<?xml version="1.0" encoding="utf-8"?>  
		   <iati-activities version="2.03" generated-datetime="2026-10-15T14:17:31">
		   <iati-activity last-updated-datetime="2026-10-15T14:17:31"
		   xml:lang="EN" default-currency="USD" hierarchy="01">
		   <iati-identifier>XI-IATI-WBTF-TF070868</iati-identifier>
		   <reporting-org ref="XI-IATI-WBTF" type="40">  
		   		   <narrative>World Bank Trust Funds</narrative>
		   </reporting-org>
		   <title>
		   <narrative>Callable Funds for the Standby Recovery Financing Facility of the Global Facility for Disaster Reduction and Recovery (GFDRR)	   </narrative>
		   </title>
		   <description type="1">
		   <narrative>THE OBJECTIVE OF TRACK III (AS STIPULATED IN THE GFDRR CHARTER) IS provide a speedy, predictable and effective mechanism for enhancing international institutional preparedness for disaster recovery, supporting joint needs assessments, and recovery and development planning by national governments, doctors, UN, World Bank and other IFIs in all disaster situations and providing supplemental financing for accelerated recovery, primarily in low income countries that have been affected by disaster(s), before formulating and launching medium and long term recovery programs and following the humanitarian phase. This track is deployed to strengthen mobilization of international assistance for prevention investments, have limited fiscal space and may require addtional resoirces for accelerated recovery without having to significantly reallocate earmarked development resources to recover from disasters when they do occur. By linking post-disaster assistance for recovery from this Fund with ex ante measures taken by the recipeint organization before a disaster, and introducing risk reduction during the recovery operations, this Fund creates incentives for governments and agencies to be proactive and integrate disaster risk considertaions ex ante in development which is the mission of GFDRR. </narrative>
		   </description><participating-org ref="CH-4" type="10" role="1" >
       <narrative>Swiss Agency for Development and Cooperation (SDC) </narrative>
       </participating-org><participating-org ref="GB-GOV-1" type="10" role="1" >
       <narrative>UK - Department for International Development (DFID) </narrative>
       </participating-org><participating-org ref="TF518001" type="10" role="1" >
       <narrative>Italy - Ministry of Foreign Affairs International Cooperation </narrative>
       </participating-org><participating-org ref="TF522009" type="10" role="1" >
       <narrative>Brazil - Ministry of External Relations </narrative>
       </participating-org><participating-org ref="TF535006" type="10" role="1" >
       <narrative>Development Cooperation and Humanitarian Affairs </narrative>
       </participating-org><participating-org ref="XI-IATI-WBTF" type="40" role="4" >
       <narrative>World Bank Trust Funds </narrative>
       </participating-org><participating-org ref="XM-DAC-3-1" type="10" role="1" >
       <narrative>MINISTRY OF FOREIGN AFFAIRS </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2007-12-04"></activity-date><activity-date type="2"  iso-date= "2007-12-04"></activity-date><activity-date type="3"  iso-date= "2017-12-31"></activity-date><activity-date type="4"  iso-date= "2018-05-29"></activity-date> <contact-info type="3">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative>Trust Funds &amp; Partner Relations</narrative>
       </department>
       <person-name>
       <narrative></narrative>
       </person-name>
       <job-title>
       <narrative></narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email></email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info> <contact-info type="3">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative>Trust Funds and Partnerships</narrative>
       </department>
       <person-name>
       <narrative></narrative>
       </person-name>
       <job-title>
       <narrative></narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email></email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="1"></activity-scope> <recipient-region code="998">   <narrative>Bilateral unspecified</narrative>
       </recipient-region> <sector code="11110" 
	    vocabulary="1" percentage="0.48">
       <narrative>+![cdata[Education policy and administrative management]]+</narrative>
       </sector> <sector code="11220" 
	    vocabulary="1" percentage="0.14">
       <narrative>+![cdata[Primary education]]+</narrative>
       </sector> <sector code="12110" 
	    vocabulary="1" percentage="0.12">
       <narrative>+![cdata[Health policy and administrative management]]+</narrative>
       </sector> <sector code="14010" 
	    vocabulary="1" percentage="20.82">
       <narrative>+![cdata[Water sector policy and administrative management]]+</narrative>
       </sector> <sector code="15110" 
	    vocabulary="1" percentage="7.55">
       <narrative>+![cdata[Public sector policy and administrative management]]+</narrative>
       </sector> <sector code="15112" 
	    vocabulary="1" percentage="0.82">
       <narrative>+![cdata[Decentralisation and support to subnational government]]+</narrative>
       </sector> <sector code="16010" 
	    vocabulary="1" percentage="0.96">
       <narrative>+![cdata[Social Protection]]+</narrative>
       </sector> <sector code="21010" 
	    vocabulary="1" percentage="4.51">
       <narrative>+![cdata[Transport policy and administrative management]]+</narrative>
       </sector> <sector code="21023" 
	    vocabulary="1" percentage="47.96">
       <narrative>+![cdata[National road construction]]+</narrative>
       </sector> <sector code="22010" 
	    vocabulary="1" percentage="0.03">
       <narrative>+![cdata[Communications policy and administrative management]]+</narrative>
       </sector> <sector code="22013" 
	    vocabulary="1" percentage="0.04">
       <narrative>+![cdata[Information services]]+</narrative>
       </sector> <sector code="23010" 
	    vocabulary="1" percentage="0.02">
       <narrative>+![cdata[Energy policy and administrative management]]+</narrative>
       </sector> <sector code="24030" 
	    vocabulary="1" percentage="0.93">
       <narrative>+![cdata[Formal sector financial intermediaries]]+</narrative>
       </sector> <sector code="24040" 
	    vocabulary="1" percentage="0.32">
       <narrative>+![cdata[Informal/semi-formal financial intermediaries]]+</narrative>
       </sector> <sector code="31161" 
	    vocabulary="1" percentage="0.73">
       <narrative>+![cdata[Food crop production]]+</narrative>
       </sector> <sector code="31163" 
	    vocabulary="1" percentage="0.73">
       <narrative>+![cdata[Livestock]]+</narrative>
       </sector> <sector code="31320" 
	    vocabulary="1" percentage="0.73">
       <narrative>+![cdata[Fishery development]]+</narrative>
       </sector> <sector code="32161" 
	    vocabulary="1" percentage="0.03">
       <narrative>+![cdata[Agro-industries]]+</narrative>
       </sector> <sector code="43010" 
	    vocabulary="1" percentage="1.75">
       <narrative>+![cdata[Multisector aid]]+</narrative>
       </sector> <sector code="43032" 
	    vocabulary="1" percentage="0.35">
       <narrative>+![cdata[Urban development]]+</narrative>
       </sector> <sector code="74020" 
	    vocabulary="1" percentage="10.98">
       <narrative>+![cdata[Multi-hazard response preparedness]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="B03"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2007-12-04"></period-start> 
       <period-end iso-date="2017-12-31"> </period-end>
