<iati-activities version="2.03" generated-datetime="2026-09-24T08:36:05"><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-23T17:18:36" humanitarian="1"  hierarchy="1"><iati-identifier>44000-P171114</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Zimbabwe Idai Recovery Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Project Development Objective (PDO) is to address the early and medium-term resilient disaster recovery needs of cyclone-affected people]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The PDO will be achieved through: (a) a surge of high-impact, immediate interventions for enhancing the coping capacity of the affected communities while humanitarian operations continue in tandem through other partners; (b) activities that transition toward medium-term recovery such as restoration of productive capacities of the communities and rehabilitation of critical community infrastructure across multiple sectors; and (c) interventions to reduce community hazard risk vulnerability through community level structural and non-structural mitigation. Component 1: Providing Immediate Support for Cyclone Recovery: This component will provide immediate and integrated livelihoods and healthcare solutions to cyclone-affected people, including: (a) restoring livelihoods through conditional cash transfers to provide food assistance, and through unconditional cash transfers for most vulnerable groups; (b) restoring agricultural crop and livestock production, including distribution of agricultural inputs for small farmer households, and the re-stocking and treatment of livestock and poultry, and; (c) accelerating the revitalization of basic health services,  including the provision of a basic package of health services and referral pathways related to Gender-Based Violence (GBV)/Sexual Exploitation and Assault (SEA), and child protection measures. All activities under this component will specifically target women and female-headed households. This component will also finance project management and overheads costs for the above activities, such as needs and beneficiary assessments, preparation of technical designs and technical quality control, etc. Component 2: Enabling Medium-term Cyclone Recovery and Resilience-building: This component will support the rehabilitation of critical community infrastructure , such as water and sanitation systems, irrigation networks, community schools, and community roads, as well as community level structural mitigation efforts for risk reduction, such as slope protection and environmental rehabilitation. This component will also finance project management and overheads costs for the above activities, such as needs and beneficiary assessments, preparation of technical designs and technical quality control, etc. Component 3: Providing Project Management and Technical Assistance: This component will include:•	Project Management. This will provide project management support for UNOPS, for overall coordination and oversight functions and for centralized project services, across all components, such as M&amp;E, environmental and social safeguards performance, technical quality assurance, grievance redressal, GBV/SEA and referral and protection systems, and for engaging third party monitoring services for project results validation. •	Technical Assistance (TA) under the Project will include a range of activities that will be progressively determined on a needs basis, to facilitate the strengthened implementation of the various project components. These could include, but not necessarily be restricted to: (a) supporting community risk assessments and monitoring and preparedness planning; (b) supporting community infrastructure damage assessment; (c) enhancing existing systems for displacement monitoring and targeting, as well as conducting intention surveys for internally displaced persons (IDPs); (d) developing health information and epidemic surveillance systems; and (e) strengthening project strategic communications and citizen engagement; The remaining US$3 million will be distributed based on a set of agreed criteria at the Project's mid-term stage. This will provide incentives for performance and needs-based flexibility in the project's resource allocation across various sub-components through the life of the project. Criteria for such resource allocation determinations will include implementation performance of the various components, and the varying levels of support from other development partners, and associated financing gaps in the various components. Such allocation shall be decided by World Bank Management, based on advice from the Task Team Leaders and in consultation with the Consultative Group being set up under the Project.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="ZW–P0041631"><narrative>United Nations Office for Project Services (UNOPS)</narrative></participating-org><participating-org role="2" xml:lang="en" ref="ZW–P0041631"><narrative>United Nations Office for Project Services (UNOPS)</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="ZW-COA-0041630"><narrative>United Nations Office for Project Services (UNOPS)</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2019-07-08"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2019-07-16"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2023-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2023-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Nicholas James Callender</narrative></person-name><telephone>+1-202-473-1000</telephone><email>ncallender@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="ZW" percentage="100"><narrative xml:lang="en">ZIMBABWE</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0008304230" />
            <name><narrative>Mutasa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-19.64435 31.63349</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000887358" />
            <name><narrative>Manicaland Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-19 32.41667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000886842" />
            <name><narrative>Mashonaland East Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-17.96667 31.66667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000886761" />
            <name><narrative>Masvingo Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-20.6 31.4</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000884978" />
            <name><narrative>Mutare District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-19.25512 32.44327</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000890590" />
            <name><narrative>Gutu</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-19.64447 31.15175</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000893549" />
            <name><narrative>Chipinge</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-20.18833 32.62365</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000893813" />
            <name><narrative>Chimanimani</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-19.8 32.86667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000894293" />
            <name><narrative>Chikomba District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-18.88846 31.09751</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000894712" />
            <name><narrative>Buhera</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-19.32082 31.43959</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000895082" />
            <name><narrative>Bikita</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-20.08213 31.62316</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007453802" />
