<iati-activities version="2.03" generated-datetime="2026-10-25T20:58:53"><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T01:57:00" hierarchy="1"><iati-identifier>44000-P116410</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Eskom Investment Support Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The project development objective (PDO) of the Eskom Investment Support Project for South Africa is to enhance its power supply andenergy security in an efficient and sustainable manner so as to support both economic growth objectives and South Africa's longterm carbon mitigation strategy.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The project development objective (PDO) of the Eskom Investment Support Project for South Africa is to enhance its power supply and energy security in an efficient and sustainable manner so as to support both economic growth objectives and South Africa's long term carbon mitigation strategy. There are three components to the project. Component A: International Bank for Reconstruction and Development (IBRD) support for the financing of the Medupi coal-fired power plant (4,800 MW using supercritical technology). This loan will finance supply and install and construction contracts for the power plant and associated transmission lines. Interest during construction, payable to IBRD and to other lenders to the project will also be financed by the proposed IBRD loan. Component B: support for financing investments in renewable energy (Wind and Concentrating Solar Power Plants). Component C: support for other low carbon energy efficiency components comprising the Majuba Rail Project (railway for coal transportation) and a technical assistance program for improving supply side efficiencies.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="ZA–P0003107"><narrative>ESKOM Holdings SOC Limited</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="ZA-COA-0003109"><narrative>ESKOM</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2010-03-30"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2010-04-08"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2021-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2021-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Franz Gerner</narrative></person-name><telephone>+1-202-473-1000</telephone><email>fgerner@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="ZA" percentage="100"><narrative xml:lang="en">SOUTH AFRICA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000943032" />
            <name><narrative>Volksrust</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-27.36541 29.88175</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000945945" />
            <name><narrative>Upington</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-28.44776 21.256121</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000947486" />
            <name><narrative>Tutuka</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-26.776951 29.352659</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000980148" />
            <name><narrative>Majuba</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-32.798302 27.373211</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000991407" />
            <name><narrative>Kendal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-26.05843 28.9569</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000996928" />
            <name><narrative>Hendrina Power Station</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-26.033331 29.66667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003359736" />
            <name><narrative>Vredendal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-31.668329 18.50119</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001005125" />
            <name><narrative>Ermelo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-26.533331 29.98333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003365354" />
            <name><narrative> Koekenaap</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-31.52689 18.291281</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007730334" />
            <name><narrative>Lephalale</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-23.666071 27.74477</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="23320" percentage="93" xml:lang="en"/><sector vocabulary="1" code="23230" percentage="4" xml:lang="en"/><sector vocabulary="1" code="23240" percentage="3" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LB" percentage="2.00000000" xml:lang="en"><narrative>FY17 - Renewable Energy Biomass</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LZ" percentage="12.0000000" xml:lang="en"><narrative>FY17 - Other Energy and Extractives</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LU" percentage="2.00000000" xml:lang="en"><narrative>FY17 - Renewable Energy Solar</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LT" percentage="80.0000000" xml:lang="en"><narrative>FY17 - Energy Transmission and Distribution</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LW" percentage="2.00000000" xml:lang="en"><narrative>FY17 - Renewable Energy Wind</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LI" percentage="2.00000000" xml:lang="en"><narrative>FY17 - Renewable Energy Geothermal</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000221" percentage="30" xml:lang="en"><narrative>Job Creation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="30" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="30" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="10" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000221" percentage="30" xml:lang="en"><narrative>Job Creation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="30" xml:lang="en"><narrative>Urban Development</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="1900-01-01"/>
<period-end iso-date="1900-01-01"/>
<value currency="USD" value-date="1900-01-01">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">133333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">133333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">133333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">66666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">66666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">66666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">66666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">66666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">66666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">66666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">66666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">66666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">50000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">50000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">50000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">73333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">73333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">73333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">73333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">73333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">73333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">66666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">66666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">66666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">66666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">66666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">66666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">38333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">38333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">38333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">40000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">40000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">40000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">40000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">40000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">40000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">38333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">38333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">38333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">38333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">38333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">38333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">38333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">38333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">38333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">38333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">38333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">38333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">38333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">38333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">38333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">35000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">35000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">35000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">35000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">35000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">35000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">35000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">35000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">35000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">35000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">35000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">35000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">35000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">35000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">35000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">35000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">35000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">35000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">66666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">66666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">66666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="1900-01-01"/>
<period-end iso-date="1900-01-01"/>
<value currency="USD" value-date="1900-01-01">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">596469170.90</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">596469170.90</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2010-04-30"/><value value-date="2010-04-30">3750000000</value><description xml:lang="en"><narrative>Total Commitment in April Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">-320000000</value><description xml:lang="en"><narrative>Total Commitment Cancellations in June Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-270389219</value><description xml:lang="en"><narrative>Total Commitment Cancellations in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-06-30"/><value value-date="2010-06-30">9375000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-10-31"/><value value-date="2010-10-31">361614275</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-06-30"/><value value-date="2011-06-30">170490687</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-11-30"/><value value-date="2011-11-30">37032041</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-01-31"/><value value-date="2012-01-31">199311127</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-04-30"/><value value-date="2012-04-30">101603214</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-06-30"/><value value-date="2012-06-30">98556678</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-09-30"/><value value-date="2012-09-30">42343488</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">56684222</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">66986417</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">167131886</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">31098570</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">-9228926</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">28373876</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">104301643</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">2617816</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">74581457</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">34388523</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">461779348</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">67545029</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-01-31"/><value value-date="2015-01-31">-2942070</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">2384252</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">67920556</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">123057029</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">49288268</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">-1688788</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">42782693</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">76077998</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">179622833</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">-2555223</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">146827300</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">70503525</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">665090</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">117516774</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">52992669</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">20625221</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">1119908</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">25369920</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">34818959</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">23362748</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">18446996</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">747804</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-06-30"/><value value-date="2010-06-30">-9375000</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-11-30"/><value value-date="2010-11-30">-30880</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-05-31"/><value value-date="2011-05-31">-1408041</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-11-30"/><value value-date="2011-11-30">-1769948</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">-3095928</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">-4940081</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">-4362747</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">-4534879</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">-27836506</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">-41569969</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">-75802073</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">-79809736</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-86005311</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-92477242</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-106992141</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-100869775</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-120453688</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-102833025</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-102271560</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-103184513</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-2025113</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-78670641</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-90513139</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-95928210</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-89571491</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-83770084</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-74748446</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-70913206</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-68278839</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-65534627</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-67464069</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-60176267</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-63916115</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-62033092</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-56097694</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-49659888</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-69576303</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-57151376</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-58656845</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-57425237</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-1117385</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-45397389</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-53193854</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-60559000</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-57324043</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-55543384</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-48664004</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-48111216</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-47170532</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-47286496</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-50033848</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-47345075</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-51013334</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-52799767</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-3109"><narrative>ESKOM</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P116410"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P116410?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P116410"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Generation capacity installed and commissioned (Medupi)
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="2021-06-30" />
<target value="4800.00">
<comment><narrative>
&lt;p&amp;gt;While all the units were commissioned by loan closure on June 30, 2021, except for the last unit which was commissioned in July 2021, the main shortfall was the significantly lower than expected energy outputs and the substantial defects which will take time and additional resources to resolve.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="4000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Generation capacity installed and commissioned from renewable energy (Sere Wind Farm)
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="2021-06-30" />
<target value="100.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Quarterly Medupi Environmental Monitoring Committee meetings held and minutes distributed.
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="2021-06-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct CO2 emissions avoided under the project (per year)
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="2021-06-30" />
<target value="238000.00">
<comment><narrative>
&lt;p&amp;gt;The target was exceeded.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="315330.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Progress rate towards completion (Sere Wind Farm)
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="2021-06-30" />
<target value="100.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Medupi construction progress rate towards completion
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="2021-06-30" />
<target value="100.00">

</target>
<actual value="99.95">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of studies for power plant efficiency improvements completed
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="2021-06-30" />
<target value="7.00">
<comment><narrative>
&lt;p&amp;gt;Fully achieved.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="7.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of studies for power plant efficiency improvements completed
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="2021-06-30" />
<target value="7.00">

</target>
<actual value="7.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Progress rate towards completion for Majuba rail project
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="2021-06-30" />
<target value="100.00">
<comment><narrative>
&lt;p&amp;gt;Not fully achieved and now scheduled for completion in 2022.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="97.50">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Majuba coal transportation cost
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="93"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="2021-06-30" />
<target value="20">
<comment><narrative>
&lt;p&amp;gt;Not achieved.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="190">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Progress rate towards completion for Majuba rail project
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="2021-06-30" />
<target value="100.00">

</target>
<actual value="97.50">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Generation capacity installed and commissioned (Medupi)
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="2021-06-30" />
<target value="4800.00">

</target>
<actual value="4000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct CO2 emissions avoided under the project (per year)
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="2021-06-30" />
<target value="238000.00">

</target>
<actual value="315330.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of wind turbines erected
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="2021-06-30" />
<target value="46.00">
<comment><narrative>
&lt;p&amp;gt;Fully achieved because plant was completed in 2015/16.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="46.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Generation capacity installed and commissioned from renewable energy (Sere Wind Farm)
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="2021-06-30" />
<target value="100.00">
<comment><narrative>
&lt;p&amp;gt;Target was fully achieved.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Transmission lines progress rate towards completion
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="2021-06-30" />
<target value="100.00">
<comment><narrative>
&lt;p&amp;gt;Not fully achieved due to delayed completion of two sections.&amp;nbsp;The two sections are scheduled for commissioning in March and May 2022.???????&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="95.88">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Energy Storage Capacity Installed and Commissioned
</narrative></title>
<baseline year="2018" iso-date="2018-11-27" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-27" />
<period-end iso-date="2021-06-30" />
<target value="200.00">

</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Majuba coal transportation cost
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="93"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="2021-06-30" />
<target value="20">

</target>
<actual value="190">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Transmission lines completed
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="2021-06-30" />
<target value="1020.00">
<comment><narrative>
&lt;p&amp;gt;Not fully achieved due to the delayed completion of two transmission line sections.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="941.90">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Project generation capacity savings
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="2021-06-30" />
<target value="3171.00">
<comment><narrative>
&lt;p&amp;gt;Target exceeded.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="4557.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Progress rate towards completion (Sere Wind Farm)
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="2021-06-30" />
<target value="100.00">
<comment><narrative>
&lt;p&amp;gt;Fully achieved.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of units handed over to commercial operations
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="2021-06-30" />
<target value="6.00">

</target>
<actual value="5.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Transmission lines progress rate towards completion
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="2021-06-30" />
<target value="100.00">

</target>
<actual value="95.88">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Energy Storage Capacity Installed and Commissioned
</narrative></title>
<baseline year="2018" iso-date="2018-11-27" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-11-27" />
<period-end iso-date="2021-06-30" />
<target value="200.00">
<comment><narrative>
&lt;p&amp;gt;Not achieved. Implementation has not started and activities will likely be supported under another project.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="200.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of units synchronized
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="2021-06-30" />
<target value="6.00">
<comment><narrative>
&lt;p&amp;gt;Fully achieved.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="6.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of wind turbines erected
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="2021-06-30" />
<target value="46.00">

</target>
<actual value="46.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of units handed over to commercial operations
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="2021-06-30" />
<target value="6.00">
<comment><narrative>
&lt;p&amp;gt;Not fully achieved because COD was for the final&amp;nbsp;unit delayed until July 2021.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="5.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Project generation capacity savings
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="2021-06-30" />
<target value="3171.00">

</target>
<actual value="4557.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Quarterly Medupi Environmental Monitoring Committee meetings held and minutes distributed.
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="2021-06-30" />
<target value="Y">
<comment><narrative>
&lt;p&amp;gt;Fully achieved.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of units synchronized
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="2021-06-30" />
<target value="6.00">

</target>
<actual value="6.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="2021-06-30" />
<target value="5500000.00">
<comment><narrative>
&lt;p&amp;gt;The target was not met due to delays in commissioning the plant and due to its low energy availability factors.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="4234100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Medupi construction progress rate towards completion
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="2021-06-30" />
<target value="100.00">
<comment><narrative>
&lt;p&amp;gt;Not fully achieved due to delayed completion and COD of the last unit.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="99.95">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Transmission lines completed
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="2021-06-30" />
<target value="1020.00">