       <value currency="USD" value-date="2026-03-31">35771150.09 </value>
       </budget><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1495223.78  </value>
		   <description>
       <narrative>Incoming Funds (Cumulative Paid-In Contribution )-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="CH-4">
       <narrative>Swiss Agency for Development and Cooperation (SDC)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF070868">
       <narrative>Callable Funds for the Standby Recovery Financing Facility of the Global Facility for Disaster Reduction and Recovery (GFDRR)</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1740348.07  </value>
		   <description>
       <narrative>Incoming Funds (Cumulative Paid-In Contribution )-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF522009">
       <narrative>Brazil - Ministry of External Relations</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF070868">
       <narrative>Callable Funds for the Standby Recovery Financing Facility of the Global Facility for Disaster Reduction and Recovery (GFDRR)</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1984435.01  </value>
		   <description>
       <narrative>Incoming Funds (Cumulative Paid-In Contribution )-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XM-DAC-3-1">
       <narrative>MINISTRY OF FOREIGN AFFAIRS</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF070868">
       <narrative>Callable Funds for the Standby Recovery Financing Facility of the Global Facility for Disaster Reduction and Recovery (GFDRR)</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">2442071.00  </value>
		   <description>
       <narrative>Incoming Funds (Cumulative Paid-In Contribution )-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF535006">
       <narrative>Development Cooperation and Humanitarian Affairs</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF070868">
       <narrative>Callable Funds for the Standby Recovery Financing Facility of the Global Facility for Disaster Reduction and Recovery (GFDRR)</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">27550732.23  </value>
		   <description>
       <narrative>Incoming Funds (Cumulative Paid-In Contribution )-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="GB-GOV-1">
       <narrative>UK - Department for International Development (DFID)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF070868">
       <narrative>Callable Funds for the Standby Recovery Financing Facility of the Global Facility for Disaster Reduction and Recovery (GFDRR)</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">558340.00  </value>
		   <description>
       <narrative>Incoming Funds (Cumulative Paid-In Contribution )-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF518001">
       <narrative>Italy - Ministry of Foreign Affairs International Cooperation</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF070868">
       <narrative>Callable Funds for the Standby Recovery Financing Facility of the Global Facility for Disaster Reduction and Recovery (GFDRR)</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1495223.78  </value>
		   <description>
       <narrative>Incoming Commitment(Cumulative Signed Contribution)-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="CH-4">
       <narrative>Swiss Agency for Development and Cooperation (SDC)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF070868">
       <narrative>Callable Funds for the Standby Recovery Financing Facility of the Global Facility for Disaster Reduction and Recovery (GFDRR)</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1740348.07  </value>
		   <description>
       <narrative>Incoming Commitment(Cumulative Signed Contribution)-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF522009">
       <narrative>Brazil - Ministry of External Relations</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF070868">
       <narrative>Callable Funds for the Standby Recovery Financing Facility of the Global Facility for Disaster Reduction and Recovery (GFDRR)</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1984435.01  </value>
		   <description>
       <narrative>Incoming Commitment(Cumulative Signed Contribution)-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XM-DAC-3-1">
       <narrative>MINISTRY OF FOREIGN AFFAIRS</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF070868">
       <narrative>Callable Funds for the Standby Recovery Financing Facility of the Global Facility for Disaster Reduction and Recovery (GFDRR)</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">2442071.00  </value>
		   <description>
       <narrative>Incoming Commitment(Cumulative Signed Contribution)-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF535006">
       <narrative>Development Cooperation and Humanitarian Affairs</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF070868">
       <narrative>Callable Funds for the Standby Recovery Financing Facility of the Global Facility for Disaster Reduction and Recovery (GFDRR)</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">27550732.23  </value>
		   <description>
       <narrative>Incoming Commitment(Cumulative Signed Contribution)-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="GB-GOV-1">
       <narrative>UK - Department for International Development (DFID)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF070868">
       <narrative>Callable Funds for the Standby Recovery Financing Facility of the Global Facility for Disaster Reduction and Recovery (GFDRR)</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">558340.00  </value>
		   <description>
       <narrative>Incoming Commitment(Cumulative Signed Contribution)-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF518001">
       <narrative>Italy - Ministry of Foreign Affairs International Cooperation</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF070868">
       <narrative>Callable Funds for the Standby Recovery Financing Facility of the Global Facility for Disaster Reduction and Recovery (GFDRR)</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">106721.99  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF070868">
       <narrative>Callable Funds for the Standby Recovery Financing Facility of the Global Facility for Disaster Reduction and Recovery (GFDRR)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P149720">
       <narrative>MOZAMBIQUE</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">107023.38  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF070868">
       <narrative>Callable Funds for the Standby Recovery Financing Facility of the Global Facility for Disaster Reduction and Recovery (GFDRR)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P110475">
       <narrative>BANGLADESH</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">12298326.07  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF070868">
       <narrative>Callable Funds for the Standby Recovery Financing Facility of the Global Facility for Disaster Reduction and Recovery (GFDRR)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P083325">
       <narrative>MOZAMBIQUE</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">139445.93  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF070868">
       <narrative>Callable Funds for the Standby Recovery Financing Facility of the Global Facility for Disaster Reduction and Recovery (GFDRR)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P149629">
       <narrative>MOZAMBIQUE</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-14374.32  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF070868">