            <name><narrative>Mutare</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-19.55906 31.61728</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="73010" percentage="53" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="47" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AL" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Livestock</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="58.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AH" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Crops</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SG" percentage="12.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="2" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="35" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="12" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="12" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000052" percentage="52" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000533" percentage="12" xml:lang="en"><narrative>Forced Displacement</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000513" percentage="12" xml:lang="en"><narrative>Participation and Civic Engagement</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="2" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="52" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000521" percentage="52" xml:lang="en"><narrative>Social Safety Nets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000052" percentage="52" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000751" percentage="100" xml:lang="en"><narrative>Disaster Response and Recovery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000751" percentage="100" xml:lang="en"><narrative>Disaster Response and Recovery</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">1833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">1833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">1833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">1833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">1833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">1833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">1833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">1833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">1833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">1833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">1833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">1833333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">1833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">1833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">1833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">1833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">1833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">1833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">1833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">1833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">1833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">1833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">1833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">1833333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">1416666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">916666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">1833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">1833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">1833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">1833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">1833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">1833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">1833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">1833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">1833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">1833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">1833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">1833333.37</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">1833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">1833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">1833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">1833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">1833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">1833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">1833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">1833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">1833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">1833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">1833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">1833333.37</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">1416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">1416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">1416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">1416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">1416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">1416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">1416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">1416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">1416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">1416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">1416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">1416666.63</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">916666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">916666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">916666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">916666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">916666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">916666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">916666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">916666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">916666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">916666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">916666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">916666.63</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">72000000</value><description xml:lang="en"><narrative>Total Commitment in July Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="ZW-COA-41630"><narrative>United Nations Office for Project Services (UNOPS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">30759921</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="ZW-COA-41630"><narrative>United Nations Office for Project Services (UNOPS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">13949591</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="ZW-COA-41630"><narrative>United Nations Office for Project Services (UNOPS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">6316627</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="ZW-COA-41630"><narrative>United Nations Office for Project Services (UNOPS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">12302078</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="ZW-COA-41630"><narrative>United Nations Office for Project Services (UNOPS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">6576307</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="ZW-COA-41630"><narrative>United Nations Office for Project Services (UNOPS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">2095476</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="ZW-COA-41630"><narrative>United Nations Office for Project Services (UNOPS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">489065</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="ZW-COA-41630"><narrative>United Nations Office for Project Services (UNOPS)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P171114"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P171114?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P171114"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of households benefiting from provision of agricultural inputs and livestock support
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2022-07-14" />
<target value="22,000">
<comment><narrative>
&lt;p&amp;gt;ZIRP achieved 100% of the revised indicator target (22,027 households benefiting from the provision of agricultural inputs and livestock support against a target of 22,000). ZIRP achieved 101% of the revised sub-indicator target (8,856 female-headed households benefiting from the provision of agricultural inputs and livestock support against a target of 8,800). This indicator and sub-indictor were revised at restructuring to reflect the additional households to be supported from the commitment of previously unallocated funds.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="22,027">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of kilometers of community roads rehabilitated to improved standards of resilience
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2022-07-14" />
<target value="90">
<comment><narrative>
&lt;p&amp;gt;ZIRP achieved 92% of the revised intermediate indicator target (82.47 kilometers of community roads rehabilitated to improved standards of resilience against a target of 90). This intermediate indicator was revised at restructuring based on the ongoing interventions in road rehabilitation, which covered 11 roads by the end of the project. This indicator was revised down at&amp;nbsp;completion to reflect final updates in the results monitoring process.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="82.47">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of irrigation schemes rehabilitated with O&amp;M plans and commercial plans
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;ZIRP achieved 67% of the upper bound of the intermediate indicator target (6 irrigation schemes rehabilitated with O&amp;amp;M plans and commercial plans against a target range maximum of 9). Further irrigation scheme rehabilitation was descoped from the project de to technical complexity, implementation risks, and time limitations.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="6">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of persons reached with GBV services through mobile One Stop Centre