</target>
<actual value="941.90">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T01:57:00" hierarchy="1"><iati-identifier>44000-P150008</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Land Bank Financial Intermediation Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The project's development objective is to sustainably scale up Land Bank's financing, specifically to benefit emerging farmers.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Land Bank Financial Intermediation Loan Project for South Africa is to sustainably scale up Land Bank's financing, specifically to benefit emerging farmers. The project is a financial intermediary loan (FIL) of US$93 million to Land Bank as the borrower and implementing agency with a guarantee of the Republic of South Africa. The project has one component: a Line of Credit (LOC) for agricultural financing in the amount of US$93 million. The objectives of the LOC component are to: support land bank in refocusing its operations on wholesale lending, and support land bank's new approach to help integrate emerging farmers into established value chains. To achieve the above objectives, land bank will provide both wholesale finance to participating PFIs for on-lending to commercial and emerging farmers and direct financing, in partnership with large agriculture corporates, to emerging farmers to support their integration in established value chains.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="ZA–P0019006"><narrative>Land and Agricultural Development Bank of South Africa</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="ZA-COA-0019007"><narrative>Land and Agriculture Development Bank of South Africa</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2015-02-27"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2017-01-23"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2022-04-01"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2022-04-01"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Ajai Nair</narrative></person-name><telephone>+1-202-473-1000</telephone><email>anair@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="ZA" percentage="100"><narrative xml:lang="en">SOUTH AFRICA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001085599" />
            <name><narrative>Province of the Western Cape</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-34 20</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001085598" />
            <name><narrative>Province of North West</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-26.5 26</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001085597" />
            <name><narrative>Limpopo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-24 29.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001085596" />
            <name><narrative>Province of Northern Cape</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-29.5 22</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001085595" />
            <name><narrative>Mpumalanga</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-26 30</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001085594" />
            <name><narrative>Gauteng</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-26.08333 28.25</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0001085593" />
            <name><narrative>Eastern Cape</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-32 26</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000972062" />
            <name><narrative>Province of KwaZulu-Natal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-29 30</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000967573" />
            <name><narrative>Free State</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-29 26</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="31193" percentage="50" xml:lang="en"/><sector vocabulary="1" code="16020" percentage="50" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="FA" percentage="40.0000000" xml:lang="en"><narrative>FY17 - Banking Institutions</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AB" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Agricultural Extension, Research, and Other Support Activities</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YA" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Agricultural markets, commercialization and agri-business</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="FL" percentage="40.0000000" xml:lang="en"><narrative>FY17 - Other Non-bank Financial Institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="50" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000323" percentage="25" xml:lang="en"><narrative>MSME Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000721" percentage="50" xml:lang="en"><narrative>Rural Markets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="100" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000032" percentage="25" xml:lang="en"><narrative>Financial Infrastructure and Access</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="25" xml:lang="en"><narrative>Finance for Development</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">3100000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">3100000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">3100000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">3100000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">3100000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">3100000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">2325000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">2325000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">2325000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">2325000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">2325000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">2325000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">2325000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">2325000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">2325000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">2325000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">2325000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">2325000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">1550000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">1550000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">1550000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">1550000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">1550000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">1550000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">1550000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">1550000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">1550000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">1550000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">1550000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">1550000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">1550000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">1550000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">1550000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">1550000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">1550000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">1550000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">1550000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">1550000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">1550000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">1550000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">1550000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">1550000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">775000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">775000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">775000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">775000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">775000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">775000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">775000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">775000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">775000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">775000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">775000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">775000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-01"/>
<value currency="USD" value-date="2022-04-01">81906120.22</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-01"/>
<value currency="USD" value-date="2022-04-01">81906120.22</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">93000000</value><description xml:lang="en"><narrative>Total Commitment in January Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-19007"><narrative>Land and Agriculture Development Bank of South Africa</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">-66124639</value><description xml:lang="en"><narrative>Total Commitment Cancellations in December Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-19007"><narrative>Land and Agriculture Development Bank of South Africa</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-15932745</value><description xml:lang="en"><narrative>Total Commitment Cancellations in October Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-19007"><narrative>Land and Agriculture Development Bank of South Africa</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">0</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-19007"><narrative>Land and Agriculture Development Bank of South Africa</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">6636214</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-19007"><narrative>Land and Agriculture Development Bank of South Africa</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">20188764</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-19007"><narrative>Land and Agriculture Development Bank of South Africa</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-15731098</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-19007"><narrative>Land and Agriculture Development Bank of South Africa</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-421048</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-19007"><narrative>Land and Agriculture Development Bank of South Africa</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">-150216</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-19007"><narrative>Land and Agriculture Development Bank of South Africa</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-112140</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-19007"><narrative>Land and Agriculture Development Bank of South Africa</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">-140888</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-19007"><narrative>Land and Agriculture Development Bank of South Africa</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">-143006</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-19007"><narrative>Land and Agriculture Development Bank of South Africa</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-107706</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-19007"><narrative>Land and Agriculture Development Bank of South Africa</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">-145765</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-19007"><narrative>Land and Agriculture Development Bank of South Africa</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-242628</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-19007"><narrative>Land and Agriculture Development Bank of South Africa</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-01-31"/><value value-date="2020-01-31">-140445</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-19007"><narrative>Land and Agriculture Development Bank of South Africa</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-391220</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-19007"><narrative>Land and Agriculture Development Bank of South Africa</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">-442429</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-19007"><narrative>Land and Agriculture Development Bank of South Africa</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-424431</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-19007"><narrative>Land and Agriculture Development Bank of South Africa</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">-349682</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-19007"><narrative>Land and Agriculture Development Bank of South Africa</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-441079</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-19007"><narrative>Land and Agriculture Development Bank of South Africa</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">-378297</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-19007"><narrative>Land and Agriculture Development Bank of South Africa</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-446806</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-19007"><narrative>Land and Agriculture Development Bank of South Africa</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-01-31"/><value value-date="2022-01-31">-343682</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-19007"><narrative>Land and Agriculture Development Bank of South Africa</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-407777</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-19007"><narrative>Land and Agriculture Development Bank of South Africa</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">-371210</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-19007"><narrative>Land and Agriculture Development Bank of South Africa</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-179469</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-19007"><narrative>Land and Agriculture Development Bank of South Africa</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">0</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-19007"><narrative>Land and Agriculture Development Bank of South Africa</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">-154794</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-19007"><narrative>Land and Agriculture Development Bank of South Africa</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-149244</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-19007"><narrative>Land and Agriculture Development Bank of South Africa</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">-7513</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-19007"><narrative>Land and Agriculture Development Bank of South Africa</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-273420</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-19007"><narrative>Land and Agriculture Development Bank of South Africa</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-85212</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-19007"><narrative>Land and Agriculture Development Bank of South Africa</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-88940</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-19007"><narrative>Land and Agriculture Development Bank of South Africa</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-6362575</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-19007"><narrative>Land and Agriculture Development Bank of South Africa</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P150008"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P150008?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P150008"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries (minimum)
</narrative></title>
<baseline year="2016" iso-date="2016-10-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Bulk of the direct project beneficiaries are workers under one of the sub-projects that utilized WB financing.&amp;nbsp; This project estimates 1444&amp;nbsp;new jobs that provide employment for 10 months in a year, 62% of who are women. These jobs are however at risk due to ongoing challenges being faced by the project following Covid (increased freight rates for produce exports), extreme weather variations related to climate change, and financial challenges faced by Land Bank. The ICR attributes 22.5% of the jobs created fro this sub-project and 50% of jobs from the second sub-project to the World Bank Project, in proportion to the World Bank financing utilized for these&amp;nbsp;sub-projects.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="350.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Return on Average Assets (minimum)
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="1.12"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The high ROA&amp;nbsp;is misleading since it is caused by Land Bank reporting a large profit for the year driven primarily&amp;nbsp;due to release of impairment charges of R 1.3 billion but its assets having reduced significantly over the past three years due to contracting loan book.&amp;nbsp; Land Bank reported a profit of R1.44 billion in FY2022 following three years of cumulative losses of R4.4 billion. Its assets&amp;nbsp; for FY 2022 was R 40.2 billion and that for FY2021 was R 34.7 billion.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="3.80">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of direct value chain loans disbursed under the project (minimum)
</narrative></title>
<baseline year="2016" iso-date="2016-10-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The achievement is from two sub-loans that utilized WB financing for a total of R123 million.&amp;nbsp;&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="8022250.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in outstanding loan portfolio of Land Bank (minimum)
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="37796688000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The original targets were a 1.5% increase in year 1, and 10% increase annually from year 2 to Year 5. This translates to a cumulative target of 48% over five years.&amp;nbsp; Land Bank&amp;#39;s outstanding loan portfolio grew from the baseline to R45.2&amp;nbsp;billion in March 2020 but started contracting following Land Bank defaulting to its commercial lenders in April 2020, new customer lending being suspended, and collections being used to primarily pay creditors.&amp;nbsp; The situation remaining unresolved at the time of project closing and&amp;nbsp;Land Bank&amp;#39;s gross loan book had contracted to R 25.9 million&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Total NPL rate under the line of credit (maximum)
</narrative></title>
<baseline year="2016" iso-date="2016-10-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The NPL under the credit line is higher than that for Land Bank&amp;#39;s overall loan book since it is an average of the risk classification of just two sub-loans that utilized WB financing.&amp;nbsp; Of these two, one utilized R90 million and the other R33 million, and the former is in non-performing status.&amp;nbsp;&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="73.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Total NPL rate for Land Bank (maximum)
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="3.72"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Land Bank&amp;#39;s continued default status resulting in a contracting performing book has contributed to rapid growth in proportion of NPLs from 23% in March 2020 to 47.7% in March 2022.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="47.70">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Land Bank liabilities that are long-term (over 1 year) (minimum)
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="31.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="58.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Return on Average Equity (minimum)
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="6.78"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The high ROE is misleading since it is caused by Land Bank reporting a large profit for the year driven primarily&amp;nbsp;due to release of impairment charges of R 1.3 billion but its equity having reduced significantly over the past three years due to accumulated losses.&amp;nbsp; Land Bank reported a profit of R1.5 billion in FY2022 following three years of cumulative losses of R4.4 billion. Its equity for FY 2022 was R 3.98 billion and that for FY2021 was R 2.59 billion.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="42.70">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of wholesale loans disbursed under the project (minimum)
</narrative></title>
<baseline year="2016" iso-date="2016-10-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;There was no achievement under the wholesale financing window since Land Bank decided to wind down its wholesale financing facility after the project was approved.&amp;nbsp; The plan to restructure the windows as indirect lending to also include agent originated lending and special purpose vehicles, which was agreed on during the mid-term review in 2019,&amp;nbsp;could not be implemented due to Land Bank moving into default status in April 2020.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T01:57:00" hierarchy="1"><iati-identifier>44000-P174246</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>South Africa Covid-19 Response Development Policy Operation</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To protect the poor and vulnerable from the adverse socio-economic impacts of the COVID-19 pandemic, and to pave the way for a resilient sustainable recovery.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objectives of the South Africa COVID-19 Response Development Policy Operation in South Africa protect the poor and vulnerable from the adverse socio-economic impacts of the COVID-19 pandemic, and to pave the way for a resilient sustainable recovery. This first Development Policy Operation for South Africa sets the stage for a deeper reform engagement with the WBG. The operation seeks to provide South Africa with relief from its most serious economic crisis in 90 years and assists in restructuring its economy while preparing the country for a resilient recovery. Its design and the selection of prior actions recognize this opportunity by balancing ambition with feasibility. It mirrors the components of the Government's ERRP and the three stages of the World Bank's COVID-19 Crisis Response Approach Paper. The operation consists of two pillars with a total of eight prior actions. The first pillar consists of measures to protect the poor and modernize social welfare. The three types of measures are: (i) measures to protect people's lives and curb the spread of the virus; (ii) measures to protect the poorest and most vulnerable; and (iii) measures to protect jobs and businesses from the short-term economic impacts of the crisis. The second pillar focuses on accelerating a resilient and sustainable recovery.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="ZA–P0045929"><narrative>Republic of South Africa</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="ZA-COA-08"><narrative>National Treasury</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2022-01-20"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2022-01-20"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2023-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2023-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Edouard Al-Dahdah</narrative></person-name><telephone>+1-202-473-1000</telephone><email>ealdahdah@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="ZA" percentage="100"><narrative xml:lang="en">SOUTH AFRICA</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="964137" />
                <name><narrative>Pretoria</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-25.74486 28.18783</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="16011" percentage="37" xml:lang="en"/><sector vocabulary="1" code="15126" percentage="25" xml:lang="en"/><sector vocabulary="1" code="23111" percentage="13" xml:lang="en"/><sector vocabulary="1" code="24010" percentage="13" xml:lang="en"/><sector vocabulary="1" code="12250" percentage="6" xml:lang="en"/><sector vocabulary="1" code="12220" percentage="6" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LZ" percentage="12.0000000" xml:lang="en"><narrative>FY17 - Other Energy and Extractives</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="25.0000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="38.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="FA" percentage="13.0000000" xml:lang="en"><narrative>FY17 - Banking Institutions</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="12.0000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000522" percentage="13" xml:lang="en"><narrative>Social Insurance and Pensions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="13" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000523" percentage="38" xml:lang="en"><narrative>Social protection delivery systems</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000862" percentage="13" xml:lang="en"><narrative>Energy Policies &amp; Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000311" percentage="13" xml:lang="en"><narrative>Financial Sector oversight and policy/banking regulation &amp; restructuring</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="13" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000863" percentage="13" xml:lang="en"><narrative>Access to Energy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000032" percentage="13" xml:lang="en"><narrative>Financial Infrastructure and Access</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000626" percentage="100" xml:lang="en"><narrative>Pandemic Response</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000261" percentage="25" xml:lang="en"><narrative>ICT Solutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000052" percentage="38" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000633" percentage="13" xml:lang="en"><narrative>Health Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="38" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000084" percentage="38" xml:lang="en"><narrative>Environmental policies and institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="100" xml:lang="en"><narrative>Disease Control</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000084" percentage="38" xml:lang="en"><narrative>Environmental policies and institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000521" percentage="25" xml:lang="en"><narrative>Social Safety Nets</narrative></sector><humanitarian-scope type="1" vocabulary="1-2" code="EP-2020-000012-001"> </humanitarian-scope><humanitarian-scope type="2" vocabulary="2-1" code="HCOVD20"> </humanitarian-scope><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">750000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">750000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2022-01-31"/><value value-date="2022-01-31">750000000</value><description xml:lang="en"><narrative>Total Commitment in January Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-45930"><narrative>National Treasury</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">750000000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-45930"><narrative>National Treasury</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">0</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-45930"><narrative>National Treasury</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-1875000</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-45930"><narrative>National Treasury</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-1910358</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-45930"><narrative>National Treasury</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-13959748</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-45930"><narrative>National Treasury</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-20944131</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-45930"><narrative>National Treasury</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-23365524</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-45930"><narrative>National Treasury</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-24526458</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-45930"><narrative>National Treasury</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-23639646</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-45930"><narrative>National Treasury</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">-20511978</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-45930"><narrative>National Treasury</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-20261980</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-45930"><narrative>National Treasury</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-16932230</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-45930"><narrative>National Treasury</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-37500000</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-45930"><narrative>National Treasury</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-37500000</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-45930"><narrative>National Treasury</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P174246"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P174246?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P174246"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people who receive SRD grants in response to the COVID-19 crisis, in million
</narrative></title>
<baseline year="2021" iso-date="2021-03-12" value="6.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-03-12" />
<period-end iso-date="2022-06-14" />
<target value="9.40">
<comment><narrative>
Exceeded.
</narrative></comment>
</target>
<actual value="10.3">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people fully vaccinated and registered on EVDS, in million
</narrative></title>
<baseline year="2021" iso-date="2021-02-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-02-14" />
<period-end iso-date="2022-12-14" />
<target value="26.50">
<comment><narrative>
Substantially met (73 percent of the target). The government's vaccination strategy shifted with the global and domestic evolution of the pandemic which translated into lower demand for COVID-19 vaccines. As of January 2024, 19.6 million South African are estimated to be fully vaccinated against COVID-19 (74 percent of the target).
</narrative></comment>
</target>
<actual value="19.3">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of workers who received benefits from the UIF-TERS, in million
</narrative></title>
<baseline year="2021" iso-date="2021-03-14" value="3.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-03-14" />
<period-end iso-date="2022-06-14" />
<target value="3.62">
<comment><narrative>
Exceeded.
</narrative></comment>
</target>
<actual value="4.98">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Department of Forestry, Fisheries, and Environment (DFFE) presents Sectoral Emissions Targets (SET) for 5 key carbon-intensive sectors to the respective line ministries
</narrative></title>
<baseline year="2021" iso-date="2021-11-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-11-14" />
<period-end iso-date="2023-06-14" />
<target value="5.00">
<comment><narrative>
The five sectors mentioned in the RI are: Energy (DMRE), Transport (DoT), Trade and Industry (DTIC), Agriculture (DALRRD), and Water and Sanitation (DWS).
The achievement of the target was delayed, but there is ongoing progress. The Climate Change Bill was approved by the National Council of Provinces on April 25, 2024. On April 26th, the DFFE published for a 60-day public comment period the SETs for Agriculture, Industry, Energy, Minerals, Human Settlements, Transport, and Environment (e.g. forestry and waste management). These seven sectors represent all the sectors that are targeted for a SET per the Climate Change Bill.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total value of SRD grants disbursed using digital application and verification procedures, in billion South African Rand
</narrative></title>
<baseline year="2021" iso-date="2021-03-14" value="19.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-03-14" />
<period-end iso-date="2022-06-14" />
<target value="26.00">
<comment><narrative>
Exceeded.
</narrative></comment>
</target>
<actual value="27.5">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Embedded generation capacity under 100 MW registered under NERSA, in MW
</narrative></title>
<baseline year="2021" iso-date="2021-10-14" value="206"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-14" />
<period-end iso-date="2022-12-14" />
<target value="1,500">
<comment><narrative>
Met. Embedded generation capacity has continued to increase throughout the program's implementation reaching 5,138 MW by September 2023, exceeding the target.
</narrative></comment>
</target>
<actual value="1,253">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Avoided CO2 emissions as a result of the shut-down of coal-fired power production, in tons
</narrative></title>
<baseline year="2021" iso-date="2021-10-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-10-14" />
<period-end iso-date="2023-06-14" />
<target value="900,000">
<comment><narrative>
Met. The closure of the Komati power plant in October 2022, resulted in avoided estimated CO2 emissions of 847,000 tons per year compared to a scenario where the plant would have remained in operation until the end of its expected life span in 2026, as estimated in the World Bank “Eskom Just Energy Transition Project (P177398)”.
</narrative></comment>
</target>
<actual value="847,000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Eligible deposits insured, in percentage
</narrative></title>
<baseline year="2021" iso-date="2021-11-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-11-14" />
<period-end iso-date="2022-12-14" />
<target value="80.00">
<comment><narrative>
The RI was exceeded with a delay, as the date for the RI was found not to be aligned with the GoSA's commencement schedule published in March 2023. As of April 2024, 97 percent of deposits are covered.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T01:57:00" hierarchy="1"><iati-identifier>44000-P174259</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>South Africa COVID-19 Emergency Response Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The project development objective is to increase COVID-19 vaccination coverage among the population of South Africa.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The project development objective is to increase COVID-19 vaccination coverage among the population of South Africa. Component 1. Emergency COVID-19 Response (US$480.0 million from IBRD) aims to support the Government of South Africa (GoSA) to procure 47 million COVID-19 vaccines to cover the target population and thus reduce the spread of COVID-19 and deaths. Specifically, the proposed project will finance vaccine procurement, while the GoSA, with support from other partners, will finance deployment of the vaccines including risk communication and community engagement (RCCE). Since the GoSA has already signed contracts with COVAX, Janssen and Pfizer between December 2020 and June 2021 to procure vaccines and some are already deployed, retroactive financing will be made available under the proposed project covering up to 100 percent of the IBRD loan allocation for expenditure incurred before the signing of the financing agreement. Raising the retroactive financing ceiling up to 100 percent will give the GoSA flexibility to pay for the procurement of eligible vaccines before the project becomes effective and will allow the government to continue financing priority COVID-19 response activities and the deployment of the COVID-19 vaccines procured by the project. The GoSA, with support from other partners, has already established institutional and implementation arrangements for the safe and effective deployment of vaccines. The GoSA has also made efforts to strengthen the immunization and service delivery capacity to successfully deliver COVID-19 vaccines at scale. To this end, the GoSA has worked to overcome bottlenecks building on existing vaccine logistics capacity and prioritizing RCCE to address vaccine hesitancy. The GoSA will continuously review and adjust the vaccine rollout strategy and program to improve its effectiveness, efficiency, and equity.The GoSA will finance activities that will strengthen public structures for the coordination and management of the proposed project as part of the national COVID-19 vaccination program, including national and provincial arrangements for coordination of activities, financial management, procurement, and environmental and social (E&amp;S) risk management. The GoSA will also finance activities that will improve the country E&amp;S systems and practices agreed with the World Bank. Existing coordination structures operating within the National Department of Health (NDoH) for the national vaccination program will be responsible for coordination of project activities, as well as fiduciary tasks of procurement and financial management. The NDoH will also support monitoring and evaluation of overall vaccination and related surveillance program, as well as project reporting as part of the national program. ]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="ZA–P0045954"><narrative>Republic of South Africa</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="ZA-COA-0045955"><narrative>National Department of Health</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2022-04-29"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2022-06-13"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2024-03-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2024-03-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Yi-Kyoung Lee</narrative></person-name><telephone>+1-202-473-1000</telephone><email>ylee1@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="ZA" percentage="100"><narrative xml:lang="en">SOUTH AFRICA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000953987" />
            <name><narrative>South Africa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-29 24</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="12250" percentage="50" xml:lang="en"/><sector vocabulary="1" code="12250" percentage="50" xml:lang="en"/><sector vocabulary="1" code="12191" percentage="50" xml:lang="en"/><sector vocabulary="1" code="12191" percentage="50" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="100.000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="100" xml:lang="en"><narrative>Disease Control</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">37083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">37083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">37083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">37083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">37083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">37083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">37083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">37083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">37083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">37083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">37083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">37083333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">2916666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">81759165.02</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">81759165.02</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">480000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-45955"><narrative>National Department of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-59894100</value><description xml:lang="en"><narrative>Total Commitment Cancellations in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-45955"><narrative>National Department of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-2729267</value><description xml:lang="en"><narrative>Total Commitment Cancellations in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-45955"><narrative>National Department of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">391038586</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-45955"><narrative>National Department of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">0</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-45955"><narrative>National Department of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">7202249</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-45955"><narrative>National Department of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">0</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-45955"><narrative>National Department of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-1151052</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-45955"><narrative>National Department of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-309321</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-45955"><narrative>National Department of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-6308011</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-45955"><narrative>National Department of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-9058996</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-45955"><narrative>National Department of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-9900553</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-45955"><narrative>National Department of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-9453837</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-45955"><narrative>National Department of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-7595670</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-45955"><narrative>National Department of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-6521759</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-45955"><narrative>National Department of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-6525207</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-45955"><narrative>National Department of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-22784330</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-45955"><narrative>National Department of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P174259"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P174259?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P174259"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of population aged 60 years and older vaccinated with at least 1 booster
</narrative></title>
<baseline year="2021" iso-date="2021-05-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-05-16" />
<period-end iso-date="2024-03-29" />
<target value="30.00">

</target>
<actual value="23.70">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of contacts responded to within the stipulated timeline as per the service level agreements
</narrative></title>
<baseline year="2021" iso-date="2021-05-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-05-16" />
<period-end iso-date="2024-03-29" />
<target value="90.00">

</target>
<actual value="90.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Rate of AEFI reported to NDOH/SAHPRA  (per 100,000 vaccines administered)
</narrative></title>
<baseline year="2021" iso-date="2021-05-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-05-16" />
<period-end iso-date="2024-03-29" />
<target value="15.00">
<comment><narrative>
This indicator was achieved at 100% achievement.
</narrative></comment>
</target>
<actual value="19.50">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of provinces with at least 70% of the population aged 60 years and older fully vaccinated
</narrative></title>
<baseline year="2021" iso-date="2021-05-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-05-16" />
<period-end iso-date="2024-03-29" />
<target value="3.00">

</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of provinces with at least 70% of the population aged 60 years and older fully vaccinated
</narrative></title>
<baseline year="2021" iso-date="2021-05-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-05-16" />
<period-end iso-date="2024-03-29" />
<target value="3.00">
<comment><narrative>
This indicator was not achieved at 33% achievement. However, it is noteworthy that four provinces had fully vaccinated over 60 percent of their population 50 years and older.
</narrative></comment>
</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Ratio of fully vaccinated female to male population aged 18 to 34 years
</narrative></title>
<baseline year="2021" iso-date="2021-05-16" value="2.62"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-05-16" />
<period-end iso-date="2024-03-29" />
<target value="1.15">

</target>
<actual value="1.29">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of population aged 60 years and older vaccinated with at least 1 booster
</narrative></title>
<baseline year="2021" iso-date="2021-05-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-05-16" />
<period-end iso-date="2024-03-29" />
<target value="30.00">

