activities.&amp;nbsp;Multiple counting is to be avoided and this value will be confirmed at MTR.
</narrative></comment>
</target>
<actual value="372">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total of project beneficiaries
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2025-12-31" />
<target value="360">
<comment><narrative>
Revised project beneficiaries excluding CERC beneficiaries
</narrative></comment>
</target>
<actual value="296915">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers reached with agriculture assets or services - Total
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2025-12-31" />
<target value="36">

</target>
<actual value="66.04">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances registered related to delivery of project benefits,actually addressed percentage disaggregated by Gender
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2025-12-31" />
<target value="100">

</target>
<actual value="99">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in yield for selected crops in targeted households benefiting directly from the project - Cereals/Pulses and vegetables / fruits
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2025-12-31" />
<target value="20">
<comment><narrative>
Yield was calculated using improved method and data from the latest Yala season and Maha seasons, and covered Paddy, Green gram and Ground nut.
</narrative></comment>
</target>
<actual value="66">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in yield for selected crops in targeted households benefiting directly from the project - Cereals/Pulses and vegetables / fruits
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2025-12-31" />
<target value="20">
<comment><narrative>
Yield was calculated using improved method and data from the latest Yala season and Maha seasons, and covered Paddy, Green gram and Ground nut.
</narrative></comment>
</target>
<actual value="28">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in yield for selected crops in targeted households benefiting directly from the project - Cereals/Pulses and vegetables / fruits
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2025-12-31" />
<target value="20">
<comment><narrative>
Yield was calculated using improved method and data from the latest Yala season and Maha seasons, and covered Paddy, Green gram and Ground nut.
</narrative></comment>
</target>
<actual value="38">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
CERC implemented according to the Emergency Action Plan
</narrative></title>
<baseline year="2020" iso-date="2020-10-20" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-20" />
<period-end iso-date="2022-12-31" />
<target value="Yes">
<comment><narrative>
Self explanatory and implementation completed satisfactorily.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
CERC implemented according to the Emergency Action Plan
</narrative></title>
<baseline year="2020" iso-date="2020-10-20" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-20" />
<period-end iso-date="2022-12-31" />
<target value="Yes">
<comment><narrative>
Self explanatory and implementation completed satisfactorily.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
CERC implemented according to the Emergency Action Plan
</narrative></title>
<baseline year="2020" iso-date="2020-10-20" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-20" />
<period-end iso-date="2022-12-31" />
<target value="Yes">
<comment><narrative>
CERC reached 265274 with seeds and planting materials
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People fed as a result of increased agricultural/food production
</narrative></title>
<baseline year="2023" iso-date="2023-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-15" />
<period-end iso-date="2025-12-15" />
<target value="30,0000">

</target>
<actual value="2,44,340">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2023" iso-date="2023-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-15" />
<period-end iso-date="2025-12-15" />
<target value="30,0000">

</target>
<actual value="266,400">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of non-paddy crops in the command area
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2025-12-31" />
<target value="30">

</target>
<actual value="49.7">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of non-paddy crops in the command area
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2025-12-31" />
<target value="30">

</target>
<actual value="42">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of non-paddy crops in the command area
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2025-12-31" />
<target value="30">
<comment><narrative>
reformulated indicator
</narrative></comment>
</target>
<actual value="38">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Cropping Intensity
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2025-12-31" />
<target value="130">

</target>
<actual value="150.8">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Cropping Intensity
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2025-12-31" />
<target value="130">

</target>
<actual value="148">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Cropping Intensity
</narrative></title>
<baseline year="2023" iso-date="2023-03-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-31" />
<period-end iso-date="2025-12-31" />
<target value="130">
<comment><narrative>
New indicator
</narrative></comment>
</target>
<actual value="205">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total of project beneficiaries – female
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2025-12-31" />
<target value="150">
<comment><narrative>
This will be the sum of only female project beneficiaries of all project interventions. Multiple counting is to be avoided&amp;nbsp;and this value will be confirmed at MTR.
</narrative></comment>
</target>
<actual value="163">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total of project beneficiaries – female
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2025-12-31" />
<target value="150">
<comment><narrative>
This will be the sum of only female project beneficiaries of all project interventions. Multiple counting is to be avoided&amp;nbsp;and this value will be confirmed at MTR.
</narrative></comment>
</target>
<actual value="163">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total of project beneficiaries – female
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2025-12-31" />
<target value="150">
<comment><narrative>
This is the total number of female project beneficiaries across all project interventions, excluding CERC beneficiaries
</narrative></comment>
</target>
<actual value="163">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total of project beneficiaries
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2025-12-31" />
<target value="360">
<comment><narrative>
This will be the sum of project beneficiaries &amp;ndash; men and women - of all project interventions including those that benefited from CERC activities.&amp;nbsp;Multiple counting is to be avoided and this value will be confirmed at MTR.
</narrative></comment>
</target>
<actual value="372">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total of project beneficiaries
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2025-12-31" />
<target value="360">
<comment><narrative>
This will be the sum of project beneficiaries &amp;ndash; men and women - of all project interventions including those that benefited from CERC activities.&amp;nbsp;Multiple counting is to be avoided and this value will be confirmed at MTR.
</narrative></comment>
</target>
<actual value="372">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total of project beneficiaries
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2025-12-31" />
<target value="360">
<comment><narrative>
Revised project beneficiaries excluding CERC beneficiaries
</narrative></comment>
</target>
<actual value="296915">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in yield for selected crops in targeted households benefiting directly from the project - Cereals/Pulses and vegetables / fruits
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2025-12-31" />
<target value="20">
<comment><narrative>
Yield was calculated using improved method and data from the latest Yala season and Maha seasons, and covered Paddy, Green gram and Ground nut.
</narrative></comment>
</target>
<actual value="66">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in yield for selected crops in targeted households benefiting directly from the project - Cereals/Pulses and vegetables / fruits
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2025-12-31" />
<target value="20">
<comment><narrative>
Yield was calculated using improved method and data from the latest Yala season and Maha seasons, and covered Paddy, Green gram and Ground nut.
</narrative></comment>
</target>
<actual value="28">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in yield for selected crops in targeted households benefiting directly from the project - Cereals/Pulses and vegetables / fruits
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2025-12-31" />
<target value="20">
<comment><narrative>
Yield was calculated using improved method and data from the latest Yala season and Maha seasons, and covered Paddy, Green gram and Ground nut.
</narrative></comment>
</target>
<actual value="38">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
CERC implemented according to the Emergency Action Plan
</narrative></title>
<baseline year="2020" iso-date="2020-10-20" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-20" />
<period-end iso-date="2022-12-31" />
<target value="Yes">
<comment><narrative>
Self explanatory and implementation completed satisfactorily.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
CERC implemented according to the Emergency Action Plan
</narrative></title>
<baseline year="2020" iso-date="2020-10-20" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-20" />
<period-end iso-date="2022-12-31" />
<target value="Yes">
<comment><narrative>
Self explanatory and implementation completed satisfactorily.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
CERC implemented according to the Emergency Action Plan
</narrative></title>
<baseline year="2020" iso-date="2020-10-20" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-20" />
<period-end iso-date="2022-12-31" />
<target value="Yes">
<comment><narrative>
CERC reached 265274 with seeds and planting materials
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances registered related to delivery of project benefits,actually addressed percentage disaggregated by Gender
</narrative></title>
<baseline year="2018" iso-date="2018-09-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-09-03" />
<period-end iso-date="2025-12-31" />
<target value="100">
<comment><narrative>
A grievance Register will be maintained at all project offices, where grievances related to the project will be recorded by name of complainant, date of receipt of complaint, nature of complaint, brief on resolution of the grievances, with  date of such resolutio.
</narrative></comment>
</target>
<actual value="99">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-11-20T15:47:22" hierarchy="1"><iati-identifier>44000-P163864</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>3P Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0033200"><narrative>Democratic Socialist Republic of Sri Lanka</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0033200"><narrative>Democratic Socialist Republic of Sri Lanka</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="LK-COA-0033201"><narrative>Ministry of Finance</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2018-06-05"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2019-02-21"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2020-02-19"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2020-02-19"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Wei Winnie Wang</narrative></person-name><telephone>+1-202-473-1000</telephone><email>winniewang@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="LK" percentage="100"><narrative xml:lang="en">SRI LANKA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001227603" />
            <name><narrative>Democratic Socialist Republic of Sri Lanka</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.75 80.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="15126" percentage="100" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="100.000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="100" xml:lang="en"><narrative>Finance for Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000023" percentage="100" xml:lang="en"><narrative>Public Private Partnerships</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="4" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000333" percentage="100" xml:lang="en"><narrative>Infrastructure Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000023" percentage="100" xml:lang="en"><narrative>Public Private Partnerships</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">67825.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">100000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">121800.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">142675.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">162425.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">182925.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">208375.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">231200.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">248175.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">261800.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">277700.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">291300.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">301475.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">310950.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">321575.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">334100.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">350275.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">369350.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">387225.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">403500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">415025.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">430950.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">450000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">460050.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">461200.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">466050.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">473225.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">473325.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">711525.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">476550.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">481325.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">487800.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">493800.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">499525.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">506725.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">513850.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">523250.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">529000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">530950.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">530950.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">537350.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">542100.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">544425.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">549350.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">557075.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">558975.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">557200.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">553875.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">553125.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">554200.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">555575.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">558050.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">560150.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">561600.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">563075.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">564750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">566375.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">573025.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">67825.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">100000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">121800.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">142675.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">162425.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">182925.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">208375.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">231200.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">248175.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">261800.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">277700.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">291300.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">301475.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">310950.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">321575.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">334100.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">350275.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">369350.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">387225.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">403500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">415025.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">430950.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">450000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">460050.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">461200.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">466050.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">473225.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">473325.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">711525.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">476550.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">481325.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">487800.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">493800.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">499525.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">506725.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">513850.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">523250.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">529000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">530950.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">530950.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">537350.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">542100.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">544425.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">549350.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">557075.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">558975.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">557200.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">553875.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">553125.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">554200.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">555575.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">558050.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">560150.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">561600.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">563075.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">564750.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">566375.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">573025.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2020-02-19"/>
<value currency="USD" value-date="2020-02-19">24617896.74</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2020-02-19"/>
<value currency="USD" value-date="2020-02-19">24617896.74</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">25000000</value><description xml:lang="en"><narrative>Total Commitment in February Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33201"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">-24617897</value><description xml:lang="en"><narrative>Total Commitment Cancellations in June Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33201"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">3449776</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33201"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">-3067673</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33201"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">-62500</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33201"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-71384</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33201"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-74073</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33201"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-6657</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33201"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-2017</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33201"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-1992</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33201"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-2036</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33201"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-6282</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33201"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-10606</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33201"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-12296</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33201"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-12808</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33201"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-12748</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33201"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-10858</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33201"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-10903</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33201"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-9533</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-33201"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P163864"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P163864?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P163864"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Transaction advisory services provided for at least four (4) PPP transactions with the assistance of the project
</narrative></title>
<baseline year="2018" iso-date="2018-04-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-02" />
<period-end iso-date="2024-02-28" />
<target value="4.00">
<comment><narrative>
The PPP transaction will be structured with appropriate risk allocation producing a concession agreement addressing all technical, financial and legal aspects of the transactions.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
At least 20% of the Government staff who will be PPP certified will be female
</narrative></title>
<baseline year="2018" iso-date="2018-04-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-02" />
<period-end iso-date="2024-02-28" />
<target value="20.00">
<comment><narrative>
The percentage of female Government staff including staff of NAPPP who will be PPP certified
</narrative></comment>
</target>
<actual value="76.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
NAPPP includes a social specialist with gender expertise in the team
</narrative></title>
<baseline year="2018" iso-date="2018-04-02" value="No social specialist with gender expertise in the NAPPP team"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-02" />
<period-end iso-date="2019-03-31" />
<target value="One social specialist with strong expertise on gender engaged in the NAPPP team">
<comment><narrative>
A social specialist with strong expertise on gender to be included within the NAPPP team to create gender awareness within stakeholders and integrate gender issues into PPP transactions
</narrative></comment>
</target>
<actual value="Social and gender specialist is in the process of being recruited">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Capacity building workshops that focus on the project cycle, screening and scoring tool, structure of concession agreements (number)
</narrative></title>
<baseline year="2018" iso-date="2018-04-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-02" />
<period-end iso-date="2024-02-28" />
<target value="4.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
At least 20% of the Government staff who will be PPP certified will be female
</narrative></title>
<baseline year="2018" iso-date="2018-04-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-02" />
<period-end iso-date="2024-02-28" />
<target value="20.00">

</target>
<actual value="76.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Stakeholder engagement for the implementation of the Communications strategy
</narrative></title>
<baseline year="2018" iso-date="2018-04-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-02" />
<period-end iso-date="2020-09-29" />
<target value="3.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Stakeholder engagement for the implementation of the Communications strategy
</narrative></title>
<baseline year="2018" iso-date="2018-04-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-02" />
<period-end iso-date="2020-09-29" />
<target value="3.00">
<comment><narrative>
Stakeholder engagement for the implementation of the Communications strategy to be carried through consultations.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Feasibility studies or project designs completed for at least five (5) PPP transactions with the assistance of the project
</narrative></title>
<baseline year="2018" iso-date="2018-04-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-02" />
<period-end iso-date="2024-02-28" />
<target value="5.00">
<comment><narrative>
A Feasibility Study is a pre-requisite to obtain financing from the private sector. All feasibility studies supported under the project will also include environmental, social and gender analysis.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Environmental and Social Asessments completed
</narrative></title>
<baseline year="2018" iso-date="2018-04-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-02" />
<period-end iso-date="2024-02-28" />
<target value="3.00">
<comment><narrative>
The envoronmnetal and social assessment is a pre requisite to establish the feasibility of a project that is carried out  independently of the feasibility study.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
NAPPP includes a social specialist with gender expertise in the team
</narrative></title>
<baseline year="2018" iso-date="2018-04-02" value="No social specialist with gender expertise in the NAPPP team"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-02" />
<period-end iso-date="2019-03-31" />
<target value="One social specialist with strong expertise on gender engaged in the NAPPP team">

</target>
<actual value="Social and gender specialist is in the process of being recruited">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Commercial closure of at least three (3) PPP transactions with the assistance of the project
</narrative></title>
<baseline year="2018" iso-date="2018-04-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-02" />
<period-end iso-date="2024-02-28" />
<target value="3.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Stakeholder engagement for the implementation of the Communications strategy
</narrative></title>
<baseline year="2018" iso-date="2018-04-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-02" />
<period-end iso-date="2020-09-29" />
<target value="3.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of PPP nodes established in participating Line Agencies or Ministries
</narrative></title>
<baseline year="2018" iso-date="2018-04-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-02" />
<period-end iso-date="2024-02-28" />
<target value="3.00">
<comment><narrative>
PPP nodes are established within the Line agencies by which the PPP transactions are carried out.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Commercial closure of at least three (3) PPP transactions with the assistance of the project
</narrative></title>
<baseline year="2018" iso-date="2018-04-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-02" />
<period-end iso-date="2024-02-28" />
<target value="3.00">
<comment><narrative>
Award of the transaction with commercial closure where the Government has followed its own PPP Procurement guidelines in issuing RFP, selection of the developer and carrying out negotiations.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
NAPPP includes a social specialist with gender expertise in the team
</narrative></title>
<baseline year="2018" iso-date="2018-04-02" value="No social specialist with gender expertise in the NAPPP team"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-02" />
<period-end iso-date="2019-03-31" />
<target value="One social specialist with strong expertise on gender engaged in the NAPPP team">

</target>
<actual value="Social and gender specialist is in the process of being recruited">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Feasibility studies or project designs completed for at least five (5) PPP transactions with the assistance of the project
</narrative></title>
<baseline year="2018" iso-date="2018-04-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-02" />
<period-end iso-date="2024-02-28" />
<target value="5.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Commercial closure of at least three (3) PPP transactions with the assistance of the project
</narrative></title>
<baseline year="2018" iso-date="2018-04-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-02" />
<period-end iso-date="2024-02-28" />
<target value="3.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Transaction advisory services provided for at least four (4) PPP transactions with the assistance of the project
</narrative></title>
<baseline year="2018" iso-date="2018-04-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-02" />
<period-end iso-date="2024-02-28" />
<target value="4.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of PPP nodes established in participating Line Agencies or Ministries
</narrative></title>
<baseline year="2018" iso-date="2018-04-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-02" />
<period-end iso-date="2024-02-28" />
<target value="3.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Environmental and Social Asessments completed
</narrative></title>
<baseline year="2018" iso-date="2018-04-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-02" />
<period-end iso-date="2024-02-28" />
<target value="3.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Transaction advisory services provided for at least four (4) PPP transactions with the assistance of the project
</narrative></title>
<baseline year="2018" iso-date="2018-04-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-02" />
<period-end iso-date="2024-02-28" />
<target value="4.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Environmental and Social Asessments completed
</narrative></title>
<baseline year="2018" iso-date="2018-04-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-02" />
<period-end iso-date="2024-02-28" />
<target value="3.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Capacity building workshops that focus on the project cycle, screening and scoring tool, structure of concession agreements (number)
</narrative></title>
<baseline year="2018" iso-date="2018-04-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-02" />
<period-end iso-date="2024-02-28" />
<target value="4.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Feasibility studies or project designs completed for at least five (5) PPP transactions with the assistance of the project
</narrative></title>
<baseline year="2018" iso-date="2018-04-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-02" />
<period-end iso-date="2024-02-28" />
<target value="5.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Capacity building workshops that focus on the project cycle, screening and scoring tool, structure of concession agreements (number)
</narrative></title>
<baseline year="2018" iso-date="2018-04-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-02" />
<period-end iso-date="2024-02-28" />
<target value="4.00">
<comment><narrative>
Workshops to create awareness within the public and private sectors on PPPs that will include project cycle, screening and scoring tool, procurement guidelines, structure of concession agreements, managing fiscal and contingent liabilities as well as addressing contractual issues related to specific sectors.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of PPP nodes established in participating Line Agencies or Ministries
</narrative></title>
<baseline year="2018" iso-date="2018-04-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-02" />
<period-end iso-date="2024-02-28" />
<target value="3.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
At least 20% of the Government staff who will be PPP certified will be female
</narrative></title>
<baseline year="2018" iso-date="2018-04-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-02" />
<period-end iso-date="2024-02-28" />
<target value="20.00">

</target>
<actual value="76.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-11-20T15:47:22" hierarchy="1"><iati-identifier>44000-P166865</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>SL-IWWRMP</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0036736"><narrative>Democratic Socialist Republic of Sri Lanka</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0036736"><narrative>Democratic Socialist Republic of Sri Lanka</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0036736"><narrative>Democratic Socialist Republic of Sri Lanka</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="LK-COA-0036735"><narrative>Ministry of Agriculture, Livestock, Land and Irrigation</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2020-05-18"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2020-05-18"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2027-10-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="2" iso-date="2027-10-31"><narrative>Projected end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Thiruni Liyanage</narrative></person-name><telephone>+1-202-473-1000</telephone><email>tlekamwasamliyan@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>







<recipient-country code="LK" percentage="100"><narrative xml:lang="en">SRI LANKA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001223421" />
            <name><narrative>Western Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.83333 80.08333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001224453" />
            <name><narrative>Walawe</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.11667 81.03333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001227603" />
            <name><narrative>Democratic Socialist Republic of Sri Lanka</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.75 80.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001228931" />
            <name><narrative>Randenigala Dam</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.2 80.9</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001232781" />
            <name><narrative>Nuwara Eliya District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.9785 80.7133</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001235855" />
            <name><narrative>Matale</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.4698 80.6217</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001237554" />
            <name><narrative>Lunugamwehera</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.3434 81.2001</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001241622" />
            <name><narrative>Kandy</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.2906 80.6336</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001248991" />
            <name><narrative>Colombo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.93548 79.84868</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001249296" />
            <name><narrative>Central Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.33333 80.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001250615" />
            <name><narrative>Badulla</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.9802 81.0577</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007440445" />
            <name><narrative>Mahalindawewa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.3755 80.2588</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007474404" />
            <name><narrative>Mahaweli Ganga</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.196 80.816</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0011988882" />
            <name><narrative>Walawa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.12064 81.03598</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="14010" percentage="89" xml:lang="en"/><sector vocabulary="1" code="14015" percentage="11" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AI" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Irrigation and Drainage</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WZ" percentage="87.0000000" xml:lang="en"><narrative>FY17 - Other Water Supply, Sanitation and Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WF" percentage="3.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Water, Sanitation and Waste Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="4" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="81" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000753" percentage="81" xml:lang="en"><narrative>Disaster Preparedness</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="22" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="22" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000837" percentage="22" xml:lang="en"><narrative>Watershed Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000083" percentage="22" xml:lang="en"><narrative>Renewable Natural Resources Asset Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000851" percentage="22" xml:lang="en"><narrative>Water Institutions, Policies and Reform</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">458333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">833333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">1583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">1583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">1583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">1583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">1583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">1583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">1583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">1583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">1583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">1583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">1583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">1583333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">2419166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">2419166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">2419166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">2419166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">2419166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">2419166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">2419166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">2419166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">2419166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">2419166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">2419166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">2419166.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">27821062.55</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">27821062.55</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">26700000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-36735"><narrative>Ministry of Agriculture, Livestock, Land and Irrigation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">42827400</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-36735"><narrative>Ministry of Agriculture, Livestock, Land and Irrigation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">66750</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-36735"><narrative>Ministry of Agriculture, Livestock, Land and Irrigation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">325635</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-36735"><narrative>Ministry of Agriculture, Livestock, Land and Irrigation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">3000000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-36735"><narrative>Ministry of Agriculture, Livestock, Land and Irrigation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">3000000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-36735"><narrative>Ministry of Agriculture, Livestock, Land and Irrigation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">2000000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-36735"><narrative>Ministry of Agriculture, Livestock, Land and Irrigation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">2000000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-36735"><narrative>Ministry of Agriculture, Livestock, Land and Irrigation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">4000000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-36735"><narrative>Ministry of Agriculture, Livestock, Land and Irrigation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">2000000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-36735"><narrative>Ministry of Agriculture, Livestock, Land and Irrigation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">3000000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-36735"><narrative>Ministry of Agriculture, Livestock, Land and Irrigation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">3000000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-36735"><narrative>Ministry of Agriculture, Livestock, Land and Irrigation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">3000000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-36735"><narrative>Ministry of Agriculture, Livestock, Land and Irrigation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">3000000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-36735"><narrative>Ministry of Agriculture, Livestock, Land and Irrigation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">3300000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-36735"><narrative>Ministry of Agriculture, Livestock, Land and Irrigation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-86048</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-36735"><narrative>Ministry of Agriculture, Livestock, Land and Irrigation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">2100000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-36735"><narrative>Ministry of Agriculture, Livestock, Land and Irrigation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">3000000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-36735"><narrative>Ministry of Agriculture, Livestock, Land and Irrigation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">5000000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-36735"><narrative>Ministry of Agriculture, Livestock, Land and Irrigation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-66750</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-36735"><narrative>Ministry of Agriculture, Livestock, Land and Irrigation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-22455</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-36735"><narrative>Ministry of Agriculture, Livestock, Land and Irrigation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-28759</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-36735"><narrative>Ministry of Agriculture, Livestock, Land and Irrigation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-40832</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-36735"><narrative>Ministry of Agriculture, Livestock, Land and Irrigation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-34903</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-36735"><narrative>Ministry of Agriculture, Livestock, Land and Irrigation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-39806</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-36735"><narrative>Ministry of Agriculture, Livestock, Land and Irrigation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-73282</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-36735"><narrative>Ministry of Agriculture, Livestock, Land and Irrigation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-77530</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-36735"><narrative>Ministry of Agriculture, Livestock, Land and Irrigation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-43703</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-36735"><narrative>Ministry of Agriculture, Livestock, Land and Irrigation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-45982</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-36735"><narrative>Ministry of Agriculture, Livestock, Land and Irrigation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-100759</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-36735"><narrative>Ministry of Agriculture, Livestock, Land and Irrigation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-130596</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-36735"><narrative>Ministry of Agriculture, Livestock, Land and Irrigation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-46079</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-36735"><narrative>Ministry of Agriculture, Livestock, Land and Irrigation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-46356</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-36735"><narrative>Ministry of Agriculture, Livestock, Land and Irrigation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-192869</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-36735"><narrative>Ministry of Agriculture, Livestock, Land and Irrigation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-43938</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-36735"><narrative>Ministry of Agriculture, Livestock, Land and Irrigation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-245251</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-36735"><narrative>Ministry of Agriculture, Livestock, Land and Irrigation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-326191</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-36735"><narrative>Ministry of Agriculture, Livestock, Land and Irrigation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-44552</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-36735"><narrative>Ministry of Agriculture, Livestock, Land and Irrigation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-42401</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-36735"><narrative>Ministry of Agriculture, Livestock, Land and Irrigation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-322689</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-36735"><narrative>Ministry of Agriculture, Livestock, Land and Irrigation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-704452</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-36735"><narrative>Ministry of Agriculture, Livestock, Land and Irrigation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-7848</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-36735"><narrative>Ministry of Agriculture, Livestock, Land and Irrigation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-708465</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-36735"><narrative>Ministry of Agriculture, Livestock, Land and Irrigation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-7848</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-36735"><narrative>Ministry of Agriculture, Livestock, Land and Irrigation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P166865"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P166865?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P166865"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of irrigation canals rehabilitated
</narrative></title>
<baseline year="2019" iso-date="2019-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-12" />
<period-end iso-date="2026-10-12" />
<target value="21">
<comment><narrative>
below 9 canal works under 13 contracts has been completed. 
1.Muhanthan kulam
2. Kawawewa LB main canal
3. Adachchakal Canal
4. Dewahuwa Scheme
5. Bathalagoda Scheme
6. Piramnathalaru Scheme
8.. Kanagambikai Kulam scheme 
9. Meiyankal D Canal
</narrative></comment>
</target>
<actual value="9">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of HMIS stations rehabilitated and in-operations
</narrative></title>
<baseline year="2019" iso-date="2019-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-13" />
<period-end iso-date="2026-10-13" />
<target value="140">
<comment><narrative>
The procurement of spare parts for 160 existing HMIS is completed, and the shipment is underway after substantial delays due to the need for several government approvals. The procurement of civil works contracts for ID and MASL is proceeding for installation.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
O&amp;M manuals developed,in use
</narrative></title>
<baseline year="2019" iso-date="2019-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-12" />
<period-end iso-date="2026-10-12" />
<target value="6">
<comment><narrative>
This activity has not started to report results, However, The consultancy contract which was commenced in February 2024 and is progressing with some delays.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Guideline for dam safety inspection and monitoring prepared
</narrative></title>
<baseline year="2019" iso-date="2019-05-11" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-11" />
<period-end iso-date="2027-10-16" />
<target value="Yes">
<comment><narrative>
The procurement of the international and national consultants was initiated in March 2025; a national consultant has been identified however, no proposal was received for the international consultant position. Concern for International consultants is the limited time (6) months.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2024" iso-date="2024-05-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-11" />
<period-end iso-date="2026-10-11" />
<target value="1,100,000">
<comment><narrative>
The current achievement is much below the project's end target; however, there are 46 activities ongoing (including the ones at the awarding stage) contributing to achievement of this target by the project closing.
</narrative></comment>
</target>
<actual value="207,640">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of irrigation canals rehabilitated
</narrative></title>
<baseline year="2019" iso-date="2019-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-12" />
<period-end iso-date="2026-10-12" />
<target value="21">

</target>
<actual value="11">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Landscapes under enhanced conservation and/or sustainable management (terrestrial and inland water areas)
</narrative></title>
<baseline year="2024" iso-date="2024-05-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-10" />
<period-end iso-date="2026-10-10" />
<target value="35,000">
<comment><narrative>
The results are related to the activities under sub-component 1.2 and there is no implementation yet. However, 26 mini-watershed plans are at the final stage of approval and the activity implementation under sub-component 1.2 is expected before April 30, 2025.

The project missed the April 30, 2025 start date due to delays in approvals, design/estimate quality, and changes in local agencies. It also proposed over 200 small activities via CBOs, which is impractical and costly to manage.
Agreed principles for packaging and procurement going forward:
Reduce the number of contracts
Shorten procurement timelines
Group activities coherently (e.g., by location, scope)
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Farmers organizations with at least 50% female members, and two women in leadership and decision-making roles.
</narrative></title>
<baseline year="2019" iso-date="2019-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-12" />
<period-end iso-date="2026-10-12" />
<target value="50">
<comment><narrative>
Total FOs formed - 100 Nos
No of Committees that has 50% females - 21 Nos. (21%)
  No of Committees that has 50% females + 02 females at leadership positions - 18 Nos. (18%)
</narrative></comment>
</target>
<actual value="20">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area provided with new/improved irrigation or drainage services
</narrative></title>
<baseline year="2019" iso-date="2019-05-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-11" />
<period-end iso-date="2026-10-11" />
<target value="201632">
<comment><narrative>
Overall 8 canal improvement works have completed. 
1.Muhanthan kulam
2. Kawawewa LB main canal
3. Walawa RB main canal
4. Dewahuwa Scheme
5. Bathalagoda Scheme
6. Muhathankulam Scheme 
7. Piramnathalaru Scheme
8. Kanagambikai Kulam scheme 

The reported number is less than what was reported during the last ISM (47,000ha); this is due to recalibration excersice being done at the PMU to align the project investments to the benifits.
</narrative></comment>
</target>
<actual value="16,405">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Groundwater management plans adopted
</narrative></title>
<baseline year="2019" iso-date="2019-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-13" />
<period-end iso-date="2026-10-13" />
<target value="4">
<comment><narrative>
The consultancy contract related to this activity is progressing but delayed.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Groundwater management plans adopted
</narrative></title>
<baseline year="2019" iso-date="2019-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-13" />
<period-end iso-date="2026-10-13" />
<target value="4">
<comment><narrative>
Groundwater management consultancy: The issue has been resolved, and work is progressing on outputs. An extension is expected, and completion is still targeted within the current project closing date.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of dams rehabilitated
</narrative></title>
<baseline year="2019" iso-date="2019-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-12" />
<period-end iso-date="2026-10-12" />
<target value="28">
<comment><narrative>
List of dams with 100% physical works completion. 
- Kalmadu (NPCID)
-Mahalindawewa (ID)
-Arawatta (ID)
- Polgolla Barrage Gantry crane installation (MASL)
- Udawalawa Barrage Gantry crane installation (MASL)
-Akathimurippu

However, the Mahalindawewa dam was breached on November 28, 2026 during the Cyclone Ditwah and temprory measure has been taken by the Irrigation Department. The rehabilitation works would be done under the government financing.
</narrative></comment>
</target>
<actual value="6.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of community based organizations benefitting from small and micro irrigation infrastructure improvement activities
</narrative></title>
<baseline year="2024" iso-date="2024-05-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-11" />
<period-end iso-date="2027-10-16" />
<target value="750">
<comment><narrative>
766 contracts have been completed under 720 CBOs.  In most of the contracts only the retention are to be paid.
</narrative></comment>
</target>
<actual value="720">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area provided with new/improved irrigation or drainage services
</narrative></title>
<baseline year="2019" iso-date="2019-05-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-11" />
<period-end iso-date="2026-10-11" />
<target value="201632">
<comment><narrative>
The current achievement is well below the targets. It was assessed during the last mission in October 2025 (ISR seq. 13) that the target is overestimated and needs to be revised in the upcoming restructuring. The revised target is estimated around 90,000 ha (tbc).
</narrative></comment>
</target>
<actual value="16,405">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances resolved within the standard time
</narrative></title>
<baseline year="2019" iso-date="2019-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-12" />
<period-end iso-date="2026-10-12" />
<target value="80">
<comment><narrative>
Since the last mission in February 2025, 16 grievances were reported, including 3 unresolved from the previous period. Of these, 16 have been resolved, and 3 are being addressed. The grievances were mainly related to construction delays, tree removal, and requests for additional livelihood. 

16 grievances received as of Sep 30, 2025
</narrative></comment>
</target>
<actual value="72">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area provided with new/improved irrigation or drainage services
</narrative></title>
<baseline year="2019" iso-date="2019-05-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-10" />
<period-end iso-date="2027-10-16" />
<target value="85,000">

</target>
<actual value="16,045">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Dams with reduced risk index
</narrative></title>
<baseline year="2019" iso-date="2019-05-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-11" />
<period-end iso-date="2026-10-11" />
<target value="30">
<comment><narrative>
The Mahalindawewa tank breached during the cyclone Ditwah. Therefore, the number of dams with reduced risk is revised to 5.
</narrative></comment>
</target>
<actual value="5">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of dams rehabilitated
</narrative></title>
<baseline year="2019" iso-date="2019-05-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-14" />
<period-end iso-date="2027-10-14" />
<target value="28">
<comment><narrative>
List of dams with 100% physical works completion. 
- Kalmadu (NPCID)
-Mahalindawewa (ID)
-Arawatta (ID)
- Polgolla Barrage Gantry crane installation (MASL)
- Udawalawa Barrage Gantry crane installation (MASL)
-Akathimurippu

However, the Mahalindawewa dam was breached on November 28, 2026 during the Cyclone Ditwah and temprory measure has been taken by the Irrigation Department. The rehabilitation works would be done under the government financing.
</narrative></comment>
</target>
<actual value="6">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Guideline for dam safety inspection and monitoring prepared
</narrative></title>
<baseline year="2019" iso-date="2019-05-12" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-12" />
<period-end iso-date="2026-10-12" />
<target value="Yes">
<comment><narrative>
The procurement of the international and national consultants was initiated in March 2025; a national consultant has been identified however, no proposal was received for the international consultant position. Concern for International consultants is the limited time (6) months.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2024" iso-date="2024-05-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-11" />
<period-end iso-date="2026-10-11" />
<target value="1,100,000">
<comment><narrative>
An overall increase of 5 activities completed contributing to 64,343 number of people  from last reporting.
</narrative></comment>
</target>
<actual value="207,640">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Progress reports submitted timely
</narrative></title>
<baseline year="2019" iso-date="2019-05-12" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-12" />
<period-end iso-date="2026-10-12" />
<target value="Yes">
<comment><narrative>
Some delays has been observed in submission in progress reports and results capturing.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Groundwater management plans adopted
</narrative></title>
<baseline year="2019" iso-date="2019-05-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-12" />
<period-end iso-date="2027-10-16" />
<target value="4">
<comment><narrative>
The consultancy contract related to this activity is progressing but delayed.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances resolved within the standard time
</narrative></title>
<baseline year="2019" iso-date="2019-05-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-11" />
<period-end iso-date="2027-10-16" />
<target value="80">
<comment><narrative>
A total of 220 grievances were received, 217 resolved (3 under follow up); 12 GRCs operated with 7 meetings, supported by monitoring visits, consultations, and social audits. Most complaints concerned construction delays, tree removal, and requests for additional livelihood support. Given contractor delays, the team recommends a comprehensive review of all ongoing tank rehabilitation to identify and mitigate risks of losing cultivation seasons
</narrative></comment>
</target>
<actual value="99">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Farmers organizations with at least 50% female members, and two women in leadership and decision-making roles.
</narrative></title>
<baseline year="2019" iso-date="2019-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-12" />
<period-end iso-date="2026-10-12" />
<target value="50">
<comment><narrative>
Total FOs formed - 100 Nos
No of Committees that has 50% females - 21 Nos. (21%)
  No of Committees that has 50% females + 02 females at leadership positions - 18 Nos. (18%)
</narrative></comment>
</target>
<actual value="20">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of HMIS stations rehabilitated and in-operations
</narrative></title>
<baseline year="2019" iso-date="2019-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-13" />
<period-end iso-date="2026-10-13" />
<target value="140">
<comment><narrative>
The procurement of spare parts for 160 existing HMIS is completed, and the shipment is underway after substantial delays due to the need for several government approvals. The procurement of civil works contracts for ID and MASL is proceeding for installation.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances resolved within the standard time
</narrative></title>
<baseline year="2019" iso-date="2019-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-12" />
<period-end iso-date="2026-10-12" />
<target value="80">
<comment><narrative>
A total of 220 grievances were received, 217 resolved (3 under follow up); 12 GRCs operated with 7 meetings, supported by monitoring visits, consultations, and social audits. Most complaints concerned construction delays, tree removal, and requests for additional livelihood support. Given contractor delays, the team recommends a comprehensive review of all ongoing tank rehabilitation to identify and mitigate risks of losing cultivation seasons
</narrative></comment>
</target>
<actual value="99">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
O&amp;M manuals developed,in use
</narrative></title>
<baseline year="2019" iso-date="2019-05-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-11" />
<period-end iso-date="2027-10-16" />
<target value="6">
<comment><narrative>
This activity has not started to report results. However, the consultancy contract, which was commenced in February 2024, is progressing with some delays. The consultants have submitted draft O&amp;M manuals to the PMU and IAs, and they are currently under review.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Emergency preparedness plans developed for dams
</narrative></title>
<baseline year="2019" iso-date="2019-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-12" />
<period-end iso-date="2026-10-12" />
<target value="6">
<comment><narrative>
The activities have not started to report results.
The consultancy contract commenced in February 2024 and is progressing with some delays. Comments  has been provided to the draft Emergency Preparedness Plans (EPP) and these are currently being updated.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National Strategic Water Plan Adopted
</narrative></title>
<baseline year="2024" iso-date="2024-05-11" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-11" />
<period-end iso-date="2026-10-11" />
<target value="Yes">
<comment><narrative>
With the change of government, overall approval for the implementation of NWRP is being sought from the Cabinet of Ministers, and the decision given in July 2025 was to revise the current &quot;water policy.&quot; The revised water policy is now at the final review prior to the public consultations. It was discussed during themission on October 2025, to revise this PDO indicator to an achievable one such as &quot; cabinet approval for the revised water policy&quot; and move this indicator to intermediate level. This is to be formalize in the upcoming restructuring.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
O&amp;M manuals developed,in use
</narrative></title>
<baseline year="2019" iso-date="2019-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-12" />
<period-end iso-date="2026-10-12" />
<target value="6">
<comment><narrative>
This activity has not started to report results. However, the consultancy contract, which was commenced in February 2024, is progressing with some delays. The consultants have submitted draft O&amp;M manuals to the PMU and IAs, and they are currently under review.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Dams portfolio risk reassessment completed
</narrative></title>
<baseline year="2026" iso-date="2026-02-14" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-14" />
<period-end iso-date="2027-10-14" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Groundwater management plans adopted
</narrative></title>
<baseline year="2019" iso-date="2019-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-13" />
<period-end iso-date="2026-10-13" />
<target value="4">
<comment><narrative>
Groundwater management consultancy: The issue has been resolved, and work is progressing on outputs. An extension is expected, and completion is still targeted within the current project closing date.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Dams with reduced risk index
</narrative></title>
<baseline year="2019" iso-date="2019-05-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-11" />
<period-end iso-date="2026-10-11" />
<target value="30">
<comment><narrative>
Following dams works has been completed.
- Arawatta tank
- Mahalindawewa
- Polgolla Barrage
- Udawalawa Reservoir
- Kalmadu Tnak
- Akathimurippu

The chnages to the risk rating would be file speparately in the portal.
</narrative></comment>
</target>
<actual value="6">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Progress reports submitted timely
</narrative></title>
<baseline year="2019" iso-date="2019-05-12" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-12" />
<period-end iso-date="2026-10-12" />
<target value="Yes">
<comment><narrative>
Some delays has been observed in submission in progress reports and results capturing.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of HMIS stations rehabilitated and in-operations
</narrative></title>
<baseline year="2019" iso-date="2019-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-13" />
<period-end iso-date="2026-10-13" />
<target value="140">
<comment><narrative>
The spare parts for HMIS stations have been shipped and are ready to be dispatched to the Irrigation Department and the Mahaweli Authority. Civil works contracts are being procured for the installation and the completion of this activity is expected by October 2026.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2024" iso-date="2024-05-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-10" />
<period-end iso-date="2027-10-16" />
<target value="1100,000">
<comment><narrative>
The current achievement is much below the project's end target; however, there are 46 activities ongoing (including the ones at the awarding stage) contributing to achievement of this target by the project closing.
</narrative></comment>
</target>
<actual value="20,7640">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Dams with reduced risk index
</narrative></title>
<baseline year="2019" iso-date="2019-05-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-10" />
<period-end iso-date="2027-10-16" />
<target value="40">
<comment><narrative>
The Mahalindawewa tank breached during the cyclone Ditwah. Therefore, the number of dams with reduced risk is revised to 5 from 6 in October 2025.
</narrative></comment>
</target>
<actual value="5">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Progress reports submitted timely
</narrative></title>
<baseline year="2019" iso-date="2019-05-12" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-12" />
<period-end iso-date="2026-10-12" />
<target value="Yes">

</target>
<actual value="yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Emergency preparedness plans developed for dams
</narrative></title>
<baseline year="2019" iso-date="2019-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-12" />
<period-end iso-date="2026-10-12" />
<target value="6">
<comment><narrative>
The activities have not started to report results.
The consultancy contract commenced in February 2024 and is progressing with some delays. Comments  has been provided to the draft Emergency Preparedness Plans (EPP) and these are currently being updated.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="9" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Watershed management center established
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Watershed Management Center established to coordinate all watershed management activities in the country. The center is deemed established, when its director has been appointed.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="9" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Watershed management center established
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Watershed Management Center established to coordinate all watershed management activities in the country. The center is deemed established, when its director has been appointed.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="9" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Watershed management center established
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Watershed Management Center established to coordinate all watershed management activities in the country. The center is deemed established, when its director has been appointed.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="9" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Soil conservation program implemented
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Establish systems to enforce the Soil Conservation Act provisions.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="9" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Soil conservation program implemented
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Establish systems to enforce the Soil Conservation Act provisions.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Mini Watershed Management Plans Adopted for Upper Mahaweli Watershed
</narrative></title>
<baseline year="2024" iso-date="2024-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-12" />
<period-end iso-date="2026-10-12" />
<target value="180">
<comment><narrative>
Good progress has been made since last mission 26 mini watershed plan which was submitted earlier  but only 6 has been approved yet. Consultnats/PMU reported on the difficulty on getting the final consent and conducting the dessimination workshop. It was reported during the mission overall 91 MWSP has been submitted to the PMU for review.
</narrative></comment>
</target>
<actual value="6">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Landscapes under enhanced conservation and/or sustainable management (terrestrial and inland water areas)
</narrative></title>
<baseline year="2024" iso-date="2024-05-09" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-09" />
<period-end iso-date="2027-10-16" />
<target value="9000">
<comment><narrative>
The results are related to the activities under sub-component 1.2 and there are no activites started to implement yet. However, 26 mini-watershed plans have been approved, and the implementation of the activity under sub-component 1.2 is expected by March 2026, following reassessment of ground conditions following Cyclone Ditwah.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area provided with new/improved irrigation or drainage services
</narrative></title>
<baseline year="2019" iso-date="2019-05-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-11" />
<period-end iso-date="2026-10-11" />
<target value="201632">
<comment><narrative>
The current achievement is well below the targets. It was assessed during the last mission in October 2025 (ISR seq. 13) that the target is overestimated and needs to be revised in the upcoming restructuring. The revised target is estimated around 90,000 ha (tbc).
</narrative></comment>
</target>
<actual value="16,405">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area provided with new/improved irrigation or drainage services
</narrative></title>
<baseline year="2019" iso-date="2019-05-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-11" />
<period-end iso-date="2026-10-11" />
<target value="201632">
<comment><narrative>
Overall 8 canal improvement works have completed. 
1.Muhanthan kulam
2. Kawawewa LB main canal
3. Walawa RB main canal
4. Dewahuwa Scheme
5. Bathalagoda Scheme
6. Muhathankulam Scheme 
7. Piramnathalaru Scheme
8. Kanagambikai Kulam scheme 