       <narrative>Callable Funds for the Standby Recovery Financing Facility of the Global Facility for Disaster Reduction and Recovery (GFDRR)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P133264">
       <narrative>NIGER</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">154277.62  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF070868">
       <narrative>Callable Funds for the Standby Recovery Financing Facility of the Global Facility for Disaster Reduction and Recovery (GFDRR)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P143702">
       <narrative>NIGERIA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">156142.39  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF070868">
       <narrative>Callable Funds for the Standby Recovery Financing Facility of the Global Facility for Disaster Reduction and Recovery (GFDRR)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P145453">
       <narrative>NIGER</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">158593.89  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF070868">
       <narrative>Callable Funds for the Standby Recovery Financing Facility of the Global Facility for Disaster Reduction and Recovery (GFDRR)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P155656">
       <narrative>PHILIPPINES</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">165633.65  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF070868">
       <narrative>Callable Funds for the Standby Recovery Financing Facility of the Global Facility for Disaster Reduction and Recovery (GFDRR)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P126533">
       <narrative>THAILAND</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">177356.05  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF070868">
       <narrative>Callable Funds for the Standby Recovery Financing Facility of the Global Facility for Disaster Reduction and Recovery (GFDRR)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P130823">
       <narrative>KENYA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">181676.46  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF070868">
       <narrative>Callable Funds for the Standby Recovery Financing Facility of the Global Facility for Disaster Reduction and Recovery (GFDRR)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P155969">
       <narrative>NEPAL</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">193004.47  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF070868">
       <narrative>Callable Funds for the Standby Recovery Financing Facility of the Global Facility for Disaster Reduction and Recovery (GFDRR)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P111272">
       <narrative>BANGLADESH</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">19434.40  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF070868">
       <narrative>Callable Funds for the Standby Recovery Financing Facility of the Global Facility for Disaster Reduction and Recovery (GFDRR)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P119775">
       <narrative>SENEGAL</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">199367.76  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF070868">
       <narrative>Callable Funds for the Standby Recovery Financing Facility of the Global Facility for Disaster Reduction and Recovery (GFDRR)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P149758">
       <narrative>PHILIPPINES</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1994699.36  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF070868">
       <narrative>Callable Funds for the Standby Recovery Financing Facility of the Global Facility for Disaster Reduction and Recovery (GFDRR)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">206682.75  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF070868">
       <narrative>Callable Funds for the Standby Recovery Financing Facility of the Global Facility for Disaster Reduction and Recovery (GFDRR)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P161556">
       <narrative>VIET NAM</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">215637.06  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF070868">
       <narrative>Callable Funds for the Standby Recovery Financing Facility of the Global Facility for Disaster Reduction and Recovery (GFDRR)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P144657">
       <narrative>Africa, regional</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">262712.00  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF070868">
       <narrative>Callable Funds for the Standby Recovery Financing Facility of the Global Facility for Disaster Reduction and Recovery (GFDRR)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P083325">
       <narrative>MOZAMBIQUE</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">270000.69  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF070868">
       <narrative>Callable Funds for the Standby Recovery Financing Facility of the Global Facility for Disaster Reduction and Recovery (GFDRR)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-">
       <narrative>Bilateral, unspecified</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">3008763.27  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF070868">
       <narrative>Callable Funds for the Standby Recovery Financing Facility of the Global Facility for Disaster Reduction and Recovery (GFDRR)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P111272">
       <narrative>BANGLADESH</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">3451.71  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF070868">
       <narrative>Callable Funds for the Standby Recovery Financing Facility of the Global Facility for Disaster Reduction and Recovery (GFDRR)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P128655">
       <narrative>PHILIPPINES</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">47972.88  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF070868">
       <narrative>Callable Funds for the Standby Recovery Financing Facility of the Global Facility for Disaster Reduction and Recovery (GFDRR)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P124825">
       <narrative>BENIN</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">487735.79  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF070868">
       <narrative>Callable Funds for the Standby Recovery Financing Facility of the Global Facility for Disaster Reduction and Recovery (GFDRR)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P131295">
       <narrative>GUATEMALA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">54676.36  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF070868">
       <narrative>Callable Funds for the Standby Recovery Financing Facility of the Global Facility for Disaster Reduction and Recovery (GFDRR)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P157441">
       <narrative>EL SALVADOR</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">565919.24  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF070868">
       <narrative>Callable Funds for the Standby Recovery Financing Facility of the Global Facility for Disaster Reduction and Recovery (GFDRR)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P163182">
       <narrative>Bilateral, unspecified</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">68020.94  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF070868">
