<iati-activities version="2.03" generated-datetime="2026-09-24T08:34:51"><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-23T20:24:13" hierarchy="1"><iati-identifier>44000-P178573</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Rural Infrastructure and Mobility for Good Living Program Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Project Development Objectives are to (i) improve climate-resilient road connectivity in selected lagging rural areas; and (ii) enhance national road sector management.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The Project aims to improve the connectivity of selected lagging rural areas by strengthening the resilience of targeted rural and trunk roads and providing safer road conditions for users. The Project will finance interventions to enhance the provision of all-weather access of rural communities to the targeted rural and trunk roads. The interventions will focus on the most vulnerable levels of the road network and those closest to communities: rural roads and the departmental, or trunk, roads connecting to the primary network and major urban areas. The definition of the geographical area of the Project was based on an in-depth analysis for the prioritization of interventions, resulting in the areas of El Altiplano, Las Verapaces and El Corredor Seco. In addition, a strong citizen commitment is expected to consider the needs of the most marginalized local population in the roads selection and the nature of the works to be realized. The project will be implemented through 3 components: (i) Rural and Trunk Roads; (ii) Technical Capacity Building; and (iii) Project Management.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="GT–P0051785"><narrative>REPUBLIC OF GUATEMALA</narrative></participating-org><participating-org role="2" xml:lang="en" ref="GT–P0051785"><narrative>REPUBLIC OF GUATEMALA</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="GT-COA-0051784"><narrative>Ministry of Communications, Infrastructure and Housing</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2025-06-30"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2025-06-30"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2032-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2032-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Fabian Hinojosa</narrative></person-name><telephone>+1-202-473-1000</telephone><email>fhinojosa@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="GT" percentage="100"><narrative xml:lang="en">GUATEMALA</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3598132" />
                <name><narrative>Guatemala City</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>14.64072 -90.513268</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="74020" percentage="50" xml:lang="en"/><sector vocabulary="1" code="21023" percentage="50" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TTI" percentage="97.0000000" xml:lang="en"><narrative>Rural and Inter-Urban Roads</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TTF" percentage="3.00000000" xml:lang="en"><narrative>Public Administration - Transportation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000026" percentage="0" xml:lang="en"><narrative>ICT</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="0" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000713" percentage="0" xml:lang="en"><narrative>Public Transport</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="0" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="0" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000261" percentage="0" xml:lang="en"><narrative>ICT Solutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000026" percentage="0" xml:lang="en"><narrative>ICT</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000713" percentage="0" xml:lang="en"><narrative>Public Transport</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="0" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="0" xml:lang="en"><narrative>Urban Development</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">227147.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">227147.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">227147.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">227147.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">227147.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">227153.35</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">1271759.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">1271759.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">1271759.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">1271759.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">1271759.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">1271759.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">1271759.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">1271759.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">1271759.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">1271759.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">1271759.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">1271759.13</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">4479006.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">4479006.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">4479006.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">4479006.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">4479006.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">4479006.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">4479006.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">4479006.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">4479006.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">4479006.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">4479006.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">4479018.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">7371763.25</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">7371763.25</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">7371763.25</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">7371763.25</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">7371763.25</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">7371763.25</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">7371763.25</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">7371763.25</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">7371763.25</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">7371763.25</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">7371763.25</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">7371763.25</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">8342210.42</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">8342210.42</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">8342210.42</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">8342210.42</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">8342210.42</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">8342210.42</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">8342210.42</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">8342210.42</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">8342210.42</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">8342210.42</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">8342210.42</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">8342210.38</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">7209269.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">7209269.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">7209269.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">7209269.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">7209269.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">7209269.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">7209269.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">7209269.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">7209269.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">7209269.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">7209269.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">7209269.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">3731875.08</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">3731875.08</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">3731875.08</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-10-01"/>
<period-end iso-date="2031-10-31"/>
<value currency="USD" value-date="2031-10-31">3731875.08</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-11-01"/>
<period-end iso-date="2031-11-30"/>
<value currency="USD" value-date="2031-11-30">3731875.08</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-12-01"/>
<period-end iso-date="2031-12-31"/>
<value currency="USD" value-date="2031-12-31">3731875.08</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-01-01"/>
<period-end iso-date="2032-01-31"/>
<value currency="USD" value-date="2032-01-31">3731875.08</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-02-01"/>
<period-end iso-date="2032-02-29"/>
<value currency="USD" value-date="2032-02-29">3731875.08</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-03-01"/>
<period-end iso-date="2032-03-31"/>
<value currency="USD" value-date="2032-03-31">3731875.08</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-04-01"/>
<period-end iso-date="2032-04-30"/>
<value currency="USD" value-date="2032-04-30">3731875.08</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-05-01"/>
<period-end iso-date="2032-05-31"/>
<value currency="USD" value-date="2032-05-31">3731875.08</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-06-01"/>
<period-end iso-date="2032-06-30"/>
<value currency="USD" value-date="2032-06-30">3731875.12</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-07-01"/>
<period-end iso-date="2032-07-31"/>
<value currency="USD" value-date="2032-07-31">1395213.71</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-08-01"/>
<period-end iso-date="2032-08-31"/>
<value currency="USD" value-date="2032-08-31">1395213.71</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-09-01"/>
<period-end iso-date="2032-09-30"/>
<value currency="USD" value-date="2032-09-30">1395213.71</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-10-01"/>
<period-end iso-date="2032-10-31"/>
<value currency="USD" value-date="2032-10-31">1395213.71</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-11-01"/>
<period-end iso-date="2032-11-30"/>
<value currency="USD" value-date="2032-11-30">1395213.71</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-12-01"/>
<period-end iso-date="2032-12-31"/>
<value currency="USD" value-date="2032-12-31">1395213.71</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-01-01"/>
<period-end iso-date="2033-01-31"/>
<value currency="USD" value-date="2033-01-31">1395220.74</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-10-01"/>
<period-end iso-date="2031-10-31"/>
<value currency="USD" value-date="2031-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-11-01"/>
<period-end iso-date="2031-11-30"/>
<value currency="USD" value-date="2031-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-12-01"/>
<period-end iso-date="2031-12-31"/>
<value currency="USD" value-date="2031-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-01-01"/>
<period-end iso-date="2032-01-31"/>
<value currency="USD" value-date="2032-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-02-01"/>
<period-end iso-date="2032-02-29"/>
<value currency="USD" value-date="2032-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-03-01"/>
<period-end iso-date="2032-03-31"/>
<value currency="USD" value-date="2032-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-04-01"/>
<period-end iso-date="2032-04-30"/>
<value currency="USD" value-date="2032-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-05-01"/>
<period-end iso-date="2032-05-31"/>
<value currency="USD" value-date="2032-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-06-01"/>
<period-end iso-date="2032-06-30"/>
<value currency="USD" value-date="2032-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-07-01"/>
<period-end iso-date="2032-07-31"/>
<value currency="USD" value-date="2032-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-08-01"/>
<period-end iso-date="2032-08-31"/>
<value currency="USD" value-date="2032-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-09-01"/>
<period-end iso-date="2032-09-30"/>
<value currency="USD" value-date="2032-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-10-01"/>
<period-end iso-date="2032-10-31"/>
<value currency="USD" value-date="2032-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-11-01"/>
<period-end iso-date="2032-11-30"/>
<value currency="USD" value-date="2032-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-12-01"/>
<period-end iso-date="2032-12-31"/>
<value currency="USD" value-date="2032-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-01-01"/>
<period-end iso-date="2033-01-31"/>
<value currency="USD" value-date="2033-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-12-01"/>
<period-end iso-date="2032-12-31"/>
<value currency="USD" value-date="2032-12-31">400000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-12-01"/>
<period-end iso-date="2032-12-31"/>
<value currency="USD" value-date="2032-12-31">400000000.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">400000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-51784"><narrative>Ministry of Communications, Infrastructure and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P178573"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P178573?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P178573"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2032-12-15" />
<target value="450000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Pipeline of rural road projects prioritized by the selection methodology
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2032-12-15" />
<target value="1500">
<comment><narrative>
This indicator will measure the pipeline of rural road interventions prioritized after applying the selection methodology. The DGC will have the list of future interventions following the criteria stablished
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2032-12-15" />
<target value="450000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Departmental and National Roads upgraded or rehabilitated
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2032-12-15" />
<target value="160">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of women in communities trained and accredited in specialized technical road works
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2032-12-15" />
<target value="80">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2032-12-15" />
<target value="450000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Road management planning tools implemented
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2030-12-15" />
<target value="Yes">
<comment><narrative>
This indicator will measure the adoption of digital tools to carry out the inspection and monitoring of road works during project implementation. These tools include de development and use of a geo-referenced inventory and the potential use of drones.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Pipeline of rural road projects prioritized by the selection methodology
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2032-12-15" />
<target value="1500">
<comment><narrative>
This indicator will measure the pipeline of rural road interventions prioritized after applying the selection methodology. The DGC will have the list of future interventions following the criteria stablished
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Pipeline of rural road projects prioritized by the selection methodology
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2032-12-15" />
<target value="1500">
<comment><narrative>
The PIU has launched the procurement process for the road projects selection methodology study, which will underpin the project pipeline.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2032-12-15" />
<target value="450000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2032-12-15" />
<target value="450000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2032-12-15" />
<target value="450000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2032-12-15" />
<target value="450000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Rural, Departmental and National roads rehabilitated or improved by the Project with maintenance programs in place
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2032-12-15" />
<target value="100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Rural, Departmental and National roads rehabilitated or improved by the Project with maintenance programs in place
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2032-12-15" />
<target value="100">
<comment><narrative>
The PIU has launched procurement for a design study covering a 22-km road section and will finance design studies for six additional road sections totaling approximately 125 km using its own resources. This will constitute the first package of roads to be intervened under the loan.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Manual for the design of climate-resilient and safe rural roads delivered
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2027-12-15" />
<target value="Yes">
<comment><narrative>
This indicator will measure the delivery of a manual for the design of climate-resilient and safe rural roads.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Rural Roads upgraded or rehabilitated
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2032-12-15" />
<target value="480">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Pipeline of rural road projects prioritized by the selection methodology
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2032-12-15" />
<target value="1500">
<comment><narrative>
The PIU has launched the procurement process for the road projects selection methodology study, which will underpin the project pipeline.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Study on private capital mobilization for the road sector delivered
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2028-12-15" />
<target value="Yes">
<comment><narrative>
The indicator will track progress on the delivery of a consultancy on private capital mobilization in road developments.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Designs of rural, departmental and national road rehabilitation/upgrade climate informed, considering gender inclusivity and universal access
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2032-12-15" />
<target value="100.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Female last-year university students or recently graduates participating in an internship program
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2032-12-15" />
<target value="20">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Gender Action Plan delivered
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2032-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Methodology for prioritization and selection of interventions delivered
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2027-12-15" />
<target value="Yes">
<comment><narrative>
the procurement for this methodolgoy has been launched.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Rural, Departmental and National roads rehabilitated or improved by the Project with maintenance programs in place
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2032-12-15" />
<target value="100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of citizens who consider that the design of rural roads and departmental and national subjected to consultation is responsive of their needs
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2032-12-15" />
<target value="80.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Strategy for maintaining the rural road network delivered
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-12-15" />
<target value="Yes">
<comment><narrative>
This indicator will track the delivery of a consultancy to review the current maintenance scheme of rural roads and establish recommendations for a more efficient and sustainable modality,
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Rural, Departmental and National roads rehabilitated or improved by the Project with maintenance programs in place
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2032-12-15" />
<target value="100">
<comment><narrative>
The PIU has launched procurement for a design study covering a 22-km road section and will finance design studies for six additional road sections totaling approximately 125 km using its own resources. This will constitute the first package of roads to be intervened under the loan.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2032-12-15" />
<target value="450000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Short-term employment through participation in road works
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2032-12-15" />
<target value="800.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Short-term employment through participation in road works
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2032-12-15" />
<target value="800.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Manual for the design of climate-resilient and safe rural roads delivered
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2027-12-15" />
<target value="Yes">
<comment><narrative>
This indicator will measure the delivery of a manual for the design of climate-resilient and safe rural roads.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Roadmap of international best practices in environmental, social and governance issues delivered
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2032-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of departmental and national roads with improved safe infrastructure for Non Motorized Transport
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2032-12-15" />
<target value="100.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of citizens who consider that the design of rural roads and departmental and national subjected to consultation is responsive of their needs
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2032-12-15" />
<target value="80.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of selected Road Zones with adequate equipment and machinery for attending to emergencies
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2032-12-15" />
<target value="3">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Departmental and National Roads upgraded or rehabilitated
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2032-12-15" />
<target value="160">
<comment><narrative>
The PIU has launched a design study for a 22-km road section and will self-finance designs for six additional sections (125 km), constituting the first package of departmental roads to be intervened under the loan.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Roadmap of international best practices in environmental, social and governance issues delivered
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2032-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Strategy for maintaining the rural road network delivered
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2029-12-15" />
<target value="Yes">
<comment><narrative>
This indicator will track the delivery of a consultancy to review the current maintenance scheme of rural roads and establish recommendations for a more efficient and sustainable modality,
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of women in communities trained and accredited in specialized technical road works
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2032-12-15" />
<target value="80">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of departmental and national roads with improved safe infrastructure for Non Motorized Transport
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2032-12-15" />
<target value="100.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Study on private capital mobilization for the road sector delivered
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2028-12-15" />
<target value="Yes">
<comment><narrative>
The indicator will track progress on the delivery of a consultancy on private capital mobilization in road developments.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Female last-year university students or recently graduates participating in an internship program
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2032-12-15" />
<target value="20">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Gender Action Plan delivered
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2032-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Road management planning tools implemented
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2030-12-15" />
<target value="Yes">
<comment><narrative>
This indicator will measure the adoption of digital tools to carry out the inspection and monitoring of road works during project implementation. These tools include de development and use of a geo-referenced inventory and the potential use of drones.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Designs of rural, departmental and national road rehabilitation/upgrade climate informed, considering gender inclusivity and universal access
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2032-12-15" />
<target value="100.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Rural Roads upgraded or rehabilitated
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2032-12-15" />
<target value="480">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of selected Road Zones with adequate equipment and machinery for attending to emergencies
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2032-12-15" />
<target value="3">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Methodology for prioritization and selection of interventions delivered
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2027-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-23T20:24:13" hierarchy="1"><iati-identifier>44000-P143495</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>GT: Urban Infrastructure and Violence Prevention</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Project's Development Objective (PDO) is to increase access to basic urban infrastructure and services and mitigate key risk factors of crime and violence in selected communities.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Urban Infrastructure and Violence Prevention Project is to increase access to basic urban infrastructure and services and mitigate key risk factors of crime and violence in selected communities. There are three components to the project, the first component being integrated package of small-scale urban infrastructure and violence prevention interventions. This component will finance the identification, preparation and execution of integrated packages of small-scale infrastructure and crime and violence prevention activities. This includes: (a) carrying out of technical assistance, capacity building and community mobilization activities to support the identification and preparation of subprojects in selected communities; (b) carrying out of small-scale infrastructure investments and/or prevention activities (Subprojects) in the territory of the urban or peri-urban (mixto) selected communities. The second component is the Technical Assistance for Capacity Building. This component seeks to strengthen the institutional capacity of Interior Ministry (MINGOB), CIVFSS, the Mancomunidad Gran Ciudad del Sur (MGCS), and participating municipalities (through MGCS). Finally, the third component is the project management, monitoring and evaluation. Component three will provide support to the PIU for project management, coordination and evaluation activities through, inter alia: (a) carrying out project audits; (b) conducting project outreach activities; (c) carrying out mid-term and impact evaluation surveys in order to evaluate the project's impacts; (d) providing technical support on procurement, safeguards and financial management (FM) requirements, including the hiring of the PIU's staff; and (e) financing operating costs. The Government is expected to cover the costs of staffing for key positions of the PIU. Finally, while data collection will be undertaken under component two, day to day M&amp;E activities will be financed by component three.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="GT–P0012478"><narrative>Republic of Guatemala</narrative></participating-org><participating-org role="2" xml:lang="en" ref="GT–P0012478"><narrative>Republic of Guatemala</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="GT-COA-0012477"><narrative>Ministry of Communications, Infrastructure and Housing</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2014-03-28"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2017-01-17"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2023-07-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2023-07-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Luis Miguel Triveno Chan Jan</narrative></person-name><telephone>+1-202-473-1000</telephone><email>ltriveno@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="GT" percentage="100"><narrative xml:lang="en">GUATEMALA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589451" />
            <name><narrative>Municipio de Santa Catarina Pinula</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.56667 -90.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003591414" />
            <name><narrative>Municipio de Petapa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.5 -90.56667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003592517" />
            <name><narrative>Municipio de Mixco</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.63333 -90.6</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003595530" />
            <name><narrative>Departamento de Guatemala</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.66667 -90.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003599732" />
            <name><narrative>Municipio de Amatitlan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.48333 -90.61667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003587922" />
            <name><narrative>Municipio de Villa Canales</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.48333 -90.53333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003587901" />
            <name><narrative>Municipio de Villa Nueva</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.51667 -90.58333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="16011" percentage="25" xml:lang="en"/><sector vocabulary="1" code="15220" percentage="25" xml:lang="en"/><sector vocabulary="1" code="43032" percentage="24" xml:lang="en"/><sector vocabulary="1" code="16020" percentage="22" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="4" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="18.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WC" percentage="20.0000000" xml:lang="en"><narrative>FY17 - Water Supply</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WZ" percentage="16.0000000" xml:lang="en"><narrative>FY17 - Other Water Supply, Sanitation and Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TZ" percentage="26.0000000" xml:lang="en"><narrative>FY17 - Other Transportation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WA" percentage="20.0000000" xml:lang="en"><narrative>FY17 - Sanitation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="100" xml:lang="en"><narrative>Urban Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000223" percentage="90" xml:lang="en"><narrative>Youth Employment</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="90" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="90" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000752" percentage="20" xml:lang="en"><narrative>Disaster Risk Reduction</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000752" percentage="20" xml:lang="en"><narrative>Disaster Risk Reduction</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000752" percentage="20" xml:lang="en"><narrative>Disaster Risk Reduction</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000053" percentage="100" xml:lang="en"><narrative>Fragility, Conflict and Violence</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="100" xml:lang="en"><narrative>Urban Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000531" percentage="100" xml:lang="en"><narrative>Conflict Prevention</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="90" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000223" percentage="90" xml:lang="en"><narrative>Youth Employment</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000513" percentage="90" xml:lang="en"><narrative>Participation and Civic Engagement</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="20" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">83333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">83333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">83333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">83333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">83333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">83333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">750000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">750000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">750000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">750000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">750000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">750000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">750000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">750000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">750000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">750000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">750000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">750000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">791666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">791666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">791666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">791666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">791666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">791666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">791666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">791666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">791666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">791666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">791666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">791666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">791666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">791666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">791666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">791666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">791666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">791666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">791666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">791666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">791666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">791666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">791666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">791666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">791666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">791666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">791666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">791666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">791666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">791666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">791666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">791666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">791666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">791666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">791666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">791666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-30"/>
<value currency="USD" value-date="2023-07-30">45000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-30"/>
<value currency="USD" value-date="2023-07-30">45000000.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">45000000</value><description xml:lang="en"><narrative>Total Commitment in January Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-12477"><narrative>Ministry of Communications, Infrastructure and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-45000000</value><description xml:lang="en"><narrative>Total Commitment Cancellations in March Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-12477"><narrative>Ministry of Communications, Infrastructure and Housing</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P143495"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P143495?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P143495"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of additional paved road surface rehabilitated and maintained
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2023-07-30" />
<target value="0.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people in urban areas provided with access to Improved Sanitation under the project
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2023-07-30" />
<target value="16200.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people in urban areas provided with access to Improved Water Sources under the project
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2023-07-30" />
<target value="11340.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of MGCS staff, municipal officials and community representatives trained
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2023-07-30" />
<target value="150.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of parents, teachers, and students who participated in school violence prevention initiatives
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2023-07-30" />
<target value="180.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increased positive use of free time: percentage of young males and females who report being actively engaged in community activities
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2023-07-30" />
<target value="15.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct Project beneficiaries of improved urban services in selected urban communities, of which female
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2023-07-30" />
<target value="32400.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Functioning Violence Observatory for the MGCS
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2023-07-30" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
tbd
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2023-07-30" />
<target value="0.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Functioning Crime and Violence Observatory at the Municipal Level
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2023-07-30" />
<target value="6.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of additional safe public spaces constructed or rehabilitated
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2023-07-30" />
<target value="0.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the perception of safety by residents of selected urban communities
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2023-12-31" />
<target value="10.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Positive change in attitude towards gender-based violence in selected urban communities: percentage of residents showing lower tolerance towards gender-based violence
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2023-07-30" />
<target value="15.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-23T20:24:13" hierarchy="1"><iati-identifier>44000-P160667</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>FIRST IMPROVED GOVERNANCE OF PUBLIC RESOURCES AND NUTRITION</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Program Development Objective is to support the Government's efforts to: (i) enhance the policy and institutional framework to address primary health care deficiencies and chronic malnutrition; and (ii) strengthen the regulatory and institutional framework toimprove governance of public resources and accountability.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the First Programmatic Improved Governance of Public Resources and Nutrition Development Policy Financing (DPF) Program Project for Guatemala is to support the government's efforts to: (i) enhance the policy and institutional framework to address primary health care deficiencies and chronic malnutrition; and (ii) strengthen the regulatory and institutional framework to improve governance of public resources and accountability. The program supports following pillars: pillar one: enhancing the policy and institutional framework to address primary health care deficiencies and chronic malnutrition; and pillar two: strengthening the regulatory and institutional framework to improve governance of public resources and accountability.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="GT–P0030015"><narrative>Republic of Guatemala</narrative></participating-org><participating-org role="2" xml:lang="en" ref="GT–P0030015"><narrative>Republic of Guatemala</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="GT-COA-0030014"><narrative>Ministerio de Finanzas Públicas, Guatemala</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2016-11-17"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2016-11-17"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2019-09-09"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2019-09-09"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Tamoya Annika Lois Christie</narrative></person-name><telephone>+1-202-473-1000</telephone><email>tchristie@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="GT" percentage="100"><narrative xml:lang="en">GUATEMALA</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3598132" />
                <name><narrative>Guatemala City</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>14.64072 -90.513268</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="25010" percentage="79" xml:lang="en"/><sector vocabulary="1" code="32130" percentage="21" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="FA" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Banking Institutions</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BG" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Law and Justice</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="20.0000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="40.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="20.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000523" percentage="10" xml:lang="en"><narrative>Social protection delivery systems</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="30" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000521" percentage="10" xml:lang="en"><narrative>Social Safety Nets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000523" percentage="10" xml:lang="en"><narrative>Social protection delivery systems</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000411" percentage="10" xml:lang="en"><narrative>Public Expenditure Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="30" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000671" percentage="20" xml:lang="en"><narrative>Nutrition</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="40" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000312" percentage="10" xml:lang="en"><narrative>Financial Sector Integrity</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="10" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000067" percentage="20" xml:lang="en"><narrative>Nutrition and Food Security</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="30" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2019-09-09"/>
<value currency="USD" value-date="2019-09-09">250000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2019-09-09"/>
<value currency="USD" value-date="2019-09-09">250000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2019-09-09"/>
<value currency="USD" value-date="2019-09-09">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2019-09-09"/>
<value currency="USD" value-date="2019-09-09">0.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">250000000</value><description xml:lang="en"><narrative>Total Commitment in November Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-30014"><narrative>Ministerio de Finanzas Públicas, Guatemala</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">250000000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-30014"><narrative>Ministerio de Finanzas Públicas, Guatemala</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">-625000</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-30014"><narrative>Ministerio de Finanzas Públicas, Guatemala</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-6562767</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-30014"><narrative>Ministerio de Finanzas Públicas, Guatemala</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-5475000</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-30014"><narrative>Ministerio de Finanzas Públicas, Guatemala</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-5475000</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-30014"><narrative>Ministerio de Finanzas Públicas, Guatemala</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-5475000</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-30014"><narrative>Ministerio de Finanzas Públicas, Guatemala</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-5475000</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-30014"><narrative>Ministerio de Finanzas Públicas, Guatemala</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-5475000</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-30014"><narrative>Ministerio de Finanzas Públicas, Guatemala</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-5475000</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-30014"><narrative>Ministerio de Finanzas Públicas, Guatemala</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-5475000</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-30014"><narrative>Ministerio de Finanzas Públicas, Guatemala</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-5475000</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-30014"><narrative>Ministerio de Finanzas Públicas, Guatemala</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-5475000</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-30014"><narrative>Ministerio de Finanzas Públicas, Guatemala</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-5475000</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-30014"><narrative>Ministerio de Finanzas Públicas, Guatemala</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-5264213</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-30014"><narrative>Ministerio de Finanzas Públicas, Guatemala</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-5053425</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-30014"><narrative>Ministerio de Finanzas Públicas, Guatemala</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-4842638</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-30014"><narrative>Ministerio de Finanzas Públicas, Guatemala</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-4631850</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-30014"><narrative>Ministerio de Finanzas Públicas, Guatemala</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-9625000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-30014"><narrative>Ministerio de Finanzas Públicas, Guatemala</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-9625000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-30014"><narrative>Ministerio de Finanzas Públicas, Guatemala</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-9625000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-30014"><narrative>Ministerio de Finanzas Públicas, Guatemala</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-9625000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-30014"><narrative>Ministerio de Finanzas Públicas, Guatemala</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-9625000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-30014"><narrative>Ministerio de Finanzas Públicas, Guatemala</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P160667"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P160667?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P160667"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The cost of the essential package of primary health care medicines is reduced.
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="Q397.07"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2018-12-31" />
<target value="5 percent lower">
<comment><narrative>
&lt;p&amp;gt;No data reported. Changes in the healthcare model resulted in the RI not being monitored.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="NO DATA REPORTED">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% public procurement executed through competitive processes in total value of executed public procurement.
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="36.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2018-12-31" />
<target value="52.00">
<comment><narrative>
&lt;p&amp;gt;Achieved. Target met and exceeded.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="62.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% public employees of the Executive who are paid through the unified payroll system (Guatenminas) with updated and verified profiles and certified identity.
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2018-12-31" />
<target value="95.00">
<comment><narrative>
&lt;p&amp;gt;Achieved. Target met and exceeded.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="99.60">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% children 12 months old in the areas prioritized by the National Strategy to Reduce Chronic Malnutrition receiving the complete vaccination scheme required for their age.
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="74.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2018-12-31" />
<target value="80.00">
<comment><narrative>
&lt;p&amp;gt;Not achieved. Delays in DPF effectiveness delayed implementation of new health model.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="74.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
No. of Prosecutor's Offices specialized in handling corruption cases (agencias de la fiscala especializada contra la corrupcin) created.
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2018-12-31" />
<target value="4.00">
<comment><narrative>
&lt;p&amp;gt;Achieved. Target met.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="4.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of financial entities (banks, finance companies and offshore banks) that include in the compliance manual specific ML/TF risks and assessment and measures for monitoring, management, and mitigation
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2018-12-31" />
<target value="50.00">
<comment><narrative>
&lt;p&amp;gt;Achieved. Target met and exceeded.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
No. of on-time transfers paid in a year to recipients of the health transfer (Bono de Salud) in areas prioritized by the National Strategy to Reduce Chronic Malnutrition
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2018-12-31" />
<target value="4.00">
<comment><narrative>
&lt;p&amp;gt;Achieved.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="4.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% financial entities(banks, fin. companies and offshore banks) the Financial Intelligence Unit checks compliance with regulation on administration of risks and enhanced due diligence measures for CPEs
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2018-12-31" />
<target value="82.00">
<comment><narrative>
&lt;p&amp;gt;Achieved. Target met and exceeded.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Coverage of health system for growth monitoring and promotion for children under 24 months old in the areas prioritized by the National Strategy to Reduce Chronic Malnutrition
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="10.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2018-12-31" />
<target value="30.00">
<comment><narrative>
&lt;p&amp;gt;Not achieved. Delays in implementation of complementary IPF affected achievement of target.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="19.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Estimated VAT non-compliance level (as share of potential VAT revenue) is reduced.
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="34.20"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2018-12-31" />
<target value="29.00">
<comment><narrative>
&lt;p&amp;gt;Achieved. Target met and exceeded.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="26.30">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
% of 0-2 children in priority municipalities that complete the full cycle of nutirtion verification
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2018-12-31" />
<target value="50%">
<comment><narrative>
&lt;p&amp;gt;Not Reported. Ministry&amp;rsquo;s information system does not provide the information needed to measure progress.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="NO DATA REPORTED">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-23T20:24:13" hierarchy="1"><iati-identifier>44000-P510861</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Smart Public Finances: Data-Driven Public Expenditure Management for Greater Efficiency</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To enhance effectiveness, efficiency, and accountability of public expenditures in Guatemala.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The program aims to enhance efficiency, effectiveness and accountability of public expenditures by deploying smart, data-driven PFM solutions. It focuses on addressing challenges related to inefficiencies in the use of public resources, the suboptimal allocation and utilization of public spending in strategic sectors, the limited adoption of evidence and data analytics for policy making and operations, and the existing vulnerability and technical weaknesses of existing management information systems. The program will support interventions around four pillars aiming at strengthening the foundations for data-driven public expenditure management (Smart PFM), supporting the optimization of expenditure management in strategic sectors (i.e. education, health, security and others), establishing a secure, sustainable PFM information ecosystem and developing the institutional capabilities and knowledge sharing mechanisms for the effective use and absorption of data analytics practices in government institutions. ]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="GT–00009884"><narrative>Republic of Guatemala</narrative></participating-org><participating-org role="2" xml:lang="en" ref="GT–00009884"><narrative>Republic of Guatemala</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="GT-COA-00009882"><narrative>Ministry of Public Finances</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2025-09-15"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2025-09-15"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2031-05-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2031-05-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Ruben Leonel Ruano Chinchilla</narrative></person-name><telephone>+1-202-473-1000</telephone><email>rruanochinchilla@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="GT" percentage="100"><narrative xml:lang="en">GUATEMALA</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3598132" />
                <name><narrative>Guatemala City</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>14.64072 -90.513268</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="15126" percentage="100" xml:lang="en"/><sector vocabulary="1" code="15126" percentage="100" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BBC" percentage="100.000000" xml:lang="en"><narrative>Central Government (Central Agencies)</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">454544.45</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">454544.45</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">454544.45</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">454544.45</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">454544.45</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">454544.45</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">454544.45</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">454544.45</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">454544.45</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">454555.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">416677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">833344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">833344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">1250011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">416677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">-1.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">-1.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">2.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-30"/>
<value currency="USD" value-date="2031-05-30">49875000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-30"/>
<value currency="USD" value-date="2031-05-30">49875000.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">50000000</value><description xml:lang="en"><narrative>Total Commitment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-9882"><narrative>Ministry of Public Finances</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">125000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-9882"><narrative>Ministry of Public Finances</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-125000</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-9882"><narrative>Ministry of Public Finances</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P510861"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P510861?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P510861"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Annual Financial Reports (PEFA PI-29)
</narrative></title>
<baseline year="2018" iso-date="2018-05-15" value="D+"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-15" />
<period-end iso-date="2031-05-15" />
<target value="C+">

</target>
<actual value="D+">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Integrated data-driven PFM conceptual model adopted
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2031-05-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Public Investment Management (PEFA PI-11).
</narrative></title>
<baseline year="2018" iso-date="2018-05-15" value="C+"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-15" />
<period-end iso-date="2031-05-15" />
<target value="B">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Performance information for service delivery (PEFA PI-8)
</narrative></title>
<baseline year="2018" iso-date="2018-05-15" value="C"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-15" />
<period-end iso-date="2031-05-15" />
<target value="A">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PFM Enterprise Architecture defined and adopted
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2031-05-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Public Investment Management (PEFA PI-11).
</narrative></title>
<baseline year="2018" iso-date="2018-05-15" value="C+"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-15" />
<period-end iso-date="2031-05-15" />
<target value="B">

</target>
<actual value="C+">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Full-cycle citizen consultations during budget preparation
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-05-15" />
<target value="12">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PFM Governance framework established
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2031-05-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IPSAS adopted
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2031-05-15" />
<target value="40">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Data analytics unit established
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2031-05-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PFM Governance framework established
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2031-05-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Data governance model
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2031-05-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Annual Financial Reports (PEFA PI-29)
</narrative></title>
<baseline year="2018" iso-date="2018-05-15" value="D+"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-15" />
<period-end iso-date="2031-05-15" />
<target value="C+">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Integrated data-driven PFM conceptual model adopted
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2031-05-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PFM Enterprise Architecture defined and adopted
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2031-05-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Information security and business continuity policy defined and adopted
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2031-05-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PFM Governance framework established
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2031-05-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Data analytics unit established
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2031-05-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Full-cycle citizen consultations during budget preparation
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-05-15" />
<target value="12">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Performance information for service delivery (PEFA PI-8)
</narrative></title>
<baseline year="2018" iso-date="2018-05-15" value="C"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-15" />
<period-end iso-date="2031-05-15" />
<target value="A">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Performance information for service delivery (PEFA PI-8)
</narrative></title>
<baseline year="2018" iso-date="2018-05-15" value="C"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-15" />
<period-end iso-date="2031-05-15" />
<target value="B">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Performance information for service delivery (PEFA PI-8)
</narrative></title>
<baseline year="2018" iso-date="2018-05-15" value="C"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-15" />
<period-end iso-date="2031-05-15" />
<target value="B">

</target>
<actual value="C">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Performance information for service delivery (PEFA PI-8)
</narrative></title>
<baseline year="2018" iso-date="2018-05-15" value="C"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-15" />
<period-end iso-date="2031-05-15" />
<target value="B">

</target>
<actual value="C">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Annual Financial Reports (PEFA PI-29)
</narrative></title>
<baseline year="2018" iso-date="2018-05-15" value="D+"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-15" />
<period-end iso-date="2031-05-15" />
<target value="C+">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Annual Financial Reports (PEFA PI-29)
</narrative></title>
<baseline year="2018" iso-date="2018-05-15" value="D+"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-15" />
<period-end iso-date="2031-05-15" />
<target value="C+">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Annual Financial Reports (PEFA PI-29)
</narrative></title>
<baseline year="2018" iso-date="2018-05-15" value="D+"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-15" />
<period-end iso-date="2031-05-15" />
<target value="C+">

</target>
<actual value="D+">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Annual Financial Reports (PEFA PI-29)
</narrative></title>
<baseline year="2018" iso-date="2018-05-15" value="D+"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-15" />
<period-end iso-date="2031-05-15" />
<target value="C+">

</target>
<actual value="D+">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Data analytics unit established
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2031-05-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Data governance model
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2031-05-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Public Investment Management (PEFA PI-11).
</narrative></title>
<baseline year="2018" iso-date="2018-05-15" value="C+"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-15" />
<period-end iso-date="2031-05-15" />
<target value="B">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Public Investment Management (PEFA PI-11).
</narrative></title>
<baseline year="2018" iso-date="2018-05-15" value="C+"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-15" />
<period-end iso-date="2031-05-15" />
<target value="B">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Public Investment Management (PEFA PI-11).
</narrative></title>
<baseline year="2018" iso-date="2018-05-15" value="C+"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-15" />
<period-end iso-date="2031-05-15" />
<target value="B">

</target>
<actual value="C+">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Public Investment Management (PEFA PI-11).
</narrative></title>
<baseline year="2018" iso-date="2018-05-15" value="C+"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-15" />
<period-end iso-date="2031-05-15" />
<target value="B">

</target>
<actual value="C+">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IPSAS adopted
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2031-05-15" />
<target value="40">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Municipalities using gender budget tagging
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="112"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-05-15" />
<target value="250">

</target>
<actual value="112">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Information security and business continuity policy defined and adopted
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2031-05-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Information security and business continuity policy defined and adopted
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2031-05-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Data analytics unit established
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2031-05-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Data governance model
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2031-05-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Municipalities using gender budget tagging
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="112"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-05-15" />
<target value="250">

</target>
<actual value="112">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IPSAS adopted
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2031-05-15" />
<target value="40">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IPSAS adopted
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2031-05-15" />
<target value="40">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PFM Governance framework established
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2031-05-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Stakeholder consultation activities during the citizens budget preparation process
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-05-15" />
<target value="12">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Full-cycle citizen consultations during budget preparation
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-05-15" />
<target value="12">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Information security and business continuity policy defined and adopted
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2031-05-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Public Investment Management (PEFA PI-11).
</narrative></title>
<baseline year="2018" iso-date="2018-05-15" value="C+"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-15" />
<period-end iso-date="2031-05-15" />
<target value="B">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Municipalities using gender budget tagging
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="112"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-05-15" />
<target value="250">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PFM Enterprise Architecture defined and adopted
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2031-05-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Data governance model
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2031-05-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Integrated data-driven PFM conceptual model adopted
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2031-05-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Municipalities using gender budget tagging
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="112"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-05-15" />
<target value="250">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Integrated data-driven PFM conceptual model adopted
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2031-05-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Performance information for service delivery (PEFA PI-8)
</narrative></title>
<baseline year="2018" iso-date="2018-05-15" value="C"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-15" />
<period-end iso-date="2031-05-15" />
<target value="B">