The reported number is less than what was reported during the last ISM (47,000ha); this is due to recalibration excersice being done at the PMU to align the project investments to the benifits.
</narrative></comment>
</target>
<actual value="16,405">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area provided with new/improved irrigation or drainage services
</narrative></title>
<baseline year="2019" iso-date="2019-05-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-11" />
<period-end iso-date="2026-10-11" />
<target value="201632">
<comment><narrative>
Overall 8 canal improvement works have completed. 
1.Muhanthan kulam
2. Kawawewa LB main canal
3. Walawa RB main canal
4. Dewahuwa Scheme
5. Bathalagoda Scheme
6. Muhathankulam Scheme 
7. Piramnathalaru Scheme
8. Kanagambikai Kulam scheme 

The reported number is less than what was reported during the last ISM (47,000ha); this is due to recalibration excersice being done at the PMU to align the project investments to the benifits.
</narrative></comment>
</target>
<actual value="16,405">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area provided with new/improved irrigation or drainage services
</narrative></title>
<baseline year="2019" iso-date="2019-05-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-10" />
<period-end iso-date="2027-10-16" />
<target value="85,000">

</target>
<actual value="16,045">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Dams with reduced risk index
</narrative></title>
<baseline year="2019" iso-date="2019-05-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-11" />
<period-end iso-date="2026-10-11" />
<target value="30">
<comment><narrative>
The Mahalindawewa tank breached during the cyclone Ditwah. Therefore, the number of dams with reduced risk is revised to 5.
</narrative></comment>
</target>
<actual value="5">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Dams with reduced risk index
</narrative></title>
<baseline year="2019" iso-date="2019-05-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-11" />
<period-end iso-date="2026-10-11" />
<target value="30">
<comment><narrative>
Following dams works has been completed.
- Arawatta tank
- Mahalindawewa
- Polgolla Barrage
- Udawalawa Reservoir
- Kalmadu Tnak
- Akathimurippu

The chnages to the risk rating would be file speparately in the portal.
</narrative></comment>
</target>
<actual value="6">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Dams with reduced risk index
</narrative></title>
<baseline year="2019" iso-date="2019-05-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-11" />
<period-end iso-date="2026-10-11" />
<target value="30">
<comment><narrative>
Following dams works has been completed.
- Arawatta tank
- Mahalindawewa
- Polgolla Barrage
- Udawalawa Reservoir
- Kalmadu Tnak
- Akathimurippu

The chnages to the risk rating would be file speparately in the portal.
</narrative></comment>
</target>
<actual value="6">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Dams with reduced risk index
</narrative></title>
<baseline year="2019" iso-date="2019-05-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-10" />
<period-end iso-date="2027-10-16" />
<target value="40">
<comment><narrative>
The Mahalindawewa tank breached during the cyclone Ditwah. Therefore, the number of dams with reduced risk is revised to 5 from 6 in October 2025.
</narrative></comment>
</target>
<actual value="5">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National Water Resources Policy adopted
</narrative></title>
<baseline year="2026" iso-date="2026-02-14" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-14" />
<period-end iso-date="2027-10-14" />
<target value="Yes">
<comment><narrative>
NWRP is being revised with a target timeline of April 2026 for the Cabinet approval.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2024" iso-date="2024-05-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-11" />
<period-end iso-date="2026-10-11" />
<target value="1,100,000">
<comment><narrative>
The current achievement is much below the project's end target; however, there are 46 activities ongoing (including the ones at the awarding stage) contributing to achievement of this target by the project closing.
</narrative></comment>
</target>
<actual value="207,640">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2024" iso-date="2024-05-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-11" />
<period-end iso-date="2026-10-11" />
<target value="1,100,000">
<comment><narrative>
An overall increase of 5 activities completed contributing to 64,343 number of people  from last reporting.
</narrative></comment>
</target>
<actual value="207,640">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2024" iso-date="2024-05-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-11" />
<period-end iso-date="2026-10-11" />
<target value="1,100,000">
<comment><narrative>
An overall increase of 5 activities completed contributing to 64,343 number of people  from last reporting.
</narrative></comment>
</target>
<actual value="207,640">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2024" iso-date="2024-05-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-10" />
<period-end iso-date="2027-10-16" />
<target value="1100,000">
<comment><narrative>
The current achievement is much below the project's end target; however, there are 46 activities ongoing (including the ones at the awarding stage) contributing to achievement of this target by the project closing.
</narrative></comment>
</target>
<actual value="20,7640">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National Strategic Water Plan Adopted
</narrative></title>
<baseline year="2024" iso-date="2024-05-11" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-11" />
<period-end iso-date="2026-10-11" />
<target value="Yes">
<comment><narrative>
With the change of government, overall approval for the implementation of NWRP is being sought from the Cabinet of Ministers, and the decision given in July 2025 was to revise the current &quot;water policy.&quot; The revised water policy is now at the final review prior to the public consultations. It was discussed during themission on October 2025, to revise this PDO indicator to an achievable one such as &quot; cabinet approval for the revised water policy&quot; and move this indicator to intermediate level. This is to be formalize in the upcoming restructuring.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National Strategic Water Plan Adopted
</narrative></title>
<baseline year="2024" iso-date="2024-05-11" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-11" />
<period-end iso-date="2026-10-11" />
<target value="Yes">
<comment><narrative>
The issue of REIO for NSWP is delayed. With the change of government, overall approval for the implementation of NWRP is being sought from the Cabinet of Ministers, and the decision given in July 2025 was to revise the current &quot;water policy.&quot; With this, the consultation for the NSWP is on hold. 
It was discussed during the mission to revise this PDO indicator to an achievable one such as &quot; cabinet approval for the revised water policy&quot; and move this indicator to intermediate level.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National Strategic Water Plan Adopted
</narrative></title>
<baseline year="2024" iso-date="2024-05-11" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-11" />
<period-end iso-date="2026-10-11" />
<target value="Yes">
<comment><narrative>
The issue of REIO for NSWP is delayed. With the change of government, overall approval for the implementation of NWRP is being sought from the Cabinet of Ministers, and the decision given in July 2025 was to revise the current &quot;water policy.&quot; With this, the consultation for the NSWP is on hold. 
It was discussed during the mission to revise this PDO indicator to an achievable one such as &quot; cabinet approval for the revised water policy&quot; and move this indicator to intermediate level.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Landscapes under enhanced conservation and/or sustainable management (terrestrial and inland water areas)
</narrative></title>
<baseline year="2024" iso-date="2024-05-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-10" />
<period-end iso-date="2026-10-10" />
<target value="35,000">
<comment><narrative>
The results are related to the activities under sub-component 1.2 and there are no activites started to implement yet. However, 26 mini-watershed plans have been approved, and the implementation of the activity under sub-component 1.2 is expected by March 2026, following reassessment of ground conditions following Cyclone Ditwah.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Landscapes under enhanced conservation and/or sustainable management (terrestrial and inland water areas)
</narrative></title>
<baseline year="2024" iso-date="2024-05-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-10" />
<period-end iso-date="2026-10-10" />
<target value="35,000">
<comment><narrative>
The results are related to the activities under sub-component 1.2 and there is no implementation yet. However, 26 mini-watershed plans are at the final stage of approval and the activity implementation under sub-component 1.2 is expected before April 30, 2025.

The project missed the April 30, 2025 start date due to delays in approvals, design/estimate quality, and changes in local agencies. It also proposed over 200 small activities via CBOs, which is impractical and costly to manage.
Agreed principles for packaging and procurement going forward:
Reduce the number of contracts
Shorten procurement timelines
Group activities coherently (e.g., by location, scope)
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Landscapes under enhanced conservation and/or sustainable management (terrestrial and inland water areas)
</narrative></title>
<baseline year="2024" iso-date="2024-05-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-10" />
<period-end iso-date="2026-10-10" />
<target value="35,000">
<comment><narrative>
The results are related to the activities under sub-component 1.2 and there is no implementation yet. However, 26 mini-watershed plans are at the final stage of approval and the activity implementation under sub-component 1.2 is expected before April 30, 2025.

The project missed the April 30, 2025 start date due to delays in approvals, design/estimate quality, and changes in local agencies. It also proposed over 200 small activities via CBOs, which is impractical and costly to manage.
Agreed principles for packaging and procurement going forward:
Reduce the number of contracts
Shorten procurement timelines
Group activities coherently (e.g., by location, scope)
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Landscapes under enhanced conservation and/or sustainable management (terrestrial and inland water areas)
</narrative></title>
<baseline year="2024" iso-date="2024-05-09" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-09" />
<period-end iso-date="2027-10-16" />
<target value="9000">
<comment><narrative>
The results are related to the activities under sub-component 1.2 and there are no activites started to implement yet. However, 26 mini-watershed plans have been approved, and the implementation of the activity under sub-component 1.2 is expected by March 2026, following reassessment of ground conditions following Cyclone Ditwah.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Mini Watershed Management Plans Adopted for Upper Mahaweli Watershed
</narrative></title>
<baseline year="2024" iso-date="2024-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-12" />
<period-end iso-date="2026-10-12" />
<target value="180">
<comment><narrative>
Good progress has been made since last mission 26 mini watershed plan which was submitted earlier  but only 6 has been approved yet. Consultnats/PMU reported on the difficulty on getting the final consent and conducting the dessimination workshop. It was reported during the mission overall 91 MWSP has been submitted to the PMU for review.
</narrative></comment>
</target>
<actual value="6">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of HMIS stations rehabilitated and in-operations
</narrative></title>
<baseline year="2019" iso-date="2019-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-12" />
<period-end iso-date="2027-10-16" />
<target value="140.00">
<comment><narrative>
The spare parts for HMIS stations have been shipped and are ready to be dispatched to the Irrigation Department and the Mahaweli Authority. Civil works contracts are being procured for the installation and the completion of this activity is expected by October 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Emergency preparedness plans developed for dams
</narrative></title>
<baseline year="2019" iso-date="2019-05-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-11" />
<period-end iso-date="2027-10-16" />
<target value="6">
<comment><narrative>
The activities have not started to report results.
The consultancy contract commenced in February 2024 and is progressing with some delays. Comments has been provided to the draft Emergency Preparedness Plans (EPP) and these are currently being updated. The finalization of the EPPs are expected by May 2026.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Landscapes under enhanced conservation and/or sustainable management (terrestrial and inland water areas)
</narrative></title>
<baseline year="2024" iso-date="2024-05-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-10" />
<period-end iso-date="2026-10-10" />
<target value="35,000">
<comment><narrative>
The results are related to the activities under sub-component 1.2 and there are no activites started to implement yet. However, 26 mini-watershed plans have been approved, and the implementation of the activity under sub-component 1.2 is expected by March 2026, following reassessment of ground conditions following Cyclone Ditwah.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Watershed Management committees with at least 50% female members, and two women in  leadership and decision making roles
</narrative></title>
<baseline year="2019" iso-date="2019-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-12" />
<period-end iso-date="2026-10-12" />
<target value="50">
<comment><narrative>
Total WMS committees  formed - 06 Nos 
 No of Committees that has 50% females - 03 Nos.
 No of Committees that has 50% females + 01 females at leadership positions -
</narrative></comment>
</target>
<actual value="19">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Farmers organizations with at least 50% female members, and two women in leadership and decision-making roles.
</narrative></title>
<baseline year="2019" iso-date="2019-05-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-11" />
<period-end iso-date="2027-10-16" />
<target value="50">
<comment><narrative>
Total FOs formed - 100 Nos
No of Committees that has 50% females - 21 Nos. (21%)
No of Committees that has 50% females + 02 females at leadership positions - 18 Nos. (18%)
</narrative></comment>
</target>
<actual value="20">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2024" iso-date="2024-05-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-11" />
<period-end iso-date="2026-10-11" />
<target value="1,100,000">
<comment><narrative>
An overall increase of 5 activities completed contributing to 64,343 number of people  from last reporting.
</narrative></comment>
</target>
<actual value="207,640">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Watershed Management committees with at least 50% female members, and two women in  leadership and decision making roles
</narrative></title>
<baseline year="2019" iso-date="2019-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-12" />
<period-end iso-date="2026-10-12" />
<target value="50">

</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Watershed Management committees with at least 50% female members, and two women in  leadership and decision making roles
</narrative></title>
<baseline year="2019" iso-date="2019-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-12" />
<period-end iso-date="2026-10-12" />
<target value="50">
<comment><narrative>
Total WMS committees  formed - 06 Nos 
 No of Committees that has 50% females - 03 Nos.
 No of Committees that has 50% females + 01 females at leadership positions -
</narrative></comment>
</target>
<actual value="19">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of irrigation canals rehabilitated
</narrative></title>
<baseline year="2019" iso-date="2019-05-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-14" />
<period-end iso-date="2027-10-14" />
<target value="21">

</target>
<actual value="11">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of community based organizations benefitting from small and micro irrigation infrastructure improvement activities
</narrative></title>
<baseline year="2024" iso-date="2024-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-12" />
<period-end iso-date="2026-10-12" />
<target value="750">
<comment><narrative>
760 contracts have been completed under 720 CBOs. Only 6 more activities are pending completion.
</narrative></comment>
</target>
<actual value="720">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances resolved within the standard time
</narrative></title>
<baseline year="2019" iso-date="2019-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-12" />
<period-end iso-date="2026-10-12" />
<target value="80">
<comment><narrative>
Since the last mission in February 2025, 16 grievances were reported, including 3 unresolved from the previous period. Of these, 16 have been resolved, and 3 are being addressed. The grievances were mainly related to construction delays, tree removal, and requests for additional livelihood. 

16 grievances received as of Sep 30, 2025
</narrative></comment>
</target>
<actual value="72">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of community based organizations benefitting from small and micro irrigation infrastructure improvement activities
</narrative></title>
<baseline year="2024" iso-date="2024-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-12" />
<period-end iso-date="2026-10-12" />
<target value="750">
<comment><narrative>
766 contracts have been completed under 720 CBOs.  In most of the contracts only the retention are to be paid.
</narrative></comment>
</target>
<actual value="720">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National Water Resources Policy adopted
</narrative></title>
<baseline year="2026" iso-date="2026-02-14" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-14" />
<period-end iso-date="2027-10-14" />
<target value="Yes">
<comment><narrative>
NWRP is being revised with a target timeline of April 2026 for the Cabinet approval.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of community based organizations benefitting from small and micro irrigation infrastructure improvement activities
</narrative></title>
<baseline year="2024" iso-date="2024-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-12" />
<period-end iso-date="2026-10-12" />
<target value="750">
<comment><narrative>
760 contracts have been completed under 720 CBOs. Only 6 more activities are pending completion.
</narrative></comment>
</target>
<actual value="720">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Mini Watershed Management Plans Adopted for Upper Mahaweli Watershed
</narrative></title>
<baseline year="2024" iso-date="2024-05-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-11" />
<period-end iso-date="2027-10-16" />
<target value="180">
<comment><narrative>
Final approval for 26 Mini-watershed plans has been granted. Another 60 at at the approval stage and the ratification workshop is to be completed by February 2026
</narrative></comment>
</target>
<actual value="26">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Farmers organizations with at least 50% female members, and two women in leadership and decision-making roles.
</narrative></title>
<baseline year="2019" iso-date="2019-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-12" />
<period-end iso-date="2026-10-12" />
<target value="50">
<comment><narrative>
Total FOs formed - 100 Nos
No of Committees that has 50% females - 21 Nos. (21%)
No of Committees that has 50% females + 02 females at leadership positions - 18 Nos. (18%)
</narrative></comment>
</target>
<actual value="20">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Watershed Management committees with at least 50% female members, and two women in  leadership and decision making roles
</narrative></title>
<baseline year="2019" iso-date="2019-05-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-11" />
<period-end iso-date="2027-10-16" />
<target value="50.00">

</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Progress reports submitted timely
</narrative></title>
<baseline year="2019" iso-date="2019-05-11" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-11" />
<period-end iso-date="2027-10-16" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National Strategic Water Plan Adopted
</narrative></title>
<baseline year="2024" iso-date="2024-05-11" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-11" />
<period-end iso-date="2026-10-11" />
<target value="Yes">
<comment><narrative>
The issue of REIO for NSWP is delayed. With the change of government, overall approval for the implementation of NWRP is being sought from the Cabinet of Ministers, and the decision given in July 2025 was to revise the current &quot;water policy.&quot; With this, the consultation for the NSWP is on hold. 
It was discussed during the mission to revise this PDO indicator to an achievable one such as &quot; cabinet approval for the revised water policy&quot; and move this indicator to intermediate level.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Guideline for dam safety inspection and monitoring prepared
</narrative></title>
<baseline year="2019" iso-date="2019-05-12" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-12" />
<period-end iso-date="2026-10-12" />
<target value="Yes">
<comment><narrative>
The procurement of the international and national consultants was initiated in March 2025; a national consultant has been identified however, no proposal was received for the international consultant position. Concern for International consultants is the limited time (6) months.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National Strategic Water Plan Adopted
</narrative></title>
<baseline year="2024" iso-date="2024-05-11" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-11" />
<period-end iso-date="2026-10-11" />
<target value="Yes">
<comment><narrative>
The issue of REIO for NSWP is delayed. With the change of government, overall approval for the implementation of NWRP is being sought from the Cabinet of Ministers, and the decision given in July 2025 was to revise the current &quot;water policy.&quot; With this, the consultation for the NSWP is on hold. 
It was discussed during the mission to revise this PDO indicator to an achievable one such as &quot; cabinet approval for the revised water policy&quot; and move this indicator to intermediate level.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Guideline for dam safety inspection and monitoring prepared
</narrative></title>
<baseline year="2019" iso-date="2019-05-12" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-12" />
<period-end iso-date="2026-10-12" />
<target value="Yes">
<comment><narrative>
The procurement of the international and national consultants was initiated in March 2025; a national consultant has been identified however, no proposal was received for the international consultant position. Concern for International consultants is the limited time (6) months.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Dams with reduced risk index
</narrative></title>
<baseline year="2019" iso-date="2019-05-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-11" />
<period-end iso-date="2026-10-11" />
<target value="30">
<comment><narrative>
Following dams works has been completed.
- Arawatta tank
- Mahalindawewa
- Polgolla Barrage
- Udawalawa Reservoir
- Kalmadu Tnak
- Akathimurippu

The chnages to the risk rating would be file speparately in the portal.
</narrative></comment>
</target>
<actual value="6">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area provided with new/improved irrigation or drainage services
</narrative></title>
<baseline year="2019" iso-date="2019-05-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-11" />
<period-end iso-date="2026-10-11" />
<target value="201632">
<comment><narrative>
The current achievement is well below the targets. It was assessed during the last mission in October 2025 (ISR seq. 13) that the target is overestimated and needs to be revised in the upcoming restructuring. The revised target is estimated around 90,000 ha (tbc).
</narrative></comment>
</target>
<actual value="16,405">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area provided with new/improved irrigation or drainage services
</narrative></title>
<baseline year="2019" iso-date="2019-05-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-11" />
<period-end iso-date="2026-10-11" />
<target value="201632">
<comment><narrative>
Overall 8 canal improvement works have completed. 
1.Muhanthan kulam
2. Kawawewa LB main canal
3. Walawa RB main canal
4. Dewahuwa Scheme
5. Bathalagoda Scheme
6. Muhathankulam Scheme 
7. Piramnathalaru Scheme
8. Kanagambikai Kulam scheme 

The reported number is less than what was reported during the last ISM (47,000ha); this is due to recalibration excersice being done at the PMU to align the project investments to the benifits.
</narrative></comment>
</target>
<actual value="16,405">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area provided with new/improved irrigation or drainage services
</narrative></title>
<baseline year="2019" iso-date="2019-05-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-11" />
<period-end iso-date="2026-10-11" />
<target value="201632">
<comment><narrative>
Overall 8 canal improvement works have completed. 
1.Muhanthan kulam
2. Kawawewa LB main canal
3. Walawa RB main canal
4. Dewahuwa Scheme
5. Bathalagoda Scheme
6. Muhathankulam Scheme 
7. Piramnathalaru Scheme
8. Kanagambikai Kulam scheme 

The reported number is less than what was reported during the last ISM (47,000ha); this is due to recalibration excersice being done at the PMU to align the project investments to the benifits.
</narrative></comment>
</target>
<actual value="16,405">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area provided with new/improved irrigation or drainage services
</narrative></title>
<baseline year="2019" iso-date="2019-05-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-10" />
<period-end iso-date="2027-10-16" />
<target value="85,000">

</target>
<actual value="16,045">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Dams with reduced risk index
</narrative></title>
<baseline year="2019" iso-date="2019-05-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-11" />
<period-end iso-date="2026-10-11" />
<target value="30">
<comment><narrative>
The Mahalindawewa tank breached during the cyclone Ditwah. Therefore, the number of dams with reduced risk is revised to 5.
</narrative></comment>
</target>
<actual value="5">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Dams with reduced risk index
</narrative></title>
<baseline year="2019" iso-date="2019-05-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-11" />
<period-end iso-date="2026-10-11" />
<target value="30">
<comment><narrative>
Following dams works has been completed.
- Arawatta tank
- Mahalindawewa
- Polgolla Barrage
- Udawalawa Reservoir
- Kalmadu Tnak
- Akathimurippu

The chnages to the risk rating would be file speparately in the portal.
</narrative></comment>
</target>
<actual value="6">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Dams with reduced risk index
</narrative></title>
<baseline year="2019" iso-date="2019-05-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-11" />
<period-end iso-date="2026-10-11" />
<target value="30">
<comment><narrative>
Following dams works has been completed.
- Arawatta tank
- Mahalindawewa
- Polgolla Barrage
- Udawalawa Reservoir
- Kalmadu Tnak
- Akathimurippu

The chnages to the risk rating would be file speparately in the portal.
</narrative></comment>
</target>
<actual value="6">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Dams with reduced risk index
</narrative></title>
<baseline year="2019" iso-date="2019-05-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-10" />
<period-end iso-date="2027-10-16" />
<target value="40">
<comment><narrative>
The Mahalindawewa tank breached during the cyclone Ditwah. Therefore, the number of dams with reduced risk is revised to 5 from 6 in October 2025.
</narrative></comment>
</target>
<actual value="5">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National Water Resources Policy adopted
</narrative></title>
<baseline year="2026" iso-date="2026-02-14" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-14" />
<period-end iso-date="2027-10-14" />
<target value="Yes">
<comment><narrative>
NWRP is being revised with a target timeline of April 2026 for the Cabinet approval.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2024" iso-date="2024-05-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-11" />
<period-end iso-date="2026-10-11" />
<target value="1,100,000">
<comment><narrative>
The current achievement is much below the project's end target; however, there are 46 activities ongoing (including the ones at the awarding stage) contributing to achievement of this target by the project closing.
</narrative></comment>
</target>
<actual value="207,640">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2024" iso-date="2024-05-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-11" />
<period-end iso-date="2026-10-11" />
<target value="1,100,000">
<comment><narrative>
An overall increase of 5 activities completed contributing to 64,343 number of people  from last reporting.
</narrative></comment>
</target>
<actual value="207,640">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2024" iso-date="2024-05-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-11" />
<period-end iso-date="2026-10-11" />
<target value="1,100,000">
<comment><narrative>
An overall increase of 5 activities completed contributing to 64,343 number of people  from last reporting.
</narrative></comment>
</target>
<actual value="207,640">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2024" iso-date="2024-05-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-10" />
<period-end iso-date="2027-10-16" />
<target value="1100,000">
<comment><narrative>
The current achievement is much below the project's end target; however, there are 46 activities ongoing (including the ones at the awarding stage) contributing to achievement of this target by the project closing.
</narrative></comment>
</target>
<actual value="20,7640">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National Strategic Water Plan Adopted
</narrative></title>
<baseline year="2024" iso-date="2024-05-11" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-11" />
<period-end iso-date="2026-10-11" />
<target value="Yes">
<comment><narrative>
With the change of government, overall approval for the implementation of NWRP is being sought from the Cabinet of Ministers, and the decision given in July 2025 was to revise the current &quot;water policy.&quot; The revised water policy is now at the final review prior to the public consultations. It was discussed during themission on October 2025, to revise this PDO indicator to an achievable one such as &quot; cabinet approval for the revised water policy&quot; and move this indicator to intermediate level. This is to be formalize in the upcoming restructuring.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National Strategic Water Plan Adopted
</narrative></title>
<baseline year="2024" iso-date="2024-05-11" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-11" />
<period-end iso-date="2026-10-11" />
<target value="Yes">
<comment><narrative>
The issue of REIO for NSWP is delayed. With the change of government, overall approval for the implementation of NWRP is being sought from the Cabinet of Ministers, and the decision given in July 2025 was to revise the current &quot;water policy.&quot; With this, the consultation for the NSWP is on hold. 
It was discussed during the mission to revise this PDO indicator to an achievable one such as &quot; cabinet approval for the revised water policy&quot; and move this indicator to intermediate level.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National Strategic Water Plan Adopted
</narrative></title>
<baseline year="2024" iso-date="2024-05-11" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-11" />
<period-end iso-date="2026-10-11" />
<target value="Yes">
<comment><narrative>
The issue of REIO for NSWP is delayed. With the change of government, overall approval for the implementation of NWRP is being sought from the Cabinet of Ministers, and the decision given in July 2025 was to revise the current &quot;water policy.&quot; With this, the consultation for the NSWP is on hold. 
It was discussed during the mission to revise this PDO indicator to an achievable one such as &quot; cabinet approval for the revised water policy&quot; and move this indicator to intermediate level.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Landscapes under enhanced conservation and/or sustainable management (terrestrial and inland water areas)
</narrative></title>
<baseline year="2024" iso-date="2024-05-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-10" />
<period-end iso-date="2026-10-10" />
<target value="35,000">
<comment><narrative>
The results are related to the activities under sub-component 1.2 and there are no activites started to implement yet. However, 26 mini-watershed plans have been approved, and the implementation of the activity under sub-component 1.2 is expected by March 2026, following reassessment of ground conditions following Cyclone Ditwah.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Landscapes under enhanced conservation and/or sustainable management (terrestrial and inland water areas)
</narrative></title>
<baseline year="2024" iso-date="2024-05-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-10" />
<period-end iso-date="2026-10-10" />
<target value="35,000">
<comment><narrative>
The results are related to the activities under sub-component 1.2 and there is no implementation yet. However, 26 mini-watershed plans are at the final stage of approval and the activity implementation under sub-component 1.2 is expected before April 30, 2025.

The project missed the April 30, 2025 start date due to delays in approvals, design/estimate quality, and changes in local agencies. It also proposed over 200 small activities via CBOs, which is impractical and costly to manage.
Agreed principles for packaging and procurement going forward:
Reduce the number of contracts
Shorten procurement timelines
Group activities coherently (e.g., by location, scope)
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Landscapes under enhanced conservation and/or sustainable management (terrestrial and inland water areas)
</narrative></title>
<baseline year="2024" iso-date="2024-05-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-10" />
<period-end iso-date="2026-10-10" />
<target value="35,000">
<comment><narrative>
The results are related to the activities under sub-component 1.2 and there is no implementation yet. However, 26 mini-watershed plans are at the final stage of approval and the activity implementation under sub-component 1.2 is expected before April 30, 2025.

The project missed the April 30, 2025 start date due to delays in approvals, design/estimate quality, and changes in local agencies. It also proposed over 200 small activities via CBOs, which is impractical and costly to manage.
Agreed principles for packaging and procurement going forward:
Reduce the number of contracts
Shorten procurement timelines
Group activities coherently (e.g., by location, scope)
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
O&amp;M manuals developed,in use
</narrative></title>
<baseline year="2019" iso-date="2019-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-12" />
<period-end iso-date="2026-10-12" />
<target value="6">
<comment><narrative>
This activity has not started to report results, However, The consultancy contract which was commenced in February 2024 and is progressing with some delays.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of irrigation canals rehabilitated
</narrative></title>
<baseline year="2019" iso-date="2019-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-12" />
<period-end iso-date="2026-10-12" />
<target value="21">
<comment><narrative>
below 9 canal works under 13 contracts has been completed. 
1.Muhanthan kulam
2. Kawawewa LB main canal
3. Adachchakal Canal
4. Dewahuwa Scheme
5. Bathalagoda Scheme
6. Piramnathalaru Scheme
8.. Kanagambikai Kulam scheme 
9. Meiyankal D Canal
</narrative></comment>
</target>
<actual value="9">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Landscapes under enhanced conservation and/or sustainable management (terrestrial and inland water areas)
</narrative></title>
<baseline year="2024" iso-date="2024-05-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-10" />
<period-end iso-date="2026-10-10" />
<target value="35,000">
<comment><narrative>
The results are related to the activities under sub-component 1.2 and there is no implementation yet. However, 26 mini-watershed plans are at the final stage of approval and the activity implementation under sub-component 1.2 is expected before April 30, 2025.

The project missed the April 30, 2025 start date due to delays in approvals, design/estimate quality, and changes in local agencies. It also proposed over 200 small activities via CBOs, which is impractical and costly to manage.
Agreed principles for packaging and procurement going forward:
Reduce the number of contracts
Shorten procurement timelines
Group activities coherently (e.g., by location, scope)
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Landscapes under enhanced conservation and/or sustainable management (terrestrial and inland water areas)
</narrative></title>
<baseline year="2024" iso-date="2024-05-09" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-09" />
<period-end iso-date="2027-10-16" />
<target value="9000">
<comment><narrative>
The results are related to the activities under sub-component 1.2 and there are no activites started to implement yet. However, 26 mini-watershed plans have been approved, and the implementation of the activity under sub-component 1.2 is expected by March 2026, following reassessment of ground conditions following Cyclone Ditwah.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of dams rehabilitated
</narrative></title>
<baseline year="2019" iso-date="2019-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-12" />
<period-end iso-date="2026-10-12" />
<target value="28">
<comment><narrative>
List of dams with 100% physical works completion. 
- Kalmadu (NPCID)
-Mahalindawewa (ID)
-Arawatta (ID)
- Polgolla Barrage Gantry crane installation (MASL)
- Udawalawa Barrage Gantry crane installation (MASL)
-Akathimurippu
</narrative></comment>
</target>
<actual value="6.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area provided with new/improved irrigation or drainage services
</narrative></title>
<baseline year="2019" iso-date="2019-05-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-11" />
<period-end iso-date="2026-10-11" />
<target value="201632">
<comment><narrative>
Overall 8 canal improvement works have completed. 
1.Muhanthan kulam
2. Kawawewa LB main canal
3. Walawa RB main canal
4. Dewahuwa Scheme
5. Bathalagoda Scheme
6. Muhathankulam Scheme 
7. Piramnathalaru Scheme
8. Kanagambikai Kulam scheme 

The reported number is less than what was reported during the last ISM (47,000ha); this is due to recalibration excersice being done at the PMU to align the project investments to the benifits.
</narrative></comment>
</target>
<actual value="16,405">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Headworks and associated hydraulic works with safety critical works completed
</narrative></title>
<baseline year="2026" iso-date="2026-02-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-14" />
<period-end iso-date="2027-10-14" />
<target value="40">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Mini Watershed Management Plans Adopted for Upper Mahaweli Watershed
</narrative></title>
<baseline year="2024" iso-date="2024-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-12" />
<period-end iso-date="2026-10-12" />
<target value="180">
<comment><narrative>
Final approval for 26 Mini-watershed plans has been granted. Another 60 at at the approval stage and the ratification workshop is to be completed by February 2026
</narrative></comment>
</target>
<actual value="26">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of dams rehabilitated
</narrative></title>
<baseline year="2019" iso-date="2019-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-12" />
<period-end iso-date="2026-10-12" />
<target value="28">
<comment><narrative>
List of dams with 100% physical works completion. 
- Kalmadu (NPCID)
-Mahalindawewa (ID)
-Arawatta (ID)
- Polgolla Barrage Gantry crane installation (MASL)
- Udawalawa Barrage Gantry crane installation (MASL)
-Akathimurippu
</narrative></comment>
</target>
<actual value="6.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Emergency preparedness plans developed for dams
</narrative></title>
<baseline year="2019" iso-date="2019-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-05-12" />
<period-end iso-date="2026-10-12" />
<target value="6">
<comment><narrative>
The activities have not started to report results.
The consultancy contract commenced in February 2024 and is progressing with some delays. Comments has been provided to the draft Emergency Preparedness Plans (EPP) and these are currently being updated. The finalization of the EPPs are expected by May 2026.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="9" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
River basin management plans developed
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
River basin management plans developed including the establishment of institutional mechanisms for agency and department coordination at basin and national levels.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="9" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
River basin management plans developed
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
River basin management plans developed including the establishment of institutional mechanisms for agency and department coordination at basin and national levels.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="9" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
River basin management plans developed
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
River basin management plans developed including the establishment of institutional mechanisms for agency and department coordination at basin and national levels.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="9" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National agency for dam safety established
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
The National agency for dam safety is considered established when: i) a director has been appointed; ii) dam safety inspection practices have been developed; and iii) a dam portfolio risk assessment has been regularized. The agency is considered operational when: i) dam safety regulation has been established; and ii) sustainable funding arrangements for O&amp;M for dam safety are in place, includng a watershed development fund.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="9" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National agency for dam safety established
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
The National agency for dam safety is considered established when: i) a director has been appointed; ii) dam safety inspection practices have been developed; and iii) a dam portfolio risk assessment has been regularized. The agency is considered operational when: i) dam safety regulation has been established; and ii) sustainable funding arrangements for O&amp;M for dam safety are in place, includng a watershed development fund.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="9" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National agency for dam safety established
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
The National agency for dam safety is considered established when: i) a director has been appointed; ii) dam safety inspection practices have been developed; and iii) a dam portfolio risk assessment has been regularized. The agency is considered operational when: i) dam safety regulation has been established; and ii) sustainable funding arrangements for O&amp;M for dam safety are in place, includng a watershed development fund.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="9" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Soil conservation program implemented
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Establish systems to enforce the Soil Conservation Act provisions.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-11-20T15:47:22" hierarchy="1"><iati-identifier>44000-P172342</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>KMTT</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0043443"><narrative>Democratic Socialist Republic of Sri Lanka</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="LK-COA-0043444"><narrative>Ministry of Transport, Highways and Urban Development</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2020-05-18"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2020-05-18"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2027-05-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="2" iso-date="2027-05-30"><narrative>Projected end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Hongye Fan</narrative></person-name><telephone>+1-202-473-1000</telephone><email>hfan1@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="LK" percentage="100"><narrative xml:lang="en">SRI LANKA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001225745" />
            <name><narrative>Udurawana</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.354 80.6687</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001227603" />
            <name><narrative>Democratic Socialist Republic of Sri Lanka</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.75 80.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001230551" />
            <name><narrative>Peradeniya-New</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.2509 80.5954</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001235626" />
            <name><narrative>Meda Ela</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.3 80.6</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001241620" />
            <name><narrative>Kandy Lake</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.3 80.63333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001241621" />
            <name><narrative>Kandy District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.3044 80.7073</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001241622" />
            <name><narrative>Kandy</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.2906 80.6336</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007433103" />
            <name><narrative>Katukele West</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.28472 80.62354</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007435549" />
            <name><narrative>Torrington</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.1199 80.686</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0008302747" />
            <name><narrative>Bogambara</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.4938 80.6697</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="21011" percentage="82" xml:lang="en"/><sector vocabulary="1" code="21012" percentage="17" xml:lang="en"/><sector vocabulary="1" code="21011" percentage="1" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TF" percentage="6.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Transportation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TC" percentage="94.0000000" xml:lang="en"><narrative>FY17 - Urban Transport</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000211" percentage="6" xml:lang="en"><narrative>Investment and Business Climate</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="100" xml:lang="en"><narrative>Urban Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000021" percentage="6" xml:lang="en"><narrative>Business Enabling Environment</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000074" percentage="1" xml:lang="en"><narrative>Road Safety</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000023" percentage="6" xml:lang="en"><narrative>Public Private Partnerships</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="100" xml:lang="en"><narrative>Urban Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000074" percentage="1" xml:lang="en"><narrative>Road Safety</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000713" percentage="100" xml:lang="en"><narrative>Public Transport</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000021" percentage="6" xml:lang="en"><narrative>Business Enabling Environment</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">91588.52</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">91588.52</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">91588.52</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">91588.52</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">91588.52</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">91588.52</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">91588.52</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">91588.52</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">91588.52</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">91588.52</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">91588.52</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">91588.52</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">732708.18</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">732708.18</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">732708.18</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">732708.18</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">732708.18</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">732708.18</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">732708.18</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">732708.18</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">732708.18</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">732708.18</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">732708.18</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">732708.18</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">1416666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">1416666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">1416666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">1611000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">1611000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">1611000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2027-05-30"/>
<value currency="USD" value-date="2027-05-30">39415552.01</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2027-05-30"/>
<value currency="USD" value-date="2027-05-30">39415552.01</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">5000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-43444"><narrative>Ministry of Transport, Highways and Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">64333000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-43444"><narrative>Ministry of Transport, Highways and Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">12500</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-43444"><narrative>Ministry of Transport, Highways and Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">460000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-43444"><narrative>Ministry of Transport, Highways and Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">2638405</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-43444"><narrative>Ministry of Transport, Highways and Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">4527500</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-43444"><narrative>Ministry of Transport, Highways and Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">1635417</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-43444"><narrative>Ministry of Transport, Highways and Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-300000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-43444"><narrative>Ministry of Transport, Highways and Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">1404253</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-43444"><narrative>Ministry of Transport, Highways and Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">1430865</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-43444"><narrative>Ministry of Transport, Highways and Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">300000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-43444"><narrative>Ministry of Transport, Highways and Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">1192781</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-43444"><narrative>Ministry of Transport, Highways and Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">1077992</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-43444"><narrative>Ministry of Transport, Highways and Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">1007835</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-43444"><narrative>Ministry of Transport, Highways and Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">1389770</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-43444"><narrative>Ministry of Transport, Highways and Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">1776637</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-43444"><narrative>Ministry of Transport, Highways and Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">7073212</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-43444"><narrative>Ministry of Transport, Highways and Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">248219</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-43444"><narrative>Ministry of Transport, Highways and Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">799809</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-43444"><narrative>Ministry of Transport, Highways and Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">1865341</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-43444"><narrative>Ministry of Transport, Highways and Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">1376911</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-43444"><narrative>Ministry of Transport, Highways and Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-12500</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-43444"><narrative>Ministry of Transport, Highways and Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">-1905</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-43444"><narrative>Ministry of Transport, Highways and Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">-6330</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-43444"><narrative>Ministry of Transport, Highways and Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-7292</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-43444"><narrative>Ministry of Transport, Highways and Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-16880</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-43444"><narrative>Ministry of Transport, Highways and Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-19004</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-43444"><narrative>Ministry of Transport, Highways and Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-20819</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-43444"><narrative>Ministry of Transport, Highways and Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-139692</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-43444"><narrative>Ministry of Transport, Highways and Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-22405</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-43444"><narrative>Ministry of Transport, Highways and Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-143214</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-43444"><narrative>Ministry of Transport, Highways and Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-67712</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-43444"><narrative>Ministry of Transport, Highways and Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-94335</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-43444"><narrative>Ministry of Transport, Highways and Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-132663</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-43444"><narrative>Ministry of Transport, Highways and Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-114353</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-43444"><narrative>Ministry of Transport, Highways and Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-115380</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-43444"><narrative>Ministry of Transport, Highways and Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-1064971</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-43444"><narrative>Ministry of Transport, Highways and Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-500000</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-43444"><narrative>Ministry of Transport, Highways and Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-1071987</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-43444"><narrative>Ministry of Transport, Highways and Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-500000</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-43444"><narrative>Ministry of Transport, Highways and Urban Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P172342"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P172342?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P172342"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of grievances received related to the development of the KMTT addressed within one month of being recorded in the GRM database
</narrative></title>
<baseline year="2019" iso-date="2019-12-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-15" />
<period-end iso-date="2027-05-14" />
<target value="90.00">
<comment><narrative>
This indicator will assess how efficiently the grievances are addressed by the GRM system.