       <narrative>Callable Funds for the Standby Recovery Financing Facility of the Global Facility for Disaster Reduction and Recovery (GFDRR)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P116815">
       <narrative>WESTERN SAHARA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">7140156.77  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF070868">
       <narrative>Callable Funds for the Standby Recovery Financing Facility of the Global Facility for Disaster Reduction and Recovery (GFDRR)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P149629">
       <narrative>MOZAMBIQUE</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">87564.20  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF070868">
       <narrative>Callable Funds for the Standby Recovery Financing Facility of the Global Facility for Disaster Reduction and Recovery (GFDRR)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P124755">
       <narrative>MOZAMBIQUE</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-P083325"  type="4"></related-activity><related-activity ref="XI-IATI-WBTF-P111272"  type="4"></related-activity><related-activity ref="XI-IATI-WBTF-P124755"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P149629"  type="2"></related-activity>
   </iati-activity>	<iati-activity last-updated-datetime="2026-10-15T14:17:33"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P111272</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>Emergency 2007 Cyclone Recovery and Restoration Project</narrative>
       </title>
       <description type="1">
       <narrative>The PDO is to support the Government of Bangladesh efforts to facilitate recovery from the damage to livelihoods and infrastructure caused by Cyclone Sidr and to build long-term preparedness through strengthened disaster risk reduction and management.  </narrative>
	   </description><participating-org ref="AU-5" type="10" role="1" >
       <narrative>Australia - Ministry for Foreign Affairs and Trade </narrative>
       </participating-org><participating-org ref="CH-4" type="10" role="1" >
       <narrative>Swiss Agency for Development and Cooperation (SDC) </narrative>
       </participating-org><participating-org ref="GB-GOV-1" type="10" role="1" >
       <narrative>UK - Department for International Development (DFID) </narrative>
       </participating-org><participating-org ref="SE-0" type="10" role="1" >
       <narrative>Swedish International Development Cooperation Agency (SIDA) </narrative>
       </participating-org><participating-org ref="TF070868" type="40" role="4" >
       <narrative>Callable Funds for the Standby Recovery Financing Facility of the Global Facility for Disaster Reduction and Recovery (GFDRR) </narrative>
       </participating-org><participating-org ref="TF071208" type="40" role="4" >
       <narrative>Multi Donor Trust Fund for Bangladesh Climate Change Resilience Fund </narrative>
       </participating-org><participating-org ref="TF518001" type="10" role="1" >
       <narrative>Italy - Ministry of Foreign Affairs International Cooperation </narrative>
       </participating-org><participating-org ref="TF522009" type="10" role="1" >
       <narrative>Brazil - Ministry of External Relations </narrative>
       </participating-org><participating-org ref="TF535006" type="10" role="1" >
       <narrative>Development Cooperation and Humanitarian Affairs </narrative>
       </participating-org><participating-org ref="TF612001" type="40" role="1" >
       <narrative>EU-Commission of the European Communities </narrative>
       </participating-org><participating-org ref="US-GOV-1" type="10" role="1" >
       <narrative>United States Agency for International Development (USAID) </narrative>
       </participating-org><participating-org ref="XM-DAC-3-1" type="10" role="1" >
       <narrative>Denmark - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="XM-DAC-3-1" type="10" role="1" >
       <narrative>MINISTRY OF FOREIGN AFFAIRS </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2009-01-13"></activity-date><activity-date type="2"  iso-date= "2009-01-13"></activity-date><activity-date type="3"  iso-date= "2017-06-30"></activity-date><activity-date type="4"  iso-date= "2017-07-18"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Ms Swarna Kazi</narrative>
       </person-name>
       <job-title>
       <narrative>Senior Disaster Risk Management Specialist</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email>skazi1@worldbank.org</email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="4"></activity-scope>  <recipient-country code="BD">     <narrative>BANGLADESH</narrative>
       </recipient-country> <sector code="31161"  vocabulary="1" percentage="6.00">
       <narrative>+![cdata[Food crop production]]+</narrative>
       </sector> <sector code="31163"  vocabulary="1" percentage="6.00">
       <narrative>+![cdata[Livestock]]+</narrative>
       </sector> <sector code="31320"  vocabulary="1" percentage="6.00">
       <narrative>+![cdata[Fishery development]]+</narrative>
       </sector> <sector code="74020"  vocabulary="1" percentage="82.00">
       <narrative>+![cdata[Multi-hazard response preparedness]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2009-01-13"></period-start> 
       <period-end iso-date="2017-06-30"> </period-end>
       <value currency="USD" value-date="2026-03-31">26497714.09 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">193004.47  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF070868">
       <narrative>Callable Funds for the Standby Recovery Financing Facility of the Global Facility for Disaster Reduction and Recovery (GFDRR)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P111272">
       <narrative>BANGLADESH</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">23063067.64  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071208">
       <narrative>Multi Donor Trust Fund for Bangladesh Climate Change Resilience Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P111272">
       <narrative>BANGLADESH</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">232878.71  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF071208">
       <narrative>Multi Donor Trust Fund for Bangladesh Climate Change Resilience Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P111272">
       <narrative>BANGLADESH</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">3008763.27  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF070868">
       <narrative>Callable Funds for the Standby Recovery Financing Facility of the Global Facility for Disaster Reduction and Recovery (GFDRR)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P111272">
       <narrative>BANGLADESH</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">26134313.54  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P111272">
       <narrative>BANGLADESH</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">421853.86  </value>
		   <description>
       <narrative>Cumulative Expenditures to Bank executed activities - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P111272">
       <narrative>BANGLADESH</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="44000-P111272" type="4"></related-activity><related-activity ref="XI-IATI-WBTF-TF071208" type="1"></related-activity><related-activity ref="XI-IATI-WBTF-TF070868" type="1"></related-activity><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Direct project beneficiaries
</narrative></title> 
<baseline year="2008" iso-date="2008-12-28" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-12-28" />  <period-end iso-date="2017-06-15" />
<target value="4800000.00">