</target>
<actual value="C">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Annual Financial Reports (PEFA PI-29)
</narrative></title>
<baseline year="2018" iso-date="2018-05-15" value="D+"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-15" />
<period-end iso-date="2031-05-15" />
<target value="C+">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PFM Enterprise Architecture defined and adopted
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2031-05-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Performance information for service delivery (PEFA PI-8)
</narrative></title>
<baseline year="2018" iso-date="2018-05-15" value="C"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-15" />
<period-end iso-date="2031-05-15" />
<target value="B">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-23T20:24:13" hierarchy="1"><iati-identifier>44000-P089898</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>EDUCATION QUALITY AND SECONDARY EDUCATION</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The objective of the Project is to improve access to a quality lower secondary education for low income students, especially indigenous communities, through improved primary education completion rates for overage students, strengthened flexible lower secondary education modalities and school management.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Education Quality and Secondary Education Project for Guatemala is to improve access to a quality lower secondary education for low income students, especially indigenous communities, through improved primary education completion rates for overage students, strengthened flexible lower secondary education modalities and school management. There are component to the project. Component one: primary education completion and quality: This component will support an integrated strategy for Basic Education (primary and lower secondary cycles) to increase primary education retention and completion of overage students, and promote their continued education at the lower secondary education level. The component will also support proposed reforms to the Pre-Service Teacher Training system. Component two: access and quality of lower secondary education: This component will support integrated strategies to increase the quality and access to lower secondary education (grades 7-9). It will include support for: (i) the curricular reform of secondary education; (ii) strengthening and expansion of existing lower secondary education modalities; and (iii) strengthening education demand programs. Component three: school management in support of education quality. This component will advance the lessons learned on school management strategies implemented at the primary school level in Guatemala.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="GT–P0000711"><narrative>Ministerio de Finanzas Publicas de Guatemala</narrative></participating-org><participating-org role="2" xml:lang="en" ref="GT–P0000711"><narrative>Ministerio de Finanzas Publicas de Guatemala</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="GT-COA-0000712"><narrative>Ministry of Education</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2006-11-14"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2007-03-06"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2015-11-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2015-11-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Juan Diego Alonso</narrative></person-name><telephone>+1-202-473-1000</telephone><email>jalonso@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="GT" percentage="100"><narrative xml:lang="en">GUATEMALA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003587546" />
            <name><narrative>Zapotitlan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.13333 -89.833328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003587578" />
            <name><narrative>Zacualpa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.08333 -90.833328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003587593" />
            <name><narrative>Yupiltepeque</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.2 -89.783333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003588043" />
            <name><narrative>Uspantan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.38333 -90.833328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003588206" />
            <name><narrative>Tucuru</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.3 -90.066673</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003588258" />
            <name><narrative>Totonicapan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.91167 -91.361107</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003588308" />
            <name><narrative>Todos Santos Cuchumatan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.51667 -91.616669</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003588460" />
            <name><narrative>Tejutla</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.11667 -91.800003</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003588474" />
            <name><narrative>Tectitan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.33333 -92.033333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003588554" />
            <name><narrative>Tamahu</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.3089 -90.235992</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003588588" />
            <name><narrative>Tajumulco</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.08333 -91.883331</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003588603" />
            <name><narrative>Tactic</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.32218 -90.354477</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003588612" />
            <name><narrative>Tacana</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.23932 -92.06736</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003588693" />
            <name><narrative>Municipio de Soloma</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.71667 -91.449997</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589103" />
            <name><narrative>Santiago Chimaltenango</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.46667 -91.716667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589105" />
            <name><narrative>Santiago Atitlan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.63823 -91.229012</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589247" />
            <name><narrative>Santa Maria Visitacion</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.71667 -91.316673</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589249" />
            <name><narrative>Santa Maria Ixhuatan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.19 -90.274719</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589256" />
            <name><narrative>Santa Maria Chiquimula</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.03028 -91.32917</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589282" />
            <name><narrative>Santa Lucia Utatlan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.76667 -91.26667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589287" />
            <name><narrative>Santa Lucia La Reforma</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.12833 -91.235558</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589404" />
            <name><narrative>Santa Cruz del Quiche</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.03056 -91.148888</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589433" />
            <name><narrative>Santa Clara La Laguna</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.71667 -91.300003</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589454" />
            <name><narrative>Santa Catarina Palopo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.71667 -91.133331</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589458" />
            <name><narrative>Santa Catarina Ixtahuacan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.8 -91.366669</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589468" />
            <name><narrative>Santa Barbara</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.31667 -91.616669</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589475" />
            <name><narrative>Santa Barbara</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.43333 -91.23333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589498" />
            <name><narrative>Santa Ana Huista</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.68085 -91.820053</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589541" />
            <name><narrative>San Sebastian Huehuetenango</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.38333 -91.583328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589543" />
            <name><narrative>San Sebastian Coatan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.73333 -91.566673</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589548" />
            <name><narrative>San Sebastian</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.56667 -91.650002</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589577" />
            <name><narrative>San Rafael Pie de La Cuesta</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.93333 -91.916672</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589579" />
            <name><narrative>San Rafael Petzal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.40487 -91.664513</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589592" />
            <name><narrative>San Rafael Las Flores</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.48139 -90.173332</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589595" />
            <name><narrative>San Rafael La Independencia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.71667 -91.533333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589629" />
            <name><narrative>San Pedro Pinula</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.66667 -89.849998</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589632" />
            <name><narrative>San Pedro Necta</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.49142 -91.765511</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589637" />
            <name><narrative>San Pedro La Laguna</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.69297 -91.272011</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589640" />
            <name><narrative>San Pedro Jocopilas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.09444 -91.15139</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589643" />
            <name><narrative>San Pedro Carcha</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.48333 -90.26667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589669" />
            <name><narrative>San Pablo La Laguna</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.71667 -91.26667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589671" />
            <name><narrative>San Pablo Jocopilas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.58333 -91.449997</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589677" />
            <name><narrative>San Pablo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.93154 -92.003922</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589706" />
            <name><narrative>San Miguel Siguila</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.9 -91.616669</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589709" />
            <name><narrative>San Miguel Panan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.53333 -91.366669</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589720" />
            <name><narrative>San Miguel Ixtahuacan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.25 -91.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589730" />
            <name><narrative>San Miguel Chicaj</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.1 -90.400002</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589734" />
            <name><narrative>San Miguel Acatan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.7 -91.616669</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589770" />
            <name><narrative>San Mateo Ixtatan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.83194 -91.478058</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589774" />
            <name><narrative>San Mateo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.86667 -91.583328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589778" />
            <name><narrative>San Martin Sacatepequez</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.81667 -91.650002</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589795" />
            <name><narrative>San Marcos La Laguna</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.71667 -91.26667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589850" />
            <name><narrative>San Lucas Toliman</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.59471 -91.146591</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589402" />
            <name><narrative>Santa Cruz La Laguna</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.75 -91.216667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589395" />
            <name><narrative>Santa Cruz Verapaz</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.36667 -90.433327</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589355" />
            <name><narrative>Santa Eulalia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.73306 -91.45694</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589074" />
            <name><narrative>Santo Domingo Suchitepequez</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.46667 -91.48333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589062" />
            <name><narrative>Santo Tomas La Union</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.63333 -91.383331</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003588984" />
            <name><narrative>Sayaxche</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>16.51667 -90.166672</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003588858" />
            <name><narrative>Senahu</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.4 -89.833328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003588762" />
            <name><narrative>Sibilia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15 -91.616669</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003588760" />
            <name><narrative>Sibinal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.14963 -92.04892</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003588726" />
            <name><narrative>Sipacapa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.2 -91.666672</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003588698" />
            <name><narrative>Solola</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.77222 -91.183327</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003587510" />
            <name><narrative>Zunil</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.78333 -91.48333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003587506" />
            <name><narrative>Zunilito</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.61667 -91.51667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589865" />
            <name><narrative>San Lorenzo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.03333 -91.73333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589869" />
            <name><narrative>San Lorenzo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.48333 -91.51667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589880" />
            <name><narrative>San Juan Tecuaco</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.08222 -90.261108</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589896" />
            <name><narrative>San Juan La Laguna</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.7 -91.283333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589900" />
            <name><narrative>San Juan Ixcoy</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.59972 -91.445282</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589903" />
            <name><narrative>San Juan Ermita</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.76667 -89.433327</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589913" />
            <name><narrative>San Juan Cotzal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.43417 -91.034172</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589917" />
            <name><narrative>San Juan Chamelco</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.43333 -90.333328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589923" />
            <name><narrative>San Juan Bautista</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.41667 -91.183327</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589925" />
            <name><narrative>San Juan Atitan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.43333 -91.633331</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589985" />
            <name><narrative>San Jose Ojetenam</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.21667 -91.966667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590029" />
            <name><narrative>San Jose El Idolo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.45 -91.416672</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590041" />
            <name><narrative>San Jose Chacaya</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.76667 -91.216667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590114" />
            <name><narrative>San Jeronimo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.06032 -90.240501</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590188" />
            <name><narrative>San Gaspar Ixchil</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.38333 -91.716667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590195" />
            <name><narrative>San Gabriel</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.51667 -91.51667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590197" />
            <name><narrative>San Francisco Zapotitlan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.58333 -91.51667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590213" />
            <name><narrative>San Francisco La Union</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.91667 -91.533333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590219" />
            <name><narrative>San Francisco El Alto</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.95 -91.449997</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590316" />
            <name><narrative>San Cristobal Verapaz</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.39632 -90.565132</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590318" />
            <name><narrative>San Cristobal Totonicapan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.91667 -91.433327</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590323" />
            <name><narrative>San Cristobal Cucho</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.9 -91.783333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590347" />
            <name><narrative>San Carlos Sija</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.98333 -91.550003</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590355" />
            <name><narrative>San Carlos Alzatate</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.49778 -90.06028</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590384" />
            <name><narrative>San Bernardino</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.53333 -91.449997</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590395" />
            <name><narrative>San Bartolome Jocotenango</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.19278 -91.077217</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590399" />
            <name><narrative>San Bartolo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.08444 -91.455833</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590412" />
            <name><narrative>San Antonio Suchitepequez</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.53333 -91.416672</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590419" />
            <name><narrative>San Antonio Sacatepequez</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.96667 -91.73333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590424" />
            <name><narrative>San Antonio Palopo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.7 -91.116669</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590456" />
            <name><narrative>San Antonio Ilotenango</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.05472 -91.229721</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590458" />
            <name><narrative>San Antonio Huista</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.6501 -91.771629</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590520" />
            <name><narrative>San Andres Xecul</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.9 -91.48333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590522" />
            <name><narrative>San Andres Villa Seca</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.56667 -91.583328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590524" />
            <name><narrative>San Andres Semetabaj</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.75 -91.133331</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590526" />
            <name><narrative>San Andres Sajcabaja</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.21667 -90.916672</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590566" />
            <name><narrative>Municipio de Samayac</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.58333 -91.466667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590605" />
            <name><narrative>Salcaja</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.88333 -91.449997</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590616" />
            <name><narrative>Salama</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.10278 -90.318062</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590690" />
            <name><narrative>Sacapulas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.28667 -91.087219</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590804" />
            <name><narrative>Rio Bravo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.40042 -91.317131</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590814" />
            <name><narrative>Rio Blanco</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.03333 -91.683327</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590924" />
            <name><narrative>Rabinal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.1 -90.449997</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003591028" />
            <name><narrative>Purulha</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.26667 -90.199997</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003591106" />
            <name><narrative>Pueblo Nuevo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.65 -91.533333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003591517" />
            <name><narrative>Patzite</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.96667 -91.216667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003591541" />
            <name><narrative>Patulul</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.41667 -91.166672</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003591955" />
            <name><narrative>Pachalum</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.92472 -90.662781</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003591997" />
            <name><narrative>Ostuncalco</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.86667 -91.616669</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003592035" />
            <name><narrative>Olopa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.68333 -89.349998</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003592041" />
            <name><narrative>Olintepeque</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.88333 -91.51667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003592086" />
            <name><narrative>Ocos</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.50998 -92.192978</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003592105" />
            <name><narrative>Nuevo San Carlos</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.6 -91.699997</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003592108" />
            <name><narrative>Nuevo Progreso</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.8 -91.916672</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003592217" />
            <name><narrative>Nenton</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.8007 -91.754639</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003592635" />
            <name><narrative>Mataquescuintla</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.52917 -90.184174</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003592751" />
            <name><narrative>Malacatancito</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.21667 -91.51667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003592753" />
            <name><narrative>Malacatan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.91065 -92.057953</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003593541" />
            <name><narrative>La Tinta</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.85 -89.716667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003594315" />
            <name><narrative>Lanquin</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.56667 -89.966667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003594422" />
            <name><narrative>La Libertad</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>16.783331 -90.116669</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003594423" />
            <name><narrative>La Libertad</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.51421 -91.869438</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003594703" />
            <name><narrative>La Esperanza</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.86667 -91.566673</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003594754" />
            <name><narrative>La Demacracia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.62544 -91.886703</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003595069" />
            <name><narrative>Jutiapa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.29167 -89.895828</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003595148" />
            <name><narrative>Joyabaj</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.995 -90.806107</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003595181" />
            <name><narrative>Jocotan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.81667 -89.383331</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003595237" />
            <name><narrative>Jalapa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.63472 -89.988892</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003595248" />
            <name><narrative>Jacaltenango</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.66667 -91.73333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003595281" />
            <name><narrative>Municipio de Ixtahuacan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.41667 -91.76667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003595406" />
            <name><narrative>Huitan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.1 -91.616669</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003595778" />
            <name><narrative>Esquipulas Palo Gordo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.93333 -91.816673</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003597587" />
            <name><narrative>El Asintal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.6 -91.73333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003597676" />
            <name><narrative>El Adelanto</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.16667 -89.833328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003597750" />
            <name><narrative>Cuyotenango</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.53333 -91.566673</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003597772" />
            <name><narrative>Cunen</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.3375 -91.026939</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003597802" />
            <name><narrative>Cuilco</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.4 -91.966667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003597837" />
            <name><narrative>Cubulco</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.13333 -90.583328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003597966" />
            <name><narrative>Conguaco</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.04417 -90.031113</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003597976" />
            <name><narrative>Concepcion Tutuapa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.28333 -91.783333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003597993" />
            <name><narrative>Concepcion Chiquirichapa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.85 -91.616669</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003598006" />
            <name><narrative>Concepcion</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.78333 -91.150002</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003598025" />
            <name><narrative>Comitancillo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.08333 -91.716667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003598031" />
            <name><narrative>Comapa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.11667 -89.916672</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003598041" />
            <name><narrative>Colotenango</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.40602 -91.712669</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003598073" />
            <name><narrative>Colomba</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.71667 -91.73333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003598787" />
            <name><narrative>Champerico</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.3 -91.916672</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003598804" />
            <name><narrative>Chajul</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.48528 -91.034172</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003598825" />
            <name><narrative>Chahal Guatemala</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.79122 -89.605179</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003598958" />
            <name><narrative>Catarina</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.8515 -92.076462</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003599069" />
            <name><narrative>Cantel</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.81667 -91.449997</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003599094" />
            <name><narrative>Canilla</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.16667 -90.849998</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003599181" />
            <name><narrative>Camotan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.81667 -89.366669</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003599253" />
            <name><narrative>Cajola</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.91667 -91.616669</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003599287" />
            <name><narrative>Cabrican</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.13333 -91.616669</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003599574" />
            <name><narrative>Municipio de Barillas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.93155 -91.221191</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003599614" />
            <name><narrative>Municipio de Ayutla</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.7272 -92.130127</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003599793" />
            <name><narrative>Almolonga</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.81667 -91.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0009165894" />
            <name><narrative>Fray Bartolome de las Casas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.80697 -89.861031</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003599265" />
            <name><narrative>Cahabon</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.56667 -89.816673</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003598692" />
            <name><narrative>Chiantla</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.35472 -91.458328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003598678" />
            <name><narrative>Chicacao</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.53333 -91.316673</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003598670" />
            <name><narrative>Chicaman</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.4 -90.76667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003598659" />
            <name><narrative>Chiche</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.00861 -91.065002</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003598655" />
            <name><narrative>Chichicastenango</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.93333 -91.116669</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003598513" />
            <name><narrative>Chinique</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.04472 -91.025833</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003598415" />
            <name><narrative>Chisec</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.81667 -90.283333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003598122" />
            <name><narrative>Coatepeque</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.7 -91.866669</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003598119" />
            <name><narrative>Coban</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.47083 -90.370827</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003597301" />
            <name><narrative>El Chol</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.96417 -90.48056</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003596644" />
            <name><narrative>El Palmar</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.65 -91.583328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003596389" />
            <name><narrative>El Quetzal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.76667 -91.816673</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003596249" />
            <name><narrative>El Rodeo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.91667 -91.966667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003595929" />
            <name><narrative>El Tumbador</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.86667 -91.933327</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003595721" />
            <name><narrative>Flores Costa Cuca</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.63238 -91.863411</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003595674" />
            <name><narrative>Genova</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.61667 -91.833328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003595631" />
            <name><narrative>Granados</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.91361 -90.522781</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003595340" />
            <name><narrative>Ixcan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.81667 -91.066673</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003595329" />
            <name><narrative>Ixchiguan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.2 -91.883331</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003594143" />
            <name><narrative>La Reforma</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.8 -91.816673</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003592483" />
            <name><narrative>Momostenango</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.04361 -91.408607</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003592322" />
            <name><narrative>Moyuta</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.03861 -90.080833</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003592286" />
            <name><narrative>Nahuala</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.85 -91.316673</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003592237" />
            <name><narrative>Nebaj</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.40583 -91.146111</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003591885" />
            <name><narrative>Pajapita</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.72152 -92.03521</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003591841" />
            <name><narrative>Palestina de los Altos</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.93333 -91.699997</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003591750" />
            <name><narrative>Panajachel</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.73333 -91.150002</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003591676" />
            <name><narrative>Panzos</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.4 -89.666672</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003599912" />
            <name><narrative>Aguacatan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.34306 -91.311668</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="11110" percentage="26" xml:lang="en"/><sector vocabulary="1" code="11220" percentage="10" xml:lang="en"/><sector vocabulary="1" code="11321" percentage="64" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="ES" percentage="74.0000000" xml:lang="en"><narrative>FY17 - Secondary Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="3.00000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="12.0000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EP" percentage="11.0000000" xml:lang="en"><narrative>FY17 - Primary Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000052" percentage="13" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000651" percentage="13" xml:lang="en"><narrative>Access to Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000521" percentage="13" xml:lang="en"><narrative>Social Safety Nets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="25" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000521" percentage="13" xml:lang="en"><narrative>Social Safety Nets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="26" xml:lang="en"><narrative>Education</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2007-03-01"/>
<period-end iso-date="2007-03-31"/>
<value currency="USD" value-date="2007-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-04-01"/>
<period-end iso-date="2007-04-30"/>
<value currency="USD" value-date="2007-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">408333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">408333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">408333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">408333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">408333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">408333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">408333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">408333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">408333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">408333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">408333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">408333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">841666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">841666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">841666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">841666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">841666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">841666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">841666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">841666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">841666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">841666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">841666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">841666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">1508333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">1508333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">1508333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">1508333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">1508333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">1508333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">1508333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">1508333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">1508333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">1508333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">1508333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">1508333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">1716666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">1716666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">1716666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">1716666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">1716666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">1716666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">1716666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">1716666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">1716666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">1716666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">1716666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">1716666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">1275000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">1275000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">1275000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">1275000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">1275000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">1275000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">1275000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">1275000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">1275000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">1275000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">1275000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">1275000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">916666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">916666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">916666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">916666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-03-01"/>
<period-end iso-date="2007-03-31"/>
<value currency="USD" value-date="2007-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-04-01"/>
<period-end iso-date="2007-04-30"/>
<value currency="USD" value-date="2007-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">408333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">408333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">408333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">408333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">408333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">408333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">408333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">408333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">408333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">841666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">841666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">841666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">4543.07</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">4543.07</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2007-03-31"/><value value-date="2007-03-31">80000000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2007</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">-1742</value><description xml:lang="en"><narrative>Total Commitment Cancellations in July Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-04-30"/><value value-date="2008-04-30">-2801</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2008</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-06-30"/><value value-date="2008-06-30">200000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2008</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-11-30"/><value value-date="2008-11-30">7000000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2008</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-02-28"/><value value-date="2010-02-28">6208203</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-08-31"/><value value-date="2010-08-31">4026416</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-11-30"/><value value-date="2010-11-30">3525920</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-02-28"/><value value-date="2011-02-28">5747029</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-07-31"/><value value-date="2011-07-31">922936</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-09-30"/><value value-date="2011-09-30">1617114</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-11-30"/><value value-date="2011-11-30">2130061</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-12-31"/><value value-date="2011-12-31">4045879</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-02-29"/><value value-date="2012-02-29">1075560</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-10-31"/><value value-date="2012-10-31">5463329</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">3928959</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-01-31"/><value value-date="2013-01-31">6065659</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">2023587</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">4317250</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">4600000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">3624288</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">6592789</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">1815897</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">5069121</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">0</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">-1742</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2008-06-30"/><value value-date="2008-06-30">-200000</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2008</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2008-09-30"/><value value-date="2008-09-30">-1251</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2008</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2009-03-31"/><value value-date="2009-03-31">-69486</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2009-09-30"/><value value-date="2009-09-30">-71760</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-03-31"/><value value-date="2010-03-31">-26426</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-09-30"/><value value-date="2010-09-30">-34308</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-03-31"/><value value-date="2011-03-31">-53993</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-09-30"/><value value-date="2011-09-30">-72973</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">-94216</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-09-30"/><value value-date="2012-09-30">-147903</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">-156570</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">-133990</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">-117957</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">-109811</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">-119185</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">-140484</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-564878</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-524520</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-484161</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-443812</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-403463</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-363113</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-322764</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-282414</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-242065</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-201715</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-161366</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-121017</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-80667</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-40318</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">-2294570</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">-2720065</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">-3215864</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">-3428972</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">-3954515</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">-4292625</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-4292625</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-4292491</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-4292491</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-4292491</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-4292491</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-4292491</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-4292491</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-4292491</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-4292491</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-4292491</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-4292491</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-4292491</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-4292491</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-4289126</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-712"><narrative>Ministry of Education</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P089898"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P089898?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P089898"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of schools with trained school councils
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2015-11-30" />
<target value="1350.00">

</target>
<actual value="1348.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of classes within schools that offer the Accelerated Primary Education Program:(ii) in Bilingual Modality
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2015-11-30" />
<target value="196.00">

</target>
<actual value="206.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of schools with trained school councils
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2015-11-30" />
<target value="1350.00">

</target>
<actual value="1489.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Gross Enrollment rate in lower secondary education (grades 7-9) in 196 targeted municipalities
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="42.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2015-11-30" />
<target value="56.00">

</target>
<actual value="51.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
9th grade Gross Completion Rate in 199 targeted municipalities
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="31.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2015-11-30" />
<target value="47.00">

</target>
<actual value="41.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of School Councils that receive grants and report expenditures satisfactorily
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2015-11-30" />
<target value="487.00">

</target>
<actual value="158.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of School Councils that receive grants and report expenditures satisfactorily
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2015-11-30" />
<target value="487.00">

</target>
<actual value="158.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Lower Secondary Schools operating under the modalities financed by the Project, that receive intercultural and instructional materials (Telesecondary Institutions)
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2015-11-30" />
<target value="967.00">

</target>
<actual value="967.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Lower Secondary Schools, operating under the modalities financed by the Project, that receive intercultural and instructional materials (NUFED)
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2015-11-30" />
<target value="600.00">

</target>
<actual value="590.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of students in the Accelerated Primary Education Program (PEPS) that graduate from primary education
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2015-11-30" />
<target value="33181.00">

</target>
<actual value="10263.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of scholarships financed by the Project that are granted to students from targeted municipalities that comply with attendance requirements
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2015-11-30" />
<target value="35280.00">

</target>
<actual value="37847.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Primary education completion rate (6th grade) in 196 targeted municipalities
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="68.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2015-11-30" />
<target value="87.00">

</target>
<actual value="81.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of classes within schools that offer the Accelerated Primary Education Program: (i) in Monolingual Modality
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2015-11-30" />
<target value="86.00">

</target>
<actual value="59.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Primary education completion rate (6th grade) in 196 targeted municipalities
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="78.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2015-11-30" />
<target value="87.00">

</target>
<actual value="87.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of pre-primary and primary education teachers that completed the in-service teacher training program (PADEP/D) in 196 targeted municipalities
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2015-11-30" />
<target value="13237.00">

</target>
<actual value="13661.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
9th grade Gross Completion Rate in 196 targeted municipalities
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="32.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2015-11-30" />
<target value="47.00">

</target>
<actual value="43.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Lower Secondary Schools, operating under the modalities financed by the Project, that receive intercultural and instructional materials (NUFED)
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2015-11-30" />
<target value="600.00">

</target>
<actual value="590.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of classes within schools that offer the Accelerated Primary Education Program:(ii) in Bilingual Modality
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2015-11-30" />
<target value="196.00">

</target>
<actual value="206.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of pre-primary and primary education teachers that completed the in-service teacher training program (PADEP/D) in 196 targeted municipalities
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2015-11-30" />
<target value="13237.00">

</target>
<actual value="9988.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of scholarships financed by the Project that are granted to students from targeted municipalities that comply with attendance requirements
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2015-11-30" />
<target value="35280.00">

</target>
<actual value="31484.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Project-financed classes in Telesecundary Institutions that are functioning with adequate equipment and instructional materials
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2015-11-30" />
<target value="5080.00">

</target>
<actual value="5080.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Project-financed classes in Telesecundary Institutions that are functioning with adequate equipment and instructional materials
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2015-11-30" />
<target value="5080.00">

</target>
<actual value="5080.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of classes within schools that offer the Accelerated Primary Education Program: (i) in Monolingual Modality
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2015-11-30" />
<target value="86.00">

</target>
<actual value="59.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of students in the Accelerated Primary Education Program (PEPS) that graduate from primary education
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2015-11-30" />
<target value="33181.00">

</target>
<actual value="20000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Gross Enrollment rate in lower secondary education (grades 7-9) in 199 targeted municipalities
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="42.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2015-11-30" />
<target value="56.00">

</target>
<actual value="51.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Lower Secondary Schools operating under the modalities financed by the Project, that receive intercultural and instructional materials (Telesecondary Institutions)
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2015-11-30" />
<target value="967.00">

</target>
<actual value="967.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-23T20:24:13" hierarchy="1"><iati-identifier>44000-P173854</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Guatemala COVID-19 Response</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To prevent, detect and respond to the threat posed by COVID-19 and strengthen national systems for public health preparedness in the Republic of Guatemala.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The Project will be comprised of two components to support the government's strategic plan to prevent, control and respond to the spread of COVID-19 and strengthen health system preparedness to respond to emergencies . In addition, climate change adaptation and mitigation measures will be incorporated throughout the sub-components, as applicable. The specific activities financed by the Project fit into the overall government strategy to: (i) rapidly address the COVID-19 emergency by identifying, isolating and providing care for patients with COVID-19 to minimize disease spread, morbidity and mortality; (ii) implement effective communication campaigns for mass awareness and education of the population to prevent the spread of COVID-19; and (iii) strengthen the capacity of the public health system to provide intensive care. Component 1: Emergency Response to COVID-19 [US$ 19.5 million]. This component will include 3 subcomponents and will finance the rollout of the national communication strategy, the distribution of sanitary kits and training for community health care providers in basic COVID-19 protocols through the communications and outreach campaign to the population in high-risk with little or no access to healthcare services, medical and non-medical equipment and supplies, development of triage and isolation areas through remodeling work within existing health facilities, ambulances for a safe transport of COVID-19 patients, transportation services of COVID-19 patients from and to healthcare facilities, and consultant and non-consultant services.Subcomponent 1.1: Prevention and Communication Activities [US$ 2.5 million]: The Project will support the actions of the national communication, coordination and social participation plan to control the spread of COVID-19. This subcomponent contributes to financing the national communication plan, which will be tailored and culturally adapted with the aim of raising awareness within the community of community members fundamental role in slowing down the spread of the disease and thus avoiding the rapid increase in the demand for critical health services. The campaign will incorporate messages and information on support resources for stakeholders that are facing other risks such as domestic violence and mental and emotional stress induced from the pandemic and the shelter-in-place policies. This subcomponent will also finance sanitary kits including cleaning alcohol, chlorine, hand washing soap, powdered soap and soap bars to wash clothes; Sanitary napkins, gloves etc. that will be distributed to vulnerable populations (e.g. with little or no access to water and sanitation) during events for the communications campaign. Finally, consulting services will ensure the inter-institutional coordination of communication across different levels of care. There will also be specific communication activities for health workers that include the preparation and delivery of specific guidelines for health care workers on self-care and mental health practices as well as protocols for prevention, detection and management of cases for community health workers, mid-wives and other traditional healers that are often the Indigenous populations first resources for health advice and support. Funding includes consulting and non-consulting services for four main activities: (i) support in developing materials and messages for the general public to increase the awareness of the risks and impacts of the pandemic and the population's understanding about what to do when feeling sick, where to seek care and how to follow-up, taking into account Guatemala's cultural and linguistic diversity; (ii) support to the strategy of conscious social participation in controlling the epidemic, including the distribution of preventative sanitary kits to communities at high risk that lack access to health care services; (iii) preparation and delivery of guidelines for health workers on self-care and mental health practices, including community health care providers and midwives; and (iv) production and dissemination of materials to support homes in compulsory self-isolation.The target population includes the general population with the confrontation in those groups of highest risk. Furthermore, this strategy is adapted to ensure a sustained effort to control transmission and to ensure that prevention and control measures are accepted and controlled by the population in the medium and long term as well. In addition to COVID-19, the health messages and materials disseminated will cover important advice to keep the population healthy during times of health system stress and during self-isolation. Since older age groups, those with pre-existing conditions and co-morbidities and the poor are particularly at risk from COVID-19, they will be specifically targeted for this advice and more likely to be self-isolating. These are also key climate-vulnerable groups, hence providing this wider health advice as well as advice on climate related-risks such as extreme heat will enhance population resilience.Subcomponent 1.2: Case Detection, Confirmation, Contact Tracing, Recording, Reporting [US$ 9.0 million]. The Project will support the national epidemiological surveillance system and strengthen the diagnostic capacity for emerging diseases by strengthening the laboratory network, early identification, monitoring, notification and control of outbreaks. Support will be provided to form rapid response teams and develop mechanisms of immediate notification after case detections. Strengthening disease surveillance systems for COVID-19 will also enhance the wider ability of the system to adapt and respond to climate-related communicable disease threats. Where possible, solar refrigeration for vaccine/drug cold chain storage and solar-powered mobile laboratories will be used to reduce net GHG emissions. The subcomponent will finance laboratory equipment, supplies and reagents for the diagnosis of COVID-19.Subcomponent 1.3: Support of Patient Care and Improved Safety [US$ 8.0 million]: The Project will strengthen critical aspects of health service delivery to face the increased demand for services posed by emergencies. This subcomponent will increase the availability of triage rooms, isolation areas, and outpatient screening areas at existing facilities through minor remodeling work, and it will address the health system's immediate needs for medical supplies and medical devices so that health workers can safely treat severe cases affected by the COVID-19 emergency. In addition, it will also include measures and activities to improve the safety of health workers, for instance through the provision of guidelines and training for health worker safety including the use and standards of personal protective equipment (PPE), patient referral and transport and measures of environmental health and sanitation.This subcomponent will promote the use of climate-smart technologies; procurement and mobilization of energy efficient equipment will be considered. Improving selected ICUs will also consider a longer-term approach to strengthen hospitals' ability to provide intensive care treatments, which is essential to deal with the COVID-19 emergency and other emergencies that may arise in the future. The training of health facility staff and front-line workers will also cover wider risk mitigation measures making them better prepared for other health threats including climate related risks. The provision of protective equipment and hygiene materials will protect staff against other climate-related disease, in particular unforeseen emerging zoonoses. The strengthened clinical care capacity will enhance adaptive capacity, making the health system better able to respond to other health threats including climate-related diseases and events.  The use of solar refrigeration for drug storage when available and utilizing solar-powered mobile health facilities where required will reduce ne]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="GT–P0045336"><narrative>Republic of Guatemala</narrative></participating-org><participating-org role="2" xml:lang="en" ref="GT–P0045336"><narrative>Republic of Guatemala</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="GT-COA-0045335"><narrative>Ministry of Public Health and Social Assistance (Ministerio de Salud Pública y Asistencia Social)</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2020-04-10"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2020-06-26"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2021-10-25"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2021-10-25"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Eleonora Cavagnero</narrative></person-name><telephone>+1-202-473-1000</telephone><email>ecavagnero@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="GT" percentage="100"><narrative xml:lang="en">GUATEMALA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003595048" />
            <name><narrative>Hacienda La AmErica</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.43333 -91.98333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003595528" />
            <name><narrative>Republic of Guatemala</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.5 -90.25</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003599773" />
            <name><narrative>Departamento de Alta Verapaz</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.66667 -90</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0009533151" />
            <name><narrative>Calamidad</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>16.03541 -91.14186</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0012106498" />
            <name><narrative>Comunidad Israel</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.71479 -90.45391</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0012016154" />
            <name><narrative>Villa Nueva</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.79074 -91.99206</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><sector vocabulary="1" code="12110" percentage="34" xml:lang="en"/><sector vocabulary="1" code="12250" percentage="33" xml:lang="en"/><sector vocabulary="1" code="12191" percentage="33" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="49.0000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HF" percentage="2.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HQ" percentage="49.0000000" xml:lang="en"><narrative>FY17 - Health Facilities and Construction</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000633" percentage="100" xml:lang="en"><narrative>Health Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="13" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="3" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000632" percentage="100" xml:lang="en"><narrative>Health Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000626" percentage="100" xml:lang="en"><narrative>Pandemic Response</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="100" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000633" percentage="100" xml:lang="en"><narrative>Health Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="100" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="100" xml:lang="en"><narrative>Disease Control</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000632" percentage="100" xml:lang="en"><narrative>Health Service Delivery</narrative></sector><humanitarian-scope type="1" vocabulary="1-2" code="EP-2020-000012-001"> </humanitarian-scope><humanitarian-scope type="2" vocabulary="2-1" code="HCOVD20"> </humanitarian-scope><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">166666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">1500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">1500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">1500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">1500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">1500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">1500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">1500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">1500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">1500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">1500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">1500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">1500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">166666.63</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-25"/>
<value currency="USD" value-date="2021-10-25">20000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-25"/>
<value currency="USD" value-date="2021-10-25">20000000.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">20000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-45335"><narrative>Ministry of Public Health and Social Assistance (Ministerio de Salud Pública y Asistencia Social)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-20000000</value><description xml:lang="en"><narrative>Total Commitment Cancellations in October Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-45335"><narrative>Ministry of Public Health and Social Assistance (Ministerio de Salud Pública y Asistencia Social)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P173854"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P173854?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P173854"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Additional designated laboratories with COVID-19 diagnostic equipment
</narrative></title>
<baseline year="2020" iso-date="2020-06-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-26" />
<period-end iso-date="2021-11-05" />
<target value="16.00">

</target>
<actual value="12.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of MSPAS hospitals that received equipment for COVID-19 response services per MSPAS Guidelines
</narrative></title>
<baseline year="2020" iso-date="2020-06-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-26" />
<period-end iso-date="2021-11-05" />
<target value="22.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Country has reported to have contextualized their risk communication and community engagement strategies
</narrative></title>
<baseline year="2020" iso-date="2020-06-26" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-26" />
<period-end iso-date="2021-11-05" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The country has implemented a safe referral system for COVID-19 patients following the official MSPAS protocol
</narrative></title>
<baseline year="2020" iso-date="2020-06-26" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-26" />
<period-end iso-date="2021-11-05" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of key messages contextualized and translated in Mayan languages that have been disseminated through different media to the target population
</narrative></title>
<baseline year="2020" iso-date="2020-06-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-26" />
<period-end iso-date="2021-11-05" />
<target value="20.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Additional acute healthcare facilities with isolation capacity
</narrative></title>
<baseline year="2020" iso-date="2020-06-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-26" />
<period-end iso-date="2021-11-05" />
<target value="10.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of health staff trained in infection prevention and control per MSPAS-approved protocols
</narrative></title>
<baseline year="2020" iso-date="2020-06-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-26" />
<period-end iso-date="2021-11-05" />
<target value="5000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Confirmed COVID-19 cases reported and managed based on national guidelines
</narrative></title>
<baseline year="2020" iso-date="2020-06-26" value="14819.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-26" />
<period-end iso-date="2021-11-05" />
<target value="40560.00">

</target>
<actual value="64881.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-23T20:24:13" hierarchy="1"><iati-identifier>44000-P173698</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Crisis Response and Recovery in Guatemala DPL</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[This DPL series supports the Government's efforts to mitigate the impacts of COVID-19 and: (i) protect the human capital of the poor and vulnerable; (ii) lay out foundations of a sustainable recovery; and (iii) promote public sector transparency and improve revenue administration.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Crisis Response and Recovery in Guatemala Development Policy Loan in Guatemala supports the Government's efforts to mitigate the impacts of COVID-19 and: (i) protect the human capital of the poor and vulnerable; (ii) lay out foundations of a sustainable recovery; and (iii) promote public sector transparency and improve revenue administration. The operation supports reforms on health, education, and social protection to protect human capital during the relief stage under the protecting the poor and vulnerable pillar.  It also supports reforms to enhance regional and global trade, increase access to finance for MSMEs, and modernize digital financial services, in line with the principal recommendations of the Crisis Response Approach Paper. Finally, reforms on transparency in the use of public resources and debt, and improvements in revenue mobilization contribute to the strengthening of institutions and improved transparency. The series aims to enhance the governance of the revenue administration.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="GT–P0045098"><narrative>Republic of Guatemala</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="GT-COA-0045099"><narrative>Ministry of Finance Guatemala (MINFIN)</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2020-12-17"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2020-12-17"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2022-11-03"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2022-11-03"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Carolina Mejia-Mantilla</narrative></person-name><telephone>+1-202-473-1000</telephone><email>cmejiamantilla@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="GT" percentage="100"><narrative xml:lang="en">GUATEMALA</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3598132" />
                <name><narrative>Guatemala City</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>14.64072 -90.513268</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="16011" percentage="20" xml:lang="en"/><sector vocabulary="1" code="11220" percentage="20" xml:lang="en"/><sector vocabulary="1" code="15142" percentage="15" xml:lang="en"/><sector vocabulary="1" code="33110" percentage="10" xml:lang="en"/><sector vocabulary="1" code="32130" percentage="10" xml:lang="en"/><sector vocabulary="1" code="31163" percentage="10" xml:lang="en"/><sector vocabulary="1" code="24010" percentage="10" xml:lang="en"/><sector vocabulary="1" code="15185" percentage="5" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="20.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AL" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Livestock</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="FA" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Banking Institutions</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="FK" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Capital Markets</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YY" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Trade</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EP" percentage="20.0000000" xml:lang="en"><narrative>FY17 - Primary Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000322" percentage="10" xml:lang="en"><narrative>Payment &amp; markets infrastructure</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="10" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000651" percentage="10" xml:lang="en"><narrative>Access to Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000521" percentage="10" xml:lang="en"><narrative>Social Safety Nets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000114" percentage="10" xml:lang="en"><narrative>Tax policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000671" percentage="10" xml:lang="en"><narrative>Nutrition</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000626" percentage="80" xml:lang="en"><narrative>Pandemic Response</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000323" percentage="10" xml:lang="en"><narrative>MSME Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="10" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="10" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="10" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000067" percentage="10" xml:lang="en"><narrative>Nutrition and Food Security</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000721" percentage="10" xml:lang="en"><narrative>Rural Markets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="10" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="80" xml:lang="en"><narrative>Disease Control</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000651" percentage="10" xml:lang="en"><narrative>Access to Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000637" percentage="10" xml:lang="en"><narrative>Child Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000721" percentage="10" xml:lang="en"><narrative>Rural Markets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="10" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000637" percentage="10" xml:lang="en"><narrative>Child Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="10" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><humanitarian-scope type="1" vocabulary="1-2" code="EP-2020-000012-001"> </humanitarian-scope><humanitarian-scope type="2" vocabulary="2-1" code="HCOVD20"> </humanitarian-scope><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-03"/>
<value currency="USD" value-date="2022-11-03">500000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-03"/>
<value currency="USD" value-date="2022-11-03">500000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-03"/>
<value currency="USD" value-date="2022-11-03">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-03"/>
<value currency="USD" value-date="2022-11-03">0.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">500000000</value><description xml:lang="en"><narrative>Total Commitment in December Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-45099"><narrative>Ministry of Finance Guatemala (MINFIN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">500000000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-45099"><narrative>Ministry of Finance Guatemala (MINFIN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">-1250000</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-45099"><narrative>Ministry of Finance Guatemala (MINFIN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-12218560</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-45099"><narrative>Ministry of Finance Guatemala (MINFIN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-14170048</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-45099"><narrative>Ministry of Finance Guatemala (MINFIN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-15997023</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-45099"><narrative>Ministry of Finance Guatemala (MINFIN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-15202685</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-45099"><narrative>Ministry of Finance Guatemala (MINFIN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-13253190</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-45099"><narrative>Ministry of Finance Guatemala (MINFIN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-11276329</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-45099"><narrative>Ministry of Finance Guatemala (MINFIN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-10252297</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-45099"><narrative>Ministry of Finance Guatemala (MINFIN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-25000000</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-45099"><narrative>Ministry of Finance Guatemala (MINFIN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-25000000</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-45099"><narrative>Ministry of Finance Guatemala (MINFIN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-25000000</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-45099"><narrative>Ministry of Finance Guatemala (MINFIN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-25000000</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-45099"><narrative>Ministry of Finance Guatemala (MINFIN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-25000000</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-45099"><narrative>Ministry of Finance Guatemala (MINFIN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P173698"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P173698?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P173698"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Results Indicator #9: Average clearance time for shipments at Tecn Umn II border post between Mexico and Guatemala (Guatemala side)
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="5.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2022-12-30" />
<target value="2.00">

</target>
<actual value="5.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Results Indicator #11: Value Added Tax (VAT) compliance rate
</narrative></title>
<baseline year="2019" iso-date="2019-12-31" value="73.70"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-31" />
<period-end iso-date="2022-12-30" />
<target value="75.30">

</target>
<actual value="73.70">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Results Indicator #3: Share of students enrolled in pre-primary and primary public schools covered by the basic health insurance program
</narrative></title>
<baseline year="2020" iso-date="2020-02-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-02-28" />
<period-end iso-date="2022-12-30" />
<target value="100.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Results Indicator #12: Share of tax audits processed on risk-based criteria
</narrative></title>
<baseline year="2019" iso-date="2019-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-31" />
<period-end iso-date="2022-12-30" />
<target value="80.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Results Indicator #10: Share of public employees of the Central government with non-sensitive information published in the public portal (excluding the Ministry of the Interior &amp; Ministry of Defense)
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2022-12-30" />
<target value="94.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Results Indicator #8: Share of adults (ages 15+) making or receiving digital payments
</narrative></title>
<baseline year="2017" iso-date="2017-12-29" value="33.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-29" />
<period-end iso-date="2022-12-30" />
<target value="50.00">