The Project has received a total of 38 complaints since it started, of which 32 have been resolved, and 6 related to cracks in structures are under follow-up and monitoring.
</narrative></comment>
</target>
<actual value="84.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Institutional setup for the operations and maintenance of the terminal established
</narrative></title>
<baseline year="2019" iso-date="2019-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-15" />
<period-end iso-date="2027-05-14" />
<target value="Yes">
<comment><narrative>
An appropriate institutional arrangement for the operations and maintenance of the terminal will be explored, including possibility of pursuing PPP opportunities.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Share of buses departing the terminal on time
</narrative></title>
<baseline year="2020" iso-date="2020-02-25" value="No timetable to monitor bus departure times at present"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-02-25" />
<period-end iso-date="2027-05-13" />
<target value="Target of 85% buses departing on time based on the timetables/schedules prepared under the project">
<comment><narrative>
This indicator will assess to what extent the proposed bus schedules/time tables are followed.
</narrative></comment>
</target>
<actual value="Bus departure schedules will be monitored and reported using a digital system once the terminal is in operations. This system is in operation at the Bogambara transitional bus terminal.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Availability of facilities inside the terminal to allow for effective social distancing and sanitation
</narrative></title>
<baseline year="2020" iso-date="2020-03-28" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-28" />
<period-end iso-date="2027-05-13" />
<target value="Yes">
<comment><narrative>
This indicator will asses whether space, facilities, and direction inside the terminal to allow for effective social distancing and sanitation to the extent possible has been provided. It will be assessed at completion of the terminal construction.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A robust financial plan for the terminal's operations and maintenance developed
</narrative></title>
<baseline year="2019" iso-date="2019-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-15" />
<period-end iso-date="2027-05-14" />
<target value="Yes">
<comment><narrative>
This analysis will explore various financing options to reduce the fiscal burden of operating and maintaining the terminal, as well as avenues of augmenting revenue of the terminal to ensure that the terminal is self-sustaining in the long-run.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of passengers that feel safe to travel through the terminal (gender-disaggregated)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2027-05-13" />
<target value="To be determined based on the results of the initial satisfaction survey">
<comment><narrative>
This indicator will help assess the prevalence of any sexual harassment incidents within the terminal and in particular, whether female passengers feel safe to use the terminal.
</narrative></comment>
</target>
<actual value="A perception survey of female commuters in Kandy city (sample of 200 female commuters) in order to understand the specific commuter needs of women. The survey provided recommendations such as appropriate security, lighting, waiting areas, washrooms with child-keeping facilities, and baggage counters for washrooms to improve female commuter experience as well as their safety. These recommendations are being considered in the final design of the KMTT terminal. A satisfaction survey will be carried out once the terminal is made operational.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Availability of facilities inside the terminal to allow for effective social distancing and sanitation
</narrative></title>
<baseline year="2020" iso-date="2020-03-28" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-28" />
<period-end iso-date="2027-05-13" />
<target value="Yes">
<comment><narrative>
This indicator will asses whether space, facilities, and direction inside the terminal to allow for effective social distancing and sanitation to the extent possible has been provided.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
KMTT terminal built and in operation
</narrative></title>
<baseline year="2019" iso-date="2019-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-15" />
<period-end iso-date="2027-05-14" />
<target value="Yes">
<comment><narrative>
This indicator will assess whether the terminal is constructed and in operation. The construction of the terminal is now progressing well, reporting 35.5% physical progress.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of complaints related to sexual harassments in public transport received through the kiosk/hotline referred to relevant authorities or service providers within two weeks of being recorded
</narrative></title>
<baseline year="2019" iso-date="2019-12-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-15" />
<period-end iso-date="2027-05-14" />
<target value="80.00">
<comment><narrative>
This indicator will assess how efficiently the complaints related to sexual harassment incidents within the terminal/in public transport are addressed by the system put in place.&amp;nbsp;The kiosk is not in place yet as the terminal is not constructed yet, and therefore, this indicator cannot be measured as of this ISR. The project will be able to report this indicator towards the end of the project. However, the project has developed a gender action plan which identifies the preliminary requirements to establish the kiosk and make it operational, such as, developing the detailed plan for the installation of the kiosk, training staff, developing referral mechanisms and protocols for reporting and handling incidents through the kiosk etc. The action plan also identifies activities to support implementation of measures to mitigate sexual harassment in public transport such as messaging around zero tolerance of sexual harassment in public transport and to encourage reporting of such incid
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Share of buses departing the terminal on time
</narrative></title>
<baseline year="2020" iso-date="2020-02-25" value="No timetable to monitor bus departure times at present"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-02-25" />
<period-end iso-date="2027-05-13" />
<target value="Target of 85% buses departing on time based on the timetables/schedules prepared under the project">
<comment><narrative>
This indicator will assess to what extent the proposed bus schedules/time tables are followed. It will be assessed once the terminal is operational.
</narrative></comment>
</target>
<actual value="Bus departure schedules will be monitored and reported using a digital system once the terminal is in operation. This system is in operation at the Bogambara transitional bus terminal.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Availability of intermodal transfer passages
</narrative></title>
<baseline year="2019" iso-date="2019-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-15" />
<period-end iso-date="2027-05-13" />
<target value="Yes">
<comment><narrative>
Will be measured at project completion
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Presence of physical accommodation and facilities for people with disabilities and baggage
</narrative></title>
<baseline year="2019" iso-date="2019-12-16" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-16" />
<period-end iso-date="2027-05-13" />
<target value="Yes">
<comment><narrative>
The terminal design will include physical features to ensure that it provides universal access to passengers, including to those with disabilities, people carrying baggage, children etc.  - features such as footpaths, sidewalks and elevators.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2027-05-10" />
<target value="150,000">
<comment><narrative>
To be assessed
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of complaints related to sexual harassments in public transport received through the kiosk/hotline referred to relevant authorities or service providers within two weeks of being recorded
</narrative></title>
<baseline year="2019" iso-date="2019-12-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-15" />
<period-end iso-date="2027-05-14" />
<target value="80.00">
<comment><narrative>
This indicator will assess how efficiently the complaints related to sexual harassment incidents within the terminal/in public transport are addressed by the system put in place.&amp;nbsp;The kiosk is not in place yet as the terminal is not constructed yet, and therefore, this indicator cannot be measured as of this ISR. The project will be able to report this indicator towards the end of the project. However, the project has developed a gender action plan which identifies the preliminary requirements to establish the kiosk and make it operational, such as, developing the detailed plan for the installation of the kiosk, training staff, developing referral mechanisms and protocols for reporting and handling incidents through the kiosk etc. The action plan also identifies activities to support implementation of measures to mitigate sexual harassment in public transport such as messaging around zero tolerance of sexual harassment in public transport and to encourage reporting of such incid
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of female employment in bus transport operations at the KMTT
</narrative></title>
<baseline year="2020" iso-date="2020-03-01" value="3.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-01" />
<period-end iso-date="2027-05-14" />
<target value="10.00">
<comment><narrative>
This indicator will ensure that job opportunities in bus transport operations at KMTT are equally accessible to women
</narrative></comment>
</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Institutional setup for the operations and maintenance of the terminal established
</narrative></title>
<baseline year="2019" iso-date="2019-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-15" />
<period-end iso-date="2027-05-14" />
<target value="Yes">
<comment><narrative>
An appropriate institutional arrangement for the operations and maintenance of the terminal will be explored, including possibility of pursuing PPP opportunities. The project currently does not have sufficient funds to implement this component given the substantial increase in the cost of the D&amp;B contract. However, the Government is in the process of identifying a O&amp;M models for all multimodal terminals in the country, including KMTT.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of female employment in bus transport operations at the KMTT
</narrative></title>
<baseline year="2020" iso-date="2020-03-01" value="3.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-01" />
<period-end iso-date="2027-05-14" />
<target value="10.00">
<comment><narrative>
This indicator will ensure that job opportunities in bus transport operations at KMTT are equally accessible to women. The indicator will be assessed once the terminal is operational.
</narrative></comment>
</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A road safety action plan developed for the Kandy city
</narrative></title>
<baseline year="2019" iso-date="2019-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-15" />
<period-end iso-date="2027-05-14" />
<target value="Yes">
<comment><narrative>
A road safety action plan will be developed for the Kandy city to address road safety issues identified under a comprehensive study. The project currently does not have sufficient funds implement this component given the substantial increase in the cost of the D&amp;B contract.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A road safety action plan developed for the Kandy city
</narrative></title>
<baseline year="2019" iso-date="2019-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-15" />
<period-end iso-date="2027-05-14" />
<target value="Yes">
<comment><narrative>
A road safety action plan will be developed for the Kandy city to address road safety issues identified under a comprehensive study. The project currently does not have sufficient funds yo implement this component given the substantial increase in the cost of the D&amp;B contract.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Share of buses departing the terminal on time
</narrative></title>
<baseline year="2020" iso-date="2020-02-25" value="No timetable to monitor bus departure times at present"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-02-25" />
<period-end iso-date="2027-05-13" />
<target value="Target of 85% buses departing on time based on the timetables/schedules prepared under the project">
<comment><narrative>
This indicator will assess to what extent the proposed bus schedules/time tables are followed.
</narrative></comment>
</target>
<actual value="Bus departure schedules will be monitored and reported using a digital system once the terminal is in operations. This system is in operation at the Bogambara transitional bus terminal.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Availability of facilities inside the terminal to allow for effective social distancing and sanitation
</narrative></title>
<baseline year="2020" iso-date="2020-03-28" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-28" />
<period-end iso-date="2027-05-13" />
<target value="Yes">
<comment><narrative>
This indicator will asses whether space, facilities, and direction inside the terminal to allow for effective social distancing and sanitation to the extent possible has been provided. It will be assessed at completion of the terminal construction.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Availability of facilities inside the terminal to allow for effective social distancing and sanitation
</narrative></title>
<baseline year="2020" iso-date="2020-03-28" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-28" />
<period-end iso-date="2027-05-13" />
<target value="Yes">
<comment><narrative>
This indicator will asses whether space, facilities, and direction inside the terminal to allow for effective social distancing and sanitation to the extent possible has been provided.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Availability of facilities inside the terminal to allow for effective social distancing and sanitation
</narrative></title>
<baseline year="2020" iso-date="2020-03-28" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-28" />
<period-end iso-date="2027-05-13" />
<target value="Yes">
<comment><narrative>
This indicator will asses whether space, facilities, and direction inside the terminal to allow for effective social distancing and sanitation to the extent possible has been provided.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Presence of physical accommodation and facilities for people with disabilities and baggage
</narrative></title>
<baseline year="2019" iso-date="2019-12-16" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-16" />
<period-end iso-date="2027-05-13" />
<target value="Yes">
<comment><narrative>
The terminal design will include physical features to ensure that it provides universal access to passengers, including to those with disabilities, people carrying baggage, children etc.  - features such as footpaths, sidewalks and elevators. The indicator will be assessed at completion of the terminal construction
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Presence of physical accommodation and facilities for people with disabilities and baggage
</narrative></title>
<baseline year="2019" iso-date="2019-12-16" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-16" />
<period-end iso-date="2027-05-13" />
<target value="Yes">
<comment><narrative>
The terminal design will include physical features to ensure that it provides universal access to passengers, including to those with disabilities, people carrying baggage, children etc.  - features such as footpaths, sidewalks and elevators.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Presence of physical accommodation and facilities for people with disabilities and baggage
</narrative></title>
<baseline year="2019" iso-date="2019-12-16" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-16" />
<period-end iso-date="2027-05-13" />
<target value="Yes">
<comment><narrative>
The terminal design will include physical features to ensure that it provides universal access to passengers, including to those with disabilities, people carrying baggage, children etc.  - features such as footpaths, sidewalks and elevators.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of passengers that feel safe to travel through the terminal (gender-disaggregated)
</narrative></title>
<baseline year="2024" iso-date="2024-05-15" value="A perception survey of female commuters in Kandy city (sample of 200 female commuters) in order to understand the specific commuter needs of women. Only around 10% of the survey participants were satisfied with the security facilities in the existing terminal arrangements."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-15" />
<period-end iso-date="2027-05-13" />
<target value="To be determined based on the results of the initial satisfaction survey">
<comment><narrative>
This indicator will help assess the prevalence of any sexual harassment incidents within the terminal and in particular, whether female passengers feel safe to use the terminal. A satisfaction survey will be carried out once the terminal is made operational to assess the indicator.
</narrative></comment>
</target>
<actual value="A perception survey of female commuters in Kandy city (sample of 200 female commuters) in order to understand the specific commuter needs of women. The survey provided recommendations such as appropriate security, lighting, waiting areas, washrooms with child-keeping facilities, and baggage counters for washrooms to improve female commuter experience as well as their safety. These recommendations are being considered in the final design of the KMTT terminal.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of passengers that feel safe to travel through the terminal (gender-disaggregated)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2027-05-13" />
<target value="To be determined based on the results of the initial satisfaction survey">
<comment><narrative>
This indicator will help assess the prevalence of any sexual harassment incidents within the terminal and in particular, whether female passengers feel safe to use the terminal.
</narrative></comment>
</target>
<actual value="A perception survey of female commuters in Kandy city (sample of 200 female commuters) in order to understand the specific commuter needs of women. The survey provided recommendations such as appropriate security, lighting, waiting areas, washrooms with child-keeping facilities, and baggage counters for washrooms to improve female commuter experience as well as their safety. These recommendations are being considered in the final design of the KMTT terminal. A satisfaction survey will be carried out once the terminal is made operational.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of passengers that feel safe to travel through the terminal (gender-disaggregated)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2027-05-13" />
<target value="To be determined based on the results of the initial satisfaction survey">
<comment><narrative>
This indicator will help assess the prevalence of any sexual harassment incidents within the terminal and in particular, whether female passengers feel safe to use the terminal.
</narrative></comment>
</target>
<actual value="A perception survey of female commuters in Kandy city (sample of 200 female commuters) in order to understand the specific commuter needs of women. The survey provided recommendations such as appropriate security, lighting, waiting areas, washrooms with child-keeping facilities, and baggage counters for washrooms to improve female commuter experience as well as their safety. These recommendations are being considered in the final design of the KMTT terminal. A satisfaction survey will be carried out once the terminal is made operational.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Share of buses departing the terminal on time
</narrative></title>
<baseline year="2020" iso-date="2020-02-25" value="No timetable to monitor bus departure times at present"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-02-25" />
<period-end iso-date="2027-05-13" />
<target value="Target of 85% buses departing on time based on the timetables/schedules prepared under the project">
<comment><narrative>
This indicator will assess to what extent the proposed bus schedules/time tables are followed. It will be assessed once the terminal is operational.
</narrative></comment>
</target>
<actual value="Bus departure schedules will be monitored and reported using a digital system once the terminal is in operation. This system is in operation at the Bogambara transitional bus terminal.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Share of buses departing the terminal on time
</narrative></title>
<baseline year="2020" iso-date="2020-02-25" value="No timetable to monitor bus departure times at present"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-02-25" />
<period-end iso-date="2027-05-13" />
<target value="Target of 85% buses departing on time based on the timetables/schedules prepared under the project">
<comment><narrative>
This indicator will assess to what extent the proposed bus schedules/time tables are followed.
</narrative></comment>
</target>
<actual value="Bus departure schedules will be monitored and reported using a digital system once the terminal is in operations. This system is in operation at the Bogambara transitional bus terminal.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Share of buses departing the terminal on time
</narrative></title>
<baseline year="2020" iso-date="2020-02-25" value="No timetable to monitor bus departure times at present"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-02-25" />
<period-end iso-date="2027-05-13" />
<target value="Target of 85% buses departing on time based on the timetables/schedules prepared under the project">
<comment><narrative>
This indicator will assess to what extent the proposed bus schedules/time tables are followed.
</narrative></comment>
</target>
<actual value="Bus departure schedules will be monitored and reported using a digital system once the terminal is in operations. This system is in operation at the Bogambara transitional bus terminal.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Availability of designated waiting areas for passengers well-separated from bus bays and bus parking areas
</narrative></title>
<baseline year="2020" iso-date="2020-08-21" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-08-21" />
<period-end iso-date="2027-05-13" />
<target value="Yes">
<comment><narrative>
This indicator will assess the safety measures incorporated in the design to ensure passenger safety. It will be assessed at completion of the terminal construction.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Availability of designated waiting areas for passengers well-separated from bus bays and bus parking areas
</narrative></title>
<baseline year="2020" iso-date="2020-08-21" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-08-21" />
<period-end iso-date="2027-05-13" />
<target value="Yes">
<comment><narrative>
This indicator will assess the safety measures incorporated in the design to ensure passenger safety.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Availability of designated waiting areas for passengers well-separated from bus bays and bus parking areas
</narrative></title>
<baseline year="2020" iso-date="2020-08-21" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-08-21" />
<period-end iso-date="2027-05-13" />
<target value="Yes">
<comment><narrative>
This indicator will assess the safety measures incorporated in the design to ensure passenger safety.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Availability of intermodal transfer passages
</narrative></title>
<baseline year="2019" iso-date="2019-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-15" />
<period-end iso-date="2027-05-13" />
<target value="Yes">
<comment><narrative>
The indicator will be assessed at completion of the terminal construction
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Availability of intermodal transfer passages
</narrative></title>
<baseline year="2019" iso-date="2019-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-15" />
<period-end iso-date="2027-05-13" />
<target value="Yes">
<comment><narrative>
Will be measured at project completion
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Availability of intermodal transfer passages
</narrative></title>
<baseline year="2019" iso-date="2019-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-15" />
<period-end iso-date="2027-05-13" />
<target value="Yes">
<comment><narrative>
Will be measured at project completion
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of complaints related to terminal service provision received through the kiosk addressed within six months of being recorded
</narrative></title>
<baseline year="2019" iso-date="2019-12-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-15" />
<period-end iso-date="2027-05-14" />
<target value="80.00">
<comment><narrative>
This indicator will assess how efficiently the issues around operations of the terminal are resolved to ensure a satisfactory service to the passengers. The project will be able to report this indicator towards the end of the project. However, the project has developed a gender action plan which identifies the preliminary requirements to establish the kiosk and make it operational, such as, developing the detailed plan for the installation of the kiosk, training staff, developing referral mechanisms and protocols for reporting and handling incidents through the kiosk etc. The baseline survey to understand the needs of the female commuters was carried out and the recommendations are being considered in the KMTT design.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Presence of physical accommodation and facilities for people with disabilities and baggage
</narrative></title>
<baseline year="2019" iso-date="2019-12-16" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-16" />
<period-end iso-date="2027-05-13" />
<target value="Yes">
<comment><narrative>
The terminal design will include physical features to ensure that it provides universal access to passengers, including to those with disabilities, people carrying baggage, children etc.  - features such as footpaths, sidewalks and elevators.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of women using the kiosk and/or hotline to report sexual harassment (per year)
</narrative></title>
<baseline year="2020" iso-date="2020-03-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-02" />
<period-end iso-date="2027-05-14" />
<target value="80.00">
<comment><narrative>
This indicator will track the use of the kiosk/hotline by women for recording of complaints related to sexual harassments. The kiosk is not in place yet as the terminal is not constructed yet, and therefore, this indicator cannot be measured as of this ISR. The project will be able to report this indicator towards the end of the project. However, the project has developed a gender action plan which identifies the preliminary requirements to establish the kiosk and make it operational, such as, developing the detailed plan for the installation of the kiosk, training staff, developing referral mechanisms and protocols for reporting and handling incidents through the kiosk etc.&amp;nbsp;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
KMTT terminal built and in operation
</narrative></title>
<baseline year="2019" iso-date="2019-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-15" />
<period-end iso-date="2027-05-14" />
<target value="Yes">
<comment><narrative>
This indicator will assess whether the terminal is constructed and in operation. Procurement of the D&amp;amp;B contract is at the last stage of awarding to the winning bidder, pending the agreement on the contingencies (3-5% instead of currently planned 30% of the contract price) included in the contract.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of public transport users who are satisfied with the transport services of the terminal (gender-disaggregated)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2027-05-12" />
<target value="To be determined based on the results of the initial satisfaction survey">
<comment><narrative>
This indicator will assess how satisfied the passengers are with the services provided by the terminal.&amp;nbsp;A perception survey of female commuters in Kandy city (sample of 200 female commuters) was carried out and the findings are being finalized.
</narrative></comment>
</target>
<actual value="The baseline survey to be carried out. A perception survey of female commuters in Kandy city (sample of 200 female commuters) in order to understand the specific commuter needs of women. The survey provided recommendations such as appropriate security, lighting, waiting areas, washrooms with child-keeping facilities, and baggage counters for washrooms to improve female commuter experience as well as their safety. These recommendations are being considered in the final design of the KMTT terminal.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of passengers that feel safe to travel through the terminal (gender-disaggregated)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2027-05-13" />
<target value="To be determined based on the results of the initial satisfaction survey">
<comment><narrative>
This indicator will help assess the prevalence of any sexual harassment incidents within the terminal and in particular, whether female passengers feel safe to use the terminal.
</narrative></comment>
</target>
<actual value="A perception survey of female commuters in Kandy city (sample of 200 female commuters) in order to understand the specific commuter needs of women. The survey provided recommendations such as appropriate security, lighting, waiting areas, washrooms with child-keeping facilities, and baggage counters for washrooms to improve female commuter experience as well as their safety. These recommendations are being considered in the final design of the KMTT terminal. A satisfaction survey will be carried out once the terminal is made operational.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Availability of designated waiting areas for passengers well-separated from bus bays and bus parking areas
</narrative></title>
<baseline year="2020" iso-date="2020-08-21" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-08-21" />
<period-end iso-date="2027-05-13" />
<target value="Yes">
<comment><narrative>
This indicator will assess the safety measures incorporated in the design to ensure passenger safety. It will be assessed at completion of the terminal construction.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2027-05-10" />
<target value="150,000">
<comment><narrative>
To be assessed
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of grievances received related to the development of the KMTT addressed within one month of being recorded in the GRM database
</narrative></title>
<baseline year="2019" iso-date="2019-12-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-15" />
<period-end iso-date="2027-05-14" />
<target value="90.00">
<comment><narrative>
This indicator will assess how efficiently the grievances are addressed by the GRM system.&amp;nbsp;

Seven grievances/complaints had been received in the first quarter of 2025 of which 5 had been resolved
satisfactorily by the GRM. The remaining 2 grievances related to vibration induced cracks which
appeared on their respective buildings are being monitored by the project for impact verification. The PMU is currently in the process of resolving the grievances of 4 business operators who state they have experienced impact on livelihood due to operations activities.
</narrative></comment>
</target>
<actual value="71.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A road safety action plan developed for the Kandy city
</narrative></title>
<baseline year="2019" iso-date="2019-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-15" />
<period-end iso-date="2027-05-14" />
<target value="Yes">
<comment><narrative>
A road safety action plan will be developed for the Kandy city to address road safety issues identified under a comprehensive study. The project currently does not have sufficient funds implement this component given the substantial increase in the cost of the D&amp;B contract.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2027-05-10" />
<target value="150,000">
<comment><narrative>
The indicator will be assessed when the terminal is made operational.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of complaints related to sexual harassments in public transport received through the kiosk/hotline referred to relevant authorities or service providers within two weeks of being recorded
</narrative></title>
<baseline year="2019" iso-date="2019-12-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-15" />
<period-end iso-date="2027-05-14" />
<target value="80.00">
<comment><narrative>
This indicator will assess how efficiently the complaints related to sexual harassment incidents within the terminal/in public transport are addressed by the system put in place. The kiosk is not in place yet as the terminal is not constructed yet, and therefore, this indicator cannot be measured as of this ISR. The project has developed a gender action plan which identifies the preliminary requirements to establish the kiosk and make it operational, such as, developing the detailed plan for the installation of the kiosk, training staff, developing referral mechanisms and protocols for reporting and handling incidents through the kiosk etc. The action plan also identifies activities to support implementation of measures to mitigate sexual harassment in public transport such as messaging around zero tolerance of sexual harassment in public transport and to encourage reporting of such incidents.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Availability of facilities inside the terminal to allow for effective social distancing and sanitation
</narrative></title>
<baseline year="2020" iso-date="2020-03-28" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-28" />
<period-end iso-date="2027-05-13" />
<target value="Yes">
<comment><narrative>
This indicator will asses whether space, facilities, and direction inside the terminal to allow for effective social distancing and sanitation to the extent possible has been provided.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Institutional setup for the operations and maintenance of the terminal established
</narrative></title>
<baseline year="2019" iso-date="2019-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-15" />
<period-end iso-date="2027-05-14" />
<target value="Yes">
<comment><narrative>
An appropriate institutional arrangement for the operations and maintenance of the terminal will be explored, including possibility of pursuing PPP opportunities.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of grievances received related to the development of the KMTT addressed within one month of being recorded in the GRM database
</narrative></title>
<baseline year="2019" iso-date="2019-12-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-15" />
<period-end iso-date="2027-05-14" />
<target value="90.00">
<comment><narrative>
This indicator will assess how efficiently the grievances are addressed by the GRM system.&amp;nbsp;

Seven grievances/complaints had been received in the first quarter of 2025 of which 5 had been resolved
satisfactorily by the GRM. The remaining 2 grievances related to vibration induced cracks which
appeared on their respective buildings are being monitored by the project for impact verification. The PMU is currently in the process of resolving the grievances of 4 business operators who state they have experienced impact on livelihood due to operations activities.
</narrative></comment>
</target>
<actual value="71.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of women using the kiosk and/or hotline to report sexual harassment (per year)
</narrative></title>
<baseline year="2020" iso-date="2020-03-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-02" />
<period-end iso-date="2027-05-14" />
<target value="80.00">
<comment><narrative>
This indicator will track the use of the kiosk/hotline by women for recording of complaints related to sexual harassments. The kiosk is not in place yet as the terminal is not constructed yet, and therefore, this indicator cannot be measured as of this ISR. The project will be able to report this indicator towards the end of the project. However, the project has developed a gender action plan which identifies the preliminary requirements to establish the kiosk and make it operational, such as, developing the detailed plan for the installation of the kiosk, training staff, developing referral mechanisms and protocols for reporting and handling incidents through the kiosk etc.&amp;nbsp;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of complaints related to terminal service provision received through the kiosk addressed within six months of being recorded
</narrative></title>
<baseline year="2019" iso-date="2019-12-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-15" />
<period-end iso-date="2027-05-14" />
<target value="80.00">
<comment><narrative>
This indicator will assess how efficiently the issues around operations of the terminal are resolved to ensure a satisfactory service to the passengers. The project has developed a gender action plan which identifies the preliminary requirements to establish the kiosk and make it operational, such as, developing the detailed plan for the installation of the kiosk, training staff, developing referral mechanisms and protocols for reporting and handling incidents through the kiosk etc. The baseline survey to understand the needs of the female commuters was carried out and the recommendations are being considered in the KMTT design. The project does not have sufficient funds to further develop this activity given the substantial increase in the cost of the D&amp;B contract.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Availability of intermodal transfer passages
</narrative></title>
<baseline year="2019" iso-date="2019-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-15" />
<period-end iso-date="2027-05-13" />
<target value="Yes">
<comment><narrative>
The indicator will be assessed at completion of the terminal construction
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of public transport users who are satisfied with the transport services of the terminal (gender-disaggregated)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2027-05-12" />
<target value="To be determined based on the results of the initial satisfaction survey">
<comment><narrative>
This indicator will assess how satisfied the passengers are with the services provided by the terminal. A perception survey of female commuters in Kandy city (sample of 200 female commuters) was carried out and the findings have been incorporated into the terminal design.
</narrative></comment>
</target>
<actual value="The baseline survey to be carried out. A perception survey of female commuters in Kandy city (sample of 200 female commuters) in order to understand the specific commuter needs of women. The survey provided recommendations such as appropriate security, lighting, waiting areas, washrooms with child-keeping facilities, and baggage counters for washrooms to improve female commuter experience as well as their safety. These recommendations are being considered in the final design of the KMTT terminal.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Availability of designated waiting areas for passengers well-separated from bus bays and bus parking areas
</narrative></title>
<baseline year="2020" iso-date="2020-08-21" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-08-21" />
<period-end iso-date="2027-05-13" />
<target value="Yes">
<comment><narrative>
This indicator will assess the safety measures incorporated in the design to ensure passenger safety.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Availability of intermodal transfer passages
</narrative></title>
<baseline year="2019" iso-date="2019-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-15" />
<period-end iso-date="2027-05-13" />
<target value="Yes">
<comment><narrative>
Will be measured at project completion
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Presence of physical accommodation and facilities for people with disabilities and baggage
</narrative></title>
<baseline year="2019" iso-date="2019-12-16" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-16" />
<period-end iso-date="2027-05-13" />
<target value="Yes">
<comment><narrative>
The terminal design will include physical features to ensure that it provides universal access to passengers, including to those with disabilities, people carrying baggage, children etc.  - features such as footpaths, sidewalks and elevators. The indicator will be assessed at completion of the terminal construction
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of women using the kiosk and/or hotline to report sexual harassment (per year)
</narrative></title>
<baseline year="2020" iso-date="2020-03-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-02" />
<period-end iso-date="2027-05-14" />
<target value="80.00">
<comment><narrative>
This indicator will track the use of the kiosk/hotline by women for recording of complaints related to sexual harassments. The kiosk is not in place yet as the terminal is not constructed yet, and therefore, this indicator cannot be measured as of this ISR. The project has developed a gender action plan which identifies the preliminary requirements to establish the kiosk and make it operational, such as, developing the detailed plan for the installation of the kiosk, training staff, developing referral mechanisms and protocols for reporting and handling incidents through the kiosk.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A robust financial plan for the terminal's operations and maintenance developed
</narrative></title>
<baseline year="2019" iso-date="2019-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-15" />
<period-end iso-date="2027-05-14" />
<target value="Yes">
<comment><narrative>
This analysis will explore various financing options to reduce the fiscal burden of operating and maintaining the terminal, as well as avenues of augmenting revenue of the terminal to ensure that the terminal is self-sustaining in the long-run.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A robust financial plan for the terminal's operations and maintenance developed
</narrative></title>
<baseline year="2019" iso-date="2019-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-15" />
<period-end iso-date="2027-05-14" />
<target value="Yes">
<comment><narrative>
This analysis will explore various financing options to reduce the fiscal burden of operating and maintaining the terminal, as well as avenues of augmenting revenue of the terminal to ensure that the terminal is self-sustaining in the long-run. The project currently does not have sufficient funds to implement this component given the substantial increase in the cost of the D&amp;B contract.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of complaints related to terminal service provision received through the kiosk addressed within six months of being recorded
</narrative></title>
<baseline year="2019" iso-date="2019-12-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-15" />
<period-end iso-date="2027-05-14" />
<target value="80.00">
<comment><narrative>
This indicator will assess how efficiently the issues around operations of the terminal are resolved to ensure a satisfactory service to the passengers. The project will be able to report this indicator towards the end of the project. However, the project has developed a gender action plan which identifies the preliminary requirements to establish the kiosk and make it operational, such as, developing the detailed plan for the installation of the kiosk, training staff, developing referral mechanisms and protocols for reporting and handling incidents through the kiosk etc. The baseline survey to understand the needs of the female commuters was carried out and the recommendations are being considered in the KMTT design.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
KMTT terminal built and in operation
</narrative></title>
<baseline year="2019" iso-date="2019-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-15" />
<period-end iso-date="2027-05-14" />
<target value="Yes">
<comment><narrative>
This indicator will assess whether the terminal is constructed and in operation. Procurement of the D&amp;amp;B contract is at the last stage of awarding to the winning bidder, pending the agreement on the contingencies (3-5% instead of currently planned 30% of the contract price) included in the contract.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of passengers that feel safe to travel through the terminal (gender-disaggregated)
</narrative></title>
<baseline year="2024" iso-date="2024-05-15" value="A perception survey of female commuters in Kandy city (sample of 200 female commuters) in order to understand the specific commuter needs of women. Only around 10% of the survey participants were satisfied with the security facilities in the existing terminal arrangements."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-15" />
<period-end iso-date="2027-05-13" />
<target value="To be determined based on the results of the initial satisfaction survey">
<comment><narrative>
This indicator will help assess the prevalence of any sexual harassment incidents within the terminal and in particular, whether female passengers feel safe to use the terminal. A satisfaction survey will be carried out once the terminal is made operational to assess the indicator.
</narrative></comment>
</target>
<actual value="A perception survey of female commuters in Kandy city (sample of 200 female commuters) in order to understand the specific commuter needs of women. The survey provided recommendations such as appropriate security, lighting, waiting areas, washrooms with child-keeping facilities, and baggage counters for washrooms to improve female commuter experience as well as their safety. These recommendations are being considered in the final design of the KMTT terminal.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Availability of designated waiting areas for passengers well-separated from bus bays and bus parking areas
</narrative></title>
<baseline year="2020" iso-date="2020-08-21" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-08-21" />
<period-end iso-date="2027-05-13" />
<target value="Yes">
<comment><narrative>
This indicator will assess the safety measures incorporated in the design to ensure passenger safety.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Availability of facilities inside the terminal to allow for effective social distancing and sanitation
</narrative></title>
<baseline year="2020" iso-date="2020-03-28" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-28" />
<period-end iso-date="2027-05-13" />
<target value="Yes">
<comment><narrative>
This indicator will asses whether space, facilities, and direction inside the terminal to allow for effective social distancing and sanitation to the extent possible has been provided. It will be assessed at completion of the terminal construction.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Availability of facilities inside the terminal to allow for effective social distancing and sanitation
</narrative></title>
<baseline year="2020" iso-date="2020-03-28" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-28" />
<period-end iso-date="2027-05-13" />
<target value="Yes">
<comment><narrative>
This indicator will asses whether space, facilities, and direction inside the terminal to allow for effective social distancing and sanitation to the extent possible has been provided.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Availability of facilities inside the terminal to allow for effective social distancing and sanitation
</narrative></title>
<baseline year="2020" iso-date="2020-03-28" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-28" />
<period-end iso-date="2027-05-13" />
<target value="Yes">
<comment><narrative>
This indicator will asses whether space, facilities, and direction inside the terminal to allow for effective social distancing and sanitation to the extent possible has been provided.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Presence of physical accommodation and facilities for people with disabilities and baggage
</narrative></title>
<baseline year="2019" iso-date="2019-12-16" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-16" />
<period-end iso-date="2027-05-13" />
<target value="Yes">
<comment><narrative>
The terminal design will include physical features to ensure that it provides universal access to passengers, including to those with disabilities, people carrying baggage, children etc.  - features such as footpaths, sidewalks and elevators. The indicator will be assessed at completion of the terminal construction
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Presence of physical accommodation and facilities for people with disabilities and baggage
</narrative></title>
<baseline year="2019" iso-date="2019-12-16" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-16" />
<period-end iso-date="2027-05-13" />
<target value="Yes">
<comment><narrative>
The terminal design will include physical features to ensure that it provides universal access to passengers, including to those with disabilities, people carrying baggage, children etc.  - features such as footpaths, sidewalks and elevators.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Presence of physical accommodation and facilities for people with disabilities and baggage
</narrative></title>
<baseline year="2019" iso-date="2019-12-16" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-16" />
<period-end iso-date="2027-05-13" />
<target value="Yes">
<comment><narrative>
The terminal design will include physical features to ensure that it provides universal access to passengers, including to those with disabilities, people carrying baggage, children etc.  - features such as footpaths, sidewalks and elevators.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of passengers that feel safe to travel through the terminal (gender-disaggregated)
</narrative></title>
<baseline year="2024" iso-date="2024-05-15" value="A perception survey of female commuters in Kandy city (sample of 200 female commuters) in order to understand the specific commuter needs of women. Only around 10% of the survey participants were satisfied with the security facilities in the existing terminal arrangements."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-15" />
<period-end iso-date="2027-05-13" />
<target value="To be determined based on the results of the initial satisfaction survey">
<comment><narrative>
This indicator will help assess the prevalence of any sexual harassment incidents within the terminal and in particular, whether female passengers feel safe to use the terminal. A satisfaction survey will be carried out once the terminal is made operational to assess the indicator.
</narrative></comment>
</target>
<actual value="A perception survey of female commuters in Kandy city (sample of 200 female commuters) in order to understand the specific commuter needs of women. The survey provided recommendations such as appropriate security, lighting, waiting areas, washrooms with child-keeping facilities, and baggage counters for washrooms to improve female commuter experience as well as their safety. These recommendations are being considered in the final design of the KMTT terminal.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of passengers that feel safe to travel through the terminal (gender-disaggregated)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2027-05-13" />
<target value="To be determined based on the results of the initial satisfaction survey">
<comment><narrative>
This indicator will help assess the prevalence of any sexual harassment incidents within the terminal and in particular, whether female passengers feel safe to use the terminal.
</narrative></comment>
</target>
<actual value="A perception survey of female commuters in Kandy city (sample of 200 female commuters) in order to understand the specific commuter needs of women. The survey provided recommendations such as appropriate security, lighting, waiting areas, washrooms with child-keeping facilities, and baggage counters for washrooms to improve female commuter experience as well as their safety. These recommendations are being considered in the final design of the KMTT terminal. A satisfaction survey will be carried out once the terminal is made operational.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of passengers that feel safe to travel through the terminal (gender-disaggregated)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2027-05-13" />
<target value="To be determined based on the results of the initial satisfaction survey">
<comment><narrative>
This indicator will help assess the prevalence of any sexual harassment incidents within the terminal and in particular, whether female passengers feel safe to use the terminal.
</narrative></comment>
</target>
<actual value="A perception survey of female commuters in Kandy city (sample of 200 female commuters) in order to understand the specific commuter needs of women. The survey provided recommendations such as appropriate security, lighting, waiting areas, washrooms with child-keeping facilities, and baggage counters for washrooms to improve female commuter experience as well as their safety. These recommendations are being considered in the final design of the KMTT terminal. A satisfaction survey will be carried out once the terminal is made operational.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Share of buses departing the terminal on time
</narrative></title>
<baseline year="2020" iso-date="2020-02-25" value="No timetable to monitor bus departure times at present"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-02-25" />
<period-end iso-date="2027-05-13" />
<target value="Target of 85% buses departing on time based on the timetables/schedules prepared under the project">
<comment><narrative>
This indicator will assess to what extent the proposed bus schedules/time tables are followed. It will be assessed once the terminal is operational.
</narrative></comment>
</target>
<actual value="Bus departure schedules will be monitored and reported using a digital system once the terminal is in operation. This system is in operation at the Bogambara transitional bus terminal.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Share of buses departing the terminal on time
</narrative></title>
<baseline year="2020" iso-date="2020-02-25" value="No timetable to monitor bus departure times at present"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-02-25" />
<period-end iso-date="2027-05-13" />
<target value="Target of 85% buses departing on time based on the timetables/schedules prepared under the project">
<comment><narrative>
This indicator will assess to what extent the proposed bus schedules/time tables are followed.
</narrative></comment>
</target>
<actual value="Bus departure schedules will be monitored and reported using a digital system once the terminal is in operations. This system is in operation at the Bogambara transitional bus terminal.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Share of buses departing the terminal on time
</narrative></title>
<baseline year="2020" iso-date="2020-02-25" value="No timetable to monitor bus departure times at present"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-02-25" />
<period-end iso-date="2027-05-13" />
<target value="Target of 85% buses departing on time based on the timetables/schedules prepared under the project">
<comment><narrative>
This indicator will assess to what extent the proposed bus schedules/time tables are followed.
</narrative></comment>
</target>
<actual value="Bus departure schedules will be monitored and reported using a digital system once the terminal is in operations. This system is in operation at the Bogambara transitional bus terminal.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Availability of designated waiting areas for passengers well-separated from bus bays and bus parking areas
</narrative></title>
<baseline year="2020" iso-date="2020-08-21" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-08-21" />
<period-end iso-date="2027-05-13" />
<target value="Yes">
<comment><narrative>
This indicator will assess the safety measures incorporated in the design to ensure passenger safety. It will be assessed at completion of the terminal construction.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Availability of designated waiting areas for passengers well-separated from bus bays and bus parking areas
</narrative></title>
<baseline year="2020" iso-date="2020-08-21" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-08-21" />
<period-end iso-date="2027-05-13" />
<target value="Yes">
<comment><narrative>
This indicator will assess the safety measures incorporated in the design to ensure passenger safety.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Availability of designated waiting areas for passengers well-separated from bus bays and bus parking areas
</narrative></title>
<baseline year="2020" iso-date="2020-08-21" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-08-21" />
<period-end iso-date="2027-05-13" />
<target value="Yes">
<comment><narrative>
This indicator will assess the safety measures incorporated in the design to ensure passenger safety.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Availability of intermodal transfer passages
</narrative></title>
<baseline year="2019" iso-date="2019-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-15" />
<period-end iso-date="2027-05-13" />
<target value="Yes">
<comment><narrative>
The indicator will be assessed at completion of the terminal construction
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Availability of intermodal transfer passages
</narrative></title>
<baseline year="2019" iso-date="2019-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-15" />
<period-end iso-date="2027-05-13" />
<target value="Yes">
<comment><narrative>
Will be measured at project completion
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Availability of intermodal transfer passages
</narrative></title>
<baseline year="2019" iso-date="2019-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-15" />
<period-end iso-date="2027-05-13" />
<target value="Yes">
<comment><narrative>
Will be measured at project completion
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of female employment in bus transport operations at the KMTT
</narrative></title>
<baseline year="2020" iso-date="2020-03-01" value="3.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-01" />
<period-end iso-date="2027-05-14" />
<target value="10.00">
<comment><narrative>
This indicator will ensure that job opportunities in bus transport operations at KMTT are equally accessible to women
</narrative></comment>
</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of public transport users who are satisfied with the transport services of the terminal (gender-disaggregated)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2027-05-12" />
<target value="To be determined based on the results of the initial satisfaction survey">
<comment><narrative>
This indicator will assess how satisfied the passengers are with the services provided by the terminal.&amp;nbsp;A perception survey of female commuters in Kandy city (sample of 200 female commuters) was carried out and the findings are being finalized.
</narrative></comment>
</target>
<actual value="The baseline survey to be carried out. A perception survey of female commuters in Kandy city (sample of 200 female commuters) in order to understand the specific commuter needs of women. The survey provided recommendations such as appropriate security, lighting, waiting areas, washrooms with child-keeping facilities, and baggage counters for washrooms to improve female commuter experience as well as their safety. These recommendations are being considered in the final design of the KMTT terminal.">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-11-20T15:47:22" hierarchy="1"><iati-identifier>44000-P173867</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Sri Lanka COVID-19 Emergency Response and Health Systems Preparedness Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0045352"><narrative>Democratic Socialist Republic of Sri Lanka</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0045352"><narrative>Democratic Socialist Republic of Sri Lanka</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="LK-COA-0045353"><narrative>Ministry of Health</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2020-04-06"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2020-04-02"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2023-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2023-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Deepika Eranjanie Attygalle</narrative></person-name><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>









<recipient-country code="LK" percentage="100"><narrative xml:lang="en">SRI LANKA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001227603" />
            <name><narrative>Democratic Socialist Republic of Sri Lanka</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.75 80.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="12110" percentage="100" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HF" percentage="17.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HQ" percentage="14.0000000" xml:lang="en"><narrative>FY17 - Health Facilities and Construction</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="69.0000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="66" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000634" percentage="31" xml:lang="en"><narrative>Private Sector Delivery in Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000632" percentage="31" xml:lang="en"><narrative>Health Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000672" percentage="11" xml:lang="en"><narrative>Food Security</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000067" percentage="11" xml:lang="en"><narrative>Nutrition and Food Security</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="100" xml:lang="en"><narrative>Disease Control</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="100" xml:lang="en"><narrative>Disease Control</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000626" percentage="100" xml:lang="en"><narrative>Pandemic Response</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="66" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000634" percentage="31" xml:lang="en"><narrative>Private Sector Delivery in Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="100" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000067" percentage="11" xml:lang="en"><narrative>Nutrition and Food Security</narrative></sector><humanitarian-scope type="1" vocabulary="1-2" code="EP-2020-000012-001"> </humanitarian-scope><humanitarian-scope type="2" vocabulary="2-1" code="HCOVD20"> </humanitarian-scope><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">6666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">3333333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">716666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">716666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">716666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">716666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">716666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">716666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">716666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">716666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">716666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">716666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">716666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">716666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">22000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">506741.93</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">29244204.89</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">732403.86</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">29816107.71</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">1723324.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">40257042.95</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">5999947.04</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">6406485.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">44455102.90</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">10382580.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">33626977.83</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">11878390.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">93600000</value><description xml:lang="en"><narrative>Total Commitment in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">35000000</value><description xml:lang="en"><narrative>Total Commitment in April Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">41900000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">45344700</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">54000000</value><description xml:lang="en"><narrative>Total Commitment in April Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">26518946</value><description xml:lang="en"><narrative>Total Commitment in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">100000000</value><description xml:lang="en"><narrative>Total Commitment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-3015944</value><description xml:lang="en"><narrative>Total Commitment Cancellations in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-13246016</value><description xml:lang="en"><narrative>Total Commitment Cancellations in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-6218654</value><description xml:lang="en"><narrative>Total Commitment Cancellations in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-169</value><description xml:lang="en"><narrative>Total Commitment Cancellations in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-3368107</value><description xml:lang="en"><narrative>Total Commitment Cancellations in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-5636814</value><description xml:lang="en"><narrative>Total Commitment Cancellations in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">87500</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">22234000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">506742</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">29244205</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">104750</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">732404</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">954435</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">10199233</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">18662440</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">12177187</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">28079856</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">6000000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">6406485</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">135000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">15000000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">29455103</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">10382580</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">16206579</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">15327382</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">2078164</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">5492101</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">80750000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">9051186</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">10013824</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">3431130</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">11049342</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">1288332</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">277396</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">1032526</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">1028391</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">1387919</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">4621528</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">670113</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">16000000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">0</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">192187</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">0</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">52444</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">4000000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-2038316</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-5463</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-2984615</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-79432</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-2581321</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-87500</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-234000</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">-104750</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-904</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-411972</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-153407</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-47616</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-135000</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-311659</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-506</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">-50309</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-250000</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-467083</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-129539</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-37384</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-475143</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">-242670</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">-282958</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">-274377</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-454928</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-178804</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-536229</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-107065</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-591281</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-247894</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-267866</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-520834</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-427961</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-544729</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-1818753</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-1425876</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-249022</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-2140758</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-853525</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-439968</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-604271</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-1773766</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-250535</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-998579</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-2559072</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-762467</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-435830</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-695192</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-1839966</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-1111674</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-247527</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-2881149</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-822354</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-440087</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-732495</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-1904614</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-2879991</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-1079180</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-246554</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-845934</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-438652</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-1936470</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-648663</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-2633034</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-1071407</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-249050</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-435899</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-831101</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-1897293</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-631017</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-2389039</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-255193</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-1056106</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-461253</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-844876</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-1890165</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-628169</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-2311220</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-1073611</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-257103</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-445930</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-814479</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-1817155</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-599823</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-575627</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-1759264</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-770638</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-748790</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-1759264</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-575627</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-740512</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-770638</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-1759264</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-575627</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-45355"><narrative>Ministry of Finance; Ministry of Health; State Ministry of Samurdhi, Household Economy, Micro Finance, Self-Employment, Business Development,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P173867"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P173867?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P173867"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Emergency Operations Centre for COVID-19 and pandemic responses established
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2023-12-31" />
<target value="Yes">
<comment><narrative>
Emergency Operations Centre for coordination of pandemic response established and functional.&amp;nbsp;

The Epidemiology Division, MoH is being strengthened as the National Emergency Center for Epidemics and Pandemics.&amp;nbsp;

End target achieved 100 percent.&amp;nbsp;??????????????