</target>
<actual value="23.80">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of contacts responded to within the stipulated timeline as per the service level agreements
</narrative></title>
<baseline year="2021" iso-date="2021-05-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-05-16" />
<period-end iso-date="2024-03-29" />
<target value="90.00">
<comment><narrative>
This indicator was achieved at 100% achievement.&amp;nbsp;
</narrative></comment>
</target>
<actual value="90.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Ratio of fully vaccinated female to male population aged 18 to 34 years
</narrative></title>
<baseline year="2021" iso-date="2021-05-16" value="2.62"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-05-16" />
<period-end iso-date="2024-03-29" />
<target value="1.15">

</target>
<actual value="1.29">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of population aged 18 years and older fully vaccinated
</narrative></title>
<baseline year="2021" iso-date="2021-05-16" value="1.23"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-05-16" />
<period-end iso-date="2024-03-29" />
<target value="48.00">
<comment><narrative>
This indicator was substantially achieved at 98% achievement.&amp;nbsp;&amp;nbsp;
</narrative></comment>
</target>
<actual value="47.11">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of active public vaccination sites with vaccine availability
</narrative></title>
<baseline year="2021" iso-date="2021-05-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-05-16" />
<period-end iso-date="2024-03-29" />
<target value="95.00">
<comment><narrative>
This indicator was achieved at 100% achievement.&amp;nbsp; Note that the denominator included only sites which were vaccinating.
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of population aged 60 years and older vaccinated with at least 1 booster
</narrative></title>
<baseline year="2021" iso-date="2021-05-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-05-16" />
<period-end iso-date="2024-03-29" />
<target value="30.00">
<comment><narrative>
This indicator was substantially achieved at 80% achievement.
</narrative></comment>
</target>
<actual value="23.80">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of provinces with at least 70% of the population aged 60 years and older fully vaccinated
</narrative></title>
<baseline year="2021" iso-date="2021-05-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-05-16" />
<period-end iso-date="2024-03-29" />
<target value="3.00">

</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Rate of AEFI reported to NDOH/SAHPRA  (per 100,000 vaccines administered)
</narrative></title>
<baseline year="2021" iso-date="2021-05-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-05-16" />
<period-end iso-date="2024-03-29" />
<target value="15.00">

</target>
<actual value="19.50">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of active public vaccination sites with vaccine availability
</narrative></title>
<baseline year="2021" iso-date="2021-05-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-05-16" />
<period-end iso-date="2024-03-29" />
<target value="95.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Rate of AEFI reported to NDOH/SAHPRA  (per 100,000 vaccines administered)
</narrative></title>
<baseline year="2021" iso-date="2021-05-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-05-16" />
<period-end iso-date="2024-03-29" />
<target value="15.00">

</target>
<actual value="20.40">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Ratio of fully vaccinated female to male population aged 18 to 34 years
</narrative></title>
<baseline year="2021" iso-date="2021-05-16" value="2.62"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-05-16" />
<period-end iso-date="2024-03-29" />
<target value="1.15">
<comment><narrative>
This indicator was substantially achieved at 90% achievement.
</narrative></comment>
</target>
<actual value="1.29">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of contacts responded to within the stipulated timeline as per the service level agreements
</narrative></title>
<baseline year="2021" iso-date="2021-05-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-05-16" />
<period-end iso-date="2024-03-29" />
<target value="90.00">

</target>
<actual value="90.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of active public vaccination sites with vaccine availability
</narrative></title>
<baseline year="2021" iso-date="2021-05-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-05-16" />
<period-end iso-date="2024-03-29" />
<target value="95.00">

</target>
<actual value="66.80">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T01:57:00" hierarchy="1"><iati-identifier>44000-P177398</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Eskom Just Energy Transition Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The PDO is to (i) pilot decommissioning activities at Komati coal-fired power plants, (ii) to demonstrate the repurposing of the project areas with renewables, and (iii) pilot the creation of opportunities for workers and communities during the transition process.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[xxxx]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="ZA–P0050218"><narrative>Eskom Holdings Soc Ltd</narrative></participating-org><participating-org role="2" xml:lang="en" ref="ZA–P0050219"><narrative>Eskom Holdings Soc Ltd</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="ZA-COA-0056045"><narrative>Eskom Holdings Soc Ltd</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2022-06-15"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2022-11-03"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2028-12-29"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2028-12-29"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Mirlan Aldayarov</narrative></person-name><telephone>+1-202-473-1000</telephone><email>maldayarov@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>