</target>
<actual value="33.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Results Indicator #4: Children benefitting from screenings for acute malnutrition by mobile health units
</narrative></title>
<baseline year="2020" iso-date="2020-02-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-02-28" />
<period-end iso-date="2022-12-30" />
<target value="50000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Results Indicator #5: Share of total land use, land use change, and forestry (LULUCF) emissions regulated by the Emission ReductionPayment Agreement (ERPA)
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2022-12-30" />
<target value="22.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Results Indicator #7: Share of companies using financial service providers to finance investments, including leasing contracts
</narrative></title>
<baseline year="2019" iso-date="2019-12-31" value="38.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-31" />
<period-end iso-date="2022-12-30" />
<target value="45.00">

</target>
<actual value="38.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Results Indicator #1: Households that are direct recipients of targeted cash transfers
</narrative></title>
<baseline year="2019" iso-date="2019-12-31" value="166000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-31" />
<period-end iso-date="2022-12-30" />
<target value="330000.00">

</target>
<actual value="166000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Results Indicator #2: Primary education teachers who have been part of the pilot of the instruments to measure teachers standards
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2023-12-29" />
<target value="740.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Result Indicator #13: Tax revenues
</narrative></title>
<baseline year="2019" iso-date="2019-12-31" value="10.60"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-31" />
<period-end iso-date="2022-12-30" />
<target value="10.80">

</target>
<actual value="10.60">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Results Indicator #6: MSMEs receiving loans under the Working Capital Credit Fund and future arrangements
</narrative></title>
<baseline year="2020" iso-date="2020-02-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-02-28" />
<period-end iso-date="2022-12-30" />
<target value="4500.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-23T20:24:13" hierarchy="1"><iati-identifier>44000-P175979</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Second Crisis Response and Recovery in Guatemala Development Policy Loan</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[This DPF series supports the Government's efforts to mitigate the impacts of COVID-19 and: (i) protect and enhance the human capital of the poor and vulnerable; (ii) lay out foundations of a sustainable and green recovery; and (iii) promote public sector transparency and improve revenue administration.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Second Crisis Response and Recovery in Guatemala Development Policy Loan for Guatemala is to supports the government's efforts to mitigate the impacts of Coronavirus disease 2019 (COVID-19) and: (i) protect and enhance the human capital of the poor and vulnerable; (ii) lay out foundations of a sustainable and green recovery; and (iii) promote public sector transparency and improve revenue administration. This second operation extends the World Bank's support for Guatemala's efforts to navigate a prolonged COVID-19 crisis and pursue a build back better approach to stimulate inclusive, sustainable, and green growth and avoid a return to the pre-pandemic status quo. This operation further contributes to the World Bank Group's institutional strategies and to the latest country partnership framework (CPF) for Guatemala and is aligned with ongoing engagement discussions to support current priorities moving forward.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="GT–P0048281"><narrative>Republic of Guatemala</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="GT-COA-0048280"><narrative>Ministry of Public Finance Guatemala (MINFIN)</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2022-06-01"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2022-10-20"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2025-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2025-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Douglas Randall</narrative></person-name><telephone>+1-202-473-1000</telephone><email>drandall@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="GT" percentage="100"><narrative xml:lang="en">GUATEMALA</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3598132" />
                <name><narrative>Guatemala City</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>14.64072 -90.513268</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="15126" percentage="23" xml:lang="en"/><sector vocabulary="1" code="12220" percentage="21" xml:lang="en"/><sector vocabulary="1" code="15196" percentage="11" xml:lang="en"/><sector vocabulary="1" code="32130" percentage="11" xml:lang="en"/><sector vocabulary="1" code="15155" percentage="11" xml:lang="en"/><sector vocabulary="1" code="33110" percentage="11" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="10" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="1" xml:lang="en"/><sector vocabulary="1" code="11220" percentage="1" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EP" percentage="6.00000000" xml:lang="en"><narrative>FY17 - Primary Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="11.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="FK" percentage="11.0000000" xml:lang="en"><narrative>FY17 - Capital Markets</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="22.0000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YY" percentage="11.0000000" xml:lang="en"><narrative>FY17 - Trade</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="22.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="17.0000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000632" percentage="11" xml:lang="en"><narrative>Health Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000441" percentage="11" xml:lang="en"><narrative>Data production, accessibility and use</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000242" percentage="11" xml:lang="en"><narrative>Global value chains</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000626" percentage="22" xml:lang="en"><narrative>Pandemic Response</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000044" percentage="11" xml:lang="en"><narrative>Data Development and Capacity Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="11" xml:lang="en"><narrative>Finance for Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="11" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000413" percentage="11" xml:lang="en"><narrative>Debt Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000114" percentage="11" xml:lang="en"><narrative>Tax policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="11" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="11" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="11" xml:lang="en"><narrative>Finance for Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000513" percentage="11" xml:lang="en"><narrative>Participation and Civic Engagement</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="11" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="22" xml:lang="en"><narrative>Disease Control</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="22" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="11" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="11" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000521" percentage="11" xml:lang="en"><narrative>Social Safety Nets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="11" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="11" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="22" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000331" percentage="11" xml:lang="en"><narrative>Disaster Risk Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="22" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000323" percentage="11" xml:lang="en"><narrative>MSME Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000441" percentage="11" xml:lang="en"><narrative>Data production, accessibility and use</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000413" percentage="11" xml:lang="en"><narrative>Debt Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="11" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="11" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000511" percentage="11" xml:lang="en"><narrative>Indigenous People and Ethnic Minorities</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000044" percentage="11" xml:lang="en"><narrative>Data Development and Capacity Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="22" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="11" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000411" percentage="11" xml:lang="en"><narrative>Public Expenditure Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000632" percentage="11" xml:lang="en"><narrative>Health Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="22" xml:lang="en"><narrative>Jobs</narrative></sector><humanitarian-scope type="1" vocabulary="1-2" code="EP-2020-000012-001"> </humanitarian-scope><humanitarian-scope type="2" vocabulary="2-1" code="HCOVD20"> </humanitarian-scope><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">250000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">250000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">250000000</value><description xml:lang="en"><narrative>Total Commitment in October Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-48280"><narrative>Ministry of Public Finance Guatemala (MINFIN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">250000000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-48280"><narrative>Ministry of Public Finance Guatemala (MINFIN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-625000</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-48280"><narrative>Ministry of Public Finance Guatemala (MINFIN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-2961115</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-48280"><narrative>Ministry of Public Finance Guatemala (MINFIN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-7045965</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-48280"><narrative>Ministry of Public Finance Guatemala (MINFIN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-6174406</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-48280"><narrative>Ministry of Public Finance Guatemala (MINFIN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P175979"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P175979?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P175979"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
RI #2: Share of students from pre-primary and primary education enrolled in public schools covered by the health insurance program
</narrative></title>
<baseline year="2021" iso-date="2021-01-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-01-14" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="na">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
RI #3: Share of registered Comadronas by MSPAS with an updated institutional ID (carnet)
</narrative></title>
<baseline year="2020" iso-date="2020-02-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-02-14" />
<period-end iso-date="2024-12-14" />
<target value="80">

</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
RI#1.a: Direct recipients of targeted cash transfers
</narrative></title>
<baseline year="2019" iso-date="2019-12-14" value="166,000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-14" />
<period-end iso-date="2024-12-14" />
<target value="220000">

</target>
<actual value="120,559">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
RI #1.b: Students from initial, pre-primary, primary, and secondary education (basic and diversified cycles) registered in public schools covered by the school feeding program
</narrative></title>
<baseline year="2019" iso-date="2019-12-14" value="2,560,486"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-14" />
<period-end iso-date="2024-12-14" />
<target value="3,010,126">

</target>
<actual value="3,102,708">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-23T20:24:13" hierarchy="1"><iati-identifier>44000-P159213</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Crecer Sano: Guatemala Nutrition and Health  Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Project Development Objective (PDO) is to (i) improve selected practices, services and behaviors known to be key determinants of chronic malnutrition (with an emphasis on the first 1,000 days of life), and (ii) respond to the threat posed by COVID-19, in selected intervention areas.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Crecer Sano: Guatemala Nutrition and Health Project is to improve selected practices, services and behaviors known to be key determinants of chronic malnutrition (with an emphasis on the first 1,000 days of life) in the intervention areas. There are three components to the project, the first component being providing inter-sectoral services to address chronic malnutrition risk factors. This component will support provision of quality nutrition and health services to mothers and children; promotion of behavioral change interventions targeted to families and communities; improving access to safe drinking water and sanitation; and enhancing coordination across sectors. It will finance works for health posts, small water supply and sanitation systems, and select community centers, as well as equipment, medical and nonmedical supplies, health promotion activities, technical assistance, studies and training. The second component is the moving the focus towards results. This component will introduce results-based financing to: (i) promote the use of health services, including timely prenatal care; (ii) promote behavioral changes, including exclusive breastfeeding during the first six (6) months of life; and (iii) strengthen the CCT Program in the intervention areas. Finally, the third component is the supporting project management, monitoring and evaluation. This component will provide support to the MIDES Social Development Fund (Fondo de Desarrollo Social, FODES), or MIDES-FODES, for the carrying out of Project management, coordination and evaluation. It will finance consulting services including consultants to support MIDES-FODES, office equipment, training, and operating costs, and an external entity to evaluate achievement of the DLIs.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="GT–P0028611"><narrative>Republic of Guatemala</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="GT-COA-0028612"><narrative>Ministry of Public Health and Social Assistance (Ministerio de Salud Pública y Asistencia Social)</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2016-09-29"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2017-03-24"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2027-07-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2027-07-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Claudia Macias</narrative></person-name><telephone>+1-202-473-1000</telephone><email>cmacias@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="GT" percentage="100"><narrative xml:lang="en">GUATEMALA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003588042" />
            <name><narrative>Municipio de Uspantan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.38333 -90.83333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003588205" />
            <name><narrative>Municipio de Tucuru</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.3 -90.06667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003588255" />
            <name><narrative>Municipio de Totonicapan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.91667 -91.36667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003588257" />
            <name><narrative>Departamento de Totonicapan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15 -91.33333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003588307" />
            <name><narrative>Municipio de Todos Santos Cuchumatan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.51667 -91.61667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003588459" />
            <name><narrative>Municipio de Tejutla</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.11667 -91.8</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003588473" />
            <name><narrative>Municipio de Tectitan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.33333 -92.03333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003588553" />
            <name><narrative>Municipio de Tamahu</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.30223 -90.24167</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003588587" />
            <name><narrative>Municipio de Tajumulco</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.08333 -91.88333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003588602" />
            <name><narrative>Municipio de Tactic</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.32028 -90.34817</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003588609" />
            <name><narrative>Municipio de Tacana</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.23333 -92.08333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003588693" />
            <name><narrative>Municipio de Soloma</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.71667 -91.45</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003588695" />
            <name><narrative>Municipio de Solola</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.76667 -91.18333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003588697" />
            <name><narrative>Departamento de Solola</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.66667 -91.25</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003588725" />
            <name><narrative>Municipio de Sipacapa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.2 -91.66667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003588759" />
            <name><narrative>Municipio de Sibinal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.13333 -92.05</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003588857" />
            <name><narrative>Municipio de Senahu</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.4 -89.83333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589102" />
            <name><narrative>Municipio de Santiago Chimaltenango</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.50739 -91.68519</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589104" />
            <name><narrative>Municipio de Santiago Atitlan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.60308 -91.22768</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589246" />
            <name><narrative>Municipio de Santa Maria Visitacion</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.71667 -91.31667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589255" />
            <name><narrative>Municipio de Santa Maria Chiquimula</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.02886 -91.32917</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589286" />
            <name><narrative>Municipio de Santa Lucia La Reforma</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.1503 -91.2785</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589354" />
            <name><narrative>Municipio de Santa Eulalia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.74978 -91.32537</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589394" />
            <name><narrative>Municipio de Santa Cruz Verapaz</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.33854 -90.41399</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589401" />
            <name><narrative>Municipio de Santa Cruz La Laguna</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.75 -91.21667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589403" />
            <name><narrative>Municipio de Santa Cruz del Quiche</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.03333 -91.13333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589432" />
            <name><narrative>Municipio de Santa Clara La Laguna</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.71667 -91.3</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589453" />
            <name><narrative>Municipio de Santa Catarina Palopo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.71794 -91.1306</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589457" />
            <name><narrative>Municipio de Santa Catarina Ixtahuacan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.8 -91.36667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589464" />
            <name><narrative>Municipio de Santa Barbara</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.31667 -91.61667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589497" />
            <name><narrative>Santa Ana Huista</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.68085 -91.82005</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589540" />
            <name><narrative>Municipio de San Sebastian Huehuetenango</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.38333 -91.58333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589542" />
            <name><narrative>Municipio de San Sebastian Coatan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.73333 -91.56667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589576" />
            <name><narrative>Municipio de San Rafael Pie de La Cuesta</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.93333 -91.91667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589578" />
            <name><narrative>Municipio de San Rafael Petzal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.40536 -91.66357</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589594" />
            <name><narrative>Municipio de San Rafael La Independencia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.71667 -91.53333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589624" />
            <name><narrative>Municipio de San Pedro Sacatepequez</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.96667 -91.76667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589631" />
            <name><narrative>Municipio de San Pedro Necta</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.5 -91.76667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589636" />
            <name><narrative>Municipio de San Pedro La Laguna</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.68333 -91.26667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589639" />
            <name><narrative>Municipio de San Pedro Jocopilas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.11667 -91.11667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589642" />
            <name><narrative>Municipio de San Pedro Carcha</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.48333 -90.26667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589673" />
            <name><narrative>Municipio de San Pablo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.93154 -92.00392</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589719" />
            <name><narrative>Municipio de San Miguel Ixtahuacan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.25 -91.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589733" />
            <name><narrative>Municipio de San Miguel Acatan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.7 -91.61667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589769" />
            <name><narrative>Municipio de San Mateo Ixtatan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.83333 -91.48333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589794" />
            <name><narrative>Municipio de San Marcos La Laguna</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.73509 -91.25984</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589799" />
            <name><narrative>Municipio de San Marcos</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.96667 -91.8</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589801" />
            <name><narrative>Departamento de San Marcos</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15 -91.91667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589849" />
            <name><narrative>Municipio de San Lucas Toliman</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.59471 -91.14659</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589860" />
            <name><narrative>Municipio de San Lorenzo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.03333 -91.73333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589895" />
            <name><narrative>Municipio de San Juan La Laguna</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.66666 -91.31468</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589899" />
            <name><narrative>Municipio de San Juan Ixcoy</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.6 -91.45</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589902" />
            <name><narrative>Municipio de San Juan Ermita</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.76667 -89.43333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589912" />
            <name><narrative>Municipio de San Juan Cotzal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.43333 -91.01667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589916" />
            <name><narrative>Municipio de San Juan Chamelco</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.43333 -90.28333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589924" />
            <name><narrative>Municipio de San Juan Atitan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.43333 -91.63333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589984" />
            <name><narrative>Municipio de San Jose Ojetenam</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.21667 -91.96667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590016" />
            <name><narrative>Municipio de San Jose La Arada</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.71667 -89.58333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590040" />
            <name><narrative>Municipio de San Jose Chacaya</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.76667 -91.21667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590124" />
            <name><narrative>Municipio de San Jacinto</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.66667 -89.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590187" />
            <name><narrative>Municipio de San Gaspar Ixchil</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.38333 -91.71667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590218" />
            <name><narrative>Municipio de San Francisco El Alto</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.95 -91.45</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590315" />
            <name><narrative>Municipio de San Cristobal Verapaz</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.38333 -90.4</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590317" />
            <name><narrative>Municipio de San Cristobal Totonicapan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.91667 -91.43333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590322" />
            <name><narrative>Municipio de San Cristobal Cucho</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.9 -91.78333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590394" />
            <name><narrative>Municipio de San Bartolome Jocotenango</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.18359 -91.03361</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590397" />
            <name><narrative>Municipio de San Bartolo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.13333 -91.41667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590418" />
            <name><narrative>Municipio de San Antonio Sacatepequez</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.96667 -91.73333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590423" />
            <name><narrative>Municipio de San Antonio Palopo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.7 -91.11667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590455" />
            <name><narrative>Municipio de San Antonio Ilotenango</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.05 -91.18333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590457" />
            <name><narrative>Municipio de San Antonio Huista</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.65947 -91.77232</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590519" />
            <name><narrative>Municipio de San Andres Xecul</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.9 -91.48333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590523" />
            <name><narrative>Municipio de San Andres Semetabaj</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.75 -91.13333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590525" />
            <name><narrative>Municipio de San Andres Sajcabaja</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.21667 -90.91667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590689" />
            <name><narrative>Municipio de Sacapulas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.26318 -91.11288</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590807" />
            <name><narrative>Municipio de Rio Blanco</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.03333 -91.68333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590964" />
            <name><narrative>Departamento del Quiche</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.5 -90.91667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590972" />
            <name><narrative>Municipio de Quezaltepeque</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.63333 -89.45</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003591516" />
            <name><narrative>Municipio de Patzite</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.96667 -91.21667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003591675" />
            <name><narrative>Municipio de Panzos</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.30866 -89.65564</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003591748" />
            <name><narrative>Municipio de Panajachel</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.73333 -91.15</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003591884" />
            <name><narrative>Municipio de Pajapita</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.72152 -92.03521</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003592034" />
            <name><narrative>Municipio de Olopa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.68333 -89.35</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003592084" />
            <name><narrative>Municipio de Ocos</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.50998 -92.19298</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003592107" />
            <name><narrative>Municipio de Nuevo Progreso</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.8 -91.91667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003592216" />
            <name><narrative>Nenton</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.8007 -91.75464</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003592236" />
            <name><narrative>Municipio de Nebaj</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.56143 -91.17326</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003592285" />
            <name><narrative>Municipio de Nahuala</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.85 -91.31667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003592482" />
            <name><narrative>Municipio de Momostenango</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.04726 -91.40625</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003592750" />
            <name><narrative>Municipio de Malacatancito</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.21667 -91.51667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003592752" />
            <name><narrative>Municipio de Malacatan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.91829 -92.10548</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003594137" />
            <name><narrative>Municipio de La Reforma</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.8 -91.81667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003594314" />
            <name><narrative>Municipio de Lanquin</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.56667 -89.96667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003594419" />
            <name><narrative>Municipio de La Libertad</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.56327 -91.91099</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003594749" />
            <name><narrative>Municipio de La Democracia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.56667 -91.86667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003595147" />
            <name><narrative>Municipio de Joyabaj</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.98333 -90.8</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003595180" />
            <name><narrative>Municipio de Jocotan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.81667 -89.38333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003595247" />
            <name><narrative>Municipio de Jacaltenango</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.75212 -91.73316</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003595281" />
            <name><narrative>Municipio de San Ildefonso Ixtahuacan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.41667 -91.76667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003595328" />
            <name><narrative>Municipio de Ixchiguan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.14291 -91.91546</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003595363" />
            <name><narrative>Municipio de Ipala</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.61667 -89.61667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003595414" />
            <name><narrative>Municipio de Huehuetenango</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.31403 -91.38761</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003595415" />
            <name><narrative>Departamento de Huehuetenango</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.66667 -91.58333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003595780" />
            <name><narrative>Municipio de Esquipulas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.56667 -89.35</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003595928" />
            <name><narrative>Municipio de El Tumbador</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.86667 -91.93333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003596243" />
            <name><narrative>Municipio de San Jose El Rodeo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.91667 -91.96667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003596386" />
            <name><narrative>Municipio de El Quetzal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.76667 -91.81667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003597771" />
            <name><narrative>Municipio de Cunen</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.38333 -91.03333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003597800" />
            <name><narrative>Municipio de Cuilco</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.4 -91.96667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003597975" />
            <name><narrative>Municipio de Concepcion Tutuapa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.28333 -91.78333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003597984" />
            <name><narrative>Municipio de Concepcion Las Minas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.51667 -89.45</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003598001" />
            <name><narrative>Municipio de Concepcion Huista</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.61667 -91.68333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003598002" />
            <name><narrative>Municipio de Concepcion</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.78333 -91.15</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003598023" />
            <name><narrative>Municipio de Comitancillo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.08333 -91.71667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003598040" />
            <name><narrative>Municipio de Colotenango</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.40718 -91.71438</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003598116" />
            <name><narrative>Municipio de Coban</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.70983 -90.54026</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003598414" />
            <name><narrative>Municipio de Chisec</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.81667 -90.28333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003598463" />
            <name><narrative>Municipio de Chiquimula</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.8 -89.55</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003598464" />
            <name><narrative>Departamento de Chiquimula</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.66667 -89.41667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003598512" />
            <name><narrative>Municipio de Chinique</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.08333 -91.03333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003598654" />
            <name><narrative>Municipio de Santo Tomas Chichicastenango</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.93333 -91.11667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003598658" />
            <name><narrative>Municipio de Chiche</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.03333 -91.06667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003598691" />
            <name><narrative>Municipio de Chiantla</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.36667 -91.45</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003598803" />
            <name><narrative>Municipio de Chajul</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.4871 -91.03786</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003598824" />
            <name><narrative>Municipio de Chahal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.75 -89.56667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003598956" />
            <name><narrative>Municipio de Catarina</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.8515 -92.07646</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003599093" />
            <name><narrative>Municipio de Canilla</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.18333 -90.81667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003599180" />
            <name><narrative>Municipio de Camotan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.81667 -89.36667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003599574" />
            <name><narrative>Municipio de Barillas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.93155 -91.22119</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003599614" />
            <name><narrative>Municipio de Ayutla</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.7272 -92.13013</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003599773" />
            <name><narrative>Departamento de Alta Verapaz</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.66667 -90</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003599911" />
            <name><narrative>Municipio de Aguacatan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.35 -91.3</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0009166134" />
            <name><narrative>Municipio de Fray Bartolome de las Casas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.86646 -89.73702</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0009166161" />
            <name><narrative>Municipio de Ixcan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.98333 -90.76667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0009166182" />
            <name><narrative>Municipio de Chicaman</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.34833 -90.79944</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0009253733" />
            <name><narrative>Municipio de Zacualpa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.09239 -90.88514</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0009253735" />
            <name><narrative>Municipio de Pachalum</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.91798 -90.65443</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0009253762" />
            <name><narrative>Santa Catarina La Tinta</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.25362 -89.83396</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="16011" percentage="22" xml:lang="en"/><sector vocabulary="1" code="12240" percentage="22" xml:lang="en"/><sector vocabulary="1" code="12220" percentage="22" xml:lang="en"/><sector vocabulary="1" code="14030" percentage="17" xml:lang="en"/><sector vocabulary="1" code="12230" percentage="17" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HQ" percentage="27.0000000" xml:lang="en"><narrative>FY17 - Health Facilities and Construction</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="35.0000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="34.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SG" percentage="4.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000052" percentage="15" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="13" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000671" percentage="30" xml:lang="en"><narrative>Nutrition</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="13" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000632" percentage="30" xml:lang="en"><narrative>Health Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="20" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000052" percentage="15" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="13" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="5" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="30" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000067" percentage="30" xml:lang="en"><narrative>Nutrition and Food Security</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000521" percentage="15" xml:lang="en"><narrative>Social Safety Nets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000632" percentage="30" xml:lang="en"><narrative>Health Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="13" xml:lang="en"><narrative>Adaptation</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">12206749.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">12206749.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">100000000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-28612"><narrative>Ministry of Public Health and Social Assistance (Ministerio de Salud Pública y Asistencia Social)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">250000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-28612"><narrative>Ministry of Public Health and Social Assistance (Ministerio de Salud Pública y Asistencia Social)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">1282051</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-28612"><narrative>Ministry of Public Health and Social Assistance (Ministerio de Salud Pública y Asistencia Social)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">1498700</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-28612"><narrative>Ministry of Public Health and Social Assistance (Ministerio de Salud Pública y Asistencia Social)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">9800000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-28612"><narrative>Ministry of Public Health and Social Assistance (Ministerio de Salud Pública y Asistencia Social)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">5900000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-28612"><narrative>Ministry of Public Health and Social Assistance (Ministerio de Salud Pública y Asistencia Social)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">8000000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-28612"><narrative>Ministry of Public Health and Social Assistance (Ministerio de Salud Pública y Asistencia Social)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">8000000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-28612"><narrative>Ministry of Public Health and Social Assistance (Ministerio de Salud Pública y Asistencia Social)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">6500000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-28612"><narrative>Ministry of Public Health and Social Assistance (Ministerio de Salud Pública y Asistencia Social)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">7900000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-28612"><narrative>Ministry of Public Health and Social Assistance (Ministerio de Salud Pública y Asistencia Social)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">7400000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-28612"><narrative>Ministry of Public Health and Social Assistance (Ministerio de Salud Pública y Asistencia Social)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">7500000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-28612"><narrative>Ministry of Public Health and Social Assistance (Ministerio de Salud Pública y Asistencia Social)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">9562500</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-28612"><narrative>Ministry of Public Health and Social Assistance (Ministerio de Salud Pública y Asistencia Social)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">7700000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-28612"><narrative>Ministry of Public Health and Social Assistance (Ministerio de Salud Pública y Asistencia Social)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">6500000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-28612"><narrative>Ministry of Public Health and Social Assistance (Ministerio de Salud Pública y Asistencia Social)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-250000</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-28612"><narrative>Ministry of Public Health and Social Assistance (Ministerio de Salud Pública y Asistencia Social)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-188925</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-28612"><narrative>Ministry of Public Health and Social Assistance (Ministerio de Salud Pública y Asistencia Social)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-140515</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-28612"><narrative>Ministry of Public Health and Social Assistance (Ministerio de Salud Pública y Asistencia Social)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-134815</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-28612"><narrative>Ministry of Public Health and Social Assistance (Ministerio de Salud Pública y Asistencia Social)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-143929</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-28612"><narrative>Ministry of Public Health and Social Assistance (Ministerio de Salud Pública y Asistencia Social)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-189961</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-28612"><narrative>Ministry of Public Health and Social Assistance (Ministerio de Salud Pública y Asistencia Social)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-275773</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-28612"><narrative>Ministry of Public Health and Social Assistance (Ministerio de Salud Pública y Asistencia Social)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-581674</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-28612"><narrative>Ministry of Public Health and Social Assistance (Ministerio de Salud Pública y Asistencia Social)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-978618</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-28612"><narrative>Ministry of Public Health and Social Assistance (Ministerio de Salud Pública y Asistencia Social)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-1453266</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-28612"><narrative>Ministry of Public Health and Social Assistance (Ministerio de Salud Pública y Asistencia Social)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-1747562</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-28612"><narrative>Ministry of Public Health and Social Assistance (Ministerio de Salud Pública y Asistencia Social)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-1825904</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-28612"><narrative>Ministry of Public Health and Social Assistance (Ministerio de Salud Pública y Asistencia Social)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-1943420</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-28612"><narrative>Ministry of Public Health and Social Assistance (Ministerio de Salud Pública y Asistencia Social)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-1945515</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-28612"><narrative>Ministry of Public Health and Social Assistance (Ministerio de Salud Pública y Asistencia Social)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-494519</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-28612"><narrative>Ministry of Public Health and Social Assistance (Ministerio de Salud Pública y Asistencia Social)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-767119</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-28612"><narrative>Ministry of Public Health and Social Assistance (Ministerio de Salud Pública y Asistencia Social)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-918799</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-28612"><narrative>Ministry of Public Health and Social Assistance (Ministerio de Salud Pública y Asistencia Social)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-1063839</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-28612"><narrative>Ministry of Public Health and Social Assistance (Ministerio de Salud Pública y Asistencia Social)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-6750000</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-28612"><narrative>Ministry of Public Health and Social Assistance (Ministerio de Salud Pública y Asistencia Social)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-1405089</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-28612"><narrative>Ministry of Public Health and Social Assistance (Ministerio de Salud Pública y Asistencia Social)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-1562169</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-28612"><narrative>Ministry of Public Health and Social Assistance (Ministerio de Salud Pública y Asistencia Social)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-2250000</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-28612"><narrative>Ministry of Public Health and Social Assistance (Ministerio de Salud Pública y Asistencia Social)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P159213"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P159213?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P159213"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with water, sanitation, and hygiene
</narrative></title>
<baseline year="2024" iso-date="2024-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-15" />
<period-end iso-date="2027-07-15" />
<target value="142,500">
<comment><narrative>
This indicator is expected to report progress in the next ISR, following the installation of both latrines and hypochlorinators.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of children under two years old who are beneficiaries of the CCT Program receiving transfers based on compliance with full verification cycle of health co-responsibilities in the interventi
</narrative></title>
<baseline year="2016" iso-date="2016-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-03-31" />
<period-end iso-date="2026-01-30" />
<target value="70.00">
<comment><narrative>
Target met. Data updated through Sep 2024.
</narrative></comment>
</target>
<actual value="96.7">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of municipalities where combined interventions were implemented (coordinated interventions/services)
</narrative></title>
<baseline year="2016" iso-date="2016-05-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-10" />
<period-end iso-date="2026-01-30" />
<target value="70.00">
<comment><narrative>
The 17% refers to 23 out of 139 municipalities where integrated actions have been implemented. Achievement of this indicator (reach 97 municipalities by the end of the project period) is rooted in the implementation of water surveillance activities (distribution of equipment and implementation of the surveillance protocol). The distribution of inputs for this activity are expected to begin in August 2025, and this indicator is expected to be achieved by the current closing date.
</narrative></comment>
</target>
<actual value="17.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with water, sanitation, and hygiene
</narrative></title>
<baseline year="2024" iso-date="2024-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-15" />
<period-end iso-date="2027-07-15" />
<target value="142,500">
<comment><narrative>
This indicator is expected to report progress in the next ISR, following the installation of both latrines and hypochlorinators.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of families being served by new or rehabilitated water systems in the intervention areas (services)
</narrative></title>
<baseline year="2016" iso-date="2016-05-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-10" />
<period-end iso-date="2026-01-30" />
<target value="25,000.00">
<comment><narrative>
The installation of hypochlorinators has begun as of June 2025, with a total of 114 communities expected to receive hypochlorinators by the current closing date. The final number of beneficiaries will be calculated as the facilities advance (through a population census in beneficiary communities). It is expected that this indicator will be met before the project's closing date.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Coverage of prenatal care with at least four visits in the intervention areas (services)
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="18.70"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2026-01-30" />
<target value="50.00">
<comment><narrative>
Data is from the GCNN survey, representative of Crecer Sano municipalities and completed in early 2025. Data verified by IVA and DLI marked as fully achieved.
</narrative></comment>
</target>
<actual value="85.29">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of children 12-months old in the intervention areas receiving complete vaccination scheme required for their age (services)
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="74.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2027-07-15" />
<target value="95.00">
<comment><narrative>
For the measurement of this indicator, the third dose of the pentavalent vaccine is being used as a tracer. Data represents official data from 2023,, which is the most recent available, reflective of the period of Jan-Dec 2023. Preliminary, unofficial data indicates 88.13% for the Jan-Dec 2024 period.
</narrative></comment>
</target>
<actual value="92.94">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of women of reproductive age in the intervention areas having access/receiving at least one family planning method (practices and services)
</narrative></title>
<baseline year="2016" iso-date="2016-05-10" value="190,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-10" />
<period-end iso-date="2026-01-30" />
<target value="230,000.00">
<comment><narrative>
Data is the officially published number reflective of the period of Jan-Dec 2023. Preliminary data from Jan-Sep 2024 is 160,612 women.
</narrative></comment>
</target>
<actual value="216,557">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Health personnel receiving training (number)
</narrative></title>
<baseline year="2016" iso-date="2016-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-03-31" />
<period-end iso-date="2027-07-15" />
<target value="2,400.00">
<comment><narrative>
Target met. Data reflects all health personnel trained over the life of the project (2020- April 2025). The figure is slightly less than previously reported due to a change in methodology that has eliminated any double counting of personnel trained.
</narrative></comment>
</target>
<actual value="11,883">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Health personnel receiving training (number)
</narrative></title>
<baseline year="2016" iso-date="2016-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-03-31" />
<period-end iso-date="2027-07-15" />
<target value="2,400.00">
<comment><narrative>
Target met. Data reflects all health personnel trained over the life of the project (2020- April 2025). The figure is slightly less than previously reported due to a change in methodology that has eliminated any double counting of personnel trained.
</narrative></comment>
</target>
<actual value="11,883">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of families served by new or rehabilitation works for sanitation systems in the intervention areas (services)
</narrative></title>
<baseline year="2016" iso-date="2016-05-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-10" />
<period-end iso-date="2027-07-15" />
<target value="3500.00">
<comment><narrative>
It expected that 3,500 improved sanitation facilities will be installed by the end of the Project period following the Total and Sustanaible Sanitation and Hygiene (SAHTOSO) methodology. The contract with the firms that will distribute materials for the latrines has been signed. It is expected that this indicator will be met before the project's closing date.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of municipalities where combined interventions were implemented (coordinated interventions/services)
</narrative></title>
<baseline year="2016" iso-date="2016-05-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-10" />
<period-end iso-date="2027-07-15" />
<target value="70.00">
<comment><narrative>
The 17% refers to 23 out of 139 municipalities where integrated actions have been implemented. Achievement of this indicator (reach 97 municipalities by the end of the project period) is rooted in the implementation of water surveillance activities (distribution of equipment and implementation of the surveillance protocol). The distribution of inputs for this activity are expected to begin in August 2025, and this indicator is expected to be achieved by the current closing date.
</narrative></comment>
</target>
<actual value="17.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of health facilities constructed or rehabilitated
</narrative></title>
<baseline year="2016" iso-date="2016-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-15" />
<period-end iso-date="2027-07-15" />
<target value="157">

</target>
<actual value="92">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of families served by new or rehabilitation works for sanitation systems in the intervention areas (services)
</narrative></title>
<baseline year="2016" iso-date="2016-05-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-10" />
<period-end iso-date="2027-07-15" />
<target value="3500.00">
<comment><narrative>
It expected that 3,500 improved sanitation facilities will be installed by the end of the Project period following the Total and Sustanaible Sanitation and Hygiene (SAHTOSO) methodology. The contract with the firms that will distribute materials for the latrines has been signed. It is expected that this indicator will be met before the project's closing date.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with water, sanitation, and hygiene
</narrative></title>
<baseline year="2024" iso-date="2024-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-15" />
<period-end iso-date="2026-01-15" />
<target value="142,500">
<comment><narrative>
This indicator is expected to report progress in the next ISR, following the installation of both latrines and hypochlorinators.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People who have received essential health, nutrition, and population (HNP) services
</narrative></title>
<baseline year="2016" iso-date="2016-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-31" />
<period-end iso-date="2026-01-30" />
<target value="680,000.00">
<comment><narrative>
The final target was significantly exceeded. This indicator reflects the total number of persons reached from Jan 2020-April 2025.
</narrative></comment>
</target>
<actual value="5,078,587">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of children six months old with exclusive breastfeeding in the intervention areas (behavior)
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="43.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2026-01-30" />
<target value="65.00">
<comment><narrative>
Data representative of Crecer Sano municipalities, collected through the Grand National Crusade for Nutrition (GCNN) baseline survey and verified accordingly.  Indicator end-target achieved.
</narrative></comment>
</target>
<actual value="70.58">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Coverage of growth promotion for children under 24-months old in the intervention areas (practices and services)
</narrative></title>
<baseline year="2016" iso-date="2016-05-10" value="19.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-10" />
<period-end iso-date="2027-07-15" />
<target value="40">
<comment><narrative>
This indicator reflects institutional coverage (people who reach health services), not population coverage. It is being requested that the official SIGSA report include at least 8 controls for children under 1 year of age and 6 controls for children between 12 and 23 months of age. Data reflects official/published coverage from Jan-Dec 2023. Data for the Jan-December 2024 period is still preliminary/unofficial but indicates a coverage rate of 39.88%. End-target achieved.
</narrative></comment>
</target>
<actual value="38.16">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Coverage of prenatal care with at least four visits in the intervention areas (services)
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="18.70"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2026-01-30" />
<target value="50.00">
<comment><narrative>
Data is from the GCNN survey, representative of Crecer Sano municipalities and completed in early 2025. Data verified by IVA and DLI marked as fully achieved.
</narrative></comment>
</target>
<actual value="85.29">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of families being served by new or rehabilitated water systems in the intervention areas (services)
</narrative></title>
<baseline year="2016" iso-date="2016-05-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-10" />
<period-end iso-date="2027-07-15" />
<target value="25,000.00">
<comment><narrative>
The installation of hypochlorinators has begun as of June 2025, with a total of 114 communities expected to receive hypochlorinators by the current closing date. The final number of beneficiaries will be calculated as the facilities advance (through a population census in beneficiary communities). It is expected that this indicator will be met before the project's closing date.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of families served by new or rehabilitation works for sanitation systems in the intervention areas (services)
</narrative></title>
<baseline year="2016" iso-date="2016-05-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-10" />
<period-end iso-date="2026-01-30" />
<target value="3500.00">
<comment><narrative>
It expected that 3,500 improved sanitation facilities will be installed by the end of the Project period following the Total and Sustanaible Sanitation and Hygiene (SAHTOSO) methodology. The contract with the firms that will distribute materials for the latrines has been signed. It is expected that this indicator will be met before the project's closing date.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Health staff trained in infection prevention and control per MSPAS-approved protocols
</narrative></title>
<baseline year="2020" iso-date="2020-07-21" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-07-21" />
<period-end iso-date="2026-01-30" />
<target value="5,000.00">
<comment><narrative>
End of project target was significantly surpassed. The development of capacities in MSPAS staff from the management of protocols, prevention, and rehabilitation has been actively promoted through all the health services. Value represents cumulative over project period, including 2020, 2021, 2022, and 2023. A slight revision has been made to ensure accuracy of the end-Dec 2023 reporting, which is the latest.
</narrative></comment>
</target>
<actual value="82,217.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of children under two years old who are beneficiaries of the CCT Program receiving transfers based on compliance with full verification cycle of health co-responsibilities in the interventi
</narrative></title>
<baseline year="2016" iso-date="2016-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-03-31" />
<period-end iso-date="2026-01-30" />
<target value="70.00">
<comment><narrative>
Target met. Data updated through Sep 2024.
</narrative></comment>
</target>
<actual value="96.7">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of children 12-months old in the intervention areas receiving complete vaccination scheme required for their age (services)
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="74.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2027-07-15" />
<target value="95.00">
<comment><narrative>
For the measurement of this indicator, the third dose of the pentavalent vaccine is being used as a tracer. Data represents official data from 2023,, which is the most recent available, reflective of the period of Jan-Dec 2023. Preliminary, unofficial data indicates 88.13% for the Jan-Dec 2024 period.
</narrative></comment>
</target>
<actual value="92.94">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of health facilities constructed or rehabilitated
</narrative></title>
<baseline year="2016" iso-date="2016-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-15" />
<period-end iso-date="2027-07-15" />
<target value="157">