???????
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of received grievances that are addressed within 30 days
</narrative></title>
<baseline year="2021" iso-date="2021-11-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-11-28" />
<period-end iso-date="2023-12-31" />
<target value="80.00">

</target>
<actual value="74.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of population vaccinated, which is included in the priority population targets defined in the NDVP, disaggregated by gender
</narrative></title>
<baseline year="2021" iso-date="2021-02-18" value="0.01"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-18" />
<period-end iso-date="2023-12-29" />
<target value="56.80">

</target>
<actual value="98.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of sub-national emergency operational centers with an established quarantine mechanism
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="8.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2023-12-31" />
<target value="26.00">

</target>
<actual value="28.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of secondary and tertiary hospitals with solar energy backup to overcome electricity outages
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2020-12-31" />
<target value="1.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of secondary and tertiary care hospitals with environmental protection license (EPL) and Scheduled waste license (SWL)
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="20.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2023-12-31" />
<target value="81.00">

</target>
<actual value="335.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of secondary and tertiary care hospitals with networked laboratory information system in place
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2021-12-31" />
<target value="50.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of secondary and tertiary care hospitals with networked laboratory information system in place
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2021-12-31" />
<target value="50.00">
<comment><narrative>
In 2022, the GoSL&amp;nbsp;started the development of a blueprint of a National Information Management System (HMIS)&amp;nbsp;which included a network of laboratories.The blueprint of the National Information System (HMIS) has been almost completed. At present, laboratories are networked internally without connecting to an integrated system. (see: https://www.icta.lk/projects/digitalizing-government/hospital-health-information-management-system-hhims
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of ICU beds in tertiary and secondary hospitals against planned
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="560.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2023-12-31" />
<target value="750.00">

</target>
<actual value="750.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of peer-reviewed publications from Research Institutions supported to undertake research and monitor progress and capacity of the health system for pandemic preparedness
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2023-12-31" />
<target value="5.00">

</target>
<actual value="5.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of individual isolation rooms established within the National Institute of Infectious Diseases established
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2023-12-31" />
<target value="24.00">

</target>
<actual value="48.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of received grievances that are addressed within 30 days
</narrative></title>
<baseline year="2021" iso-date="2021-11-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-11-28" />
<period-end iso-date="2023-12-29" />
<target value="80.00">

</target>
<actual value="71.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of health staff trained in infection prevention and control per MoH approved protocols
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="100.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2023-12-31" />
<target value="1000.00">

</target>
<actual value="30000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Percentage of health districts with a tertiary or secondary care hospital with isolation capacity
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="8.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2023-12-31" />
<target value="100.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of secondary and tertiary care hospitals with networked laboratory information system in place
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2021-12-31" />
<target value="50.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Guidelines to engage private health facilities in supporting pandemic response
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2023-12-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of population vaccinated, which is included in the priority population targets defined in the NDVP, disaggregated by gender
</narrative></title>
<baseline year="2021" iso-date="2021-02-18" value="0.01"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-18" />
<period-end iso-date="2023-12-31" />
<target value="56.80">

</target>
<actual value="98.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of field staff engaged in elder care, homes for the people with special needs and orphanages trained and equipped for prevention and care measures
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="100.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2023-12-31" />
<target value="1000.00">

</target>
<actual value="1000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of secondary and tertiary care hospitals with environmental protection license (EPL) and Scheduled waste license (SWL)
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="20.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2023-12-31" />
<target value="81.00">

</target>
<actual value="335.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National protocols for detection, surveillance, and response systems for animal and human health infections
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2023-12-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Risk communication plan implemented
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2021-03-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Guidelines to engage private health facilities in supporting pandemic response
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2023-12-31" />
<target value="Yes">
<comment><narrative>
Developed laboratory guidelines and &amp;nbsp;coordinated to establish networking of facilities to cater to the pandemic response. During the pandemic there was a good coordination between public and private sector for testing and cater to the growing needs from people. The list of COVID-19 testing centers for the public and private sector were available on the Ministry of Health website. This is a 100 percent achievement of the end of project target. &amp;nbsp;

   &amp;nbsp;??????????????
   
  
 


???????
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of field staff engaged in elder care, homes for the people with special needs and orphanages trained and equipped for prevention and care measures
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="100.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2023-12-31" />
<target value="1000.00">

</target>
<actual value="1000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of individual isolation rooms established within the National Institute of Infectious Diseases established
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2023-12-31" />
<target value="24.00">

</target>
<actual value="48.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National protocols for detection, surveillance, and response systems for animal and human health infections
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2023-12-31" />
<target value="Yes">
<comment><narrative>
The national protocols for detection, surveillance, and response systems for animal and human health infections have been developed. The project has achieved 100 percent of the end target.&amp;nbsp; ?????????????????????????????????????????????????
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of health staff trained in infection prevention and control per MoH approved protocols
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="100.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2023-12-31" />
<target value="1000.00">

</target>
<actual value="30000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of secondary and tertiary hospitals with solar energy backup to overcome electricity outages
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2020-12-31" />
<target value="1.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of secondary and tertiary care hospitals with classified accredited labs
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2023-12-31" />
<target value="50.00">

</target>
<actual value="50.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of individual isolation rooms established within the National Institute of Infectious Diseases established
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2023-12-31" />
<target value="24.00">

</target>
<actual value="48.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of designated laboratories with COVID-19 diagnostic equipment, test kits, and reagents
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="5.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2020-12-31" />
<target value="17.00">

</target>
<actual value="17.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of peer-reviewed publications from Research Institutions supported to undertake research and monitor progress and capacity of the health system for pandemic preparedness
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2023-12-31" />
<target value="5.00">
<comment><narrative>
Research studies conducted are at different levels of completion that vary from draft manuscript to acceptance for publication. The Project achieved 100 percent of end of project target.
</narrative></comment>
</target>
<actual value="5.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Risk communication plan implemented
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2021-03-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Emergency Operations Centre for COVID-19 and pandemic responses established
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2023-12-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of peer-reviewed publications from Research Institutions supported to undertake research and monitor progress and capacity of the health system for pandemic preparedness
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2023-12-29" />
<target value="5.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of districts with functional vaccination tracking system/HMIS collecting sex and age disaggregated data on COVID-19 vaccinesat district level
</narrative></title>
<baseline year="2021" iso-date="2021-02-18" value="3.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-18" />
<period-end iso-date="2023-12-31" />
<target value="25.00">

</target>
<actual value="25.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of secondary and tertiary care hospitals with environmental protection license (EPL) and Scheduled waste license (SWL)
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="20.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2023-12-31" />
<target value="81.00">

</target>
<actual value="335.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Risk communication plan implemented
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2021-03-31" />
<target value="Yes">
<comment><narrative>
Risk communication campaign plan developed and implemented to the satisfaction of the MOH. UNICEF partners with the MoH in planning and implementing risk communication. The project achieved 100 percent of the end of the project target. ???????
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Percentage of health districts with a tertiary or secondary care hospital with isolation capacity
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="8.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2023-12-31" />
<target value="100.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of designated laboratories with COVID-19 diagnostic equipment, test kits, and reagents
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="5.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2020-12-31" />
<target value="17.00">

</target>
<actual value="17.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of beneficiaries provided with cash transfers in response to COVID-19
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2020-08-31" />
<target value="600000.00">

</target>
<actual value="3150429.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of sub-national emergency operational centers with an established quarantine mechanism
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="8.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2023-12-31" />
<target value="26.00">
<comment><narrative>
Quarantine mechanisms have been established at identified subnational centers to help strengthen provincial administration. In addition, Epidemiological Unit and Disaster and Emergency Management Center at MOH have also been strengthened. The project has achieved 104 percent of the end of project targets.??????????????

?????????????????????
</narrative></comment>
</target>
<actual value="28.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of secondary and tertiary care hospitals with classified accredited labs
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2023-12-31" />
<target value="50.00">
<comment><narrative>
As part of the national accreditation process, internal quality assurance required for 50 labs have been completed. Ongoing WB financed PSSO project has provided technical assistance for the quality assurance process. The project has achieved 100 percent of the end of project target. ???????????????????????????????????

??????????????
</narrative></comment>
</target>
<actual value="50.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of individuals utilizing GBV services through the Mithuru Piyasas
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="9,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2023-12-31" />
<target value="12,000.00">
<comment><narrative>
The number of persons seeking GBV services through Mithuru Piyasa exceeded with an achievement of 136 percent of the end of project target. It is interesting to note that 94.8 percent women and 5.2 percent of males and children have sought GBV services through the Mithuru Piyasa. Women&amp;rsquo;s use of Mithuru Piyasa for GBV services showed an achievement of 141 percent of ed of the project target created for women.???????
</narrative></comment>
</target>
<actual value="16,350.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of beneficiaries provided with cash transfers in response to COVID-19
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2020-08-31" />
<target value="600,000.00">
<comment><narrative>
In total, the cash transfer program has supported 629,303 elderly persons, 52,940 people with special needs, 18,972 patients with chronic kidney disease, and 2,229,214 people who lost livelihoods. The in-kind transfer program has supported 417,427 beneficiaries sent on home quarantine with food packs for two weeks.&amp;nbsp;In total, this subcomponent has provided benefits to 3.5 million people (cash transfer benefits to 3.1 million beneficiaries and in-kind benefits to 417,427). The number of persons supported through cash transfers was an achievement of 525 percent of the end of the project target.?????????????????????

??????????????

???????
</narrative></comment>
</target>
<actual value="3,150,429.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of districts with functional vaccination tracking system/HMIS collecting sex and age disaggregated data on COVID-19 vaccinesat district level
</narrative></title>
<baseline year="2021" iso-date="2021-02-18" value="3.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-18" />
<period-end iso-date="2023-12-29" />
<target value="25.00">

</target>
<actual value="25.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of secondary and tertiary hospitals with solar energy backup to overcome electricity outages
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2020-12-31" />
<target value="1.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of population vaccinated, which is included in the priority population targets defined in the NDVP, disaggregated by gender
</narrative></title>
<baseline year="2021" iso-date="2021-02-18" value="0.01"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-18" />
<period-end iso-date="2023-12-31" />
<target value="56.80">

</target>
<actual value="98.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Emergency Operations Centre for COVID-19 and pandemic responses established
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2023-03-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of designated laboratories with COVID-19 diagnostic equipment, test kits, and reagents
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="5.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2020-12-31" />
<target value="17.00">
<comment><narrative>
Number of designated laboratories with COVID-19 essential diagnostic equipment, test kits, and reagents (identified as essential for COVID-19 response as per WHO guidelines) include 17 functional laboratories

The end target of 17 achieved (100ercent)

&amp;nbsp;
</narrative></comment>
</target>
<actual value="17.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of received grievances that are addressed within 30 days
</narrative></title>
<baseline year="2021" iso-date="2021-11-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-11-28" />
<period-end iso-date="2023-12-31" />
<target value="80.00">
<comment><narrative>
The system to address grievances set up and addressed within 30 days increased from zero percent to 100 percent by the end of the Project and this is an&amp;nbsp;achievement of 125 percent of the end of project target.
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Guidelines to engage private health facilities in supporting pandemic response
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2023-12-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of secondary and tertiary care hospitals with environmental protection license (EPL) and Scheduled waste license (SWL)
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="20.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2023-12-31" />
<target value="81.00">
<comment><narrative>
By the end of the Project, 335&amp;nbsp;hospitals have obtained EPL/SWL. This is a 414 percent acheivement of the end target. These also included three IDH hospitals (Angoda, Kilinochchi, and Ampara) obtaining license and the fourth IDH hospital (Hambantota) meeting standards and submission of application to receive certificates.???????
</narrative></comment>
</target>
<actual value="335.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Risk communication plan implemented
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2021-03-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of districts with functional vaccination tracking system/HMIS collecting sex and age disaggregated data on COVID-19 vaccines at district level
</narrative></title>
<baseline year="2021" iso-date="2021-02-18" value="3.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-18" />
<period-end iso-date="2023-12-31" />
<target value="25.00">
<comment><narrative>
The vaccination tracking system was developed and functioned in all 25 districts. The innovative DHIS tracker and App developed was fully functional (see results stories: https://dhis2.org/sri-lanka-covid-surveillance/ and https://www.who.int/about/accountability/results/who-results-report-2020-mtr/country-story/2021/sri-lanka).

The project achieved 100 percent of the end of project target.
</narrative></comment>
</target>
<actual value="25.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of health staff trained in infection prevention and control per MoH approved protocols
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="100.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2023-12-31" />
<target value="1,000.00">
<comment><narrative>
Using online training module developed, all institutions trained 30,000 health staff. This is 3,000 percent achievement&amp;nbsp;of the project end target.
</narrative></comment>
</target>
<actual value="30,000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National protocols for detection, surveillance, and response systems for animal and human health infections
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2023-12-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of ICU beds in tertiary and secondary hospitals against planned
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="560.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2023-12-31" />
<target value="750.00">

</target>
<actual value="750.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of sub-national emergency operational centers with an established quarantine mechanism
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="8.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2023-12-31" />
<target value="26.00">

</target>
<actual value="28.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Percentage of health districts with a tertiary or secondary care hospital with isolation capacity
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="8.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2023-12-31" />
<target value="100.00">
<comment><narrative>
Indicator Definition - Numerator: Number of districts with at least one tertiary or secondary care hospital with isolation capacity Denominator: Number of districts (25 districts).

End target achieved 100 percent.

&amp;nbsp;
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of peer-reviewed publications from Research Institutions supported to undertake research and monitor progress and capacity of the health system for pandemic preparedness
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2023-12-31" />
<target value="5.00">

</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Guidelines to engage private health facilities in supporting pandemic response
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2023-12-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Percentage of health districts with a tertiary or secondary care hospital with isolation capacity
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="8.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2023-12-31" />
<target value="100.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of secondary and tertiary hospitals with solar energy backup to overcome electricity outages
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2020-12-31" />
<target value="1.00">
<comment><narrative>
This activity could not be completed as planned due to policies introduced by the government to resolve the economic crisis in 2022 which resulted in energy crisis, foreign exchange crisis, high inflation, and &amp;nbsp;import restriction policy. However, some of the hospitals managed to use its own resources to install solar energy backups.

The end of project target could not be achieved. &amp;nbsp;???????
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of population vaccinated, which is included in the priority population targets defined in the NDVP, disaggregated by gender
</narrative></title>
<baseline year="2021" iso-date="2021-02-18" value="0.01"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-18" />
<period-end iso-date="2023-12-31" />
<target value="56.80">
<comment><narrative>
98% of population has been vaccinated with the first dose. Populations male to female ratio is 49:51. Therefore, it is expected that vaccinations reached a similar percentage of males and females of the population..

End target overachieved (173 percent).&amp;nbsp;&amp;nbsp;

&amp;nbsp;

???????
</narrative></comment>
</target>
<actual value="98.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of beneficiaries provided with cash transfers in response to COVID-19
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2020-08-31" />
<target value="600000.00">

</target>
<actual value="3150429.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Emergency Operations Centre for COVID-19 and pandemic responses established
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2023-12-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of secondary and tertiary care hospitals with networked laboratory information system in place
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2021-12-31" />
<target value="50.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of ICU beds in tertiary and secondary hospitals against planned
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="560.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2023-12-31" />
<target value="750.00">

</target>
<actual value="750.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of individual isolation rooms established within the National Institute of Infectious Diseases established
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2023-12-31" />
<target value="24.00">
<comment><narrative>
A total of 48 isolation rooms have been established (16 isolation rooms at regional infectious disease hospitals and 32 isolation rooms at Hambantota sub-national ID). The project achieved 200 percent of the end of project target.???????
</narrative></comment>
</target>
<actual value="48.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National Deployment and Vaccination Plan for COVID-19 vaccines with input from relevant bodies is updated by the government, as needed
</narrative></title>
<baseline year="2021" iso-date="2021-02-18" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-18" />
<period-end iso-date="2023-12-31" />
<target value="Yes">
<comment><narrative>
National Deployment and Vaccination Plan for COVID-19 vaccination initially prepared by forming a partnership with the COVAX facility. The Ministry prepared COVID preparedness response plan in 2020 and updated in 2021. Thereafter, the Ministry of Health prepared a plan focusing on &amp;lsquo;Strategic Preparedness, Readiness and Response Plan to End COVID - 19 Emergency in 2022.&amp;rsquo;&amp;nbsp; When the World Health Organization declared end of COVID-19 pandemic in 2023, the Ministry of Health&amp;rsquo;s Technical Committee decided not to update 2022 plan prepared by the Ministry of Health. The Project achieved 100 percent of the end of project target.?????????????????????

???????
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of field staff engaged in elder care, homes for the people with special needs and orphanages trained and equipped for prevention and care measures
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="100.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2023-12-31" />
<target value="1000.00">

</target>
<actual value="1000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National Deployment and Vaccination Plan for COVID-19 vaccines with input from relevant bodies is updated by the government, as needed
</narrative></title>
<baseline year="2021" iso-date="2021-02-18" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-18" />
<period-end iso-date="2023-12-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of received grievances that are addressed within 30 days
</narrative></title>
<baseline year="2021" iso-date="2021-11-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-11-28" />
<period-end iso-date="2023-12-31" />
<target value="80.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of designated laboratories with COVID-19 diagnostic equipment, test kits, and reagents
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="5.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2020-12-31" />
<target value="17.00">

</target>
<actual value="17.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National protocols for detection, surveillance, and response systems for animal and human health infections
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2021-12-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of secondary and tertiary care hospitals with classified accredited labs
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2023-12-31" />
<target value="50.00">

</target>
<actual value="50.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of sub-national emergency operational centers with an established quarantine mechanism
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="8.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2023-12-31" />
<target value="26.00">

</target>
<actual value="28.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of field staff engaged in elder care, homes for the people with special needs and orphanages trained and equipped for prevention and care measures
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="100.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2023-12-31" />
<target value="1,000.00">
<comment><narrative>
The Ministry of Health partnered with the National Secretariat for Elders to conduct training of field staff engaged in eldercare homes and other institutionalized care centers. The project achieved 100 percent of the end of the year target. ???????

&amp;nbsp;

&amp;nbsp;
</narrative></comment>
</target>
<actual value="1,000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of ICU beds in tertiary and secondary hospitals against planned
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="560.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2023-12-31" />
<target value="750.00">
<comment><narrative>
The support included strengthening ICU, High Dependency Unit (HDU) with oxygen connectivity. All units are fully functional. The Project achieved 100 percent of the end target. &amp;nbsp;
</narrative></comment>
</target>
<actual value="750.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National Deployment and Vaccination Plan for COVID-19 vaccines with input from relevant bodies is updated by the government, as needed
</narrative></title>
<baseline year="2021" iso-date="2021-02-18" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-18" />
<period-end iso-date="2023-12-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of health staff trained in infection prevention and control per MoH approved protocols
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="100.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2020-07-31" />
<target value="1000.00">

</target>
<actual value="30000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of districts with functional vaccination tracking system/HMIS collecting sex and age disaggregated data on COVID-19 vaccinesat district level
</narrative></title>
<baseline year="2021" iso-date="2021-02-18" value="3.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-18" />
<period-end iso-date="2023-12-31" />
<target value="25.00">

</target>
<actual value="25.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of secondary and tertiary care hospitals with classified accredited labs
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2023-12-29" />
<target value="50.00">

</target>
<actual value="50.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of beneficiaries provided with cash transfers in response to COVID-19
</narrative></title>
<baseline year="2020" iso-date="2020-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-01" />
<period-end iso-date="2020-08-31" />
<target value="600000.00">

</target>
<actual value="3150429.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National Deployment and Vaccination Plan for COVID-19 vaccines with input from relevant bodies is updated by the government, as needed
</narrative></title>
<baseline year="2021" iso-date="2021-02-18" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-18" />
<period-end iso-date="2023-12-29" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-11-20T15:47:22" hierarchy="1"><iati-identifier>44000-P176164</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>ICDP</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0048511"><narrative>Democratic Socialist Republic of Sri Lanka</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0048515"><narrative>Ministry of Finance, Planning and Economic Development</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="LK-COA-0048512"><narrative>Ministry of Transport, Highways, and Urban Development</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2021-09-30"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2021-09-30"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2029-10-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="2" iso-date="2029-10-31"><narrative>Projected end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Edpo Covalciuk Silva</narrative></person-name><telephone>+1-202-473-1000</telephone><email>ecovalciuksilva@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>







<recipient-country code="LK" percentage="100"><narrative xml:lang="en">SRI LANKA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001227603" />
            <name><narrative>Democratic Socialist Republic of Sri Lanka</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.873054 80.771797</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001228730" />
            <name><narrative>Ratnapura</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.6858 80.4036</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001235855" />
            <name><narrative>Matale</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.4698 80.6217</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001248749" />
            <name><narrative>Dambulla</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.86 80.65167</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001251081" />
            <name><narrative>Anuradhapura</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.31223 80.41306</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="74020" percentage="90" xml:lang="en"/><sector vocabulary="1" code="31110" percentage="7" xml:lang="en"/><sector vocabulary="1" code="21024" percentage="2" xml:lang="en"/><sector vocabulary="1" code="21011" percentage="1" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YA" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Agricultural markets, commercialization and agri-business</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TF" percentage="3.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Transportation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TI" percentage="87.0000000" xml:lang="en"><narrative>FY17 - Rural and Inter-Urban Roads</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000133" percentage="5" xml:lang="en"><narrative>Green Growth</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000723" percentage="94" xml:lang="en"><narrative>Rural Infrastructure and service delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="100" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000721" percentage="10" xml:lang="en"><narrative>Rural Markets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="1" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="90" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="100" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000074" percentage="88" xml:lang="en"><narrative>Road Safety</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="87" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="90" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000074" percentage="88" xml:lang="en"><narrative>Road Safety</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000142" percentage="5" xml:lang="en"><narrative>Trade Logistics</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000013" percentage="5" xml:lang="en"><narrative>Economic Growth and Planning</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000723" percentage="94" xml:lang="en"><narrative>Rural Infrastructure and service delivery</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">6818181.82</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">6818181.82</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">6818181.82</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">6818181.82</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">6818181.82</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">6818181.82</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">6818181.82</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">6818181.82</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">6818181.82</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">6818181.82</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">6818181.80</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">8333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">8333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">8333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">8333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">8333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">8333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">8333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">8333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">8333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">8333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">8333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">8333333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">8333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">8333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">8333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">8333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">8333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">8333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">8333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">8333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">8333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">8333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">8333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">8333333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">10416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">10416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">10416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">10416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">10416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">10416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">10416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">10416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">10416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">10416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">10416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">10416666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">5833333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">4285714.29</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">4285714.29</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">4285714.29</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">4285714.29</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">4285714.29</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">4285714.29</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">4285714.26</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">6818181.82</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">63456582.30</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">63456582.30</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">500000000</value><description xml:lang="en"><narrative>Total Commitment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-48514"><narrative>Ministry of Agriculture; Ministry of Health; Ministry of Transport, Highways, and Urban Development; Ministry of Women, Child Affairs and Social Empowerment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">1250000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-48514"><narrative>Ministry of Agriculture; Ministry of Health; Ministry of Transport, Highways, and Urban Development; Ministry of Women, Child Affairs and Social Empowerment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">9710000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-48514"><narrative>Ministry of Agriculture; Ministry of Health; Ministry of Transport, Highways, and Urban Development; Ministry of Women, Child Affairs and Social Empowerment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">130000000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-48514"><narrative>Ministry of Agriculture; Ministry of Health; Ministry of Transport, Highways, and Urban Development; Ministry of Women, Child Affairs and Social Empowerment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">16239203</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-48514"><narrative>Ministry of Agriculture; Ministry of Health; Ministry of Transport, Highways, and Urban Development; Ministry of Women, Child Affairs and Social Empowerment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">18622982</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-48514"><narrative>Ministry of Agriculture; Ministry of Health; Ministry of Transport, Highways, and Urban Development; Ministry of Women, Child Affairs and Social Empowerment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">22843711</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-48514"><narrative>Ministry of Agriculture; Ministry of Health; Ministry of Transport, Highways, and Urban Development; Ministry of Women, Child Affairs and Social Empowerment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">14335720</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-48514"><narrative>Ministry of Agriculture; Ministry of Health; Ministry of Transport, Highways, and Urban Development; Ministry of Women, Child Affairs and Social Empowerment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">19626831</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-48514"><narrative>Ministry of Agriculture; Ministry of Health; Ministry of Transport, Highways, and Urban Development; Ministry of Women, Child Affairs and Social Empowerment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">23451053</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-48514"><narrative>Ministry of Agriculture; Ministry of Health; Ministry of Transport, Highways, and Urban Development; Ministry of Women, Child Affairs and Social Empowerment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">42013514</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-48514"><narrative>Ministry of Agriculture; Ministry of Health; Ministry of Transport, Highways, and Urban Development; Ministry of Women, Child Affairs and Social Empowerment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">26972755</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-48514"><narrative>Ministry of Agriculture; Ministry of Health; Ministry of Transport, Highways, and Urban Development; Ministry of Women, Child Affairs and Social Empowerment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">9000000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-48514"><narrative>Ministry of Agriculture; Ministry of Health; Ministry of Transport, Highways, and Urban Development; Ministry of Women, Child Affairs and Social Empowerment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">3981139</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-48514"><narrative>Ministry of Agriculture; Ministry of Health; Ministry of Transport, Highways, and Urban Development; Ministry of Women, Child Affairs and Social Empowerment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">3731764</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-48514"><narrative>Ministry of Agriculture; Ministry of Health; Ministry of Transport, Highways, and Urban Development; Ministry of Women, Child Affairs and Social Empowerment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">21022550</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-48514"><narrative>Ministry of Agriculture; Ministry of Health; Ministry of Transport, Highways, and Urban Development; Ministry of Women, Child Affairs and Social Empowerment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">718250</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-48514"><narrative>Ministry of Agriculture; Ministry of Health; Ministry of Transport, Highways, and Urban Development; Ministry of Women, Child Affairs and Social Empowerment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-5226054</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-48514"><narrative>Ministry of Agriculture; Ministry of Health; Ministry of Transport, Highways, and Urban Development; Ministry of Women, Child Affairs and Social Empowerment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">16550000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-48514"><narrative>Ministry of Agriculture; Ministry of Health; Ministry of Transport, Highways, and Urban Development; Ministry of Women, Child Affairs and Social Empowerment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">17500000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-48514"><narrative>Ministry of Agriculture; Ministry of Health; Ministry of Transport, Highways, and Urban Development; Ministry of Women, Child Affairs and Social Empowerment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">11000000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-48514"><narrative>Ministry of Agriculture; Ministry of Health; Ministry of Transport, Highways, and Urban Development; Ministry of Women, Child Affairs and Social Empowerment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">8200000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-48514"><narrative>Ministry of Agriculture; Ministry of Health; Ministry of Transport, Highways, and Urban Development; Ministry of Women, Child Affairs and Social Empowerment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">15000000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-48514"><narrative>Ministry of Agriculture; Ministry of Health; Ministry of Transport, Highways, and Urban Development; Ministry of Women, Child Affairs and Social Empowerment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">10000000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-48514"><narrative>Ministry of Agriculture; Ministry of Health; Ministry of Transport, Highways, and Urban Development; Ministry of Women, Child Affairs and Social Empowerment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-1250000</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-48514"><narrative>Ministry of Agriculture; Ministry of Health; Ministry of Transport, Highways, and Urban Development; Ministry of Women, Child Affairs and Social Empowerment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">-154375</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-48514"><narrative>Ministry of Agriculture; Ministry of Health; Ministry of Transport, Highways, and Urban Development; Ministry of Women, Child Affairs and Social Empowerment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-1220936</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-48514"><narrative>Ministry of Agriculture; Ministry of Health; Ministry of Transport, Highways, and Urban Development; Ministry of Women, Child Affairs and Social Empowerment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-6936122</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-48514"><narrative>Ministry of Agriculture; Ministry of Health; Ministry of Transport, Highways, and Urban Development; Ministry of Women, Child Affairs and Social Empowerment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-10651387</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-48514"><narrative>Ministry of Agriculture; Ministry of Health; Ministry of Transport, Highways, and Urban Development; Ministry of Women, Child Affairs and Social Empowerment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-12678552</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-48514"><narrative>Ministry of Agriculture; Ministry of Health; Ministry of Transport, Highways, and Urban Development; Ministry of Women, Child Affairs and Social Empowerment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-13094065</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-48514"><narrative>Ministry of Agriculture; Ministry of Health; Ministry of Transport, Highways, and Urban Development; Ministry of Women, Child Affairs and Social Empowerment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-12412043</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-48514"><narrative>Ministry of Agriculture; Ministry of Health; Ministry of Transport, Highways, and Urban Development; Ministry of Women, Child Affairs and Social Empowerment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-11653881</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-48514"><narrative>Ministry of Agriculture; Ministry of Health; Ministry of Transport, Highways, and Urban Development; Ministry of Women, Child Affairs and Social Empowerment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-11681436</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-48514"><narrative>Ministry of Agriculture; Ministry of Health; Ministry of Transport, Highways, and Urban Development; Ministry of Women, Child Affairs and Social Empowerment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P176164"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P176164?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P176164"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
CERC implemented according to the emergency action plan
</narrative></title>
<baseline year="2022" iso-date="2022-05-09" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-09" />
<period-end iso-date="2023-11-09" />
<target value="Yes">
<comment><narrative>
The activities described in the Sri Lanka CERC Emergency Action Plan, were completed
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Kms of rural roads upgraded with safety measures
</narrative></title>
<baseline year="2021" iso-date="2021-03-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-03-10" />
<period-end iso-date="2026-10-30" />
<target value="1,000.00">
<comment><narrative>
The actual estimate reported in this ISR is the number reported as of the implementation support mission October 2025.

Measures improved road safety in project financed areas.
</narrative></comment>
</target>
<actual value="702">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of women that have access to paved all weather roads in selected districts in project-financed areas
</narrative></title>
<baseline year="2021" iso-date="2021-08-11" value="262,554.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-11" />
<period-end iso-date="2026-10-30" />
<target value="427,554.00">
<comment><narrative>
The actual estimate reported in this ISR is the number reported as of the implementation support mission June 2024.

Measures the women's improved accessibility to paved, all weather roads in select few project-financed districts. Baseline estimate is calculated as existing female population in Rathnapura, Matale and Anuradhapura districts who already have access to paved, alleather roads. End target is calculated by adding the incremental number of female beneficiaries who will have access to improved roads under this project to the baseline estimate.
</narrative></comment>
</target>
<actual value="262,554.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of main cash transfer programs (Elderly, Disabled, CKD, Samurdhi) and their wait list, including top-ups
</narrative></title>
<baseline year="2022" iso-date="2022-05-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-09" />
<period-end iso-date="2023-11-09" />
<target value="3,000,000.00">
<comment><narrative>
Direct beneficiaries
</narrative></comment>
</target>
<actual value="3,090,000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cooking gas procured and distributed
</narrative></title>
<baseline year="2022" iso-date="2022-05-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-09" />
<period-end iso-date="2023-11-09" />
<target value="70,000.00">
<comment><narrative>
Amount of cooking gas procured and distributed
</narrative></comment>
</target>
<actual value="85,038.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Project beneficiaries with improved climate resilient road access to markets, schools and health facilities in selected districts in project-financed areas (gender disaggregated)
</narrative></title>
<baseline year="2021" iso-date="2021-08-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-11" />
<period-end iso-date="2026-10-30" />
<target value="323,614.00">

</target>
<actual value="878,980">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Travel time along the project-financed roads (percentage reduction)
</narrative></title>
<baseline year="2021" iso-date="2021-03-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-03-10" />
<period-end iso-date="2026-10-30" />
<target value="20.00">
<comment><narrative>
This indicator will be revised in the proposed restructuring.

Measures the average reduction in travel time along the project financed roads. For the target value, on a 2.5 km rural road, assumed current operating speed is 40 km/hr which rises to 50km/hr.
</narrative></comment>
</target>
<actual value="7.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of women employed in road maintenance work under the project
</narrative></title>
<baseline year="2021" iso-date="2021-08-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-11" />
<period-end iso-date="2026-10-30" />
<target value="15.00">
<comment><narrative>
This indicator will be revised in the proposed restructuring.

Measures the increased employment of women in road maintenance work in project financed road work. End target is estimated taking into consideration the recent project experience by the RDA and the proposed activities under this project to improve female employment in road maintenance work.
</narrative></comment>
</target>
<actual value="10.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of storage/collection centers constructed or rehabilitated
</narrative></title>
<baseline year="2021" iso-date="2021-06-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-06-08" />
<period-end iso-date="2026-10-30" />
<target value="18.00">
<comment><narrative>
This indicator will be revised in the upcoming project restructuring.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cooking gas procured and distributed
</narrative></title>
<baseline year="2022" iso-date="2022-05-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-09" />
<period-end iso-date="2023-11-09" />
<target value="70,000.00">
<comment><narrative>
Amount of cooking gas procured and distributed
</narrative></comment>
</target>
<actual value="85,038.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
An institutional framework for road management developed
</narrative></title>
<baseline year="2021" iso-date="2021-06-07" value="No institutional framework for road management in place"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-06-07" />
<period-end iso-date="2026-10-30" />
<target value="An institutional framework for road management developed">
<comment><narrative>
This indicator will be revised in the proposed restructuring.

Measures steps taken to improve road management practices in the country's road sector
</narrative></comment>
</target>
<actual value="No institutional framework for road management in place">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of community groups actively engaged in project monitoring activities
</narrative></title>
<baseline year="2021" iso-date="2021-06-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-06-08" />
<period-end iso-date="2026-10-30" />
<target value="9.00">
<comment><narrative>
The actual estimate reported in this ISR is the number reported as of the implementation support mission October 2025. 


Measures the improved community participation in project monitoring activities. The GRCs appointed for the project, which include community members, are involved in project monitoring activities as well. The actual is measured as the number of GRCs appointed under the project.&amp;nbsp;&amp;nbsp;
</narrative></comment>
</target>
<actual value="305">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Average sales of agriculture products in the catchment area of collection points rehabilitated by the project
</narrative></title>
<baseline year="2022" iso-date="2022-11-18" value="To be assessed after restructuring is completed"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-18" />
<period-end iso-date="2026-10-30" />
<target value="To be determined based on baseline">
<comment><narrative>
This indicator will be revised / removed in the upcoming restructuring of the project.
</narrative></comment>
</target>
<actual value="To be assessed">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of school girls that have access to paved all weather roads to schools in selected districts in project-financed areas
</narrative></title>
<baseline year="2022" iso-date="2022-02-03" value="17,187"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-02-03" />
<period-end iso-date="2026-10-30" />
<target value="23,600">
<comment><narrative>
The actual estimate reported in this ISR is the number reported as of the implementation support mission April 2026. Data is provided for 9 districts. The end target is only for 3 districts and thus will be updated in the proposed restructuring. 


Measures the number of school girls benefited by improved access to schools through paved, all weather roads in select few project-financed districts. The baseline is calculated based on the number of school girls served by the roads improved in Ratnapura, Anuradhapura and Matale districts.
</narrative></comment>
</target>
<actual value="123,848">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of beneficiaries satisfied with improved agro-logistics infrastructure (collection centers) in selected districts in project-financed areas (gender disaggregated)
</narrative></title>
<baseline year="2021" iso-date="2021-06-17" value="To be obtained via satisfaction surveys carried out prior to infrastructure rehabilitation"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-06-17" />
<period-end iso-date="2026-10-30" />
<target value="To be determined based on baseline">
<comment><narrative>
This indicator will be revised in the upcoming project restructuring.
</narrative></comment>
</target>
<actual value="To be obtained via satisfaction surveys carried out prior to infrastructure rehabilitation">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Travel time along the project-financed roads (percentage reduction)
</narrative></title>
<baseline year="2021" iso-date="2021-03-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-03-10" />
<period-end iso-date="2026-10-30" />
<target value="20.00">
<comment><narrative>
Measures the average reduction in travel time along the project financed roads. For the target value, on a 2.5 km rural road, assumed current operating speed is 40 km/hr which rises to 50km/hr.
</narrative></comment>
</target>
<actual value="7.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of beneficiaries satisfied with improved roads in selected districts in project-financed areas (gender disaggregated)
</narrative></title>
<baseline year="2021" iso-date="2021-08-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-11" />
<period-end iso-date="2026-10-30" />
<target value="50.00">
<comment><narrative>
The actual estimate reported in this ISR is the number reported as of the implementation support mission April 2025.

Measures the public feedback on the road improvements in select few project-financed districts. The baseline is estimated as the percentage of population satisfied with the existing condition of the candidate roads in Rathnapura, Matale and Anuradhapura distrits based on a sample of 203 people surveyed by the RDA E&amp;amp;S division. Surveys and community consultations for this has been restricted due to prevalence of COVID-19. End target is estimated based on the baseline and will be verified through a satisfaction survey carried out at the end of road rehabilitations.&amp;nbsp;
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of farmer beneficiaries receiving fertilizer
</narrative></title>
<baseline year="2022" iso-date="2022-05-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-09" />
<period-end iso-date="2023-11-09" />
<target value="1,000,000.00">
<comment><narrative>
The actual progress reported for this indicator accounts for the number of farmers who received fertilizer in the Maha 2022/23 season. In the Yala 2023 season 660,511 farmers received fertilizer, however, there's a possibility that this includes the same farmers who received fertilizer in the Maha season. Therefore, the number for Yala 2023 is not accounted for to avoid any double counting. 

Approximate number of farmers covered in 800,000 hectares
</narrative></comment>
</target>
<actual value="684,597.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of community groups actively engaged in project monitoring activities
</narrative></title>
<baseline year="2021" iso-date="2021-06-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-06-08" />
<period-end iso-date="2026-10-30" />
<target value="9.00">
<comment><narrative>
The actual estimate reported in this ISR is the number reported as of the implementation support mission April 2026. The actual estimate is reported for 19 districts, while the end target is for 9, thus will be revised in the upcoming project restructuring.


Measures the improved community participation in project monitoring activities. The GRCs appointed for the project, which include community members, are involved in project monitoring activities as well. The actual is measured as the number of GRCs appointed under the project.&amp;nbsp;&amp;nbsp;
</narrative></comment>
</target>
<actual value="342">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Quantity of fertilizer distributed through agrarian service centers
</narrative></title>
<baseline year="2022" iso-date="2022-05-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-09" />
<period-end iso-date="2023-11-09" />
<target value="137,500.00">
<comment><narrative>
The actual progress reported for this indicator accounts only for the fertilizer distributed during the Maha 2022/23 and Yala 2023 seasons. The total including the distributions made in Maha 2023/24 season will be reported in subsequent ISRs.

Volume of fertilizer in metric tons distributed to smallholder farmers through agrarian service centers
</narrative></comment>
</target>
<actual value="118,872.18">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of women employed in road maintenance work under the project
</narrative></title>
<baseline year="2021" iso-date="2021-08-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-11" />
<period-end iso-date="2026-10-30" />
<target value="15.00">
<comment><narrative>
Measures the increased employment of women in road maintenance work in project financed road work. End target is estimated taking into consideration the recent project experience by the RDA and the proposed activities under this project to improve female employment in road maintenance work.
</narrative></comment>
</target>
<actual value="13.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of road safety awareness campaigns completed during project implementation
</narrative></title>
<baseline year="2021" iso-date="2021-06-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-06-07" />
<period-end iso-date="2026-10-30" />
<target value="9.00">
<comment><narrative>
The actual estimate reported in this ISR is the number reported as of the implementation support mission April 2026. The actual estimate is reported for 12 districts, while the end target is for 9. The end target will be revised in the upcoming project restructuring to capture 19 districts.

Measures the increased awareness around road safety among the communities in project financed areas.
</narrative></comment>
</target>
<actual value="84.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Climate resilient road maintenance plans prepared on an annual basis
</narrative></title>
<baseline year="2021" iso-date="2021-04-05" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-04-05" />
<period-end iso-date="2026-10-30" />
<target value="Yes">
<comment><narrative>
This indicator will be revised in the proposed restructuring. 

Measures the adoption of climate resilient road maintenance practices by the RDA
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of farmer beneficiaries receiving fertilizer
</narrative></title>
<baseline year="2022" iso-date="2022-05-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-09" />
<period-end iso-date="2023-11-09" />
<target value="1,000,000.00">
<comment><narrative>
The actual progress reported for this indicator accounts for the number of farmers who received fertilizer in the Maha 2022/23 season. In the Yala 2023 season 660,511 farmers received fertilizer, however, there's a possibility that this includes the same farmers who received fertilizer in the Maha season. Therefore, the number for Yala 2023 is not accounted for to avoid any double counting. 