<recipient-country code="ZA" percentage="100"><narrative xml:lang="en">SOUTH AFRICA</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000988288" />
            <name><narrative>Komati Power Station</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-26.1 29.43333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><sector vocabulary="1" code="23631" percentage="100" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LU" percentage="84.0000000" xml:lang="en"><narrative>FY17 - Renewable Energy Solar</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LT" percentage="3.00000000" xml:lang="en"><narrative>FY17 - Energy Transmission and Distribution</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LP" percentage="3.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Energy and Extractives</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LZ" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Other Energy and Extractives</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000513" percentage="10" xml:lang="en"><narrative>Participation and Civic Engagement</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000863" percentage="100" xml:lang="en"><narrative>Access to Energy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000861" percentage="90" xml:lang="en"><narrative>Energy Efficiency</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="93" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="93" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000086" percentage="100" xml:lang="en"><narrative>Energy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000221" percentage="93" xml:lang="en"><narrative>Job Creation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="100" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000861" percentage="90" xml:lang="en"><narrative>Energy Efficiency</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="10" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000241" percentage="10" xml:lang="en"><narrative>Entrepreneurship</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000862" percentage="84" xml:lang="en"><narrative>Energy Policies &amp; Reform</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">222222.22</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">222222.22</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">222222.22</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">222222.22</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">222222.22</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">222222.22</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">222222.22</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">222222.22</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">222222.24</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">3166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">3166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">3166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">3166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">3166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">3166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">3166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">3166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">3166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">3166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">3166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">3166666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">5416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">5416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">5416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">5416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">5416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">5416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">5416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">5416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">5416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">5416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">5416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">5416666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">9500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">9500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">9500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">9500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">9500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">9500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">9500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">9500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">9500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">9500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">9500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">9500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">8333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">8333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">8333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">8333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">8333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">8333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">8333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">8333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">8333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">8333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">8333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">8333333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">5833333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">12625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">12625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">12625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">12625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">222222.22</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-29"/>
<value currency="USD" value-date="2028-12-29">436653174.95</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-29"/>
<value currency="USD" value-date="2028-12-29">436653174.95</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">439500000</value><description xml:lang="en"><narrative>Total Commitment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-56045"><narrative>Eskom Holdings Soc Ltd</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">1098750</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-56045"><narrative>Eskom Holdings Soc Ltd</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">868709</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-56045"><narrative>Eskom Holdings Soc Ltd</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">428040</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-56045"><narrative>Eskom Holdings Soc Ltd</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">402456</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-56045"><narrative>Eskom Holdings Soc Ltd</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">48871</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-56045"><narrative>Eskom Holdings Soc Ltd</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">-1098750</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-56045"><narrative>Eskom Holdings Soc Ltd</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-673735</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-56045"><narrative>Eskom Holdings Soc Ltd</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-585745</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-56045"><narrative>Eskom Holdings Soc Ltd</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-597221</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-56045"><narrative>Eskom Holdings Soc Ltd</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">-601966</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-56045"><narrative>Eskom Holdings Soc Ltd</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-620590</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-56045"><narrative>Eskom Holdings Soc Ltd</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-617252</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-56045"><narrative>Eskom Holdings Soc Ltd</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P177398"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P177398?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P177398"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Hiring of Owner-Engineer (OE)
</narrative></title>
<baseline year="2022" iso-date="2022-09-29" value="06/22/2022"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-29" />
<period-end iso-date="2028-10-23" />
<target value="09/25/2023">
<comment><narrative>
Hiring of OE is critical for planning and implementation of Component A. OE will be ESMAP grant funded. It is aimed that the OE procurement will be completed by June 2025.&amp;nbsp;
</narrative></comment>
</target>
<actual value="October 2023">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
EJETP Community Forum established (% of female representation)
</narrative></title>
<baseline year="2022" iso-date="2022-10-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-24" />
<period-end iso-date="2023-03-20" />
<target value="50.00">
<comment><narrative>
Indicator contributes to gender tagging and access to Canadian funds
</narrative></comment>
</target>
<actual value="27">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Installation of 150 MW energy storage
</narrative></title>
<baseline year="2022" iso-date="2022-09-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-28" />
<period-end iso-date="2025-07-15" />
<target value="150.00">
<comment><narrative>
Installation of batteries at repurposed site.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net greenhouse gas (GHG) emissions
</narrative></title>
<baseline year="2022" iso-date="2022-09-28" value="80000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-28" />
<period-end iso-date="2028-10-22" />
<target value="0.00">
<comment><narrative>
Project net greenhouse gas (GHG) emissions are calculated as an annual average of the difference between project gross (absolute) emissions aggregated over the economic lifetime of the project and the emissions of a baseline (counterfactual) scenario aggregated over the same time horizon.  They are reported in metric tons of carbon dioxide equivalent per year.
</narrative></comment>
</target>
<actual value="80000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy capacity enabled with direct support
</narrative></title>
<baseline year="2022" iso-date="2022-10-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-14" />
<period-end iso-date="2028-10-14" />
<target value="220">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New or better jobs
</narrative></title>
<baseline year="2022" iso-date="2022-10-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-13" />
<period-end iso-date="2028-10-14" />
<target value="100">
<comment><narrative>
Socio-economic activities are under implementation. Figures will be provided in the next ISR.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Female Komati workers trained at Komati who are gainfully employed or self-employed 6 months after certification
</narrative></title>
<baseline year="2022" iso-date="2022-09-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-27" />
<period-end iso-date="2028-10-24" />
<target value="80.00">
<comment><narrative>
gender tagged and access to Canada funds
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New renewable energy jobs directly created (Percentage m/f, Percentage permanent/temporary).
</narrative></title>
<baseline year="2022" iso-date="2022-10-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-24" />
<period-end iso-date="2028-10-24" />
<target value="100.00">
<comment><narrative>
new RE jobs created
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances solved within 6 month
</narrative></title>
<baseline year="2022" iso-date="2022-09-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-27" />
<period-end iso-date="2028-10-23" />
<target value="80.00">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net greenhouse gas (GHG) emissions
</narrative></title>
<baseline year="2022" iso-date="2022-09-28" value="80000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-28" />
<period-end iso-date="2028-10-22" />
<target value="0.00">
<comment><narrative>
Project net greenhouse gas (GHG) emissions are calculated as an annual average of the difference between project gross (absolute) emissions aggregated over the economic lifetime of the project and the emissions of a baseline (counterfactual) scenario aggregated over the same time horizon.  They are reported in metric tons of carbon dioxide equivalent per year.
</narrative></comment>
</target>
<actual value="80000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Suppliers, contractors and enterprises supported
</narrative></title>
<baseline year="2022" iso-date="2022-09-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-20" />
<period-end iso-date="2028-10-22" />
<target value="40.00">
<comment><narrative>
Indicator will measure support to suppliers, contractors and enterprises that deliver Komati
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Suppliers, contractors and enterprises supported
</narrative></title>
<baseline year="2022" iso-date="2022-09-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-20" />
<period-end iso-date="2028-10-22" />
<target value="40.00">
<comment><narrative>
Indicator will measure support to suppliers, contractors and enterprises that deliver Komati
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Feedback received through the stakeholder engagement platforms and Eskom's responses published on a semi-annual basis
</narrative></title>
<baseline year="2022" iso-date="2022-10-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-24" />
<period-end iso-date="2028-10-23" />
<target value="40.00">
<comment><narrative>
Feedback on project by stakeholders and third parties
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy produced (annually)
</narrative></title>
<baseline year="2022" iso-date="2022-10-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-24" />
<period-end iso-date="2028-10-23" />
<target value="420.00">
<comment><narrative>
Indicator will measure total annual electricity production from solar PV and wind generation.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Coal Plant Repurposing Guidelines
</narrative></title>
<baseline year="2022" iso-date="2022-10-25" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-25" />
<period-end iso-date="2028-10-24" />
<target value="Yes">
<comment><narrative>
Repurposing guidelines will be developed by Eskom and the Bank to draw lessons for future coal plant retirement.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Feedback received through the stakeholder engagement platforms and Eskom's responses published on a semi-annual basis
</narrative></title>
<baseline year="2022" iso-date="2022-10-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-24" />
<period-end iso-date="2028-10-23" />
<target value="40.00">
<comment><narrative>
Feedback on project by stakeholders and third parties
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
EJETP Community Forum established (% of female representation)
</narrative></title>
<baseline year="2022" iso-date="2022-10-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-24" />
<period-end iso-date="2023-03-20" />
<target value="50.00">
<comment><narrative>
Indicator contributes to gender tagging and access to Canadian funds
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Generation capacity of energy constructed or rehabilitated
</narrative></title>
<baseline year="2022" iso-date="2022-10-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-25" />
<period-end iso-date="2028-10-23" />
<target value="220.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
EJETP Community Forum established (% of female representation)
</narrative></title>
<baseline year="2022" iso-date="2022-10-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-24" />
<period-end iso-date="2023-03-20" />
<target value="50.00">
<comment><narrative>
Indicator contributes to gender tagging and access to Canadian funds
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Suppliers, contractors, enterprises supported that are women-led
</narrative></title>
<baseline year="2022" iso-date="2022-09-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-27" />
<period-end iso-date="2028-10-25" />
<target value="50.00">
<comment><narrative>
will ensure gender tagged and access to Canada funds
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New renewable energy jobs directly created (Percentage m/f, Percentage permanent/temporary).
</narrative></title>
<baseline year="2022" iso-date="2022-10-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-24" />
<period-end iso-date="2028-10-24" />
<target value="100.00">
<comment><narrative>
new RE jobs created
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Female Komati workers trained at Komati who are gainfully employed or self-employed 6 months after certification
</narrative></title>
<baseline year="2022" iso-date="2022-09-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-27" />
<period-end iso-date="2028-10-24" />
<target value="80.00">
<comment><narrative>
gender tagged and access to Canada funds
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New or better jobs
</narrative></title>
<baseline year="2022" iso-date="2022-10-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-13" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Installation of 150 MW energy storage
</narrative></title>
<baseline year="2022" iso-date="2022-09-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-28" />
<period-end iso-date="2025-07-15" />
<target value="150.00">
<comment><narrative>
Installation of batteries at repurposed site.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Socio-Economic Guidelines for Coal Plant Retirement
</narrative></title>
<baseline year="2022" iso-date="2022-10-24" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-24" />
<period-end iso-date="2028-10-23" />
<target value="Yes">
<comment><narrative>
Guidelines from Komati lessons for coal plant retirement scale up
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Suppliers, contractors, enterprises supported that are women-led
</narrative></title>
<baseline year="2022" iso-date="2022-09-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-27" />
<period-end iso-date="2028-10-25" />
<target value="50.00">
<comment><narrative>
will ensure gender tagged and access to Canada funds
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Coal Plant Repurposing Guidelines
</narrative></title>
<baseline year="2022" iso-date="2022-10-25" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-25" />
<period-end iso-date="2028-10-24" />
<target value="Yes">
<comment><narrative>
Repurposing guidelines will be developed by Eskom and the Bank to draw lessons for future coal plant retirement.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Installation of 150 MW energy storage
</narrative></title>
<baseline year="2022" iso-date="2022-09-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-28" />
<period-end iso-date="2025-07-15" />
<target value="150.00">
<comment><narrative>
Installation of batteries at repurposed site.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Feedback received through the stakeholder engagement platforms and Eskom's responses published on a semi-annual basis
</narrative></title>
<baseline year="2022" iso-date="2022-10-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-24" />
<period-end iso-date="2028-10-23" />
<target value="40.00">
<comment><narrative>
Feedback on project by stakeholders and third parties
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net greenhouse gas (GHG) emissions
</narrative></title>
<baseline year="2022" iso-date="2022-09-28" value="80000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-28" />
<period-end iso-date="2028-10-22" />
<target value="0.00">
<comment><narrative>
Project net greenhouse gas (GHG) emissions are calculated as an annual average of the difference between project gross (absolute) emissions aggregated over the economic lifetime of the project and the emissions of a baseline (counterfactual) scenario aggregated over the same time horizon.  They are reported in metric tons of carbon dioxide equivalent per year.
</narrative></comment>
</target>
<actual value="80000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of private and public direct finance mobilized for renewable energy leveraged
</narrative></title>
<baseline year="2022" iso-date="2022-10-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-24" />
<period-end iso-date="2028-10-24" />
<target value="350,000,000.00">
<comment><narrative>
Measure of financing of repurposing
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Generation capacity of energy constructed or rehabilitated
</narrative></title>
<baseline year="2022" iso-date="2022-10-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-25" />
<period-end iso-date="2028-10-23" />
<target value="220.00">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of private and public direct finance mobilized for renewable energy leveraged
</narrative></title>
<baseline year="2022" iso-date="2022-10-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-24" />
<period-end iso-date="2028-10-24" />
<target value="350,000,000.00">
<comment><narrative>
Measure of financing of repurposing
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Generation capacity of energy constructed or rehabilitated
</narrative></title>
<baseline year="2022" iso-date="2022-10-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-25" />
<period-end iso-date="2028-10-23" />
<target value="220.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Feedback received through the stakeholder engagement platforms and Eskom's responses published on a semi-annual basis
</narrative></title>
<baseline year="2022" iso-date="2022-10-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-24" />
<period-end iso-date="2028-10-23" />
<target value="40.00">
<comment><narrative>
Feedback on project by stakeholders and third parties
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Synchronous Condensers
</narrative></title>
<baseline year="2022" iso-date="2022-09-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-27" />
<period-end iso-date="2026-10-26" />
<target value="3.00">
<comment><narrative>
Condensers will be connected to existing generators.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Coal Plant Decommissioning Guidelines
</narrative></title>
<baseline year="2022" iso-date="2022-10-26" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-26" />
<period-end iso-date="2028-10-24" />
<target value="Yes">
<comment><narrative>
The project will prepare guidelines / lessons learned from coal plant decommissioning for future scale up. Those guidelines will be prepared by Eskom internally with WB technical support.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
EJETP Community Forum established (% of female representation)
</narrative></title>
<baseline year="2022" iso-date="2022-10-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-24" />
<period-end iso-date="2023-03-20" />
<target value="50.00">
<comment><narrative>
Indicator contributes to gender tagging and access to Canadian funds
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Eskom Workers at Komati retrained / re-deployed / compensated
</narrative></title>
<baseline year="2022" iso-date="2022-07-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-26" />
<period-end iso-date="2028-10-22" />
<target value="100.00">
<comment><narrative>
Eskom applies four mitigation options: (i) transfers to other power stations; (ii) reskilling and upskilling for deployment to repurposed renewables plants; (iii) secondment to other critical Eskom projects / operations; and (iv) other levers (such as voluntary separation packages). Transfers and reskilling/upskilling for redeployment are the main options being considered for Komati workers. This indicator will also insure that the ratio of female / male employment will not deteriorate.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Coal Plant Decommissioning Guidelines
</narrative></title>
<baseline year="2022" iso-date="2022-10-26" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-26" />
<period-end iso-date="2028-10-24" />
<target value="Yes">
<comment><narrative>
The project will prepare guidelines / lessons learned from coal plant decommissioning for future scale up. Those guidelines will be prepared by Eskom internally with WB technical support.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New renewable energy jobs directly created (Percentage m/f, Percentage permanent/temporary).
</narrative></title>
<baseline year="2022" iso-date="2022-10-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-24" />
<period-end iso-date="2028-10-24" />
<target value="100.00">
<comment><narrative>
new RE jobs created
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Eskom Workers at Komati retrained / re-deployed / compensated
</narrative></title>
<baseline year="2022" iso-date="2022-07-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-26" />
<period-end iso-date="2028-10-22" />
<target value="100.00">
<comment><narrative>
Eskom applies four mitigation options: (i) transfers to other power stations; (ii) reskilling and upskilling for deployment to repurposed renewables plants; (iii) secondment to other critical Eskom projects / operations; and (iv) other levers (such as voluntary separation packages). Transfers and reskilling/upskilling for redeployment are the main options being considered for Komati workers. This indicator will also insure that the ratio of female / male employment will not deteriorate.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Installation of 150 MW energy storage
</narrative></title>
<baseline year="2022" iso-date="2022-09-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-28" />
<period-end iso-date="2025-07-15" />
<target value="150.00">
<comment><narrative>
Installation of batteries at repurposed site.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy capacity enabled with direct support
</narrative></title>
<baseline year="2022" iso-date="2022-10-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-14" />
<period-end iso-date="2028-10-14" />
<target value="220">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New or better jobs
</narrative></title>
<baseline year="2022" iso-date="2022-10-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-13" />
<period-end iso-date="2028-10-14" />
<target value="100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Eskom Workers at Komati retrained / re-deployed / compensated
</narrative></title>
<baseline year="2022" iso-date="2022-07-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-26" />
<period-end iso-date="2028-10-22" />
<target value="100.00">
<comment><narrative>
Eskom applies four mitigation options: (i) transfers to other power stations; (ii) reskilling and upskilling for deployment to repurposed renewables plants; (iii) secondment to other critical Eskom projects / operations; and (iv) other levers (such as voluntary separation packages). Transfers and reskilling/upskilling for redeployment are the main options being considered for Komati workers. This indicator will also insure that the ratio of female / male employment will not deteriorate.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Suppliers, contractors and enterprises supported
</narrative></title>
<baseline year="2022" iso-date="2022-09-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-20" />
<period-end iso-date="2028-10-22" />
<target value="40.00">
<comment><narrative>
Indicator will measure support to suppliers, contractors and enterprises that deliver Komati
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Socio-Economic Guidelines for Coal Plant Retirement
</narrative></title>
<baseline year="2022" iso-date="2022-10-24" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-24" />
<period-end iso-date="2028-10-23" />
<target value="Yes">
<comment><narrative>
Guidelines from Komati lessons for coal plant retirement scale up
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Synchronous Condensers
</narrative></title>
<baseline year="2022" iso-date="2022-09-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-27" />
<period-end iso-date="2026-10-26" />
<target value="3.00">
<comment><narrative>
Condensers will be connected to existing generators.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Coal Plant Repurposing Guidelines
</narrative></title>
<baseline year="2022" iso-date="2022-10-25" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-25" />
<period-end iso-date="2028-10-24" />
<target value="Yes">
<comment><narrative>
Repurposing guidelines will be developed by Eskom and the Bank to draw lessons for future coal plant retirement.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Hiring of Owner-Engineer (OE)
</narrative></title>
<baseline year="2022" iso-date="2022-09-29" value="06/22/2022"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-29" />
<period-end iso-date="2028-10-23" />
<target value="09/25/2023">
<comment><narrative>
Hiring of OE is critical for planning and implementation of Component A. OE will be ESMAP grant funded. It is aimed that the OE procurement will be completed by June 2025.&amp;nbsp;
</narrative></comment>
</target>
<actual value="06/31/2025">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Synchronous Condensers
</narrative></title>
<baseline year="2022" iso-date="2022-09-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-27" />
<period-end iso-date="2026-10-26" />
<target value="3.00">
<comment><narrative>
Condensers will be connected to existing generators.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Suppliers, contractors, enterprises supported that are women-led
</narrative></title>
<baseline year="2022" iso-date="2022-09-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-27" />
<period-end iso-date="2028-10-25" />
<target value="50.00">
<comment><narrative>
will ensure gender tagged and access to Canada funds
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Eskom Workers at Komati retrained / re-deployed / compensated
</narrative></title>
<baseline year="2022" iso-date="2022-07-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-26" />
<period-end iso-date="2028-10-22" />
<target value="100.00">
<comment><narrative>
Eskom applies four mitigation options: (i) transfers to other power stations; (ii) reskilling and upskilling for deployment to repurposed renewables plants; (iii) secondment to other critical Eskom projects / operations; and (iv) other levers (such as voluntary separation packages). Transfers and reskilling/upskilling for redeployment are the main options being considered for Komati workers. This indicator will also insure that the ratio of female / male employment will not deteriorate.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy capacity enabled with direct support
</narrative></title>
<baseline year="2022" iso-date="2022-10-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-14" />
<period-end iso-date="2028-10-14" />
<target value="220">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Suppliers, contractors and enterprises supported
</narrative></title>
<baseline year="2022" iso-date="2022-09-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-20" />
<period-end iso-date="2028-10-22" />
<target value="40.00">
<comment><narrative>
Indicator will measure support to suppliers, contractors and enterprises that deliver Komati
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Female Komati workers trained at Komati who are gainfully employed or self-employed 6 months after certification
</narrative></title>
<baseline year="2022" iso-date="2022-09-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-27" />
<period-end iso-date="2028-10-24" />
<target value="80.00">
<comment><narrative>
gender tagged and access to Canada funds
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Socio-Economic Guidelines for Coal Plant Retirement
</narrative></title>
<baseline year="2022" iso-date="2022-10-24" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-24" />
<period-end iso-date="2028-10-23" />
<target value="Yes">
<comment><narrative>
Guidelines from Komati lessons for coal plant retirement scale up
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Synchronous Condensers
</narrative></title>
<baseline year="2022" iso-date="2022-09-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-27" />
<period-end iso-date="2026-10-26" />
<target value="3.00">
<comment><narrative>
Condensers will be connected to existing generators.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy produced (annually)
</narrative></title>
<baseline year="2022" iso-date="2022-10-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-24" />
<period-end iso-date="2028-10-23" />
<target value="420.00">
<comment><narrative>
Indicator will measure total annual electricity production from solar PV and wind generation.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Coal Plant Decommissioning Guidelines
</narrative></title>
<baseline year="2022" iso-date="2022-10-26" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-26" />
<period-end iso-date="2028-10-24" />
<target value="Yes">
<comment><narrative>
The project will prepare guidelines / lessons learned from coal plant decommissioning for future scale up. Those guidelines will be prepared by Eskom internally with WB technical support.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Socio-Economic Guidelines for Coal Plant Retirement
</narrative></title>
<baseline year="2022" iso-date="2022-10-24" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-24" />
<period-end iso-date="2028-10-23" />
<target value="Yes">
<comment><narrative>
Guidelines from Komati lessons for coal plant retirement scale up
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of private and public direct finance mobilized for renewable energy leveraged
</narrative></title>
<baseline year="2022" iso-date="2022-10-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-24" />
<period-end iso-date="2028-10-24" />
<target value="350,000,000.00">
<comment><narrative>
Measure of financing of repurposing
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy produced (annually)
</narrative></title>
<baseline year="2022" iso-date="2022-10-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-24" />
<period-end iso-date="2028-10-23" />
<target value="420.00">
<comment><narrative>
Indicator will measure total annual electricity production from solar PV and wind generation.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances solved within 6 month
</narrative></title>
<baseline year="2022" iso-date="2022-09-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-27" />
<period-end iso-date="2028-10-23" />
<target value="80.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy produced (annually)
</narrative></title>
<baseline year="2022" iso-date="2022-10-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-24" />
<period-end iso-date="2028-10-23" />
<target value="420.00">
<comment><narrative>
Indicator will measure total annual electricity production from solar PV and wind generation.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy capacity enabled with direct support
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2028-12-15" />
<target value="370">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Hiring of EPC contractor
</narrative></title>
<baseline year="2022" iso-date="2022-10-25" value="06/22/2022"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-25" />
<period-end iso-date="2028-10-24" />
<target value="03/31/2025">
<comment><narrative>
Once OE conduced its detailed planning activities for Component A, a EPC contractor will be hired to implement the works under one contract.
</narrative></comment>
</target>
<actual value="06/30/2026">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of private and public direct finance mobilized for renewable energy leveraged
</narrative></title>
<baseline year="2022" iso-date="2022-10-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-24" />
<period-end iso-date="2028-10-24" />
<target value="350,000,000.00">
<comment><narrative>
Measure of financing of repurposing
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net greenhouse gas (GHG) emissions
</narrative></title>
<baseline year="2022" iso-date="2022-09-28" value="80000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-28" />
<period-end iso-date="2028-10-22" />
<target value="0.00">
<comment><narrative>
Project net greenhouse gas (GHG) emissions are calculated as an annual average of the difference between project gross (absolute) emissions aggregated over the economic lifetime of the project and the emissions of a baseline (counterfactual) scenario aggregated over the same time horizon.  They are reported in metric tons of carbon dioxide equivalent per year.
</narrative></comment>
</target>
<actual value="80000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Coal Plant Decommissioning Guidelines
</narrative></title>
<baseline year="2022" iso-date="2022-10-26" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-26" />
<period-end iso-date="2028-10-24" />
<target value="Yes">
<comment><narrative>
The project will prepare guidelines / lessons learned from coal plant decommissioning for future scale up. Those guidelines will be prepared by Eskom internally with WB technical support.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances solved within 6 month
</narrative></title>
<baseline year="2022" iso-date="2022-09-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-27" />
<period-end iso-date="2028-10-23" />
<target value="80.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy produced (annually)
</narrative></title>
<baseline year="2022" iso-date="2022-10-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-24" />
<period-end iso-date="2028-10-23" />
<target value="420.00">
<comment><narrative>
Indicator will measure total annual electricity production from solar PV and wind generation.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy produced (annually)
</narrative></title>
<baseline year="2022" iso-date="2022-10-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-24" />
<period-end iso-date="2028-10-23" />
<target value="420.00">
<comment><narrative>
Indicator will measure total annual electricity production from solar PV and wind generation.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy produced (annually)
</narrative></title>
<baseline year="2022" iso-date="2022-10-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-24" />
<period-end iso-date="2028-10-23" />
<target value="420.00">
<comment><narrative>
Indicator will measure total annual electricity production from solar PV and wind generation.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy produced (annually)
</narrative></title>
<baseline year="2022" iso-date="2022-10-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-24" />
<period-end iso-date="2028-10-23" />
<target value="420.00">
<comment><narrative>
Indicator will measure total annual electricity production from solar PV and wind generation.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy produced (annually)
</narrative></title>
<baseline year="2022" iso-date="2022-10-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-24" />
<period-end iso-date="2028-10-23" />
<target value="420.00">
<comment><narrative>
Indicator will measure total annual electricity production from solar PV and wind generation.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
EJETP Community Forum established (% of female representation)
</narrative></title>
<baseline year="2022" iso-date="2022-10-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-24" />
<period-end iso-date="2023-03-20" />
<target value="50.00">
<comment><narrative>
Indicator contributes to gender tagging and access to Canadian funds
</narrative></comment>
</target>
<actual value="27">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
EJETP Community Forum established (% of female representation)
</narrative></title>
<baseline year="2022" iso-date="2022-10-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-24" />
<period-end iso-date="2023-03-20" />
<target value="50.00">
<comment><narrative>
Indicator contributes to gender tagging and access to Canadian funds
</narrative></comment>
</target>
<actual value="27">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
EJETP Community Forum established (% of female representation)
</narrative></title>
<baseline year="2022" iso-date="2022-10-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-24" />
<period-end iso-date="2023-03-20" />
<target value="50.00">
<comment><narrative>
Indicator contributes to gender tagging and access to Canadian funds
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
EJETP Community Forum established (% of female representation)
</narrative></title>
<baseline year="2022" iso-date="2022-10-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-24" />
<period-end iso-date="2023-03-20" />
<target value="50.00">
<comment><narrative>
Indicator contributes to gender tagging and access to Canadian funds
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
EJETP Community Forum established (% of female representation)
</narrative></title>
<baseline year="2022" iso-date="2022-10-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-24" />
<period-end iso-date="2023-03-20" />
<target value="50.00">
<comment><narrative>
Indicator contributes to gender tagging and access to Canadian funds
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net greenhouse gas (GHG) emissions
</narrative></title>
<baseline year="2022" iso-date="2022-09-28" value="80000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-28" />
<period-end iso-date="2028-10-22" />
<target value="0.00">
<comment><narrative>
Project net greenhouse gas (GHG) emissions are calculated as an annual average of the difference between project gross (absolute) emissions aggregated over the economic lifetime of the project and the emissions of a baseline (counterfactual) scenario aggregated over the same time horizon.  They are reported in metric tons of carbon dioxide equivalent per year.
</narrative></comment>
</target>
<actual value="80000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net greenhouse gas (GHG) emissions
</narrative></title>
<baseline year="2022" iso-date="2022-09-28" value="80000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-28" />
<period-end iso-date="2028-10-22" />
<target value="0.00">
<comment><narrative>
Project net greenhouse gas (GHG) emissions are calculated as an annual average of the difference between project gross (absolute) emissions aggregated over the economic lifetime of the project and the emissions of a baseline (counterfactual) scenario aggregated over the same time horizon.  They are reported in metric tons of carbon dioxide equivalent per year.
</narrative></comment>
</target>
<actual value="80000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net greenhouse gas (GHG) emissions
</narrative></title>
<baseline year="2022" iso-date="2022-09-28" value="80000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-28" />
<period-end iso-date="2028-10-22" />
<target value="0.00">
<comment><narrative>
Project net greenhouse gas (GHG) emissions are calculated as an annual average of the difference between project gross (absolute) emissions aggregated over the economic lifetime of the project and the emissions of a baseline (counterfactual) scenario aggregated over the same time horizon.  They are reported in metric tons of carbon dioxide equivalent per year.
</narrative></comment>
</target>
<actual value="80000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net greenhouse gas (GHG) emissions
</narrative></title>
<baseline year="2022" iso-date="2022-09-28" value="80000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-28" />
<period-end iso-date="2028-10-22" />
<target value="0.00">
<comment><narrative>
Project net greenhouse gas (GHG) emissions are calculated as an annual average of the difference between project gross (absolute) emissions aggregated over the economic lifetime of the project and the emissions of a baseline (counterfactual) scenario aggregated over the same time horizon.  They are reported in metric tons of carbon dioxide equivalent per year.
</narrative></comment>
</target>
<actual value="80000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net greenhouse gas (GHG) emissions
</narrative></title>
<baseline year="2022" iso-date="2022-09-28" value="80000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-28" />
<period-end iso-date="2028-10-22" />
<target value="0.00">
<comment><narrative>
Project net greenhouse gas (GHG) emissions are calculated as an annual average of the difference between project gross (absolute) emissions aggregated over the economic lifetime of the project and the emissions of a baseline (counterfactual) scenario aggregated over the same time horizon.  They are reported in metric tons of carbon dioxide equivalent per year.
</narrative></comment>
</target>
<actual value="80000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Suppliers, contractors and enterprises supported
</narrative></title>
<baseline year="2022" iso-date="2022-09-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-20" />
<period-end iso-date="2028-10-22" />
<target value="40.00">
<comment><narrative>
Indicator will measure support to suppliers, contractors and enterprises that deliver Komati
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Suppliers, contractors and enterprises supported
</narrative></title>
<baseline year="2022" iso-date="2022-09-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-20" />
<period-end iso-date="2028-10-22" />
<target value="40.00">
<comment><narrative>
Indicator will measure support to suppliers, contractors and enterprises that deliver Komati
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Suppliers, contractors and enterprises supported
</narrative></title>
<baseline year="2022" iso-date="2022-09-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-20" />
<period-end iso-date="2028-10-22" />
<target value="40.00">
<comment><narrative>
Indicator will measure support to suppliers, contractors and enterprises that deliver Komati
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Suppliers, contractors and enterprises supported
</narrative></title>
<baseline year="2022" iso-date="2022-09-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-20" />
<period-end iso-date="2028-10-22" />
<target value="40.00">
<comment><narrative>
Indicator will measure support to suppliers, contractors and enterprises that deliver Komati
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Suppliers, contractors and enterprises supported
</narrative></title>
<baseline year="2022" iso-date="2022-09-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-20" />
<period-end iso-date="2028-10-22" />
<target value="40.00">
<comment><narrative>
Indicator will measure support to suppliers, contractors and enterprises that deliver Komati
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Eskom Workers at Komati retrained / re-deployed / compensated
</narrative></title>
<baseline year="2022" iso-date="2022-07-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-26" />
<period-end iso-date="2028-10-22" />
<target value="100.00">
<comment><narrative>
Eskom applies four mitigation options: (i) transfers to other power stations; (ii) reskilling and upskilling for deployment to repurposed renewables plants; (iii) secondment to other critical Eskom projects / operations; and (iv) other levers (such as voluntary separation packages). Transfers and reskilling/upskilling for redeployment are the main options being considered for Komati workers. This indicator will also insure that the ratio of female / male employment will not deteriorate.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Eskom Workers at Komati retrained / re-deployed / compensated
</narrative></title>
<baseline year="2022" iso-date="2022-07-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-26" />
<period-end iso-date="2028-10-22" />
<target value="100.00">
<comment><narrative>
Eskom applies four mitigation options: (i) transfers to other power stations; (ii) reskilling and upskilling for deployment to repurposed renewables plants; (iii) secondment to other critical Eskom projects / operations; and (iv) other levers (such as voluntary separation packages). Transfers and reskilling/upskilling for redeployment are the main options being considered for Komati workers. This indicator will also insure that the ratio of female / male employment will not deteriorate.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Eskom Workers at Komati retrained / re-deployed / compensated
</narrative></title>
<baseline year="2022" iso-date="2022-07-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-26" />
<period-end iso-date="2028-10-22" />
<target value="100.00">
<comment><narrative>
Eskom applies four mitigation options: (i) transfers to other power stations; (ii) reskilling and upskilling for deployment to repurposed renewables plants; (iii) secondment to other critical Eskom projects / operations; and (iv) other levers (such as voluntary separation packages). Transfers and reskilling/upskilling for redeployment are the main options being considered for Komati workers. This indicator will also insure that the ratio of female / male employment will not deteriorate.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Eskom Workers at Komati retrained / re-deployed / compensated
</narrative></title>
<baseline year="2022" iso-date="2022-07-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-26" />
<period-end iso-date="2028-10-22" />
<target value="100.00">
<comment><narrative>
Eskom applies four mitigation options: (i) transfers to other power stations; (ii) reskilling and upskilling for deployment to repurposed renewables plants; (iii) secondment to other critical Eskom projects / operations; and (iv) other levers (such as voluntary separation packages). Transfers and reskilling/upskilling for redeployment are the main options being considered for Komati workers. This indicator will also insure that the ratio of female / male employment will not deteriorate.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Eskom Workers at Komati retrained / re-deployed / compensated
</narrative></title>
<baseline year="2022" iso-date="2022-07-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-26" />
<period-end iso-date="2028-10-22" />
<target value="100.00">
<comment><narrative>
Eskom applies four mitigation options: (i) transfers to other power stations; (ii) reskilling and upskilling for deployment to repurposed renewables plants; (iii) secondment to other critical Eskom projects / operations; and (iv) other levers (such as voluntary separation packages). Transfers and reskilling/upskilling for redeployment are the main options being considered for Komati workers. This indicator will also insure that the ratio of female / male employment will not deteriorate.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New or better jobs
</narrative></title>
<baseline year="2022" iso-date="2022-10-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-13" />
<period-end iso-date="2028-10-14" />
<target value="100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Hiring of EPC contractor
</narrative></title>
<baseline year="2022" iso-date="2022-10-25" value="06/22/2022"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-25" />
<period-end iso-date="2028-10-24" />
<target value="03/31/2025">
<comment><narrative>
Once OE conduced its detailed planning activities for Component A, a EPC contractor will be hired to implement the works under one contract.
</narrative></comment>
</target>
<actual value="06/30/2026">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Hiring of EPC contractor
</narrative></title>
<baseline year="2022" iso-date="2022-10-25" value="06/22/2022"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-25" />
<period-end iso-date="2028-10-24" />
<target value="03/31/2025">
<comment><narrative>
Once OE conduced its detailed planning activities for Component A, a EPC contractor will be hired to implement the works under one contract.
</narrative></comment>
</target>
<actual value="June 2026">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Hiring of Owner-Engineer (OE)
</narrative></title>
<baseline year="2022" iso-date="2022-09-29" value="06/22/2022"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-29" />
<period-end iso-date="2028-10-23" />
<target value="09/25/2023">
<comment><narrative>
Hiring of OE is critical for planning and implementation of Component A. OE will be ESMAP grant funded. It is aimed that the OE procurement will be completed by June 2025.&amp;nbsp;
</narrative></comment>
</target>
<actual value="06/31/2025">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Hiring of EPC contractor
</narrative></title>
<baseline year="2022" iso-date="2022-10-25" value="06/22/2022"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-25" />
<period-end iso-date="2028-10-24" />
<target value="03/31/2025">
<comment><narrative>
Once OE conduced its detailed planning activities for Component A, a EPC contractor will be hired to implement the works under one contract.
</narrative></comment>
</target>
<actual value="06/30/2026">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New renewable energy jobs directly created (Percentage m/f, Percentage permanent/temporary).
</narrative></title>
<baseline year="2022" iso-date="2022-10-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-24" />
<period-end iso-date="2028-10-24" />
<target value="100.00">
<comment><narrative>
new RE jobs created
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Generation capacity of energy constructed or rehabilitated
</narrative></title>
<baseline year="2022" iso-date="2022-10-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-25" />
<period-end iso-date="2028-10-23" />
<target value="220.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New renewable energy jobs directly created (Percentage m/f, Percentage permanent/temporary).
</narrative></title>
<baseline year="2022" iso-date="2022-10-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-24" />
<period-end iso-date="2028-10-24" />
<target value="100.00">
<comment><narrative>
new RE jobs created
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of private and public direct finance mobilized for renewable energy leveraged
</narrative></title>
<baseline year="2022" iso-date="2022-10-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-24" />
<period-end iso-date="2028-10-24" />
<target value="350,000,000.00">
<comment><narrative>
Measure of financing of repurposing
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Coal Plant Repurposing Guidelines
</narrative></title>
<baseline year="2022" iso-date="2022-10-25" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-25" />
<period-end iso-date="2028-10-24" />
<target value="Yes">
<comment><narrative>
Repurposing guidelines will be developed by Eskom and the Bank to draw lessons for future coal plant retirement.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Socio-Economic Guidelines for Coal Plant Retirement
</narrative></title>
<baseline year="2022" iso-date="2022-10-24" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-24" />
<period-end iso-date="2028-10-23" />
<target value="Yes">