																	</target>

																	<actual value="4360000.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Number of Agriculture Equipment (Power tillers, Power threshers, Hand sprayer) distributed
</narrative></title> 
<baseline year="2008" iso-date="2008-12-24" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-12-24" />  <period-end iso-date="2014-06-30" />
<target value="2969.00">


																	</target>

																	<actual value="2530.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Improved rice seeds distributed (in MT)
</narrative></title> 
<baseline year="2008" iso-date="2008-12-24" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-12-24" />  <period-end iso-date="2014-06-30" />
<target value="501.00">


																	</target>

																	<actual value="500.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Total fertilizers distributed (in MT)
</narrative></title> 
<baseline year="2008" iso-date="2008-12-24" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-12-24" />  <period-end iso-date="2014-06-30" />
<target value="6894.00">


																	</target>

																	<actual value="6682.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Number of livestock (cow, goat/sheep) distributed
</narrative></title> 
<baseline year="2008" iso-date="2008-12-24" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-12-24" />  <period-end iso-date="2014-06-30" />
<target value="240681.00">


																	</target>

																	<actual value="280500.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Number of dairy production facilities (cattle sheds and portable poultry sheds) distributed
</narrative></title> 
<baseline year="2008" iso-date="2008-12-24" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-12-24" />  <period-end iso-date="2014-06-30" />
<target value="30957.00">