Approximate number of farmers covered in 800,000 hectares
</narrative></comment>
</target>
<actual value="684,597.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Climate resilient road maintenance plans prepared on an annual basis
</narrative></title>
<baseline year="2021" iso-date="2021-04-05" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-04-05" />
<period-end iso-date="2026-10-30" />
<target value="Yes">
<comment><narrative>
This indicator will be revised in the proposed restructuring. 

Measures the adoption of climate resilient road maintenance practices by the RDA
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Kms of rural roads upgraded with safety measures
</narrative></title>
<baseline year="2021" iso-date="2021-03-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-03-10" />
<period-end iso-date="2026-10-30" />
<target value="1,000.00">
<comment><narrative>
Measures improved road safety in project financed areas.

The actual estimate reported in this ISR is the number reported as of the implementation support mission April 2026.
</narrative></comment>
</target>
<actual value="799">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with strengthened food and nutrition security
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of smallholder farmers with reduced travel time to output markets in selected districts in project-financed areas
</narrative></title>
<baseline year="2022" iso-date="2022-02-03" value="56,179"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-02-03" />
<period-end iso-date="2026-10-30" />
<target value="61,800">
<comment><narrative>
Measures the number of smallholder farmers with improved accessibility to output markets in select few project-financed districts. The baseline and target of this indicator is updated with this ISR. The baseline is calculated based on the number of smallholder farmers served by the roads improved in Ratnapura, Anuradhapura and Matale districts.
</narrative></comment>
</target>
<actual value="57,646">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of road safety awareness campaigns completed during project implementation
</narrative></title>
<baseline year="2021" iso-date="2021-06-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-06-07" />
<period-end iso-date="2026-10-30" />
<target value="9.00">
<comment><narrative>
The actual estimate reported in this ISR is the number reported as of the implementation support mission October 2025.

Measures the increased awareness around road safety among the communities in project financed areas.&amp;nbsp;The actual estimate reported in this ISR is reported progress as of the implementation support mission April 2023. Five awareness programs have been conducted in Ratnapura district&amp;nbsp;to the communities around the roads being improved.
</narrative></comment>
</target>
<actual value="64.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of project-financed roads with safety audits
</narrative></title>
<baseline year="2021" iso-date="2021-04-23" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-04-23" />
<period-end iso-date="2026-10-30" />
<target value="10.00">
<comment><narrative>
The indicator measures the percentage of project financed roads that have road safety audits completed.
</narrative></comment>
</target>
<actual value="85.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of storage/collection centers constructed or rehabilitated
</narrative></title>
<baseline year="2021" iso-date="2021-06-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-06-08" />
<period-end iso-date="2026-10-30" />
<target value="18.00">
<comment><narrative>
This indicator will be revised in the proposed restructuring. 


Measures the improved agro-logistics infrastructure in project financed areas
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of smallholder farmers with reduced travel time to output markets in selected districts in project-financed areas
</narrative></title>
<baseline year="2022" iso-date="2022-02-03" value="56,179"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-02-03" />
<period-end iso-date="2026-10-30" />
<target value="61,800">

</target>
<actual value="57,646">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Quantity of fertilizer distributed through agrarian service centers
</narrative></title>
<baseline year="2022" iso-date="2022-05-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-09" />
<period-end iso-date="2023-11-09" />
<target value="137,500.00">
<comment><narrative>
The actual progress reported for this indicator accounts only for the fertilizer distributed during the Maha 2022/23 and Yala 2023 seasons. The total including the distributions made in Maha 2023/24 season will be reported in subsequent ISRs.

Volume of fertilizer in metric tons distributed to smallholder farmers through agrarian service centers
</narrative></comment>
</target>
<actual value="118,872.18">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of project-financed roads with safety audits
</narrative></title>
<baseline year="2021" iso-date="2021-04-23" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-04-23" />
<period-end iso-date="2026-10-30" />
<target value="10.00">
<comment><narrative>
The indicator measures the percentage of project financed roads that have road safety audits completed.
</narrative></comment>
</target>
<actual value="85.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Project beneficiaries with improved climate resilient road access to markets, schools and health facilities in selected districts in project-financed areas (gender disaggregated)
</narrative></title>
<baseline year="2021" iso-date="2021-08-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-11" />
<period-end iso-date="2026-10-30" />
<target value="323,614.00">

</target>
<actual value="878,980">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Project beneficiaries with improved climate resilient road access to markets, schools and health facilities in selected districts in project-financed areas (gender disaggregated)
</narrative></title>
<baseline year="2021" iso-date="2021-08-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-11" />
<period-end iso-date="2026-10-30" />
<target value="323,614.00">
<comment><narrative>
Data is provided for 18 districts. The end target is only for 3 districts and thus will be updated in the proposed restructuring. The gender disaggregated number for the actual is as follows: Male: 431,263, Female: 447,717

Measures the the number of beneficiaries with improved climate resilient road access to markets, schools and health facilities in a select few project-financed districts. End target is calculated based on the sample project beneficiaries in project-financed areas in Rathnapura, Matale and Anuradhapura districts who will benefit with improved climate resilient road access due to project interventions. Corresponding gender disaggregated numbers for the end target are as follows: Male - 158,614; Female - 165,000
</narrative></comment>
</target>
<actual value="878,980.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Average sales of agriculture products in the catchment area of collection points rehabilitated by the project
</narrative></title>
<baseline year="2022" iso-date="2022-11-18" value="To be assessed after restructuring is completed"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-18" />
<period-end iso-date="2026-10-30" />
<target value="To be determined based on baseline">
<comment><narrative>
This indicator will be revised / removed in the upcoming restructuring of the project.
</narrative></comment>
</target>
<actual value="To be assessed">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Average sales of agriculture products in the catchment area of collection points rehabilitated by the project
</narrative></title>
<baseline year="2022" iso-date="2022-11-18" value="To be assessed after restructuring is completed"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-18" />
<period-end iso-date="2026-10-30" />
<target value="To be determined based on baseline">
<comment><narrative>
Measures the increase in average value of sales of agriculture products resulting from improvements in quantity and quality of products through project interventions. The indicator would be measured for farmers and agribusiness organizations.
</narrative></comment>
</target>
<actual value="To be assessed">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
CERC implemented according to the emergency action plan
</narrative></title>
<baseline year="2022" iso-date="2022-05-09" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-09" />
<period-end iso-date="2023-11-09" />
<target value="Yes">
<comment><narrative>
The activities described in the Sri Lanka CERC Emergency Action Plan, were completed
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
CERC implemented according to the emergency action plan
</narrative></title>
<baseline year="2022" iso-date="2022-05-09" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-09" />
<period-end iso-date="2023-11-09" />
<target value="Yes">
<comment><narrative>
The activities described in the Sri Lanka CERC Emergency Action Plan, were completed
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of smallholder farmers with reduced travel time to output markets in selected districts in project-financed areas
</narrative></title>
<baseline year="2022" iso-date="2022-02-03" value="56,179"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-02-03" />
<period-end iso-date="2026-10-30" />
<target value="61,800">

</target>
<actual value="57,646">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of smallholder farmers with reduced travel time to output markets in selected districts in project-financed areas
</narrative></title>
<baseline year="2022" iso-date="2022-02-03" value="56,179"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-02-03" />
<period-end iso-date="2026-10-30" />
<target value="61,800">
<comment><narrative>
Measures the number of smallholder farmers with improved accessibility to output markets in select few project-financed districts. The baseline and target of this indicator is updated with this ISR. The baseline is calculated based on the number of smallholder farmers served by the roads improved in Ratnapura, Anuradhapura and Matale districts.
</narrative></comment>
</target>
<actual value="57,646">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of project-financed roads with safety audits
</narrative></title>
<baseline year="2021" iso-date="2021-04-23" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-04-23" />
<period-end iso-date="2026-10-30" />
<target value="10.00">
<comment><narrative>
The indicator measures the percentage of project financed roads that have road safety audits completed.
</narrative></comment>
</target>
<actual value="85.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of project-financed roads with safety audits
</narrative></title>
<baseline year="2021" iso-date="2021-04-23" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-04-23" />
<period-end iso-date="2026-10-30" />
<target value="10.00">
<comment><narrative>
The indicator measures the percentage of project financed roads that have road safety audits completed.
</narrative></comment>
</target>
<actual value="85.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with strengthened food and nutrition security
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Note that this indicator is yet to be assessed.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of beneficiaries satisfied with improved agro-logistics infrastructure (collection centers) in selected districts in project-financed areas (gender disaggregated)
</narrative></title>
<baseline year="2021" iso-date="2021-06-17" value="To be obtained via satisfaction surveys carried out prior to infrastructure rehabilitation"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-06-17" />
<period-end iso-date="2026-10-30" />
<target value="To be determined based on baseline">
<comment><narrative>
This indicator will be revised in the proposed restructuring. 


Measures the public feedback on the agro-logistic infrastructure improvements in select few project-financed districts.
</narrative></comment>
</target>
<actual value="To be obtained via satisfaction surveys carried out prior to infrastructure rehabilitation">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of school girls that have access to paved all weather roads to schools in selected districts in project-financed areas
</narrative></title>
<baseline year="2022" iso-date="2022-02-03" value="17,187"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-02-03" />
<period-end iso-date="2026-10-30" />
<target value="23,600">
<comment><narrative>
The actual estimate reported in this ISR is the number reported as of the implementation support mission October 2025. Data is provided for 9 districts. The end target is only for 3 districts and thus will be updated in the proposed restructuring. 


Measures the number of school girls benefited by improved access to schools through paved, all weather roads in select few project-financed districts. The baseline is calculated based on the number of school girls served by the roads improved in Ratnapura, Anuradhapura and Matale districts.
</narrative></comment>
</target>
<actual value="88,714">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Average sales of agriculture products in the catchment area of collection points rehabilitated by the project
</narrative></title>
<baseline year="2022" iso-date="2022-11-18" value="To be assessed after restructuring is completed"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-18" />
<period-end iso-date="2026-10-30" />
<target value="To be determined based on baseline">
<comment><narrative>
Measures the increase in average value of sales of agriculture products resulting from improvements in quantity and quality of products through project interventions. The indicator would be measured for farmers and agribusiness organizations.
</narrative></comment>
</target>
<actual value="To be assessed">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of beneficiaries satisfied with improved roads in selected districts in project-financed areas (gender disaggregated)
</narrative></title>
<baseline year="2021" iso-date="2021-08-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-11" />
<period-end iso-date="2026-10-30" />
<target value="50.00">
<comment><narrative>
The actual estimate reported in this ISR is the number reported as of the implementation support mission October 2025.


Measures the public feedback on the road improvements in select few project-financed districts. The baseline is estimated as the percentage of population satisfied with the existing condition of the candidate roads in Rathnapura, Matale and Anuradhapura distrits based on a sample of 203 people surveyed by the RDA E&amp;amp;S division. Surveys and community consultations for this has been restricted due to prevalence of COVID-19. End target is estimated based on the baseline and will be verified through a satisfaction survey carried out at the end of road rehabilitations.&amp;nbsp;
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of women that have access to paved all weather roads in selected districts in project-financed areas
</narrative></title>
<baseline year="2021" iso-date="2021-08-11" value="262,554.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-11" />
<period-end iso-date="2026-10-30" />
<target value="427,554.00">
<comment><narrative>
This indicator will be removed in the upcoming project restructuring as gender disaggregated data is captured in the PDO indicator. 

Measures the women's improved accessibility to paved, all weather roads in select few project-financed districts. Baseline estimate is calculated as existing female population in Rathnapura, Matale and Anuradhapura districts who already have access to paved, alleather roads. End target is calculated by adding the incremental number of female beneficiaries who will have access to improved roads under this project to the baseline estimate.
</narrative></comment>
</target>
<actual value="262,554.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of main cash transfer programs (Elderly, Disabled, CKD, Samurdhi) and their wait list, including top-ups
</narrative></title>
<baseline year="2022" iso-date="2022-05-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-09" />
<period-end iso-date="2023-11-09" />
<target value="3,000,000.00">
<comment><narrative>
Direct beneficiaries
</narrative></comment>
</target>
<actual value="3,090,000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
An institutional framework for road management developed
</narrative></title>
<baseline year="2021" iso-date="2021-06-07" value="No institutional framework for road management in place"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-06-07" />
<period-end iso-date="2026-10-30" />
<target value="An institutional framework for road management developed">
<comment><narrative>
This indicator will be revised in the proposed restructuring.

Measures steps taken to improve road management practices in the country's road sector
</narrative></comment>
</target>
<actual value="No institutional framework for road management in place">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Project beneficiaries with improved climate resilient road access to markets, schools and health facilities in selected districts in project-financed areas (gender disaggregated)
</narrative></title>
<baseline year="2021" iso-date="2021-08-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-11" />
<period-end iso-date="2026-10-30" />
<target value="323,614.00">
<comment><narrative>
Data is provided for 18 districts. The end target is only for 3 districts and thus will be updated in the proposed restructuring. The gender disaggregated number for the actual is as follows: Male: 431,263, Female: 447,717

Measures the the number of beneficiaries with improved climate resilient road access to markets, schools and health facilities in a select few project-financed districts. End target is calculated based on the sample project beneficiaries in project-financed areas in Rathnapura, Matale and Anuradhapura districts who will benefit with improved climate resilient road access due to project interventions. Corresponding gender disaggregated numbers for the end target are as follows: Male - 158,614; Female - 165,000
</narrative></comment>
</target>
<actual value="878,980.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Project beneficiaries with improved climate resilient road access to markets, schools and health facilities in selected districts in project-financed areas (gender disaggregated)
</narrative></title>
<baseline year="2021" iso-date="2021-08-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-11" />
<period-end iso-date="2026-10-30" />
<target value="323,614.00">

</target>
<actual value="878,980">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Project beneficiaries with improved climate resilient road access to markets, schools and health facilities in selected districts in project-financed areas (gender disaggregated)
</narrative></title>
<baseline year="2021" iso-date="2021-08-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-08-11" />
<period-end iso-date="2026-10-30" />
<target value="323,614.00">
<comment><narrative>
Data is provided for 18 districts. The end target is only for 3 districts and thus will be updated in the proposed restructuring. The gender disaggregated number for the actual is as follows: Male: 431,263, Female: 447,717

Measures the the number of beneficiaries with improved climate resilient road access to markets, schools and health facilities in a select few project-financed districts. End target is calculated based on the sample project beneficiaries in project-financed areas in Rathnapura, Matale and Anuradhapura districts who will benefit with improved climate resilient road access due to project interventions. Corresponding gender disaggregated numbers for the end target are as follows: Male - 158,614; Female - 165,000
</narrative></comment>
</target>
<actual value="878,980.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Average sales of agriculture products in the catchment area of collection points rehabilitated by the project
</narrative></title>
<baseline year="2022" iso-date="2022-11-18" value="To be assessed after restructuring is completed"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-18" />
<period-end iso-date="2026-10-30" />
<target value="To be determined based on baseline">
<comment><narrative>
This indicator will be revised / removed in the upcoming restructuring of the project.
</narrative></comment>
</target>
<actual value="To be assessed">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Average sales of agriculture products in the catchment area of collection points rehabilitated by the project
</narrative></title>
<baseline year="2022" iso-date="2022-11-18" value="To be assessed after restructuring is completed"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-18" />
<period-end iso-date="2026-10-30" />
<target value="To be determined based on baseline">
<comment><narrative>
Measures the increase in average value of sales of agriculture products resulting from improvements in quantity and quality of products through project interventions. The indicator would be measured for farmers and agribusiness organizations.
</narrative></comment>
</target>
<actual value="To be assessed">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
CERC implemented according to the emergency action plan
</narrative></title>
<baseline year="2022" iso-date="2022-05-09" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-09" />
<period-end iso-date="2023-11-09" />
<target value="Yes">
<comment><narrative>
The activities described in the Sri Lanka CERC Emergency Action Plan, were completed
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
CERC implemented according to the emergency action plan
</narrative></title>
<baseline year="2022" iso-date="2022-05-09" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-09" />
<period-end iso-date="2023-11-09" />
<target value="Yes">
<comment><narrative>
The activities described in the Sri Lanka CERC Emergency Action Plan, were completed
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of smallholder farmers with reduced travel time to output markets in selected districts in project-financed areas
</narrative></title>
<baseline year="2022" iso-date="2022-02-03" value="56,179"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-02-03" />
<period-end iso-date="2026-10-30" />
<target value="61,800">

</target>
<actual value="57,646">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of smallholder farmers with reduced travel time to output markets in selected districts in project-financed areas
</narrative></title>
<baseline year="2022" iso-date="2022-02-03" value="56,179"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-02-03" />
<period-end iso-date="2026-10-30" />
<target value="61,800">
<comment><narrative>
Measures the number of smallholder farmers with improved accessibility to output markets in select few project-financed districts. The baseline and target of this indicator is updated with this ISR. The baseline is calculated based on the number of smallholder farmers served by the roads improved in Ratnapura, Anuradhapura and Matale districts.
</narrative></comment>
</target>
<actual value="57,646">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of project-financed roads with safety audits
</narrative></title>
<baseline year="2021" iso-date="2021-04-23" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-04-23" />
<period-end iso-date="2026-10-30" />
<target value="10.00">
<comment><narrative>
The indicator measures the percentage of project financed roads that have road safety audits completed.
</narrative></comment>
</target>
<actual value="85.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of project-financed roads with safety audits
</narrative></title>
<baseline year="2021" iso-date="2021-04-23" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-04-23" />
<period-end iso-date="2026-10-30" />
<target value="10.00">
<comment><narrative>
The indicator measures the percentage of project financed roads that have road safety audits completed.
</narrative></comment>
</target>
<actual value="85.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
CERC implemented according to the emergency action plan
</narrative></title>
<baseline year="2022" iso-date="2022-05-09" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-09" />
<period-end iso-date="2023-11-09" />
<target value="Yes">
<comment><narrative>
The activities described in the Sri Lanka CERC Emergency Action Plan, were completed
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-11-20T15:47:22" hierarchy="1"><iati-identifier>44000-P178973</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Social Protection Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0054873"><narrative>Democratic Socialist Republic of Sri Lanka</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0054873"><narrative>Democratic Socialist Republic of Sri Lanka</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0054873"><narrative>Democratic Socialist Republic of Sri Lanka</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="LK-COA-0054794"><narrative>Ministry of Finance, Economic Stabilization &amp; National Policies</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2022-09-22"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2023-06-28"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2027-09-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="2" iso-date="2027-09-30"><narrative>Projected end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Dalal Hasan S Moosa</narrative></person-name><telephone>+1-202-473-1000</telephone><email>dmoosa@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>










<recipient-country code="LK" percentage="100"><narrative xml:lang="en">SRI LANKA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001227603" />
            <name><narrative>Democratic Socialist Republic of Sri Lanka</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.75 80.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="16011" percentage="87" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="13" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="96.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SG" percentage="4.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000521" percentage="100" xml:lang="en"><narrative>Social Safety Nets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="8" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000524" percentage="97" xml:lang="en"><narrative>Disability</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000441" percentage="97" xml:lang="en"><narrative>Data production, accessibility and use</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="8" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000512" percentage="8" xml:lang="en"><narrative>Other Excluded Groups</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000322" percentage="97" xml:lang="en"><narrative>Payment &amp; markets infrastructure</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="8" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000751" percentage="97" xml:lang="en"><narrative>Disaster Response and Recovery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="0" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="97" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000052" percentage="100" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000512" percentage="8" xml:lang="en"><narrative>Other Excluded Groups</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">9090909.09</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">9090909.09</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">9090909.09</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">9090909.09</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">9090909.09</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">9090909.09</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">9090909.09</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">9090909.09</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">9090909.09</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">9090909.09</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">9090909.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">4666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">4666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">4666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">4666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">4666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">4666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">4666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">4666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">4666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">4666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">4666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">4666666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">3000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">3000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">3000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">3000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">3000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">3000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">3000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">3000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">3000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">3000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">3000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">3000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">583333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">166666.65</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">34197434.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">34197434.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">200000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-54794"><narrative>Ministry of Finance, Economic Stabilization &amp; National Policies; Ministry of Women, Child Affairs and Social Empowerment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">500000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-54794"><narrative>Ministry of Finance, Economic Stabilization &amp; National Policies; Ministry of Women, Child Affairs and Social Empowerment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">14026302</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-54794"><narrative>Ministry of Finance, Economic Stabilization &amp; National Policies; Ministry of Women, Child Affairs and Social Empowerment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">10320932</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-54794"><narrative>Ministry of Finance, Economic Stabilization &amp; National Policies; Ministry of Women, Child Affairs and Social Empowerment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">11210349</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-54794"><narrative>Ministry of Finance, Economic Stabilization &amp; National Policies; Ministry of Women, Child Affairs and Social Empowerment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">5264654</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-54794"><narrative>Ministry of Finance, Economic Stabilization &amp; National Policies; Ministry of Women, Child Affairs and Social Empowerment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">13794284</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-54794"><narrative>Ministry of Finance, Economic Stabilization &amp; National Policies; Ministry of Women, Child Affairs and Social Empowerment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">68106</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-54794"><narrative>Ministry of Finance, Economic Stabilization &amp; National Policies; Ministry of Women, Child Affairs and Social Empowerment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">12361993</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-54794"><narrative>Ministry of Finance, Economic Stabilization &amp; National Policies; Ministry of Women, Child Affairs and Social Empowerment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">14647939</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-54794"><narrative>Ministry of Finance, Economic Stabilization &amp; National Policies; Ministry of Women, Child Affairs and Social Empowerment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">600000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-54794"><narrative>Ministry of Finance, Economic Stabilization &amp; National Policies; Ministry of Women, Child Affairs and Social Empowerment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">7895764</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-54794"><narrative>Ministry of Finance, Economic Stabilization &amp; National Policies; Ministry of Women, Child Affairs and Social Empowerment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">15199949</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-54794"><narrative>Ministry of Finance, Economic Stabilization &amp; National Policies; Ministry of Women, Child Affairs and Social Empowerment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">7074772</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-54794"><narrative>Ministry of Finance, Economic Stabilization &amp; National Policies; Ministry of Women, Child Affairs and Social Empowerment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">7115889</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-54794"><narrative>Ministry of Finance, Economic Stabilization &amp; National Policies; Ministry of Women, Child Affairs and Social Empowerment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">14173761</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-54794"><narrative>Ministry of Finance, Economic Stabilization &amp; National Policies; Ministry of Women, Child Affairs and Social Empowerment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">9943013</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-54794"><narrative>Ministry of Finance, Economic Stabilization &amp; National Policies; Ministry of Women, Child Affairs and Social Empowerment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">11125100</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-54794"><narrative>Ministry of Finance, Economic Stabilization &amp; National Policies; Ministry of Women, Child Affairs and Social Empowerment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">5385068</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-54794"><narrative>Ministry of Finance, Economic Stabilization &amp; National Policies; Ministry of Women, Child Affairs and Social Empowerment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">2619349</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-54794"><narrative>Ministry of Finance, Economic Stabilization &amp; National Policies; Ministry of Women, Child Affairs and Social Empowerment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">2475343</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-54794"><narrative>Ministry of Finance, Economic Stabilization &amp; National Policies; Ministry of Women, Child Affairs and Social Empowerment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-264223</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-54794"><narrative>Ministry of Finance, Economic Stabilization &amp; National Policies; Ministry of Women, Child Affairs and Social Empowerment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-625294</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-54794"><narrative>Ministry of Finance, Economic Stabilization &amp; National Policies; Ministry of Women, Child Affairs and Social Empowerment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-1131356</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-54794"><narrative>Ministry of Finance, Economic Stabilization &amp; National Policies; Ministry of Women, Child Affairs and Social Empowerment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-1485772</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-54794"><narrative>Ministry of Finance, Economic Stabilization &amp; National Policies; Ministry of Women, Child Affairs and Social Empowerment</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P178973"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P178973?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P178973"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of enumerated households in WBIS
</narrative></title>
<baseline year="2023" iso-date="2023-05-31" value="3,250,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-05-31" />
<period-end iso-date="2027-09-30" />
<target value="4,000,000.00">
<comment><narrative>
Comment: Achieved. approximately 18 percent have submitted female as the head of the household
. 
Definition; Number of households enumerated and populated in the WBIS.
</narrative></comment>
</target>
<actual value="4,103,094">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of the economic inclusion pilot
</narrative></title>
<baseline year="2023" iso-date="2023-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-05-31" />
<period-end iso-date="2027-09-30" />
<target value="5,800.00">
<comment><narrative>
Number of beneficiaries receiving training, coaching, asset transfers or economic inclusion grants.
</narrative></comment>
</target>
<actual value="4557">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances addressed within a stipulated standard
</narrative></title>
<baseline year="2023" iso-date="2023-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-05-31" />
<period-end iso-date="2027-09-30" />
<target value="90.00">
<comment><narrative>
Numerator: Total number of grievances cases from the WBPS addressed in accordance  to established protocol.  
Denominator: Total number of grievances cases received from the WBPS.  
Stipulated service standards and protocols for response times will be outlined in WBB GRM Manual.
</narrative></comment>
</target>
<actual value="80">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Climate and disaster management mechanism linked to the WBIS for targeted emergency support
</narrative></title>
<baseline year="2023" iso-date="2023-05-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-05-31" />
<period-end iso-date="2027-09-30" />
<target value="Yes">
<comment><narrative>
Progress: Discussions with other ministries on protocols for exchanges of information still ongoing. 
Definition: DRM database linked to the WBIS with GPS of the location of households, enabling targeting of households affected during disasters.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of enumerated households in WBIS
</narrative></title>
<baseline year="2023" iso-date="2023-05-31" value="3,250,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-05-31" />
<period-end iso-date="2027-09-30" />
<target value="4,000,000.00">
<comment><narrative>
Progress: With the re-opening of the program for a second round of registration at the end of 2024, over 800,000 new families were enumerated this year. This indicator has surpassed the final target. 
Definition; Number of households enumerated and populated in the WBIS.
</narrative></comment>
</target>
<actual value="4103094">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Climate and disaster management mechanism linked to the WBIS for targeted emergency support
</narrative></title>
<baseline year="2023" iso-date="2023-05-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-05-31" />
<period-end iso-date="2027-09-30" />
<target value="Yes">
<comment><narrative>
Comment: Expected by April 2026. The system linkage to DRM system is expected to be completed by end April 2026.

Definition/Description: 
DRM database linked to the WBIS with GPS of the location of households, enabling targeting of households affected during disasters.
</narrative></comment>
</target>
<actual value="No but expected soon">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of WBPS beneficiaries from the poorest 20 percent of population
</narrative></title>
<baseline year="2023" iso-date="2023-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-05-31" />
<period-end iso-date="2027-09-30" />
<target value="60.00">
<comment><narrative>
Comment: This indicator now reported using BRIGHT survey 2025-2025 and reporting only Aswesuma WBPS. As the HIES data will be released in December 2026, the coverage of overall WBPS will be reported. 

Definition: 
Numerator: Number of  households in the bottom 20 percent of households expenditure distribution receiving WBPS.  
Denominator: Total number of households in bottom 20 percent of the household distribution.
</narrative></comment>
</target>
<actual value="48.2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances addressed within a stipulated standard
</narrative></title>
<baseline year="2023" iso-date="2023-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-05-31" />
<period-end iso-date="2027-09-30" />
<target value="90.00">
<comment><narrative>
Achieved
Definition/Description: 
Numerator: Total number of grievances cases from the WBPS addressed in accordance to established protocol. 
Denominator: Total number of grievances cases received from the WBPS. 
Stipulated service standards and protocols for response times will be outlined in WBB GRM Manual.
</narrative></comment>
</target>
<actual value="93">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Top up transfers provided to families with Persons with Disabilities and CKDU patients
</narrative></title>
<baseline year="2023" iso-date="2023-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-05-31" />
<period-end iso-date="2027-09-30" />
<target value="50,000.00">
<comment><narrative>
Comment: 
Delayed. MRDSSCE to include all Persons with Disabilities and CKDU to be included in the IWMS by June 2026. Progress on this indicator has been significantly delayed and is still pending reporting progress. 
Definition/Description: 
Number of people with disabilities and CKDU patients receiving top-up transfers.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Top up transfers provided to families with Persons with Disabilities and CKDU patients
</narrative></title>
<baseline year="2023" iso-date="2023-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-05-31" />
<period-end iso-date="2027-09-30" />
<target value="50,000.00">
<comment><narrative>
Progress: This payment is still not being processed as the information system and validation of documents not yet completed.

Definition: Number of persons with disabilities and CKDU patients receiving top-up transfers.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries with periodically updated socio-economic survey information reported in the WBIS
</narrative></title>
<baseline year="2023" iso-date="2023-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-05-31" />
<period-end iso-date="2027-09-30" />
<target value="95.00">
<comment><narrative>
Comment: Delayed. Re-enumeration is in progress. The data update is expected to be completed by April, 2026 although the proposed date given limited progress seems very ambitious. 

Definition/Description: 
Numerator: Number of beneficiaries of the WBPS with updated information and recertified using the WBIS. 
Denominator: Total number of households beneficiaries of the WBPS
</narrative></comment>
</target>
<actual value="8">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with strengthened food and nutrition security
</narrative></title>
<baseline year="2023" iso-date="2023-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-05-13" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of social safety net programs
</narrative></title>
<baseline year="2023" iso-date="2023-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-05-31" />
<period-end iso-date="2027-09-30" />
<target value="7400000.00">
<comment><narrative>
Based on the Parliament approved amendment to the payment scheme, Aswesuma payments for the transitional group discontinued at the end of April. Therefore, there is a reduction in number of families supported. The second stage of Aswesuma family payments commenced in September 2025.
</narrative></comment>
</target>
<actual value="4378172">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Shock responsive system to identify and target poor and vulnerable households
</narrative></title>
<baseline year="2023" iso-date="2023-05-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-05-31" />
<period-end iso-date="2027-09-30" />
<target value="Yes">
<comment><narrative>
Comment: WBB has drafted a Memorandum of Understanding to share selected household data with the DRM system that commenced updating in March 2026. WBIS is designed to share data with the DRM information system. Any WBIS data update and management would be designed to respond to any future shocks including climate shocks.

Definition: WBIS is designed to share data with the information system. Any WBIS data update and management would be designed to respond to any future shocks including climate shocks.
</narrative></comment>
</target>
<actual value="On track">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of consumption that CT comprise for the poorest 20 percent of beneficiaries
</narrative></title>
<baseline year="2023" iso-date="2023-05-31" value="12.70"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-05-31" />
<period-end iso-date="2027-09-30" />
<target value="40.00">
<comment><narrative>
Comment: BRIGHT survey 2024 shows improvements versus Samurdhi program.

Definition/Description: 
Denominator: Monthly consumption expenditure for the poorest 20 percent of CT beneficiaries. 
Numerator: Monthly CT amount for the poorest 20 percent of CT beneficiaries
</narrative></comment>
</target>
<actual value="19">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of beneficiaries satisfied with the regularity and timeliness of the benefit payments
</narrative></title>
<baseline year="2023" iso-date="2023-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-05-31" />
<period-end iso-date="2027-09-30" />
<target value="75.00">
<comment><narrative>
Comment:  Based on a study conducted by the WBB staff, in selected districts reported at 88 percent. In order to report a nationally representative survey will need to be conducted.  

Definition/Description: 
Numerator: Number of beneficiaries that report they are satisfied with the regularity and timeliness of the CT. 
Denominator: Total number of SSN CT beneficiaries responding to the satisfaction survey.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of consumption that CT comprise for the poorest 20 percent of beneficiaries
</narrative></title>
<baseline year="2023" iso-date="2023-05-31" value="12.70"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-05-31" />
<period-end iso-date="2027-09-30" />
<target value="40.00">
<comment><narrative>
Progress on this indicator will be reported once nationally representative surveys data become available. 
Definition: Denominator: Monthly consumption expenditure for the poorest 20 percent of CT beneficiaries.  
Numerator: Monthly CT amount for the poorest 20 percent of CT beneficiaries.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of WBPS beneficiaries from the poorest 20 percent of population
</narrative></title>
<baseline year="2023" iso-date="2023-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-05-31" />
<period-end iso-date="2027-09-30" />
<target value="60.00">
<comment><narrative>
Progress: This indicator will only be reported once a national representative survey with consumption module completed and data available. Expected to report progress before the end of the year. 

Definition: 
Numerator: Number of  households in the bottom 20 percent of households expenditure distribution receiving WBPS.  
Denominator: Total number of households in bottom 20 percent of the household distribution.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Shock responsive system to identify and target poor and vulnerable households
</narrative></title>
<baseline year="2023" iso-date="2023-05-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-05-31" />
<period-end iso-date="2027-09-30" />
<target value="Yes">
<comment><narrative>
Progress: Interoperability between social registry and information systems of the ministry / institutions in charge of disaster and weather are still under discussion.

Definition: WBIS is designed to share data with the information system. Any WBIS data update and management would be designed to respond to any future shocks including climate shocks.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of the economic inclusion pilot
</narrative></title>
<baseline year="2023" iso-date="2023-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-05-31" />
<period-end iso-date="2027-09-30" />
<target value="5,800.00">
<comment><narrative>
Comment: On-track. The first phase selected participants have received training to complete the Family Development Plan, and 1,861 has received economic inclusion grant. The second phase of beneficiary selection and subsequent interventions will help to achieve this target.

Definition/Description: 
Number of beneficiaries receiving expressed interest and engaged in  training, coaching, asset transfers or economic inclusion grants.
</narrative></comment>
</target>
<actual value="4,651">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of WBPS beneficiaries from the poorest 20 percent of population
</narrative></title>
<baseline year="2023" iso-date="2023-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-05-31" />
<period-end iso-date="2027-09-30" />
<target value="60.00">
<comment><narrative>
Comment: This indicator now reported using BRIGHT survey 2025-2025 and reporting only Aswesuma WBPS. As the HIES data will be released in December 2026, the coverage of overall WBPS will be reported. 

Definition: 
Numerator: Number of  households in the bottom 20 percent of households expenditure distribution receiving WBPS.  
Denominator: Total number of households in bottom 20 percent of the household distribution.
</narrative></comment>
</target>
<actual value="48.2">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of WBPS beneficiaries from the poorest 20 percent of population
</narrative></title>
<baseline year="2023" iso-date="2023-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-05-31" />
<period-end iso-date="2027-09-30" />
<target value="60.00">
<comment><narrative>
Progress: This indicator will only be reported once a national representative survey with consumption module completed and data available. Expected to report progress before the end of the year. 

Definition: 
Numerator: Number of  households in the bottom 20 percent of households expenditure distribution receiving WBPS.  
Denominator: Total number of households in bottom 20 percent of the household distribution.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries of economic inclusion interventions whose business remains viable
</narrative></title>
<baseline year="2023" iso-date="2023-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-05-31" />
<period-end iso-date="2027-09-30" />
<target value="65.00">
<comment><narrative>
Progress: Pilot commenced implementation but not yet into full implementation to report on this indicator. 

Definition: 
Numerator: Number of beneficiaries actively generating income or who remain self-employed 6 months after the program completion. 
Denominator: Total economic inclusion program beneficiaries.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Shock responsive system to identify and target poor and vulnerable households
</narrative></title>
<baseline year="2023" iso-date="2023-05-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-05-31" />
<period-end iso-date="2027-09-30" />
<target value="Yes">
<comment><narrative>
Comment: WBB has drafted a Memorandum of Understanding to share selected household data with the DRM system that commenced updating in March 2026. WBIS is designed to share data with the DRM information system. Any WBIS data update and management would be designed to respond to any future shocks including climate shocks.

Definition: WBIS is designed to share data with the information system. Any WBIS data update and management would be designed to respond to any future shocks including climate shocks.
</narrative></comment>
</target>
<actual value="On track">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Shock responsive system to identify and target poor and vulnerable households
</narrative></title>
<baseline year="2023" iso-date="2023-05-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-05-31" />
<period-end iso-date="2027-09-30" />
<target value="Yes">
<comment><narrative>
Progress: Interoperability between social registry and information systems of the ministry / institutions in charge of disaster and weather are still under discussion.

Definition: WBIS is designed to share data with the information system. Any WBIS data update and management would be designed to respond to any future shocks including climate shocks.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries of economic inclusion interventions whose business remains viable
</narrative></title>
<baseline year="2023" iso-date="2023-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-05-31" />
<period-end iso-date="2027-09-30" />
<target value="65.00">
<comment><narrative>
This will be measured starting from Sept/October 2026 for 4,200 beneficiaries and for remaining by March/April 2027.

Definition/Description:
Numerator: Number of beneficiaries actively generating income or who remain self-employed 6 months after the program completion. 
Denominator: Total economic inclusion program beneficiaries.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of social safety net programs
</narrative></title>
<baseline year="2023" iso-date="2023-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-05-31" />
<period-end iso-date="2027-09-30" />
<target value="7400000.00">
<comment><narrative>
. Comment: Achieved. Cumulative number of Aswesuma beneficiaries (first phase of all four categories in April, second phase of Aswesuma cash transfers, and elderly allowance recipients).  The average family size in the first and second phase is 3.06.
Definition/Description:  Number of beneficiary households multiplied by the average family size of (HIES 2019) 3.7 as reported in the WBIS. The total number of WBPS beneficiaries could also include the number of top ups for older persons, persons with disabilities and CKDU patients.
</narrative></comment>
</target>
<actual value="7,532,639">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of beneficiaries satisfied with the regularity and timeliness of the benefit payments
</narrative></title>
<baseline year="2023" iso-date="2023-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-05-31" />
<period-end iso-date="2027-09-30" />
<target value="75.00">
<comment><narrative>
The research is in the planning stage.

Numerator: Number of beneficiaries that report they are satisfied with the regularity and timeliness of the CT. 
Denominator: Total number of SSN CT beneficiaries responding to the satisfaction survey.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries of economic inclusion interventions whose business remains viable
</narrative></title>
<baseline year="2023" iso-date="2023-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-05-31" />
<period-end iso-date="2027-09-30" />
<target value="65.00">
<comment><narrative>
This will be measured starting from Sept/October 2026 for 4,200 beneficiaries and for remaining by March/April 2027.

Definition/Description:
Numerator: Number of beneficiaries actively generating income or who remain self-employed 6 months after the program completion. 
Denominator: Total economic inclusion program beneficiaries.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries of economic inclusion interventions whose business remains viable
</narrative></title>
<baseline year="2023" iso-date="2023-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-05-31" />
<period-end iso-date="2027-09-30" />
<target value="65.00">
<comment><narrative>
Progress: Pilot commenced implementation but not yet into full implementation to report on this indicator. 

Definition: 
Numerator: Number of beneficiaries actively generating income or who remain self-employed 6 months after the program completion. 
Denominator: Total economic inclusion program beneficiaries.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries with periodically updated socio-economic survey information reported in the WBIS
</narrative></title>
<baseline year="2023" iso-date="2023-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-05-31" />
<period-end iso-date="2027-09-30" />
<target value="95.00">
<comment><narrative>
Recertification  delayed and expected to be completed by May 2026.
Definition indicator: Numerator: Number of beneficiaries of the WBPS with updated information and recertified using the WBIS. 
Denominator: Total number of households beneficiaries of the WBPS.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries of economic inclusion interventions whose business remains viable
</narrative></title>
<baseline year="2023" iso-date="2023-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-05-31" />
<period-end iso-date="2027-09-30" />
<target value="65.00">
<comment><narrative>
This will be measured starting from Sept/October 2026 for 4,200 beneficiaries and for remaining by March/April 2027.

Definition/Description:
Numerator: Number of beneficiaries actively generating income or who remain self-employed 6 months after the program completion. 
Denominator: Total economic inclusion program beneficiaries.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries of economic inclusion interventions whose business remains viable
</narrative></title>
<baseline year="2023" iso-date="2023-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-05-31" />
<period-end iso-date="2027-09-30" />
<target value="65.00">
<comment><narrative>
Progress: Pilot commenced implementation but not yet into full implementation to report on this indicator. 

Definition: 
Numerator: Number of beneficiaries actively generating income or who remain self-employed 6 months after the program completion. 
Denominator: Total economic inclusion program beneficiaries.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Shock responsive system to identify and target poor and vulnerable households
</narrative></title>
<baseline year="2023" iso-date="2023-05-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-05-31" />
<period-end iso-date="2027-09-30" />
<target value="Yes">
<comment><narrative>
Comment: WBB has drafted a Memorandum of Understanding to share selected household data with the DRM system that commenced updating in March 2026. WBIS is designed to share data with the DRM information system. Any WBIS data update and management would be designed to respond to any future shocks including climate shocks.

Definition: WBIS is designed to share data with the information system. Any WBIS data update and management would be designed to respond to any future shocks including climate shocks.
</narrative></comment>
</target>
<actual value="On track">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Shock responsive system to identify and target poor and vulnerable households
</narrative></title>
<baseline year="2023" iso-date="2023-05-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-05-31" />
<period-end iso-date="2027-09-30" />
<target value="Yes">
<comment><narrative>
Progress: Interoperability between social registry and information systems of the ministry / institutions in charge of disaster and weather are still under discussion.

Definition: WBIS is designed to share data with the information system. Any WBIS data update and management would be designed to respond to any future shocks including climate shocks.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of WBPS beneficiaries from the poorest 20 percent of population
</narrative></title>
<baseline year="2023" iso-date="2023-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-05-31" />
<period-end iso-date="2027-09-30" />
<target value="60.00">
<comment><narrative>
Comment: This indicator now reported using BRIGHT survey 2025-2025 and reporting only Aswesuma WBPS. As the HIES data will be released in December 2026, the coverage of overall WBPS will be reported. 

Definition: 
Numerator: Number of  households in the bottom 20 percent of households expenditure distribution receiving WBPS.  
Denominator: Total number of households in bottom 20 percent of the household distribution.
</narrative></comment>
</target>
<actual value="48.2">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of WBPS beneficiaries from the poorest 20 percent of population
</narrative></title>
<baseline year="2023" iso-date="2023-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-05-31" />
<period-end iso-date="2027-09-30" />
<target value="60.00">
<comment><narrative>
Progress: This indicator will only be reported once a national representative survey with consumption module completed and data available. Expected to report progress before the end of the year. 