<comment><narrative>
Guidelines from Komati lessons for coal plant retirement scale up
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Feedback received through the stakeholder engagement platforms and Eskom's responses published on a semi-annual basis
</narrative></title>
<baseline year="2022" iso-date="2022-10-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-24" />
<period-end iso-date="2028-10-23" />
<target value="40.00">
<comment><narrative>
Feedback on project by stakeholders and third parties
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances solved within 6 month
</narrative></title>
<baseline year="2022" iso-date="2022-09-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-27" />
<period-end iso-date="2028-10-23" />
<target value="80.00">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Generation capacity of energy constructed or rehabilitated
</narrative></title>
<baseline year="2022" iso-date="2022-10-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-25" />
<period-end iso-date="2028-10-23" />
<target value="220.00">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Coal Plant Decommissioning Guidelines
</narrative></title>
<baseline year="2022" iso-date="2022-10-26" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-26" />
<period-end iso-date="2028-10-24" />
<target value="Yes">
<comment><narrative>
The project will prepare guidelines / lessons learned from coal plant decommissioning for future scale up. Those guidelines will be prepared by Eskom internally with WB technical support.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Female Komati workers trained at Komati who are gainfully employed or self-employed 6 months after certification
</narrative></title>
<baseline year="2022" iso-date="2022-09-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-27" />
<period-end iso-date="2028-10-24" />
<target value="80.00">
<comment><narrative>
gender tagged and access to Canada funds
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Synchronous Condensers
</narrative></title>
<baseline year="2022" iso-date="2022-09-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-27" />
<period-end iso-date="2026-10-26" />
<target value="3.00">
<comment><narrative>
Condensers will be connected to existing generators.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Hiring of EPC contractor
</narrative></title>
<baseline year="2022" iso-date="2022-10-25" value="06/22/2022"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-25" />
<period-end iso-date="2028-10-24" />
<target value="03/31/2025">
<comment><narrative>
Once OE conduced its detailed planning activities for Component A, a EPC contractor will be hired to implement the works under one contract.
</narrative></comment>
</target>
<actual value="June 2026">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Suppliers, contractors, enterprises supported that are women-led
</narrative></title>
<baseline year="2022" iso-date="2022-09-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-27" />
<period-end iso-date="2028-10-25" />
<target value="50.00">
<comment><narrative>
will ensure gender tagged and access to Canada funds
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Installation of 150 MW energy storage
</narrative></title>
<baseline year="2022" iso-date="2022-09-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-28" />
<period-end iso-date="2025-07-15" />
<target value="150.00">
<comment><narrative>
Installation of batteries at repurposed site.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Hiring of Owner-Engineer (OE)
</narrative></title>
<baseline year="2022" iso-date="2022-09-29" value="06/22/2022"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-29" />
<period-end iso-date="2028-10-23" />
<target value="09/25/2023">
<comment><narrative>
Hiring of OE is critical for planning and implementation of Component A. OE procurement was completed in June 2026.
</narrative></comment>
</target>
<actual value="October 2023">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy produced (annually)
</narrative></title>
<baseline year="2022" iso-date="2022-10-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-24" />
<period-end iso-date="2028-10-23" />
<target value="420.00">
<comment><narrative>
Indicator will measure total annual electricity production from solar PV and wind generation.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy produced (annually)
</narrative></title>
<baseline year="2022" iso-date="2022-10-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-24" />
<period-end iso-date="2028-10-23" />
<target value="420.00">
<comment><narrative>
Indicator will measure total annual electricity production from solar PV and wind generation.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy produced (annually)
</narrative></title>
<baseline year="2022" iso-date="2022-10-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-24" />
<period-end iso-date="2028-10-23" />
<target value="420.00">
<comment><narrative>
Indicator will measure total annual electricity production from solar PV and wind generation.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Suppliers, contractors, enterprises supported that are women-led
</narrative></title>
<baseline year="2022" iso-date="2022-09-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-27" />
<period-end iso-date="2028-10-25" />
<target value="50.00">
<comment><narrative>
will ensure gender tagged and access to Canada funds
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy produced (annually)
</narrative></title>
<baseline year="2022" iso-date="2022-10-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-24" />
<period-end iso-date="2028-10-23" />
<target value="420.00">
<comment><narrative>
Indicator will measure total annual electricity production from solar PV and wind generation.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy produced (annually)
</narrative></title>
<baseline year="2022" iso-date="2022-10-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-24" />
<period-end iso-date="2028-10-23" />
<target value="420.00">
<comment><narrative>
Indicator will measure total annual electricity production from solar PV and wind generation.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
EJETP Community Forum established (% of female representation)
</narrative></title>
<baseline year="2022" iso-date="2022-10-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-24" />
<period-end iso-date="2023-03-20" />
<target value="50.00">
<comment><narrative>
Indicator contributes to gender tagging and access to Canadian funds
</narrative></comment>
</target>
<actual value="27">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
EJETP Community Forum established (% of female representation)
</narrative></title>
<baseline year="2022" iso-date="2022-10-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-24" />
<period-end iso-date="2023-03-20" />
<target value="50.00">
<comment><narrative>
Indicator contributes to gender tagging and access to Canadian funds
</narrative></comment>
</target>
<actual value="27">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
EJETP Community Forum established (% of female representation)
</narrative></title>
<baseline year="2022" iso-date="2022-10-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-24" />
<period-end iso-date="2023-03-20" />
<target value="50.00">
<comment><narrative>
Indicator contributes to gender tagging and access to Canadian funds
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
EJETP Community Forum established (% of female representation)
</narrative></title>
<baseline year="2022" iso-date="2022-10-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-24" />
<period-end iso-date="2023-03-20" />
<target value="50.00">
<comment><narrative>
Indicator contributes to gender tagging and access to Canadian funds
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
EJETP Community Forum established (% of female representation)
</narrative></title>
<baseline year="2022" iso-date="2022-10-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-24" />
<period-end iso-date="2023-03-20" />
<target value="50.00">
<comment><narrative>
Indicator contributes to gender tagging and access to Canadian funds
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net greenhouse gas (GHG) emissions
</narrative></title>
<baseline year="2022" iso-date="2022-09-28" value="80000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-28" />
<period-end iso-date="2028-10-22" />
<target value="0.00">
<comment><narrative>
Project net greenhouse gas (GHG) emissions are calculated as an annual average of the difference between project gross (absolute) emissions aggregated over the economic lifetime of the project and the emissions of a baseline (counterfactual) scenario aggregated over the same time horizon.  They are reported in metric tons of carbon dioxide equivalent per year.
</narrative></comment>
</target>
<actual value="80000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net greenhouse gas (GHG) emissions
</narrative></title>
<baseline year="2022" iso-date="2022-09-28" value="80000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-28" />
<period-end iso-date="2028-10-22" />
<target value="0.00">
<comment><narrative>
Project net greenhouse gas (GHG) emissions are calculated as an annual average of the difference between project gross (absolute) emissions aggregated over the economic lifetime of the project and the emissions of a baseline (counterfactual) scenario aggregated over the same time horizon.  They are reported in metric tons of carbon dioxide equivalent per year.
</narrative></comment>
</target>
<actual value="80000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net greenhouse gas (GHG) emissions
</narrative></title>
<baseline year="2022" iso-date="2022-09-28" value="80000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-28" />
<period-end iso-date="2028-10-22" />
<target value="0.00">
<comment><narrative>
Project net greenhouse gas (GHG) emissions are calculated as an annual average of the difference between project gross (absolute) emissions aggregated over the economic lifetime of the project and the emissions of a baseline (counterfactual) scenario aggregated over the same time horizon.  They are reported in metric tons of carbon dioxide equivalent per year.
</narrative></comment>
</target>
<actual value="80000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net greenhouse gas (GHG) emissions
</narrative></title>
<baseline year="2022" iso-date="2022-09-28" value="80000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-28" />
<period-end iso-date="2028-10-22" />
<target value="0.00">
<comment><narrative>
Project net greenhouse gas (GHG) emissions are calculated as an annual average of the difference between project gross (absolute) emissions aggregated over the economic lifetime of the project and the emissions of a baseline (counterfactual) scenario aggregated over the same time horizon.  They are reported in metric tons of carbon dioxide equivalent per year.
</narrative></comment>
</target>
<actual value="80000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net greenhouse gas (GHG) emissions
</narrative></title>
<baseline year="2022" iso-date="2022-09-28" value="80000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-28" />
<period-end iso-date="2028-10-22" />
<target value="0.00">
<comment><narrative>
Project net greenhouse gas (GHG) emissions are calculated as an annual average of the difference between project gross (absolute) emissions aggregated over the economic lifetime of the project and the emissions of a baseline (counterfactual) scenario aggregated over the same time horizon.  They are reported in metric tons of carbon dioxide equivalent per year.
</narrative></comment>
</target>
<actual value="80000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Suppliers, contractors and enterprises supported
</narrative></title>
<baseline year="2022" iso-date="2022-09-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-20" />
<period-end iso-date="2028-10-22" />
<target value="40.00">
<comment><narrative>
Indicator will measure support to suppliers, contractors and enterprises that deliver Komati
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Suppliers, contractors and enterprises supported
</narrative></title>
<baseline year="2022" iso-date="2022-09-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-20" />
<period-end iso-date="2028-10-22" />
<target value="40.00">
<comment><narrative>
Indicator will measure support to suppliers, contractors and enterprises that deliver Komati
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Hiring of Owner-Engineer (OE)
</narrative></title>
<baseline year="2022" iso-date="2022-09-29" value="06/22/2022"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-29" />
<period-end iso-date="2028-10-23" />
<target value="09/25/2023">
<comment><narrative>
Hiring of OE is critical for planning and implementation of Component A. OE will be ESMAP grant funded. It is aimed that the OE procurement will be completed by June 2025.&amp;nbsp;
</narrative></comment>
</target>
<actual value="06/31/2025">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Suppliers, contractors and enterprises supported
</narrative></title>
<baseline year="2022" iso-date="2022-09-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-20" />
<period-end iso-date="2028-10-22" />
<target value="40.00">
<comment><narrative>
Indicator will measure support to suppliers, contractors and enterprises that deliver Komati
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Suppliers, contractors and enterprises supported
</narrative></title>
<baseline year="2022" iso-date="2022-09-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-20" />
<period-end iso-date="2028-10-22" />
<target value="40.00">
<comment><narrative>
Indicator will measure support to suppliers, contractors and enterprises that deliver Komati
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Suppliers, contractors and enterprises supported
</narrative></title>
<baseline year="2022" iso-date="2022-09-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-20" />
<period-end iso-date="2028-10-22" />
<target value="40.00">
<comment><narrative>
Indicator will measure support to suppliers, contractors and enterprises that deliver Komati
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Eskom Workers at Komati retrained / re-deployed / compensated
</narrative></title>
<baseline year="2022" iso-date="2022-07-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-26" />
<period-end iso-date="2028-10-22" />
<target value="100.00">
<comment><narrative>
Eskom applies four mitigation options: (i) transfers to other power stations; (ii) reskilling and upskilling for deployment to repurposed renewables plants; (iii) secondment to other critical Eskom projects / operations; and (iv) other levers (such as voluntary separation packages). Transfers and reskilling/upskilling for redeployment are the main options being considered for Komati workers. This indicator will also insure that the ratio of female / male employment will not deteriorate.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Eskom Workers at Komati retrained / re-deployed / compensated
</narrative></title>
<baseline year="2022" iso-date="2022-07-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-26" />
<period-end iso-date="2028-10-22" />
<target value="100.00">
<comment><narrative>
Eskom applies four mitigation options: (i) transfers to other power stations; (ii) reskilling and upskilling for deployment to repurposed renewables plants; (iii) secondment to other critical Eskom projects / operations; and (iv) other levers (such as voluntary separation packages). Transfers and reskilling/upskilling for redeployment are the main options being considered for Komati workers. This indicator will also insure that the ratio of female / male employment will not deteriorate.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Eskom Workers at Komati retrained / re-deployed / compensated
</narrative></title>
<baseline year="2022" iso-date="2022-07-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-26" />
<period-end iso-date="2028-10-22" />
<target value="100.00">
<comment><narrative>
Eskom applies four mitigation options: (i) transfers to other power stations; (ii) reskilling and upskilling for deployment to repurposed renewables plants; (iii) secondment to other critical Eskom projects / operations; and (iv) other levers (such as voluntary separation packages). Transfers and reskilling/upskilling for redeployment are the main options being considered for Komati workers. This indicator will also insure that the ratio of female / male employment will not deteriorate.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Eskom Workers at Komati retrained / re-deployed / compensated
</narrative></title>
<baseline year="2022" iso-date="2022-07-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-26" />
<period-end iso-date="2028-10-22" />
<target value="100.00">
<comment><narrative>
Eskom applies four mitigation options: (i) transfers to other power stations; (ii) reskilling and upskilling for deployment to repurposed renewables plants; (iii) secondment to other critical Eskom projects / operations; and (iv) other levers (such as voluntary separation packages). Transfers and reskilling/upskilling for redeployment are the main options being considered for Komati workers. This indicator will also insure that the ratio of female / male employment will not deteriorate.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Eskom Workers at Komati retrained / re-deployed / compensated
</narrative></title>
<baseline year="2022" iso-date="2022-07-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-26" />
<period-end iso-date="2028-10-22" />
<target value="100.00">
<comment><narrative>
Eskom applies four mitigation options: (i) transfers to other power stations; (ii) reskilling and upskilling for deployment to repurposed renewables plants; (iii) secondment to other critical Eskom projects / operations; and (iv) other levers (such as voluntary separation packages). Transfers and reskilling/upskilling for redeployment are the main options being considered for Komati workers. This indicator will also insure that the ratio of female / male employment will not deteriorate.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy capacity enabled with direct support
</narrative></title>
<baseline year="2022" iso-date="2022-10-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-14" />
<period-end iso-date="2028-10-14" />
<target value="220">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New or better jobs
</narrative></title>
<baseline year="2022" iso-date="2022-10-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-13" />
<period-end iso-date="2028-10-14" />
<target value="100">
<comment><narrative>
Socio-economic activities are under implementation. Figures will be provided in the next ISR.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances solved within 6 month
</narrative></title>
<baseline year="2022" iso-date="2022-09-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-27" />
<period-end iso-date="2028-10-23" />
<target value="80.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Female Komati workers trained at Komati who are gainfully employed or self-employed 6 months after certification
</narrative></title>
<baseline year="2022" iso-date="2022-09-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-27" />
<period-end iso-date="2028-10-24" />
<target value="80.00">
<comment><narrative>
gender tagged and access to Canada funds
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Coal Plant Repurposing Guidelines
</narrative></title>
<baseline year="2022" iso-date="2022-10-25" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-25" />
<period-end iso-date="2028-10-24" />
<target value="Yes">
<comment><narrative>
Repurposing guidelines will be developed by Eskom and the Bank to draw lessons for future coal plant retirement.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T01:57:00" hierarchy="1"><iati-identifier>44000-P179077</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>South Africa Sustainable and Low-Carbon Energy Transition Development Policy Loan</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To advance the restructuring of the power sector to promote long-term energy security and support a low carbon transition.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="ZA–P0055237"><narrative>Republic of South Africa</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="ZA-COA-08"><narrative>National Treasury</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2022-10-28"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2023-10-24"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2025-02-28"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2025-02-28"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Jacques Morisset</narrative></person-name><telephone>+1-202-473-1000</telephone><email>jmorisset@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="ZA" percentage="100"><narrative xml:lang="en">SOUTH AFRICA</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="964137" />
                <name><narrative>Pretoria</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-25.74486 28.18783</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="23631" percentage="25" xml:lang="en"/><sector vocabulary="1" code="15117" percentage="13" xml:lang="en"/><sector vocabulary="1" code="24010" percentage="13" xml:lang="en"/><sector vocabulary="1" code="32210" percentage="13" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="6" xml:lang="en"/><sector vocabulary="1" code="23231" percentage="6" xml:lang="en"/><sector vocabulary="1" code="15155" percentage="6" xml:lang="en"/><sector vocabulary="1" code="23111" percentage="6" xml:lang="en"/><sector vocabulary="1" code="15124" percentage="6" xml:lang="en"/><sector vocabulary="1" code="15119" percentage="6" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="31.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LU" percentage="6.00000000" xml:lang="en"><narrative>FY17 - Renewable Energy Solar</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="FA" percentage="13.0000000" xml:lang="en"><narrative>FY17 - Banking Institutions</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LM" percentage="12.0000000" xml:lang="en"><narrative>FY17 - Mining</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LZ" percentage="13.0000000" xml:lang="en"><narrative>FY17 - Other Energy and Extractives</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LT" percentage="25.0000000" xml:lang="en"><narrative>FY17 - Energy Transmission and Distribution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000411" percentage="25" xml:lang="en"><narrative>Public Expenditure Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000863" percentage="13" xml:lang="en"><narrative>Access to Energy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000715" percentage="13" xml:lang="en"><narrative>Municipal Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000412" percentage="13" xml:lang="en"><narrative>Domestic Revenue Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000861" percentage="38" xml:lang="en"><narrative>Energy Efficiency</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000323" percentage="13" xml:lang="en"><narrative>MSME Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000011" percentage="25" xml:lang="en"><narrative>Fiscal Policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000411" percentage="25" xml:lang="en"><narrative>Public Expenditure Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000114" percentage="13" xml:lang="en"><narrative>Tax policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000751" percentage="13" xml:lang="en"><narrative>Disaster Response and Recovery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000113" percentage="13" xml:lang="en"><narrative>Debt Policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000862" percentage="38" xml:lang="en"><narrative>Energy Policies &amp; Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000086" percentage="63" xml:lang="en"><narrative>Energy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="50" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000437" percentage="13" xml:lang="en"><narrative>Municipal Institution Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="25" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="13" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000861" percentage="38" xml:lang="en"><narrative>Energy Efficiency</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">2112000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">6684000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">14524000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">16093000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">8603000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">18201000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">19397000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">10186000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">21767000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">23829000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">24985000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">12657000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">25276000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">26390000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">13373000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">26248000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">2112000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">6684000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">14524000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">16093000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">8603000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">18201000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">19397000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">10186000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">21767000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">23829000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">24985000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">12657000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">25276000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">26390000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">13373000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">26248000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">729675000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">729675000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">1000000000</value><description xml:lang="en"><narrative>Total Commitment in October Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-55238"><narrative>National Treasury</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">1000000000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-55238"><narrative>National Treasury</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">0</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-55238"><narrative>National Treasury</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-2500000</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-55238"><narrative>National Treasury</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-81967</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-55238"><narrative>National Treasury</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-31170298</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-55238"><narrative>National Treasury</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-23831667</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-55238"><narrative>National Treasury</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-24226667</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-55238"><narrative>National Treasury</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-23831667</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-55238"><narrative>National Treasury</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P179077"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P179077?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P179077"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of independent non-executive members appointed to the NTCSA Board.
</narrative></title>
<baseline year="2023" iso-date="2023-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-15" />
<period-end iso-date="2025-12-15" />
<target value="50">
<comment><narrative>
Exceeded.
</narrative></comment>
</target>
<actual value="50">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Amount of new transformer capacity installed and commissioned in NTCSA network (MVA)
</narrative></title>
<baseline year="2023" iso-date="2023-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-15" />
<period-end iso-date="2025-06-15" />
<target value="2620">
<comment><narrative>
Exceeded
</narrative></comment>
</target>
<actual value="2620">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of businesses benefiting from renewable energy tax incentives.
</narrative></title>
<baseline year="2023" iso-date="2023-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-15" />
<period-end iso-date="2025-12-15" />
<target value="">
<comment><narrative>
Could not be assessed due to a lag in data availability.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Amount of MW of new Renewable Energy registered with NERSA and connected to the grid.  Baseline (July 2023): 259 MW
</narrative></title>
<baseline year="2023" iso-date="2023-07-15" value="259"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-15" />
<period-end iso-date="2025-12-15" />
<target value="">
<comment><narrative>
Exceeded
</narrative></comment>
</target>
<actual value="4,514">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of households receiving Free Basic Electricity as a percentage of LGES funded poor households.
</narrative></title>
<baseline year="2023" iso-date="2023-07-15" value="23"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-15" />
<period-end iso-date="2025-12-15" />
<target value="">
<comment><narrative>
Not achieved.
</narrative></comment>
</target>
<actual value="17.8">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of independent non-executive members appointed to the NTCSA Board.
</narrative></title>
<baseline year="2023" iso-date="2023-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-15" />
<period-end iso-date="2025-12-15" />
<target value="50">
<comment><narrative>
Exceeded.
</narrative></comment>
</target>
<actual value="50">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Processing time for National Energy Regulator of South Africa (NERSA) to consider applications for the registration of electricity generation facilities.
</narrative></title>
<baseline year="2023" iso-date="2023-07-15" value="45"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-15" />
<period-end iso-date="2025-09-15" />
<target value="10">
<comment><narrative>
Exceeded
</narrative></comment>
</target>
<actual value="12">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Eskom debt/asset ratio
</narrative></title>
<baseline year="2023" iso-date="2023-07-15" value="52.8"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-15" />
<period-end iso-date="2025-09-15" />
<target value="38.9">
<comment><narrative>
Achieved.
</narrative></comment>
</target>
<actual value="40.9">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Eskom operating profit margin
</narrative></title>
<baseline year="2023" iso-date="2023-07-15" value="14.7"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-15" />
<period-end iso-date="2025-09-15" />
<target value="35.8">
<comment><narrative>
Exceeded.
</narrative></comment>
</target>
<actual value="29.1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Amount of new transformer capacity installed and commissioned in NTCSA network (MVA)
</narrative></title>
<baseline year="2023" iso-date="2023-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-15" />
<period-end iso-date="2025-06-15" />
<target value="2620">
<comment><narrative>
Exceeded
</narrative></comment>
</target>
<actual value="2620">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of households receiving Free Basic Electricity as a percentage of LGES funded poor households.
</narrative></title>
<baseline year="2023" iso-date="2023-07-15" value="23"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-15" />
<period-end iso-date="2025-12-15" />
<target value="">
<comment><narrative>
Not achieved.
</narrative></comment>
</target>
<actual value="17.8">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Amount of MW of new Renewable Energy registered with NERSA and connected to the grid.  Baseline (July 2023): 259 MW
</narrative></title>
<baseline year="2023" iso-date="2023-07-15" value="259"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-15" />
<period-end iso-date="2025-12-15" />
<target value="">
<comment><narrative>
Exceeded
</narrative></comment>
</target>
<actual value="4,514">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Amount of private capital mobilized in new Renewable Energy registered with NERSA and connected to the grid, in million of South African Rands
</narrative></title>
<baseline year="2023" iso-date="2023-07-15" value="1,455"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-15" />
<period-end iso-date="2025-12-15" />
<target value="">
<comment><narrative>
Exceeded.
</narrative></comment>
</target>
<actual value="64,500">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of businesses benefiting from renewable energy tax incentives.
</narrative></title>
<baseline year="2023" iso-date="2023-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-15" />
<period-end iso-date="2025-12-15" />
<target value="">
<comment><narrative>
Could not be assessed due to a lag in data availability.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Amount of MW of new decentralized renewable energy solutions financed with support of the EBB.
</narrative></title>
<baseline year="2023" iso-date="2023-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-15" />
<period-end iso-date="2025-12-15" />
<target value="">
<comment><narrative>
Could not be assessed.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Eskom debt/asset ratio
</narrative></title>
<baseline year="2023" iso-date="2023-07-15" value="52.8"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-15" />
<period-end iso-date="2025-09-15" />
<target value="38.9">
<comment><narrative>
Achieved.
</narrative></comment>
</target>
<actual value="40.9">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of women-led households and businesses that accessed financing for new decentralized renewable energy solutions with support of the EBB.
</narrative></title>
<baseline year="2023" iso-date="2023-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-15" />
<period-end iso-date="2025-12-15" />
<target value="">
<comment><narrative>
Could not be assessed due to incomplete data.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Amount of private capital mobilized in new Renewable Energy registered with NERSA and connected to the grid, in million of South African Rands
</narrative></title>
<baseline year="2023" iso-date="2023-07-15" value="1,455"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-15" />
<period-end iso-date="2025-12-15" />
<target value="">
<comment><narrative>
Exceeded.
</narrative></comment>
</target>
<actual value="64,500">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Revenue collected from the carbon tax, in millions South African Rands.
</narrative></title>
<baseline year="2023" iso-date="2023-07-15" value="1,397"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-15" />
<period-end iso-date="2026-03-15" />
<target value="2,318">
<comment><narrative>
Mostly achieved. Estimated (November 2025 mid-term budget) to exceed the target in FY2025/26.
</narrative></comment>
</target>
<actual value="2,024">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Revenue collected from the carbon tax, in millions South African Rands.
</narrative></title>
<baseline year="2023" iso-date="2023-07-15" value="1,397"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-15" />
<period-end iso-date="2026-03-15" />
<target value="2,318">
<comment><narrative>
Mostly achieved. Estimated (November 2025 mid-term budget) to exceed the target in FY2025/26.
</narrative></comment>
</target>
<actual value="2,024">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of women-led households and businesses that accessed financing for new decentralized renewable energy solutions with support of the EBB.
</narrative></title>
<baseline year="2023" iso-date="2023-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-15" />
<period-end iso-date="2025-12-15" />
<target value="">
<comment><narrative>
Could not be assessed due to incomplete data.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Amount of MW of new decentralized renewable energy solutions financed with support of the EBB.
</narrative></title>
<baseline year="2023" iso-date="2023-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-15" />
<period-end iso-date="2025-12-15" />
<target value="">
<comment><narrative>
Could not be assessed.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Eskom operating profit margin
</narrative></title>
<baseline year="2023" iso-date="2023-07-15" value="14.7"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-15" />
<period-end iso-date="2025-09-15" />
<target value="35.8">
<comment><narrative>
Exceeded.
</narrative></comment>
</target>
<actual value="29.1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Revenue collected from the carbon tax, in millions South African Rands.
</narrative></title>
<baseline year="2023" iso-date="2023-07-15" value="1,397"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-15" />
<period-end iso-date="2026-03-15" />
<target value="2,318">
<comment><narrative>
Mostly achieved. Estimated (November 2025 mid-term budget) to exceed the target in FY2025/26.
</narrative></comment>
</target>
<actual value="2,024">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of women-led households and businesses that accessed financing for new decentralized renewable energy solutions with support of the EBB.
</narrative></title>
<baseline year="2023" iso-date="2023-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-15" />
<period-end iso-date="2025-12-15" />
<target value="">
<comment><narrative>
Could not be assessed due to incomplete data.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Amount of MW of new decentralized renewable energy solutions financed with support of the EBB.
</narrative></title>
<baseline year="2023" iso-date="2023-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-15" />
<period-end iso-date="2025-12-15" />
<target value="">
<comment><narrative>
Could not be assessed.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of businesses benefiting from renewable energy tax incentives.
</narrative></title>
<baseline year="2023" iso-date="2023-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-15" />
<period-end iso-date="2025-12-15" />
<target value="">
<comment><narrative>
Could not be assessed due to a lag in data availability.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Amount of private capital mobilized in new Renewable Energy registered with NERSA and connected to the grid, in million of South African Rands
</narrative></title>
<baseline year="2023" iso-date="2023-07-15" value="1,455"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-15" />
<period-end iso-date="2025-12-15" />
<target value="">
<comment><narrative>
Exceeded.
</narrative></comment>
</target>
<actual value="64,500">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Amount of MW of new Renewable Energy registered with NERSA and connected to the grid.  Baseline (July 2023): 259 MW
</narrative></title>
<baseline year="2023" iso-date="2023-07-15" value="259"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-15" />
<period-end iso-date="2025-12-15" />
<target value="">
<comment><narrative>
Exceeded
</narrative></comment>
</target>
<actual value="4,514">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of households receiving Free Basic Electricity as a percentage of LGES funded poor households.
</narrative></title>
<baseline year="2023" iso-date="2023-07-15" value="23"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-15" />
<period-end iso-date="2025-12-15" />
<target value="">
<comment><narrative>
Not achieved.
</narrative></comment>
</target>
<actual value="17.8">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Amount of new transformer capacity installed and commissioned in NTCSA network (MVA)
</narrative></title>
<baseline year="2023" iso-date="2023-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-15" />
<period-end iso-date="2025-06-15" />
<target value="2620">
<comment><narrative>
Exceeded
</narrative></comment>
</target>
<actual value="2620">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Eskom operating profit margin
</narrative></title>
<baseline year="2023" iso-date="2023-07-15" value="14.7"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-15" />
<period-end iso-date="2025-09-15" />
<target value="35.8">
<comment><narrative>
Exceeded.
</narrative></comment>
</target>
<actual value="29.1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Eskom debt/asset ratio
</narrative></title>
<baseline year="2023" iso-date="2023-07-15" value="52.8"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-15" />
<period-end iso-date="2025-09-15" />
<target value="38.9">
<comment><narrative>
Achieved.
</narrative></comment>
</target>
<actual value="40.9">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Processing time for National Energy Regulator of South Africa (NERSA) to consider applications for the registration of electricity generation facilities.
</narrative></title>
<baseline year="2023" iso-date="2023-07-15" value="45"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-15" />
<period-end iso-date="2025-09-15" />
<target value="10">
<comment><narrative>
Exceeded
</narrative></comment>
</target>
<actual value="12">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of independent non-executive members appointed to the NTCSA Board.
</narrative></title>
<baseline year="2023" iso-date="2023-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-15" />
<period-end iso-date="2025-12-15" />
<target value="50">
<comment><narrative>
Exceeded.
</narrative></comment>
</target>
<actual value="50">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Processing time for National Energy Regulator of South Africa (NERSA) to consider applications for the registration of electricity generation facilities.
</narrative></title>
<baseline year="2023" iso-date="2023-07-15" value="45"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-15" />
<period-end iso-date="2025-09-15" />
<target value="10">
<comment><narrative>
Exceeded
</narrative></comment>
</target>
<actual value="12">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T01:57:00" hierarchy="1"><iati-identifier>44000-P505813</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>South Africa Metro Trading Services Program</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="ZA–00006667"><narrative>The Republic of South Africa</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="ZA-COA-00010444"><narrative>The National Treasury</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2025-11-07"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2025-11-07"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2031-03-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2031-03-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Megha Mukim</narrative></person-name><telephone>+1-202-473-1000</telephone><email>mmukim@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="ZA" percentage="100"><narrative xml:lang="en">SOUTH AFRICA</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="964137" />
                <name><narrative>Pretoria</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-25.74486 28.18783</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="15185" percentage="100" xml:lang="en"/><sector vocabulary="1" code="15185" percentage="100" xml:lang="en"/><sector vocabulary="1" code="15185" percentage="100" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WWC" percentage="20.0000000" xml:lang="en"><narrative>Water Supply</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BBH" percentage="20.0000000" xml:lang="en"><narrative>Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WWB" percentage="20.0000000" xml:lang="en"><narrative>Solid Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LLZ" percentage="20.0000000" xml:lang="en"><narrative>Other - Energy and Mineral Resources</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WWA" percentage="20.0000000" xml:lang="en"><narrative>Sanitation</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">4002571.13</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">4002571.13</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">4002571.13</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">4002571.13</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">4002571.13</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">4002571.13</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">4002571.13</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">4002579.09</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">5851850.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">5851850.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">5851850.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">5851850.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">5851850.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">5851850.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">5851850.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">5851850.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">5851850.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">5851850.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">5851850.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">5851862.87</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">13023147.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">13023147.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">13023147.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">13023147.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">13023147.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">13023147.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">13023147.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">13023147.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">13023147.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">13023147.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">13023147.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">13023159.13</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">17476850.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">17476850.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">17476850.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">17476850.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">17476850.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">17476850.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">17476850.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">17476850.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">17476850.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">17476850.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">17476850.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">17476862.87</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">18248455.75</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">18248455.75</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">18248455.75</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">18248455.75</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">18248455.75</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">18248455.75</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">18248455.75</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">18248455.75</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">18248455.75</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">18248455.75</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">18248455.75</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">18248467.75</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">19814642.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">19814642.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">19814642.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">19814642.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">19814642.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">19814642.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">19814642.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">19814642.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">19814642.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">19814642.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">19814642.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">19814654.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">4002571.13</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">4002571.13</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">4002571.13</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">4002571.13</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">4002571.13</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">4002571.13</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">4002571.13</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">4002579.09</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">5851850.83</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">5851850.83</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">5851850.83</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">5851850.83</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">5851850.83</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">5851850.83</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">5851850.83</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">5851850.83</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">5851850.83</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">5851850.83</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">5851850.83</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">5851862.87</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">13023147.17</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">13023147.17</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">13023147.17</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">13023147.17</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">13023147.17</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">13023147.17</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">13023147.17</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">13023147.17</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">13023147.17</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">13023147.17</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">13023147.17</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">13023159.13</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">17476850.83</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">17476850.83</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">17476850.83</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">17476850.83</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">17476850.83</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">17476850.83</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">17476850.83</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">17476850.83</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">17476850.83</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">17476850.83</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">17476850.83</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">17476862.87</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">18248455.75</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">18248455.75</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">18248455.75</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">18248455.75</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">18248455.75</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">18248455.75</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">18248455.75</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">18248455.75</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">18248455.75</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">18248455.75</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">18248455.75</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">18248467.75</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">19814642.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">19814642.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">19814642.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">19814642.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">19814642.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">19814642.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">19814642.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">19814642.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">19814642.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">19814642.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">19814642.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">19814654.37</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">925000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">925000000.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">925000000</value><description xml:lang="en"><narrative>Total Commitment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-10444"><narrative>The National Treasury</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-09-30"/><value value-date="2026-09-30">0</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-10444"><narrative>The National Treasury</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P505813"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P505813?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P505813"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Industrial (bulk) and commercial customers metered and operational
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-03-11" />
<target value="To be identified at PIAP formulation">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Non-Revenue Water reduction in South Africa's metros as a result of the Program
</narrative></title>
<baseline year="2025" iso-date="2025-09-14" value="41"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-09-14" />
<period-end iso-date="2031-03-12" />
<target value="28">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Newly appointed female technical staff in trading sectors at metro level under the Program
</narrative></title>
<baseline year="2025" iso-date="2025-09-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-09-15" />
<period-end iso-date="2031-03-11" />
<target value="20">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Bulk water system input volume versus the permitted raw water allocation volume
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-03-11" />
<target value="To be identified at PIAP formulation">