																	</target>

																	<actual value="32300.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Number of Aquaculture packages (Carp, Golda, Bagda+Tilapia) distributed
</narrative></title> 
<baseline year="2008" iso-date="2008-12-24" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-12-24" />  <period-end iso-date="2014-06-30" />
<target value="24850.00">


																	</target>

																	<actual value="24850.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Mechanized fishing boats distributed
</narrative></title> 
<baseline year="2008" iso-date="2008-12-24" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-12-24" />  <period-end iso-date="2014-06-30" />
<target value="93.00">


																	</target>

																	<actual value="93.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Number of Farmers’ Field School (FFS) formed
</narrative></title> 
<baseline year="2008" iso-date="2008-12-24" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-12-24" />  <period-end iso-date="2014-06-30" />
<target value="2848.00">


																	</target>

																	<actual value="2848.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Numbers of shelters repaired and improved upon with improved connectivity (such as access roads) with the community
</narrative></title> 
<baseline year="2008" iso-date="2008-12-24" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-12-24" />  <period-end iso-date="2017-06-15" />
<target value="459.00">


																	</target>

																	<actual value="460.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Reduced risk to cyclone affected population due to rehabilitation of protective infrastructure (e.g. embankments, disaster shelters)
</narrative></title> 
<baseline year="2008" iso-date="2008-12-24" value="0"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-12-24" />  <period-end iso-date="2017-06-15" />
<target value="4800000">


																	</target>

																	<actual value="4360000">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Recovery of agriculture sector and livelihoods for cyclone affected populations
</narrative></title> 
<baseline year="2008" iso-date="2008-12-24" value="0"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-12-24" />  <period-end iso-date="2014-06-30" />
<target value="Crops : 230,000 HHLivestock : 38,000 HHFisheries: ">


																	</target>

																	<actual value="Crops: 224,000 HHLivestock: 33,000 HHFisheries: ">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Strengthened disaster risk management in the government
</narrative></title> 
<baseline year="2008" iso-date="2008-12-24" value="Limited capacity"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-12-24" />  <period-end iso-date="2017-06-15" />
<target value="Emergency equipment in use, community based early ">


																	</target>

																	<actual value="Improved response during emergencies">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Number of newly constructed shelters with improved design standards and connectivity with the community
</narrative></title> 
<baseline year="2008" iso-date="2008-12-24" value="0"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-12-24" />  <period-end iso-date="2017-06-30" />
<target value="352">


																	</target>

																	<actual value="353">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Length of coastal embankments including appurtenant structures rehabilitated and upgraded with improved design standards
</narrative></title> 
<baseline year="2008" iso-date="2008-12-24" value="0"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-12-24" />  <period-end iso-date="2017-06-15" />
<target value="501">


																	</target>

																	<actual value="502">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Number of emergency vehicles for effective communication and response to disasters
</narrative></title> 
<baseline year="2008" iso-date="2008-12-24" value="0"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-12-24" />  <period-end iso-date="2017-06-15" />
<target value="18">


																	</target>

																	<actual value="18">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Detailed multi-hazard models are used to generate maps
</narrative></title> 
<baseline year="2008" iso-date="2008-12-24" value="No maps exist"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-12-24" />  <period-end iso-date="2016-12-27" />
<target value="Final Multi-hazard Risk and Vulnerability Assessme">


																	</target>

																	<actual value="MRVA Maps and Atlas generated and used">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Preparation of future operations for the long-term disaster risk reduction program.  This includes, RMIP, CEIP, and MDSP.
</narrative></title> 
<baseline year="2008" iso-date="2008-12-24" value="No report"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-12-24" />  <period-end iso-date="2017-06-15" />
<target value="CEIP, MDSP under implementation, RMIP (RBIP) negot">


																	</target>

																	<actual value="Completion of preparation and study reports includ">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Timely submission of quarterly M&amp;E reports
</narrative></title> 
<baseline year="2008" iso-date="2008-12-24" value="No report"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-12-24" />  <period-end iso-date="2018-06-29" />
<target value="29 (22 Quarterly and 7 Annual Progress Reports)">


																	</target>

																	<actual value="31 (24 Quarterly and 7 Annual Progress Reports)">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Household survey completed at MTR and once in every year thereafter
</narrative></title> 
<baseline year="2008" iso-date="2008-12-24" value="Baseline survey done in 2010"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-12-24" />  <period-end iso-date="2018-06-29" />
<target value="4 (HH survey report at MTR in 2012, Project Evalua">


																	</target>

																	<actual value="4">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
PCMU to capture the results of the project components and submit report at MTR and at project closing
</narrative></title> 
<baseline year="2008" iso-date="2008-12-24" value="No results report"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-12-24" />  <period-end iso-date="2017-06-15" />
<target value="Project Completion report submitted at closing">