Definition: 
Numerator: Number of  households in the bottom 20 percent of households expenditure distribution receiving WBPS.  
Denominator: Total number of households in bottom 20 percent of the household distribution.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with strengthened food and nutrition security
</narrative></title>
<baseline year="2023" iso-date="2023-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-05-13" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Comment: This indicator was added as corporate indicator after board approval and therefore no specific target set as not agreed with the client during negotiations. In order to measure this indicator will need to use a national representative survey. While awaiting that HIES 2025 data become available we are reporting results from BRIGHT survey. The cash transfer supports strengthened food security primarily through improved economic capacity to access, measured through the prevalence of food insecurity.
[Source: Staff calculations based on BRIGHT, based on the Food Insecurity Experience Scale (FIES), defined as households who receive Aswesuma cash transfers and do not experience either moderate or high food insecurity]
</narrative></comment>
</target>
<actual value="441,8621">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-11-20T15:47:22" hierarchy="1"><iati-identifier>44000-P179808</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Sri Lanka RESET DPO</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0053945"><narrative>DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0053945"><narrative>DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="LK-COA-0053944"><narrative>Ministry of Finance, Economic Stabilization and National Policies</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2023-05-31"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2023-06-28"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2024-10-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2024-10-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Richard Walker</narrative></person-name><telephone>+1-202-473-1000</telephone><email>rwalker3@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>







<recipient-country code="LK" percentage="100"><narrative xml:lang="en">SRI LANKA</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="1248991" />
                <name><narrative>Colombo</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>6.93548 79.848679</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="24010" percentage="28" xml:lang="en"/><sector vocabulary="1" code="15155" percentage="25" xml:lang="en"/><sector vocabulary="1" code="33110" percentage="14" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="14" xml:lang="en"/><sector vocabulary="1" code="15129" percentage="14" xml:lang="en"/><sector vocabulary="1" code="15119" percentage="4" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="1" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="14.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YY" percentage="14.0000000" xml:lang="en"><narrative>FY17 - Trade</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="29.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="14.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="FA" percentage="29.0000000" xml:lang="en"><narrative>FY17 - Banking Institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000321" percentage="14" xml:lang="en"><narrative>Credit Infrastructure</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="29" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="14" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="14" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="29" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000751" percentage="14" xml:lang="en"><narrative>Disaster Response and Recovery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000436" percentage="14" xml:lang="en"><narrative>State-owned Enterprise Reform and Privatization</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000413" percentage="14" xml:lang="en"><narrative>Debt Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000752" percentage="14" xml:lang="en"><narrative>Disaster Risk Reduction</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="14" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000143" percentage="14" xml:lang="en"><narrative>Trade Policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000521" percentage="14" xml:lang="en"><narrative>Social Safety Nets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000412" percentage="29" xml:lang="en"><narrative>Domestic Revenue Administration</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">500000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">500000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">4375616.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">4375616.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">500000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-55544"><narrative>Central Bank of Sri Lanka; Ministry of Finance, Economic Stabilization and National Policies</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">247568128</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-55544"><narrative>Central Bank of Sri Lanka; Ministry of Finance, Economic Stabilization and National Policies</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">248056256</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-55544"><narrative>Central Bank of Sri Lanka; Ministry of Finance, Economic Stabilization and National Policies</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P179808"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P179808?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P179808"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Total revenue-to-GDP (percent)
</narrative></title>
<baseline year="2022" iso-date="2022-12-11" value="8.3"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-11" />
<period-end iso-date="2025-12-11" />
<target value="13.3">
<comment><narrative>
On-track
</narrative></comment>
</target>
<actual value="11.1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Use of electronic filing facilities for non-corporate tax declarations (percent)
</narrative></title>
<baseline year="2021" iso-date="2021-12-11" value="23"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-11" />
<period-end iso-date="2025-12-11" />
<target value="70">
<comment><narrative>
Actuals were not available at the time of ISR preparation.
</narrative></comment>
</target>
<actual value="TBD">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Coverage of the poorest 20 percent by cash transfer programs (percent)
</narrative></title>
<baseline year="2022" iso-date="2022-12-13" value="43"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-13" />
<period-end iso-date="2025-12-13" />
<target value="60">
<comment><narrative>
Data still being collected
</narrative></comment>
</target>
<actual value="TBD">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Coverage of female headed household by the new WBPS (percent)
</narrative></title>
<baseline year="2022" iso-date="2022-12-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-13" />
<period-end iso-date="2025-12-13" />
<target value="20">
<comment><narrative>
On-track
</narrative></comment>
</target>
<actual value="14">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private investment in broadband networks facilitated (US$ million)
</narrative></title>
<baseline year="2022" iso-date="2022-12-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-12" />
<period-end iso-date="2025-12-12" />
<target value="100">
<comment><narrative>
Reforms to start in DPO2
</narrative></comment>
</target>
<actual value="TBD">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Exposures to SOEs of total assets of the two largest SOBs (percent)
</narrative></title>
<baseline year="2022" iso-date="2022-06-11" value="22"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-11" />
<period-end iso-date="2025-12-11" />
<target value="10">
<comment><narrative>
Actuals were not available at the time of ISR preparation.
</narrative></comment>
</target>
<actual value="TBD">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Publication of consolidated annual debt report with comprehensive debt information on Central Government, guaranteed SOE, nonguaranteed non-financial SOEs, and CBSL debt with a time-lag smaller than 3
</narrative></title>
<baseline year="2022" iso-date="2022-12-11" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-11" />
<period-end iso-date="2025-12-11" />
<target value="Yes">
<comment><narrative>
The PDM Bill ensures the publication of a consolidated annual debt report, but the establishment of the Public Debt Management Office within MoF and making it fully operational is the critical pursued result under Prior Action 1. Also, a critical reform towards debt sustainability (to align with the new Corporate Scorecard). Thus, this indicator may be revised in the DPO2 Program Document.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of the new Welfare Benefits Payment Scheme (WBPS) (number of households per year)
</narrative></title>
<baseline year="2022" iso-date="2022-12-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-13" />
<period-end iso-date="2025-12-13" />
<target value="2000000">
<comment><narrative>
On-track
</narrative></comment>
</target>
<actual value="1820000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Exposures to SOEs of total assets of the entire banking sector (percent)
</narrative></title>
<baseline year="2022" iso-date="2022-06-11" value="8.8"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-11" />
<period-end iso-date="2025-12-11" />
<target value="5">
<comment><narrative>
On-track
</narrative></comment>
</target>
<actual value="3.8">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
SOEs for which divestment to private ownership is 51 percent and above (number)
</narrative></title>
<baseline year="2023" iso-date="2023-06-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-12" />
<period-end iso-date="2025-12-12" />
<target value="15">
<comment><narrative>
Prior Action 5 may be changed and the results indicator revised. Still being discussed with government.
</narrative></comment>
</target>
<actual value="TBD">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Trade (imports and exports) as a share of GDP (percent)
</narrative></title>
<baseline year="2021" iso-date="2021-12-12" value="41"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-12" />
<period-end iso-date="2025-12-12" />
<target value="46">
<comment><narrative>
On-track
</narrative></comment>
</target>
<actual value="42.8">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in revenue from income tax audits using third-party information data (LKR million)
</narrative></title>
<baseline year="2022" iso-date="2022-12-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-11" />
<period-end iso-date="2025-12-11" />
<target value="130">
<comment><narrative>
The tax audit cycle prevents the application of a centralized risk-based selection system before 2025 and, thus, the publication of the corresponding results will only be available in 2026. Therefore, the results will not materialize within the target period. This indicator will be dropped in the DPO2 Program Document.
</narrative></comment>
</target>
<actual value="TBD">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Publication of revised inspection checklist for labor compliance audits
</narrative></title>
<baseline year="2022" iso-date="2022-12-13" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-13" />
<period-end iso-date="2025-12-13" />
<target value="Yes">
<comment><narrative>
Related Prior Action will be strengthened and the results indicator revised in DPO2
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-11-20T15:47:22" hierarchy="1"><iati-identifier>44000-P180861</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Fin Sector Safety Net Strengthening</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0054912"><narrative>Democratic Socialist Republic of Sri Lanka</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="LK-COA-0054911"><narrative>Central Bank of Sri Lanka</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2023-11-09"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2023-11-09"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2027-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="2" iso-date="2027-12-31"><narrative>Projected end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Tatsiana Kliatskova</narrative></person-name><telephone>+1-202-473-1000</telephone><email>tkliatskova@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="LK" percentage="100"><narrative xml:lang="en">SRI LANKA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001227603" />
            <name><narrative>Democratic Socialist Republic of Sri Lanka</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.873054 80.771797</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="24030" percentage="100" xml:lang="en"/><sector vocabulary="1" code="24030" percentage="100" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="FP" percentage="50.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Financial Sector</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="FA" percentage="50.0000000" xml:lang="en"><narrative>FY17 - Banking Institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="98" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000123" percentage="98" xml:lang="en"><narrative>Macroeconomic Resilience</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000442" percentage="98" xml:lang="en"><narrative>Institutional strengthening and capacity building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000513" percentage="98" xml:lang="en"><narrative>Participation and Civic Engagement</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000026" percentage="3" xml:lang="en"><narrative>ICT</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000012" percentage="98" xml:lang="en"><narrative>Macro-financial policies</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">8124999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">8124999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">8124999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">8124999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">8124999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">8124999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">8124999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">8125007.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">5416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">5416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">5416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">5416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">5416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">5416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">5416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">5416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">5416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">5416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">5416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">5416677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">666677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">333344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">1333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">1333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">1333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">1333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">1333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">1333338.35</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">19494753.01</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">19494753.01</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">150000000</value><description xml:lang="en"><narrative>Total Commitment in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-54911"><narrative>Central Bank of Sri Lanka</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">70400000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-54911"><narrative>Central Bank of Sri Lanka</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">30000000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-54911"><narrative>Central Bank of Sri Lanka</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">-300000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-54911"><narrative>Central Bank of Sri Lanka</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">213247</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-54911"><narrative>Central Bank of Sri Lanka</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">30000000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-54911"><narrative>Central Bank of Sri Lanka</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">97000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-54911"><narrative>Central Bank of Sri Lanka</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">95000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-54911"><narrative>Central Bank of Sri Lanka</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-548258</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-54911"><narrative>Central Bank of Sri Lanka</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-936160</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-54911"><narrative>Central Bank of Sri Lanka</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-1073032</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-54911"><narrative>Central Bank of Sri Lanka</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-1398762</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-54911"><narrative>Central Bank of Sri Lanka</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P180861"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P180861?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P180861"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
MOU on fiscal backstop funding mechanism is in place
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2027-12-01" />
<target value="Yes">
<comment><narrative>
This indicator is aligned with PBC 2 which requires the signing of MoU between the CBSL and the MOF, laying the terms and procedures of fiscal backstop funding mechanism.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Directions requiring member institutions to post via different channels standardized information on their membership with the SLDIS and the amount of deposit insurance coverage in place
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2027-12-01" />
<target value="Yes">
<comment><narrative>
This indicator is aligned with PBC 5 which requires issue of directions requiring member institutions to publicly disclose their membership with the SLDIS and the availability of deposit insurance coverage.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Survey conducted measuring financial literacy and public awareness about deposit insurance
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2027-12-01" />
<target value="2.00">
<comment><narrative>
This indicator is aligned with PBCs 6 and 7 which require conducting public awareness surveys, based on the methodology acceptable to the WB, to measure public awareness about deposit insurance.
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Contingency plan for carrying out large/simultaneous payouts in place
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2027-12-01" />
<target value="Yes">
<comment><narrative>
This indicator is aligned with PBC 8 which requires approval of a contingency plan to carry out large/simultaneous payouts.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Enabling regulations for bank resolution adopted
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2027-12-01" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Gender gap with regards to use of financial institutions for savings (percentage points)
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="5 percentage points"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-12-01" />
<target value="2 percentage points">
<comment><narrative>
The indicator is defined as a difference in percentage of men and women using formal financial institutions for saving or setting aside any money. The data comes from WB's Findex survey.
</narrative></comment>
</target>
<actual value="5 pp">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
MOU on fiscal backstop funding mechanism is in place
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2027-12-01" />
<target value="Yes">
<comment><narrative>
This indicator is aligned with PBC 2 which requires the signing of MoU between the CBSL and the MOF, laying the terms and procedures of fiscal backstop funding mechanism.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Deposit insurance and bank resolution functions clearly assigned, adequately staffed, and have reporting lines to CBSL management separate from bank supervision
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2027-12-01" />
<target value="Yes">
<comment><narrative>
This indicator is aligned with PBC 1 which requires that deposit insurance and bank resolution functions are clearly assigned, adequately staffed, and have reporting lines to CBSL management separate from bank supervision.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
MOU on fiscal backstop funding mechanism is in place
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2027-12-01" />
<target value="Yes">
<comment><narrative>
This indicator is aligned with PBC 2 which requires the signing of MoU between the CBSL and the MOF, laying the terms and procedures of fiscal backstop funding mechanism.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Guidelines on the reimbursement of insured deposits and Guidelines for processing and validating depositor information approved
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2027-12-01" />
<target value="Yes">
<comment><narrative>
This indicator is aligned with PBC 9 which requires approval of guidelines on the reimbursement of insured deposits and of guidelines for processing and validating depositor information.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Enabling regulations for bank resolution adopted
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2027-12-01" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Guidelines on the reimbursement of insured deposits and Guidelines for processing and validating depositor information approved
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2027-12-01" />
<target value="Yes">
<comment><narrative>
This indicator is aligned with PBC 9 which requires approval of guidelines on the reimbursement of insured deposits and of guidelines for processing and validating depositor information.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Directions requiring member institutions to post via different channels standardized information on their membership with the SLDIS and the amount of deposit insurance coverage in place
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2027-12-01" />
<target value="Yes">
<comment><narrative>
This indicator is aligned with PBC 5 which requires issue of directions requiring member institutions to publicly disclose their membership with the SLDIS and the availability of deposit insurance coverage.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
New directions on premium methodology ensuring long-term sustainability in place
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2027-12-01" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Long-Term Public Awareness Strategy based on the results of the survey approved
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2027-12-01" />
<target value="Yes">
<comment><narrative>
This indicator is aligned with PBC 6 which requires approval of long-term Public Awareness Strategy based on the results of the survey.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Contingency plan for carrying out large/simultaneous payouts in place
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2027-12-01" />
<target value="Yes">
<comment><narrative>
This indicator is aligned with PBC 8 which requires approval of a contingency plan to carry out large/simultaneous payouts.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People and businesses using financial services
</narrative></title>
<baseline year="2021" iso-date="2021-12-15" value="15,187,200"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-15" />
<period-end iso-date="2027-12-15" />
<target value="15,481,000">
<comment><narrative>
The number for June 30, 2025 is based on the newly released Findex data that suggests a drop in use of financial services in SL, likely as a result of the crisis.
</narrative></comment>
</target>
<actual value="1,396,0000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances addressed by Grievance Redress mechanism, disaggregated by district
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2027-12-01" />
<target value="100.00">
<comment><narrative>
Indicator will track percentage of registered grievances that are addressed according to agreed procedures. This is the total number of grievance messages received through website and other facilities, which have been satisfactorily addressed and recorded. Since there were no complaints received so far, the number cannot be reported. The GRM systems is however in place and procedures for reporting complaints are established.
</narrative></comment>
</target>
<actual value="In place">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
New directions on premium methodology ensuring long-term sustainability and methodology for determining SLDIS target fund are in place
</narrative></title>
<baseline year="2023" iso-date="2023-06-14" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-14" />
<period-end iso-date="2027-12-14" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Time required to start reimbursement of deposits since deposits become unavailable for withdrawal as a result of failure of a member institution
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2027-12-01" />
<target value="&lt;45 days">
<comment><narrative>
The indicator measures the capacity of SLDIS and Sri Lanka's overall financial sector safety net to initiate the payout out procedure in the event of a bank/LFC failure. The indicator is defined as the number of days between the date deposits become unavailable for withdrawal and the start of the payout of insured deposits. It will be measured either through actual payouts or through a simulation exercise using methodology satisfactory to the WB.
</narrative></comment>
</target>
<actual value="82.1 days (average for 7 failed member institutions)">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Contingency plan for carrying out large/simultaneous payouts in place
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2027-12-01" />
<target value="Yes">
<comment><narrative>
This indicator is aligned with PBC 8 which requires approval of a contingency plan to carry out large/simultaneous payouts.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
CBSL conducts a payout simulation exercise, based on a methodology acceptable to the Association.
</narrative></title>
<baseline year="2023" iso-date="2023-06-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-01" />
<period-end iso-date="2027-12-01" />
<target value="Yes">
<comment><narrative>
This indicator is aligned with PBC 10 which requires conduct of a payout simulation exercise, based on a methodology acceptable to the Association.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Guidelines on the reimbursement of insured deposits and Guidelines for processing and validating depositor information approved
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2027-12-01" />
<target value="Yes">
<comment><narrative>
This indicator is aligned with PBC 9 which requires approval of guidelines on the reimbursement of insured deposits and of guidelines for processing and validating depositor information.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase in financial literacy and public awareness about the deposit insurance scheme (disaggregated by gender and urban / rural) (percent, from a baseline)
</narrative></title>
<baseline year="2023" iso-date="2023-12-31" value="To be established by baseline survey"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-31" />
<period-end iso-date="2027-12-01" />
<target value="at least 30% increase from baseline survey">
<comment><narrative>
The financial literacy and public awareness about the deposit insurance scheme will be measured through public awareness surveys estimating percentage of depositors that were reached and made aware of the scheme. The first survey (in year 1 of the Project) will provide the baseline, and the second survey (in year 4 of the project) will evaluate the impact of implementation of public awareness strategy on the awareness about the scheme. The indicator will be disaggregated by urban/rural and by gender.
</narrative></comment>
</target>
<actual value="To be established by baseline survey">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
CBSL conducts a payout simulation exercise, based on a methodology acceptable to the Association.
</narrative></title>
<baseline year="2023" iso-date="2023-06-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-01" />
<period-end iso-date="2027-12-01" />
<target value="Yes">
<comment><narrative>
This indicator is aligned with PBC 10 which requires conduct of a payout simulation exercise, based on a methodology acceptable to the Association.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Gender gap with regards to use of financial institutions for savings (percentage points)
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="5 percentage points"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-12-01" />
<target value="2 percentage points">
<comment><narrative>
The indicator is defined as a difference in percentage of men and women using formal financial institutions for saving or setting aside any money. The data comes from WB's Findex survey.
</narrative></comment>
</target>
<actual value="5 pp">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Survey conducted measuring financial literacy and public awareness about deposit insurance
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2027-12-01" />
<target value="2.00">
<comment><narrative>
This indicator is aligned with PBCs 6 and 7 which require conducting public awareness surveys, based on the methodology acceptable to the WB, to measure public awareness about deposit insurance.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
New SLDIS investment policy considering diversification and safety needs is in place
</narrative></title>
<baseline year="2023" iso-date="2023-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-15" />
<period-end iso-date="2027-12-15" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People and businesses using financial services
</narrative></title>
<baseline year="2021" iso-date="2021-12-15" value="15,187,200"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-15" />
<period-end iso-date="2027-12-15" />
<target value="15,481,000">
<comment><narrative>
The number for June 30, 2025 is based on the newly released Findex data that suggests a drop in use of financial services in SL, likely as a result of the crisis.
</narrative></comment>
</target>
<actual value="1,396,0000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances addressed by Grievance Redress mechanism, disaggregated by district
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2027-12-01" />
<target value="100.00">
<comment><narrative>
Zero (0) grievances have been reported regarding project activities. However, seven inquiries related to the public awareness survey were received through the grievance handling system established at CBSL and clarifications were provided for all inquiries to the satisfaction of the inquirers.
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
New directions on premium methodology ensuring long-term sustainability and methodology for determining SLDIS target fund are in place
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
CBSL's Monetary Board approves a methodology for adjustments to the premium rate payable by member institutions in a manner that ensures the build-up and maintenance of the deposit insurance reserves, and issues the necessary directions to adjust the premium rates according to such methodology.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
New directions on premium methodology ensuring long-term sustainability in place
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
CBSL's Monetary Board approves a methodology for adjustments to the premium rate payable by member institutions in a manner that ensures the build-up and maintenance of the deposit insurance reserves, and issues the necessary directions to adjust the premium rates according to such methodology.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
New directions on premium methodology ensuring long-term sustainability and methodology for determining SLDIS target fund are in place
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
CBSL's Monetary Board approves a methodology for adjustments to the premium rate payable by member institutions in a manner that ensures the build-up and maintenance of the deposit insurance reserves, and issues the necessary directions to adjust the premium rates according to such methodology.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
New SLDIS investment policy considering diversification and safety needs is in place
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
CBSL's Monetary Board approves a new investment policy aimed at a prudent and diversified management of SLDIS reserves, by allowing the SLDIS to shift its investments away from domestic public debt instruments and allowing the allocation of part of the reserves i other investments, including in foreign assets.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
New SLDIS investment policy considering diversification and safety needs is in place
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
CBSL's Monetary Board approves a new investment policy aimed at a prudent and diversified management of SLDIS reserves, by allowing the SLDIS to shift its investments away from domestic public debt instruments and allowing the allocation of part of the reserves i other investments, including in foreign assets.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
New SLDIS investment policy considering diversification and safety needs is in place
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
CBSL's Monetary Board approves a new investment policy aimed at a prudent and diversified management of SLDIS reserves, by allowing the SLDIS to shift its investments away from domestic public debt instruments and allowing the allocation of part of the reserves i other investments, including in foreign assets.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
MOU on fiscal backstop funding mechanism is in place
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
CBSL and MOF enter into an MOU for the fiscal back-stop funding arrangement for the SLDIS, including the terms, procedures, conditions and triggers, to ensure timely availability of funds for the SLDIS in the event the existing reserves in the SLDIS are depleted or inadequate.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Long-Term Public Awareness Strategy based on the results of the survey approved
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2027-12-01" />
<target value="Yes">
<comment><narrative>
This indicator is aligned with PBC 6 which requires approval of long-term Public Awareness Strategy based on the results of the survey.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
MOU on fiscal backstop funding mechanism is in place
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
CBSL and MOF enter into an MOU for the fiscal back-stop funding arrangement for the SLDIS, including the terms, procedures, conditions and triggers, to ensure timely availability of funds for the SLDIS in the event the existing reserves in the SLDIS are depleted or inadequate.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
MOU on fiscal backstop funding mechanism is in place
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
CBSL and MOF enter into an MOU for the fiscal back-stop funding arrangement for the SLDIS, including the terms, procedures, conditions and triggers, to ensure timely availability of funds for the SLDIS in the event the existing reserves in the SLDIS are depleted or inadequate.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Deposit insurance and bank resolution functions clearly assigned, adequately staffed, and have reporting lines to CBSL management separate from bank supervision
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
(1) CBSL's Monetary Board approves the new organizational structure which clearly delineates the deposit insurance scheme (SLDIS) and the bank resolution functions within RED, with reporting lines to top management of CBSL separate from bank supervision department; and (2) CBSL assigns staff for key positions to enable both the SLDIS and the bank resolution functions to perform their respective mandates.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Deposit insurance and bank resolution functions clearly assigned, adequately staffed, and have reporting lines to CBSL management separate from bank supervision
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
(1) CBSL's Monetary Board approves the new organizational structure which clearly delineates the deposit insurance scheme (SLDIS) and the bank resolution functions within RED, with reporting lines to top management of CBSL separate from bank supervision department; and (2) CBSL assigns staff for key positions to enable both the SLDIS and the bank resolution functions to perform their respective mandates.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Deposit insurance and bank resolution functions clearly assigned, adequately staffed, and have reporting lines to CBSL management separate from bank supervision
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
(1) CBSL's Monetary Board approves the new organizational structure which clearly delineates the deposit insurance scheme (SLDIS) and the bank resolution functions within RED, with reporting lines to top management of CBSL separate from bank supervision department; and (2) CBSL assigns staff for key positions to enable both the SLDIS and the bank resolution functions to perform their respective mandates.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Guidelines on the reimbursement of insured deposits and Guidelines for processing and validating depositor information approved
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
CBSL adopts new guidelines (1) on the reimbursement of insured deposits aimed at simplifying and expediting the filing and processing of claims and payment to insured depositors, and (2) on the processing and validating depositor information submitted by member institutions.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Guidelines on the reimbursement of insured deposits and Guidelines for processing and validating depositor information approved
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
CBSL adopts new guidelines (1) on the reimbursement of insured deposits aimed at simplifying and expediting the filing and processing of claims and payment to insured depositors, and (2) on the processing and validating depositor information submitted by member institutions.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Guidelines on the reimbursement of insured deposits and Guidelines for processing and validating depositor information approved
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
CBSL adopts new guidelines (1) on the reimbursement of insured deposits aimed at simplifying and expediting the filing and processing of claims and payment to insured depositors, and (2) on the processing and validating depositor information submitted by member institutions.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Contingency plan for carrying out large/simultaneous payouts in place
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
CBSL adopts a contingency plan, including a public communications strategy, on how to carry out large or simultaneous payout operations in times of crisis.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Contingency plan for carrying out large/simultaneous payouts in place
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
CBSL adopts a contingency plan, including a public communications strategy, on how to carry out large or simultaneous payout operations in times of crisis.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Contingency plan for carrying out large/simultaneous payouts in place
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
CBSL adopts a contingency plan, including a public communications strategy, on how to carry out large or simultaneous payout operations in times of crisis.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase in financial literacy and public awareness about the deposit insurance scheme (disaggregated by gender and urban / rural) (percent, from a baseline)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="To be established by baseline survey"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
CBSL conducts a second public awareness survey based on a methodology, acceptable to the Association, and the survey evidences a level of public awareness at least 30% higher than the one measured in the first survey.
</narrative></comment>
</target>
<actual value="To be established by baseline survey">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase in financial literacy and public awareness about the deposit insurance scheme (disaggregated by gender and urban / rural) (percent, from a baseline)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="To be established by baseline survey"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
CBSL conducts a second public awareness survey based on a methodology, acceptable to the Association, and the survey evidences a level of public awareness at least 30% higher than the one measured in the first survey.
</narrative></comment>
</target>
<actual value="To be established by baseline survey">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase in financial literacy and public awareness about the deposit insurance scheme (disaggregated by gender and urban / rural) (percent, from a baseline)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="To be established by baseline survey"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
CBSL conducts a second public awareness survey based on a methodology, acceptable to the Association, and the survey evidences a level of public awareness at least 30% higher than the one measured in the first survey.
</narrative></comment>
</target>
<actual value="To be established by baseline survey">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Long-Term Public Awareness Strategy based on the results of the survey approved
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
(1) CBSL conducts a first nation-wide representative survey measuring the public awareness of SLDIS based on a methodology, acceptable to the Association, and (2) CBSL's Monetary Board approves a long-term public awareness strategy to increase awareness of SLDIS among the general population, including among others, women and people in low-income households and rural areas.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Long-Term Public Awareness Strategy based on the results of the survey approved
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
(1) CBSL conducts a first nation-wide representative survey measuring the public awareness of SLDIS based on a methodology, acceptable to the Association, and (2) CBSL's Monetary Board approves a long-term public awareness strategy to increase awareness of SLDIS among the general population, including among others, women and people in low-income households and rural areas.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Long-Term Public Awareness Strategy based on the results of the survey approved
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
(1) CBSL conducts a first nation-wide representative survey measuring the public awareness of SLDIS based on a methodology, acceptable to the Association, and (2) CBSL's Monetary Board approves a long-term public awareness strategy to increase awareness of SLDIS among the general population, including among others, women and people in low-income households and rural areas.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Directions requiring member institutions to post via different channels standardized information on their membership with the SLDIS and the amount of deposit insurance coverage in place
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
CBSL issues directions requiring member institutions to publicly disclose (e.g., in their premises, websites, ATMs, smartphone applications and advertisements) their membership with the SLDIS and the availability of deposit insurance coverage.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Directions requiring member institutions to post via different channels standardized information on their membership with the SLDIS and the amount of deposit insurance coverage in place
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
CBSL issues directions requiring member institutions to publicly disclose (e.g., in their premises, websites, ATMs, smartphone applications and advertisements) their membership with the SLDIS and the availability of deposit insurance coverage.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Directions requiring member institutions to post via different channels standardized information on their membership with the SLDIS and the amount of deposit insurance coverage in place
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
CBSL issues directions requiring member institutions to publicly disclose (e.g., in their premises, websites, ATMs, smartphone applications and advertisements) their membership with the SLDIS and the availability of deposit insurance coverage.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase in financial literacy and public awareness about the deposit insurance scheme (disaggregated by gender and urban / rural) (percent, from a baseline)
</narrative></title>
<baseline year="2023" iso-date="2023-12-31" value="To be established by baseline survey"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-31" />
<period-end iso-date="2027-12-01" />
<target value="at least 30% increase from baseline survey">
<comment><narrative>
The financial literacy and public awareness about the deposit insurance scheme will be measured through public awareness surveys estimating percentage of depositors that were reached and made aware of the scheme. The first survey (in year 1 of the Project) will provide the baseline, and the second survey (in year 4 of the project) will evaluate the impact of implementation of public awareness strategy on the awareness about the scheme. The indicator will be disaggregated by urban/rural and by gender.
</narrative></comment>
</target>
<actual value="To be established by baseline survey">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase in financial literacy and public awareness about the deposit insurance scheme (disaggregated by gender and urban / rural) (percent, from a baseline)
</narrative></title>
<baseline year="2023" iso-date="2023-12-31" value="To be established by baseline survey"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-31" />
<period-end iso-date="2027-12-01" />
<target value="at least 30% increase from baseline survey">
<comment><narrative>
The financial literacy and public awareness about the deposit insurance scheme will be measured through public awareness surveys estimating percentage of depositors that were reached and made aware of the scheme. The first survey (in year 1 of the Project) will provide the baseline, and the second survey (in year 4 of the project) will evaluate the impact of implementation of public awareness strategy on the awareness about the scheme. The indicator will be disaggregated by urban/rural and by gender.
</narrative></comment>
</target>
<actual value="To be established by baseline survey">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase in financial literacy and public awareness about the deposit insurance scheme (disaggregated by gender and urban / rural) (percent, from a baseline)
</narrative></title>
<baseline year="2023" iso-date="2023-12-31" value="To be established by baseline survey"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-31" />
<period-end iso-date="2027-12-01" />
<target value="at least 30% increase from baseline survey">
<comment><narrative>
The financial literacy and public awareness about the deposit insurance scheme will be measured through public awareness surveys estimating percentage of depositors that were reached and made aware of the scheme. The first survey (in year 1 of the Project) will provide the baseline, and the second survey (in year 4 of the project) will evaluate the impact of implementation of public awareness strategy on the awareness about the scheme. The indicator will be disaggregated by urban/rural and by gender.
</narrative></comment>
</target>
<actual value="To be established by baseline survey">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Time required to start reimbursement of deposits since deposits become unavailable for withdrawal as a result of failure of a member institution
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2027-12-01" />
<target value="&lt;45 days">
<comment><narrative>
The indicator measures the capacity of SLDIS and Sri Lanka's overall financial sector safety net to initiate the payout out procedure in the event of a bank/LFC failure. The indicator is defined as the number of days between the date deposits become unavailable for withdrawal and the start of the payout of insured deposits. It will be measured either through actual payouts or through a simulation exercise using methodology satisfactory to the WB.
</narrative></comment>
</target>
<actual value="82.1 days (average for 7 failed member institutions)">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Time required to start reimbursement of deposits since deposits become unavailable for withdrawal as a result of failure of a member institution
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2027-12-01" />
<target value="&lt;45 days">
<comment><narrative>
The indicator measures the capacity of SLDIS and Sri Lanka's overall financial sector safety net to initiate the payout out procedure in the event of a bank/LFC failure. The indicator is defined as the number of days between the date deposits become unavailable for withdrawal and the start of the payout of insured deposits. It will be measured either through actual payouts or through a simulation exercise using methodology satisfactory to the WB.
</narrative></comment>
</target>
<actual value="82.1 days (average for 7 failed member institutions)">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Time required to start reimbursement of deposits since deposits become unavailable for withdrawal as a result of failure of a member institution
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2027-12-01" />
<target value="&lt;45 days">
<comment><narrative>
The indicator measures the capacity of SLDIS and Sri Lanka's overall financial sector safety net to initiate the payout out procedure in the event of a bank/LFC failure. The indicator is defined as the number of days between the date deposits become unavailable for withdrawal and the start of the payout of insured deposits. It will be measured either through actual payouts or through a simulation exercise using methodology satisfactory to the WB.
</narrative></comment>
</target>
<actual value="82.1 days (average for 7 failed member institutions)">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Funding ratio (defined as the ratio of total reserves of the SLDIS to total insured deposits), in the absence of payouts
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="1.30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2027-12-01" />
<target value="2.80">
<comment><narrative>
Ratio is as at end-June 2025.
</narrative></comment>
</target>
<actual value="3.06">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Funding ratio (defined as the ratio of total reserves of the SLDIS to total insured deposits), in the absence of payouts
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="1.30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2027-12-01" />
<target value="2.80">
<comment><narrative>
The number for June 30, 2025 does not include the WB loan that generally can be considered part of the total reserves. The fund balance as % of insured liabilities was 2.76% as of end-December 2024, comparable to the 2.8% as of end-June 2025.
</narrative></comment>
</target>
<actual value="2.92">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Funding ratio (defined as the ratio of total reserves of the SLDIS to total insured deposits), in the absence of payouts
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="1.30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2027-12-01" />
<target value="2.80">
<comment><narrative>
Ratio is as at end-June 2025.
</narrative></comment>
</target>
<actual value="3.06">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
CBSL conducts a payout simulation exercise, based on a methodology acceptable to the Association.
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
CBSL conducts a payout simulation exercise, based on a methodology acceptable to the Association.
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
CBSL conducts a payout simulation exercise, based on a methodology acceptable to the Association.
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
New SLDIS investment policy considering diversification and safety needs is in place
</narrative></title>
<baseline year="2023" iso-date="2023-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-15" />
<period-end iso-date="2027-12-15" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Directions requiring member institutions to post via different channels standardized information on their membership with the SLDIS and the amount of deposit insurance coverage in place
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2027-12-01" />
<target value="Yes">
<comment><narrative>
This indicator is aligned with PBC 5 which requires issue of directions requiring member institutions to publicly disclose their membership with the SLDIS and the availability of deposit insurance coverage.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Funding ratio (defined as the ratio of total reserves of the SLDIS to total insured deposits), in the absence of payouts
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="1.30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2027-12-01" />
<target value="2.80">
<comment><narrative>
The number for June 30, 2025 does not include the WB loan that generally can be considered part of the total reserves. The fund balance as % of insured liabilities was 2.76% as of end-December 2024, comparable to the 2.8% as of end-June 2025.
</narrative></comment>
</target>
<actual value="2.92">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Time required to start reimbursement of deposits since deposits become unavailable for withdrawal as a result of failure of a member institution
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2027-12-01" />
<target value="&lt;45 days">
<comment><narrative>
The indicator measures the capacity of SLDIS and Sri Lanka's overall financial sector safety net to initiate the payout out procedure in the event of a bank/LFC failure. The indicator is defined as the number of days between the date deposits become unavailable for withdrawal and the start of the payout of insured deposits. It will be measured either through actual payouts or through a simulation exercise using methodology satisfactory to the WB.
</narrative></comment>
</target>
<actual value="82.1 days (average for 7 failed member institutions)">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People and businesses using financial services
</narrative></title>
<baseline year="2021" iso-date="2021-12-15" value="15,187,200"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-15" />
<period-end iso-date="2027-12-15" />
<target value="15,481,000">
<comment><narrative>
The number for June 30, 2025 is based on the newly released Findex data that suggests a drop in use of financial services in SL, likely as a result of the crisis.
</narrative></comment>
</target>
<actual value="1,396,0000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Funding ratio (defined as the ratio of total reserves of the SLDIS to total insured deposits), in the absence of payouts
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="1.30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2027-12-01" />
<target value="2.80">
<comment><narrative>
Ratio is as at end-June 2025.
</narrative></comment>
</target>
<actual value="3.06">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
New directions on premium methodology ensuring long-term sustainability and methodology for determining SLDIS target fund are in place
</narrative></title>
<baseline year="2023" iso-date="2023-06-14" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-14" />
<period-end iso-date="2027-12-14" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Gender gap with regards to use of financial institutions for savings (percentage points)
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="5 percentage points"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-12-01" />
<target value="2 percentage points">
<comment><narrative>
The indicator is defined as a difference in percentage of men and women using formal financial institutions for saving or setting aside any money. The data comes from WB's Findex survey.
</narrative></comment>
</target>
<actual value="5 pp">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Deposit insurance and bank resolution functions clearly assigned, adequately staffed, and have reporting lines to CBSL management separate from bank supervision
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2027-12-01" />
<target value="Yes">
<comment><narrative>
This indicator is aligned with PBC 1 which requires that deposit insurance and bank resolution functions are clearly assigned, adequately staffed, and have reporting lines to CBSL management separate from bank supervision.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Funding ratio (defined as the ratio of total reserves of the SLDIS to total insured deposits), in the absence of payouts
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="1.30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2027-12-01" />
<target value="2.80">
<comment><narrative>
Ratio is as at end-June 2025.
</narrative></comment>
</target>
<actual value="3.06">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase in financial literacy and public awareness about the deposit insurance scheme (disaggregated by gender and urban / rural) (percent, from a baseline)
</narrative></title>
<baseline year="2023" iso-date="2023-12-31" value="To be established by baseline survey"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-31" />
<period-end iso-date="2027-12-01" />
<target value="at least 30% increase from baseline survey">
<comment><narrative>
The financial literacy and public awareness about the deposit insurance scheme will be measured through public awareness surveys estimating percentage of depositors that were reached and made aware of the scheme. The first survey (in year 1 of the Project) will provide the baseline, and the second survey (in year 4 of the project) will evaluate the impact of implementation of public awareness strategy on the awareness about the scheme. The indicator will be disaggregated by urban/rural and by gender.
</narrative></comment>
</target>
<actual value="To be established by baseline survey">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Time required to start reimbursement of deposits since deposits become unavailable for withdrawal as a result of failure of a member institution
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2027-12-01" />
<target value="&lt;45 days">
<comment><narrative>
The indicator measures the capacity of SLDIS and Sri Lanka's overall financial sector safety net to initiate the payout out procedure in the event of a bank/LFC failure. The indicator is defined as the number of days between the date deposits become unavailable for withdrawal and the start of the payout of insured deposits. It will be measured either through actual payouts or through a simulation exercise using methodology satisfactory to the WB.
</narrative></comment>
</target>
<actual value="82.1 days (average for 7 failed member institutions)">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase in financial literacy and public awareness about the deposit insurance scheme (disaggregated by gender and urban / rural) (percent, from a baseline)
</narrative></title>
<baseline year="2023" iso-date="2023-12-31" value="To be established by baseline survey"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-31" />
<period-end iso-date="2027-12-01" />
<target value="at least 30% increase from baseline survey">
<comment><narrative>
The financial literacy and public awareness about the deposit insurance scheme will be measured through public awareness surveys estimating percentage of depositors that were reached and made aware of the scheme. The first survey (in year 1 of the Project) will provide the baseline, and the second survey (in year 4 of the project) will evaluate the impact of implementation of public awareness strategy on the awareness about the scheme. The indicator will be disaggregated by urban/rural and by gender.
</narrative></comment>
</target>
<actual value="To be established by baseline survey">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
New SLDIS investment policy considering diversification and safety needs is in place
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2027-12-01" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Enabling regulations for bank resolution adopted
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2027-12-01" />
<target value="Yes">
<comment><narrative>
The enabling regulations necessary to operationalize resolution functions of CBSL as envisioned under BSPA.  This indicator is aligned with technical assistance provided under Component 2 for resolution function of RED.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
CBSL conducts a payout simulation exercise, based on a methodology acceptable to the Association.
</narrative></title>
<baseline year="2023" iso-date="2023-06-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-01" />
<period-end iso-date="2027-12-01" />
<target value="Yes">
<comment><narrative>
This indicator is aligned with PBC 10 which requires conduct of a payout simulation exercise, based on a methodology acceptable to the Association.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Survey conducted measuring financial literacy and public awareness about deposit insurance
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2027-12-01" />
<target value="2.00">
<comment><narrative>
This indicator is aligned with PBCs 6 and 7 which require conducting public awareness surveys, based on the methodology acceptable to the WB, to measure public awareness about deposit insurance.
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase in financial literacy and public awareness about the deposit insurance scheme (disaggregated by gender and urban / rural) (percent, from a baseline)
</narrative></title>
<baseline year="2023" iso-date="2023-12-31" value="To be established by baseline survey"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-31" />
<period-end iso-date="2027-12-01" />
<target value="at least 30% increase from baseline survey">
<comment><narrative>
The financial literacy and public awareness about the deposit insurance scheme will be measured through public awareness surveys estimating percentage of depositors that were reached and made aware of the scheme. The first survey (in year 1 of the Project) will provide the baseline, and the second survey (in year 4 of the project) will evaluate the impact of implementation of public awareness strategy on the awareness about the scheme. The indicator will be disaggregated by urban/rural and by gender.
</narrative></comment>
</target>
<actual value="To be established by baseline survey">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase in financial literacy and public awareness about the deposit insurance scheme (disaggregated by gender and urban / rural) (percent, from a baseline)
</narrative></title>
<baseline year="2023" iso-date="2023-12-31" value="To be established by baseline survey"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-31" />
<period-end iso-date="2027-12-01" />
<target value="at least 30% increase from baseline survey">
<comment><narrative>
The financial literacy and public awareness about the deposit insurance scheme will be measured through public awareness surveys estimating percentage of depositors that were reached and made aware of the scheme. The first survey (in year 1 of the Project) will provide the baseline, and the second survey (in year 4 of the project) will evaluate the impact of implementation of public awareness strategy on the awareness about the scheme. The indicator will be disaggregated by urban/rural and by gender.
</narrative></comment>
</target>
<actual value="To be established by baseline survey">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase in financial literacy and public awareness about the deposit insurance scheme (disaggregated by gender and urban / rural) (percent, from a baseline)
</narrative></title>
<baseline year="2023" iso-date="2023-12-31" value="To be established by baseline survey"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-31" />
<period-end iso-date="2027-12-01" />
<target value="at least 30% increase from baseline survey">
<comment><narrative>
The financial literacy and public awareness about the deposit insurance scheme will be measured through public awareness surveys estimating percentage of depositors that were reached and made aware of the scheme. The first survey (in year 1 of the Project) will provide the baseline, and the second survey (in year 4 of the project) will evaluate the impact of implementation of public awareness strategy on the awareness about the scheme. The indicator will be disaggregated by urban/rural and by gender.
</narrative></comment>
</target>
<actual value="To be established by baseline survey">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Time required to start reimbursement of deposits since deposits become unavailable for withdrawal as a result of failure of a member institution
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2027-12-01" />
<target value="&lt;45 days">
<comment><narrative>
The indicator measures the capacity of SLDIS and Sri Lanka's overall financial sector safety net to initiate the payout out procedure in the event of a bank/LFC failure. The indicator is defined as the number of days between the date deposits become unavailable for withdrawal and the start of the payout of insured deposits. It will be measured either through actual payouts or through a simulation exercise using methodology satisfactory to the WB.
</narrative></comment>
</target>
<actual value="82.1 days (average for 7 failed member institutions)">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Time required to start reimbursement of deposits since deposits become unavailable for withdrawal as a result of failure of a member institution
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2027-12-01" />
<target value="&lt;45 days">
<comment><narrative>
The indicator measures the capacity of SLDIS and Sri Lanka's overall financial sector safety net to initiate the payout out procedure in the event of a bank/LFC failure. The indicator is defined as the number of days between the date deposits become unavailable for withdrawal and the start of the payout of insured deposits. It will be measured either through actual payouts or through a simulation exercise using methodology satisfactory to the WB.
</narrative></comment>
</target>
<actual value="82.1 days (average for 7 failed member institutions)">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Time required to start reimbursement of deposits since deposits become unavailable for withdrawal as a result of failure of a member institution
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2027-12-01" />
<target value="&lt;45 days">
<comment><narrative>
The indicator measures the capacity of SLDIS and Sri Lanka's overall financial sector safety net to initiate the payout out procedure in the event of a bank/LFC failure. The indicator is defined as the number of days between the date deposits become unavailable for withdrawal and the start of the payout of insured deposits. It will be measured either through actual payouts or through a simulation exercise using methodology satisfactory to the WB.
</narrative></comment>
</target>
<actual value="82.1 days (average for 7 failed member institutions)">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Funding ratio (defined as the ratio of total reserves of the SLDIS to total insured deposits), in the absence of payouts
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="1.30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2027-12-01" />
<target value="2.80">
<comment><narrative>
Ratio is as at end-June 2025.
</narrative></comment>
</target>
<actual value="3.06">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Funding ratio (defined as the ratio of total reserves of the SLDIS to total insured deposits), in the absence of payouts
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="1.30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2027-12-01" />
<target value="2.80">
<comment><narrative>
The number for June 30, 2025 does not include the WB loan that generally can be considered part of the total reserves. The fund balance as % of insured liabilities was 2.76% as of end-December 2024, comparable to the 2.8% as of end-June 2025.
</narrative></comment>
</target>
<actual value="2.92">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Funding ratio (defined as the ratio of total reserves of the SLDIS to total insured deposits), in the absence of payouts
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="1.30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2027-12-01" />
<target value="2.80">
<comment><narrative>
Ratio is as at end-June 2025.
</narrative></comment>
</target>
<actual value="3.06">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Long-Term Public Awareness Strategy based on the results of the survey approved
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2027-12-01" />
<target value="Yes">
<comment><narrative>
This indicator is aligned with PBC 6 which requires approval of long-term Public Awareness Strategy based on the results of the survey.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances addressed by Grievance Redress mechanism, disaggregated by district
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2027-12-01" />
<target value="100.00">
<comment><narrative>
Zero (0) grievances have been reported regarding project activities. However, seven inquiries related to the public awareness survey were received through the grievance handling system established at CBSL and clarifications were provided for all inquiries to the satisfaction of the inquirers.
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Deposit insurance and bank resolution functions clearly assigned, adequately staffed, and have reporting lines to CBSL management separate from bank supervision
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2027-12-01" />
<target value="Yes">
<comment><narrative>
This indicator is aligned with PBC 1 which requires that deposit insurance and bank resolution functions are clearly assigned, adequately staffed, and have reporting lines to CBSL management separate from bank supervision.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-11-20T15:47:22" hierarchy="1"><iati-identifier>44000-P181564</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Sri Lanka PHSEP</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–P0056330"><narrative>Democratic Socialist Republic of Sri Lanka</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="LK-COA-0056331"><narrative>Ministry of Health</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2024-06-21"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2024-06-21"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2028-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="2" iso-date="2028-12-31"><narrative>Projected end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Di Dong</narrative></person-name><telephone>+1-202-473-1000</telephone><email>ddong1@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<contact-info type="2">
<mailing-address><narrative>
Suwasiripaya, No. 385, Rev. Baddegama Wimalawansa Thero Mawatha, Colombo, Sri Lanka, (94) 112 694033, info(at)health.gov.lk
, http://www.health.gov.lk/moh_final/english/
</narrative></mailing-address></contact-info><recipient-country code="LK" percentage="100"><narrative xml:lang="en">SRI LANKA</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="1248991" />
                <name><narrative>Colombo</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>6.93548 79.848679</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="12230" percentage="54" xml:lang="en"/><sector vocabulary="1" code="12230" percentage="54" xml:lang="en"/><sector vocabulary="1" code="12220" percentage="27" xml:lang="en"/><sector vocabulary="1" code="12220" percentage="27" xml:lang="en"/><sector vocabulary="1" code="12191" percentage="11" xml:lang="en"/><sector vocabulary="1" code="12191" percentage="11" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="8" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="8" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HQ" percentage="53.0000000" xml:lang="en"><narrative>FY17 - Health Facilities and Construction</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HF" percentage="4.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="43.0000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="0" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000067" percentage="0" xml:lang="en"><narrative>Nutrition and Food Security</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="0" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="0" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000632" percentage="0" xml:lang="en"><narrative>Health Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="0" xml:lang="en"><narrative>Disease Control</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="0" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000633" percentage="0" xml:lang="en"><narrative>Health Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000625" percentage="0" xml:lang="en"><narrative>Non-communicable diseases</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000625" percentage="0" xml:lang="en"><narrative>Non-communicable diseases</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000637" percentage="0" xml:lang="en"><narrative>Child Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000411" percentage="0" xml:lang="en"><narrative>Public Expenditure Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="0" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="0" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="0" xml:lang="en"><narrative>Disease Control</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000067" percentage="0" xml:lang="en"><narrative>Nutrition and Food Security</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">833344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">2083344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">4166677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">4166677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">1499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">1499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">1499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">1499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">1499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">1499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">1499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">1499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">1499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">1500009.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">139944029.01</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">139944029.01</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">50000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-56331"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">100000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-56331"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">175000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-56331"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">5880971</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-56331"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">4000000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-56331"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P181564"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P181564?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P181564"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PMCIs with capacity to respond to pandemics and infectious disease outbreaks
</narrative></title>
<baseline year="2024" iso-date="2024-03-12" value="30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-12" />
<period-end iso-date="2028-12-12" />
<target value="65">
<comment><narrative>
MoH is updating the capacity requirement for pandemic response. Baseline retained, progress to be updated in next ISM.
</narrative></comment>
</target>
<actual value="30">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PMCIs which adopt the expanded package of services (including mental health, palliative, geriatric, and rehabilitative care)
</narrative></title>
<baseline year="2024" iso-date="2024-03-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-12" />
<period-end iso-date="2028-12-12" />
<target value="65">
<comment><narrative>
Baseline retained, progress to be updated in next ISM.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Manual/ guidelines and SOPs for NCD screening, diagnosis, treatment and management, including referral and counter-referral pathways developed and endorsed by MoH
</narrative></title>
<baseline year="2024" iso-date="2024-03-12" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-12" />
<period-end iso-date="2028-12-12" />
<target value="Continued">
<comment><narrative>
The NCD referral guidelines are being developed, pending finalization and endorsement. It is expected to be endorsed by December 2026.
</narrative></comment>
</target>
<actual value="The NCD referral guidelines are being developed, pending finalization and endorsement">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Revise guidelines/ strategies for citizen engagement/GRM
</narrative></title>
<baseline year="2024" iso-date="2024-03-11" value="Guidelines exist"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-11" />
<period-end iso-date="2028-12-11" />
<target value="Implemented">
<comment><narrative>
Not due. The MoH has initiated the exrcise to revise guidelines for GRM.
</narrative></comment>
</target>
<actual value="Guidelines exist">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Develop district-level guidelines for multi-sectoral NCD action plan
</narrative></title>
<baseline year="2024" iso-date="2024-03-11" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-11" />
<period-end iso-date="2028-12-11" />
<target value="Implemented">
<comment><narrative>
Not due
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Comprehensive social and behavioral change communications strategy updated and implemented
</narrative></title>
<baseline year="2024" iso-date="2024-03-11" value="Yes"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-11" />
<period-end iso-date="2028-12-11" />
<target value="Implemented">
<comment><narrative>
Not due
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women aged 35 to 45 years who tested positive for cervical cancer followed up
</narrative></title>
<baseline year="2024" iso-date="2024-03-13" value="10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-13" />
<period-end iso-date="2028-12-13" />
<target value="55">
<comment><narrative>
Based on data from the MoH, 2806 women were tested positive via Pap Smear / HPV DNA testing in 2025, among which 672 cases were entered into MoH's eRHMIS2 system to track follow up and treatment status. This indicator is calculated using follow up data from eRHMIS2.
</narrative></comment>
</target>
<actual value="44">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implementation of the e-procurement system for national level procurement activities
</narrative></title>
<baseline year="2024" iso-date="2024-03-11" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-11" />
<period-end iso-date="2028-12-11" />
<target value="The project's procurement activities are managed through an e-procurement system (accounting for 70% of contracts managed by the Project)">
<comment><narrative>
MoH has issued an internal circular and guidance on the use of e-procurement. Currently, the use of e-procurement is limited to small value shopping contracts, and have not been adopted for PHSEP procurements.
</narrative></comment>
</target>
<actual value="MoH has issued an internal circular and guidance on the use of e-procurement.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PMCIs using personal health records and implement referrals
</narrative></title>
<baseline year="2024" iso-date="2024-03-12" value="50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-12" />
<period-end iso-date="2028-12-12" />
<target value="85">
<comment><narrative>
*The 2025 data collection from over 1000 PCMIs is still ongoing, and 322 PMCIs have reported data. This indicator value in this ISR only captures partial data. 230 out of 322 PMCIs that submited data for this indicator reported using personal records for referals in 2025.
</narrative></comment>
</target>
<actual value="71.04">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PMCIs with active Friends of Facilities committees
</narrative></title>
<baseline year="2024" iso-date="2024-03-12" value="50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-12" />
<period-end iso-date="2028-12-12" />
<target value="85">