</target>
<actual value="nA">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
City Manager delegations to Trading Services Head of Department for: human resources, SCM, revenue, fleet management, IT, customer service, real estate, and security
</narrative></title>
<baseline year="2025" iso-date="2025-09-13" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-09-13" />
<period-end iso-date="2031-03-11" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Electricity losses reduction in South Africa's metros as a result of the Program
</narrative></title>
<baseline year="2025" iso-date="2025-09-15" value="22"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-09-15" />
<period-end iso-date="2031-03-12" />
<target value="12">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net greenhouse gas emissions
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-03-11" />
<target value="To be identified at PIAP formulation">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Full separate Annual Financial Statement for each trading service
</narrative></title>
<baseline year="2025" iso-date="2025-09-14" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-09-14" />
<period-end iso-date="2031-03-11" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
City Manager delegations to Trading Services Head of Department for: human resources, SCM, revenue, fleet management, IT, customer service, real estate, and security
</narrative></title>
<baseline year="2025" iso-date="2025-09-13" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-09-13" />
<period-end iso-date="2031-03-11" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Metros that have met and maintained the Program's Minimum Commitments
</narrative></title>
<baseline year="2025" iso-date="2025-09-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-09-11" />
<period-end iso-date="2031-03-08" />
<target value="8">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Non-Revenue Water reduction in South Africa's metros as a result of the Program
</narrative></title>
<baseline year="2025" iso-date="2025-09-14" value="41"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-09-14" />
<period-end iso-date="2031-03-12" />
<target value="28">