</target>
<actual value="93">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of children 12-months old in the intervention areas receiving complete vaccination scheme required for their age (services)
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="74.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2027-07-15" />
<target value="95.00">
<comment><narrative>
For the measurement of this indicator, the third dose of the pentavalent vaccine is being used as a tracer. Data represents official data from 2024, which is the most recent available, reflective of the period of Jan-Dec 2024.
</narrative></comment>
</target>
<actual value="89.47">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Coverage of growth promotion for children under 24-months old in the intervention areas (practices and services)
</narrative></title>
<baseline year="2016" iso-date="2016-05-10" value="19.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-10" />
<period-end iso-date="2026-01-30" />
<target value="40">
<comment><narrative>
This indicator reflects institutional coverage (people who reach health services), not population coverage. It is being requested that the official SIGSA report include at least 8 controls for children under 1 year of age and 6 controls for children between 12 and 23 months of age. Data reflects official/published coverage from Jan-Dec 2023. Data for the Jan-December 2024 period is still preliminary/unofficial but indicates a coverage rate of 39.88%. End-target achieved.
</narrative></comment>
</target>
<actual value="38.16">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Coverage of prenatal care with at least four visits in the intervention areas (services)
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="18.70"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2026-01-30" />
<target value="50.00">
<comment><narrative>
Data is from the GCNN survey, representative of Crecer Sano municipalities and completed in early 2025. Data verified by IVA and DLI marked as fully achieved.
</narrative></comment>
</target>
<actual value="85.29">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Surveillance system for safe drinking water in place, and reporting as defined in the protocols (services)
</narrative></title>
<baseline year="2016" iso-date="2016-05-10" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-10" />
<period-end iso-date="2026-01-30" />
<target value="Yes">
<comment><narrative>
The Project is providing supplies and capacity building to enable the functionality of the new national water surveillance protocol; this indicator is expected to be met by the end of the project period.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Health facilities constructed, rehabilitated, or equipped, which include designated areas for the management of infectious diseases, including COVID-19
</narrative></title>
<baseline year="2020" iso-date="2020-08-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-08-13" />
<period-end iso-date="2027-07-15" />
<target value="75.00">
<comment><narrative>
This data point corresponds to: 61 of 66 rehabilitated facilities and all 24 new health facilities constructed with designated areas for the management of infectious diseases. Facilities included in this count are only those that have been finalized and are in operation. Thus, this indicator may change as additional facilities are added, though it is expected to remain as met by the project end date.
</narrative></comment>
</target>
<actual value="94.44">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
CCT information system tracks and reports compliance with health and nutrition co-responsibilities of individual household members (services)
</narrative></title>
<baseline year="2016" iso-date="2016-05-10" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-10" />
<period-end iso-date="2026-01-30" />
<target value="Yes">
<comment><narrative>
Target met and data verified by IVA.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
CCT information system tracks and reports compliance with health and nutrition co-responsibilities of individual household members (services)
</narrative></title>
<baseline year="2016" iso-date="2016-05-10" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-10" />
<period-end iso-date="2026-01-30" />
<target value="Yes">
<comment><narrative>
Target met and data verified by IVA.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of municipalities where combined interventions were implemented (coordinated interventions/services)
</narrative></title>
<baseline year="2016" iso-date="2016-05-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-10" />
<period-end iso-date="2027-07-15" />
<target value="70.00">
<comment><narrative>
Achievement of this indicator is pending implementation of water surveillance activities. The baseline for water quality was done July 2024-March 2025, supplies for the follow-up testing were distributed between August and November 2025, and the second/follow-up measurement is planned for February 2026. It is expected for this indicator to be met in the next six months and will be maintained through ongoing implementation of activities throughout the remaining project implementation period.
</narrative></comment>
</target>
<actual value="35.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Participants in consultation activities during project implementation (number)
</narrative></title>
<baseline year="2016" iso-date="2016-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-03-31" />
<period-end iso-date="2026-01-30" />
<target value="40,000.00">
<comment><narrative>
Indicator reflects cumulative consultative activities from 2021-2023, across the PIU, SESAN, and MIDES.
</narrative></comment>
</target>
<actual value="57,067.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The Unique Registry of Beneficiaries receives individual level data on health system usage (services)
</narrative></title>
<baseline year="2016" iso-date="2016-03-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-03-31" />
<period-end iso-date="2026-01-30" />
<target value="Data is being shared with the CCT Program for verification of co-responsibilities.">
<comment><narrative>
Target met. The information for 2021 was completed by updating the data on the services provided by MSPAS with information exchange between SIGSA and MIDES. Verification agency verified the result and DLI was marked as achieved.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Coverage of prenatal care with at least four visits in the intervention areas (services)
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="18.70"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2026-01-30" />
<target value="50.00">
<comment><narrative>
Data from the GCNN baseline survey, representative of Crecer Sano municipalities. Data verified by IVA and DLI marked as fully achieved.
</narrative></comment>
</target>
<actual value="80.25">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of children 12-months old in the intervention areas receiving complete vaccination scheme required for their age (services)
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="74.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2026-01-30" />
<target value="95.00">
<comment><narrative>
For the measurement of this indicator, the third dose of the pentavalent vaccine is being used as a tracer. Data represents official data from 2023,, which is the most recent available, reflective of the period of Jan-Dec 2023. Preliminary, unofficial data indicates 88.13% for the Jan-Dec 2024 period.
</narrative></comment>
</target>
<actual value="92.94">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of  children 12-months old in the intervention areas receiving micronutrients as defined in the protocol (services)
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="5.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2026-01-30" />
<target value="60.00">
<comment><narrative>
This is based on verified data from the survey of the Gran Cruzada Nacional para la Nutricion, representative of Crecer Sano municipalities, completed in early 2025.
</narrative></comment>
</target>
<actual value="51.65">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of children 12-months old in the intervention areas receiving complete vaccination scheme required for their age (services)
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="74.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2026-01-30" />
<target value="95.00">
<comment><narrative>
For the measurement of this indicator, the third dose of the pentavalent vaccine is being used as a tracer. Data represents official data from 2023, reflective of the period of Jan-Dec 2023. Preliminary data from Jan-Sep 2024 reflects a coverage of 69.48%.
</narrative></comment>
</target>
<actual value="92.95">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Health facilities constructed, rehabilitated, or equipped, which include designated areas for the management of infectious diseases, including COVID-19
</narrative></title>
<baseline year="2020" iso-date="2020-08-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-08-13" />
<period-end iso-date="2027-07-15" />
<target value="75.00">
<comment><narrative>
This data point corresponds to: 61 of 66 rehabilitated facilities and all 24 new health facilities constructed with designated areas for the management of infectious diseases. Facilities included in this count are only those that have been finalized and are in operation. Thus, this indicator may change as additional facilities are added, though it is expected to remain as met by the project end date.
</narrative></comment>
</target>
<actual value="94.44">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Coverage of growth promotion for children under 24-months old in the intervention areas (practices and services)
</narrative></title>
<baseline year="2016" iso-date="2016-05-10" value="19.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-10" />
<period-end iso-date="2027-07-15" />
<target value="40">
<comment><narrative>
This indicator reflects institutional coverage (people who reach health services), not population coverage. It is being requested that the official SIGSA report include at least 8 controls for children under 1 year of age and 6 controls for children between 12 and 23 months of age. Data reflects official/published coverage from Jan-Dec 2024. End-target achieved.
</narrative></comment>
</target>
<actual value="40.37">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The Unique Registry of Beneficiaries receives individual level data on health system usage (services)
</narrative></title>
<baseline year="2016" iso-date="2016-03-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-03-31" />
<period-end iso-date="2026-01-30" />
<target value="Data is being shared with the CCT Program for verification of co-responsibilities.">
<comment><narrative>
Target met. The information for 2021 was completed by updating the data on the services provided by MSPAS with information exchange between SIGSA and MIDES. Verification agency verified the result and DLI was marked as achieved.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of municipalities where combined interventions were implemented (coordinated interventions/services)
</narrative></title>
<baseline year="2016" iso-date="2016-05-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-10" />
<period-end iso-date="2026-01-30" />
<target value="70.00">
<comment><narrative>
The 17% refers to 23 out of 139 municipalities where integrated actions have been implemented. Achievement of this indicator (reach 97 municipalities by the end of the project period) is rooted in the implementation of water surveillance activities (distribution of equipment and implementation of the surveillance protocol). The distribution of inputs for this activity are expected to begin in August 2025, and this indicator is expected to be achieved by the current closing date.
</narrative></comment>
</target>
<actual value="17.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Coverage of growth promotion for children under 24-months old in the intervention areas (practices and services)
</narrative></title>
<baseline year="2016" iso-date="2016-05-10" value="19.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-10" />
<period-end iso-date="2026-01-30" />
<target value="40">
<comment><narrative>
This indicator reflects institutional coverage (people who reach health services), not population coverage. It is being requested that the official SIGSA report include at least 8 controls for children under 1 year of age and 6 controls for children between 12 and 23 months of age. Data reflects official/published coverage from Jan-Dec 2023. Data for the Jan-December 2024 period is still preliminary/unofficial but indicates a coverage rate of 39.88%. End-target achieved.
</narrative></comment>
</target>
<actual value="38.16">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of municipalities where combined interventions were implemented (coordinated interventions/services)
</narrative></title>
<baseline year="2016" iso-date="2016-05-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-10" />
<period-end iso-date="2027-07-15" />
<target value="70.00">
<comment><narrative>
The 17% refers to 23 out of 139 municipalities where integrated actions have been implemented. Achievement of this indicator (reach 97 municipalities by the end of the project period) is rooted in the implementation of water surveillance activities (distribution of equipment and implementation of the surveillance protocol). The distribution of inputs for this activity are expected to begin in August 2025, and this indicator is expected to be achieved by the current closing date.
</narrative></comment>
</target>
<actual value="17.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of municipalities where combined interventions were implemented (coordinated interventions/services)
</narrative></title>
<baseline year="2016" iso-date="2016-05-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-10" />
<period-end iso-date="2027-07-15" />
<target value="70.00">
<comment><narrative>
The 17% refers to 23 out of 139 municipalities where integrated actions have been implemented. Achievement of this indicator (reach 97 municipalities by the end of the project period) is rooted in the implementation of water surveillance activities (distribution of equipment and implementation of the surveillance protocol). The distribution of inputs for this activity are expected to begin in August 2025, and this indicator is expected to be achieved by the current closing date.
</narrative></comment>
</target>
<actual value="17.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of municipalities where combined interventions were implemented (coordinated interventions/services)
</narrative></title>
<baseline year="2016" iso-date="2016-05-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-10" />
<period-end iso-date="2026-01-30" />
<target value="70.00">
<comment><narrative>
The 17% refers to 23 out of 139 municipalities where integrated actions have been implemented. Achievement of this indicator (reach 97 municipalities by the end of the project period) is rooted in the implementation of water surveillance activities (distribution of equipment and implementation of the surveillance protocol). The distribution of inputs for this activity are expected to begin in August 2025, and this indicator is expected to be achieved by the current closing date.
</narrative></comment>
</target>
<actual value="17.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of municipalities where combined interventions were implemented (coordinated interventions/services)
</narrative></title>
<baseline year="2016" iso-date="2016-05-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-10" />
<period-end iso-date="2027-07-15" />
<target value="70.00">
<comment><narrative>
Achievement of this indicator is pending implementation of water surveillance activities. The baseline for water quality was done July 2024-March 2025, supplies for the follow-up testing were distributed between August and November 2025, and the second/follow-up measurement is planned for February 2026. It is expected for this indicator to be met in the next six months and will be maintained through ongoing implementation of activities throughout the remaining project implementation period.
</narrative></comment>
</target>
<actual value="35.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of municipalities where combined interventions were implemented (coordinated interventions/services)
</narrative></title>
<baseline year="2016" iso-date="2016-05-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-10" />
<period-end iso-date="2027-07-15" />
<target value="70.00">
<comment><narrative>
The 17% refers to 23 out of 139 municipalities where integrated actions have been implemented. Achievement of this indicator (reach 97 municipalities by the end of the project period) is rooted in the implementation of water surveillance activities (distribution of equipment and implementation of the surveillance protocol). The distribution of inputs for this activity are expected to begin in August 2025, and this indicator is expected to be achieved by the current closing date.
</narrative></comment>
</target>
<actual value="17.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of families being served by new or rehabilitated water systems in the intervention areas (services)
</narrative></title>
<baseline year="2016" iso-date="2016-05-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-10" />
<period-end iso-date="2026-01-30" />
<target value="25,000.00">
<comment><narrative>
The installation of hypochlorinators has begun as of June 2025, with a total of 114 communities expected to receive hypochlorinators by the current closing date. The final number of beneficiaries will be calculated as the facilities advance (through a population census in beneficiary communities). It is expected that this indicator will be met before the project's closing date.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of families being served by new or rehabilitated water systems in the intervention areas (services)
</narrative></title>
<baseline year="2016" iso-date="2016-05-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-10" />
<period-end iso-date="2027-07-15" />
<target value="25,000.00">
<comment><narrative>
The installation of hypochlorinators has begun as of June 2025, with a total of 114 communities expected to receive hypochlorinators by the current closing date. The final number of beneficiaries will be calculated as the facilities advance (through a population census in beneficiary communities). It is expected that this indicator will be met before the project's closing date.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of families being served by new or rehabilitated water systems in the intervention areas (services)
</narrative></title>
<baseline year="2016" iso-date="2016-05-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-10" />
<period-end iso-date="2027-07-15" />
<target value="25,000.00">
<comment><narrative>
The installation of hypochlorinators has begun as of June 2025, with a total of 114 communities expected to receive hypochlorinators by the current closing date. The final number of beneficiaries will be calculated as the facilities advance (through a population census in beneficiary communities). It is expected that this indicator will be met before the project's closing date.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of families being served by new or rehabilitated water systems in the intervention areas (services)
</narrative></title>
<baseline year="2016" iso-date="2016-05-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-10" />
<period-end iso-date="2026-01-30" />
<target value="25,000.00">
<comment><narrative>
The installation of hypochlorinators has begun as of June 2025, with a total of 114 communities expected to receive hypochlorinators by the current closing date. The final number of beneficiaries will be calculated as the facilities advance (through a population census in beneficiary communities). It is expected that this indicator will be met before the project's closing date.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of families being served by new or rehabilitated water systems in the intervention areas (services)
</narrative></title>
<baseline year="2016" iso-date="2016-05-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-10" />
<period-end iso-date="2027-07-15" />
<target value="25,000.00">
<comment><narrative>
The distribution of hypoclorinator has been completed (139) and 121 have been installed. The final number of beneficiaries is being calculated as the facilities advance (through a population census in beneficiary communities). It is expected that population numbers of beneficiaries will be finalized in 2026 and this indicator will be met before the project's closing date.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Coverage of growth promotion for children under 24-months old in the intervention areas (practices and services)
</narrative></title>
<baseline year="2016" iso-date="2016-05-10" value="19.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-10" />
<period-end iso-date="2026-01-30" />
<target value="40">
<comment><narrative>
This indicator reflects institutional coverage (people who reach health services), not population coverage. It is being requested that the official SIGSA report include at least 8 controls for children under 1 year of age and 6 controls for children between 12 and 23 months of age. Data reflects official/published coverage from Jan-Dec 2023. Data for the Jan-December 2024 period is still preliminary/unofficial but indicates a coverage rate of 39.88%. End-target achieved.
</narrative></comment>
</target>
<actual value="38.16">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Coverage of growth promotion for children under 24-months old in the intervention areas (practices and services)
</narrative></title>
<baseline year="2016" iso-date="2016-05-10" value="19.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-10" />
<period-end iso-date="2027-07-15" />
<target value="40">
<comment><narrative>
This indicator reflects institutional coverage (people who reach health services), not population coverage. It is being requested that the official SIGSA report include at least 8 controls for children under 1 year of age and 6 controls for children between 12 and 23 months of age. Data reflects official/published coverage from Jan-Dec 2023. Data for the Jan-December 2024 period is still preliminary/unofficial but indicates a coverage rate of 39.88%. End-target achieved.
</narrative></comment>
</target>
<actual value="38.16">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Coverage of growth promotion for children under 24-months old in the intervention areas (practices and services)
</narrative></title>
<baseline year="2016" iso-date="2016-05-10" value="19.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-10" />
<period-end iso-date="2027-07-15" />
<target value="40">
<comment><narrative>
This indicator reflects institutional coverage (people who reach health services), not population coverage. It is being requested that the official SIGSA report include at least 8 controls for children under 1 year of age and 6 controls for children between 12 and 23 months of age. Data reflects official/published coverage from Jan-Dec 2023. Data for the Jan-December 2024 period is still preliminary/unofficial but indicates a coverage rate of 39.88%. End-target achieved.
</narrative></comment>
</target>
<actual value="38.16">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Coverage of growth promotion for children under 24-months old in the intervention areas (practices and services)
</narrative></title>
<baseline year="2016" iso-date="2016-05-10" value="19.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-10" />
<period-end iso-date="2026-01-30" />
<target value="40">
<comment><narrative>
This indicator reflects institutional coverage (people who reach health services), not population coverage. It is being requested that the official SIGSA report include at least 8 controls for children under 1 year of age and 6 controls for children between 12 and 23 months of age. Data reflects official/published coverage from Jan-Dec 2023. Data for the Jan-December 2024 period is still preliminary/unofficial but indicates a coverage rate of 39.88%. End-target achieved.
</narrative></comment>
</target>
<actual value="38.16">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Coverage of growth promotion for children under 24-months old in the intervention areas (practices and services)
</narrative></title>
<baseline year="2016" iso-date="2016-05-10" value="19.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-10" />
<period-end iso-date="2027-07-15" />
<target value="40">
<comment><narrative>
This indicator reflects institutional coverage (people who reach health services), not population coverage. It is being requested that the official SIGSA report include at least 8 controls for children under 1 year of age and 6 controls for children between 12 and 23 months of age. Data reflects official/published coverage from Jan-Dec 2024. End-target achieved.
</narrative></comment>
</target>
<actual value="40.37">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of children six months old with exclusive breastfeeding in the intervention areas (behavior)
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="43.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2026-01-30" />
<target value="65.00">
<comment><narrative>
Data representative of Crecer Sano municipalities, collected through the Grand National Crusade for Nutrition (GCNN) baseline survey and verified accordingly.  Indicator end-target achieved.
</narrative></comment>
</target>
<actual value="70.58">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of children six months old with exclusive breastfeeding in the intervention areas (behavior)
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="43.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2026-01-30" />
<target value="65.00">
<comment><narrative>
Data representative of Crecer Sano municipalities, collected through the Grand National Crusade for Nutrition (GCNN) baseline survey and verified accordingly.  Indicator end-target achieved.
</narrative></comment>
</target>
<actual value="70.58">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of children six months old with exclusive breastfeeding in the intervention areas (behavior)
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="43.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2026-01-30" />
<target value="65.00">
<comment><narrative>
Data representative of Crecer Sano municipalities, collected through the Grand National Crusade for Nutrition (GCNN) baseline survey and verified accordingly.  Indicator end-target achieved.
</narrative></comment>
</target>
<actual value="70.58">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of children six months old with exclusive breastfeeding in the intervention areas (behavior)
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="43.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2026-01-30" />
<target value="65.00">
<comment><narrative>
Data representative of Crecer Sano municipalities, collected through the Grand National Crusade for Nutrition (GCNN) baseline survey and verified accordingly.  Indicator end-target achieved.
</narrative></comment>
</target>
<actual value="70.58">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of children six months old with exclusive breastfeeding in the intervention areas (behavior)
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="43.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2026-01-30" />
<target value="65.00">
<comment><narrative>
Data representative of Crecer Sano municipalities, collected through the Grand National Crusade for Nutrition (GCNN) endline survey published in 2025 and verified accordingly.  Indicator end-target achieved.
</narrative></comment>
</target>
<actual value="70.58">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Health facilities constructed, rehabilitated, or equipped, which include designated areas for the management of infectious diseases, including COVID-19
</narrative></title>
<baseline year="2020" iso-date="2020-08-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-08-13" />
<period-end iso-date="2026-01-30" />
<target value="75.00">
<comment><narrative>
This data point corresponds to: 61 of 66 rehabilitated facilities and all 24 new health facilities constructed with designated areas for the management of infectious diseases. Facilities included in this count are only those that have been finalized and are in operation. Thus, this indicator may change as additional facilities are added, though it is expected to remain as met by the project end date.
</narrative></comment>
</target>
<actual value="94.44">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Health facilities constructed, rehabilitated, or equipped, which include designated areas for the management of infectious diseases, including COVID-19
</narrative></title>
<baseline year="2020" iso-date="2020-08-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-08-13" />
<period-end iso-date="2027-07-15" />
<target value="75.00">
<comment><narrative>
This data point corresponds to: 61 of 66 rehabilitated facilities and all 24 new health facilities constructed with designated areas for the management of infectious diseases. Facilities included in this count are only those that have been finalized and are in operation. Thus, this indicator may change as additional facilities are added, though it is expected to remain as met by the project end date.
</narrative></comment>
</target>
<actual value="94.44">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Health facilities constructed, rehabilitated, or equipped, which include designated areas for the management of infectious diseases, including COVID-19
</narrative></title>
<baseline year="2020" iso-date="2020-08-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-08-13" />
<period-end iso-date="2027-07-15" />
<target value="75.00">
<comment><narrative>
This data point corresponds to: 61 of 66 rehabilitated facilities and all 24 new health facilities constructed with designated areas for the management of infectious diseases. Facilities included in this count are only those that have been finalized and are in operation. Thus, this indicator may change as additional facilities are added, though it is expected to remain as met by the project end date.
</narrative></comment>
</target>
<actual value="94.44">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Health facilities constructed, rehabilitated, or equipped, which include designated areas for the management of infectious diseases, including COVID-19
</narrative></title>
<baseline year="2020" iso-date="2020-08-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-08-13" />
<period-end iso-date="2026-01-30" />
<target value="75.00">
<comment><narrative>
This data point corresponds to: 61 of 66 rehabilitated facilities and all 24 new health facilities constructed with designated areas for the management of infectious diseases. Facilities included in this count are only those that have been finalized and are in operation. Thus, this indicator may change as additional facilities are added, though it is expected to remain as met by the project end date.
</narrative></comment>
</target>
<actual value="94.44">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Health facilities constructed, rehabilitated, or equipped, which include designated areas for the management of infectious diseases, including COVID-19
</narrative></title>
<baseline year="2020" iso-date="2020-08-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-08-13" />
<period-end iso-date="2027-07-15" />
<target value="75.00">
<comment><narrative>
This data point corresponds to: 61 of 66 rehabilitated facilities and all 24 new health facilities constructed with designated areas for the management of infectious diseases. Facilities included in this count are only those that have been finalized and are in operation. Thus, this indicator may change as additional facilities are added, though it is expected to remain as met by the project end date.
</narrative></comment>
</target>
<actual value="94.62">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of health facilities constructed or rehabilitated
</narrative></title>
<baseline year="2016" iso-date="2016-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-15" />
<period-end iso-date="2027-07-15" />
<target value="157">