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;ZIRP achieved 141% of the intermediate indicator target (12,111 persons reached with GBV services through mobile One Stop Centres against a target of 8,600). This indicator was revised up at&amp;nbsp;completion to reflect final updates in the results monitoring process.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="12111.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of livestock treated or and vaccinated
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;ZIRP achieved 103% of the upper bound of the intermediate indicator target (3,044,003 livestock treated and/or vaccinated against a target range maximum of 2,954,500). This indicator was revised up at&amp;nbsp;completion to reflect final updates in the results monitoring process.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="3,044,003">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of people benefiting from rehabilitated community infrastructure and risk reduction interventions
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2022-07-14" />
<target value="270,000">
<comment><narrative>
&lt;p&amp;gt;ZIRP achieved 128% of the revised indicator target (346,002 people benefiting from rehabilitated community infrastructure and risk reduction interventions against a target of 270,000). This indicator was revised at restructuring based on the number of beneficiaries from the ongoing interventions in community infrastructure and water supply. This indicator was revised up at&amp;nbsp;completion to reflect final updates in the results monitoring process.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="346,002">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of vulnerable people targeted under the unconditional cash transfer program
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;ZIRP achieved 328% of the upper bound of the intermediate indicator target (209,023 vulnerable people targeted under the unconditional cash transfer program against a target range maximum of 63,800). ZIRP achieved 413% of the upper bound of the first intermediate sub-indicator target (131,796 vulnerable women and girls targeted under the unconditional cash transfer program against a target range maximum of 31,900). ZIRP achieved 991% of the upper bound of the second intermediate sub-indicator target (126,843 vulnerable people targeted under the unconditional cash transfer program among female-headed households against a target range maximum of 12,80). This indicator and these sub-indicators were not revised at restructuring because their respective activities had been completed by that time.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="209,023">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of people provided with healthcare support
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2022-07-14" />
<target value="619,074">
<comment><narrative>
&lt;p&amp;gt;ZIRP achieved 107% of the revised intermediate indicator target (661,692 people provided with healthcare support against a target of 619,074). This intermediate indicator was revised at restructuring based on the number of beneficiaries from the ongoing interventions in integrated comprehensive health services cumulatively coordinated by WHO, UNCEF, and UNFPA. This indicator was revised up at&amp;nbsp;completion to reflect final updates in the results monitoring process.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="661,692">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of people benefiting from conditional and unconditional cash transfers for food
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;ZIRP achieved 250% of the upper bound of the indicator target (239,324 people benefiting from conditional and unconditional cash transfers for food against a target range maximum of 95,700). ZIRP achieved 316% of the upper bound of the first sub-indicator targt (151,165 women and girls benefiting from conditional and unconditional cash transfers for food against a target range maximum of 47,900). ZIRP achieved 373% of the upper bound of the second sub-indicator target (142,864 people benefiting from conditional and unconditional cash transfers for food among female-headed households against a target range maximum of 38,300). ZIRP achieved 8.6% of the upper bound of the third sub-indicator target (1,645 displaced people benefiting from conditional and unconditional cash transfers for food against a target range maximum of 19,100). However, individuals who were formerly IDPs were still provided food assistance and are included in the outcome of the overall indicator. This indicator and these sub-indicators were not revised at restructuring because their respective activities had been completed by that time.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="239,324">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of community assets rehabilitated under the food-for-assets program
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;ZIRP achieved 87% of the upper bound of the intermediate indicator target (13 community assets rehabilitated under the food-for-assets program against a target range maximum of 15).&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="13">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of students benefiting from restored community schools and education services
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;ZIRP achieved 132% of the upper bound of the intermediate indicator target (5,921 students benefiting from restored community schools and education services against a target range maximum of 4,500). ZIRP achieved 131% of the upper bound of the intermediate sub-indicator target (2,884 girl students benefiting from restored community schools and education services against a target range maximum of 2,200).&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="5,921">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of households with restored access to water and sanitation services
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2022-07-14" />
<target value="35,000">
<comment><narrative>
&lt;p&amp;gt;ZIRP achieved 126% of the revised intermediate indicator target (44,106 households with restored access to water and sanitation services against a target of 35,000). This intermediate indicator was revised at restructuring based on the number of beneficiary households from the ongoing interventions in restoring water systems and sanitation facilities at household and institutional levels.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="44,106">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of reported project related grievances closed within 45 days.
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2022-07-14" />
<target value="90.00">
<comment><narrative>
&lt;p&amp;gt;ZIRP achieved 110% of the revised intermediate indicator target (99 percent of reported project related grievances closed within 45 days against a target of 90 percent). This intermediate indicator was revised at restructuring based on the efficacy of the projct&amp;rsquo;s GRM. This indicator was revised up at&amp;nbsp;completion to reflect final updates in the results monitoring process.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="99.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of wards with risk mitigation infrastructure constructed
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="2022-07-14" />
<target value="12-14">
<comment><narrative>
&lt;p&amp;gt;ZIRP achieved 93% of the upper bound of the revised intermediate indicator target (13 wards with risk mitigation infrastructure constructed against a target range maximum of 14). This intermediate indicator was revised at restructuring in accordance with the revision of the previous intermediate indicator on community roads rehabilitated. This indicator was revised up at&amp;nbsp;completion to reflect final updates in the results monitoring process.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="13">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of students benefiting from education services
</narrative></title>
<baseline year="2019" iso-date="2019-09-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-02" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;ZIRP achieved 101% of the intermediate indicator target (88,516 students benefiting from education services against a target of 88,000). ZIRP achieved 100% of the intermediate sub-indicator target (43,410 girl students benefiting from education services against a target of 43,400).&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="88516.00">

</actual>
</period>
</indicator>
</result></iati-activity></iati-activities>