</target>
<actual value="41">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Improved service reliability
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-03-11" />
<target value="To be identified at PIAP formulation">

</target>
<actual value="nA">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Full separate Annual Financial Statement for each trading service
</narrative></title>
<baseline year="2025" iso-date="2025-09-14" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-09-14" />
<period-end iso-date="2031-03-11" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Cash collection rate
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-03-11" />
<target value="To be identified at PIAP formulation">

</target>
<actual value="nA">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Operating cost coverage ratio (OCCR)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-03-11" />
<target value="To be identified at PIAP formulation">

</target>
<actual value="nA">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Service compact between service authority (Metro) and service provider (Trading Service) for effective delivery of the trading service
</narrative></title>
<baseline year="2025" iso-date="2025-09-13" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-09-13" />
<period-end iso-date="2031-03-11" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Bulk water system input volume versus the permitted raw water allocation volume
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-03-11" />
<target value="To be identified at PIAP formulation">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Green Drop Score
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-03-11" />
<target value="To be identified at PIAP formulation">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Green Drop Score
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-03-11" />
<target value="To be identified at PIAP formulation">

</target>
<actual value="nA">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Repairs Efficiency, Total operational spend on repairs and maintenance / total operational revenue
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-03-11" />
<target value="To be identified at PIAP formulation">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Newly appointed female technical staff in trading sectors at metro level under the Program
</narrative></title>
<baseline year="2025" iso-date="2025-09-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-09-15" />
<period-end iso-date="2031-03-11" />
<target value="20">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net greenhouse gas emissions
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-03-11" />
<target value="To be identified at PIAP formulation">

</target>
<actual value="nA">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Operating cost coverage ratio (OCCR)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-03-11" />
<target value="To be identified at PIAP formulation">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Formal and informal settlements receiving basic waste collection services.
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-03-11" />
<target value="To be identified at PIAP formulation">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Industrial (bulk) and commercial customers metered and operational
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-03-11" />
<target value="To be identified at PIAP formulation">

</target>
<actual value="nA">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Cash collection rate
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-03-11" />
<target value="To be identified at PIAP formulation">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Metros that have met and maintained the Program's Minimum Commitments
</narrative></title>
<baseline year="2025" iso-date="2025-09-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-09-11" />
<period-end iso-date="2031-03-08" />
<target value="8">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Service compact between service authority (Metro) and service provider (Trading Service) for effective delivery of the trading service
</narrative></title>
<baseline year="2025" iso-date="2025-09-13" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-09-13" />
<period-end iso-date="2031-03-11" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Improved service reliability
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-03-11" />
<target value="To be identified at PIAP formulation">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Electricity losses reduction in South Africa's metros as a result of the Program
</narrative></title>
<baseline year="2025" iso-date="2025-09-15" value="22"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-09-15" />
<period-end iso-date="2031-03-12" />
<target value="12">

</target>
<actual value="22">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Electricity losses reduction in South Africa's metros as a result of the Program
</narrative></title>
<baseline year="2025" iso-date="2025-09-15" value="22"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-09-15" />
<period-end iso-date="2031-03-12" />
<target value="12">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Non-Revenue Water reduction in South Africa's metros as a result of the Program
</narrative></title>
<baseline year="2025" iso-date="2025-09-14" value="41"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-09-14" />
<period-end iso-date="2031-03-12" />
<target value="28">

</target>
<actual value="41">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Non-Revenue Water reduction in South Africa's metros as a result of the Program
</narrative></title>
<baseline year="2025" iso-date="2025-09-14" value="41"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-09-14" />
<period-end iso-date="2031-03-12" />
<target value="28">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Metros that have met and maintained the Program's Minimum Commitments
</narrative></title>
<baseline year="2025" iso-date="2025-09-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-09-11" />
<period-end iso-date="2031-03-08" />
<target value="8">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Metros that have met and maintained the Program's Minimum Commitments
</narrative></title>
<baseline year="2025" iso-date="2025-09-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-09-11" />
<period-end iso-date="2031-03-08" />
<target value="8">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Newly appointed female technical staff in trading sectors at metro level under the Program
</narrative></title>
<baseline year="2025" iso-date="2025-09-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-09-15" />
<period-end iso-date="2031-03-11" />
<target value="20">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Newly appointed female technical staff in trading sectors at metro level under the Program
</narrative></title>
<baseline year="2025" iso-date="2025-09-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-09-15" />
<period-end iso-date="2031-03-11" />
<target value="20">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net greenhouse gas emissions
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-03-11" />
<target value="To be identified at PIAP formulation">

</target>
<actual value="nA">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net greenhouse gas emissions
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-03-11" />
<target value="To be identified at PIAP formulation">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Improved service reliability
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-03-11" />
<target value="To be identified at PIAP formulation">

</target>
<actual value="nA">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Improved service reliability
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-03-11" />
<target value="To be identified at PIAP formulation">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Formal and informal settlements receiving basic waste collection services.
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-03-11" />
<target value="To be identified at PIAP formulation">

</target>
<actual value="nA">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Formal and informal settlements receiving basic waste collection services.
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-03-11" />
<target value="To be identified at PIAP formulation">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Cash collection rate
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-03-11" />
<target value="To be identified at PIAP formulation">

</target>
<actual value="nA">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Cash collection rate
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-03-11" />
<target value="To be identified at PIAP formulation">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Operating cost coverage ratio (OCCR)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-03-11" />
<target value="To be identified at PIAP formulation">

</target>
<actual value="nA">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Operating cost coverage ratio (OCCR)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-03-11" />
<target value="To be identified at PIAP formulation">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Full separate Annual Financial Statement for each trading service
</narrative></title>
<baseline year="2025" iso-date="2025-09-14" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-09-14" />
<period-end iso-date="2031-03-11" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Full separate Annual Financial Statement for each trading service
</narrative></title>
<baseline year="2025" iso-date="2025-09-14" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-09-14" />
<period-end iso-date="2031-03-11" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Service compact between service authority (Metro) and service provider (Trading Service) for effective delivery of the trading service
</narrative></title>
<baseline year="2025" iso-date="2025-09-13" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-09-13" />
<period-end iso-date="2031-03-11" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Service compact between service authority (Metro) and service provider (Trading Service) for effective delivery of the trading service
</narrative></title>
<baseline year="2025" iso-date="2025-09-13" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-09-13" />
<period-end iso-date="2031-03-11" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
City Manager delegations to Trading Services Head of Department for: human resources, SCM, revenue, fleet management, IT, customer service, real estate, and security
</narrative></title>
<baseline year="2025" iso-date="2025-09-13" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-09-13" />
<period-end iso-date="2031-03-11" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
City Manager delegations to Trading Services Head of Department for: human resources, SCM, revenue, fleet management, IT, customer service, real estate, and security
</narrative></title>
<baseline year="2025" iso-date="2025-09-13" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-09-13" />
<period-end iso-date="2031-03-11" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Repairs Efficiency, Total operational spend on repairs and maintenance / total operational revenue
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-03-11" />
<target value="To be identified at PIAP formulation">

</target>
<actual value="nA">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Repairs Efficiency, Total operational spend on repairs and maintenance / total operational revenue
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-03-11" />
<target value="To be identified at PIAP formulation">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Industrial (bulk) and commercial customers metered and operational
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-03-11" />
<target value="To be identified at PIAP formulation">

</target>
<actual value="nA">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Industrial (bulk) and commercial customers metered and operational
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-03-11" />
<target value="To be identified at PIAP formulation">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Green Drop Score
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-03-11" />
<target value="To be identified at PIAP formulation">

</target>
<actual value="nA">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Green Drop Score
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-03-11" />
<target value="To be identified at PIAP formulation">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Bulk water system input volume versus the permitted raw water allocation volume
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-03-11" />
<target value="To be identified at PIAP formulation">

</target>
<actual value="nA">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Bulk water system input volume versus the permitted raw water allocation volume
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-03-11" />
<target value="To be identified at PIAP formulation">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Electricity losses reduction in South Africa's metros as a result of the Program
</narrative></title>
<baseline year="2025" iso-date="2025-09-15" value="22"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-09-15" />
<period-end iso-date="2031-03-12" />
<target value="12">

</target>
<actual value="22">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Electricity losses reduction in South Africa's metros as a result of the Program
</narrative></title>
<baseline year="2025" iso-date="2025-09-15" value="22"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-09-15" />
<period-end iso-date="2031-03-12" />
<target value="12">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Non-Revenue Water reduction in South Africa's metros as a result of the Program
</narrative></title>
<baseline year="2025" iso-date="2025-09-14" value="41"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-09-14" />
<period-end iso-date="2031-03-12" />
<target value="28">

</target>
<actual value="41">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Non-Revenue Water reduction in South Africa's metros as a result of the Program
</narrative></title>
<baseline year="2025" iso-date="2025-09-14" value="41"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-09-14" />
<period-end iso-date="2031-03-12" />
<target value="28">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Metros that have met and maintained the Program's Minimum Commitments
</narrative></title>
<baseline year="2025" iso-date="2025-09-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-09-11" />
<period-end iso-date="2031-03-08" />
<target value="8">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Metros that have met and maintained the Program's Minimum Commitments
</narrative></title>
<baseline year="2025" iso-date="2025-09-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-09-11" />
<period-end iso-date="2031-03-08" />
<target value="8">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Nelson Mandela Bay has council approved PIAPs for the (3) Trading Services and is meeting its accountability, financial and operational performance targets
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Nelson Mandela Bay has council approved PIAPs for the (3) Trading Services and is meeting its accountability, financial and operational performance targets
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Mangaung has council approved PIAPs for the (3) Trading Services and is meeting its accountability, financial and operational performance targets
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Mangaung has council approved PIAPs for the (3) Trading Services and is meeting its accountability, financial and operational performance targets
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
eThekwini has council approved PIAPs for the (3) Trading Services and is meeting its accountability, financial and operational performance targets
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
eThekwini has council approved PIAPs for the (3) Trading Services and is meeting its accountability, financial and operational performance targets
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The City of Tshwane has council approved PIAPs for the (3) Trading Services and is meeting its accountability, financial and operational performance targets
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The City of Tshwane has council approved PIAPs for the (3) Trading Services and is meeting its accountability, financial and operational performance targets
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The City of Johannesburg has council approved PIAPs for the Trading Services and is meeting its accountability, financial and operational performance targets
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The City of Johannesburg has council approved PIAPs for the Trading Services and is meeting its accountability, financial and operational performance targets
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The City of Ekurhuleni has council approved PIAPs for the Trading Services and is meeting its accountability, financial and operational performance targets
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The City of Ekurhuleni has council approved PIAPs for the Trading Services and is meeting its accountability, financial and operational performance targets
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The City of Cape Town has council approved PIAPs for the Trading Services and is meeting its accountability, financial and operational performance targets
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The City of Cape Town has council approved PIAPs for the Trading Services and is meeting its accountability, financial and operational performance targets
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Buffalo City has council approved PIAPs for the Trading Services and is meeting its accountability, financial and operational performance targets
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Buffalo City has council approved PIAPs for the Trading Services and is meeting its accountability, financial and operational performance targets
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Newly appointed female technical staff in trading sectors at metro level under the Program
</narrative></title>
<baseline year="2025" iso-date="2025-09-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-09-15" />
<period-end iso-date="2031-03-11" />
<target value="20">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Newly appointed female technical staff in trading sectors at metro level under the Program
</narrative></title>
<baseline year="2025" iso-date="2025-09-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-09-15" />
<period-end iso-date="2031-03-11" />
<target value="20">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net greenhouse gas emissions
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-03-11" />
<target value="To be identified at PIAP formulation">

</target>
<actual value="nA">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net greenhouse gas emissions
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-03-11" />
<target value="To be identified at PIAP formulation">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Improved service reliability
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-03-11" />
<target value="To be identified at PIAP formulation">

</target>
<actual value="nA">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Improved service reliability
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-03-11" />
<target value="To be identified at PIAP formulation">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Formal and informal settlements receiving basic waste collection services.
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-03-11" />
<target value="To be identified at PIAP formulation">

</target>
<actual value="nA">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Formal and informal settlements receiving basic waste collection services.
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-03-11" />
<target value="To be identified at PIAP formulation">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Cash collection rate
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-03-11" />
<target value="To be identified at PIAP formulation">

</target>
<actual value="nA">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Cash collection rate
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-03-11" />
<target value="To be identified at PIAP formulation">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Operating cost coverage ratio (OCCR)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-03-11" />
<target value="To be identified at PIAP formulation">

</target>
<actual value="nA">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Operating cost coverage ratio (OCCR)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-03-11" />
<target value="To be identified at PIAP formulation">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Full separate Annual Financial Statement for each trading service
</narrative></title>
<baseline year="2025" iso-date="2025-09-14" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-09-14" />
<period-end iso-date="2031-03-11" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Full separate Annual Financial Statement for each trading service
</narrative></title>
<baseline year="2025" iso-date="2025-09-14" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-09-14" />
<period-end iso-date="2031-03-11" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Service compact between service authority (Metro) and service provider (Trading Service) for effective delivery of the trading service
</narrative></title>
<baseline year="2025" iso-date="2025-09-13" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-09-13" />
<period-end iso-date="2031-03-11" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Service compact between service authority (Metro) and service provider (Trading Service) for effective delivery of the trading service
</narrative></title>
<baseline year="2025" iso-date="2025-09-13" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-09-13" />
<period-end iso-date="2031-03-11" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
City Manager delegations to Trading Services Head of Department for: human resources, SCM, revenue, fleet management, IT, customer service, real estate, and security
</narrative></title>
<baseline year="2025" iso-date="2025-09-13" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-09-13" />
<period-end iso-date="2031-03-11" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
City Manager delegations to Trading Services Head of Department for: human resources, SCM, revenue, fleet management, IT, customer service, real estate, and security
</narrative></title>
<baseline year="2025" iso-date="2025-09-13" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-09-13" />
<period-end iso-date="2031-03-11" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Repairs Efficiency, Total operational spend on repairs and maintenance / total operational revenue
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-03-11" />
<target value="To be identified at PIAP formulation">

</target>
<actual value="nA">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Repairs Efficiency, Total operational spend on repairs and maintenance / total operational revenue
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-03-11" />
<target value="To be identified at PIAP formulation">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Industrial (bulk) and commercial customers metered and operational
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-03-11" />
<target value="To be identified at PIAP formulation">

</target>
<actual value="nA">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Industrial (bulk) and commercial customers metered and operational
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-03-11" />
<target value="To be identified at PIAP formulation">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Green Drop Score
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-03-11" />
<target value="To be identified at PIAP formulation">

</target>
<actual value="nA">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Green Drop Score
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-03-11" />
<target value="To be identified at PIAP formulation">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Bulk water system input volume versus the permitted raw water allocation volume
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-03-11" />
<target value="To be identified at PIAP formulation">

</target>
<actual value="nA">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Bulk water system input volume versus the permitted raw water allocation volume
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-03-11" />
<target value="To be identified at PIAP formulation">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Formal and informal settlements receiving basic waste collection services.
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-03-11" />
<target value="To be identified at PIAP formulation">

</target>
<actual value="nA">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Electricity losses reduction in South Africa's metros as a result of the Program
</narrative></title>
<baseline year="2025" iso-date="2025-09-15" value="22"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-09-15" />
<period-end iso-date="2031-03-12" />
<target value="12">

</target>
<actual value="22">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Repairs Efficiency, Total operational spend on repairs and maintenance / total operational revenue
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-03-11" />
<target value="To be identified at PIAP formulation">

</target>
<actual value="nA">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T01:57:00" hierarchy="1"><iati-identifier>44000-P507031</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>South Africa : Infrastructure Modernization DPL</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Program Development Objectives of the proposed DPL are to support the government's effort to (i) ) improve energy security by unlocking investments into transmission, easing access to the grid, and upgrading the performance of municipalities in distribution; (ii) enhance the efficiency of freight transport services by opening access to private operators and unbundling the state-owned company; and (iii) contribute to the transition toward a low carbon economy by promoting the use of fiscal instruments and protecting people and communities affected by the energy transition.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="ZA–00009917"><narrative>Government of South of Africa</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="ZA-COA-08"><narrative>National Treasury</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2025-06-05"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2025-06-05"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2026-03-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2026-03-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Jacques Morisset</narrative></person-name><telephone>+1-202-473-1000</telephone><email>jmorisset@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<contact-info type="2">
<mailing-address><narrative>
Main Street, Pretoria, Gauteng