</target>
<actual value="92">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
CCT information system tracks and reports compliance with health and nutrition co-responsibilities of individual household members (services)
</narrative></title>
<baseline year="2016" iso-date="2016-05-10" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-10" />
<period-end iso-date="2026-01-30" />
<target value="Yes">
<comment><narrative>
Target met. Data verified by IVA and indicator marked as achieved.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Health facilities constructed, rehabilitated, or equipped, which include designated areas for the management of infectious diseases, including COVID-19
</narrative></title>
<baseline year="2020" iso-date="2020-08-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-08-13" />
<period-end iso-date="2026-01-30" />
<target value="75.00">
<comment><narrative>
This data point corresponds to: 61 of 66 rehabilitated facilities and all 24 new health facilities constructed with designated areas for the management of infectious diseases. Facilities included in this count are only those that have been finalized and are in operation. Thus, this indicator may change as additional facilities are added, though it is expected to remain as met by the project end date.
</narrative></comment>
</target>
<actual value="94.44">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of children under two years old who are beneficiaries of the CCT Program receiving transfers based on compliance with full verification cycle of health co-responsibilities in the interventi
</narrative></title>
<baseline year="2016" iso-date="2016-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-03-31" />
<period-end iso-date="2026-01-30" />
<target value="70.00">
<comment><narrative>
Target met. Data updated through Sep 2024.
</narrative></comment>
</target>
<actual value="96.84">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People who have received essential health, nutrition, and population (HNP) services
</narrative></title>
<baseline year="2016" iso-date="2016-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-31" />
<period-end iso-date="2026-01-30" />
<target value="680,000.00">
<comment><narrative>
The final target was significantly exceeded. This indicator reflects the total number of persons reached from Jan 2020-April 2025.
</narrative></comment>
</target>
<actual value="5,078,587">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Participants in consultation activities during project implementation (number)
</narrative></title>
<baseline year="2016" iso-date="2016-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-03-31" />
<period-end iso-date="2026-01-30" />
<target value="40,000.00">
<comment><narrative>
Indicator reflects cumulative consultative activities from 2021-2023, across the PIU, SESAN, and MIDES.
</narrative></comment>
</target>
<actual value="57,067.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Coverage of growth promotion for children under 24-months old in the intervention areas (practices and services)
</narrative></title>
<baseline year="2016" iso-date="2016-05-10" value="19.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-10" />
<period-end iso-date="2027-07-15" />
<target value="40">
<comment><narrative>
This indicator reflects institutional coverage (people who reach health services), not population coverage. It is being requested that the official SIGSA report include at least 8 controls for children under 1 year of age and 6 controls for children between 12 and 23 months of age. Data reflects official/published coverage from Jan-Dec 2023. Data for the Jan-December 2024 period is still preliminary/unofficial but indicates a coverage rate of 39.88%. End-target achieved.
</narrative></comment>
</target>
<actual value="38.16">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
CCT information system tracks and reports compliance with health and nutrition co-responsibilities of individual household members (services)
</narrative></title>
<baseline year="2016" iso-date="2016-05-10" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-10" />
<period-end iso-date="2026-01-30" />
<target value="Yes">
<comment><narrative>
Target met and data verified by IVA.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Health staff trained in infection prevention and control per MSPAS-approved protocols
</narrative></title>
<baseline year="2020" iso-date="2020-07-21" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-07-21" />
<period-end iso-date="2026-01-30" />
<target value="5,000.00">
<comment><narrative>
End of project target was significantly surpassed in 2023. Value represents cumulative over project period, including 2020, 2021, 2022, and 2023.
</narrative></comment>
</target>
<actual value="82,217.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of families being served by new or rehabilitated water systems in the intervention areas (services)
</narrative></title>
<baseline year="2016" iso-date="2016-05-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-10" />
<period-end iso-date="2026-01-30" />
<target value="25,000.00">
<comment><narrative>
The installation of hypochlorinators has begun as of June 2025, with a total of 114 communities expected to receive hypochlorinators by the current closing date. The final number of beneficiaries will be calculated as the facilities advance (through a population census in beneficiary communities). It is expected that this indicator will be met before the project's closing date.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of  children 12-months old in the intervention areas receiving micronutrients as defined in the protocol (services)
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="5.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2027-07-15" />
<target value="60.00">
<comment><narrative>
This is based on verified data from the survey of the Gran Cruzada Nacional para la Nutricion, representative of Crecer Sano municipalities, completed in early 2025.
</narrative></comment>
</target>
<actual value="51.65">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The Unique Registry of Beneficiaries receives individual level data on health system usage (services)
</narrative></title>
<baseline year="2016" iso-date="2016-03-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-03-31" />
<period-end iso-date="2026-01-30" />
<target value="Data is being shared with the CCT Program for verification of co-responsibilities.">
<comment><narrative>
Target met. The information for 2021 was completed by updating the data on the services provided by MSPAS with information exchange between SIGSA and MIDES. Verification agency verified the result and DLI was marked as achieved.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of  children 12-months old in the intervention areas receiving micronutrients as defined in the protocol (services)
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="5.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2027-07-15" />
<target value="60.00">
<comment><narrative>
This is based on verified data from the survey of the Gran Cruzada Nacional para la Nutricion, representative of Crecer Sano municipalities, completed in early 2025 and published June 2025.
</narrative></comment>
</target>
<actual value="68.66">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Health personnel receiving training (number)
</narrative></title>
<baseline year="2016" iso-date="2016-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-03-31" />
<period-end iso-date="2026-01-30" />
<target value="2,400.00">
<comment><narrative>
Target met. Data reflects all health personnel trained over the life of the project (2020- 2024). The PIU is currently implementing methods to ensure that there is no double counting, therefore, this data point may change slightly but is expected to be met.
</narrative></comment>
</target>
<actual value="14,276.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Participants in consultation activities during project implementation (number)
</narrative></title>
<baseline year="2016" iso-date="2016-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-03-31" />
<period-end iso-date="2026-01-30" />
<target value="40,000.00">
<comment><narrative>
Indicator reflects cumulative consultative activities from 2021-2023, across the PIU, SESAN, and MIDES.
</narrative></comment>
</target>
<actual value="57,067.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
CCT information system tracks and reports compliance with health and nutrition co-responsibilities of individual household members (services)
</narrative></title>
<baseline year="2016" iso-date="2016-05-10" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-10" />
<period-end iso-date="2026-01-30" />
<target value="Yes">
<comment><narrative>
Target met and data verified by IVA.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People who have received essential health, nutrition, and population (HNP) services
</narrative></title>
<baseline year="2016" iso-date="2016-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-31" />
<period-end iso-date="2026-01-30" />
<target value="680,000.00">
<comment><narrative>
The final target was significantly exceeded. This indicator reflects the total number of persons reached from Jan 2020-April 2025.
</narrative></comment>
</target>
<actual value="5,078,587">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Participants in consultation activities during project implementation (number)
</narrative></title>
<baseline year="2016" iso-date="2016-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-03-31" />
<period-end iso-date="2026-01-30" />
<target value="40,000.00">
<comment><narrative>
Indicator reflects cumulative activities from 2021-2023, across UIP, SESAN, and MIDES.
</narrative></comment>
</target>
<actual value="57,067.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of municipalities where combined interventions were implemented (coordinated interventions/services)
</narrative></title>
<baseline year="2016" iso-date="2016-05-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-10" />
<period-end iso-date="2026-01-30" />
<target value="70.00">
<comment><narrative>
The 17% refers to 23 out of 139 municipalities where integrated actions have been implemented. Achievement of this indicator (reach 97 municipalities by the end of the project period) is rooted in the implementation of water surveillance activities (distribution of equipment and implementation of the surveillance protocol). The distribution of inputs for this activity are expected to begin in August 2025, and this indicator is expected to be achieved by the current closing date.
</narrative></comment>
</target>
<actual value="17.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of families served by new or rehabilitation works for sanitation systems in the intervention areas (services)
</narrative></title>
<baseline year="2016" iso-date="2016-05-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-10" />
<period-end iso-date="2027-07-15" />
<target value="3500.00">
<comment><narrative>
The implementation of latrines has been initiated, with 2,147 units installed. It is expected that this indicator will be achieved by the end of the Project closing date.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Health facilities constructed, rehabilitated, or equipped, which include designated areas for the management of infectious diseases, including COVID-19
</narrative></title>
<baseline year="2020" iso-date="2020-08-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-08-13" />
<period-end iso-date="2026-01-30" />
<target value="75.00">
<comment><narrative>
This data point corresponds to: 61 of 66 rehabilitated facilities and all 24 new health facilities constructed with designated areas for the management of infectious diseases. Facilities included in this count are only those that have been finalized and are in operation. Thus, this indicator may change as additional facilities are added, though it is expected to remain as met by the project end date.
</narrative></comment>
</target>
<actual value="94.44">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of  children 12-months old in the intervention areas receiving micronutrients as defined in the protocol (services)
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="5.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2026-01-30" />
<target value="60.00">
<comment><narrative>
Data from the baseline survey of the Gran Cruzada Nacional para la Nutricion, representative of Crecer Sano municipalities. Data analyzed August 2023, will be updated in the next ISR when data from the endline survey is finalized and verified.
</narrative></comment>
</target>
<actual value="51.65">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of  children 12-months old in the intervention areas receiving micronutrients as defined in the protocol (services)
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="5.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2027-07-15" />
<target value="60.00">
<comment><narrative>
This is based on verified data from the survey of the Gran Cruzada Nacional para la Nutricion, representative of Crecer Sano municipalities, completed in early 2025.
</narrative></comment>
</target>
<actual value="51.65">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People who have received essential health, nutrition, and population (HNP) services
</narrative></title>
<baseline year="2016" iso-date="2016-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-31" />
<period-end iso-date="2027-07-15" />
<target value="4,500,000">
<comment><narrative>
The final target was significantly exceeded. This indicator reflects the total number of persons reached from Jan 2020-April 2025.
</narrative></comment>
</target>
<actual value="5,078,587">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with water, sanitation, and hygiene
</narrative></title>
<baseline year="2024" iso-date="2024-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-15" />
<period-end iso-date="2026-01-15" />
<target value="142,500">
<comment><narrative>
This indicator is expected to report progress in the next ISR, following the installation of both latrines and hypochlorinators.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Health staff trained in infection prevention and control per MSPAS-approved protocols
</narrative></title>
<baseline year="2020" iso-date="2020-07-21" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-07-21" />
<period-end iso-date="2026-01-30" />
<target value="5,000.00">
<comment><narrative>
End of project target was significantly surpassed. The development of capacities in MSPAS staff from the management of protocols, prevention, and rehabilitation has been actively promoted through all the health services. Value represents cumulative over project period, including 2020, 2021, 2022, and 2023. A slight revision has been made to ensure accuracy of the end-Dec 2023 reporting, which is the latest.
</narrative></comment>
</target>
<actual value="82,217.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of children under two years old who are beneficiaries of the CCT Program receiving transfers based on compliance with full verification cycle of health co-responsibilities in the interventi
</narrative></title>
<baseline year="2016" iso-date="2016-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-03-31" />
<period-end iso-date="2026-01-30" />
<target value="70.00">
<comment><narrative>
Target met. Data updated through Sep 2024.
</narrative></comment>
</target>
<actual value="96.7">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of families served by new or rehabilitation works for sanitation systems in the intervention areas (services)
</narrative></title>
<baseline year="2016" iso-date="2016-05-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-10" />
<period-end iso-date="2026-01-30" />
<target value="3500.00">
<comment><narrative>
It expected that 3,500 improved sanitation facilities will be installed by the end of the Project period following the Total and Sustanaible Sanitation and Hygiene (SAHTOSO) methodology.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Coverage of prenatal care with at least four visits in the intervention areas (services)
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="18.70"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2026-01-30" />
<target value="50.00">
<comment><narrative>
Data is from the GCNN survey, representative of Crecer Sano municipalities and completed in early 2025. Data verified by IVA and DLI marked as fully achieved.
</narrative></comment>
</target>
<actual value="85.29">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People receiving quality health, nutrition, and population services
</narrative></title>
<baseline year="2016" iso-date="2016-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-15" />
<period-end iso-date="2027-07-15" />
<target value="4,500,000">
<comment><narrative>
These figures reflect validated totals between 2020 and end-2024.
</narrative></comment>
</target>
<actual value="3,308,948">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People who have received essential health, nutrition, and population (HNP) services
</narrative></title>
<baseline year="2016" iso-date="2016-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-31" />
<period-end iso-date="2026-01-30" />
<target value="680,000.00">
<comment><narrative>
The final target was significantly exceeded. This indicator reflects the total number of persons reached from Jan 2020-April 2025.
</narrative></comment>
</target>
<actual value="5,078,587">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Surveillance system for safe drinking water in place, and reporting as defined in the protocols (services)
</narrative></title>
<baseline year="2016" iso-date="2016-05-10" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-10" />
<period-end iso-date="2027-07-15" />
<target value="Yes">
<comment><narrative>
The operation of the surveillance system is pending the implementation of water monitoring activities, which is expected to begin in February 2026. It is expected that this indicator will be met before the project's closing date.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of children six months old with exclusive breastfeeding in the intervention areas (behavior)
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="43.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2026-01-30" />
<target value="65.00">
<comment><narrative>
Data representative of Crecer Sano municipalities, collected through the Grand National Crusade for Nutrition (GCNN) baseline survey and verified accordingly.  Indicator end-target achieved.
</narrative></comment>
</target>
<actual value="70.58">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The Unique Registry of Beneficiaries receives individual level data on health system usage (services)
</narrative></title>
<baseline year="2016" iso-date="2016-03-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-03-31" />
<period-end iso-date="2026-01-30" />
<target value="Data is being shared with the CCT Program for verification of co-responsibilities.">
<comment><narrative>
Target met. The information for 2021 was completed by updating the data on the services provided by MSPAS with information exchange between SIGSA and MIDES. Verification agency verified the result and DLI was marked as achieved.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of children six months old with exclusive breastfeeding in the intervention areas (behavior)
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="43.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2026-01-30" />
<target value="65.00">
<comment><narrative>
Data representative of Crecer Sano municipalities, collected through the Grand National Crusade for Nutrition (GCNN) baseline survey and verified accordingly.  Indicator end-target achieved.
</narrative></comment>
</target>
<actual value="70.58">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with water, sanitation, and hygiene
</narrative></title>
<baseline year="2024" iso-date="2024-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-15" />
<period-end iso-date="2027-07-15" />
<target value="142,500">
<comment><narrative>
This indicator is expected to report progress in the next ISR, following the installation of both latrines and hypochlorinators.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of families being served by new or rehabilitated water systems in the intervention areas (services)
</narrative></title>
<baseline year="2016" iso-date="2016-05-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-10" />
<period-end iso-date="2027-07-15" />
<target value="25,000.00">
<comment><narrative>
The distribution of hypoclorinator has been completed (139) and 121 have been installed. The final number of beneficiaries is being calculated as the facilities advance (through a population census in beneficiary communities). It is expected that population numbers of beneficiaries will be finalized in 2026 and this indicator will be met before the project's closing date.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Health facilities constructed, rehabilitated, or equipped, which include designated areas for the management of infectious diseases, including COVID-19
</narrative></title>
<baseline year="2020" iso-date="2020-08-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-08-13" />
<period-end iso-date="2027-07-15" />
<target value="75.00">
<comment><narrative>
This data point corresponds to: 61 of 66 rehabilitated facilities and all 24 new health facilities constructed with designated areas for the management of infectious diseases. Facilities included in this count are only those that have been finalized and are in operation. Thus, this indicator may change as additional facilities are added, though it is expected to remain as met by the project end date.
</narrative></comment>
</target>
<actual value="94.62">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of women of reproductive age in the intervention areas having access/receiving at least one family planning method (practices and services)
</narrative></title>
<baseline year="2016" iso-date="2016-05-10" value="190,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-10" />
<period-end iso-date="2026-01-30" />
<target value="230,000.00">
<comment><narrative>
Data is the officially published number reflective of the period of Jan-Dec 2023. Preliminary data from Jan-Sep 2024 is 160,612 women.
</narrative></comment>
</target>
<actual value="216,557.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Participants in consultation activities during project implementation (number)
</narrative></title>
<baseline year="2016" iso-date="2016-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-03-31" />
<period-end iso-date="2026-01-30" />
<target value="40,000.00">
<comment><narrative>
Indicator reflects cumulative consultative activities from 2021-2023, across the PIU, SESAN, and MIDES.
</narrative></comment>
</target>
<actual value="57,067.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Surveillance system for safe drinking water in place, and reporting as defined in the protocols (services)
</narrative></title>
<baseline year="2016" iso-date="2016-05-10" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-10" />
<period-end iso-date="2026-01-30" />
<target value="Yes">
<comment><narrative>
The operation of the surveillance system is pending socialization of SIVASA (which is almost complete), and the implementation of water monitoring activities. It is expected that this indicator will be met before the project's closing date.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The Unique Registry of Beneficiaries receives individual level data on health system usage (services)
</narrative></title>
<baseline year="2016" iso-date="2016-03-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-03-31" />
<period-end iso-date="2026-01-30" />
<target value="Data is being shared with the CCT Program for verification of co-responsibilities.">
<comment><narrative>
Target met. The information for 2021 was completed by updating the data on the services provided by MSPAS with information exchange between SIGSA and MIDES. Verification agency verified the result and DLI was marked as achieved.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People who have received essential health, nutrition, and population (HNP) services
</narrative></title>
<baseline year="2016" iso-date="2016-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-31" />
<period-end iso-date="2027-07-15" />
<target value="4,500,000">
<comment><narrative>
The final target was significantly exceeded. This indicator reflects the total number of persons reached from Jan 2020-April 2025.
</narrative></comment>
</target>
<actual value="5,078,587">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People receiving quality health, nutrition, and population services
</narrative></title>
<baseline year="2016" iso-date="2016-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-15" />
<period-end iso-date="2027-07-15" />
<target value="4,500,000">
<comment><narrative>
These figures reflect validated totals between January 2020 and October 31, 2025.
</narrative></comment>
</target>
<actual value="3,823,616">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Surveillance system for safe drinking water in place, and reporting as defined in the protocols (services)
</narrative></title>
<baseline year="2016" iso-date="2016-05-10" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-10" />
<period-end iso-date="2027-07-15" />
<target value="Yes">
<comment><narrative>
The operation of the surveillance system is pending socialization of SIVASA (which is almost complete), and the implementation of water monitoring activities. It is expected that this indicator will be met before the project's closing date.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Health staff trained in infection prevention and control per MSPAS-approved protocols
</narrative></title>
<baseline year="2020" iso-date="2020-07-21" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-07-21" />
<period-end iso-date="2026-01-30" />
<target value="5,000.00">
<comment><narrative>
End of project target was significantly surpassed. The development of capacities in MSPAS staff from the management of protocols, prevention, and rehabilitation has been actively promoted through all the health services. Value represents cumulative over project period, including 2020, 2021, 2022, and 2023. A slight revision has been made to ensure accuracy of the end-Dec 2023 reporting, which is the latest.
</narrative></comment>
</target>
<actual value="82,217.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Health staff trained in infection prevention and control per MSPAS-approved protocols
</narrative></title>
<baseline year="2020" iso-date="2020-07-21" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-07-21" />
<period-end iso-date="2026-01-30" />
<target value="5,000.00">
<comment><narrative>
End of project target was significantly surpassed. The development of capacities in MSPAS staff from the management of protocols, prevention, and rehabilitation has been actively promoted through all the health services. Value represents cumulative over project period, including 2020, 2021, 2022, and 2023. As of January 2024, this indicator is no longer being tracked. A slight revision has therefore been made to reflect the latest reporting and final figures.
</narrative></comment>
</target>
<actual value="82,217.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Health personnel receiving training (number)
</narrative></title>
<baseline year="2016" iso-date="2016-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-03-31" />
<period-end iso-date="2026-01-30" />
<target value="2,400.00">
<comment><narrative>
Target met. Data reflects all health personnel trained over the life of the project (2020- April 2025). The figure is slightly less than previously reported due to a change in methodology that has eliminated any double counting of personnel trained.
</narrative></comment>
</target>
<actual value="11,883">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Health personnel receiving training (number)
</narrative></title>
<baseline year="2016" iso-date="2016-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-03-31" />
<period-end iso-date="2027-07-15" />
<target value="2,400.00">
<comment><narrative>
Target met. Data reflects all health personnel trained over the life of the project (2020- October 2025).
</narrative></comment>
</target>
<actual value="12,263">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of children under two years old who are beneficiaries of the CCT Program receiving transfers based on compliance with full verification cycle of health co-responsibilities in the interventi
</narrative></title>
<baseline year="2016" iso-date="2016-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-03-31" />
<period-end iso-date="2026-01-30" />
<target value="70.00">
<comment><narrative>
Target met. Data updated through Sep 2024.
</narrative></comment>
</target>
<actual value="96.7">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of children six months old with exclusive breastfeeding in the intervention areas (behavior)
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="43.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2026-01-30" />
<target value="65.00">
<comment><narrative>
Data representative of Crecer Sano municipalities, collected through the Grand National Crusade for Nutrition (GCNN) baseline survey and verified accordingly.  Indicator end-target achieved.
</narrative></comment>
</target>
<actual value="70.58">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of families being served by new or rehabilitated water systems in the intervention areas (services)
</narrative></title>
<baseline year="2016" iso-date="2016-05-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-10" />
<period-end iso-date="2027-07-15" />
<target value="25,000.00">
<comment><narrative>
The installation of hypochlorinators has begun as of June 2025, with a total of 114 communities expected to receive hypochlorinators by the current closing date. The final number of beneficiaries will be calculated as the facilities advance (through a population census in beneficiary communities). It is expected that this indicator will be met before the project's closing date.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Surveillance system for safe drinking water in place, and reporting as defined in the protocols (services)
</narrative></title>
<baseline year="2016" iso-date="2016-05-10" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-10" />
<period-end iso-date="2027-07-15" />
<target value="Yes">
<comment><narrative>
The operation of the surveillance system is pending socialization of SIVASA (which is almost complete), and the implementation of water monitoring activities. It is expected that this indicator will be met before the project's closing date.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of children six months old with exclusive breastfeeding in the intervention areas (behavior)
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="43.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2026-01-30" />
<target value="65.00">
<comment><narrative>
Data representative of Crecer Sano municipalities, collected through the Grand National Crusade for Nutrition (GCNN) endline survey published in 2025 and verified accordingly.  Indicator end-target achieved.
</narrative></comment>
</target>
<actual value="70.58">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-23T20:24:13" hierarchy="1"><iati-identifier>44000-P173480</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Responding to COVID-19: Modern and Resilient Agri-food Value Chains</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The objective of the Project is to promote an agro-industrialization strategy that reduces food losses, increases the adoption of climate-resilient technologies, and supports the COVID-19 emergency response for beneficiaries in select value chains.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The proposed project is an Investment Project Financing (IPF) for US$150 million of IBRD, US$17.7 million of counterpart financing from project beneficiaries, and an expected co-financing of US$11.3 million of IFAD credit. The total project cost is estimated to be US$179 million and be implemented over a period of five years. The PDO is to promote an agro-industrialization strategy that reduces food losses, increases the adoption of climate-resilient technologies, and supports the COVID 19 emergency response for beneficiaries in select value chains. Investment in post-harvest activities in key value-chains with agro-industrial potential will contribute to an efficient and resilient agri-food industry, playing a critical role in helping the government deliver on its job creation, inclusion and sustainable growth objectives, while strengthening the economic foundation for recovering from the impacts of the COVID-19 pandemic. Increasing efficiency will reduce food losses and improve quality, improving returns to farmers and other food system actors and enhancing delivery of nutrition outcomes. Increasing beneficiary resilience will contribute to reducing adverse impacts on incomes, nutrition, employment, and other aspects of the rural economy in the face of future shocks and crises due to climate change, pandemics, and other unforeseen events. The project will contribute to improved efficiency and resilience through supporting adoption of on-farm technologies to a) extend the shelf life of food production, which increases market access and the bargaining power of producers and small agro-industrial enterprises, also fostering their growth potential; and b) diversify year-round the population's diet at affordable prices, with favorable impacts on nutrition. Overall, the proposed activities will contribute to improving the efficiency of key value-chains while investing in on-farm technologies to help beneficiaries in key VCs increase resilience.  The project has 4 components.  Under component 1, it will support the post-COVID-19 economic recovery and the productive transformation of the agro-industrial sector, investing in (i) technical assistance to the National Strategy on Financial Inclusion 2019-2023 and an emergency relief fund; (ii) skills development for greater employability and export opportunities and (iii) consumer education for better consumption patterns.  Through Component 2, eligible beneficiary MSMEs will receive financial support on the basis of approved (profitable, inclusive, sustainable and climate-informed) business plans to improve the quality of their productive processes through investments in production and post-harvest practices, including activities such as storage, agro-logistics, aggregation, and transformation of harvested products along the selected VCs.  All business plans will be accompanied by technical assistance, with a focus on the most vulnerable populations, including indigenous populations, youth and women and will specifically prioritize the adoption of climate resilient / climate smart technologies.  The financing mechanism for business plans will be a blend of grants and MSMEs own contributions (in-kind or cash), and the option to MSMEs for accessing loans from national financial institutions to cover part of their contribution. Component 3 will strengthen strategic public sector institutions of the agrifood system and finance investments in Sanitary and Phytosanitary (SPS) and Traceability Systems for Food Safety.  Component 4 will focus on monitoring, evaluation and project management.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="GT–P0044859"><narrative>Ministry of Finance Guatemala (MINFIN)</narrative></participating-org><participating-org role="2" xml:lang="en" ref="GT–P0044859"><narrative>Ministry of Finance Guatemala (MINFIN)</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="GT-COA-0044858"><narrative>Ministry of Economy Guatemala (MINECO)</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2021-01-08"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2021-01-08"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2024-03-12"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2024-03-12"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Johannes Georges Pius Jansen</narrative></person-name><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="GT" percentage="100"><narrative xml:lang="en">GUATEMALA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003595528" />
            <name><narrative>Republic of Guatemala</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.5 -90.25</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="31150" percentage="26" xml:lang="en"/><sector vocabulary="1" code="31120" percentage="26" xml:lang="en"/><sector vocabulary="1" code="32161" percentage="24" xml:lang="en"/><sector vocabulary="1" code="32130" percentage="15" xml:lang="en"/><sector vocabulary="1" code="31191" percentage="9" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YA" percentage="46.0000000" xml:lang="en"><narrative>FY17 - Agricultural markets, commercialization and agri-business</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YF" percentage="21.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Industry, Trade and Services</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AB" percentage="33.0000000" xml:lang="en"><narrative>FY17 - Agricultural Extension, Research, and Other Support Activities</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="96" xml:lang="en"><narrative>Disease Control</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="17" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="87" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000626" percentage="96" xml:lang="en"><narrative>Pandemic Response</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000323" percentage="17" xml:lang="en"><narrative>MSME Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="28" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000067" percentage="87" xml:lang="en"><narrative>Nutrition and Food Security</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000512" percentage="83" xml:lang="en"><narrative>Other Excluded Groups</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="83" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="87" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000512" percentage="83" xml:lang="en"><narrative>Other Excluded Groups</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000243" percentage="83" xml:lang="en"><narrative>MSME Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000221" percentage="17" xml:lang="en"><narrative>Job Creation</narrative></sector><humanitarian-scope type="1" vocabulary="1-2" code="EP-2020-000012-001"> </humanitarian-scope><humanitarian-scope type="2" vocabulary="2-1" code="HCOVD20"> </humanitarian-scope><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">40000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">190000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">390000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">410000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">210000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">210000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">210000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">210000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">430000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">220000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">220000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">220000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">220000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">460000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">230000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">240000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">260000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">270000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">630000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">380000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">440000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">480000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">550000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">2360000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">2080000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">2440000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">2580000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">2590000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">4940000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">1830000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">1790000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">1760000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">1730000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">3410000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">1690000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">1690000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">1700000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">1720000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">1740000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">3260000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">1520000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">1540000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">1570000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">1580000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">3170000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">1550000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">2160000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">2240000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">2290000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">4650000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">2360000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">2380000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">2400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">2420000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">4890000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">2470000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">2490000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">2520000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">2530000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">5110000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">5160000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">2600000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">2610000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">5250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">2640000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">2650000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">2660000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">2670000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">5370000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">2700000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">2700000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">2710000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">2720000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">5790000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">40000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">190000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">390000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">200000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">200000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">200000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">200000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">410000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">210000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">210000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">210000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">210000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">430000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">220000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">220000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">220000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">220000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">460000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">230000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">240000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">260000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">270000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">630000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">380000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">440000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">480000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">550000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">2360000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">2080000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">2440000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">2580000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">2590000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">4940000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">1830000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">1790000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">1760000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">1730000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">3410000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">1690000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">1690000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">1700000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">1720000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">1740000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">3260000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">1520000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">1540000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">1570000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">1580000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">3170000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">1550000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">2160000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">2240000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">2290000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">4650000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">2360000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">2380000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">2400000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">2420000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">4890000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">2470000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">2490000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">2500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">2520000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">2530000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">5110000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">5160000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">2600000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">2610000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">5250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">2640000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">2650000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">2660000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">2670000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">5370000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">2700000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">2700000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">2710000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">2720000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">5790000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-12"/>
<value currency="USD" value-date="2024-03-12">150000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-12"/>
<value currency="USD" value-date="2024-03-12">150000000.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">150000000</value><description xml:lang="en"><narrative>Total Commitment in January Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-44858"><narrative>Ministry of Economy Guatemala (MINECO)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-150000000</value><description xml:lang="en"><narrative>Total Commitment Cancellations in June Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-44858"><narrative>Ministry of Economy Guatemala (MINECO)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P173480"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P173480?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P173480"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People reached through communication campaigns related to improved food consumption habits, dissagretated by sex and age group.
</narrative></title>
<baseline year="2021" iso-date="2021-01-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-01-25" />
<period-end iso-date="2026-10-01" />
<target value="100,000.00">
<comment><narrative>
Number of people reached through different awareness-raising activities to promote changes in consumption habits, e.g. television campaigns, community radio campaigns, internet, posters, pamphlets, etc.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries trained in climate smart production practices and/or technologies.
</narrative></title>
<baseline year="2021" iso-date="2021-01-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-01-25" />
<period-end iso-date="2026-10-01" />
<target value="10,000.00">
<comment><narrative>
Number beneficiaries receiving training in climate smart production practices and technologies.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
INE's institutional processes evaluated and redesigned according to international standards.
</narrative></title>
<baseline year="2021" iso-date="2021-01-25" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-01-25" />
<period-end iso-date="2026-10-01" />
<target value="Yes">
<comment><narrative>
INE's institutional processes evaluated and redesigned to determine the extent of compliance of their legal mandate and comparison with international standards.  The diagnostic study will include: organizational structure, functions, processes, systems and products.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of sub-projects (business plans) funded by the innovation challenge mechanism.
</narrative></title>
<baseline year="2021" iso-date="2021-01-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-01-25" />
<period-end iso-date="2026-10-01" />
<target value="50.00">
<comment><narrative>
Number of innovative subprojects funded by the Innovation Challenge Mechanism related to post-harvest and/or food safety technologies.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of agro-industrial enterprises supported by the project reporting increases in sales.
</narrative></title>
<baseline year="2021" iso-date="2021-01-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-01-25" />
<period-end iso-date="2026-10-01" />
<target value="80.00">
<comment><narrative>
Ratio of number of agro-industrial enterprises reporting increased real gross sales (with respect to baseline established in the business plans) over total number of agro-industrial enterprises financed by the project.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Institutional strengthening investment plans implemented by MINECO, INE and MAGA.
</narrative></title>
<baseline year="2021" iso-date="2021-01-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-01-25" />
<period-end iso-date="2026-10-01" />
<target value="3.00">
<comment><narrative>
Number of institutional strengthening investment plans implemented (MINECO, INE and MAGA).
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries receiving scholarships, stipends or services to improve job skills, disaggregated by sex.
</narrative></title>
<baseline year="2021" iso-date="2021-01-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-01-25" />
<period-end iso-date="2026-10-01" />
<target value="9,000.00">
<comment><narrative>
Number of beneficiaries enrolled in training courses financed by the project.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
MINECO-PRONACOM's gender unit develops and issues its gender strategy.
</narrative></title>
<baseline year="2021" iso-date="2021-01-25" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-01-25" />
<period-end iso-date="2026-10-01" />
<target value="Yes">
<comment><narrative>
Gender Strategy to close gender gaps in agriculture and agro-industry incorporated into PRONACOM's current strategies based on a Gender Gap Assessment.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries satisfied with technical and financial assistance received under the Project (Percentage)
</narrative></title>
<baseline year="2021" iso-date="2021-01-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-01-25" />
<period-end iso-date="2026-10-01" />
<target value="80.00">
<comment><narrative>
Ratio of beneficiaries expressing satisfaction with technical and financial assistance received under the project over total number of beneficiaries surveyed.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of completed sub-projects (business plans) financed by the Project.
</narrative></title>
<baseline year="2021" iso-date="2021-01-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-01-25" />
<period-end iso-date="2026-10-01" />
<target value="350.00">
<comment><narrative>
A business plans is considered complete when it has been 100% implemented and their final report has been audited by the PMU.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries accessing job opportunities due to improved labor skills or through the employment platform.
</narrative></title>
<baseline year="2021" iso-date="2021-01-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-01-25" />
<period-end iso-date="2026-10-01" />
<target value="10,000.00">
<comment><narrative>
Beneficiaries accessing job opportunities due to productive transformation activities in component 1 (scholarships, short trainings, skills-matching platform).
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
MSMEs accessing improved financial services due to implementation of ENIF.
</narrative></title>
<baseline year="2020" iso-date="2020-10-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-01" />
<period-end iso-date="2026-10-01" />
<target value="1,500.00">
<comment><narrative>
Number of MSMEs accessing financial services due to the implementation of the National Strategy of Financial Inclusion (ENIF).  According to ENIF, improved financial services include (i) the use of payment methods that are inclusive, modern, secure and reliable; (ii) credit products and other financing mechanisms evaluated with modern techniques, backed by non-conventional guarantees and that can be based on integral credit information systems; (iii) reliable and accessible savings products and services; (iv) new insuranc products; (v) financial education through integral programs that facilitate the enhanced understanding of the financial benefits, concepts, products and risks.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Project impact evaluation implemented.
</narrative></title>
<baseline year="2021" iso-date="2021-01-25" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-01-25" />
<period-end iso-date="2026-10-01" />
<target value="Yes">
<comment><narrative>
Project's impact evaluation designed (including identification strategy, sampling methods, protocols and survey instruments developed) and implemented (including survey piloting and data collection, data analysis, sensitivity testing, identification of results), and impact evaluation report prepared.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of micro, small and medium agro-industrial enterprises trained in export processes and innovation that increase their export volumes.
</narrative></title>
<baseline year="2021" iso-date="2021-01-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-01-25" />
<period-end iso-date="2026-10-01" />
<target value="20.00">
<comment><narrative>
Ratio of number of agro-industrial enterprises trained in export processes and innovation that increase by at least 5% their export volume over total number of agro-industrial enterprises trained in export processes and innovation.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of national surveys designed to improve INE's database.
</narrative></title>
<baseline year="2021" iso-date="2021-01-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-01-25" />
<period-end iso-date="2026-10-01" />
<target value="3.00">
<comment><narrative>
Design of thematic surveys at the national level such as Living Standards Measurement Suvery (LSMS), Industrial Survey and National Agricultural Survey.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction of post-harvest losses in selected value chains (percentage of total production)
</narrative></title>
<baseline year="2021" iso-date="2021-01-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-01-25" />
<period-end iso-date="2026-10-01" />
<target value="50.00">
<comment><narrative>
Ratio of total post harvest losses from subprojects (tons) / total quantity produced from subprojects (tons).
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Women-tailored training events implemented to provide additional support to their enterprises.
</narrative></title>
<baseline year="2020" iso-date="2020-05-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-05-06" />
<period-end iso-date="2026-02-03" />
<target value="160.00">
<comment><narrative>
Number of training and capacity building events directed at women's enterprises to provide additional support for their subprojects.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Project M&amp;E systems tools created and fully operational.
</narrative></title>
<baseline year="2021" iso-date="2021-01-25" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-01-25" />
<period-end iso-date="2026-10-01" />
<target value="Yes">
<comment><narrative>
A decentralized digital Monitoring and Evaluation System to support project planning, monitoring and management is implemented under the responsibility of the PMU through the M&amp;E Unit and produces bi-yearly progress reports.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances responded and/or resolved within 90 days (percentage of total received)
</narrative></title>
<baseline year="2021" iso-date="2021-01-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-01-25" />
<period-end iso-date="2026-10-01" />
<target value="100.00">
<comment><narrative>
Percentage of grievances addressed and resolved through the GRM mechanism within the stipulated time period.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improvements in the quality of public services (laboratories) in food safety and traceability.
</narrative></title>
<baseline year="2021" iso-date="2021-01-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-01-25" />
<period-end iso-date="2026-10-01" />
<target value="5.00">
<comment><narrative>
Number of public safety and traceability laboratories update their equipment and have received a certification from the competent authority.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of micro, small and medium agro-industrial enterprises trained in export processes and innovation.
</narrative></title>
<baseline year="2021" iso-date="2021-01-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-01-25" />
<period-end iso-date="2026-10-01" />
<target value="5,000.00">
<comment><narrative>
Number of micro, small and medium entrepreneurs trained in export processes and innovation (sanitary and phytosanitary standards, food safety, nutritional value, labeling, packaging, cold chain techniques, etc.)
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Member of beneficiary organizations incorporating agricultural technologies promoted by the Project to enhance climate resilience, disaggregated by sex, age group and ethnicity.
</narrative></title>
<baseline year="2021" iso-date="2021-01-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-01-25" />
<period-end iso-date="2026-10-01" />
<target value="12,000.00">
<comment><narrative>
Number of project beneficiaries who have adopted an improved agricultural technology promoted by the project. Technologies may include (but are not limited to) technologies for cold-storage rooms for vegetable storage and preservation, on-farm vegetable and fruits washing/cleaning equipment and technologies, equipment for drying of fruits and vegetables, greenhouses, hail nets, micro irrigation systems, refrigerated vehicles.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women beneficiaries demonstrating an improvement in empowerment (PRO-WEAI) (IFAD core indicator)
</narrative></title>
<baseline year="2021" iso-date="2021-01-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-01-25" />
<period-end iso-date="2026-10-01" />
<target value="30.00">
<comment><narrative>
Ratio of number of women beneficiaries demonstrating an increase in the PRO-WEAI index over total number of women beneficiaries surveyed.  

The project-level Women's Empowerment in Agriculture Index (PRO-WEAI), a survey-based index for measuring empowerment, agency, and inclusion of women in the agriculture sector. It is composed of 12 indicators of women's empowerment in agriculture: autonomy in income, self-efficacy, attitudes about domestic violence, input in productive decisions, ownership of land and other assets, access to and decisions on credit, control over use of income, work balance, visiting important locations, group membership, membership in influential groups, and respect among household members.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-23T20:24:13" hierarchy="1"><iati-identifier>44000-P153366</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Transparency and Efficiency in Tax Administration</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The project development objective is to increase levels of compliance with tax and customs obligations.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Transparency and Efficiency in Tax Administration Project for Guatemala is to increase levels of compliance with tax and customs obligations. The project comprises of three components. The first component, transparency, integrity and institutional development in Tax Administration Superintendence (SAT) objective is to help improve SAT's governance, by supporting the implementation of the recently approved amendments to SAT's organic law of SAT and strengthening its internal capacities. It consists of following three sub-components: (i) managing the SAT reform; (ii) strengthening human resource management and institutional integrity; and (iii) upgrading and integrating the information and communication technology (ICT) platform. The second component, strengthening of tax collection functions in internal revenues and customs objective is to strengthen the core processes of the primary tax collection and control functions in both internal revenues and customs. It consists of following two sub-components: (i) strengthening internal revenue collection processes; and (ii) strengthening customs services. The third component, objective is to strengthen SAT's tax intelligence and enforcement capabilities. It consists of following three sub-components: (i) strengthening tax intelligence and tax audit; (ii) strengthening legal services; and (iii) tax appeals procedures in SAT.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="GT–P0022787"><narrative>Ministry of Public Finance</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="GT-COA-0022786"><narrative>Superintendencia de Administracion Tributaria</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2015-07-13"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2017-01-17"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2023-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2023-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Alberto Leyton</narrative></person-name><telephone>+1-202-473-1000</telephone><email>aleyton@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="GT" percentage="100"><narrative xml:lang="en">GUATEMALA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003595528" />
            <name><narrative>Republic of Guatemala</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.5 -90.25</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="15155" percentage="29" xml:lang="en"/><sector vocabulary="1" code="33120" percentage="24" xml:lang="en"/><sector vocabulary="1" code="15117" percentage="18" xml:lang="en"/><sector vocabulary="1" code="15126" percentage="15" xml:lang="en"/><sector vocabulary="1" code="22040" percentage="14" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="75.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YY" percentage="25.0000000" xml:lang="en"><narrative>FY17 - Trade</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000261" percentage="20" xml:lang="en"><narrative>ICT Solutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="20" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="30" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000026" percentage="20" xml:lang="en"><narrative>ICT</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000261" percentage="20" xml:lang="en"><narrative>ICT Solutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="30" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="30" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">373333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">373333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">373333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">373333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">373333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">373333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">373333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">373333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">373333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">373333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">373333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">373333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">994166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">994166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">994166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">994166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">994166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">994166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">994166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">994166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">994166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">994166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">994166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">994166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">1653333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">1653333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">1653333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">1653333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">1653333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">1653333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">1653333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">1653333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">1653333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">1653333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">1653333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">1653333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">817500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">817500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">817500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">817500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">817500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">817500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">817500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">817500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">817500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">817500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">817500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">817500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">637500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">637500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">637500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">637500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">637500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">637500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">637500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">637500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">637500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">637500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">637500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">637500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">107500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">107500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">107500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">107500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">107500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">107500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">107500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">107500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">107500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">107500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">107500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">107500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">373333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">373333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">373333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">373333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">373333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">373333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">373333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">373333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">373333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">373333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">373333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">373333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">994166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">994166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">994166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">994166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">994166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">994166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">994166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">994166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">994166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">994166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">994166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">994166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">1653333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">1653333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">1653333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">1653333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">1653333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">1653333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">1653333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">1653333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">1653333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">1653333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">1653333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">1653333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">817500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">817500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">817500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">817500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">817500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">817500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">817500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">817500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">817500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">817500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">817500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">817500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">637500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">637500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">637500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">637500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">637500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">637500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">637500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">637500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">637500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">637500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">637500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">637500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">107500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">107500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">107500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">107500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">107500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">107500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">107500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">107500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">107500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">107500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">107500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">107500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">55000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">55000000.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">55000000</value><description xml:lang="en"><narrative>Total Commitment in January Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-22786"><narrative>Superintendencia de Administracion Tributaria</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-55000000</value><description xml:lang="en"><narrative>Total Commitment Cancellations in March Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-22786"><narrative>Superintendencia de Administracion Tributaria</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P153366"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P153366?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P153366"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Use of virtual taxpayer services
</narrative></title>
<baseline year="2016" iso-date="2016-12-31" value="26.20"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-12-31" />
<period-end iso-date="2022-03-31" />
<target value="37.00">

</target>
<actual value="26.20">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Effectiveness of tax appeal procedures
</narrative></title>
<baseline year="2016" iso-date="2016-12-31" value="80.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-12-31" />
<period-end iso-date="2023-03-31" />
<target value="82.50">

</target>
<actual value="80.50">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
SAT Staff Organizational Environment Perception
</narrative></title>
<baseline year="2017" iso-date="2017-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-31" />
<period-end iso-date="2023-03-31" />
<target value="30.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
ICT disaster recovery timeframe
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2023-03-31" />
<target value="8.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increased compliance with taxes through reduction in VAT gross compliance gap
</narrative></title>
<baseline year="2016" iso-date="2016-11-29" value="34.20"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-29" />
<period-end iso-date="2023-03-31" />
<target value="26.00">

</target>
<actual value="34.20">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Availability of the Technology Platform
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="99.47"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2023-03-31" />
<target value="99.52">

</target>
<actual value="99.47">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction of stop-filers
</narrative></title>
<baseline year="2016" iso-date="2016-11-29" value="14.49"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-29" />
<period-end iso-date="2023-03-31" />
<target value="9.49">

</target>
<actual value="14.49">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Effectiveness of Tax Audits
</narrative></title>
<baseline year="2016" iso-date="2016-12-31" value="40.93"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-12-31" />
<period-end iso-date="2023-03-31" />
<target value="80.00">

</target>
<actual value="40.93">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Clearance time of definitive import declarations
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="2.81"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2023-03-31" />
<target value="1.50">

</target>
<actual value="2.81">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increased effectiveness of customs controls/inspections
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="6.30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2023-03-31" />
<target value="14.00">

</target>
<actual value="6.30">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increased compliance with taxes through reduction in VAT gross compliance gap
</narrative></title>
<baseline year="2016" iso-date="2016-12-31" value="33.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-12-31" />
<period-end iso-date="2023-12-31" />
<target value="26.00">

</target>
<actual value="32.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction of Tax Administrative Cost
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="1.81"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2023-03-31" />
<target value="1.72">

</target>
<actual value="1.81">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Strengthened credibility of the countrys tax administration system
</narrative></title>
<baseline year="2017" iso-date="2017-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-31" />
<period-end iso-date="2023-03-31" />
<target value="20.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Use of e-invoice business to business
</narrative></title>
<baseline year="2017" iso-date="2017-03-31" value="0.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-31" />
<period-end iso-date="2023-03-31" />
<target value="100.00">

</target>
<actual value="0.50">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implementation of the Internal Affairs Unit
</narrative></title>
<baseline year="2017" iso-date="2017-03-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-31" />
<period-end iso-date="2023-03-31" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-23T20:24:13" hierarchy="1"><iati-identifier>44000-P133738</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Enhanced Fiscal and Financial Management for Greater Opportunities DPL</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[ The Program Development Objective of the Development Policy Loan (DPL) series is to support the Government of Guatemala to (i) strengthen tax administration and tax policy; (ii) strengthen budget management and increase the results orientation of public spending; and (iii) improve the management and coordination of social policies. ]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Enhanced Fiscal and Financial Management for Greater Opportunities Development Policy Loan (DPL) Project for Guatemala is to support the Government of Guatemala to: (i) strengthen tax administration and tax policy; (ii) strengthen budget management and increase the results orientation of public spending; and (iii) improve the management and coordination of social policies. This program document provides a second DPL in the amount of United States (U.S.) 340 million dollars to the Republic of Guatemala. This operation complements efforts of other development partners, and builds on lessons learned and progress achieved under previous World Bank operations. It helps consolidate a set of cross-sectorial policies intended to support a more efficient delivery of quality public services. At the same time, this operation aims to establish a foundation for progress in the medium- to long-term. In particular, new initiatives include enhancements to the organizational structure of the tax administration superintendence (superintendencia de la administracion tributaria, SAT), the creation of a department of international taxation within the ministry of finance (ministerio de finanzas publicas, MINFIN), and mandating the use of the single treasury account and the integrated financial management system (SIAF) for all budgetary transactions, thereby increasing the transparency and monitoring of public spending. In addition, to enhance its policy dialogue, the World Bank Group is engaged in a series of analytical and advisory activities in support of envisaged reforms in this DPL in the areas of economic governance, poverty and equity monitoring, and competitiveness.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="GT-COA-0012000"><narrative>Ministry of Public Finance</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2013-07-18"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2014-06-17"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2015-03-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2015-03-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Marco Hernandez</narrative></person-name><telephone>+1-202-473-1000</telephone><email>marcohernandez@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>




<recipient-country code="GT" percentage="100"><narrative xml:lang="en">GUATEMALA</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3598132" />
                <name><narrative>Guatemala City</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>14.64072 -90.513268</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="15117" percentage="50" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="50" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="29.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="71.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000523" percentage="14" xml:lang="en"><narrative>Social protection delivery systems</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000052" percentage="14" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000067" percentage="14" xml:lang="en"><narrative>Nutrition and Food Security</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="15" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000411" percentage="15" xml:lang="en"><narrative>Public Expenditure Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000067" percentage="14" xml:lang="en"><narrative>Nutrition and Food Security</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000523" percentage="14" xml:lang="en"><narrative>Social protection delivery systems</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="15" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="37" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000411" percentage="15" xml:lang="en"><narrative>Public Expenditure Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000671" percentage="7" xml:lang="en"><narrative>Nutrition</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000052" percentage="14" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="15" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000114" percentage="22" xml:lang="en"><narrative>Tax policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000067" percentage="14" xml:lang="en"><narrative>Nutrition and Food Security</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="100" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="15" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">340000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">340000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">340000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-12000"><narrative>Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-01-31"/><value value-date="2015-01-31">340000000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-12000"><narrative>Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">0</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-12000"><narrative>Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-01-31"/><value value-date="2015-01-31">-850000</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-12000"><narrative>Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">-6245065</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-12000"><narrative>Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-5202000</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-12000"><narrative>Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-5236000</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-12000"><narrative>Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-5304000</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-12000"><narrative>Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-5355000</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-12000"><narrative>Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-5372000</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-12000"><narrative>Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-5389000</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-12000"><narrative>Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-5423000</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-12000"><narrative>Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-5457000</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-12000"><narrative>Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-5440000</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-12000"><narrative>Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-5423000</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-12000"><narrative>Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-5457000</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-12000"><narrative>Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-5491000</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-12000"><narrative>Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-5508000</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-12000"><narrative>Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-5525000</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-12000"><narrative>Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-5508000</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-12000"><narrative>Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-5406000</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-12000"><narrative>Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-5508000</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-12000"><narrative>Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-5576000</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-12000"><narrative>Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-5291716</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-12000"><narrative>Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-5109432</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-12000"><narrative>Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-4927147</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-12000"><narrative>Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-11322000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-12000"><narrative>Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-11322000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-12000"><narrative>Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-11322000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-12000"><narrative>Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-11322000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-12000"><narrative>Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P133738"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P133738?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P133738"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-23T20:24:13" hierarchy="1"><iati-identifier>44000-P112011</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>GT Enhancing MSME Productivity Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The objective of the Project is to stimulate growth of MSMEs in Selected Value Chains.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Enhancing Micro, Small and Medium Enterprise (MSME) Productivity Project for Guatemala is to stimulate the growth of MSMEs in selected value chains. This will be achieved by supporting investments and technical assistance to enhance their productivity, improve the quality of their products and processes, and facilitate their integration into the national and international markets. There are three components to the project. The first component of the project is improving and promoting business development services. This component supports to strengthening Ministry of Economy's (MINECO's) capacity to lead and coordinate the development efforts of the public and private sectors in support of MSMEs, based on existing national policies, including strengthening Business Development Services (BDS), supporting pilots for the development and implementation of new products to increase access to BDS and financial services, and strengthening MINECO's Vice Ministry for MSMEs. The second component of the project is creating productive value chains. This component supports to improving the competitiveness of MSMEs through the provision of technical assistance and training to beneficiaries to facilitate the design of sub-project proposals; and sub-grants to beneficiaries operating in the selected value chains for the carrying out of subprojects. The third component of the project is project management and monitoring. This component supports the provision of technical assistance, equipment, training and operational costs to the project implementation unit, including the hiring of technical staff to manage the fiduciary, technical, and safeguards aspects of the project, monitor the physical progress of the project and the impact of project activities.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="GT-COA-0002388"><narrative>Ministry of Economy</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2009-12-03"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2011-03-03"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2016-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2016-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Cristian Quijada Torres</narrative></person-name><telephone>+1-202-473-1000</telephone><email>cquijadatorres@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>


<recipient-country code="GT" percentage="100"><narrative xml:lang="en">GUATEMALA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003587571" />
            <name><narrative>Zaculeu</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.33333 -91.48333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003587586" />
            <name><narrative>Departamento de Zacapa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15 -89.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003588258" />
            <name><narrative>Totonicapán</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.91167 -91.361107</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003588369" />
            <name><narrative>Tikal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>17.22529 -89.611702</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003588668" />
            <name><narrative>Departamento de SuchitepEquez</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.38084 -91.430458</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003588697" />
            <name><narrative>Departamento de Sololá</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.66667 -91.25</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589172" />
            <name><narrative>Departamento de Santa Rosa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.16667 -90.300003</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589801" />
            <name><narrative>Departamento de San Marcos</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15 -91.916672</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590686" />
            <name><narrative>Departamento de SacatepEquez</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.58333 -90.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590857" />
            <name><narrative>Departamento de Retalhuleu</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.33333 -91.833328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590939" />
            <name><narrative>Quiriguá Viejo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.31667 -89.083328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590964" />
            <name><narrative>Departamento del QuichE</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.5 -90.916672</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590979" />
            <name><narrative>Quetzaltenango</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.83472 -91.518059</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003591410" />
            <name><narrative>Departamento del PetEn</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>16.83333 -90</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003595067" />
            <name><narrative>Departamento de Jutiapa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.16667 -89.833328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003595236" />
            <name><narrative>Departamento de Jalapa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.58333 -89.916672</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003595259" />
            <name><narrative>Departamento de Izabal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.5 -89</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003595416" />
            <name><narrative>Huehuetenango</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.31972 -91.470833</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003595803" />
            <name><narrative>Escuintla</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.305 -90.785004</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003598464" />
            <name><narrative>Departamento de Chiquimula</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.66667 -89.416672</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003598572" />
            <name><narrative>Chimaltenango</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.66111 -90.819443</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003598655" />
            <name><narrative>Chichicastenango</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.93333 -91.116669</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003599602" />
            <name><narrative>Departamento de Baja Verapaz</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.08333 -90.333328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003599629" />
            <name><narrative>Atitán</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>13.93583 -90.70472</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003599699" />
            <name><narrative>Antigua Guatemala</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.56111 -90.734444</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003599773" />
            <name><narrative>Departamento de Alta Verapaz</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.66667 -90</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003596779" />
            <name><narrative>El Mirador</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.78333 -91.099998</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003596416" />
            <name><narrative>Departamento de El Progreso</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.83333 -90</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003595528" />
            <name><narrative>Republic of Guatemala</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.5 -90.25</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003593912" />
            <name><narrative>Las Flores</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.81667 -89.23333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003593376" />
            <name><narrative>Livingston</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.82826 -88.750389</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003734186" />
            <name><narrative>Rio Dulce</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.77333 -91.250557</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><sector vocabulary="1" code="25010" percentage="100" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YF" percentage="24.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Industry, Trade and Services</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YA" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Agricultural markets, commercialization and agri-business</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="FA" percentage="5.00000000" xml:lang="en"><narrative>FY17 - Banking Institutions</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="FL" percentage="2.00000000" xml:lang="en"><narrative>FY17 - Other Non-bank Financial Institutions</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YZ" percentage="59.0000000" xml:lang="en"><narrative>FY17 - Other Industry, Trade and Services</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000023" percentage="10" xml:lang="en"><narrative>Public Private Partnerships</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000243" percentage="38" xml:lang="en"><narrative>MSME Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000023" percentage="10" xml:lang="en"><narrative>Public Private Partnerships</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="100" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000323" percentage="38" xml:lang="en"><narrative>MSME Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000323" percentage="38" xml:lang="en"><narrative>MSME Finance</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">27497617.16</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">27497617.16</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2011-03-31"/><value value-date="2011-03-31">32000000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-2388"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">-25000000</value><description xml:lang="en"><narrative>Total Commitment Cancellations in February Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-2388"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-2497617</value><description xml:lang="en"><narrative>Total Commitment Cancellations in March Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-2388"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">80000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-2388"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-07-31"/><value value-date="2013-07-31">1400000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-2388"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">300000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-2388"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">625488</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-2388"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">450000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-2388"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">1700000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-2388"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">50000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-2388"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-103105</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-2388"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">-80000</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-2388"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-04-30"/><value value-date="2013-04-30">-399</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-2388"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">-6466</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-2388"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">-10176</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-2388"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">-9931</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-2388"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">-11164</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-2388"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">-17045</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-2388"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">-65993</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-2388"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">-77278</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-2388"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">-76622</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-2388"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">-76090</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-2388"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">-76090</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-2388"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">-76090</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-2388"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">-76090</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-2388"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-76090</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-2388"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-76090</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-2388"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-76090</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-2388"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-76090</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-2388"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-73556</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-2388"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-71023</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-2388"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-68489</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-2388"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-65955</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-2388"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-63421</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-2388"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-60887</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-2388"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-58354</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-2388"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-55820</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-2388"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-53286</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-2388"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-50752</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-2388"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-149929</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-2388"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-149929</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-2388"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-149929</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-2388"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-149929</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-2388"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-149929</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-2388"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-149929</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-2388"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-149929</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-2388"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-149929</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-2388"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-149929</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-2388"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-149929</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-2388"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-149929</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-2388"><narrative>Ministry of Economy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P112011"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P112011?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P112011"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
MINECO Personnel Trained
</narrative></title>
<baseline year="2014" iso-date="2014-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-01-01" />
<period-end iso-date="2016-04-30" />
<target value="175.00">

</target>
<actual value="149.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of MSMEs that have received support from at least one activity implemented by the project
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2016-04-30" />
<target value="400.00">

</target>
<actual value="451.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of municipalities where MSMEs can receive BDS provided by the MSME directorate.
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="94.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2017-12-29" />
<target value="185.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Competitiveness Subproject Proposals
</narrative></title>
<baseline year="2014" iso-date="2014-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-01-01" />
<period-end iso-date="2016-04-30" />
<target value="12.00">

</target>
<actual value="9.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of MSMEs that receive business development services provided by BDS Units
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="94.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2016-04-30" />
<target value="370.00">

</target>
<actual value="396.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Microfinance Institutions registered in the new Microfinance Registry.
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2017-12-29" />
<target value="80.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Value Chain Strategic Plans
</narrative></title>
<baseline year="2014" iso-date="2014-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-01-01" />
<period-end iso-date="2016-04-30" />
<target value="6.00">

</target>
<actual value="6.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of BDS providers validated, categorized and registered in the new BDS online database.
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2017-12-29" />
<target value="300.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of MSMEs that have received support from at least one activity of support from the project
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="0.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Training in Good Manufacturing and Business Practices
</narrative></title>
<baseline year="2014" iso-date="2014-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-01-01" />
<period-end iso-date="2016-04-30" />
<target value="28.00">

</target>
<actual value="28.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of MSMEs that receive business development services provided by BDS Units
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="94.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2016-04-30" />
<target value="370.00">

</target>
<actual value="396.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
MINECO Personnel Trained
</narrative></title>
<baseline year="2014" iso-date="2014-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-01-01" />
<period-end iso-date="2016-04-30" />
<target value="175.00">

</target>
<actual value="188.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Competitiveness Subproject Proposals
</narrative></title>
<baseline year="2014" iso-date="2014-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-01-01" />
<period-end iso-date="2016-04-30" />
<target value="12.00">

</target>
<actual value="17.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of project beneficiaries that implement clean production improvements
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2017-12-29" />
<target value="18.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of MSMEs that have received support from at least one activity implemented by the project
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2016-04-30" />
<target value="400.00">

</target>
<actual value="451.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Formalization of MSMEs
</narrative></title>
<baseline year="2014" iso-date="2014-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-01-01" />
<period-end iso-date="2016-04-30" />
<target value="30.00">