</target>
<actual value="50">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Availability of palliative and geriatric services at selected PMCIs in each Regional Director of Health Services (RDHS) division
</narrative></title>
<baseline year="2024" iso-date="2024-03-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-13" />
<period-end iso-date="2028-12-13" />
<target value="26">
<comment><narrative>
Baseline retained, progress to be updated in next ISM.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PMCIs meeting four out of five minimum capabilities
</narrative></title>
<baseline year="2024" iso-date="2024-03-13" value="550"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-13" />
<period-end iso-date="2028-12-13" />
<target value="825">
<comment><narrative>
Baseline retained, progress to be updated in next ISM.
</narrative></comment>
</target>
<actual value="550">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
People aged 35 years and above (men and women) who are screened and diagnosed with hypertension, effectively managed, and followed up
</narrative></title>
<baseline year="2024" iso-date="2024-03-13" value="30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-13" />
<period-end iso-date="2028-12-13" />
<target value="50">
<comment><narrative>
This indicator is calculated using  2025 data from the MoH's NCD App, which is currently used in 55% of PMCIs, and in the process of scaling up. 49% of hypertesion patients in those PMCIs using NCD App have their blood pressure under control
</narrative></comment>
</target>
<actual value="49">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PMCIs equipped with solar power
</narrative></title>
<baseline year="2024" iso-date="2024-03-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-12" />
<period-end iso-date="2028-12-12" />
<target value="250">
<comment><narrative>
Baseline retained, progress to be updated in next ISM.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Comprehensive social and behavioral change communications strategy updated and implemented
</narrative></title>
<baseline year="2024" iso-date="2024-03-11" value="Yes"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-11" />
<period-end iso-date="2028-12-11" />
<target value="Implemented">
<comment><narrative>
Baseline retained, progress to be updated in next ISM.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PMCIs conducting annual patient experience surveys using standardized tools.
</narrative></title>
<baseline year="2024" iso-date="2024-03-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-12" />
<period-end iso-date="2028-12-12" />
<target value="40">
<comment><narrative>
*The 2025 data collection from over 1000 PCMIs is still ongoing, and 322 PMCIs have reported data. This indicator value in this ISR only captures partial data. 47 out of 300 PMCIs that submited data for this indicator conducts annual patient surveys in 2025.
</narrative></comment>
</target>
<actual value="15.67">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People (disaggregated by male/female) who obtained services from Mithuru Piyasa centers at the national level
</narrative></title>
<baseline year="2024" iso-date="2024-03-12" value="15,510 (women) 841 (men and children)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-12" />
<period-end iso-date="2028-12-12" />
<target value="19,000 (women) 1,250 (men and children)">
<comment><narrative>
Baseline retained, progress to be updated in next ISM.
</narrative></comment>
</target>
<actual value="15,510 (women) 841 (men and children)">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People receiving quality health, nutrition and population services
</narrative></title>
<baseline year="2024" iso-date="2024-03-10" value="-"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-10" />
<period-end iso-date="2028-12-10" />
<target value="-">
<comment><narrative>
Based on the OPD visits at primary healthcare facilities from Annual Health Bulletin 2022.
Average visits per person per year - 4 (documentary evidence from MoH awaited)
Baseline in 2024 - 50% of 7,045,375
Endline in 2028 - Complete coverage as per Annual Health Bulletin (2022) which is 7,045,375
Annual targets calculated as per the rate of increase of PMCIs meeting minimum capabilities number
</narrative></comment>
</target>
<actual value="3,522,688">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PMCIs conducting annual patient experience surveys using standardized tools.
</narrative></title>
<baseline year="2024" iso-date="2024-03-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-12" />
<period-end iso-date="2028-12-12" />
<target value="40">
<comment><narrative>
Baseline retained, progress to be updated in next ISM.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual National Continuous Professional Development programs implemented
</narrative></title>
<baseline year="2024" iso-date="2024-03-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-12" />
<period-end iso-date="2028-12-12" />
<target value="10">
<comment><narrative>
Baseline retained, progress to be updated in next ISM.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PMCIs implementing all three safe drug dispensing practices
</narrative></title>
<baseline year="2024" iso-date="2024-03-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-12" />
<period-end iso-date="2028-12-12" />
<target value="825">
<comment><narrative>
*The 2025 data collection from over 1000 PCMIs is still ongoing, and 322 PMCIs have reported data for December 2025. This indicator value in this ISR only captures partial data. 124 out of 322 PMCIs that submited data for this indicator reported adopting safe drug dispensing practices in 2025.
</narrative></comment>
</target>
<actual value="124">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PMCIs which adopt the expanded package of services (including mental health, palliative, geriatric, and rehabilitative care)
</narrative></title>
<baseline year="2024" iso-date="2024-03-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-12" />
<period-end iso-date="2028-12-12" />
<target value="65">
<comment><narrative>
Package development and trainings are ongoing.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PMCIs with active Friends of Facilities committees
</narrative></title>
<baseline year="2024" iso-date="2024-03-12" value="50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-12" />
<period-end iso-date="2028-12-12" />
<target value="85">
<comment><narrative>
*The 2025 data collection from over 1000 PCMIs is still ongoing, and 302 PMCIs have reported data. This indicator value in this ISR only captures partial data. 72 out of 302 PMCIs (23.48%) that submited data for this indicator reported having active Friends of Facility Committees in 2025.
</narrative></comment>
</target>
<actual value="23.48">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People receiving quality health, nutrition and population services
</narrative></title>
<baseline year="2024" iso-date="2024-03-10" value="-"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-10" />
<period-end iso-date="2028-12-10" />
<target value="-">
<comment><narrative>
Based on the OPD visits at primary healthcare facilities from Annual Health Bulletin 2022.
Average visits per person per year - 4 (documentary evidence from MoH awaited)
Baseline in 2024 - 50% of 7,045,375
Endline in 2028 - Complete coverage as per Annual Health Bulletin (2022) which is 7,045,375
Annual targets calculated as per the rate of increase of PMCIs meeting minimum capabilities number
</narrative></comment>
</target>
<actual value="3,522,688">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People receiving quality health, nutrition, and population services
</narrative></title>
<baseline year="2024" iso-date="2024-09-11" value="3,522,688"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-11" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
3,522,688
</narrative></comment>
</target>
<actual value="3,522,688">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Conduct population based demand-side survey to assess prevalence, risk factors, diagnosis, treatment, and effective management of NCDs
</narrative></title>
<baseline year="2024" iso-date="2024-03-11" value="-"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-11" />
<period-end iso-date="2028-12-11" />
<target value="Survey conducted">
<comment><narrative>
Not due. PHSEP baseline survey and Sri Lanka Demography and Health Survey (DHS) both are under contracting, and expected to be carried out in 2026.
</narrative></comment>
</target>
<actual value="-">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Conduct annual clinical audits according to revised guidelines for improvement of quality and safety of healthcare institutions
</narrative></title>
<baseline year="2024" iso-date="2024-03-10" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-10" />
<period-end iso-date="2028-12-10" />
<target value="Conducted">
<comment><narrative>
Baseline retained, progress to be updated in next ISM.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Revision and adoption by MoH of the list of essential medicines for different levels of care
</narrative></title>
<baseline year="2024" iso-date="2024-03-12" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-12" />
<period-end iso-date="2028-12-12" />
<target value="Continued">
<comment><narrative>
This PBC is achieved, pending verification by IVA.
</narrative></comment>
</target>
<actual value="New essential medicine list has been developed and issued by MoH">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PMCIs with capacity to respond to pandemics and infectious disease outbreaks
</narrative></title>
<baseline year="2024" iso-date="2024-03-12" value="30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-12" />
<period-end iso-date="2028-12-12" />
<target value="65">
<comment><narrative>
Baseline retained, progress to be updated in next ISM.
</narrative></comment>
</target>
<actual value="30">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Manual/ guidelines and SOPs for NCD screening, diagnosis, treatment and management, including referral and counter-referral pathways developed and endorsed by MoH
</narrative></title>
<baseline year="2024" iso-date="2024-03-12" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-12" />
<period-end iso-date="2028-12-12" />
<target value="Continued">
<comment><narrative>
Baseline retained, progress to be updated in next ISM.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implementation of the e-procurement system for national level procurement activities
</narrative></title>
<baseline year="2024" iso-date="2024-03-11" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-11" />
<period-end iso-date="2028-12-11" />
<target value="The project's procurement activities are managed through an e-procurement system (accounting for 70% of contracts managed by the Project)">
<comment><narrative>
Baseline retained, progress to be updated in next ISM.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PMCIs using personal health records and implement referrals
</narrative></title>
<baseline year="2024" iso-date="2024-03-12" value="50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-12" />
<period-end iso-date="2028-12-12" />
<target value="85">
<comment><narrative>
Baseline retained, progress to be updated in next ISM.
</narrative></comment>
</target>
<actual value="50">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual National Continuous Professional Development programs implemented
</narrative></title>
<baseline year="2024" iso-date="2024-03-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-12" />
<period-end iso-date="2028-12-12" />
<target value="10">
<comment><narrative>
Baseline retained, progress to be updated in next ISM.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Availability of palliative and geriatric services at selected PMCIs in each Regional Director of Health Services (RDHS) division
</narrative></title>
<baseline year="2024" iso-date="2024-03-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-13" />
<period-end iso-date="2028-12-13" />
<target value="26">
<comment><narrative>
The packages are being developed, the first phase of pilot PCMIs have been selected, and trainings are ongoing.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Primary care institutions (PMCIs and MOH) with transport facilities for dispatching samples for investigations to designated apex laboratories
</narrative></title>
<baseline year="2024" iso-date="2024-03-12" value="50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-12" />
<period-end iso-date="2028-12-12" />
<target value="85">
<comment><narrative>
MoH is exploring new modalities of sample transport including private sector contracting. Baseline retained, progress to be updated in next ISM.
</narrative></comment>
</target>
<actual value="50">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Develop district-level guidelines for multi-sectoral NCD action plan
</narrative></title>
<baseline year="2024" iso-date="2024-03-11" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-11" />
<period-end iso-date="2028-12-11" />
<target value="Implemented">
<comment><narrative>
Baseline retained, progress to be updated in next ISM.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Primary care institutions (PMCIs and MOH) with transport facilities for dispatching samples for investigations to designated apex laboratories
</narrative></title>
<baseline year="2024" iso-date="2024-03-12" value="50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-12" />
<period-end iso-date="2028-12-12" />
<target value="85">
<comment><narrative>
Baseline retained, progress to be updated in next ISM.
</narrative></comment>
</target>
<actual value="50">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Conduct population based demand-side survey to assess prevalence, risk factors, diagnosis, treatment, and effective management of NCDs
</narrative></title>
<baseline year="2024" iso-date="2024-03-11" value="-"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-11" />
<period-end iso-date="2028-12-11" />
<target value="Survey conducted">

</target>
<actual value="-">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Availability of palliative and geriatric services at selected PMCIs in each Regional Director of Health Services (RDHS) division
</narrative></title>
<baseline year="2024" iso-date="2024-03-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-13" />
<period-end iso-date="2028-12-13" />
<target value="26">
<comment><narrative>
The packages are being developed, the first phase of pilot PCMIs have been selected, and trainings are ongoing.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Availability of palliative and geriatric services at selected PMCIs in each Regional Director of Health Services (RDHS) division
</narrative></title>
<baseline year="2024" iso-date="2024-03-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-13" />
<period-end iso-date="2028-12-13" />
<target value="26">
<comment><narrative>
Baseline retained, progress to be updated in next ISM.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PMCIs meeting four out of five minimum capabilities
</narrative></title>
<baseline year="2024" iso-date="2024-03-13" value="550"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-13" />
<period-end iso-date="2028-12-13" />
<target value="825">
<comment><narrative>
*The 2025 data collection from over 1000 PCMIs is still ongoing, and 322 PMCIs have reported data. This indicator value in this ISR only captures partial data. Out of the 322 PMCIs reported on this indicator, 141 met the minimum capability requirements. **There is a change in the indicator verification protocol from baseline, due to 1) an update in the MoH's essential medicine list after project approval, 2) an update in MoH's essential diagnostic equipment list after project approval, 3) an update in MoH's emergency care protocol after project approval)
</narrative></comment>
</target>
<actual value="141">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PMCIs meeting four out of five minimum capabilities
</narrative></title>
<baseline year="2024" iso-date="2024-03-13" value="550"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-13" />
<period-end iso-date="2028-12-13" />
<target value="825">
<comment><narrative>
Baseline retained, progress to be updated in next ISM.
</narrative></comment>
</target>
<actual value="550">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
People aged 35 years and above (men and women) who are screened and diagnosed with hypertension, effectively managed, and followed up
</narrative></title>
<baseline year="2024" iso-date="2024-03-13" value="30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-13" />
<period-end iso-date="2028-12-13" />
<target value="50">
<comment><narrative>
This indicator is calculated using  2025 data from the MoH's NCD App, which is currently used in 55% of PMCIs, and in the process of scaling up. 49% of hypertesion patients in those PMCIs using NCD App have their blood pressure under control
</narrative></comment>
</target>
<actual value="49">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
People aged 35 years and above (men and women) who are screened and diagnosed with hypertension, effectively managed, and followed up
</narrative></title>
<baseline year="2024" iso-date="2024-03-13" value="30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-13" />
<period-end iso-date="2028-12-13" />
<target value="50">
<comment><narrative>
Baseline retained, progress to be updated in next ISM.
</narrative></comment>
</target>
<actual value="30">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women aged 35 to 45 years who tested positive for cervical cancer followed up
</narrative></title>
<baseline year="2024" iso-date="2024-03-13" value="10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-13" />
<period-end iso-date="2028-12-13" />
<target value="55">
<comment><narrative>
Based on data from the MoH, 2806 women were tested positive via Pap Smear / HPV DNA testing in 2025, among which 672 cases were entered into MoH's eRHMIS2 system to track follow up and treatment status. This indicator is calculated using follow up data from eRHMIS2.
</narrative></comment>
</target>
<actual value="44">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women aged 35 to 45 years who tested positive for cervical cancer followed up
</narrative></title>
<baseline year="2024" iso-date="2024-03-13" value="10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-13" />
<period-end iso-date="2028-12-13" />
<target value="55">
<comment><narrative>
Baseline retained, progress to be updated in next ISM.
</narrative></comment>
</target>
<actual value="10">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PMCIs implementing all three safe drug dispensing practices
</narrative></title>
<baseline year="2024" iso-date="2024-03-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-12" />
<period-end iso-date="2028-12-12" />
<target value="825">
<comment><narrative>
Baseline retained, progress to be updated in next ISM.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People (disaggregated by male/female) who obtained services from Mithuru Piyasa centers at the national level
</narrative></title>
<baseline year="2024" iso-date="2024-03-12" value="15,510 (women) 841 (men and children)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-12" />
<period-end iso-date="2028-12-12" />
<target value="19,000 (women) 1,250 (men and children)">
<comment><narrative>
Baseline retained, progress to be updated in next ISM.
</narrative></comment>
</target>
<actual value="15,510 (women) 841 (men and children)">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women aged 35 to 45 years who tested positive for cervical cancer followed up
</narrative></title>
<baseline year="2024" iso-date="2024-03-13" value="10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-13" />
<period-end iso-date="2028-12-13" />
<target value="55">
<comment><narrative>
Baseline retained, progress to be updated in next ISM.
</narrative></comment>
</target>
<actual value="10">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PMCIs implementing all three safe drug dispensing practices
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="124">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PMCIs implementing all three safe drug dispensing practices
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Manual/ guidelines and SOPs for NCD screening, diagnosis, treatment and management, including referral and counter-referral pathways developed and endorsed by MoH
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="NCD guideline updated and pending for MoH approval.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Manual/ guidelines and SOPs for NCD screening, diagnosis, treatment and management, including referral and counter-referral pathways developed and endorsed by MoH
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="NCD guideline updated and pending for MoH approval.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Revision and adoption by MoH of the list of essential medicines for different levels of care
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="Essential Medicine list updated.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Revision and adoption by MoH of the list of essential medicines for different levels of care
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="Essential Medicine list uddaed and pending for">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PMCIs meeting four out of five minimum capabilities
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="550"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="141">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PMCIs meeting four out of five minimum capabilities
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="550">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Availability of palliative and geriatric services at selected PMCIs in each Regional Director of Health Services (RDHS) division
</narrative></title>
<baseline year="2024" iso-date="2024-03-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-13" />
<period-end iso-date="2028-12-13" />
<target value="26">
<comment><narrative>
The packages are being developed, the first phase of pilot PCMIs have been selected, and trainings are ongoing.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Availability of palliative and geriatric services at selected PMCIs in each Regional Director of Health Services (RDHS) division
</narrative></title>
<baseline year="2024" iso-date="2024-03-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-13" />
<period-end iso-date="2028-12-13" />
<target value="26">
<comment><narrative>
Baseline retained, progress to be updated in next ISM.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PMCIs meeting four out of five minimum capabilities
</narrative></title>
<baseline year="2024" iso-date="2024-03-13" value="550"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-13" />
<period-end iso-date="2028-12-13" />
<target value="825">
<comment><narrative>
*The 2025 data collection from over 1000 PCMIs is still ongoing, and 322 PMCIs have reported data. This indicator value in this ISR only captures partial data. Out of the 322 PMCIs reported on this indicator, 141 met the minimum capability requirements. **There is a change in the indicator verification protocol from baseline, due to 1) an update in the MoH's essential medicine list after project approval, 2) an update in MoH's essential diagnostic equipment list after project approval, 3) an update in MoH's emergency care protocol after project approval)
</narrative></comment>
</target>
<actual value="141">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PMCIs meeting four out of five minimum capabilities
</narrative></title>
<baseline year="2024" iso-date="2024-03-13" value="550"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-13" />
<period-end iso-date="2028-12-13" />
<target value="825">
<comment><narrative>
Baseline retained, progress to be updated in next ISM.
</narrative></comment>
</target>
<actual value="550">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
People aged 35 years and above (men and women) who are screened and diagnosed with hypertension, effectively managed, and followed up
</narrative></title>
<baseline year="2024" iso-date="2024-03-13" value="30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-13" />
<period-end iso-date="2028-12-13" />
<target value="50">
<comment><narrative>
This indicator is calculated using  2025 data from the MoH's NCD App, which is currently used in 55% of PMCIs, and in the process of scaling up. 49% of hypertesion patients in those PMCIs using NCD App have their blood pressure under control
</narrative></comment>
</target>
<actual value="49">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
People aged 35 years and above (men and women) who are screened and diagnosed with hypertension, effectively managed, and followed up
</narrative></title>
<baseline year="2024" iso-date="2024-03-13" value="30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-13" />
<period-end iso-date="2028-12-13" />
<target value="50">
<comment><narrative>
Baseline retained, progress to be updated in next ISM.
</narrative></comment>
</target>
<actual value="30">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women aged 35 to 45 years who tested positive for cervical cancer followed up
</narrative></title>
<baseline year="2024" iso-date="2024-03-13" value="10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-13" />
<period-end iso-date="2028-12-13" />
<target value="55">
<comment><narrative>
Based on data from the MoH, 2806 women were tested positive via Pap Smear / HPV DNA testing in 2025, among which 672 cases were entered into MoH's eRHMIS2 system to track follow up and treatment status. This indicator is calculated using follow up data from eRHMIS2.
</narrative></comment>
</target>
<actual value="44">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women aged 35 to 45 years who tested positive for cervical cancer followed up
</narrative></title>
<baseline year="2024" iso-date="2024-03-13" value="10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-13" />
<period-end iso-date="2028-12-13" />
<target value="55">
<comment><narrative>
Baseline retained, progress to be updated in next ISM.
</narrative></comment>
</target>
<actual value="10">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
People aged 35 years and above (men and women) who are screened and diagnosed with hypertension, effectively managed, and followed up
</narrative></title>
<baseline year="2024" iso-date="2024-03-13" value="30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-13" />
<period-end iso-date="2028-12-13" />
<target value="50">
<comment><narrative>
Baseline retained, progress to be updated in next ISM.
</narrative></comment>
</target>
<actual value="30">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PMCIs meeting four out of five minimum capabilities
</narrative></title>
<baseline year="2024" iso-date="2024-03-13" value="550"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-13" />
<period-end iso-date="2028-12-13" />
<target value="825">
<comment><narrative>
*The 2025 data collection from over 1000 PCMIs is still ongoing, and 322 PMCIs have reported data. This indicator value in this ISR only captures partial data. Out of the 322 PMCIs reported on this indicator, 141 met the minimum capability requirements. **There is a change in the indicator verification protocol from baseline, due to 1) an update in the MoH's essential medicine list after project approval, 2) an update in MoH's essential diagnostic equipment list after project approval, 3) an update in MoH's emergency care protocol after project approval)
</narrative></comment>
</target>
<actual value="141">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PMCIs equipped with solar power
</narrative></title>
<baseline year="2024" iso-date="2024-03-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-12" />
<period-end iso-date="2028-12-12" />
<target value="250">
<comment><narrative>
Installation of solar panels is delayed.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Primary healthcare staff trained on integrated essential packages (NCDs, geriatric care, family medical care, mental health care, palliative care, and A&amp;E services)
</narrative></title>
<baseline year="2024" iso-date="2024-03-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-12" />
<period-end iso-date="2028-12-12" />
<target value="60">

</target>
<actual value="12.36">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Conduct annual clinical audits according to revised guidelines for improvement of quality and safety of healthcare institutions
</narrative></title>
<baseline year="2024" iso-date="2024-03-10" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-10" />
<period-end iso-date="2028-12-10" />
<target value="Conducted">
<comment><narrative>
2025 data collection is still ongoing. Based on partial data from PMCIs, around 8% of PMCIs conducted clinical audits in 2025
</narrative></comment>
</target>
<actual value="Clinical audits have been initiated in a proportion of PMCIs">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Primary healthcare staff trained on integrated essential packages (NCDs, geriatric care, family medical care, mental health care, palliative care, and A&amp;E services)
</narrative></title>
<baseline year="2024" iso-date="2024-03-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-12" />
<period-end iso-date="2028-12-12" />
<target value="60">
<comment><narrative>
Baseline retained, progress to be updated in next ISM.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Revise guidelines/ strategies for citizen engagement/GRM
</narrative></title>
<baseline year="2024" iso-date="2024-03-11" value="Guidelines exist"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-11" />
<period-end iso-date="2028-12-11" />
<target value="Implemented">
<comment><narrative>
Baseline retained, progress to be updated in next ISM.
</narrative></comment>
</target>
<actual value="Guidelines exist">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Revision and adoption by MoH of the list of essential medicines for different levels of care
</narrative></title>
<baseline year="2024" iso-date="2024-03-12" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-12" />
<period-end iso-date="2028-12-12" />
<target value="Continued">
<comment><narrative>
Baseline retained, progress to be updated in next ISM.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People receiving quality health, nutrition, and population services
</narrative></title>
<baseline year="2024" iso-date="2024-09-11" value="3,522,688"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-11" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
2025 data collection is still ongoing and no new data is available yet.
The baseline was calculated based on the OPD visits data at primary healthcare facilities from Annual Health Bulletin 2022, and estimated OPD utilization rate of 4 visits per person per year.
</narrative></comment>
</target>
<actual value="3,522,688">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-11-20T15:47:22" hierarchy="1"><iati-identifier>44000-P505052</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>SASES</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–00009809"><narrative>Democratic Socialist Republic of Sri Lanka</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–00009809"><narrative>Democratic Socialist Republic of Sri Lanka</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="LK-COA-00006730"><narrative>National Transmission Network Service Provider</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2025-06-20"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2025-06-20"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2030-07-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="2" iso-date="2030-07-31"><narrative>Projected end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Prajakta Ajit Chitre</narrative></person-name><telephone>+1-202-473-1000</telephone><email>pchitre@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>

<contact-info type="2">
<mailing-address><narrative>
Ministry of Finance, Planning and Economic Development, Colombo

</narrative></mailing-address></contact-info>
<contact-info type="2">
<mailing-address><narrative>
Ministry of Finance, Planning and Economic Development, Colombo

</narrative></mailing-address></contact-info>




<recipient-country code="LK" percentage="100"><narrative xml:lang="en">SRI LANKA</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="1248991" />
                <name><narrative>Colombo</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>6.93548 79.848679</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="23111" percentage="100" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LLP" percentage="17.0000000" xml:lang="en"><narrative>Public Administration - Energy</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LLT" percentage="83.0000000" xml:lang="en"><narrative>Energy Networks and Storage</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">500011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">1416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">1416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">1416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">1416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">1416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">1416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">1416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">1416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">1416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">1416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">1416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">1416677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">333344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">83332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">83332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">83332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">83332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">83332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">83332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">83332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">83332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">83332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">83332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">83332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">83344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">83332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">83332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">83332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">83332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">83332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">83332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">83332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">83332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">83332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">83332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">83332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">83344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">250003.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">500011.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">1416665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">1416665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">1416665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">1416665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">1416665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">1416665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">1416665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">1416665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">1416665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">1416665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">1416665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">1416677.63</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">333332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">333332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">333332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">333332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">333332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">333332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">333332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">333332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">333332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">333332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">333332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">333344.37</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">83332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">83332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">83332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">83332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">83332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">83332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">83332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">83332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">83332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">83332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">83332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">83344.37</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">83332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">83332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">83332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">83332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">83332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">83332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">83332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">83332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">83332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">83332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">83332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">83344.37</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">250003.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">30000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">30000000.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">30000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-14498"><narrative>National System Operator; National Transmission Network Service Provider</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P505052"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P505052?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P505052"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Advanced planning tools operationalized
</narrative></title>
<baseline year="2025" iso-date="2025-04-07" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-07" />
<period-end iso-date="2030-07-13" />
<target value="Yes">
<comment><narrative>
project is yet to be effective
</narrative></comment>
</target>
<actual value="no">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Greenhouse gas emissions avoided
</narrative></title>
<baseline year="2025" iso-date="2025-04-04" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-04" />
<period-end iso-date="2030-07-04" />
<target value="451,720">
<comment><narrative>
Project is yet to become effective
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Received grievances addressed within 30 days
</narrative></title>
<baseline year="2025" iso-date="2025-04-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-10" />
<period-end iso-date="2030-07-10" />
<target value="80">
<comment><narrative>
project is yet to be effective
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women recruited in technical and managerial roles
</narrative></title>
<baseline year="2025" iso-date="2025-04-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-12" />
<period-end iso-date="2030-07-12" />
<target value="25">
<comment><narrative>
Project is yet to become effective
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy capacity enabled with direct support
</narrative></title>
<baseline year="2025" iso-date="2025-04-04" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-04" />
<period-end iso-date="2030-07-04" />
<target value="665">
<comment><narrative>
project is not yet effective
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy capacity enabled with direct support
</narrative></title>
<baseline year="2025" iso-date="2025-04-04" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-04" />
<period-end iso-date="2030-07-04" />
<target value="665">
<comment><narrative>
Project is yet to become effective
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Pipeline projects moving to bidding phase
</narrative></title>
<baseline year="2025" iso-date="2025-04-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-10" />
<period-end iso-date="2030-07-10" />
<target value="5">
<comment><narrative>
project is yet to be effective
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Advanced planning tools operationalized
</narrative></title>
<baseline year="2025" iso-date="2025-04-07" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-07" />
<period-end iso-date="2030-07-13" />
<target value="Yes">
<comment><narrative>
Project is yet to become effective
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Greenhouse gas emissions avoided
</narrative></title>
<baseline year="2025" iso-date="2025-04-04" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-04" />
<period-end iso-date="2030-07-04" />
<target value="451,720">
<comment><narrative>
Project is yet to become effective
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Greenhouse gas emissions avoided
</narrative></title>
<baseline year="2025" iso-date="2025-04-04" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-04" />
<period-end iso-date="2030-07-04" />
<target value="451,720">
<comment><narrative>
project is yet to be effective
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduced monthly frequency violations
</narrative></title>
<baseline year="2025" iso-date="2025-04-14" value="6"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-14" />
<period-end iso-date="2030-07-14" />
<target value="tbc">
<comment><narrative>
Project is yet to become effective
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduced monthly frequency violations
</narrative></title>
<baseline year="2025" iso-date="2025-04-14" value="6"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-14" />
<period-end iso-date="2030-07-14" />
<target value="tbc">
<comment><narrative>
project is yet to be effective
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Advanced planning tools operationalized
</narrative></title>
<baseline year="2025" iso-date="2025-04-07" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-07" />
<period-end iso-date="2030-07-13" />
<target value="Yes">
<comment><narrative>
Project is yet to become effective
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Advanced planning tools operationalized
</narrative></title>
<baseline year="2025" iso-date="2025-04-07" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-07" />
<period-end iso-date="2030-07-13" />
<target value="Yes">
<comment><narrative>
project is yet to be effective
</narrative></comment>
</target>
<actual value="no">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy capacity enabled with direct support
</narrative></title>
<baseline year="2025" iso-date="2025-04-04" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-04" />
<period-end iso-date="2030-07-04" />
<target value="665">
<comment><narrative>
Project is yet to become effective
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy capacity enabled with direct support
</narrative></title>
<baseline year="2025" iso-date="2025-04-04" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-04" />
<period-end iso-date="2030-07-04" />
<target value="665">
<comment><narrative>
project is not yet effective
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Pipeline projects moving to bidding phase
</narrative></title>
<baseline year="2025" iso-date="2025-04-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-10" />
<period-end iso-date="2030-07-10" />
<target value="5">
<comment><narrative>
Project is yet to become effective
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Greenhouse gas emissions avoided
</narrative></title>
<baseline year="2025" iso-date="2025-04-04" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-04" />
<period-end iso-date="2030-07-04" />
<target value="451,720">
<comment><narrative>
Project is yet to become effective
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Greenhouse gas emissions avoided
</narrative></title>
<baseline year="2025" iso-date="2025-04-04" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-04" />
<period-end iso-date="2030-07-04" />
<target value="451,720">
<comment><narrative>
project is yet to be effective
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduced monthly frequency violations
</narrative></title>
<baseline year="2025" iso-date="2025-04-14" value="6"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-14" />
<period-end iso-date="2030-07-14" />
<target value="tbc">
<comment><narrative>
Project is yet to become effective
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduced monthly frequency violations
</narrative></title>
<baseline year="2025" iso-date="2025-04-14" value="6"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-14" />
<period-end iso-date="2030-07-14" />
<target value="tbc">
<comment><narrative>
project is yet to be effective
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Advanced planning tools operationalized
</narrative></title>
<baseline year="2025" iso-date="2025-04-07" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-07" />
<period-end iso-date="2030-07-13" />
<target value="Yes">
<comment><narrative>
Project is yet to become effective
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Advanced planning tools operationalized
</narrative></title>
<baseline year="2025" iso-date="2025-04-07" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-07" />
<period-end iso-date="2030-07-13" />
<target value="Yes">
<comment><narrative>
project is yet to be effective
</narrative></comment>
</target>
<actual value="no">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy capacity enabled with direct support
</narrative></title>
<baseline year="2025" iso-date="2025-04-04" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-04" />
<period-end iso-date="2030-07-04" />
<target value="665">
<comment><narrative>
Project is yet to become effective
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy capacity enabled with direct support
</narrative></title>
<baseline year="2025" iso-date="2025-04-04" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-04" />
<period-end iso-date="2030-07-04" />
<target value="665">
<comment><narrative>
project is not yet effective
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduced monthly frequency violations
</narrative></title>
<baseline year="2025" iso-date="2025-04-14" value="6"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-14" />
<period-end iso-date="2030-07-14" />
<target value="tbc">
<comment><narrative>
Project is yet to become effective
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Greenhouse gas emissions avoided
</narrative></title>
<baseline year="2025" iso-date="2025-04-04" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-04" />
<period-end iso-date="2030-07-04" />
<target value="451,720">
<comment><narrative>
project is yet to be effective
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduced monthly frequency violations
</narrative></title>
<baseline year="2025" iso-date="2025-04-14" value="6"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-14" />
<period-end iso-date="2030-07-14" />
<target value="tbc">
<comment><narrative>
project is yet to be effective
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women recruited in technical and managerial roles
</narrative></title>
<baseline year="2025" iso-date="2025-04-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-12" />
<period-end iso-date="2030-07-12" />
<target value="25">
<comment><narrative>
project is yet to be effective
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Received grievances addressed within 30 days
</narrative></title>
<baseline year="2025" iso-date="2025-04-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-10" />
<period-end iso-date="2030-07-10" />
<target value="80">
<comment><narrative>
Project is yet to become effective
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-11-20T15:47:22" hierarchy="1"><iati-identifier>44000-P505241</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>IRDCRP</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–00006306"><narrative>Democratic Socialist Republic of Sri Lanka</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–00006306"><narrative>Democratic Socialist Republic of Sri Lanka</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–00006306"><narrative>Democratic Socialist Republic of Sri Lanka</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="LK-COA-00006598"><narrative>Ministry of Agriculture, Livestock, Land and Irrigation</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2025-04-10"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2025-04-10"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2030-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="2" iso-date="2030-06-30"><narrative>Projected end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Felipe F. Dizon</narrative></person-name><telephone>+1-202-473-1000</telephone><email>fdizon@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>

<contact-info type="2">
<mailing-address><narrative>
The Secretariat (3rd Floor), P.O. Box 277, Colombo

</narrative></mailing-address></contact-info>
<contact-info type="2">
<mailing-address><narrative>
The Secretariat (3rd Floor), P.O. Box 277, Colombo

</narrative></mailing-address></contact-info>
<contact-info type="2">
<mailing-address><narrative>
The Secretariat (3rd Floor), P.O. Box 277, Colombo