</narrative></mailing-address></contact-info><recipient-country code="ZA" percentage="100"><narrative xml:lang="en">SOUTH AFRICA</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="964137" />
                <name><narrative>Pretoria</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-25.74486 28.18783</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="23631" percentage="39" xml:lang="en"/><sector vocabulary="1" code="23111" percentage="33" xml:lang="en"/><sector vocabulary="1" code="21030" percentage="17" xml:lang="en"/><sector vocabulary="1" code="23231" percentage="6" xml:lang="en"/><sector vocabulary="1" code="21040" percentage="5" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LLZ" percentage="33.0000000" xml:lang="en"><narrative>Other - Energy and Mineral Resources</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LLU" percentage="6.00000000" xml:lang="en"><narrative>Energy Generation - Solar</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TTP" percentage="5.00000000" xml:lang="en"><narrative>Ports/Waterways</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TTW" percentage="17.0000000" xml:lang="en"><narrative>Railways</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LLT" percentage="39.0000000" xml:lang="en"><narrative>Energy Networks and Storage</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">1500000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">1500000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">1500000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-7852"><narrative>National Treasury</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">1500000000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-7852"><narrative>National Treasury</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">0</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-7852"><narrative>National Treasury</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">-3750000</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-7852"><narrative>National Treasury</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-45428038</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-7852"><narrative>National Treasury</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P507031"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P507031?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P507031"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Revenue collected from the carbon fuel levy and the motor vehicle emissions tax
</narrative></title>
<baseline year="2024" iso-date="2024-03-14" value="5.1 Billion of Rand"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-14" />
<period-end iso-date="2027-03-14" />
<target value="6.1 Billion of Rand">
<comment><narrative>
not available
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Effective collection rate of electricity revenue by municipalities
</narrative></title>
<baseline year="2023" iso-date="2023-03-13" value="80"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-13" />
<period-end iso-date="2027-03-13" />
<target value="85">
<comment><narrative>
Not available
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Additional renewable energy capacity enabled
</narrative></title>
<baseline year="2024" iso-date="2024-08-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-14" />
<period-end iso-date="2027-03-14" />
<target value="3500">
<comment><narrative>
Not available
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual Revenue reported by National Transmission Company of South Africa - scorecard indicator
</narrative></title>
<baseline year="2024" iso-date="2024-08-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-14" />
<period-end iso-date="2027-03-14" />
<target value="18.8 billion of Rand">
<comment><narrative>
Not available
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Social Employment Fund jobs created in the Mpumalanga province
</narrative></title>
<baseline year="2024" iso-date="2024-08-14" value="Men:  1,207; Women: 2,858"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-14" />
<period-end iso-date="2027-03-14" />
<target value="Men: 2,250; Women: 5,250">
<comment><narrative>
exceed target
</narrative></comment>
</target>
<actual value="6062">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
% of network available without interruption
</narrative></title>
<baseline year="2024" iso-date="2024-08-12" value="25"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-12" />
<period-end iso-date="2027-03-12" />
<target value="65">
<comment><narrative>
Not available
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Transmission lines to be procured under an independent power transmission program.
</narrative></title>
<baseline year="2024" iso-date="2024-08-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-14" />
<period-end iso-date="2027-03-14" />
<target value="1000">
<comment><narrative>
In process
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of private rail operator approved by regulator
</narrative></title>
<baseline year="2024" iso-date="2024-08-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-12" />
<period-end iso-date="2027-03-12" />
<target value="4">
<comment><narrative>
Exceed target
</narrative></comment>
</target>
<actual value="11">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Value of Just Energy Transition Plan projects managed by the platform
</narrative></title>
<baseline year="2024" iso-date="2024-08-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-14" />
<period-end iso-date="2027-03-14" />
<target value="600 Million of Rand">
<comment><narrative>
not available
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Social Employment Fund jobs created in the Mpumalanga province
</narrative></title>
<baseline year="2024" iso-date="2024-08-14" value="Men:  1,207; Women: 2,858"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-14" />
<period-end iso-date="2027-03-14" />
<target value="Men: 2,250; Women: 5,250">
<comment><narrative>
exceed target
</narrative></comment>
</target>
<actual value="6062">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Value of Just Energy Transition Plan projects managed by the platform
</narrative></title>
<baseline year="2024" iso-date="2024-08-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-14" />
<period-end iso-date="2027-03-14" />
<target value="600 Million of Rand">
<comment><narrative>
not available
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Revenue collected from the carbon fuel levy and the motor vehicle emissions tax
</narrative></title>
<baseline year="2024" iso-date="2024-03-14" value="5.1 Billion of Rand"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-14" />
<period-end iso-date="2027-03-14" />
<target value="6.1 Billion of Rand">
<comment><narrative>
not available
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of projects with a capacity &amp;gt;15MW registered on the Carbon Offset Administration System
</narrative></title>
<baseline year="2024" iso-date="2024-08-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-14" />
<period-end iso-date="2027-03-14" />
<target value="10">
<comment><narrative>
not available
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
% of network available without interruption
</narrative></title>
<baseline year="2024" iso-date="2024-08-12" value="25"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-12" />
<period-end iso-date="2027-03-12" />
<target value="65">
<comment><narrative>
Not available
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of private rail operator approved by regulator
</narrative></title>
<baseline year="2024" iso-date="2024-08-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-12" />
<period-end iso-date="2027-03-12" />
<target value="4">
<comment><narrative>
Exceed target
</narrative></comment>
</target>
<actual value="11">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Effective collection rate of electricity revenue by municipalities
</narrative></title>
<baseline year="2023" iso-date="2023-03-13" value="80"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-13" />
<period-end iso-date="2027-03-13" />
<target value="85">
<comment><narrative>
Not available
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Additional renewable energy capacity enabled
</narrative></title>
<baseline year="2024" iso-date="2024-08-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-14" />
<period-end iso-date="2027-03-14" />
<target value="3500">
<comment><narrative>
Not available
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Transmission lines to be procured under an independent power transmission program.
</narrative></title>
<baseline year="2024" iso-date="2024-08-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-14" />
<period-end iso-date="2027-03-14" />
<target value="1000">
<comment><narrative>
In process
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual Revenue reported by National Transmission Company of South Africa - scorecard indicator
</narrative></title>
<baseline year="2024" iso-date="2024-08-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-14" />
<period-end iso-date="2027-03-14" />
<target value="18.8 billion of Rand">
<comment><narrative>
Not available
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Social Employment Fund jobs created in the Mpumalanga province
</narrative></title>
<baseline year="2024" iso-date="2024-08-14" value="Men:  1,207; Women: 2,858"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-14" />
<period-end iso-date="2027-03-14" />
<target value="Men: 2,250; Women: 5,250">
<comment><narrative>
exceed target
</narrative></comment>
</target>
<actual value="6062">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Value of Just Energy Transition Plan projects managed by the platform
</narrative></title>
<baseline year="2024" iso-date="2024-08-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-14" />
<period-end iso-date="2027-03-14" />
<target value="600 Million of Rand">
<comment><narrative>
not available
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Revenue collected from the carbon fuel levy and the motor vehicle emissions tax
</narrative></title>
<baseline year="2024" iso-date="2024-03-14" value="5.1 Billion of Rand"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-14" />
<period-end iso-date="2027-03-14" />
<target value="6.1 Billion of Rand">
<comment><narrative>
not available
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of projects with a capacity &amp;gt;15MW registered on the Carbon Offset Administration System
</narrative></title>
<baseline year="2024" iso-date="2024-08-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-14" />
<period-end iso-date="2027-03-14" />
<target value="10">
<comment><narrative>
not available
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
% of network available without interruption
</narrative></title>
<baseline year="2024" iso-date="2024-08-12" value="25"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-12" />
<period-end iso-date="2027-03-12" />
<target value="65">
<comment><narrative>
Not available
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of private rail operator approved by regulator
</narrative></title>
<baseline year="2024" iso-date="2024-08-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-12" />
<period-end iso-date="2027-03-12" />
<target value="4">
<comment><narrative>
Exceed target
</narrative></comment>
</target>
<actual value="11">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Effective collection rate of electricity revenue by municipalities
</narrative></title>
<baseline year="2023" iso-date="2023-03-13" value="80"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-13" />
<period-end iso-date="2027-03-13" />
<target value="85">
<comment><narrative>
Not available
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Additional renewable energy capacity enabled
</narrative></title>
<baseline year="2024" iso-date="2024-08-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-14" />
<period-end iso-date="2027-03-14" />
<target value="3500">
<comment><narrative>
Not available
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Transmission lines to be procured under an independent power transmission program.
</narrative></title>
<baseline year="2024" iso-date="2024-08-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-14" />
<period-end iso-date="2027-03-14" />
<target value="1000">
<comment><narrative>
In process
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual Revenue reported by National Transmission Company of South Africa - scorecard indicator
</narrative></title>
<baseline year="2024" iso-date="2024-08-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-14" />
<period-end iso-date="2027-03-14" />
<target value="18.8 billion of Rand">
<comment><narrative>
Not available
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of projects with a capacity &amp;gt;15MW registered on the Carbon Offset Administration System
</narrative></title>
<baseline year="2024" iso-date="2024-08-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-14" />
<period-end iso-date="2027-03-14" />
<target value="10">
<comment><narrative>
not available
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-23T01:57:00" hierarchy="1"><iati-identifier>44000-P508930</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Blended Finance Platform for Resilient Infrastructure</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[Blended Finance Platform for Resilient Infrastructure for South Africa has the development objectives of establishing a Credit Guarantee Vehicle to mobilize capital for investment in resilient infrastructure, create jobs, reduce greenhouse gas emissions, and improve service delivery across electricity, transport and logistics, and water and sanitation. Component 1: Capitalization of the Credit Guarantee Vehicle (CGV) will establish and scale a privately managed, non-life insurance company licensed by the Prudential Authority to issue market-priced credit guarantees that de-risk key project-finance risks, beginning with public offtaker payment and termination risks, to enable private participation in priority sectors; it will operate under robust governance, an Environmental and Social Management System aligned with IFC Performance Standards, and a tiered capital structure to crowd in diverse investors while coordinating with World Bank Group partners. Sub-components include Start-up capital to operationalize the CGV with professional management, Initial capitalization to begin underwriting guarantees for early transactions such as independent transmission projects, and Scale-up capitalization to expand guarantee capacity and sector coverage as the pipeline matures. Component 2: Project Pipeline Development, implemented by the Development Bank of Southern Africa (DBSA), will prepare a pipeline of bankable public-private partnership transactions by financing early-stage work and standardizing approaches across priority sectors. Sub-components include Client engagement and screening, (pre)feasibility and due diligence, Legal, financial, and operational structuring, and Standardization and bankability support for transactions that may be eligible for CGV de-risking. Component 3: Project Coordination and Implementation will establish a Project Implementation Unit at DBSA to manage fiduciary, environmental and social, and monitoring and evaluation functions; support CGV licensing and operational readiness; and integrate gender and learning. Sub-components include PIU establishment and systems, CGV operational support, Gender action plan and reporting with targets for women's representation in the CGV board and senior management, and Learning agenda and monitoring and evaluation to inform subsequent phases.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="ZA–00008975"><narrative>Republic of South Africa</narrative></participating-org><participating-org role="2" xml:lang="en" ref="ZA–00008975"><narrative>Republic of South Africa</narrative></participating-org><participating-org role="2" xml:lang="en" ref="ZA–00008975"><narrative>Republic of South Africa</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="ZA-COA-00010105"><narrative>Development Bank of Southern Africa</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2026-02-24"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2026-02-24"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2031-03-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2031-03-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Marc Schrijver</narrative></person-name><telephone>+1-202-473-1000</telephone><email>mschrijver@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>










<recipient-country code="ZA" percentage="100"><narrative xml:lang="en">SOUTH AFRICA</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="964137" />
                <name><narrative>Pretoria</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-25.74486 28.18783</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="24010" percentage="100" xml:lang="en"/><sector vocabulary="1" code="24010" percentage="100" xml:lang="en"/><sector vocabulary="1" code="24010" percentage="100" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="FFK" percentage="100.000000" xml:lang="en"><narrative>Capital Markets</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">1000004.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">7916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">7916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">7916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">7916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">7916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">7916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">7916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">7916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">7916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">7916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">7916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">7916677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">6666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">6666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">6666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">6666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">6666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">6666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">6666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">6666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">6666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">6666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">6666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">6666677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">7083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">7083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">7083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">7083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">7083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">7083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">7083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">7083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">7083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">7083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">7083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">7083344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">14167386.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">14167386.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">14167386.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">14167386.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">14167386.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">14167392.50</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">1000004.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">7916665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">7916665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">7916665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">7916665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">7916665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">7916665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">7916665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">7916665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">7916665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">7916665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">7916665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">7916677.63</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">6666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">6666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">6666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">6666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">6666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">6666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">6666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">6666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">6666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">6666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">6666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">6666677.63</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">7083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">7083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">7083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">7083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">7083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">7083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">7083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">7083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">7083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">7083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">7083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">7083344.37</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">14167386.50</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">14167386.50</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">14167386.50</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">14167386.50</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">14167386.50</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">14167392.50</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">338820000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">338820000.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">338820000</value><description xml:lang="en"><narrative>Total Commitment in February Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-12418"><narrative>Credit Guarantee Vehicle; Development Bank of Southern Africa</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-09-30"/><value value-date="2026-09-30">0</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="ZA-COA-12418"><narrative>Credit Guarantee Vehicle; Development Bank of Southern Africa</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P508930"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P508930?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P508930"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
More and Better-Paid Jobs
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2031-03-15" />
<target value="218890">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Capital Mobilized from Development Partners
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2031-03-15" />
<target value="1000000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiary Feedback
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2031-03-15" />
<target value="75">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private Capital Mobilized
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2031-03-15" />
<target value="3500000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in women's representation in senior management
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2031-03-15" />
<target value="3">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiary Feedback
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2031-03-15" />
<target value="75">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Capital Mobilized from Development Partners
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2031-03-15" />
<target value="1000000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Infrastructure projects reached bankability
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2031-03-15" />
<target value="10">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduced GHG emissions
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2031-03-15" />
<target value="33700">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Infrastructure projects reached bankability
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2031-03-15" />
<target value="10">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Capital Mobilization
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2031-03-15" />
<target value="4500000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiary Feedback
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2031-03-15" />
<target value="75">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Capital Mobilization
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2031-03-15" />
<target value="4500000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Capital Mobilized from Development Partners
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2031-03-15" />
<target value="1000000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy capacity enabled with indirect support
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2031-03-14" />
<target value="3,400">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
More and Better-Paid Jobs
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2031-03-15" />
<target value="218890">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduced GHG emissions
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2031-03-15" />
<target value="14.95">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Annual report on execution learning agenda
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="no"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2031-03-14" />
<target value="yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy capacity enabled with indirect support
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2031-03-14" />
<target value="3,400">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduced GHG emissions
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2031-03-15" />
<target value="34000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private Capital Mobilized
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2031-03-15" />
<target value="3500000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in women's representation in the board
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2031-03-15" />
<target value="3">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Infrastructure projects reached bankability
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2031-03-15" />
<target value="10">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Capital Mobilization
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2031-03-15" />
<target value="4500000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Annual report on execution learning agenda
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="no"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2031-03-14" />
<target value="yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in women's representation in senior management
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2031-03-15" />
<target value="3">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in women's representation in the CGV board
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2031-03-14" />
<target value="3">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Credit Guarantee Vehicle Licensed
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="no"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2026-12-15" />
<target value="yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private Capital Mobilized
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2031-03-15" />
<target value="3500000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy capacity enabled with indirect support
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2031-03-14" />
<target value="3,400">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Credit Guarantee Vehicle Licensed
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="no"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2026-12-15" />
<target value="yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduced GHG emissions
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2031-03-15" />
<target value="14.95">
<comment><narrative>
no comments
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduced GHG emissions
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2031-03-15" />
<target value="14.95">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduced GHG emissions
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2031-03-15" />
<target value="33700">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduced GHG emissions
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2031-03-15" />
<target value="34000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Capital Mobilization
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2031-03-15" />
<target value="4500000000">
<comment><narrative>
No comments
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Capital Mobilization
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2031-03-15" />
<target value="4500000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Capital Mobilization
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2031-03-15" />
<target value="4500000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Capital Mobilization
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2031-03-15" />
<target value="4500000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Credit Guarantee Vehicle Licensed
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="no"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2026-12-15" />
<target value="yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
More and Better-Paid Jobs
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2031-03-15" />
<target value="218890">
<comment><narrative>
no comments
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
More and Better-Paid Jobs
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2031-03-15" />
<target value="218890">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
More and Better-Paid Jobs
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2031-03-15" />
<target value="218890">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy capacity enabled with indirect support
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2031-03-14" />
<target value="3,400">
<comment><narrative>
no comments
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in women's representation in CGV senior management
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2031-03-14" />
<target value="3">
<comment><narrative>
no comments
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiary Feedback
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2031-03-15" />
<target value="75">
<comment><narrative>
no comments
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in women's representation in the CGV board
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2031-03-14" />
<target value="3">
<comment><narrative>
no comments
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Infrastructure projects reached bankability
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2031-03-15" />
<target value="10">
<comment><narrative>
no comments
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private Capital Mobilized
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2031-03-15" />
<target value="3500000000">
<comment><narrative>
no comments
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Capital Mobilized from Development Partners
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2031-03-15" />
<target value="1000000000">
<comment><narrative>
no comments
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Credit Guarantee Vehicle Licensed
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="no"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2026-12-15" />
<target value="yes">
<comment><narrative>
no comments
</narrative></comment>
</target>
<actual value="no">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduced GHG emissions
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2031-03-15" />
<target value="14.95">
<comment><narrative>
no comments
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduced GHG emissions
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2031-03-15" />
<target value="14.95">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduced GHG emissions
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2031-03-15" />
<target value="33700">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduced GHG emissions
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2031-03-15" />
<target value="34000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Capital Mobilization
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2031-03-15" />
<target value="4500000000">
<comment><narrative>
No comments
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Capital Mobilization
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2031-03-15" />
<target value="4500000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Capital Mobilization
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2031-03-15" />
<target value="4500000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Capital Mobilization
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2031-03-15" />
<target value="4500000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in women's representation in the board
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2031-03-15" />
<target value="3">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
More and Better-Paid Jobs
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2031-03-15" />
<target value="218890">
<comment><narrative>
no comments
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
More and Better-Paid Jobs
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2031-03-15" />
<target value="218890">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
More and Better-Paid Jobs
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2031-03-15" />
<target value="218890">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Annual report on execution learning agenda
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="no"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2031-03-14" />
<target value="yes">
<comment><narrative>
no comments
</narrative></comment>
</target>
<actual value="no">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in women's representation in CGV senior management
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2031-03-14" />
<target value="3">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result></iati-activity></iati-activities>