																	</target>

																	<actual value="Final report on results submitted">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Support Strategic study and detailed design for a pilot project identified during project implementation
</narrative></title> 
<baseline year="2008" iso-date="2008-12-24" value="No study"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-12-24" />  <period-end iso-date="2015-12-14" />
<target value="Strategic studies and detailed designs carried out">


																	</target>

																	<actual value="Support Strategic study and detailed design for a ">


																	</actual>

																	</period>
</indicator>
</result></iati-activity><iati-activity last-updated-datetime="2026-10-15T14:17:39"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P149629</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>Enhancing Spatial Data for Flood Risk Management Project</narrative>
       </title>
       <description type="1">
       <narrative>To increase the capacity of Mozambique to prepare for and manage flood events in the Limpopo and Zambezi River basins.  </narrative>
	   </description><participating-org ref="CH-4" type="10" role="1" >
       <narrative>Swiss Agency for Development and Cooperation (SDC) </narrative>
       </participating-org><participating-org ref="GB-GOV-1" type="10" role="1" >
       <narrative>UK - Department for International Development (DFID) </narrative>
       </participating-org><participating-org ref="TF070868" type="40" role="4" >
       <narrative>Callable Funds for the Standby Recovery Financing Facility of the Global Facility for Disaster Reduction and Recovery (GFDRR) </narrative>
       </participating-org><participating-org ref="TF518001" type="10" role="1" >
       <narrative>Italy - Ministry of Foreign Affairs International Cooperation </narrative>
       </participating-org><participating-org ref="TF522009" type="10" role="1" >
       <narrative>Brazil - Ministry of External Relations </narrative>
       </participating-org><participating-org ref="TF535006" type="10" role="1" >
       <narrative>Development Cooperation and Humanitarian Affairs </narrative>
       </participating-org><participating-org ref="XM-DAC-3-1" type="10" role="1" >
       <narrative>MINISTRY OF FOREIGN AFFAIRS </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2014-03-03"></activity-date><activity-date type="2"  iso-date= "2014-03-03"></activity-date><activity-date type="3"  iso-date= "2017-12-31"></activity-date><activity-date type="4"  iso-date= "2018-02-01"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Ms Shelley Mcmillan</narrative>
       </person-name>
       <job-title>
       <narrative></narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email>smcmillan@worldbank.org</email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="4"></activity-scope>  <recipient-country code="MZ">     <narrative>MOZAMBIQUE</narrative>
       </recipient-country> <sector code="14010"  vocabulary="1" percentage="70.00">
       <narrative>+![cdata[Water sector policy and administrative management]]+</narrative>
       </sector> <sector code="15110"  vocabulary="1" percentage="15.00">
       <narrative>+![cdata[Public sector policy and administrative management]]+</narrative>
       </sector> <sector code="21010"  vocabulary="1" percentage="15.00">
       <narrative>+![cdata[Transport policy and administrative management]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2014-03-03"></period-start> 
       <period-end iso-date="2017-12-31"> </period-end>
       <value currency="USD" value-date="2026-03-31">7279602.70 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">139445.93  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF070868">
       <narrative>Callable Funds for the Standby Recovery Financing Facility of the Global Facility for Disaster Reduction and Recovery (GFDRR)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P149629">
       <narrative>MOZAMBIQUE</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">7140156.77  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF070868">
       <narrative>Callable Funds for the Standby Recovery Financing Facility of the Global Facility for Disaster Reduction and Recovery (GFDRR)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P149629">
       <narrative>MOZAMBIQUE</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">7243271.49  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P149629">
       <narrative>MOZAMBIQUE</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">125567.36  </value>
		   <description>
       <narrative>Cumulative Expenditures to Bank executed activities - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P149629">
       <narrative>MOZAMBIQUE</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF070868" type="1"></related-activity><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Female Beneficiaries (Percentage, Core Supplement)
</narrative></title> 
<baseline year="2014" iso-date="2014-06-20" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2014-06-20" />  <period-end iso-date="2017-06-30" />
<target value="192480.00">


																	</target>

																	<actual value="575066.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Number of which are women
</narrative></title> 
<baseline year="2014" iso-date="2014-06-20" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2014-06-20" />  <period-end iso-date="2017-06-30" />
<target value="11.00">


																	</target>

																	<actual value="11.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Staff trained in Lidar processing and data management for the Zambezi
</narrative></title> 
<baseline year="2014" iso-date="2014-06-20" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2014-06-20" />  <period-end iso-date="2017-06-30" />
<target value="25.00">


																	</target>

																	<actual value="50.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Number of which are women
</narrative></title> 
<baseline year="2014" iso-date="2014-06-20" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2014-06-20" />  <period-end iso-date="2017-06-30" />
<target value="11.00">