</narrative></mailing-address></contact-info>



<recipient-country code="LK" percentage="100"><narrative xml:lang="en">SRI LANKA</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="1248991" />
                <name><narrative>Colombo</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>6.93548 79.848679</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="31140" percentage="56" xml:lang="en"/><sector vocabulary="1" code="31191" percentage="44" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YYA" percentage="43.0000000" xml:lang="en"><narrative>Agricultural Markets, Commercialization, Agri-Business and Agriculture finance </narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AAK" percentage="2.00000000" xml:lang="en"><narrative>Public Administration - Agriculture, Fishing, and Forestry </narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AAI" percentage="55.0000000" xml:lang="en"><narrative>Irrigation and Drainage</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">-1.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">-1.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">2.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">250011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">1250011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">2083344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">2083344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">2083344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">1166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">1166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">1166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">1166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">1166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">1166671.65</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">84000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">84000000.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">100000000</value><description xml:lang="en"><narrative>Total Commitment in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-6598"><narrative>Ministry of Agriculture, Livestock, Land and Irrigation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">1000000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-6598"><narrative>Ministry of Agriculture, Livestock, Land and Irrigation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">15000000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-6598"><narrative>Ministry of Agriculture, Livestock, Land and Irrigation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-13746</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-6598"><narrative>Ministry of Agriculture, Livestock, Land and Irrigation</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P505241"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P505241?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P505241"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Productive Partnerships with business plans approved by Evaluation Committee and financed (disaggregated by ‘approved’ / ‘financed’)
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2030-06-09" />
<target value="60">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2030-06-13" />
<target value="380,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Small and medium producers in targeted value chains provided with improved market services
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2030-06-01" />
<target value="10000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Small and medium producers financed through Productive Partnerships
</narrative></title>
<baseline year="2025" iso-date="2025-04-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-14" />
<period-end iso-date="2030-06-14" />
<target value="8000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Small and medium producers financed through Productive Partnerships
</narrative></title>
<baseline year="2025" iso-date="2025-04-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-14" />
<period-end iso-date="2030-06-14" />
<target value="8000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Landscape Governance Index (disaggregated by landscape)
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="3.0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2030-06-15" />
<target value="4.0">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Landscapes under enhanced conservation and/or sustainable management (terrestrial and inland water areas)
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2030-06-15" />
<target value="28,3000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2030-06-13" />
<target value="380,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Entrepreneurs with innovation business plans approved by Evaluation Committee (disaggregated by sex and age)
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2030-06-15" />
<target value="500">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Agri-food producers adopting improved and climate-resilient agricultural technology or practices supported by the project
</narrative></title>
<baseline year="2025" iso-date="2025-04-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-14" />
<period-end iso-date="2030-06-14" />
<target value="8000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Irrigation infrastructure assets rehabilitated or modernized
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2030-06-15" />
<target value="700">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Entrepreneurs with innovation business plans approved by Evaluation Committee (disaggregated by sex and age)
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2030-06-15" />
<target value="500">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net GHG emissions
</narrative></title>
<baseline year="2025" iso-date="2025-04-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-14" />
<period-end iso-date="2030-06-15" />
<target value="70000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of targeted beneficiaries with rating ‘Satisfactory’ or above on project interventions
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2030-06-15" />
<target value="70">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Agricultural surveys conducted
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2030-06-15" />
<target value="2">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Productive Partnerships with business plans approved by Evaluation Committee and financed (disaggregated by ‘approved’ / ‘financed’)
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2030-06-09" />
<target value="60">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Agri-food producers with increased marketed value of their produce of at least 15 percent compared to comparison group through Productive Partnerships
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2030-06-15" />
<target value="8000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of targeted beneficiaries with rating ‘Satisfactory’ or above on project interventions
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2030-06-15" />
<target value="70">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Agri-food producers with increased marketed value of their produce of at least 15 percent compared to comparison group through Productive Partnerships
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2030-06-15" />
<target value="8000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2030-06-13" />
<target value="380,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2030-06-13" />
<target value="380,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2030-06-13" />
<target value="380,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Agri-food producers adopting improved and climate-resilient agricultural technology or practices supported by the project
</narrative></title>
<baseline year="2025" iso-date="2025-04-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-14" />
<period-end iso-date="2030-06-14" />
<target value="8000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Agri-food producers adopting improved and climate-resilient agricultural technology or practices supported by the project
</narrative></title>
<baseline year="2025" iso-date="2025-04-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-14" />
<period-end iso-date="2030-06-14" />
<target value="8000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Agri-food producers adopting improved and climate-resilient agricultural technology or practices supported by the project
</narrative></title>
<baseline year="2025" iso-date="2025-04-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-14" />
<period-end iso-date="2030-06-14" />
<target value="8000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area provided with improved irrigation or drainage services
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2030-06-13" />
<target value="71630">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area provided with improved irrigation or drainage services
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2030-06-13" />
<target value="71630">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area provided with improved irrigation or drainage services
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2030-06-13" />
<target value="71630">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Agri-food producers with increased marketed value of their produce of at least 15 percent compared to comparison group through Productive Partnerships
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2030-06-15" />
<target value="8000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Agri-food producers with increased marketed value of their produce of at least 15 percent compared to comparison group through Productive Partnerships
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2030-06-15" />
<target value="8000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Agri-food producers with increased marketed value of their produce of at least 15 percent compared to comparison group through Productive Partnerships
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2030-06-15" />
<target value="8000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Cascade Management Committees (CMC) with women in leadership roles
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2030-06-15" />
<target value="60">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Agri-food producers adopting improved and climate-resilient agricultural technology or practices supported by the project
</narrative></title>
<baseline year="2025" iso-date="2025-04-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-14" />
<period-end iso-date="2030-06-14" />
<target value="8000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Landscape Governance Index (disaggregated by landscape)
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="3.0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2030-06-15" />
<target value="4.0">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Irrigation infrastructure assets rehabilitated or modernized
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2030-06-15" />
<target value="700">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Landscapes under enhanced conservation and/or sustainable management (terrestrial and inland water areas)
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2030-06-15" />
<target value="28,3000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area provided with improved irrigation or drainage services
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2030-06-13" />
<target value="71630">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Agricultural surveys conducted
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2030-06-15" />
<target value="2">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Agencies participating in automation platform supported by the project
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2030-06-12" />
<target value="8">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area provided with improved irrigation or drainage services
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2030-06-13" />
<target value="71630">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private capital mobilized
</narrative></title>
<baseline year="2025" iso-date="2025-04-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-14" />
<period-end iso-date="2030-06-14" />
<target value="17,000,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private capital mobilized
</narrative></title>
<baseline year="2025" iso-date="2025-04-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-14" />
<period-end iso-date="2030-06-14" />
<target value="17,000,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Cascade Management Committees (CMC) with women in leadership roles
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2030-06-15" />
<target value="60">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Agencies participating in automation platform supported by the project
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2030-06-12" />
<target value="8">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Small and medium producers financed through Productive Partnerships
</narrative></title>
<baseline year="2025" iso-date="2025-04-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-14" />
<period-end iso-date="2030-06-14" />
<target value="8000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Landscape Governance Index (disaggregated by landscape)
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="3.0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2030-06-15" />
<target value="4.0">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Entrepreneurs with innovation business plans approved by Evaluation Committee (disaggregated by sex and age)
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2030-06-15" />
<target value="500">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of targeted beneficiaries with rating ‘Satisfactory’ or above on project interventions
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2030-06-15" />
<target value="70">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Irrigation infrastructure assets rehabilitated or modernized
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2030-06-15" />
<target value="700">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net GHG emissions
</narrative></title>
<baseline year="2025" iso-date="2025-04-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-14" />
<period-end iso-date="2030-06-15" />
<target value="70000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Landscapes under enhanced conservation and/or sustainable management (terrestrial and inland water areas)
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2030-06-15" />
<target value="28,3000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private capital mobilized
</narrative></title>
<baseline year="2025" iso-date="2025-04-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-14" />
<period-end iso-date="2030-06-14" />
<target value="17,000,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Small and medium producers in targeted value chains provided with improved market services
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2030-06-01" />
<target value="10000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Agencies participating in automation platform supported by the project
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2030-06-12" />
<target value="8">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2030-06-13" />
<target value="380,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2030-06-13" />
<target value="380,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2030-06-13" />
<target value="380,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Agri-food producers adopting improved and climate-resilient agricultural technology or practices supported by the project
</narrative></title>
<baseline year="2025" iso-date="2025-04-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-14" />
<period-end iso-date="2030-06-14" />
<target value="8000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Agri-food producers adopting improved and climate-resilient agricultural technology or practices supported by the project
</narrative></title>
<baseline year="2025" iso-date="2025-04-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-14" />
<period-end iso-date="2030-06-14" />
<target value="8000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Agri-food producers adopting improved and climate-resilient agricultural technology or practices supported by the project
</narrative></title>
<baseline year="2025" iso-date="2025-04-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-14" />
<period-end iso-date="2030-06-14" />
<target value="8000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area provided with improved irrigation or drainage services
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2030-06-13" />
<target value="71630">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area provided with improved irrigation or drainage services
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2030-06-13" />
<target value="71630">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area provided with improved irrigation or drainage services
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2030-06-13" />
<target value="71630">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Cascade Management Committees (CMC) with women in leadership roles
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2030-06-15" />
<target value="60">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Agricultural surveys conducted
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2030-06-15" />
<target value="2">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Agri-food producers with increased marketed value of their produce of at least 15 percent compared to comparison group through Productive Partnerships
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2030-06-15" />
<target value="8000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Agri-food producers with increased marketed value of their produce of at least 15 percent compared to comparison group through Productive Partnerships
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2030-06-15" />
<target value="8000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Agri-food producers with increased marketed value of their produce of at least 15 percent compared to comparison group through Productive Partnerships
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2030-06-15" />
<target value="8000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Small and medium producers in targeted value chains provided with improved market services
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2030-06-01" />
<target value="10000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Productive Partnerships with business plans approved by Evaluation Committee and financed (disaggregated by ‘approved’ / ‘financed’)
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2030-06-09" />
<target value="60">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net GHG emissions
</narrative></title>
<baseline year="2025" iso-date="2025-04-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-14" />
<period-end iso-date="2030-06-15" />
<target value="70000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-11-20T15:47:22" hierarchy="1"><iati-identifier>44000-P508317</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Digital SL</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–00010388"><narrative>Democratic Socialist Republic of Sri Lanka</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–00010388"><narrative>Democratic Socialist Republic of Sri Lanka</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="LK-COA-00010279"><narrative>Ministry of Digital Economy</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2025-12-19"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2025-12-19"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2029-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="2" iso-date="2029-12-31"><narrative>Projected end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Anna Zita Metz</narrative></person-name><telephone>+1-202-473-1000</telephone><email>ametz@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>







<recipient-country code="LK" percentage="100"><narrative xml:lang="en">SRI LANKA</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="1248991" />
                <name><narrative>Colombo</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>6.93548 79.848679</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="22040" percentage="73" xml:lang="en"/><sector vocabulary="1" code="22040" percentage="73" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="27" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="27" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="DDG" percentage="68.0000000" xml:lang="en"><narrative>Digital Government - Public Administration</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="DDE" percentage="32.0000000" xml:lang="en"><narrative>Digital Economy - Digital Industry</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">214284.71</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">214284.71</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">214284.71</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">214284.71</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">214284.71</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">214284.71</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">214291.74</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">1250011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">1666677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">833344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">500006.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">50000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">50000000.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">50000000</value><description xml:lang="en"><narrative>Total Commitment in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-11779"><narrative>GovTech Sri Lanka (Private) Limited; Ministry of Digital Economy</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P508317"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P508317?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P508317"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services (enhanced services)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="4,000,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services (enhanced services)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="4,000,000">
<comment><narrative>
Project is not yet effective.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Data and service classification completed by government entities
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="50">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People reached by digital empowerment program
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="300000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services (enhanced services)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="4,000,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New private sector investment enabled for IT firms
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="5000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services (enhanced services)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="400,0000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IT firms provided with international market access support
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="75">
<comment><narrative>
Project is not yet effective.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Digital economy enabling reforms adopted
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2029-12-14" />
<target value="5">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Startups that have secured new, private sector investment
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="25">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Data and service classification completed by government entities
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="50">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Government systems connected to National Data Exchange (NDX)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="50">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IT firms provided with international market access support
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="75">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IT firms acquired new business customers
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2030-12-15" />
<target value="30">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Citizen- and/or business-facing services available via the SuperApp
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="50">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Government services and systems migrated to the new GovCloud
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="50">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IT firms acquired new business customers
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2030-12-15" />
<target value="30">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Verifiable credentials accessible via the digital locker
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="15">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Government entities using government-wide communication and collaboration tools
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="35">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Digital champions trained
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="300">
<comment><narrative>
Project is not yet effective.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People who contributed through participatory approaches to SuperApp design and accessibility
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="250">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
GovCloud compliant with climate and disaster recovery standards
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="Yes">
<comment><narrative>
Project is not yet effective.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Government services and systems migrated to the new GovCloud
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="50">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People who contributed through participatory approaches to SuperApp design and accessibility
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="250">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Digital startups that have secured new, private sector investment
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="25">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People reached by digital empowerment program
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="300000">
<comment><narrative>
Project is not yet effective.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Startups that have completed an acceleration program
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="100">
<comment><narrative>
Project is not yet effective.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Verifiable credentials accessible via the digital locker
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="15">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People reached by digital empowerment program
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="300000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New private sector investment enabled for IT firms
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="5000000">
<comment><narrative>
Project is not yet effective.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People who contributed through participatory approaches to SuperApp design and accessibility
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="250">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Digital champions trained
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="300">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
GovCloud compliant with climate and disaster recovery standards
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2025-12-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Comprehensive IT industry development strategy formulated
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
People satisfied with their experience accessing public services online
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2029-12-15" />
<target value="75">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People reached by digital empowerment program
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="300000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Verifiable credentials accessible via the digital locker
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="15">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Digital economy enabling reforms adopted
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2029-12-14" />
<target value="5">
<comment><narrative>
Project is not yet effective.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Citizen- and/or business-facing services available via the SuperApp
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="50">
<comment><narrative>
Project is not yet effective.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IT firms provided with international market access support
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="75">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Comprehensive IT industry development strategy formulated
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Verifiable credentials accessible via the digital locker
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="15">
<comment><narrative>
Project is not yet effective.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IT firms acquired new business customers
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="30">
<comment><narrative>
Project is not yet effective.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Government systems connected to National Data Exchange (NDX)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="50">
<comment><narrative>
Project is not yet effective.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Digital economy enabling reforms adopted
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2029-12-14" />
<target value="5">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
GovCloud compliant with climate and disaster recovery standards
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Digital champions trained
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="300">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Digital champions trained
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="300">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Citizen- and/or business-facing services available via the SuperApp
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="50">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Startups that have completed an acceleration program
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Government services and systems migrated to the new GovCloud
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="50">
<comment><narrative>
Project is not yet effective.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Digital economy enabling legal, regulatory, and policy frameworks developed or updated
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="5">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Government systems connected to National Data Exchange (NDX)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="50">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Startups that have completed an acceleration program
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IT firms acquired new business customers
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="30">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Startups that have completed an acceleration program
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New private investment generated by IT firms
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="5000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Data and service classification completed by government entities
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="50">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New private sector investment enabled for IT firms
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="5000000">
<comment><narrative>
Project is not yet effective.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New private sector investment enabled for IT firms
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="5000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New private sector investment enabled for IT firms
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="5000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Startups that have secured new, private sector investment
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="25">
<comment><narrative>
Project is not yet effective.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Government entities using government-wide communication and collaboration tools
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="35">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New private investment generated by IT firms
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="5000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Comprehensive IT industry development strategy formulated
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Government systems connected to National Data Exchange (NDX)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="50">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IT firms provided with international market access support
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="75">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Government entities using government-wide communication and collaboration tools
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="35">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Government entities using government-wide communication and collaboration tools
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="35">
<comment><narrative>
Project is not yet effective.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New private sector investment enabled for IT firms
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="5000000">
<comment><narrative>
Project is not yet effective.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New private sector investment enabled for IT firms
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="5000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New private sector investment enabled for IT firms
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="5000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New private investment generated by IT firms
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="5000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services (enhanced services)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="4,000,000">
<comment><narrative>
Project is not yet effective.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services (enhanced services)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="4,000,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services (enhanced services)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="4,000,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services (enhanced services)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="400,0000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People who contributed through participatory approaches to SuperApp design and accessibility
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="250">
<comment><narrative>
Project is not yet effective.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
People satisfied with their experience accessing public services online
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2029-12-15" />
<target value="75">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services (enhanced services)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="4,000,000">
<comment><narrative>
Project is not yet effective.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services (enhanced services)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="4,000,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services (enhanced services)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="4,000,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services (enhanced services)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="400,0000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Citizen- and/or business-facing services available via the SuperApp
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="50">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Comprehensive IT industry development strategy formulated
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="Yes">
<comment><narrative>
Project is not yet effective.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Government services and systems migrated to the new GovCloud
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="50">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
People satisfied with their experience accessing public services online
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2029-12-15" />
<target value="75">
<comment><narrative>
Project is not yet effective.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New private sector investment enabled for IT firms
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="5000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Digital startups that have secured new, private sector investment
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="25">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Data and service classification completed by government entities
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="50">
<comment><narrative>
Project is not yet effective.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
People satisfied with their experience accessing public services online
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2029-12-15" />
<target value="75">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
GovCloud compliant with climate and disaster recovery standards
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2025-12-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-11-20T15:47:22" hierarchy="1"><iati-identifier>44000-P511605</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>SL-REVIVE</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–00010600"><narrative>Democratic Socialist Republic of Sri Lanka</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="LK-COA-00010525"><narrative>Ministry of Transport Highway and Urban Development (MTHUD) </narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2026-03-31"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2026-03-31"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2031-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="2" iso-date="2031-06-30"><narrative>Projected end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Phoram Shah</narrative></person-name><telephone>+1-202-473-1000</telephone><email>pshah5@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<contact-info type="2">
<mailing-address><narrative>
Chief Secretary's Secretariat, Provincial Council Complex, , , Kaithady. Jaffna., Northtern Province

</narrative></mailing-address></contact-info>
<contact-info type="2">
<mailing-address><narrative>
Chief Secretary's Secretariat, , Trincomalee, Eastern Province

</narrative></mailing-address></contact-info>
<contact-info type="2">
<mailing-address><narrative>
Chief Secretary's Secretariat, Trincomalee, Eastern Province

</narrative></mailing-address></contact-info><recipient-country code="LK" percentage="100"><narrative xml:lang="en">SRI LANKA</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="1248991" />
                <name><narrative>Colombo</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>6.93548 79.848679</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="74020" percentage="49" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="49" xml:lang="en"/><sector vocabulary="1" code="15185" percentage="45" xml:lang="en"/><sector vocabulary="1" code="15185" percentage="45" xml:lang="en"/><sector vocabulary="1" code="33210" percentage="2" xml:lang="en"/><sector vocabulary="1" code="33210" percentage="2" xml:lang="en"/><sector vocabulary="1" code="31110" percentage="2" xml:lang="en"/><sector vocabulary="1" code="31110" percentage="2" xml:lang="en"/><sector vocabulary="1" code="31310" percentage="2" xml:lang="en"/><sector vocabulary="1" code="31310" percentage="2" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AAF" percentage="1.00000000" xml:lang="en"><narrative>Fisheries</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YYT" percentage="2.00000000" xml:lang="en"><narrative>Tourism</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BBH" percentage="95.0000000" xml:lang="en"><narrative>Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AAZ" percentage="2.00000000" xml:lang="en"><narrative>Other - Agriculture, Fishing, and Forestry </narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">833344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">2083344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">2083344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">1916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">1916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">1916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">1916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">1916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">1916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">1916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">1916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">1916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">1916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">1916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">1916677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">1000011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">100000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">100000000.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">100000000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="LK-COA-12721"><narrative>Eastern Province; Eastern Provincial Council; Ministry of Transport Highway and Urban Development (MTHUD) ; Ministry of Transport, Highways and Urban Development; Northern Provincial Council</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P511605"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P511605?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P511605"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Strategic Regional Development Plan adopted
</narrative></title>
<baseline year="2026" iso-date="2026-03-14" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-03-14" />
<period-end iso-date="2031-06-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Tourism facilities/sites/public parks rehabilitated or constructed
</narrative></title>
<baseline year="2026" iso-date="2026-03-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-03-14" />
<period-end iso-date="2031-06-15" />
<target value="5">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances received that are processed within the stipulated service standards
</narrative></title>
<baseline year="2026" iso-date="2026-03-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-03-14" />
<period-end iso-date="2031-06-15" />
<target value="80">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private Capital Enabled by designing market-validated PPP projects
</narrative></title>
<baseline year="2026" iso-date="2026-03-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-03-14" />
<period-end iso-date="2031-06-15" />
<target value="8000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Preparatory studies and technical assessments completed for future implementation
</narrative></title>
<baseline year="2026" iso-date="2026-03-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-03-14" />
<period-end iso-date="2031-06-15" />
<target value="3">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Tourism facilities/sites/public parks rehabilitated or constructed
</narrative></title>
<baseline year="2026" iso-date="2026-03-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-03-14" />
<period-end iso-date="2031-06-15" />
<target value="5">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women reporting increased perception of safety and accessibility in public spaces
</narrative></title>
<baseline year="2026" iso-date="2026-03-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-03-14" />
<period-end iso-date="2031-06-14" />
<target value="80">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
On-shore fisheries related facilities upgraded
</narrative></title>
<baseline year="2026" iso-date="2026-03-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-03-14" />
<period-end iso-date="2031-06-15" />
<target value="5">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Preparatory studies and technical assessments completed for future implementation
</narrative></title>
<baseline year="2026" iso-date="2026-03-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-03-14" />
<period-end iso-date="2031-06-15" />
<target value="3">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Preparatory studies and technical assessments completed for future implementation
</narrative></title>
<baseline year="2026" iso-date="2026-03-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-03-14" />
<period-end iso-date="2031-06-15" />
<target value="3">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances received that are processed within the stipulated service standards
</narrative></title>
<baseline year="2026" iso-date="2026-03-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-03-14" />
<period-end iso-date="2031-06-15" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women reporting increased perception of safety and accessibility in public spaces
</narrative></title>
<baseline year="2026" iso-date="2026-03-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-03-14" />
<period-end iso-date="2031-06-14" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2026" iso-date="2026-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-03-15" />
<period-end iso-date="2031-06-15" />
<target value="250,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Central, regional and local government staff benefiting from capacity building activities
</narrative></title>
<baseline year="2026" iso-date="2026-03-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-03-14" />
<period-end iso-date="2031-06-14" />
<target value="100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with more and better-paid jobs
</narrative></title>
<baseline year="2026" iso-date="2026-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-03-15" />
<period-end iso-date="2031-06-15" />
<target value="3000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries satisfied with project interventions
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-06-14" />
<target value="85">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries (residents, businesses, tourists) satisfied with project interventions
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-06-15" />
<target value="85">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New enterprises established or existing enterprises with expanded operations
</narrative></title>
<baseline year="2026" iso-date="2026-03-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-03-14" />
<period-end iso-date="2031-06-14" />
<target value="500">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Strategic Regional Development Plans Prepared
</narrative></title>
<baseline year="2026" iso-date="2026-03-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-03-14" />
<period-end iso-date="2031-06-14" />
<target value="2">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Strategic Regional Development Plans Prepared
</narrative></title>
<baseline year="2026" iso-date="2026-03-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-03-14" />
<period-end iso-date="2031-06-14" />
<target value="2">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances received that are processed within the stipulated service standards
</narrative></title>
<baseline year="2026" iso-date="2026-03-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-03-14" />
<period-end iso-date="2031-06-15" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women reporting increased perception of safety and accessibility in public spaces
</narrative></title>
<baseline year="2026" iso-date="2026-03-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-03-14" />
<period-end iso-date="2031-06-14" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private Capital Enabled by designing market-validated PPP projects
</narrative></title>
<baseline year="2026" iso-date="2026-03-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-03-14" />
<period-end iso-date="2031-06-15" />
<target value="8000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Central, regional and local staff benefiting from the capacity building activities
</narrative></title>
<baseline year="2026" iso-date="2026-03-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-03-14" />
<period-end iso-date="2031-06-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries satisfied with project interventions
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-06-14" />
<target value="85">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with more and better-paid jobs
</narrative></title>
<baseline year="2026" iso-date="2026-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-03-15" />
<period-end iso-date="2031-06-15" />
<target value="3000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
On-shore fisheries related facilities upgraded
</narrative></title>
<baseline year="2026" iso-date="2026-03-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-03-14" />
<period-end iso-date="2031-06-15" />
<target value="5">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2026" iso-date="2026-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-03-15" />
<period-end iso-date="2031-06-15" />
<target value="260,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private Capital Enabled by designing market-validated PPP projects
</narrative></title>
<baseline year="2026" iso-date="2026-03-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-03-14" />
<period-end iso-date="2031-06-15" />
<target value="8000000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
On-shore fisheries related facilities upgraded
</narrative></title>
<baseline year="2026" iso-date="2026-03-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-03-14" />
<period-end iso-date="2031-06-15" />
<target value="5">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private Capital Enabled by designing market-validated PPP projects
</narrative></title>
<baseline year="2026" iso-date="2026-03-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-03-14" />
<period-end iso-date="2031-06-15" />
<target value="8000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with more and better-paid jobs
</narrative></title>
<baseline year="2026" iso-date="2026-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-03-15" />
<period-end iso-date="2031-06-15" />
<target value="3000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Tourism facilities/sites/public parks rehabilitated or constructed
</narrative></title>
<baseline year="2026" iso-date="2026-03-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-03-14" />
<period-end iso-date="2031-06-15" />
<target value="5">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with more and better-paid jobs
</narrative></title>
<baseline year="2026" iso-date="2026-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-03-15" />
<period-end iso-date="2031-06-15" />
<target value="3000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with more and better-paid jobs
</narrative></title>
<baseline year="2026" iso-date="2026-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-03-15" />
<period-end iso-date="2031-06-15" />
<target value="3000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with more and better-paid jobs
</narrative></title>
<baseline year="2026" iso-date="2026-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-03-15" />
<period-end iso-date="2031-06-15" />
<target value="3000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with more and better-paid job
</narrative></title>
<baseline year="2026" iso-date="2026-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-03-15" />
<period-end iso-date="2031-06-15" />
<target value="3000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New enterprises established or existing enterprises with expanded operations
</narrative></title>
<baseline year="2026" iso-date="2026-03-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-03-14" />
<period-end iso-date="2031-06-14" />
<target value="500">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2026" iso-date="2026-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-03-15" />
<period-end iso-date="2031-06-15" />
<target value="260,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2026" iso-date="2026-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-03-15" />
<period-end iso-date="2031-06-15" />
<target value="260,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2026" iso-date="2026-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-03-15" />
<period-end iso-date="2031-06-15" />
<target value="260,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2026" iso-date="2026-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-03-15" />
<period-end iso-date="2031-06-15" />
<target value="250,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Tourism facilities/sites/public parks rehabilitated or constructed
</narrative></title>
<baseline year="2026" iso-date="2026-03-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-03-14" />
<period-end iso-date="2031-06-15" />
<target value="5">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Central, regional and local government staff benefiting from capacity building activities
</narrative></title>
<baseline year="2026" iso-date="2026-03-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-03-14" />
<period-end iso-date="2031-06-14" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women reporting increased perception of safety in public spaces
</narrative></title>
<baseline year="2026" iso-date="2026-03-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-03-14" />
<period-end iso-date="2031-06-15" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Central, regional and local government staff benefiting from capacity building activities
</narrative></title>
<baseline year="2026" iso-date="2026-03-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-03-14" />
<period-end iso-date="2031-06-14" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2026" iso-date="2026-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-03-15" />
<period-end iso-date="2031-06-15" />
<target value="260,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
On-shore fisheries related facilities upgraded
</narrative></title>
<baseline year="2026" iso-date="2026-03-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-03-14" />
<period-end iso-date="2031-06-15" />
<target value="5">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New enterprises established or existing enterprises with expanded operations
</narrative></title>
<baseline year="2026" iso-date="2026-03-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-03-14" />
<period-end iso-date="2031-06-14" />
<target value="500">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Strategic Regional Development Plan adopted
</narrative></title>
<baseline year="2026" iso-date="2026-03-14" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-03-14" />
<period-end iso-date="2031-06-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances received that are processed within the stipulated service standards
</narrative></title>
<baseline year="2026" iso-date="2026-03-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-03-14" />
<period-end iso-date="2031-06-15" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2026" iso-date="2026-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-03-15" />
<period-end iso-date="2031-06-15" />
<target value="260,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with more and better-paid job
</narrative></title>
<baseline year="2026" iso-date="2026-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-03-15" />
<period-end iso-date="2031-06-15" />
<target value="3000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries satisfied with project interventions
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-06-14" />
<target value="85">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Preparatory studies and technical assessments completed for future implementation
</narrative></title>
<baseline year="2026" iso-date="2026-03-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-03-14" />
<period-end iso-date="2031-06-15" />
<target value="3">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with more and better-paid jobs
</narrative></title>
<baseline year="2026" iso-date="2026-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-03-15" />
<period-end iso-date="2031-06-15" />
<target value="3000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with more and better-paid jobs
</narrative></title>
<baseline year="2026" iso-date="2026-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-03-15" />
<period-end iso-date="2031-06-15" />
<target value="3000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with more and better-paid jobs
</narrative></title>
<baseline year="2026" iso-date="2026-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-03-15" />
<period-end iso-date="2031-06-15" />
<target value="3000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with more and better-paid job
</narrative></title>
<baseline year="2026" iso-date="2026-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-03-15" />
<period-end iso-date="2031-06-15" />
<target value="3000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2026" iso-date="2026-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-03-15" />
<period-end iso-date="2031-06-15" />
<target value="260,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2026" iso-date="2026-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-03-15" />
<period-end iso-date="2031-06-15" />
<target value="260,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2026" iso-date="2026-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-03-15" />
<period-end iso-date="2031-06-15" />
<target value="260,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2026" iso-date="2026-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-03-15" />
<period-end iso-date="2031-06-15" />
<target value="250,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New enterprises established or existing enterprises with expanded operations
</narrative></title>
<baseline year="2026" iso-date="2026-03-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-03-14" />
<period-end iso-date="2031-06-14" />
<target value="500">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-11-23T12:42:36" hierarchy="1"><iati-identifier>44000-P511917</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Sri Lanka Reforms for Growth, Resilience and Openness Development Policy Operation</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To boost investment and create jobs by supporting structural reforms that enhance competitiveness and improve economic governance]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Sri Lanka Reforms for Growth, Resilience and Openness (REGROW) Development Policy Operation for Democratic Socialist Republic of Sri Lanka is to boost investment and create jobs by supporting structural reforms that enhance competitiveness and improve economic governance. The operation, first in a programmatic series, works in two areas: enhancing competitiveness by lowering barriers to trade through a four year phase out of para tariffs under the National Tariff Policy, modernizing the investment climate via a new Investment and Trade Commission law and regulations, strengthening the financial sector with a unified Rescue, Rehabilitation and Insolvency Act for corporate and personal cases, and removing legal barriers to women's work through amendment of the Shop and Office Employees regulations and broader labor standards reform; and improving economic governance by tightening transparency and discipline of tax incentives through amendments to the Strategic Development Projects Act and a forthcoming tax expenditure framework and Tax Administration Procedures Law, strengthening state owned enterprise oversight via a standardized credit risk assessment methodology and a new Public Commercial Enterprises Management framework with a Holding Company, increasing private participation and efficiency in the power sector through a national competitive procurement manual for energy projects, and upgrading the evidence base for policymaking with a new National Statistics Act and a National Statistical Council. The operation intends to reduce average import duties, raise foreign direct investment by Board of Investment (BOI) registered companies, resolve insolvency cases in court, increase women's formal employment in hospitality, lift income tax revenue as a share of Gross Domestic Product, transfer major state owned enterprises to the Holding Company or market, mobilize private investment in energy, and improve the Statistical Performance Indicator (SPI), thereby supporting private sector led growth, job creation, and resilience.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="LK–00013979"><narrative>Democratic Socialist Republic of Sri Lanka </narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="LK-COA-00011954"><narrative>Ministry of Finance</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2026-06-29"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2026-06-29"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2026-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="2" iso-date="2026-12-31"><narrative>Projected end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Namoos Zaheer</narrative></person-name><telephone>+1-202-473-1000</telephone><email>nzaheer@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>








<recipient-country code="LK" percentage="100"><narrative xml:lang="en">SRI LANKA</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="1248991" />
                <name><narrative>Colombo</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>6.93548 79.848679</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="24010" percentage="17" xml:lang="en"/><sector vocabulary="1" code="24010" percentage="17" xml:lang="en"/><sector vocabulary="1" code="23111" percentage="17" xml:lang="en"/><sector vocabulary="1" code="23111" percentage="17" xml:lang="en"/><sector vocabulary="1" code="33110" percentage="17" xml:lang="en"/><sector vocabulary="1" code="33110" percentage="17" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="17" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="17" xml:lang="en"/><sector vocabulary="1" code="15155" percentage="16" xml:lang="en"/><sector vocabulary="1" code="15155" percentage="16" xml:lang="en"/><sector vocabulary="1" code="15126" percentage="16" xml:lang="en"/><sector vocabulary="1" code="15126" percentage="16" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YYY" percentage="17.0000000" xml:lang="en"><narrative>Trade</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LLP" percentage="17.0000000" xml:lang="en"><narrative>Public Administration - Energy</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="FFA" percentage="8.00000000" xml:lang="en"><narrative>Banking Institutions</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SSA" percentage="17.0000000" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BBC" percentage="33.0000000" xml:lang="en"><narrative>Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="FFK" percentage="8.00000000" xml:lang="en"><narrative>Capital Markets</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">150000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">150000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">150000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">150000000.00</value>
</budget>
<capital-spend percentage="0" /><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P511917"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P511917?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P511917"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in statistical capacity as measured by the Statistical Performance Indicator
</narrative></title>
<baseline year="2024" iso-date="2024-12-14" value="74.6"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-14" />
<period-end iso-date="2029-12-14" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in statistical capacity as measured by the Statistical Performance Indicator
</narrative></title>
<baseline year="2024" iso-date="2024-12-14" value="74.6"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-14" />
<period-end iso-date="2029-12-14" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in statistical capacity as measured by the Statistical Performance Indicator
</narrative></title>
<baseline year="2024" iso-date="2024-12-14" value="74.6"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-14" />
<period-end iso-date="2029-12-14" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private investment mobilized through competitive bidding for energy projects
</narrative></title>
<baseline year="2026" iso-date="2026-04-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-14" />
<period-end iso-date="2029-12-15" />
<target value="500000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private investment mobilized through competitive bidding for energy projects
</narrative></title>
<baseline year="2026" iso-date="2026-04-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-14" />
<period-end iso-date="2029-12-15" />
<target value="800000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private investment mobilized through competitive bidding for energy projects
</narrative></title>
<baseline year="2026" iso-date="2026-04-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-14" />
<period-end iso-date="2029-12-15" />
<target value="800000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Largest SOEs (by average annual revenue since 2015) scheduled under the PCEM Act that have been transferred to the HoCo or brought to market for divestment
</narrative></title>
<baseline year="2026" iso-date="2026-04-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-14" />
<period-end iso-date="2029-12-15" />
<target value="15">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Largest SOEs (by average annual revenue since 2015) scheduled under the PCEM Act that have been transferred to the HoCo or brought to market for divestment
</narrative></title>
<baseline year="2026" iso-date="2026-04-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-14" />
<period-end iso-date="2029-12-15" />
<target value="15">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Largest SOEs (by average annual revenue since 2015) scheduled under the PCEM Act that have been transferred to the HoCo or brought to market for divestment
</narrative></title>
<baseline year="2026" iso-date="2026-04-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-14" />
<period-end iso-date="2029-12-15" />
<target value="15">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in income tax revenue collected (percent of GDP)
</narrative></title>
<baseline year="2024" iso-date="2024-12-14" value="3.4"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-14" />
<period-end iso-date="2029-12-14" />
<target value="3.7">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in income tax revenue collected (percent of GDP)
</narrative></title>
<baseline year="2024" iso-date="2024-12-14" value="3.4"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-14" />
<period-end iso-date="2029-12-14" />
<target value="3.7">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in income tax revenue collected (percent of GDP)
</narrative></title>
<baseline year="2024" iso-date="2024-12-14" value="3.4"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-14" />
<period-end iso-date="2029-12-14" />
<target value="3.7">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in women's formal employment in the hospitality sector
</narrative></title>
<baseline year="2023" iso-date="2023-12-14" value="110,694"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-14" />
<period-end iso-date="2029-12-14" />
<target value="121,763">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in women's formal employment in the hospitality sector
</narrative></title>
<baseline year="2023" iso-date="2023-12-14" value="110,694"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-14" />
<period-end iso-date="2029-12-14" />
<target value="121,763">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in women's formal employment in the hospitality sector
</narrative></title>
<baseline year="2023" iso-date="2023-12-14" value="110,694"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-14" />
<period-end iso-date="2029-12-14" />
<target value="121,763">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Restructuring and/or liquidation applications resolved in court under the new insolvency law
</narrative></title>
<baseline year="2026" iso-date="2026-04-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-14" />
<period-end iso-date="2029-12-14" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Restructuring and/or liquidation applications resolved in court under the new insolvency law
</narrative></title>
<baseline year="2026" iso-date="2026-04-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-14" />
<period-end iso-date="2029-12-14" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Restructuring and/or liquidation applications resolved in court under the new insolvency law
</narrative></title>
<baseline year="2026" iso-date="2026-04-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-14" />
<period-end iso-date="2029-12-14" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Simple average total import duties
</narrative></title>
<baseline year="2026" iso-date="2026-04-14" value="18.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-14" />
<period-end iso-date="2029-12-15" />
<target value="9.5">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Simple average total import duties
</narrative></title>
<baseline year="2026" iso-date="2026-04-14" value="18.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-14" />
<period-end iso-date="2029-12-15" />
<target value="9.5">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Simple average total import duties
</narrative></title>
<baseline year="2026" iso-date="2026-04-14" value="18.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-14" />
<period-end iso-date="2029-12-15" />
<target value="9.5">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
FDI by BOI registered companies (including equity, retained earnings, debt)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="952000000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="1394000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
FDI by BOI registered companies (including equity, retained earnings, debt)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="952000000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="1394000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
FDI by BOI registered companies (including equity, retained earnings, debt)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="952000000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="1394000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in statistical capacity as measured by the Statistical Performance Indicator
</narrative></title>
<baseline year="2024" iso-date="2024-12-14" value="74.6"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-14" />
<period-end iso-date="2029-12-14" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in statistical capacity as measured by the Statistical Performance Indicator
</narrative></title>
<baseline year="2024" iso-date="2024-12-14" value="74.6"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-14" />
<period-end iso-date="2029-12-14" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in statistical capacity as measured by the Statistical Performance Indicator
</narrative></title>
<baseline year="2024" iso-date="2024-12-14" value="74.6"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-14" />
<period-end iso-date="2029-12-14" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private investment mobilized through competitive bidding for energy projects
</narrative></title>
<baseline year="2026" iso-date="2026-04-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-14" />
<period-end iso-date="2029-12-15" />
<target value="500000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private investment mobilized through competitive bidding for energy projects
</narrative></title>
<baseline year="2026" iso-date="2026-04-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-14" />
<period-end iso-date="2029-12-15" />
<target value="800000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private investment mobilized through competitive bidding for energy projects
</narrative></title>
<baseline year="2026" iso-date="2026-04-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-14" />
<period-end iso-date="2029-12-15" />
<target value="800000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Largest SOEs (by average annual revenue since 2015) scheduled under the PCEM Act that have been transferred to the HoCo or brought to market for divestment
</narrative></title>
<baseline year="2026" iso-date="2026-04-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-14" />
<period-end iso-date="2029-12-15" />
<target value="15">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Largest SOEs (by average annual revenue since 2015) scheduled under the PCEM Act that have been transferred to the HoCo or brought to market for divestment
</narrative></title>
<baseline year="2026" iso-date="2026-04-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-14" />
<period-end iso-date="2029-12-15" />
<target value="15">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Largest SOEs (by average annual revenue since 2015) scheduled under the PCEM Act that have been transferred to the HoCo or brought to market for divestment
</narrative></title>
<baseline year="2026" iso-date="2026-04-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-14" />
<period-end iso-date="2029-12-15" />
<target value="15">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in income tax revenue collected (percent of GDP)
</narrative></title>
<baseline year="2024" iso-date="2024-12-14" value="3.4"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-14" />
<period-end iso-date="2029-12-14" />
<target value="3.7">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in income tax revenue collected (percent of GDP)
</narrative></title>
<baseline year="2024" iso-date="2024-12-14" value="3.4"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-14" />
<period-end iso-date="2029-12-14" />
<target value="3.7">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in income tax revenue collected (percent of GDP)
</narrative></title>
<baseline year="2024" iso-date="2024-12-14" value="3.4"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-14" />
<period-end iso-date="2029-12-14" />
<target value="3.7">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in women's formal employment in the hospitality sector
</narrative></title>
<baseline year="2023" iso-date="2023-12-14" value="110,694"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-14" />
<period-end iso-date="2029-12-14" />
<target value="121,763">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in women's formal employment in the hospitality sector
</narrative></title>
<baseline year="2023" iso-date="2023-12-14" value="110,694"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-14" />
<period-end iso-date="2029-12-14" />
<target value="121,763">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in women's formal employment in the hospitality sector
</narrative></title>
<baseline year="2023" iso-date="2023-12-14" value="110,694"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-14" />
<period-end iso-date="2029-12-14" />
<target value="121,763">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Restructuring and/or liquidation applications resolved in court under the new insolvency law
</narrative></title>
<baseline year="2026" iso-date="2026-04-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-14" />
<period-end iso-date="2029-12-14" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Restructuring and/or liquidation applications resolved in court under the new insolvency law
</narrative></title>
<baseline year="2026" iso-date="2026-04-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-14" />
<period-end iso-date="2029-12-14" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Restructuring and/or liquidation applications resolved in court under the new insolvency law
</narrative></title>
<baseline year="2026" iso-date="2026-04-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-14" />
<period-end iso-date="2029-12-14" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Simple average total import duties
</narrative></title>
<baseline year="2026" iso-date="2026-04-14" value="18.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-14" />
<period-end iso-date="2029-12-15" />
<target value="9.5">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Simple average total import duties
</narrative></title>
<baseline year="2026" iso-date="2026-04-14" value="18.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-14" />
<period-end iso-date="2029-12-15" />
<target value="9.5">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Simple average total import duties
</narrative></title>
<baseline year="2026" iso-date="2026-04-14" value="18.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-14" />
<period-end iso-date="2029-12-15" />
<target value="9.5">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
FDI by BOI registered companies (including equity, retained earnings, debt)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="952000000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="1394000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
FDI by BOI registered companies (including equity, retained earnings, debt)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="952000000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="1394000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
FDI by BOI registered companies (including equity, retained earnings, debt)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="952000000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2029-12-15" />
<target value="1394000000">

</target>
<actual value="">

</actual>
</period>
</indicator>