</target>
<actual value="15.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in revenue of MSMEs in  value chains selected for project support
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2017-12-29" />
<target value="20.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of normalization, certification, accreditation, and metrology verification services provided to MSMEs.
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2017-12-31" />
<target value="475.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of MSMEs receiving services from project activities relative to the total number of firms in selected value chains-agrobusiness
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2017-12-29" />
<target value="30.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of calibration and testing services provided to MSMEs
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2017-12-31" />
<target value="450.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of MSMEs receiving services from project activities relative to the total number of firms in selected value chains-tourism
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2017-12-29" />
<target value="20.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Formalization of MSMEs
</narrative></title>
<baseline year="2014" iso-date="2014-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-01-01" />
<period-end iso-date="2016-04-30" />
<target value="30.00">

</target>
<actual value="27.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Training in Good Manufacturing and Business Practices
</narrative></title>
<baseline year="2014" iso-date="2014-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-01-01" />
<period-end iso-date="2016-04-30" />
<target value="28.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Value Chain Strategic Plans
</narrative></title>
<baseline year="2014" iso-date="2014-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-01-01" />
<period-end iso-date="2016-04-30" />
<target value="6.00">

</target>
<actual value="6.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-23T20:24:13" hierarchy="1"><iati-identifier>44000-P131763</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>First Programmatic Development Policy Loan</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Program Development Objective of the DPL series is to support the Guatemalan Government in creating fiscal space and expanding opportunities for the most vulnerable segments of society.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the First Programmatic Development Policy Loan Project for Guatemala is to support the Guatemalan Government in creating fiscal space and expanding opportunities for the most vulnerable segments of society. This programmatic series of Development Policy Loans (DPLs) will support the Government's reform agenda in three areas: (i) strengthening tax administration and tax policy; (ii) enhancing the quality of public expenditure; and (iii) improving the coordination and management of social policy.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="GT–P0009984"><narrative>Ministry of Public Finance</narrative></participating-org><participating-org role="2" xml:lang="en" ref="GT–P0009984"><narrative>Ministry of Public Finance</narrative></participating-org><participating-org role="2" xml:lang="en" ref="GT–P0009984"><narrative>Ministry of Public Finance</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="GT-COA-0009983"><narrative>Directorate of Public Credit, Ministry of Public Finance</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2012-09-27"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2012-09-27"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2013-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2013-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Marco Hernandez</narrative></person-name><telephone>+1-202-473-1000</telephone><email>marcohernandez@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>







<recipient-country code="GT" percentage="100"><narrative xml:lang="en">GUATEMALA</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3598132" />
                <name><narrative>Guatemala City</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>14.64072 -90.513268</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="15117" percentage="33" xml:lang="en"/><sector vocabulary="1" code="16050" percentage="33" xml:lang="en"/><sector vocabulary="1" code="15150" percentage="33" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="58.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="17.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="25.0000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="28" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000067" percentage="14" xml:lang="en"><narrative>Nutrition and Food Security</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000067" percentage="14" xml:lang="en"><narrative>Nutrition and Food Security</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000011" percentage="25" xml:lang="en"><narrative>Fiscal Policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="3" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="17" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="3" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="17" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="14" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000411" percentage="3" xml:lang="en"><narrative>Public Expenditure Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000671" percentage="7" xml:lang="en"><narrative>Nutrition</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000114" percentage="25" xml:lang="en"><narrative>Tax policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000411" percentage="3" xml:lang="en"><narrative>Public Expenditure Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="3" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000513" percentage="17" xml:lang="en"><narrative>Participation and Civic Engagement</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000635" percentage="14" xml:lang="en"><narrative>Reproductive and Maternal Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="100" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000067" percentage="14" xml:lang="en"><narrative>Nutrition and Food Security</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000635" percentage="14" xml:lang="en"><narrative>Reproductive and Maternal Health</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">200000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">200000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2012-09-30"/><value value-date="2012-09-30">200000000</value><description xml:lang="en"><narrative>Total Commitment in September Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-9983"><narrative>Directorate of Public Credit, Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">200000000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-9983"><narrative>Directorate of Public Credit, Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">0</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-9983"><narrative>Directorate of Public Credit, Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">-500000</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-9983"><narrative>Directorate of Public Credit, Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">-2665519</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-9983"><narrative>Directorate of Public Credit, Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">-4590000</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-9983"><narrative>Directorate of Public Credit, Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">-4590000</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-9983"><narrative>Directorate of Public Credit, Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">-4590000</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-9983"><narrative>Directorate of Public Credit, Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-4590000</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-9983"><narrative>Directorate of Public Credit, Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-4590000</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-9983"><narrative>Directorate of Public Credit, Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-4590000</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-9983"><narrative>Directorate of Public Credit, Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-4590000</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-9983"><narrative>Directorate of Public Credit, Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-4590000</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-9983"><narrative>Directorate of Public Credit, Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-4590000</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-9983"><narrative>Directorate of Public Credit, Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-4590000</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-9983"><narrative>Directorate of Public Credit, Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-4590000</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-9983"><narrative>Directorate of Public Credit, Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-4590000</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-9983"><narrative>Directorate of Public Credit, Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-4590000</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-9983"><narrative>Directorate of Public Credit, Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-4590000</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-9983"><narrative>Directorate of Public Credit, Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-4590000</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-9983"><narrative>Directorate of Public Credit, Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-4590000</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-9983"><narrative>Directorate of Public Credit, Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-4590000</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-9983"><narrative>Directorate of Public Credit, Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-4590000</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-9983"><narrative>Directorate of Public Credit, Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-4437153</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-9983"><narrative>Directorate of Public Credit, Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-4284306</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-9983"><narrative>Directorate of Public Credit, Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-4131459</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-9983"><narrative>Directorate of Public Credit, Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-3978612</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-9983"><narrative>Directorate of Public Credit, Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-3825765</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-9983"><narrative>Directorate of Public Credit, Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-3672918</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-9983"><narrative>Directorate of Public Credit, Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-6660000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-9983"><narrative>Directorate of Public Credit, Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-6660000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-9983"><narrative>Directorate of Public Credit, Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-6660000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-9983"><narrative>Directorate of Public Credit, Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-6660000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-9983"><narrative>Directorate of Public Credit, Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-6660000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-9983"><narrative>Directorate of Public Credit, Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-6660000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-9983"><narrative>Directorate of Public Credit, Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-6660000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-9983"><narrative>Directorate of Public Credit, Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P131763"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P131763?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P131763"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Major social programs are included in the Unique Beneficiary Registry
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2013-12-31" />
<target value="3.00">

</target>
<actual value="0.00">
<comment><narrative>
Advances have been made with regards to MIDES' institutional structure, with the appointment of two vice ministers (socialprotection; policy, planning and evaluation). A Unique Beneficiary Registry is being set up and will include major social programs.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of children under 1 year old in 83 prioritized municipalities who receive the appropriate growth promotion package of services for their age
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2013-12-31" />
<target value="10.00">

</target>
<actual value="0.00">
<comment><narrative>
The Government has defined a list of indicators in line with the results-based management agreement, and has taken steps to set upa monitoring an evaluation framework for priority health programs. A database to measure the percentage of children who receiveappropriate growth promotion packages is being prepared but is not yet operational. An updated value for this indicators is not yetavailable.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in tax collections as a share of GDP
</narrative></title>
<baseline year="2011" iso-date="2011-12-31" value="11.00"><comment><narrative>Cumulative value for 2011</narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-31" />
<period-end iso-date="2013-12-31" />
<target value="12.00">

</target>
<actual value="10.85">
<comment><narrative>
Annual cumulative tax collections in 2012 were 10.85 percent of 2012 GDP. Only a small part of the 2012 tax reforms was effectivein 2012; an income tax reform became effective in January 2013. A fall in import values led to a weak performance in import tariffsand import-related VAT collections. Cumulative tax collections between January-April 2013 were 3.83 percent of the projected GDPfor 2013. (Source: SAT). Annual cumulative tax collection for 2013 is estimated at around 11.4 percent of GDP.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the tax base by 8 percent
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2013-12-31" />
<target value="8.00">

</target>
<actual value="8.33">
<comment><narrative>
The tax base - defined as the number of taxpayers paying any taxes to SAT (i.e., effective tax payers and tax payers subject toretention) increased from 1.8 million in 2011 to 1.95 million in 2012. In 2012 the SAT updated the tax base, including eliminatingduplicates in the tax payers database. (Source: SAT.)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in the number of audits of exports and imports
</narrative></title>
<baseline year="2011" iso-date="2011-12-31" value="346.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-31" />
<period-end iso-date="2013-12-31" />
<target value="519.00">

</target>
<actual value="1252.00">
<comment><narrative>
In 2012 the total number of audits of exports and imports was 452. In addition, in 2012 there were a total of 837 verifications(joint operatives) for imports and exports. (Source: SAT).
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Tax information is exchanged with other countries as twelve tax information sharing agreements have been signed
</narrative></title>
<baseline year="2011" iso-date="2011-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-31" />
<period-end iso-date="2013-12-31" />
<target value="12.00">

</target>
<actual value="7.00">
<comment><narrative>
In addition to the seven agreements already signed, a draft TIEA has been agreed upon with Australia, but its signature is pendingprocedural steps to be taken by the Australian Government. In 2012 Guatemala signed the Agreement on Mutual Assistance andTechnicalCooperation between the Tax and Customs Administrations in Central America (equivalent to an additional 4 TIEAs).  Inaddition, in December 2012 the Guatemalan government signed the OECD Multilateral Convention on Mutual Administrative Assistance inTax Matters. This now allows Guatemala to exchange tax information with 45 countries including including with the USA and Mexico.The OECD has moved Guatemala from the &quot;gray list&quot; to the list of countries that have made substantial progress in terms oftransparency in tax matters. (Source: SAT.)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
CES holds regular meetings to discuss public policies
</narrative></title>
<baseline year="2011" iso-date="2011-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-31" />
<period-end iso-date="2013-12-31" />
<target value="Yes">

</target>
<actual value="Yes">
<comment><narrative>
CES held 6 assemblies in 2012 and is scheduled to hold 24 assemblies in 2013. Two commissions have been  created inside the CES(Rural Development, and Employment). CES also produced in 2013 an annual report on the economic and social context in Guatemala.(Source: CES).
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Zero Hunger offices established in priority municipalities with the highest incidence of chronic malnutrition
</narrative></title>
<baseline year="2011" iso-date="2011-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-31" />
<period-end iso-date="2013-12-31" />
<target value="100.00">

</target>
<actual value="0.00">
<comment><narrative>
The Government has at least one representative of the Zero Hunger Program in 151 municipalities in Guatemala.  A malnutritionsurvey was completed in cooperation with the National Institute of Statistics. A baseline for the monitoring of the program wasestablished.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of women in 83 prioritized municipalities who are attended to during labor in facilities of the Ministry of Public Health and Social Assistance by qualified providers
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2013-12-31" />
<target value="15.00">

</target>
<actual value="0.00">
<comment><narrative>
The Government has defined a list of indicators in line with the results-based management agreement, and has taken steps to set upa monitoring an evaluation framework for priority health programs. A database to measure the percentage of women who are attendedduring labor by qualified providers is being prepared but is not yet operational. An updated value for this indicators is not yetavailable.
</narrative></comment>
</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-23T20:24:13" hierarchy="1"><iati-identifier>44000-P505784</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Third Guatemala Development Policy Loan for Disaster Risk Management with a Catastrophe Deferred Drawdown Option (CAT DDO)</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To support the Government of Guatemala in: (i) strengthening the institutional capacity for inclusive DRM and CCA, including financial support for vulnerable groups; and (ii) mainstreaming DRM and CCA in selected sectors]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Third Disaster Risk Management (DRM) Development Policy Loan with a Catastrophe Deferred Drawdown Option (CAT DDO) Project for Guatemala is to support the Government of Guatemala (GoG) in: (i) strengthening the institutional capacity for inclusive DRM and climate change adaptation (CCA), including financial support for vulnerable groups; and (ii) mainstreaming DRM and CCA in selected sectors. It builds on the successes and lessons learned from two previous CAT DDOs, approved in 2009 and 2019, and over 15 years of partnership between the GoG and the World Bank on disaster and climate risk management. this operation is expected to be a key component of the GoG's disaster risk financing strategy (DRFS), serving as one of the few and preferred instruments available to the government for emergency response. It will enable rapid resource mobilization after extreme natural events, thereby mitigating budget shocks, facilitating recovery processes, and fostering macro-fiscal stability. Additionally, this operation will enhance the DRM policy framework by promoting the adoption of a multisectoral approach that devolves DRM and CCA responsibilities to line ministries and relevant sectoral agencies. The policy reform supported by this CAT DDO will also expand the country's social protection (SP) system to better safeguard vulnerable households against hazards and sudden income loss and improve their capacity to manage risks.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="GT–00008190"><narrative>Republic of Guatemala</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="GT-COA-00006457"><narrative> Ministry of Public Finance</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2025-09-24"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2025-09-24"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2029-08-28"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2029-08-28"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Giuliana De Mendiola Ramirez</narrative></person-name><telephone>+1-202-473-1000</telephone><email>gdemendiolaram@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="GT" percentage="100"><narrative xml:lang="en">GUATEMALA</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3598132" />
                <name><narrative>Guatemala City</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>14.64072 -90.513268</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="74020" percentage="70" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="70" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="70" xml:lang="en"/><sector vocabulary="1" code="32161" percentage="10" xml:lang="en"/><sector vocabulary="1" code="32161" percentage="10" xml:lang="en"/><sector vocabulary="1" code="32161" percentage="10" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="10" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="10" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="10" xml:lang="en"/><sector vocabulary="1" code="21011" percentage="10" xml:lang="en"/><sector vocabulary="1" code="21011" percentage="10" xml:lang="en"/><sector vocabulary="1" code="21011" percentage="10" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TTI" percentage="20.0000000" xml:lang="en"><narrative>Rural and Inter-Urban Roads</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SSA" percentage="20.0000000" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YYA" percentage="10.0000000" xml:lang="en"><narrative>Agricultural Markets, Commercialization, Agri-Business and Agriculture finance </narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BBH" percentage="20.0000000" xml:lang="en"><narrative>Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BBZ" percentage="20.0000000" xml:lang="en"><narrative>Other - Public Administration</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AAK" percentage="10.0000000" xml:lang="en"><narrative>Public Administration - Agriculture, Fishing, and Forestry </narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-28"/>
<value currency="USD" value-date="2029-08-28">430000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-28"/>
<value currency="USD" value-date="2029-08-28">430000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-28"/>
<value currency="USD" value-date="2029-08-28">430000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-28"/>
<value currency="USD" value-date="2029-08-28">430000000.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">430000000</value><description xml:lang="en"><narrative>Total Commitment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-6457"><narrative> Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P505784"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P505784?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P505784"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
1.b: Percentage increase in the participation of girls, boys, and adolescents in territorial dialogue platforms focused on comprehensive risk management
</narrative></title>
<baseline year="2024" iso-date="2024-11-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-13" />
<period-end iso-date="2028-05-14" />
<target value="40">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
3.a: Number of new agricultural hectares with resilient irrigation infrastructure
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2028-05-13" />
<target value="6,000">

</target>
<actual value="10">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
1.b: Percentage increase in the participation of girls, boys, and adolescents in territorial dialogue platforms focused on comprehensive risk management
</narrative></title>
<baseline year="2024" iso-date="2024-11-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-13" />
<period-end iso-date="2028-05-14" />
<target value="40">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.a: Number of female-headed households registered in the social registry
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="29,075"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2028-05-13" />
<target value="123,847">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
4.a: Number of kilometers of priority infrastructure that have been maintained, rehabilitated, or reconstructed with enhanced resilience and climate adaptation measures
</narrative></title>
<baseline year="2025" iso-date="2025-05-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-14" />
<period-end iso-date="2028-05-14" />
<target value="300">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
5.a:  Number of households that have improved their access to resilient basic services and/or infrastructure through neighborhood upgrading interventions
</narrative></title>
<baseline year="2025" iso-date="2025-05-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-14" />
<period-end iso-date="2028-05-14" />
<target value="3,000">

</target>
<actual value="350">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
3.a: Number of new agricultural hectares with resilient irrigation infrastructure
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2028-05-13" />
<target value="6,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.a: Number of public entities that have integrated and budgeted for Disaster Risk Management (DRM) using the thematic classifiers
</narrative></title>
<baseline year="2025" iso-date="2025-05-14" value="2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-14" />
<period-end iso-date="2028-05-14" />
<target value="8">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.a: Number of public entities that have integrated and budgeted for Disaster Risk Management (DRM) using the thematic classifiers
</narrative></title>
<baseline year="2025" iso-date="2025-05-14" value="2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-14" />
<period-end iso-date="2028-05-14" />
<target value="8">

</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
1.b: Percentage increase in the participation of girls, boys, and adolescents in territorial dialogue platforms focused on comprehensive risk management
</narrative></title>
<baseline year="2024" iso-date="2024-11-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-13" />
<period-end iso-date="2028-05-14" />
<target value="40">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
1.b: Percentage increase in the participation of girls, boys, and adolescents in territorial dialogue platforms focused on comprehensive risk management
</narrative></title>
<baseline year="2024" iso-date="2024-11-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-13" />
<period-end iso-date="2028-05-14" />
<target value="40">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
3.a: Number of new agricultural hectares with resilient irrigation infrastructure
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2028-05-13" />
<target value="6,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
3.a: Number of new agricultural hectares with resilient irrigation infrastructure
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2028-05-13" />
<target value="6,000">

</target>
<actual value="10">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
4.a: Number of kilometers of priority infrastructure that have been maintained, rehabilitated, or reconstructed with enhanced resilience and climate adaptation measures
</narrative></title>
<baseline year="2025" iso-date="2025-05-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-14" />
<period-end iso-date="2028-05-14" />
<target value="300">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
4.a: Number of kilometers of priority infrastructure that have been maintained, rehabilitated, or reconstructed with enhanced resilience and climate adaptation measures
</narrative></title>
<baseline year="2025" iso-date="2025-05-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-14" />
<period-end iso-date="2028-05-14" />
<target value="300">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
5.a:  Number of households that have improved their access to resilient basic services and/or infrastructure through neighborhood upgrading interventions
</narrative></title>
<baseline year="2025" iso-date="2025-05-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-14" />
<period-end iso-date="2028-05-14" />
<target value="3,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
5.a:  Number of households that have improved their access to resilient basic services and/or infrastructure through neighborhood upgrading interventions
</narrative></title>
<baseline year="2025" iso-date="2025-05-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-14" />
<period-end iso-date="2028-05-14" />
<target value="3,000">

</target>
<actual value="350">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.a: Number of female-headed households registered in the social registry
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="29,075"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2028-05-13" />
<target value="123,847">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.a: Number of female-headed households registered in the social registry
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="29,075"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2028-05-13" />
<target value="123,847">

</target>
<actual value="202,390">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.a: Number of female-headed households registered in the social registry
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="29,075"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2028-05-13" />
<target value="123,847">

</target>
<actual value="202,390">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.a: Number of public entities that have integrated and budgeted for Disaster Risk Management (DRM) using the thematic classifiers
</narrative></title>
<baseline year="2025" iso-date="2025-05-14" value="2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-14" />
<period-end iso-date="2028-05-14" />
<target value="8">

</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
4.a: Number of kilometers of priority infrastructure that have been maintained, rehabilitated, or reconstructed with enhanced resilience and climate adaptation measures
</narrative></title>
<baseline year="2025" iso-date="2025-05-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-14" />
<period-end iso-date="2028-05-14" />
<target value="300">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
5.a:  Number of households that have improved their access to resilient basic services and/or infrastructure through neighborhood upgrading interventions
</narrative></title>
<baseline year="2025" iso-date="2025-05-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-14" />
<period-end iso-date="2028-05-14" />
<target value="3,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.a: Number of public entities that have integrated and budgeted for Disaster Risk Management (DRM) using the thematic classifiers
</narrative></title>
<baseline year="2025" iso-date="2025-05-14" value="2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-14" />
<period-end iso-date="2028-05-14" />
<target value="8">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-23T20:24:13" hierarchy="1"><iati-identifier>44000-P087106</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>LAND ADMINISTRATION II APL</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The objective of the Project is to foster the process of achieving land tenure security in the Project Area through the provision of efficient and accessible cadastral and land administration services.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The second land administration project for Guatemala aims to foster the process of achieving land tenure security in seven new departments (Alta Verapaz, Baja Verapaz, Chiquimula, Escuintla, Izabal, Sacatepequez, and Zacapa) and the municipality of Palachum in the Department of Quiche, through the provision of efficient and accessible cadastral and land administration services. The project consists of the following components: 1: This component will carry out the cadastral and limited land regularization processes in the project area. 2: This component will develop the framework at the national and municipal level to support the field surveys to keep cadastral information updated and incorporate it into initiatives for local development and territorial planning. 3: This component will improve the legal framework for land administration in Guatemala and strengthen the institutional capacity of the agencies involved in its application. 4: This component covers the costs of the project coordination unit, monitoring and evaluation systems, including participatory evaluation mechanisms, independent evaluations and audits, and inter-institutional coordination activities.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="GT–P0000604"><narrative>Ministry of Finance and Public Credit</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="GT-COA-0000602"><narrative>Registro de Informacion Catastral (RIC)</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2005-05-30"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2006-12-14"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2015-09-01"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2015-09-01"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Enrique Pantoja</narrative></person-name><telephone>+1-202-473-1000</telephone><email>epantoja@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>




<recipient-country code="GT" percentage="100"><narrative xml:lang="en">GUATEMALA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003587586" />
            <name><narrative>Departamento de Zacapa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15 -89.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590686" />
            <name><narrative>Departamento de Sacatepequez</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.58333 -90.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590686" />
            <name><narrative>Departamento de SacatepEquez</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.58333 -90.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590964" />
            <name><narrative>Departamento del QuichE</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.5 -90.916672</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003591410" />
            <name><narrative>Departamento del PetEn</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>16.83333 -90</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003591955" />
            <name><narrative>Pachalum</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.92472 -90.662781</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003595259" />
            <name><narrative>Departamento de Izabal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.5 -89</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003599602" />
            <name><narrative>Departamento de Baja Verapaz</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.08333 -90.333328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003599773" />
            <name><narrative>Departamento de Alta Verapaz</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.66667 -90</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003598464" />
            <name><narrative>Departamento de Chiquimula</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.66667 -89.416672</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003595802" />
            <name><narrative>Departamento de Escuintla</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.16667 -91</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="15126" percentage="66" xml:lang="en"/><sector vocabulary="1" code="15129" percentage="34" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="66.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="34.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000423" percentage="24" xml:lang="en"><narrative>Personal and Property Rights</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="13" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="13" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000042" percentage="24" xml:lang="en"><narrative>Rule of Law</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000511" percentage="13" xml:lang="en"><narrative>Indigenous People and Ethnic Minorities</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="13" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000437" percentage="9" xml:lang="en"><narrative>Municipal Institution Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000511" percentage="13" xml:lang="en"><narrative>Indigenous People and Ethnic Minorities</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2006-12-01"/>
<period-end iso-date="2006-12-31"/>
<value currency="USD" value-date="2006-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-01-01"/>
<period-end iso-date="2007-01-31"/>
<value currency="USD" value-date="2007-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-02-01"/>
<period-end iso-date="2007-02-28"/>
<value currency="USD" value-date="2007-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-03-01"/>
<period-end iso-date="2007-03-31"/>
<value currency="USD" value-date="2007-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-04-01"/>
<period-end iso-date="2007-04-30"/>
<value currency="USD" value-date="2007-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">570000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">570000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">570000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">570000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">570000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">570000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">570000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">570000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">570000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">570000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">570000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">570000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">830000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">830000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">830000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">830000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">830000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">830000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">830000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">830000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">830000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">830000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">830000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">830000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">1193333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">1193333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">1193333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">1193333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">1193333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">1193333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">1193333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">1193333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">1193333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">1193333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">1193333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">1193333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">1040000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">1040000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">1040000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">1040000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">1040000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">1040000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">1040000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">1040000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">1040000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">1040000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">1040000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">1040000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">933333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">933333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">933333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">933333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">933333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">933333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">933333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">933333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">933333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">933333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">933333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">933333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-12-01"/>
<period-end iso-date="2006-12-31"/>
<value currency="USD" value-date="2006-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-01-01"/>
<period-end iso-date="2007-01-31"/>
<value currency="USD" value-date="2007-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-02-01"/>
<period-end iso-date="2007-02-28"/>
<value currency="USD" value-date="2007-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-03-01"/>
<period-end iso-date="2007-03-31"/>
<value currency="USD" value-date="2007-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-04-01"/>
<period-end iso-date="2007-04-30"/>
<value currency="USD" value-date="2007-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">570000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">570000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">570000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">570000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">570000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">570000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">570000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">570000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">570000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">830000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">830000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">830000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">830000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">830000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">830000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">830000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">830000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">830000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">1193333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">1193333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">1193333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2015-09-01"/>
<value currency="USD" value-date="2015-09-01">12530562.60</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2015-09-01"/>
<value currency="USD" value-date="2015-09-01">12530562.60</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2006-12-31"/><value value-date="2006-12-31">62300000</value><description xml:lang="en"><narrative>Total Commitment in December Month of 2006</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">-11000000</value><description xml:lang="en"><narrative>Total Commitment Cancellations in August Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2016-01-31"/><value value-date="2016-01-31">-1530563</value><description xml:lang="en"><narrative>Total Commitment Cancellations in January Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-05-31"/><value value-date="2008-05-31">155750</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2008</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-11-30"/><value value-date="2008-11-30">1500000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2008</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-12-31"/><value value-date="2009-12-31">713211</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-02-28"/><value value-date="2010-02-28">493507</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-06-30"/><value value-date="2010-06-30">312130</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-07-31"/><value value-date="2010-07-31">669350</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-09-30"/><value value-date="2010-09-30">449452</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-11-30"/><value value-date="2010-11-30">538320</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-12-31"/><value value-date="2010-12-31">564540</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-02-28"/><value value-date="2011-02-28">2584711</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-05-31"/><value value-date="2011-05-31">1427006</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-07-31"/><value value-date="2011-07-31">1497649</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-10-31"/><value value-date="2011-10-31">2249739</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-12-31"/><value value-date="2011-12-31">1833035</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-02-29"/><value value-date="2012-02-29">1081242</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">2222448</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-08-31"/><value value-date="2012-08-31">1624673</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-09-30"/><value value-date="2012-09-30">-214204</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-10-31"/><value value-date="2012-10-31">2098884</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">1224675</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">2751374</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">1593604</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">1122660</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">1415110</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">2816619</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">916722</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-07-31"/><value value-date="2014-07-31">1647167</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">1624136</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">1186792</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">947217</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">4225981</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">3410479</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">3085459</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">0</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2008-05-31"/><value value-date="2008-05-31">-155750</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2008</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2008-09-30"/><value value-date="2008-09-30">-1380</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2008</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2009-03-31"/><value value-date="2009-03-31">-19275</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2009-09-30"/><value value-date="2009-09-30">-16502</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-03-31"/><value value-date="2010-03-31">-7523</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-09-30"/><value value-date="2010-09-30">-7044</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-03-31"/><value value-date="2011-03-31">-13674</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-09-30"/><value value-date="2011-09-30">-25664</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">-39065</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-09-30"/><value value-date="2012-09-30">-70995</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">-80991</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">-64021</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">-61790</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">-57642</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">-67368</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">-86814</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-117540</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-294013</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-271396</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-248779</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-226162</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-203545</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-180927</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-158310</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-135693</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-113076</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-90459</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-67842</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-45225</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-22608</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">-1151306</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">-1379852</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">-1677556</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">-1828312</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">-2327320</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">-2554799</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-2775101</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-2775101</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-2775101</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-2775101</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-2775101</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-2775101</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-2775101</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-2775101</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-2775101</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-2775101</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-2775101</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-2775101</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-2775101</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-2773980</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-602"><narrative>Registro de Informacion Catastral (RIC)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-603"><narrative>Registro de Informacion Catastral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P087106"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P087106?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P087106"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The technological platform that includes RIC's public registry is assessed to be satisfactory regarding its funcitionality, and physical and data security
</narrative></title>
<baseline year="2007" iso-date="2007-01-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-01-12" />
<period-end iso-date="2015-09-01" />
<target value="Assessed as Satisfactory">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
An integrated Registry-Cadastre information platform operates satisfactorily.
</narrative></title>
<baseline year="2007" iso-date="2007-01-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-01-12" />
<period-end iso-date="2015-09-01" />
<target value="100%">

</target>
<actual value="80%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
An integrated Registry-Cadastre information platform operates satisfactorily.
</narrative></title>
<baseline year="2007" iso-date="2007-01-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-01-12" />
<period-end iso-date="2015-09-01" />
<target value="100%">

</target>
<actual value="80%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
30% of land conflicts identified previously by SAA within the Project area are resolved
</narrative></title>
<baseline year="2007" iso-date="2007-01-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-01-12" />
<period-end iso-date="2015-09-01" />
<target value="30.00">

</target>
<actual value="26.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
At least 60% of individual parcels or communal lands identified as eligible for regularization or special titling are titled and registered in RGP, and benefit women and indigenous peoples
</narrative></title>
<baseline year="2007" iso-date="2007-01-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-01-12" />
<period-end iso-date="2015-09-01" />
<target value="60%">

</target>
<actual value="26%">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Less than 10% of parcels incorporated in the RIC database have reports of absenteeism or not attendance of the owner/occupant
</narrative></title>
<baseline year="2007" iso-date="2007-01-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-01-12" />
<period-end iso-date="2015-09-01" />
<target value="10%">

</target>
<actual value="3%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
80% of communal lands in the project identified and certified according to the process established in the Regulations for Communal Lands and Indigenous Peoples Plan (IPP), of which at least 50% are in
</narrative></title>
<baseline year="2007" iso-date="2007-01-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-01-12" />
<period-end iso-date="2015-09-01" />
<target value="80.00">

</target>
<actual value="9.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
427 km of protected areas'boundaries and 100 km ofnational reserve areas'boundaries delimited and demarcated in the project area
</narrative></title>
<baseline year="2007" iso-date="2007-01-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-01-12" />
<period-end iso-date="2015-09-01" />
<target value="427 / 100">

</target>
<actual value="427/427/88.2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
80% of communal lands in the project identified and certified according to the process established in the Regulations for Communal Lands and Indigenous Peoples Plan (IPP), of which at least 50% are in
</narrative></title>
<baseline year="2007" iso-date="2007-01-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-01-12" />
<period-end iso-date="2015-09-01" />
<target value="80%">

</target>
<actual value="9%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
At least 20 municipalities use cadastral information for territorial planning and other uses; and send information for cadastral update and maintenance.
</narrative></title>
<baseline year="2007" iso-date="2007-01-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-01-12" />
<period-end iso-date="2015-09-01" />
<target value="20">

</target>
<actual value="20">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
100% of new transactions within the Project area, related to change of rights (dominio) in RGP, are incorporated in the Public Registry of RIC.
</narrative></title>
<baseline year="2007" iso-date="2007-01-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-01-12" />
<period-end iso-date="2015-09-01" />
<target value="100.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
At least 60% of individual parcels or communal lands identified as eligible for regularization or special titling are titled and registered in RGP, and benefit women and indigenous peoples
</narrative></title>
<baseline year="2007" iso-date="2007-01-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-01-12" />
<period-end iso-date="2015-09-01" />
<target value="60.00">

</target>
<actual value="29.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
6 cluster offices established in the project area during cadastral surveying  process, of which at least 5 offer cadastral servicespermanently.
</narrative></title>
<baseline year="2007" iso-date="2007-01-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-01-12" />
<period-end iso-date="2015-09-01" />
<target value="6">

</target>
<actual value="10">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
6 cluster offices established in the project area during cadastral surveying  process, of which at least 5 offer cadastral servicespermanently.
</narrative></title>
<baseline year="2007" iso-date="2007-01-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-01-12" />
<period-end iso-date="2015-09-01" />
<target value="6.00">

</target>
<actual value="9.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
195 archeological sites and 25 ceremonial sites in the project area identified, geo-referenced and incorporated into the database of the Department of Cultural Resources' Registry.
</narrative></title>
<baseline year="2007" iso-date="2007-01-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-01-12" />
<period-end iso-date="2015-09-01" />
<target value="195 / 25">

</target>
<actual value="299/25">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
35% of parcels in the Project area are integrated into RIC's Public Registry
</narrative></title>
<baseline year="2010" iso-date="2010-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-07-01" />
<period-end iso-date="2015-09-01" />
<target value="35.00">

</target>
<actual value="18.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
100 professional surveyors and 250 technical surveyors certified and registered in RIC's Registry of Surveyors.
</narrative></title>
<baseline year="2007" iso-date="2007-01-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-01-12" />
<period-end iso-date="2015-09-01" />
<target value="100 / 250">

</target>
<actual value="696/1066">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
At least 20 municipalities use cadastral information for territorial planning and other uses; and send information for cadastral update and maintenance.
</narrative></title>
<baseline year="2007" iso-date="2007-01-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-01-12" />
<period-end iso-date="2015-09-01" />
<target value="20">

</target>
<actual value="11">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
35% of parcels in the Project area are integrated into RIC's Public Registry
</narrative></title>
<baseline year="2010" iso-date="2010-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-07-01" />
<period-end iso-date="2015-09-01" />
<target value="35.00">

</target>
<actual value="17.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The technological platform that includes RIC's public registry is assessed to be satisfactory regarding its funcitionality, and physical and data security
</narrative></title>
<baseline year="2007" iso-date="2007-01-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-01-12" />
<period-end iso-date="2015-09-01" />
<target value="Assessed as Satisfactory">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Less than 10% of parcels incorporated in the RIC database have reports of absenteeism or not attendance of the owner/occupant
</narrative></title>
<baseline year="2007" iso-date="2007-01-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-01-12" />
<period-end iso-date="2015-09-01" />
<target value="10.00">

</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regulations on the RIC Law and regulations on the certification of communal lands approved by RIC.
</narrative></title>
<baseline year="2007" iso-date="2007-01-12" value="No regulations on the RIC Law or Special Regulations on Communal Lands"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-01-12" />
<period-end iso-date="2015-09-01" />
<target value="Regulations on the RIC Law and Special Regulations on Communal Lands approved by RIC">

</target>
<actual value="2 Regulations completed">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
427 km of protected areas'boundaries and 100 km ofnational reserve areas'boundaries delimited and demarcated in the project area
</narrative></title>
<baseline year="2007" iso-date="2007-01-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-01-12" />
<period-end iso-date="2015-09-01" />
<target value="427 / 100">

</target>
<actual value="427/427/88.2">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
At least 50% of land conflicts identified during the cadastral establishment process are resolved.
</narrative></title>
<baseline year="2007" iso-date="2007-01-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-01-12" />
<period-end iso-date="2015-09-01" />
<target value="50.00">

</target>
<actual value="53.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
30% of land conflicts identified previously by SAA within the Project area are resolved
</narrative></title>
<baseline year="2007" iso-date="2007-01-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-01-12" />
<period-end iso-date="2015-09-01" />
<target value="30.00">

</target>
<actual value="26.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
195 archeological sites and 25 ceremonial sites in the project area identified, geo-referenced and incorporated into the database of the Department of Cultural Resources' Registry.
</narrative></title>
<baseline year="2007" iso-date="2007-01-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-01-12" />
<period-end iso-date="2015-09-01" />
<target value="195 / 25">

</target>
<actual value="299/25">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
100% of new transactions within the Project area, related to change of rights (dominio) in RGP, are incorporated in the Public Registry of RIC.
</narrative></title>
<baseline year="2007" iso-date="2007-01-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-01-12" />
<period-end iso-date="2015-09-01" />
<target value="100%">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regulations on the RIC Law and regulations on the certification of communal lands approved by RIC.
</narrative></title>
<baseline year="2007" iso-date="2007-01-12" value="No regulations on the RIC Law or Special Regulations on Communal Lands"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-01-12" />
<period-end iso-date="2015-09-01" />
<target value="Regulations on the RIC Law and Special Regulations on Communal Lands approved by RIC">

</target>
<actual value="2 Regulations completed">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
100 professional surveyors and 250 technical surveyors certified and registered in RIC's Registry of Surveyors.
</narrative></title>
<baseline year="2007" iso-date="2007-01-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-01-12" />
<period-end iso-date="2015-09-01" />
<target value="100 / 250">

</target>
<actual value="741/1080">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
At least 50% of land conflicts identified during the cadastral establishment process are resolved.
</narrative></title>
<baseline year="2007" iso-date="2007-01-12" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-01-12" />
<period-end iso-date="2015-09-01" />
<target value="50%">

</target>
<actual value="55%">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-23T20:24:13" hierarchy="1"><iati-identifier>44000-P055085</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>SECOND RURAL AND MAIN ROADS PROJECT</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The overarching goal of the project is to contribute reducing rural poverty and build social cohesion by improving and maintaining access in rural areas to markets, schools, health centers and other social and economic infrastructure through broadened community participation. By emphasizing beneficiary involvement, the project will assure that local development decisions reflect the needs and priorities of rural communities.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><activity-status code="3" /><activity-date type="1" iso-date="2001-06-21"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2003-05-06"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2013-09-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2013-09-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Stephen Muzira</narrative></person-name><telephone>+1-202-473-1000</telephone><email>smuzira@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>