																	</target>

																	<actual value="11.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Staff trained in Lidar processing and data management from Limpopo
</narrative></title> 
<baseline year="2014" iso-date="2014-06-20" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2014-06-20" />  <period-end iso-date="2017-06-30" />
<target value="25.00">


																	</target>

																	<actual value="50.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="1">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Direct project beneficiaries
</narrative></title> 
<baseline year="2014" iso-date="2014-06-20" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2014-06-20" />  <period-end iso-date="2017-06-30" />
<target value="320800.00">


																	</target>

																	<actual value="1035304.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Improved accuracy of areas &amp; pop. at risk of 100-year flood in the Limpopo and Zambezi with improvement to EWS
</narrative></title> 
<baseline year="2014" iso-date="2014-06-20" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2014-06-20" />  <period-end iso-date="2017-06-30" />
<target value="100.00">


																	</target>

																	<actual value="100.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Geospatial data stored and managed for the Zambezi
</narrative></title> 
<baseline year="2014" iso-date="2014-06-20" value="No storage &amp; mgmt. system in place"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2014-06-20" />  <period-end iso-date="2017-06-30" />
<target value="Data utilized through network across agencies">


																	</target>

																	<actual value="Data storage system under installation">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Airborne survey data collected for the Zambezi
</narrative></title> 
<baseline year="2014" iso-date="2014-06-20" value="No LiDAR data available"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2014-06-20" />  <period-end iso-date="2017-06-30" />
<target value="Pre and post processing of data complete">


																	</target>

																	<actual value="Pre and post">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Geospatial data stored and managed for the Limpopo
</narrative></title> 
<baseline year="2014" iso-date="2014-06-20" value="No storage &amp; mgmt. system in place"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2014-06-20" />  <period-end iso-date="2017-06-30" />
<target value="Data utilized through network across agencies">


																	</target>

																	<actual value="System under installation">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Airborne survey data collected for the Limpopo
</narrative></title> 
<baseline year="2014" iso-date="2014-06-20" value="Limited Lidar data available"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2014-06-20" />  <period-end iso-date="2017-06-30" />
<target value="Pre and post processing of data complete">


																	</target>

																	<actual value="Pre and post processing of data complete">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Multi-sector ‘uptake’ of Zambezi Lidar data for applications other than WRM and DRM
</narrative></title> 
<baseline year="2014" iso-date="2014-06-20" value="No"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2014-06-20" />  <period-end iso-date="2017-06-30" />
<target value="Yes">


																	</target>

																	<actual value="Yes">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
New geospatial Zambezi data available for public
</narrative></title> 
<baseline year="2014" iso-date="2014-06-20" value="No"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2014-06-20" />  <period-end iso-date="2017-06-30" />
<target value="Yes">


																	</target>

																	<actual value="Yes">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Data transferred from contractor to client for the Zambezi
</narrative></title> 
<baseline year="2014" iso-date="2014-06-20" value="No"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2014-06-20" />  <period-end iso-date="2017-06-30" />
<target value="Yes">


																	</target>

																	<actual value="Yes">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Multi-sector ‘uptake’ of Limpopo Lidar data for applications other than WRM and DRM
</narrative></title> 
<baseline year="2014" iso-date="2014-06-20" value="No"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2014-06-20" />  <period-end iso-date="2017-06-30" />
<target value="Yes">


																	</target>

																	<actual value="Yes">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
New geospatial Limpopo data available for public
</narrative></title> 
<baseline year="2014" iso-date="2014-06-20" value="No"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2014-06-20" />  <period-end iso-date="2017-06-30" />
<target value="Yes">


																	</target>

																	<actual value="Yes">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Flood risk identification improved through the incorporation of new geospatial data in the Limpopo and Zambezi basin plans
</narrative></title> 
<baseline year="2014" iso-date="2014-06-20" value="No"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2014-06-20" />  <period-end iso-date="2017-06-30" />
<target value="Yes">


																	</target>

																	<actual value="Yes">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Data transferred from contractor to client for the Limpopo
</narrative></title> 
<baseline year="2014" iso-date="2014-06-20" value="No"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2014-06-20" />  <period-end iso-date="2017-06-30" />
<target value="Yes">


																	</target>

																	<actual value="Yes">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Horizontal resolution of DEMs used for Zambezi
</narrative></title> 
<baseline year="2014" iso-date="2014-06-20" value="9000.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2014-06-20" />  <period-end iso-date="2017-06-30" />
<target value="15.00">


																	</target>

																	<actual value="1.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Horizontal resolution of DEMs used for Limpopo
</narrative></title> 
<baseline year="2014" iso-date="2014-06-20" value="9000.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2014-06-20" />  <period-end iso-date="2017-06-30" />
<target value="15.00">


																	</target>

																	<actual value="1.00">


																	</actual>

																	</period>
</indicator>
</result></iati-activity></iati-activities>