<recipient-country code="GT" percentage="100"><narrative xml:lang="en">GUATEMALA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003599773" />
            <name><narrative>Departamento de Alta Verapaz</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.66667 -90</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003587672" />
            <name><narrative>Yalambojoch</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.98333 -91.566673</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003587784" />
            <name><narrative>XEmal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.41667 -91.699997</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003587931" />
            <name><narrative>Vilil</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.85 -91.650002</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003588323" />
            <name><narrative>Tixel</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.43333 -91.76667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003588473" />
            <name><narrative>Municipio de Tectitán</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.33333 -92.033333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003588612" />
            <name><narrative>Tacaná</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.23932 -92.06736</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003599602" />
            <name><narrative>Departamento de Baja Verapaz</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.08333 -90.333328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003595415" />
            <name><narrative>Departamento de Huehuetenango</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.66667 -91.583328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003595415" />
            <name><narrative> Departamento de Huehuetenango</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.66667 -91.583328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589734" />
            <name><narrative>San Miguel Acatán</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.7 -91.616669</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589733" />
            <name><narrative>Municipio de San Miguel Acatán</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.7 -91.616669</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003595392" />
            <name><narrative>Ical</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.45 -91.73333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003595282" />
            <name><narrative>Ixtahuacán</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.41667 -91.76667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003595281" />
            <name><narrative>Municipio de Ixtahuacán</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.41667 -91.76667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003595247" />
            <name><narrative>Municipio de Jacaltenango</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.75212 -91.733162</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003595005" />
            <name><narrative>La Barranca</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.34444 -91.337219</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003591412" />
            <name><narrative>Petatán</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.61667 -91.73333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590964" />
            <name><narrative>Departamento del QuichE</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.5 -90.916672</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590930" />
            <name><narrative>Quixal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.81667 -91.716667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589801" />
            <name><narrative>Departamento de San Marcos</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15 -91.916672</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589769" />
            <name><narrative>Municipio de San Mateo Ixtatán</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.83333 -91.48333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003588308" />
            <name><narrative>Todos Santos Cuchumatán</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.51667 -91.616669</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003588307" />
            <name><narrative>Municipio de Todos Santos Cuchumatán</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.51667 -91.616669</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003592814" />
            <name><narrative>Lupiná</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.69407 -91.791443</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003593527" />
            <name><narrative>La Trinidad</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.91667 -91.883331</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003594419" />
            <name><narrative>Municipio de La Libertad</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.56327 -91.910988</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003594423" />
            <name><narrative>La Libertad</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.51421 -91.869438</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003594749" />
            <name><narrative>Municipio de La Democracia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.56667 -91.866669</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003594764" />
            <name><narrative>La Cumbre</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.45 -91.800003</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003597543" />
            <name><narrative>El Boquerón</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.50963 -92.006401</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003597800" />
            <name><narrative>Municipio de Cuilco</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.4 -91.966667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003598040" />
            <name><narrative>Municipio de Colotenango</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.40718 -91.714378</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003598762" />
            <name><narrative>Finca ChanquejelbE</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.86667 -91.683327</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003599079" />
            <name><narrative>Canquintic</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.9 -91.650002</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003599307" />
            <name><narrative>Bujxub</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.70495 -91.81546</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003599327" />
            <name><narrative>Buenos Aires</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.35 -91.449997</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589464" />
            <name><narrative>Municipio de Santa Bárbara</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.31667 -91.616669</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003592751" />
            <name><narrative>Malacatancito</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.21667 -91.51667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003592750" />
            <name><narrative>Municipio de Malacatancito</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.21667 -91.51667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003592216" />
            <name><narrative>Municipio de Nentón</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.8007 -91.754639</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003592137" />
            <name><narrative>Nueva Esperanza</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.83556 -91.760246</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590779" />
            <name><narrative>Rio Ocho</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.55 -91.699997</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590457" />
            <name><narrative>Municipio de San Antonio Huista</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.65947 -91.772324</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589924" />
            <name><narrative>Municipio de San Juan Atitán</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.43333 -91.633331</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589103" />
            <name><narrative>Santiago Chimaltenango</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.46667 -91.716667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589102" />
            <name><narrative>Municipio de Santiago Chimaltenango</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.50739 -91.685188</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590187" />
            <name><narrative>Municipio de San Gaspar Ixchil</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.38333 -91.716667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589632" />
            <name><narrative>San Pedro Necta</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.49142 -91.765511</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589631" />
            <name><narrative>Municipio de San Pedro Necta</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.5 -91.76667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589579" />
            <name><narrative>San Rafael Petzal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.40487 -91.664513</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589578" />
            <name><narrative>Municipio de San Rafael Petzal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.40536 -91.663567</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589540" />
            <name><narrative>Municipio de San Sebastián Huehuetenango</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.38333 -91.583328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589497" />
            <name><narrative>Municipio de Santa Ana Huista</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.68085 -91.820053</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="21023" percentage="100" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TI" percentage="90.0000000" xml:lang="en"><narrative>FY17 - Rural and Inter-Urban Roads</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="33" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="100" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="67" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="33" xml:lang="en"><narrative>Social Inclusion</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2003-05-01"/>
<period-end iso-date="2003-05-31"/>
<value currency="USD" value-date="2003-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2003-06-01"/>
<period-end iso-date="2003-06-30"/>
<value currency="USD" value-date="2003-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2003-07-01"/>
<period-end iso-date="2003-07-31"/>
<value currency="USD" value-date="2003-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2003-08-01"/>
<period-end iso-date="2003-08-31"/>
<value currency="USD" value-date="2003-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2003-09-01"/>
<period-end iso-date="2003-09-30"/>
<value currency="USD" value-date="2003-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2003-10-01"/>
<period-end iso-date="2003-10-31"/>
<value currency="USD" value-date="2003-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2003-11-01"/>
<period-end iso-date="2003-11-30"/>
<value currency="USD" value-date="2003-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2003-12-01"/>
<period-end iso-date="2003-12-31"/>
<value currency="USD" value-date="2003-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2004-01-01"/>
<period-end iso-date="2004-01-31"/>
<value currency="USD" value-date="2004-01-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2004-02-01"/>
<period-end iso-date="2004-02-29"/>
<value currency="USD" value-date="2004-02-29">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2004-03-01"/>
<period-end iso-date="2004-03-31"/>
<value currency="USD" value-date="2004-03-31">833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2004-04-01"/>
<period-end iso-date="2004-04-30"/>
<value currency="USD" value-date="2004-04-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2004-05-01"/>
<period-end iso-date="2004-05-31"/>
<value currency="USD" value-date="2004-05-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2004-06-01"/>
<period-end iso-date="2004-06-30"/>
<value currency="USD" value-date="2004-06-30">833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2004-07-01"/>
<period-end iso-date="2004-07-31"/>
<value currency="USD" value-date="2004-07-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2004-08-01"/>
<period-end iso-date="2004-08-31"/>
<value currency="USD" value-date="2004-08-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2004-09-01"/>
<period-end iso-date="2004-09-30"/>
<value currency="USD" value-date="2004-09-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2004-10-01"/>
<period-end iso-date="2004-10-31"/>
<value currency="USD" value-date="2004-10-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2004-11-01"/>
<period-end iso-date="2004-11-30"/>
<value currency="USD" value-date="2004-11-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2004-12-01"/>
<period-end iso-date="2004-12-31"/>
<value currency="USD" value-date="2004-12-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-01-01"/>
<period-end iso-date="2005-01-31"/>
<value currency="USD" value-date="2005-01-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-02-01"/>
<period-end iso-date="2005-02-28"/>
<value currency="USD" value-date="2005-02-28">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-03-01"/>
<period-end iso-date="2005-03-31"/>
<value currency="USD" value-date="2005-03-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-04-01"/>
<period-end iso-date="2005-04-30"/>
<value currency="USD" value-date="2005-04-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-05-01"/>
<period-end iso-date="2005-05-31"/>
<value currency="USD" value-date="2005-05-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-06-01"/>
<period-end iso-date="2005-06-30"/>
<value currency="USD" value-date="2005-06-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-07-01"/>
<period-end iso-date="2005-07-31"/>
<value currency="USD" value-date="2005-07-31">1110000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-08-01"/>
<period-end iso-date="2005-08-31"/>
<value currency="USD" value-date="2005-08-31">1110000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-09-01"/>
<period-end iso-date="2005-09-30"/>
<value currency="USD" value-date="2005-09-30">1110000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-10-01"/>
<period-end iso-date="2005-10-31"/>
<value currency="USD" value-date="2005-10-31">1113333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-11-01"/>
<period-end iso-date="2005-11-30"/>
<value currency="USD" value-date="2005-11-30">1113333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-12-01"/>
<period-end iso-date="2005-12-31"/>
<value currency="USD" value-date="2005-12-31">1113333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-01-01"/>
<period-end iso-date="2006-01-31"/>
<value currency="USD" value-date="2006-01-31">1113333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-02-01"/>
<period-end iso-date="2006-02-28"/>
<value currency="USD" value-date="2006-02-28">1113333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-03-01"/>
<period-end iso-date="2006-03-31"/>
<value currency="USD" value-date="2006-03-31">1113333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-04-01"/>
<period-end iso-date="2006-04-30"/>
<value currency="USD" value-date="2006-04-30">1113333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-05-01"/>
<period-end iso-date="2006-05-31"/>
<value currency="USD" value-date="2006-05-31">1113333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-06-01"/>
<period-end iso-date="2006-06-30"/>
<value currency="USD" value-date="2006-06-30">1113333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-07-01"/>
<period-end iso-date="2006-07-31"/>
<value currency="USD" value-date="2006-07-31">1110000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-08-01"/>
<period-end iso-date="2006-08-31"/>
<value currency="USD" value-date="2006-08-31">1110000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-09-01"/>
<period-end iso-date="2006-09-30"/>
<value currency="USD" value-date="2006-09-30">1110000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-10-01"/>
<period-end iso-date="2006-10-31"/>
<value currency="USD" value-date="2006-10-31">1113333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-11-01"/>
<period-end iso-date="2006-11-30"/>
<value currency="USD" value-date="2006-11-30">1113333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-12-01"/>
<period-end iso-date="2006-12-31"/>
<value currency="USD" value-date="2006-12-31">1113333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-01-01"/>
<period-end iso-date="2007-01-31"/>
<value currency="USD" value-date="2007-01-31">1113333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-02-01"/>
<period-end iso-date="2007-02-28"/>
<value currency="USD" value-date="2007-02-28">1113333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-03-01"/>
<period-end iso-date="2007-03-31"/>
<value currency="USD" value-date="2007-03-31">1113333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-04-01"/>
<period-end iso-date="2007-04-30"/>
<value currency="USD" value-date="2007-04-30">1113333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">1113333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">1113333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2003-05-01"/>
<period-end iso-date="2003-05-31"/>
<value currency="USD" value-date="2003-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2003-06-01"/>
<period-end iso-date="2003-06-30"/>
<value currency="USD" value-date="2003-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2003-07-01"/>
<period-end iso-date="2003-07-31"/>
<value currency="USD" value-date="2003-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2003-08-01"/>
<period-end iso-date="2003-08-31"/>
<value currency="USD" value-date="2003-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2003-09-01"/>
<period-end iso-date="2003-09-30"/>
<value currency="USD" value-date="2003-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2003-10-01"/>
<period-end iso-date="2003-10-31"/>
<value currency="USD" value-date="2003-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2003-11-01"/>
<period-end iso-date="2003-11-30"/>
<value currency="USD" value-date="2003-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2003-12-01"/>
<period-end iso-date="2003-12-31"/>
<value currency="USD" value-date="2003-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2004-01-01"/>
<period-end iso-date="2004-01-31"/>
<value currency="USD" value-date="2004-01-31">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2004-02-01"/>
<period-end iso-date="2004-02-29"/>
<value currency="USD" value-date="2004-02-29">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2004-03-01"/>
<period-end iso-date="2004-03-31"/>
<value currency="USD" value-date="2004-03-31">833333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2004-04-01"/>
<period-end iso-date="2004-04-30"/>
<value currency="USD" value-date="2004-04-30">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2004-05-01"/>
<period-end iso-date="2004-05-31"/>
<value currency="USD" value-date="2004-05-31">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2004-06-01"/>
<period-end iso-date="2004-06-30"/>
<value currency="USD" value-date="2004-06-30">833333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2004-07-01"/>
<period-end iso-date="2004-07-31"/>
<value currency="USD" value-date="2004-07-31">1250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2004-08-01"/>
<period-end iso-date="2004-08-31"/>
<value currency="USD" value-date="2004-08-31">1250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2004-09-01"/>
<period-end iso-date="2004-09-30"/>
<value currency="USD" value-date="2004-09-30">1250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2004-10-01"/>
<period-end iso-date="2004-10-31"/>
<value currency="USD" value-date="2004-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2004-11-01"/>
<period-end iso-date="2004-11-30"/>
<value currency="USD" value-date="2004-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2004-12-01"/>
<period-end iso-date="2004-12-31"/>
<value currency="USD" value-date="2004-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-01-01"/>
<period-end iso-date="2005-01-31"/>
<value currency="USD" value-date="2005-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-02-01"/>
<period-end iso-date="2005-02-28"/>
<value currency="USD" value-date="2005-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-03-01"/>
<period-end iso-date="2005-03-31"/>
<value currency="USD" value-date="2005-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-04-01"/>
<period-end iso-date="2005-04-30"/>
<value currency="USD" value-date="2005-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-05-01"/>
<period-end iso-date="2005-05-31"/>
<value currency="USD" value-date="2005-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-06-01"/>
<period-end iso-date="2005-06-30"/>
<value currency="USD" value-date="2005-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-07-01"/>
<period-end iso-date="2005-07-31"/>
<value currency="USD" value-date="2005-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-08-01"/>
<period-end iso-date="2005-08-31"/>
<value currency="USD" value-date="2005-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-09-01"/>
<period-end iso-date="2005-09-30"/>
<value currency="USD" value-date="2005-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-10-01"/>
<period-end iso-date="2005-10-31"/>
<value currency="USD" value-date="2005-10-31">1113333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-11-01"/>
<period-end iso-date="2005-11-30"/>
<value currency="USD" value-date="2005-11-30">1113333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-12-01"/>
<period-end iso-date="2005-12-31"/>
<value currency="USD" value-date="2005-12-31">1113333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-01-01"/>
<period-end iso-date="2006-01-31"/>
<value currency="USD" value-date="2006-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-02-01"/>
<period-end iso-date="2006-02-28"/>
<value currency="USD" value-date="2006-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-03-01"/>
<period-end iso-date="2006-03-31"/>
<value currency="USD" value-date="2006-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-04-01"/>
<period-end iso-date="2006-04-30"/>
<value currency="USD" value-date="2006-04-30">1113333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-05-01"/>
<period-end iso-date="2006-05-31"/>
<value currency="USD" value-date="2006-05-31">1113333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-06-01"/>
<period-end iso-date="2006-06-30"/>
<value currency="USD" value-date="2006-06-30">1113333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-07-01"/>
<period-end iso-date="2006-07-31"/>
<value currency="USD" value-date="2006-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-08-01"/>
<period-end iso-date="2006-08-31"/>
<value currency="USD" value-date="2006-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-09-01"/>
<period-end iso-date="2006-09-30"/>
<value currency="USD" value-date="2006-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-10-01"/>
<period-end iso-date="2006-10-31"/>
<value currency="USD" value-date="2006-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-11-01"/>
<period-end iso-date="2006-11-30"/>
<value currency="USD" value-date="2006-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-12-01"/>
<period-end iso-date="2006-12-31"/>
<value currency="USD" value-date="2006-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-01-01"/>
<period-end iso-date="2007-01-31"/>
<value currency="USD" value-date="2007-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-02-01"/>
<period-end iso-date="2007-02-28"/>
<value currency="USD" value-date="2007-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-03-01"/>
<period-end iso-date="2007-03-31"/>
<value currency="USD" value-date="2007-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-04-01"/>
<period-end iso-date="2007-04-30"/>
<value currency="USD" value-date="2007-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">1348638.89</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">1348638.89</value>
</budget>
<capital-spend percentage="100" /><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P055085"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P055085?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P055085"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Maintenance through ME on a pilot basis - ADIMAM (number of ME in operation)
</narrative></title>
<baseline year="2003" iso-date="2003-04-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2003-04-01" />
<period-end iso-date="2013-09-30" />
<target value="20">

</target>
<actual value="180">
<comment><narrative>
ADIMAM officials requested to stay with model of maintenance committees (COMAVIs) where work is voluntary and not paid. 61 COMAVIsset up in San Marcos, and an additional 119 were set up in Huehuetenango for a total of 180 COMAVIs. Project has provided tools andequipment. COMAVIs have also been trained
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Kilometers of Rural Roads Rehabilitated
</narrative></title>
<baseline year="2003" iso-date="2003-04-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2003-04-01" />
<period-end iso-date="2013-09-30" />
<target value="830 (Revised target 819km)">

</target>
<actual value="749km completed including 674km of tertiary roads under INFOM and 75km of secondary roads under DGC">
<comment><narrative>
One core indicator for both secondary and tertiary roads (INFOM 674km, DGC 145km). Of the target 145km of secondary roads, 75 kmofsecondary roads actually completed. The rest will be completed with Government financing.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Employment generated in rural areas
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2013-09-30" />
<target value="1. 20 micro-enterprises for routine road maintenance pilot. 2. 20 communities involved with about 150 worker posts. 3.Enterpreneural culture for road maintenance activities.">

</target>
<actual value="1. 180 maintenance committees created; 2. &amp; 3. Micro-enterprises were not created but the maintenance committes have been trainedand carrying out maintenance funtions.">
<comment><narrative>
COMAVIs in San Marcos received routine maintenance equipment and road safety gear.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Pathways and Pedestrian Bridges
</narrative></title>
<baseline year="2003" iso-date="2003-04-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2003-04-01" />
<period-end iso-date="2013-09-30" />
<target value="300 km pathways and 80 pedestrian bridges">
<comment><narrative>
Local communities asked to replace the pathways with the periodic maintenance works. For the bridges, 21 no. could not becontracted due to contractor non-fulflllment of the bid criteria. And costs also increased from original 2003 estimates.
</narrative></comment>
</target>
<actual value="30 km of peeriodic maintenance (gravel, stone,  etc) and 37 pedestrian bridges.">
<comment><narrative>
See comments under end target.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Approximately 2000m of spot improvements on municipal roads
</narrative></title>
<baseline year="2003" iso-date="2003-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2003-04-01" />
<period-end iso-date="2013-09-30" />
<target value="2000.00">

</target>
<actual value="2000.00">
<comment><narrative>
Target met under intervened roads which lead to municipal headquarters, and connect communities in the municipalities.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Strengthened institutional capacity to manage rural transport infrastructure on sustainable basis
</narrative></title>
<baseline year="2005" iso-date="2005-01-01" value="1. UTAVs and FVR non existent 2. Municipalities do not cofinance works 3. Poor road maintenance 4. No municipal contribution tooperations
5. No national transport and rural roads participatory strategy 6. No strengthening of involved institutions
7. Nomedium term impact evaluation done"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-01-01" />
<period-end iso-date="2013-09-30" />
<target value="1. UTAVs and FVR operational 2. Municipalities cofinancing works 3. Municipalities maintaining rural network rehabilitated
4.Municipal contributions to operations of at least Q75,000 per year
5. National transport and rural roads participatory strategydone  6. Strengthening of involved institutions
7. Medium term impact evaluation done">

</target>
<actual value="1. UTAVs and FVR operational 2. Municipalities cofinancing works 3. Municipalities maintaining rural network rehabilitated
4.Municipal contributions to operations of at least Q80,000 per year
5. National transport and rural roads participatory strategydone but not implemented  6. Strengthening of involved institutions
7. Medium term impact evaluation done in May 2008">
<comment><narrative>
Cofinancing percentage dropped to 15% from 25%.  The mucipalities of Huista and Mamsohue were created under the project. Trainingand capacity building delivered.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Strengthening local capacity (Creation of UTAVs and FVRs)
</narrative></title>
<baseline year="2003" iso-date="2003-04-01" value="0"><comment><narrative>UTAVs-refers to the technical administration units in the mancomunidades while the FVRs refers to the regional road funds.</narrative></comment></baseline>
<period>
<period-start iso-date="2003-04-01" />
<period-end iso-date="2013-09-30" />
<target value="UTAV and FVR fully operational in each Mancomunidad">

</target>
<actual value="UTAVs fully operational in both mancomunidades">
<comment><narrative>
THe FVRs were redesigned to include a Head and a Treasurer in each mancomunidad
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of kilometers of rural roads maintained
</narrative></title>
<baseline year="2003" iso-date="2003-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2003-04-01" />
<period-end iso-date="2013-09-30" />
<target value="350.00">
<comment><narrative>
Project Target for San Marcos only.
</narrative></comment>
</target>
<actual value="380.00">
<comment><narrative>
380km maintained by 61 COMAVIS in San Marcos. An extra 325km maintained by 119 COMAVIs in Huehuetenango
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Incorporation of coordination unit in the structure of INFOM
</narrative></title>
<baseline year="2003" iso-date="2003-04-01" value="Not incorporated"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2003-04-01" />
<period-end iso-date="2013-09-30" />
<target value="Incorporated">

</target>
<actual value="Incorporated">
<comment><narrative>
Coordination unit incorporated into INFOM structure, and in addition to project is also managing a loan with the Japanesefinancing. INFOM now has strong capacity to implement other projects.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved rural road network in MAMSOHUE and HUISTA
</narrative></title>
<baseline year="2005" iso-date="2005-01-01" value="1. 400,000 people in ADIMAM benefit from improved access (4260-GU) 2. 500,000 people do not benefit from improved access."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-01-01" />
<period-end iso-date="2013-09-30" />
<target value="1. 400,000 people from ADIMAM will continue to benefit from improved access 2. 500,000 people in Huehuetenango will be providedwith reliable access 3. Travel time reduced up to 40%">

</target>
<actual value="1. 355,000 people benefited in both San Marcos and Huehuetenango from INFOM component; and 408,820 people benefited from DGCinvestments in both departments 3. Travel time reduced up to 42%">
<comment><narrative>
Beneficiaries separated by implementing agency (INFOM and DGC) due to restructuring during implementation
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implementation of the Social Management Plan
</narrative></title>
<baseline year="2003" iso-date="2003-04-01" value="Not implemented"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2003-04-01" />
<period-end iso-date="2013-09-30" />
<target value="Implemented">

</target>
<actual value="Implemented">
<comment><narrative>
INFOM has delivered workshops on social awareness and citizen responsibility for community road infrastructure, capacity buildingin social, technical and financial matters, accompaniment in solving arising problems e.g. resettlement, and promotion of roadmaintenance, and safety.
</narrative></comment>
</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-23T20:24:13" hierarchy="1"><iati-identifier>44000-P077756</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>GUATEMALA Maternal and Infant Health and Nutrition</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The proposed Project aims to support the Government of Guatemala to: (a) improve maternal and infant health in the project's 40 areas of intervention; and (b) reduce chronic malnutrition among children younger than 2 years of age in the rural areas of the 70 municipalities targeted by the project.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The Maternal-Infant Health and Nutrition Project for Guatemala aims to: (a) improve maternal and infant health in the project's 40 areas of intervention; and (b) reduce chronic malnutrition among children younger than 2 years of age in the rural areas of the 70 municipalities targeted by the project. The project has the following components: (1) This component will support the development of a Maternal and Infant Health Referral Network, promote the demand for maternal and infant health care, and contribute to increase the proportion of safe institutional deliveries, the referral of obstetric emergencies directly from the community. (2) This component aims to address the problem of child malnutrition in the selected 70 municipalities by expanding coverage of community-based growth promotion and basic health services. (3) This component seeks to: (i) provide support to poor families to learn about nutrition and health programs, encourage the poor and indigenous population to utilize health and nutrition services promote changing in pattern of behavior, disseminate the population's right to utilize services, and encourage social auditing; (ii) design and implement a comprehensive monitoring and evaluation system (M&amp;E) for the nutrition and health interventions; and (iii) measure the Project's impact on targeted population welfare. (4) This component would support the institutional capacity of the Ministry of Health to implement and administer basic health and nutrition services.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><activity-status code="3" /><activity-date type="1" iso-date="2004-05-14"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2006-01-19"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2013-05-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2013-05-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Christine Lao Pena</narrative></person-name><telephone>+1-202-473-1000</telephone><email>cpena@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>

<recipient-country code="GT" percentage="100"><narrative xml:lang="en">GUATEMALA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003588042" />
            <name><narrative>Municipio de Uspantán</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.38333 -90.833328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003588459" />
            <name><narrative>Municipio de Tejutla</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.11667 -91.800003</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003588534" />
            <name><narrative>Tanchi</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.53333 -90.300003</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003588693" />
            <name><narrative>Municipio de Soloma</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.71667 -91.449997</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003588761" />
            <name><narrative>Municipio de Sibilia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15 -91.616669</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003588763" />
            <name><narrative>Sibilá</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.48333 -91.466667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589255" />
            <name><narrative>Municipio de Santa Maria Chiquimula</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.02886 -91.32917</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589289" />
            <name><narrative>Santa Lucia Cotzumalguapa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.33333 -91.01667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589628" />
            <name><narrative>Municipio de San Pedro Pinula</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.66667 -89.849998</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589835" />
            <name><narrative>Municipio de San Luis</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>16.23333 -89.449997</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589879" />
            <name><narrative>Municipio de San Juan Tecuaco</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.08333 -90.26667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590033" />
            <name><narrative>Municipio de San JosE del Golfo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.75 -90.366669</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590346" />
            <name><narrative>Municipio de San Carlos Sija</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.98333 -91.550003</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590526" />
            <name><narrative>San AndrEs Sajcabajá</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.21667 -90.916672</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590547" />
            <name><narrative>San Agustin Acasaguastlán</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.95 -89.966667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590923" />
            <name><narrative>Municipio de Rabinal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.11238 -90.507057</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003591091" />
            <name><narrative>Municipio de Pueblo Nuevo Viñas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.23333 -90.48333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003591209" />
            <name><narrative>Municipio de Pochuta</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.55 -91.083328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003591540" />
            <name><narrative>Municipio de Patulul</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.41667 -91.166672</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003592034" />
            <name><narrative>Municipio de Olopa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.68333 -89.349998</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003592216" />
            <name><narrative>Municipio de Nentón</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.8007 -91.754639</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003592285" />
            <name><narrative>Municipio de Nahualá</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.85 -91.316673</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003592482" />
            <name><narrative>Municipio de Momostenango</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.04726 -91.40625</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003592483" />
            <name><narrative>Momostenango</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.04361 -91.408607</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003592635" />
            <name><narrative>Mataquescuintla</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.52917 -90.184174</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003593375" />
            <name><narrative>Municipio de Livingston</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.82783 -88.753517</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003594418" />
            <name><narrative>Municipio de La Libertad</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>16.783331 -90.116669</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003595180" />
            <name><narrative>Municipio de Jocotán</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.81667 -89.383331</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003595340" />
            <name><narrative>Ixcán</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.81667 -91.066673</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003596337" />
            <name><narrative>Finca El Refugio</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.28333 -90.76667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003596943" />
            <name><narrative>El Jicaro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.23333 -89.933327</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003597077" />
            <name><narrative>Municipio de El Estor</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.53333 -89.349998</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003597339" />
            <name><narrative>El Chal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>16.66667 -89.633331</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003597749" />
            <name><narrative>Municipio de Cuyotenango</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.53333 -91.566673</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003598023" />
            <name><narrative>Municipio de Comitancillo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.08333 -91.716667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003598031" />
            <name><narrative>Comapa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.11667 -89.916672</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003598414" />
            <name><narrative>Municipio de Chisec</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.81667 -90.283333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003598786" />
            <name><narrative>Municipio de Champerico</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.3 -91.916672</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003598803" />
            <name><narrative>Municipio de Chajul</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.4871 -91.037857</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003598851" />
            <name><narrative>ChactE</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>16.105829 -89.363892</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003599264" />
            <name><narrative>Municipio de Cahabón</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.56667 -89.816673</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003599537" />
            <name><narrative>Barrios</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.66667 -91.73333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003599744" />
            <name><narrative>Amatillo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.53333 -89.599998</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003599786" />
            <name><narrative>Municipio de Alotenango</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.48333 -90.800003</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003600008" />
            <name><narrative>Acatenango</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.55194 -90.942223</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="12110" percentage="7" xml:lang="en"/><sector vocabulary="1" code="12240" percentage="29" xml:lang="en"/><sector vocabulary="1" code="13020" percentage="29" xml:lang="en"/><sector vocabulary="1" code="15126" percentage="5" xml:lang="en"/><sector vocabulary="1" code="15150" percentage="14" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="16" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="5.00000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="65.0000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="30.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="28" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="28" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000671" percentage="15" xml:lang="en"><narrative>Nutrition</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000067" percentage="30" xml:lang="en"><narrative>Nutrition and Food Security</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="28" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000635" percentage="29" xml:lang="en"><narrative>Reproductive and Maternal Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000511" percentage="14" xml:lang="en"><narrative>Indigenous People and Ethnic Minorities</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000671" percentage="15" xml:lang="en"><narrative>Nutrition</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000672" percentage="15" xml:lang="en"><narrative>Food Security</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000672" percentage="15" xml:lang="en"><narrative>Food Security</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000511" percentage="14" xml:lang="en"><narrative>Indigenous People and Ethnic Minorities</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000243" percentage="14" xml:lang="en"><narrative>MSME Development</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2006-01-01"/>
<period-end iso-date="2006-01-31"/>
<value currency="USD" value-date="2006-01-31">2955000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-02-01"/>
<period-end iso-date="2006-02-28"/>
<value currency="USD" value-date="2006-02-28">2955000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-03-01"/>
<period-end iso-date="2006-03-31"/>
<value currency="USD" value-date="2006-03-31">2955000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-04-01"/>
<period-end iso-date="2006-04-30"/>
<value currency="USD" value-date="2006-04-30">2955000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-05-01"/>
<period-end iso-date="2006-05-31"/>
<value currency="USD" value-date="2006-05-31">2955000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-06-01"/>
<period-end iso-date="2006-06-30"/>
<value currency="USD" value-date="2006-06-30">2955000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-07-01"/>
<period-end iso-date="2006-07-31"/>
<value currency="USD" value-date="2006-07-31">922500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-08-01"/>
<period-end iso-date="2006-08-31"/>
<value currency="USD" value-date="2006-08-31">922500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-09-01"/>
<period-end iso-date="2006-09-30"/>
<value currency="USD" value-date="2006-09-30">922500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-10-01"/>
<period-end iso-date="2006-10-31"/>
<value currency="USD" value-date="2006-10-31">922500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-11-01"/>
<period-end iso-date="2006-11-30"/>
<value currency="USD" value-date="2006-11-30">922500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-12-01"/>
<period-end iso-date="2006-12-31"/>
<value currency="USD" value-date="2006-12-31">922500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-01-01"/>
<period-end iso-date="2007-01-31"/>
<value currency="USD" value-date="2007-01-31">922500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-02-01"/>
<period-end iso-date="2007-02-28"/>
<value currency="USD" value-date="2007-02-28">922500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-03-01"/>
<period-end iso-date="2007-03-31"/>
<value currency="USD" value-date="2007-03-31">922500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-04-01"/>
<period-end iso-date="2007-04-30"/>
<value currency="USD" value-date="2007-04-30">922500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">922500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">922500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">919166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">919166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">919166.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">919166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">919166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">919166.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">919166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">919166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">919166.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">919166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">919166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">919166.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">464166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">464166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">464166.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">464166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">464166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">464166.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">464166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">464166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">464166.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">464166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">464166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">464166.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">600000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">600000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">600000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">600000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">600000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">600000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-01-01"/>
<period-end iso-date="2006-01-31"/>
<value currency="USD" value-date="2006-01-31">2955000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-02-01"/>
<period-end iso-date="2006-02-28"/>
<value currency="USD" value-date="2006-02-28">2955000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-03-01"/>
<period-end iso-date="2006-03-31"/>
<value currency="USD" value-date="2006-03-31">2955000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-04-01"/>
<period-end iso-date="2006-04-30"/>
<value currency="USD" value-date="2006-04-30">2955000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-05-01"/>
<period-end iso-date="2006-05-31"/>
<value currency="USD" value-date="2006-05-31">2955000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-06-01"/>
<period-end iso-date="2006-06-30"/>
<value currency="USD" value-date="2006-06-30">2955000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-07-01"/>
<period-end iso-date="2006-07-31"/>
<value currency="USD" value-date="2006-07-31">922500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-08-01"/>
<period-end iso-date="2006-08-31"/>
<value currency="USD" value-date="2006-08-31">922500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-09-01"/>
<period-end iso-date="2006-09-30"/>
<value currency="USD" value-date="2006-09-30">922500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-10-01"/>
<period-end iso-date="2006-10-31"/>
<value currency="USD" value-date="2006-10-31">922500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-11-01"/>
<period-end iso-date="2006-11-30"/>
<value currency="USD" value-date="2006-11-30">922500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-12-01"/>
<period-end iso-date="2006-12-31"/>
<value currency="USD" value-date="2006-12-31">922500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-01-01"/>
<period-end iso-date="2007-01-31"/>
<value currency="USD" value-date="2007-01-31">922500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-02-01"/>
<period-end iso-date="2007-02-28"/>
<value currency="USD" value-date="2007-02-28">922500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-03-01"/>
<period-end iso-date="2007-03-31"/>
<value currency="USD" value-date="2007-03-31">922500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-04-01"/>
<period-end iso-date="2007-04-30"/>
<value currency="USD" value-date="2007-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">919166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">919166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">919166.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">919166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">919166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">919166.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">919166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">919166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">919166.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">464166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">464166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">464166.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2013-05-30"/>
<value currency="USD" value-date="2013-05-30">1400190.96</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2013-05-30"/>
<value currency="USD" value-date="2013-05-30">1400190.96</value>
</budget>
<capital-spend percentage="100" /><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P077756"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P077756?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P077756"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of children for whom change in weight is measured in the areas of intervention.
</narrative></title>
<baseline year="2006" iso-date="2006-06-30" value="0%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-30" />
<period-end iso-date="2012-12-31" />
<target value="85 percent">

</target>
<actual value="76%">
<comment><narrative>
On track.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of secondary level services with cartera ampliada, but without operating room, fully operational.
</narrative></title>
<baseline year="2006" iso-date="2006-06-30" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-30" />
<period-end iso-date="2013-05-30" />
<target value="27 areas">
<comment><narrative>
Target revised from 32 to 27 to support more areas with more CAIMI  to improve access to surgical services than CAP whilemaintaining the total number of rehabilitated health facilities.
</narrative></comment>
</target>
<actual value="27">
<comment><narrative>
Target achieved. The Project supported the rehabilitation of an additional CAP that will only be 80% complete by end of Projectdate which will bring total to 27.8%.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Indigenous/non indigenous infant mortality ratio in project area.
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="1.2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2013-05-30" />
<target value="Reduce by 10 percent with respect to the baseline.">

</target>
<actual value="1.22">
<comment><narrative>
Final target not achieved. Latest available reliable data is from 2010. Improved from 2009 but slightly higher than 2007 data.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of children for whom change in weight is measured in the areas of intervention.
</narrative></title>
<baseline year="2006" iso-date="2006-06-30" value="0%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-30" />
<period-end iso-date="2013-05-30" />
<target value="80 percent">
<comment><narrative>
Target revised to 80% as part of approved Project restructuring
</narrative></comment>
</target>
<actual value="78%">
<comment><narrative>
target almost achieved. This is the latest available updated information.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of children under 2 with height for age &lt;-2Z in project areas.
</narrative></title>
<baseline year="2011" iso-date="2011-03-31" value="68.2 (2008 cohort) and 78.3% (2009 cohort)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-03-31" />
<period-end iso-date="2013-03-31" />
<target value="reduce by 5 percentage points with respect to 2011 baseline survey.">

</target>
<actual value="Not available until July 2013">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of institutional deliveries in the areas of intervention.
</narrative></title>
<baseline year="2006" iso-date="2006-06-30" value="22.3%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-30" />
<period-end iso-date="2013-05-30" />
<target value="Increase by 20 percent with respect to the baseline.">

</target>
<actual value="42%">
<comment><narrative>
Target surpassed (increase is 88%). Data from MOH SIGSA.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of institutional deliveries in the areas of intervention.
</narrative></title>
<baseline year="2006" iso-date="2006-06-30" value="22.3%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-30" />
<period-end iso-date="2012-12-31" />
<target value="Increase by 20 percent with respect to the baseline.">

</target>
<actual value="31%">
<comment><narrative>
Target surpassed (increase is 40%) as early as first trimester of 2012. Data from MOH SIGSA.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of families attended by Creciendo Bien in areas of intervention.
</narrative></title>
<baseline year="2006" iso-date="2006-06-30" value="0%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-30" />
<period-end iso-date="2012-12-31" />
<target value="30% of total beneficiaries">

</target>
<actual value="Not applicable since the program no longer exists but it reached 100%  in 2010.">
<comment><narrative>
Target surpassed for last applicable period. After 2010, this program has been included as part of another program and is nolongermonitored as an individual program.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of jurisdictions with AINM-C.
</narrative></title>
<baseline year="2006" iso-date="2006-06-30" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-30" />
<period-end iso-date="2012-12-31" />
<target value="112 jurisdictions.">

</target>
<actual value="146">
<comment><narrative>
Target surpassed. Government is  now supporting 146 jurisdictions with AINM-C by financing community educators who link healthstaff and communities through the PEC.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Integrated strategy for the implementation of the three programs.
</narrative></title>
<baseline year="2006" iso-date="2006-06-30" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-30" />
<period-end iso-date="2012-12-31" />
<target value="Available">

</target>
<actual value="Available">
<comment><narrative>
Target achieved
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of mothers receiving post-natal case within 10 days of delivery in the areas of intervention (information to be gatheredfrom CAIMI and PEC).
</narrative></title>
<baseline year="2006" iso-date="2006-06-30" value="0%"><comment><narrative>Earlier ISR had listed this as 45.54% but that was a typographical error. The PAD and other project docs indicate that this shouldbe 0</narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-30" />
<period-end iso-date="2013-05-30" />
<target value="20%">

</target>
<actual value="31%">
<comment><narrative>
Target surpassed.
source: SIGSA
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of children under 2 years old who participate in the weighing sessions in the areas of intervention.
</narrative></title>
<baseline year="2006" iso-date="2006-06-30" value="55%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-30" />
<period-end iso-date="2013-05-30" />
<target value="80 percent">
<comment><narrative>
Target revised to 80% as part of approved Project restructuring
</narrative></comment>
</target>
<actual value="78%">
<comment><narrative>
target almost achieved. This is the latest available updated information.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of mothers receiving post-natal case within 10 days of delivery in the areas of intervention (information to be gatheredfrom CAIMI and PEC).
</narrative></title>
<baseline year="2006" iso-date="2006-06-30" value="0%"><comment><narrative>Earlier ISR had listed this as 45.54% but that was a typographical error. The PAD and other project docs indicate that this shouldbe 0</narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-30" />
<period-end iso-date="2012-12-31" />
<target value="20 percent">

</target>
<actual value="10%">
<comment><narrative>
On track considering figure presented is only for first trimester of the year.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of pregnant women with at least one prenatal care in project areas.
</narrative></title>
<baseline year="2006" iso-date="2006-06-30" value="54.2%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-30" />
<period-end iso-date="2012-12-31" />
<target value="100 percent">

</target>
<actual value="23%">
<comment><narrative>
Indicator on track considering available figure is just for the 1st trimester of 2012
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with access to a basic package of health, nutrition, or reproductive health services (number)
</narrative></title>
<baseline year="2009" iso-date="2009-11-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-11-04" />
<period-end iso-date="2013-05-30" />
<target value="0.00">
<comment><narrative>
Target: Increase since Project start date per approved Project restructuring
</narrative></comment>
</target>
<actual value="1094108.00">
<comment><narrative>
Target achieved.  Increased with total number of people with access reaching 1,094,108 persons of which 159,604 are children lessthan 5 years old.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of children under 2 with weight for age &lt;-2Z in project areas.
</narrative></title>
<baseline year="2011" iso-date="2011-03-31" value="21.9 (2008 cohort) and 27.4 (2009 cohort)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-03-31" />
<period-end iso-date="2013-03-31" />
<target value="reduce by 5 percentage points relative to 2011 baseline survey">

</target>
<actual value="NA until July 2013">
<comment><narrative>
To be updated after nutrition survey analysis is completed by July 2013
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of jurisdictions with AINM-C.
</narrative></title>
<baseline year="2006" iso-date="2006-06-30" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-30" />
<period-end iso-date="2012-12-31" />
<target value="112 jurisdictions.">

</target>
<actual value="142 jurisdictions (community based) and 8 districts (AINM-C institutional or with health mobile teams)">
<comment><narrative>
Target surpassed. Government supported 142 jurisdictions with AINM-C by financing community educators who link health staff andcommunities through the PEC and the Project continued to support 8 districts with AINM-C &quot;institicional&quot; or with MOH mobile healthteams instead of NGOs
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of Secondary level services with cartera ampliada and operating room fully operational.
</narrative></title>
<baseline year="2006" iso-date="2006-06-30" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-30" />
<period-end iso-date="2012-12-31" />
<target value="12 areas">
<comment><narrative>
Target revised from 8 to 12 to take into account Project's strategic decision to provide more areas with improved healthfacilitiesthat provide surgical services especially emergency obstetric care.
</narrative></comment>
</target>
<actual value="8">
<comment><narrative>
Increased.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of children under 2 with weight for age &lt;-2Z in project areas.
</narrative></title>
<baseline year="2006" iso-date="2006-06-30" value="40%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-30" />
<period-end iso-date="2012-12-31" />
<target value="Increase by 15 percentage points with respect to baseline.">

</target>
<actual value="21.9 (2008 cohort) and 27.4 (2009 cohort)">
<comment><narrative>
Based on survey conducted from Oct. 2010 to March 2011.  Given that the 2006 data were only extrapolated, the Project considersthedata obtained from the 2010-2011 survey as the real baseline for the Project areas.  Follow-up survey to be conducted early 2013.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Indigenous/non indigenous maternal mortality ratio in project area.
</narrative></title>
<baseline year="2006" iso-date="2006-06-30" value="3.2"><comment><narrative>Source: SIGSA</narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-30" />
<period-end iso-date="2013-05-30" />
<target value="Reduce by 10 percent with respect to the baseline.">

</target>
<actual value="1.24">
<comment><narrative>
Target surpassed. indigenous to non-indigenous MMR reduced to less than half of baseline. Latest available reliable informationsource from National Center of Epidemiology. Most recently available comparable information from SIGSA also show target has beensurpassed in 2010 and 2011 with the ratios being 1.59 and 1.44, respectively.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Indigenous/non indigenous maternal mortality ratio in project area.
</narrative></title>
<baseline year="2006" iso-date="2006-06-30" value="3.2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-30" />
<period-end iso-date="2012-12-31" />
<target value="Reduce by 10 percent with respect to the baseline.">

</target>
<actual value="1.59">
<comment><narrative>
Target surpassed. Latest available reliable data is from end 2009.  Based on INE Statistics
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of children under 2 years old who participate in the weighing sessions in the areas of intervention.
</narrative></title>
<baseline year="2006" iso-date="2006-06-30" value="55%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-30" />
<period-end iso-date="2012-12-31" />
<target value="85 percent">

</target>
<actual value="76%">
<comment><narrative>
On track
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of secondary level services with cartera ampliada, but without operating room, fully operational.
</narrative></title>
<baseline year="2006" iso-date="2006-06-30" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-30" />
<period-end iso-date="2012-12-31" />
<target value="28 areas">
<comment><narrative>
Target revised from 32 to 28 to support more areas with more CAIMI  to improve access to surgical services than CAP whilemaintaining the total number of rehabilitated health facilities.
</narrative></comment>
</target>
<actual value="26">
<comment><narrative>
Increased. 
Comment: Please note that previous ISR had a typographical error. It should have referred to 24 CAP and not 28 CAP.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of Secondary level services with cartera ampliada and operating room fully operational.
</narrative></title>
<baseline year="2006" iso-date="2006-06-30" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-30" />
<period-end iso-date="2013-05-30" />
<target value="10 areas">
<comment><narrative>
Target revised from 8 to 10 to take into account final Project restructuring.
</narrative></comment>
</target>
<actual value="8">
<comment><narrative>
Advanced. At most, renovation of another facility would  be completed by end of Project for a total of 9 renovated CAIMI. Oneremaining CAIMI will be 76% complete.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of families attended by Creciendo Bien in areas of intervention.
</narrative></title>
<baseline year="2006" iso-date="2006-06-30" value="0%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-30" />
<period-end iso-date="2012-12-31" />
<target value="30% of total beneficiaries">

</target>
<actual value="100%">
<comment><narrative>
Target surpassed for last applicable period in end of 2010. After 2010, this program has been included as part of another programand is no longermonitored as an individual program.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Indigenous/non indigenous infant mortality ratio in project area.
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="1.2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2012-12-31" />
<target value="Reduce by 10 percent with respect to the baseline.">

</target>
<actual value="1.3">
<comment><narrative>
Latest available reliable data is from 2009. Improved from 2008 but slightly higher than 2007 data.  The Project's actualimplementation started in mid-2008 even though it became effective in 2007.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Health facilities constructed, renovated, and/or equipped (number)
</narrative></title>
<baseline year="2009" iso-date="2009-11-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-11-04" />
<period-end iso-date="2013-05-30" />
<target value="37.00">
<comment><narrative>
Target reduced to 37 per approved Project restructuring
</narrative></comment>
</target>
<actual value="35.00">
<comment><narrative>
Target almost achieved but by end of Project, remaining CAIMI will be 76% rehabilitated and remaining CAP will be 80% rehabilitated.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Health facilities constructed, renovated, and/or equipped (number)
</narrative></title>
<baseline year="2009" iso-date="2009-11-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-11-04" />
<period-end iso-date="2012-12-31" />
<target value="40.00">

</target>
<actual value="34.00">
<comment><narrative>
On track. All 34 facilities are  functioning although 1 still needs to be fully equipped.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Health personnel receiving training (number)
</narrative></title>
<baseline year="2009" iso-date="2009-11-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-11-04" />
<period-end iso-date="2012-12-31" />
<target value="0.00">

</target>
<actual value="1504.00">
<comment><narrative>
On track considering that data is just for first 5 months of 2012.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of children under 2 with height for age &lt;-2Z in project areas.
</narrative></title>
<baseline year="2006" iso-date="2006-06-30" value="72.4"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-30" />
<period-end iso-date="2012-12-31" />
<target value="Increase by 10 percentage points with respect to baseline.">

</target>
<actual value="68.2 (2008 cohort) and 78.3% (2009 cohort)">
<comment><narrative>
Based on survey conducted from Oct. 2010 to March 2011. Given that the 2006 nutritional data were only extrapolated, the Projectconsiders the data obtained from the 2010-2011 survey as the real baseline for the Project areas.  Follow up survey to be conductedearly 2013.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Integrated strategy for the implementation of the three programs.
</narrative></title>
<baseline year="2006" iso-date="2006-06-30" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-30" />
<period-end iso-date="2012-12-31" />
<target value="Available">
<comment><narrative>
As part of the approved restructuring, the 3 programs (PEC, AINM-C, and Cresciendo Bien) were specified.
</narrative></comment>
</target>
<actual value="Available">
<comment><narrative>
Target achieved for the 3 programs (AINM-C, PEC, and Cresciendo Bien) especially in terms of an integrated communications strategyand incorporation of the community educators trained in AINM-C in the PEC.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with access to a basic package of health, nutrition, or reproductive health services (number)
</narrative></title>
<baseline year="2009" iso-date="2009-11-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-11-04" />
<period-end iso-date="2012-12-31" />
<target value="0.00">

</target>
<actual value="950000.00">
<comment><narrative>
Total number of people with access is 950,000, of which 159,604 are children less than 5 years old.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of pregnant women with at least one prenatal care in project areas.
</narrative></title>
<baseline year="2006" iso-date="2006-06-30" value="54.2%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-30" />
<period-end iso-date="2013-05-30" />
<target value="90%">
<comment><narrative>
Target revised to 90% as part of approved restructuring.
</narrative></comment>
</target>
<actual value="89%">
<comment><narrative>
Target almost achieved. Source: SIGSA
</narrative></comment>
</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-23T20:24:13" hierarchy="1"><iati-identifier>44000-P159710</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Guatemala DRM Development Policy Loan with CAT DDO II</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The PDO is to help strengthen Guatemala's legal, institutional and financial framework to manage the impact of adverse natural events and climate risk.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The Second Disaster Risk Management Development Policy Loan operation is a stand-alone US dollar 200 million Disaster Risk Management Development Policy Loan (DPL) with a Catastrophe Deferred Drawdown Option (CAT DDO). It supports the efforts of the Government of Guatemala (GoG) to strengthen the legal and institutional framework for disaster risk management (DRM) and climate change adaptation (CCA), and to quickly mobilize resources in the aftermath of disasters in the country. This operation would be the second CA DDO in the country, it builds on the success and lessons learned from the first DPL with CAT-DDO disbursed in 2010. Guatemala is among the countries most affected by climate events and geophysical hazards. Located on the Ring of Fire between the Atlantic and Pacific Oceans, the country is frequently affected by earthquakes, landslides, and volcanic eruptions. Guatemala ranks Eleventh in the world among the countries most affected by climate-related events such as floods, hurricanes, and extreme weather. Recurrent droughts related to El Niño in the Dry Corridor endanger crops, livestock, and food security. Rapid urbanization and climate change further increase disaster risk in the country. As a result, vulnerable households may only be one disaster away from falling below the poverty line or sliding further back into poverty. Recognizing the need to enhance the country's policy and institutional framework in the areas of DRM and CCA, the GoG requested the proposed operation. The operation will support the modernization of Guatemala's legal and institutional framework to manage disasters and climate risks; and increase the Government's capacity to quickly mobilize resources in the aftermath of natural disasters. The operation reflects lessons learned from Guatemala's active participation in regional disaster risk management initiatives, the use of the first CAT DDO, and the experience with the most recent disaster, the El Fuego volcano eruption (2018), for which, in the absence of any other financial instrument, Congress fast tracked the approval of the World Bank-financed First Programmatic Improved Governance of Public Resources and Nutrition Development Policy Financing (US dollar 250 million) to address the liquidity shortage. The operation can also be activated to provide timely liquidity in the case of health-related emergencies.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="GT–P0029122"><narrative>Republic of Guatemala</narrative></participating-org><participating-org role="2" xml:lang="en" ref="GT–P0029122"><narrative>Republic of Guatemala</narrative></participating-org><participating-org role="2" xml:lang="en" ref="GT–P0029122"><narrative>Republic of Guatemala</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="GT-COA-0029123"><narrative>Ministry of Public Finance</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2016-08-11"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2019-05-24"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2023-03-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2023-03-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Rodrigo Donoso</narrative></person-name><telephone>+1-202-473-1000</telephone><email>rdonoso@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>







<recipient-country code="GT" percentage="100"><narrative xml:lang="en">GUATEMALA</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3598132" />
                <name><narrative>Guatemala City</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>14.64072 -90.513268</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="74020" percentage="83" xml:lang="en"/><sector vocabulary="1" code="15117" percentage="17" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="100.000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="17" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000752" percentage="33" xml:lang="en"><narrative>Disaster Risk Reduction</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000331" percentage="100" xml:lang="en"><narrative>Disaster Risk Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000752" percentage="33" xml:lang="en"><narrative>Disaster Risk Reduction</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000753" percentage="50" xml:lang="en"><narrative>Disaster Preparedness</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000658" percentage="17" xml:lang="en"><narrative>Education Facilities</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000411" percentage="33" xml:lang="en"><narrative>Public Expenditure Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="67" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="92" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000753" percentage="50" xml:lang="en"><narrative>Disaster Preparedness</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000658" percentage="17" xml:lang="en"><narrative>Education Facilities</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="33" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000752" percentage="33" xml:lang="en"><narrative>Disaster Risk Reduction</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="100" xml:lang="en"><narrative>Finance for Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="17" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="92" xml:lang="en"><narrative>Adaptation</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">200000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">200000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">200000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-29123"><narrative>Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">200000000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-29123"><narrative>Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-1000000</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-29123"><narrative>Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-2197207</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-29123"><narrative>Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-1890444</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-29123"><narrative>Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-1829778</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-29123"><narrative>Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-1759722</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-29123"><narrative>Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-2790667</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-29123"><narrative>Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-5470222</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-29123"><narrative>Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-6797778</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-29123"><narrative>Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-7471410</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-29123"><narrative>Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-7579773</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-29123"><narrative>Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-6707375</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-29123"><narrative>Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-6530352</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-29123"><narrative>Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-6003963</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-29123"><narrative>Ministry of Public Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P159710"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P159710?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P159710"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
B.1a: Number of new financial instruments established in line with the DRFS.
</narrative></title>
<baseline year="2019" iso-date="2019-03-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-20" />
<period-end iso-date="2023-02-24" />
<target value="2.00">
<comment><narrative>
&lt;p&amp;gt;In 2021, two new financial instruments were established in line with the DRFS: Cat DDO II and parametric insurance for excess rainfall (CCRIF SPC). These instruments were part of a financial strategy that aimed to organize financial instruments and identify their benefits based on specific needs. Additionally, the government negotiated a contingent credit line of up to US$400 million with the IDB. MAGA is also piloting agricultural insurance to provide economic coverage for small producers affected by intense rainfall or prolonged drought. https://www.minfin.gob.gt/images/eta/baselegal.html&lt;/p&amp;gt;

&lt;p&amp;gt;&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A.2a: National Institute of Seismology, Volcanology, Meteorology and Hydrology (INSIVUMEH), restructured, strengthened and providing enhanced hazard information related to volcano activity.
</narrative></title>
<baseline year="2019" iso-date="2019-03-20" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-20" />
<period-end iso-date="2023-01-24" />
<target value="Y">
<comment><narrative>
&lt;p&amp;gt;INSIVUMEH has undergone restructuring and strengthening efforts to provide enhanced hazard information related to volcano activity. The target set&amp;nbsp;was successfully achieved through the improvement of the monitoring network and coordination with CONRED for preparation and alerts.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
B.3a: Number of government institutions implementing thematic classifiers in DRM and CCA in line with the new conceptual guide and implementation manual.
</narrative></title>
<baseline year="2019" iso-date="2019-03-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-20" />
<period-end iso-date="2023-01-24" />
<target value="2.00">
<comment><narrative>
&lt;p&amp;gt;No progress has been reported by the overseeing entities, SECONRED and MARN, regarding the implementation of thematic classifiers in DRM (Disaster Risk Management) and CCA (Climate Change Adaptation) in accordance with the new conceptual guide and implementation manual. SECONRED claims to have implemented the classifier, but there is a lack of evidence to support its current usage. The challenges faced in this implementation include staff turnover in the budget and planning departments. Additionally, the governing bodies have not provided guidelines for other public entities to align with the conceptualization of the theme.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
A.1a: Percentage of municipalities that have included disaster risk reduction activities in their local development plans.
</narrative></title>
<baseline year="2019" iso-date="2019-03-20" value="3.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-20" />
<period-end iso-date="2023-01-24" />
<target value="29.00">
<comment><narrative>
&lt;p&amp;gt;The percentage of municipalities that have incorporated disaster risk reduction activities into their local development plans exceeded the target of 29% and reached a coverage rate of 85%. Achievements related to this include the launch of the first Territorial Platform for Disaster Risk Management in the West Region, which facilitates regional and local dialogue on risk management. CONRED continued promoting Comprehensive Disaster Risk Management at municipal level, following the conceptual framework established in th Bill..&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="85.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
B.1c: Operations Manual for the implementation of the DRFS adopted by the Ministry of Public Finance (MINFIN).
</narrative></title>
<baseline year="2019" iso-date="2019-03-20" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-20" />
<period-end iso-date="2023-01-24" />
<target value="Y">
<comment><narrative>
&lt;p&amp;gt;MINFIN designed and adopted an Operations Manual for the DRFS, achieving its goal in 2022 through Ministerial Agreement No. 167-2022. This clarified and organized internal functions regarding financial management, fiscal policy, and expenditure quality within the disaster risk management framework. The Operational Plan received World Bank and WFP support. https://www.minfin.gob.gt/images/downloads/leyes_generales/167_acuerdo_riesgos.pdf&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
B.2a: Number of new emergency procurement tools and mechanisms in place for dealing with adverse natural events.
</narrative></title>
<baseline year="2019" iso-date="2019-03-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-20" />
<period-end iso-date="2023-01-24" />
<target value="2.00">
<comment><narrative>
&lt;p&amp;gt;In 2020, the number of new emergency procurement tools and mechanisms for addressing adverse natural events exceeded the goal of two, reaching a total of three instruments. This accomplishment was made possible through the issuance of streamlined guidelines an provisions for procurement processes within the emergency framework. These resources can be accessed on the GUATECOMPRAS website.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
B.2b: Number of fiscal risk budget reports elaborated by the Directorate of Fiscal Transparency that consider natural hazards and climate risks.
</narrative></title>
<baseline year="2019" iso-date="2019-03-20" value="2.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-20" />
<period-end iso-date="2023-01-24" />
<target value="4.00">
<comment><narrative>
&lt;p&amp;gt;The Directorate of Fiscal Transparency has produced a significant number of fiscal risk budget reports that address natural hazards and climate risks. The initial goal of four reports was not only achieved but surpassed, with a total of 12 reports as of the closing date in 2020. These reports include Specific Risk Reports, Risk Supplement, and Annual Fiscal Risk Report.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="12.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
A.1b: Percentage of municipalities that have created or updated local DRM committees in line with the new DRM framework.
</narrative></title>
<baseline year="2019" iso-date="2019-03-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-20" />
<period-end iso-date="2023-01-24" />
<target value="15.00">
<comment><narrative>
&lt;p&amp;gt;The percentage of municipalities that have established or updated local DRM committees in accordance with the new DRM framework surpassed the 15% target in 2021. With an advancement of over 69% (230 municipalities out of 340) as of the closing date, this initiative has made significant progress.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="69.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
A.1c: Number of educational facilities constructed in compliance with the technical criteria adopted by the Ministry of Education about safe location and seismic-resistant infrastructure.
</narrative></title>
<baseline year="2019" iso-date="2019-03-20" value="100.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-20" />
<period-end iso-date="2023-01-24" />
<target value="220.00">
<comment><narrative>
&lt;p&amp;gt;The number of educational facilities constructed in accordance with the technical criteria set by the Ministry of Education for safe location and seismic-resistant infrastructure has surpassed the goal of 202 educational spaces in 2021. The final progress as of the closing date stands at 3,497 centers.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="3497.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
B.3b: Permanent National DRM Fund annually funded and operational in line with the DRFS.
</narrative></title>
<baseline year="2019" iso-date="2019-03-20" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-20" />
<period-end iso-date="2023-01-24" />
<target value="Y">
<comment><narrative>
&lt;p&amp;gt;The establishment of a Permanent National DRM Fund, operational and annually capitalized through the Annual Budget Law, in accordance with the DRFS, has not been achieved yet. According to Government authorities, this situation is due to pending Congress approval of the respective legislative reform that authorizes the creation of said Fund.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="N">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A.2b: Coordination of humanitarian assistance guided by the updated National Humanitarian Assistance Manual adopted by the Executive Secretariat of the National Coordinator for Disaster Reduction.
</narrative></title>
<baseline year="2019" iso-date="2019-03-20" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-20" />
<period-end iso-date="2023-01-24" />
<target value="Y">
<comment><narrative>
&lt;p&amp;gt;The coordination of humanitarian assistance was guided by the updated National Humanitarian Assistance Manual adopted by CONRED. The goal set for this coordination was achieved in 2021, with the manual being successfully utilized during the tropical emergencie Eta and Iota.???????&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
B.1b: Accelerated response time in providing emergency funds after the declaration of emergency.
</narrative></title>
<baseline year="2019" iso-date="2019-03-20" value="14.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-20" />
<period-end iso-date="2023-01-24" />
<target value="14.00">
<comment><narrative>
&lt;p&amp;gt;The response time for providing emergency funds was accelerated and maintained after the state of emergency was declared. In 2021, the goal of delivering funds within 14 days was successfully achieved during the Declaration of Public Calamity and in response to TS Eta.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="14.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
A.3a:Number of local communities with environmental risk evaluations completed and disseminated and trained to protect strategic ecosystems and the livelihoods provided by them.
</narrative></title>
<baseline year="2019" iso-date="2019-03-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-20" />
<period-end iso-date="2023-01-24" />
<target value="25.00">
<comment><narrative>
&lt;p&amp;gt;In 2021, the goal of completing and disseminating environmental risk evaluations in local communities to protect strategic ecosystems and livelihoods was achieved. A total of 25 communities underwent validation, with 13 communities in the Lake Pet&amp;eacute;n Itz&amp;aacute; ecosystem and 12 communities in the Lake Izabal ecosystem. These communities also received training from the Department of Risk Prevention Against the Effects of Climate Change. Collaboration through early warning systems facilitated by Agroclimatic Technical Committees (MTAs) in partnership with INSIVUMEH ensures that farmers receive crucial information for enhanced crop planning.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="25.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-23T20:24:13" hierarchy="1"><iati-identifier>44000-P122370</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Emergency Support for Social Services</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The objective of the Project is to preserve health and education services following severe flooding and other natural disasters that took place in Guatemala between May and September 2010.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><activity-status code="3" /><activity-date type="1" iso-date="2010-09-30"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2010-12-09"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2012-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2012-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Jasmin Chakeri</narrative></person-name><telephone>+1-202-473-1000</telephone><email>jchakeri@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>

<recipient-country code="GT" percentage="100"><narrative xml:lang="en">GUATEMALA</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3598132" />
                <name><narrative>Guatemala City</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>14.64072 -90.513268</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="11110" percentage="33" xml:lang="en"/><sector vocabulary="1" code="12110" percentage="33" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="33" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="30.0000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EZ" percentage="70.0000000" xml:lang="en"><narrative>FY17 - Other Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="25" xml:lang="en"><narrative>Finance for Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000751" percentage="25" xml:lang="en"><narrative>Disaster Response and Recovery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000752" percentage="25" xml:lang="en"><narrative>Disaster Risk Reduction</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000753" percentage="25" xml:lang="en"><narrative>Disaster Preparedness</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000752" percentage="25" xml:lang="en"><narrative>Disaster Risk Reduction</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000752" percentage="25" xml:lang="en"><narrative>Disaster Risk Reduction</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="100" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000751" percentage="25" xml:lang="en"><narrative>Disaster Response and Recovery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000751" percentage="25" xml:lang="en"><narrative>Disaster Response and Recovery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000753" percentage="25" xml:lang="en"><narrative>Disaster Preparedness</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000331" percentage="25" xml:lang="en"><narrative>Disaster Risk Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="75" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">30000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">30000.00</value>
</budget>
<capital-spend percentage="100" /><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P122370"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P122370?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P122370"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Not applicable
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Not applicable
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Not applicable
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Preservation of basic health services
</narrative></title>
<baseline year="2010" iso-date="2010-11-01" value="1915.00"><comment><narrative>Maintain the three levels of health care service in the 130 poorest municipalities, as measured by the number of health workersproviding medical services.</narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-01" />
<period-end iso-date="2011-12-31" />
<target value="1910.00">

</target>
<actual value="0.00">
<comment><narrative>
The government could not provide an update of the results indicator using a definition that is consistent with the baseline.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Maintain basic education services (grades 1-9) in the 130 poorest municipalties, as measured by the number of teachers and Telesecundaria facilitators providing education services
</narrative></title>
<baseline year="2010" iso-date="2010-10-31" value="34,057.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-10-31" />
<period-end iso-date="2012-12-31" />
<target value="34,057.00">

</target>
<actual value="34,659.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Preservation of basic education services
</narrative></title>
<baseline year="2010" iso-date="2010-11-01" value="37982.00"><comment><narrative>Maintain basic education services (grades 1 through 9) in the 130 poorest municipalities, as measured by the number teachers andTelescundaria facilitators providing education services.</narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-01" />
<period-end iso-date="2011-12-31" />
<target value="37980.00">

</target>
<actual value="0.00">
<comment><narrative>
The government could not provide an update of the results indicator using a definition that is consistent with the baseline.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Maintain the three levels of health care service in the 130 poorest municipalities, as measured by the number of health workers providing medical services.
</narrative></title>
<baseline year="2010" iso-date="2010-10-31" value="1,623.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-10-31" />
<period-end iso-date="2012-12-31" />
<target value="1,623.00">

</target>
<actual value="1,650.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-23T20:24:13" hierarchy="1"><iati-identifier>44000-P094321</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Project to Support a Rural Economic Development Program</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Project Development Objectives (PDO) are (i) to improve the competitiveness of rural productive supply chains with strong indigenous participation; and (ii) to strengthen the institutional capacity of the public entities participating in the program through the adoption of a territorial management model with indigenous participation.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The Project to Support the Rural Economic Development Program for Guatemala aims for strong indigenous involvement to improve the competitiveness of rural productive supply chains and strengthen the institutional capacity of public entities to adopt a territorial management model. The Project has three components: (1) it improves income, it invests in productive supply chains -- market access, technical assistance, seed capital, financial services, productive infrastructure investments and access to telecommunications; (2) it introduces in the institutions involved in the program a new model of public management focused on territorial management; and (3) it finances project management, monitoring and evaluation.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="GT–P0000935"><narrative>Ministry of Finance</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="GT-COA-0000936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2005-12-15"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2006-03-29"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2014-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2014-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Svetlana Edmeades</narrative></person-name><telephone>+1-202-473-1000</telephone><email>sedmeades@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>







<recipient-country code="GT" percentage="100"><narrative xml:lang="en">GUATEMALA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003588257" />
            <name><narrative>Departamento de Totonicapán</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15 -91.333328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003588697" />
            <name><narrative>Departamento de Sololá</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.66667 -91.25</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003589801" />
            <name><narrative>Departamento de San Marcos</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15 -91.916672</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590686" />
            <name><narrative>Departamento de SacatepEquez</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.58333 -90.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003590978" />
            <name><narrative>Departamento de Quetzaltenango</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.75 -91.666672</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003595415" />
            <name><narrative>Departamento de Huehuetenango</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.66667 -91.583328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003598571" />
            <name><narrative>Departamento de Chimaltenango</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.66667 -90.916672</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003599773" />
            <name><narrative>Departamento de Alta Verapaz</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15.66667 -90</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="15126" percentage="9" xml:lang="en"/><sector vocabulary="1" code="21023" percentage="22" xml:lang="en"/><sector vocabulary="1" code="22020" percentage="25" xml:lang="en"/><sector vocabulary="1" code="22040" percentage="22" xml:lang="en"/><sector vocabulary="1" code="31191" percentage="22" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="CF" percentage="6.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Information and Communications Technologies</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YA" percentage="22.0000000" xml:lang="en"><narrative>FY17 - Agricultural markets, commercialization and agri-business</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="CI" percentage="24.0000000" xml:lang="en"><narrative>FY17 - ICT Infrastructure</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="9.00000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="CS" percentage="11.0000000" xml:lang="en"><narrative>FY17 - ICT Services</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TI" percentage="22.0000000" xml:lang="en"><narrative>FY17 - Rural and Inter-Urban Roads</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="CZ" percentage="6.00000000" xml:lang="en"><narrative>FY17 - Other Information and Communications Technologies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="7" xml:lang="en"><narrative>Finance for Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000024" percentage="14" xml:lang="en"><narrative>Enterprise Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000211" percentage="14" xml:lang="en"><narrative>Investment and Business Climate</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000024" percentage="14" xml:lang="en"><narrative>Enterprise Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000243" percentage="14" xml:lang="en"><narrative>MSME Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000243" percentage="14" xml:lang="en"><narrative>MSME Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000332" percentage="7" xml:lang="en"><narrative>Agriculture Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000721" percentage="7" xml:lang="en"><narrative>Rural Markets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000021" percentage="14" xml:lang="en"><narrative>Business Enabling Environment</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000211" percentage="14" xml:lang="en"><narrative>Investment and Business Climate</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2006-03-01"/>
<period-end iso-date="2006-03-31"/>
<value currency="USD" value-date="2006-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-04-01"/>
<period-end iso-date="2006-04-30"/>
<value currency="USD" value-date="2006-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-05-01"/>
<period-end iso-date="2006-05-31"/>
<value currency="USD" value-date="2006-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-06-01"/>
<period-end iso-date="2006-06-30"/>
<value currency="USD" value-date="2006-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-07-01"/>
<period-end iso-date="2006-07-31"/>
<value currency="USD" value-date="2006-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-08-01"/>
<period-end iso-date="2006-08-31"/>
<value currency="USD" value-date="2006-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-09-01"/>
<period-end iso-date="2006-09-30"/>
<value currency="USD" value-date="2006-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-10-01"/>
<period-end iso-date="2006-10-31"/>
<value currency="USD" value-date="2006-10-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-11-01"/>
<period-end iso-date="2006-11-30"/>
<value currency="USD" value-date="2006-11-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-12-01"/>
<period-end iso-date="2006-12-31"/>
<value currency="USD" value-date="2006-12-31">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-01-01"/>
<period-end iso-date="2007-01-31"/>
<value currency="USD" value-date="2007-01-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-02-01"/>
<period-end iso-date="2007-02-28"/>
<value currency="USD" value-date="2007-02-28">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-03-01"/>
<period-end iso-date="2007-03-31"/>
<value currency="USD" value-date="2007-03-31">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-04-01"/>
<period-end iso-date="2007-04-30"/>
<value currency="USD" value-date="2007-04-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-03-01"/>
<period-end iso-date="2006-03-31"/>
<value currency="USD" value-date="2006-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-04-01"/>
<period-end iso-date="2006-04-30"/>
<value currency="USD" value-date="2006-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-05-01"/>
<period-end iso-date="2006-05-31"/>
<value currency="USD" value-date="2006-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-06-01"/>
<period-end iso-date="2006-06-30"/>
<value currency="USD" value-date="2006-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-07-01"/>
<period-end iso-date="2006-07-31"/>
<value currency="USD" value-date="2006-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-08-01"/>
<period-end iso-date="2006-08-31"/>
<value currency="USD" value-date="2006-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-09-01"/>
<period-end iso-date="2006-09-30"/>
<value currency="USD" value-date="2006-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-10-01"/>
<period-end iso-date="2006-10-31"/>
<value currency="USD" value-date="2006-10-31">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-11-01"/>
<period-end iso-date="2006-11-30"/>
<value currency="USD" value-date="2006-11-30">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-12-01"/>
<period-end iso-date="2006-12-31"/>
<value currency="USD" value-date="2006-12-31">166666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-01-01"/>
<period-end iso-date="2007-01-31"/>
<value currency="USD" value-date="2007-01-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-02-01"/>
<period-end iso-date="2007-02-28"/>
<value currency="USD" value-date="2007-02-28">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-03-01"/>
<period-end iso-date="2007-03-31"/>
<value currency="USD" value-date="2007-03-31">333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-04-01"/>
<period-end iso-date="2007-04-30"/>
<value currency="USD" value-date="2007-04-30">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">161241.49</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">161241.49</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2006-03-31"/><value value-date="2006-03-31">30000000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2006</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">-1408268</value><description xml:lang="en"><narrative>Total Commitment Cancellations in October Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-100674</value><description xml:lang="en"><narrative>Total Commitment Cancellations in May Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-01-31"/><value value-date="2008-01-31">75000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2008</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-04-30"/><value value-date="2008-04-30">63073</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2008</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-06-30"/><value value-date="2008-06-30">53011</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2008</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-10-31"/><value value-date="2008-10-31">63714</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2008</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-12-31"/><value value-date="2008-12-31">108895</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2008</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-01-31"/><value value-date="2009-01-31">50000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-02-28"/><value value-date="2009-02-28">300000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-03-31"/><value value-date="2009-03-31">45000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-03-31"/><value value-date="2009-03-31">125996</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2009</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-04-30"/><value value-date="2009-04-30">14265</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2009</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-05-31"/><value value-date="2009-05-31">121143</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2009</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-07-31"/><value value-date="2009-07-31">70666</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2009</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-08-31"/><value value-date="2009-08-31">18480</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2009</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-08-31"/><value value-date="2009-08-31">205000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-09-30"/><value value-date="2009-09-30">150000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-09-30"/><value value-date="2009-09-30">96722</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2009</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-12-31"/><value value-date="2009-12-31">169000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-12-31"/><value value-date="2009-12-31">124284</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2009</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-02-28"/><value value-date="2010-02-28">132735</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2010</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-02-28"/><value value-date="2010-02-28">540574</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-04-30"/><value value-date="2010-04-30">160000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-04-30"/><value value-date="2010-04-30">73898</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2010</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-05-31"/><value value-date="2010-05-31">212068</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-06-30"/><value value-date="2010-06-30">78552</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2010</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-07-31"/><value value-date="2010-07-31">112500</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2010</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-08-31"/><value value-date="2010-08-31">240000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-09-30"/><value value-date="2010-09-30">171273</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-10-31"/><value value-date="2010-10-31">71600</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-10-31"/><value value-date="2010-10-31">89767</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2010</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-11-30"/><value value-date="2010-11-30">40000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-12-31"/><value value-date="2010-12-31">260821</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-01-31"/><value value-date="2011-01-31">119190</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-03-31"/><value value-date="2011-03-31">223143</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-05-31"/><value value-date="2011-05-31">378572</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-07-31"/><value value-date="2011-07-31">221175</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-08-31"/><value value-date="2011-08-31">969988</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-09-30"/><value value-date="2011-09-30">100000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-10-31"/><value value-date="2011-10-31">1051063</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-11-30"/><value value-date="2011-11-30">215060</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-12-31"/><value value-date="2011-12-31">1071562</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-02-29"/><value value-date="2012-02-29">109452</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-04-30"/><value value-date="2012-04-30">73273</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">824286</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-06-30"/><value value-date="2012-06-30">516234</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-08-31"/><value value-date="2012-08-31">490254</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-09-30"/><value value-date="2012-09-30">1150031</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">335471</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">3937351</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-02-28"/><value value-date="2013-02-28">350000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-04-30"/><value value-date="2013-04-30">1213645</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">1269618</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-07-31"/><value value-date="2013-07-31">334000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">970370</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">2298364</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">800000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">1353697</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-02-28"/><value value-date="2014-02-28">800000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">2276710</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">609891</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">1731194</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">-126117</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">211513</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">500000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">-397833</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">-79760</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">0</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-100674</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2008-01-31"/><value value-date="2008-01-31">-75000</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2008</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2008-05-31"/><value value-date="2008-05-31">-1706</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2008</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2008-11-30"/><value value-date="2008-11-30">-1104</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2008</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2009-05-31"/><value value-date="2009-05-31">-3384</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2009-11-30"/><value value-date="2009-11-30">-4806</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-05-31"/><value value-date="2010-05-31">-3462</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-11-30"/><value value-date="2010-11-30">-6992</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-05-31"/><value value-date="2011-05-31">-7053</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-11-30"/><value value-date="2011-11-30">-9762</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">-25051</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">-35548</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">-38519</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">-40792</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">-45751</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">-46568</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">-46575</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">-53686</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-178766</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-166840</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-155704</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-144568</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-133432</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-122295</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-111159</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-100023</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-88887</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-77751</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-66615</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-55478</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-44342</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-33206</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-22070</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-10934</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">-298136</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">-430988</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">-641327</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">-821997</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">-1084600</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">-1321313</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">-1360874</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">-1337447</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-1332456</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-1325736</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-1325736</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-1325736</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-1325736</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-1325736</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-1325736</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-1325736</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-1325736</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-1325736</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-1325736</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-1325736</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-1325736</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-1325736</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-1325736</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-1301616</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="GT-COA-936"><narrative>MINISTRY OF THE ECONOMY (MINECO)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-937"><narrative>National Peace Fund (FONAPAZ)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-938"><narrative>Presidential Secretariat for Planning and Programming (SEGEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-939"><narrative>Social Investment Fund (FIS)</narrative></receiver-org><receiver-org xml:lang="en" ref="GT-COA-940"><narrative>Telephony Development Fund (FONDETEL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P094321"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P094321?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P094321"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Preparation of half-yearly project monitoring reports within 45 days of the end of each semester and a coordinated annual project plan at least 3 months prior to the beginning of the fiscal year
</narrative></title>
<baseline year="2007" iso-date="2007-11-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-11-26" />
<period-end iso-date="2014-07-31" />
<target value="10.00">
<comment><narrative>
Target has been achieved. Revised through restructuring in March 2013
</narrative></comment>
</target>
<actual value="10.00">
<comment><narrative>
2 per year
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
80% of project beneficiaries are indigenous (original indicator)
</narrative></title>
<baseline year="2007" iso-date="2007-11-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-11-26" />
<period-end iso-date="2014-07-31" />
<target value="80.00">
<comment><narrative>
Target has been surpassed.
</narrative></comment>
</target>
<actual value="90.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
At least 33% of departments covered by the project have departmental development plans (revised indicator)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2014-07-31" />
<target value="33.00">
<comment><narrative>
Target has been achieved and exceeded. Revised through restructuring in March 2013
</narrative></comment>
</target>
<actual value="94.00">
<comment><narrative>
33% corresponds to 7 DDPs; now these exist for 20 DDPs, which is equivalent to 94%
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
100% of the beneficiaries of the improvement in rural roads have access during the whole year to critical markets (revised indicators)
</narrative></title>
<baseline year="2007" iso-date="2007-11-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-11-26" />
<period-end iso-date="2014-07-31" />
<target value="100.00">
<comment><narrative>
Target has been achieved; Revised through restructuring in March 2013
</narrative></comment>
</target>
<actual value="100.00">
<comment><narrative>
Public access for completed bridges
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
At least 25% of project ideas identified in the Municipal Development Plans have budget in the POAs of local governments (revised indicator)
</narrative></title>
<baseline year="2007" iso-date="2007-11-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-11-26" />
<period-end iso-date="2014-07-31" />
<target value="25.00">
<comment><narrative>
Target has been achieved and surpassed. Revised through restructuring in March 2013
</narrative></comment>
</target>
<actual value="35.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
At least 80% of the technical assistance provided to producer organizations is done so in the prevailing language of the participating producer organization (revised indicator)
</narrative></title>
<baseline year="2010" iso-date="2010-09-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-09-28" />
<period-end iso-date="2014-07-31" />
<target value="80.00">
<comment><narrative>
Target has been achieved;
revised through restructuring in March 2013
</narrative></comment>
</target>
<actual value="80.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
100% of the productive infrastruture approved by the Investment Coordination Committee (ICC) is implemented according to timing expected in the contract (revised indicator)
</narrative></title>
<baseline year="2007" iso-date="2007-11-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-11-26" />
<period-end iso-date="2014-07-31" />
<target value="100.00">
<comment><narrative>
Target was revised up to 100% from 90% through restructuring in March 2013
</narrative></comment>
</target>
<actual value="82.00">
<comment><narrative>
this indicator related to productive infrastructure and not bridges; hence, it captures all sub-projects that include productiveinfrastructure (33); of the 33 with contract, 27 were implemented on time, according to contract
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Sub-project implementation complies with at least 70% of environmental mitigation measures as defined in the business plan (revisedindicator)
</narrative></title>
<baseline year="2010" iso-date="2010-09-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-09-28" />
<period-end iso-date="2014-07-31" />
<target value="100.00">
<comment><narrative>
revised through restructuring in March 2013
</narrative></comment>
</target>
<actual value="72.00">
<comment><narrative>
137 sub-projects complies with 70 to 100% of the mitigation measures (representing 72% of all sub-projects); the rest apply somemitigation measure, but there is no clear progress measure
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
90% of all municipalities covered by the project have a territorial management plan (revised indicator)
</narrative></title>
<baseline year="2007" iso-date="2007-11-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-11-26" />
<period-end iso-date="2014-07-31" />
<target value="90.00">
<comment><narrative>
Target has been achieved and exceeded. Revised through restructuring in March 2013
</narrative></comment>
</target>
<actual value="98.00">
<comment><narrative>
90% corresponds to 300; now these exist for 328 municipalities, which is equivalent to 98%
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
At least 200 new productive supply chain partnerships reaching at least 30,000 project beneficiaries are operating (revised indicator)
</narrative></title>
<baseline year="2007" iso-date="2007-11-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-11-26" />
<period-end iso-date="2014-07-31" />
<target value="200.00">
<comment><narrative>
Original target of 300 partnerships was revised down to 200; Number of beneficiaries was also revised down from 45,000 to 30,000,where at least 12,000 are direct and 18,000 are indirect beneficiaries; revised through restructuring in March 2013
</narrative></comment>
</target>
<actual value="189.00">
<comment><narrative>
13 have been canceled;

Direct beneficiaries (17,990) + indirect beneficiaries (89,950) = 107,940 beneficiaries from productivepartnerships
There are additional 11,316 direct and indirect beneficiaries from business strengthening activities under the project
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
All financed projects have an environmental management tool developed according to the norms of he Ministry of Environment and Natural Resources, before their implementation (revised indicator)
</narrative></title>
<baseline year="2010" iso-date="2010-09-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-09-28" />
<period-end iso-date="2014-07-31" />
<target value="100.00">
<comment><narrative>
Target has been achieved;
revised through restructuring in March 2013
</narrative></comment>
</target>
<actual value="100.00">
<comment><narrative>
all sub-projects have an env. management tool
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
At least 25% of municipal projects stem from the participatory planning process (revised indicator)
</narrative></title>
<baseline year="2010" iso-date="2010-09-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-09-28" />
<period-end iso-date="2014-07-31" />
<target value="25.00">
<comment><narrative>
This target was revised up to 25% (from 5%) through restructuring in March 2013
</narrative></comment>
</target>
<actual value="35.00">
<comment><narrative>
This indicator has consistently exceeded the original target value of 5%, which was increased to 25%
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase of total sales of the rural productive supply chain partnerships with US$35 million during the project period (revised indicator)
</narrative></title>
<baseline year="2009" iso-date="2009-10-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-10-01" />
<period-end iso-date="2014-07-31" />
<target value="US$35 million">
<comment><narrative>
This target was revised down to US$35 million (from US$50 million) through restructuring in March 2013
</narrative></comment>
</target>
<actual value="US$15.4 million">
<comment><narrative>
Reflects sales from 189 sub-projects;  only sub-projects were considered (and not plans for capacity strengthening)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
The decentralized strategic territorial information management system is operational in 3 departments, and provides service coverage to the remaining departments (revised indicator)
</narrative></title>
<baseline year="2007" iso-date="2007-11-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-11-26" />
<period-end iso-date="2014-07-31" />
<target value="3.00">
<comment><narrative>
Target has been achieved and surpassed. Revised through restructuring in March 2013
</narrative></comment>
</target>
<actual value="8.00">
<comment><narrative>
Operational in 8 departments
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
100% of infrastructure investments have a maintenance plan signed by the beneficiaries (revised indicator)
</narrative></title>
<baseline year="2007" iso-date="2007-11-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-11-26" />
<period-end iso-date="2014-07-31" />
<target value="100.00">
<comment><narrative>
TTarget has been achieved; Revised through restructuring in March 2013
</narrative></comment>
</target>
<actual value="100.00">
<comment><narrative>
Notifications of receipt of those plans are in the project archives
</narrative></comment>
</actual>
</period>
</indicator>
</result></iati-activity></iati-activities>